EPWU 2013-14 Strategic Planning Slide Show

download EPWU 2013-14 Strategic Planning Slide Show

of 64

Transcript of EPWU 2013-14 Strategic Planning Slide Show

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    1/64

    Strategic Plan forMarch 2013 to February 2014

    October 11 & 12, 2012

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    2/64

    Strategic Planning Meetings

    EPWU Executive Staff Mtg. Aug. 16

    PSB Meeting Oct. 11 & 12

    Approval of Strategic Plan Nov. 14

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    3/64

    Strategic Planning Goals

    Outlines what has to be done, who is going to do it, andwhen it will be accomplished (road map that needs to beflexible)

    Identifies ways that the organization can reduce costs,complete programs more efficiently, and identify andaddresses new initiatives

    Five year plan that is updated annually

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    4/64

    Implementation of Strategic Plan

    President/CEO incorporates the goals and objectivesinto work plans and evaluates employees

    performances.

    EPWU staff continuously addresses the goals and

    objectives and prepares progress reports.

    Periodic and special reports are provided to thePublic Service Board.

    EPWUs strives to exceed the best public and private

    utility standards and regulatory benchmarks.

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    5/64

    Strategic Issues

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    6/64

    Strategic Issues for 2013/2014

    Drought

    Population Growth

    System Reliability

    Energy

    Land Management

    Transition of

    President/CEO

    Financial Planning

    StormwaterManagement

    Communications andConservation

    Government/Policy

    Research

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    7/64

    Operations & Technical Services

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    8/64

    Principal Drivers

    Drought

    Water Resources

    Energy Stormwater Management

    Aging Infrastructure

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    9/64

    Drought

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    10/64

    Available Water at Elephant Butte for the Region

    50%

    40%

    30%

    20%

    10%

    0% End of Season 0.2% of capacity

    ThousandAcre-Feet

    Beginning of Season 11% of capacity

    1,200

    1,000

    800

    600

    400

    200

    0

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    11/64

    Drought - Outlook

    Outlook Surface water allotment uncertain

    Budget target 25,000 acre feet allotment

    Redundancy of water supply Goal of maintaining 160MGD ready

    groundwater and desalination supplies

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    12/64

    Peak Water DemandCalendar Year

    149.5

    159.5

    169.5

    179.5

    189.5

    199.5

    1990

    1991

    1992

    1993

    1994

    1995

    1996

    1997

    1998

    1999

    2000

    2001

    2002

    2003

    2004

    2005

    2006

    2007

    2008

    2009

    2010

    2011

    2012

    MillionGallons

    195

    163

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    13/64

    EPWU Peak Monthly Daily Demand

    2005 2006 2007 2008 2009 2010 2011 2012

    June July August

    170

    MGD

    Year

    160

    150

    140

    130

    120

    110

    100

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    14/64

    Drought - Response

    Projects underway Paisano line Partello line (Northeast/Central) Shearman pump station modifications

    Wellhead RO re-drilling

    Recommended Projects Immediate well drilling program

    EPEC (2), Other EPWU Customers (2) FY13/14 larger well drilling program Additional storage for valley pressure zone

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    15/64

    Paisano Valley Line

    Existing Line

    Proposed Line

    Will Carry Groundwater from Wells in Canutilloto Downtown and Near West El Paso

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    16/64

    Northeast/Central Drought ProjectWill Carry Groundwater from Wells in Northeast El Paso

    to Central El Paso and Near Eastside

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    17/64

    CanutilloWell Field

    CanalWTP

    ValleyWells

    RogersWTP

    WestPressure

    Zones

    16 MGDPaisano

    NE PressureZones

    Airport/MontanaPressure Zones

    Wells Wells

    Desal Plant

    6 MGD

    Partello15 MGD

    Shearman10 MGD

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    18/64

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    19/64

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    20/64

    Water Resources

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    21/64

    Water Resources Region E Update

    Region E Plan update Basic assumptions require a fresh look The next official revision due in 2016 Drought strategies will be expedited

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    22/64

    0

    50,000

    100,000

    150,000

    200,000

    250,000

    2010 2020 2030 2040 2050 2060

    Water Management Strategies for EPWU and Projected Demands(2011 Plan)

    Dell City Groundwater

    Capitan Reef Groundwater

    Additional Conjunctive Use

    Recharge

    Agricultural Drain Water

    Additional Reclaimed Supply

    Additional Conservation

    Current Reclaimed Supply

    Conjunctive Use

    EPWU Demand

    Acre-feetper

    year

    Additional Water Management

    Strategies-year 2020

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    23/64

    Water Resources Current Planning

    Planning underway 2012/13 Indirect Potable Reuse Expansion of Jonathan W. Rogers water plant Agricultural drain water study of agricultural impacts Update importation cost estimate Mesilla model update Hueco Bolson solute model NW reclaimed water upgrade

    UTEP reclaimed water

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    24/64

    Northwest Reclaimed Water Upgrade

    Imagine the result 24

    Northwest

    Wastewater

    Treatment

    Plant

    Reclaimed

    Water System

    Pump Station

    Reclaimed

    Water

    System

    Cl2MF/NF

    pH

    BrineSolids

    HSO3 AcidRO

    Advanced Treatment System

    Reuse Water Influent to Pump Station

    NW WWTP Site

    Rio Grande

    Outfall

    To Haskell WWTP

    (discharge to MH located at NWWWTP)

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    25/64

    Water Resources Future Planning

    Projects to begin 2013/14 Phase II Partello line Additional storage for valley pressure zone Injection of treated surface water Additional conservation Additional reclaimed projects

    - Blackie Chesher- Rio Bosque

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    26/64

    Phase II Partello Line

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    27/64

    Injection of Treated Surface Water

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    28/64

    Blackie Chesher Project

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    29/64

    Bustamante / Rio Bosque

    Budgeted for a reclaimed water line from Bustamanteto Rio Bosque

    MOU with City and possible land swap involving

    Palisades to transfer Rio Bosque to PSB inventory

    Agreement of EPCWID#1

    Groundwater modeling beneath the Bosque

    Determination of how much water the Bosque requires Agreement with UTEP on the management of the

    Bosque

    2010 Irrigation Season Effluent Flow

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    30/64

    Fred Hervey

    3,630

    Uses

    3,630

    Available0

    Bustamante

    21,170

    Uses

    180

    EPCWID#1

    13,333

    Available7,660

    Northwest

    4,800

    Uses

    1,040

    EPCWID#1

    4,667

    Available0

    Haskell

    12,900

    Uses

    840

    EPCWID#1

    12,000

    Available60

    g

    Distribution

    42,500

    Transfer 2,240

    All units in acre feet

    Irrigation Season from February 15 to October 15Note, NW underfilled EPCWID#1 obligation by 907

    In Season Total 7,720

    1

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    31/64

    Fred Hervey

    1,826

    Uses

    1,826

    Available

    0 ac-ft

    Bustamante

    7,545

    Uses

    13

    EPCWID#1

    0

    Available

    7,532

    Northwest

    2,808

    Uses

    285

    EPCWID#1

    2,333

    Available

    189

    Haskell

    5,216

    Uses

    70

    EPCWID#1

    0

    Available

    5,146

    2009-10 Non-Irrigation Season1 Effluent Flow Distribution17,395 ac-ft

    All units in Acre-feet1Non-irrigation Season from October 16 to February 14

    Non-Season Total 12,867

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    32/64

    Bustamante Reclaimed

    Water Demands (af/y)

    Existing Customers 180

    Blackie Chesher Park 70

    Del Valle Elementary 70

    Del Valle High 60 Soccer fields 10

    Total 390

    Available 7840 (7660+180)

    Transfer to HRS 2000 IPR Project 4500

    Rio Bosque 950

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    33/64

    2010 2020 2030 2040 2050 2060

    Additional Conservation 3,000 7,000 11,000 16,000 22,000

    Additional Reclaimed Water Supply 2,000 10,000 15,000 20,000 24,000

    Bustamante Indirect Potable Reuse 10,000 10,000 10,000 10,000 10,000

    Recharge of Groundwater with Treated Surface Water 8,000 9,000 10,000 11,000 12,000

    Desalination of Agriculture Drain Water 2,700 2,700 5,400 5,400 5,400

    Canal Plant Brackish Groundwater Desalination 2,500 2,500 2,500 2,500 2,500

    Lower Valley Brackish Groundwater Desalination 11,000 11,000 11,000 11,000 11,000

    Additional Conjunctive Use 5,000 15,000 20,000 20,000 20,000

    Groundwater from Capitan Reef 10,000 10,000 10,000

    Groundwater From Dell City Area 10,000 20,000

    Total Proposed Additional Supply for EPWU 0 44,200 67,200 94,900 115,900 136,900

    Potential Water Management Strategies(in acre feet)

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    34/64

    Water Resources Next Steps

    In order to develop these sources, thefollowing must happen

    TCEQ permitting of Indirect Potable Reuse projects Additional groundwater modeling

    Sustained yield of Mesilla Bolson Yield of Hueco Bolson under changing circumstances

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    35/64

    Stormwater Management

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    36/64

    Stormwater Management

    Drainage Design Manual (DDM) update iscomplete Pending Crabtree Group, Inc. work on NW Master plan

    to incorporate any of their ideas Extensive public approval process next

    Copia Pond(25 ac-ft)

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    37/64

    Dallas PS170 cfs

    San Diego Pond(6 ac-ft)

    Added Q toExisting Ponds

    (7 ac-ft)

    (25 ac-ft)

    Morenci Pond(28 ac-ft)Houston Pond(27 ac-ft)

    Armendariz Pond(6 ac-ft) Magnolia

    Pond(9 ac-ft) Magnolia

    SystemCebadaSystem

    Gateway Pond(11 ac-ft)

    175 cfs

    Channel 938 cfs

    3,031 cfs

    Cebada Pond(7 ac-ft)

    590 cfs

    Cebada PS

    785 cfs

    300 cfs

    B&B Report 540 cfsURS Report cfs max

    Exist 205-260 cfs

    LowerMagnolia Pond(14 cfs / 28 cfs) Magnolia PS

    (175 cfs)

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    38/64

    Energy

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    39/64

    Process Efficiency

    Wastewater Completing Roberto Bustamante wastewater treatment

    plant analysis Starting Haskell Street wastewater treatment plant

    analysis Feasibility of chemical addition at all plants Initiating Bustamante efficiency design

    Water

    Derceto energy management system implementation Programmatic improvements to SCADA Replacement of leak detection system

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    40/64

    Energy - Outlook

    Gas Stable low pricing

    Electricity EPEC no increase Backup generation subject to bond issuance Drought makes KBH loads critical Solar still not economical

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    41/64

    Aging Infrastructure

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    42/64

    Aging Water Well Infrastructure EPWU routinely uses wells that are over 50 years old Evaluation of well construction materials and age of

    well to develop a systematic replacement plan

    Maintaining current well capacity (Replacement ofold wells)

    Additional well capacity from new wells to meet futuredemand

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    43/64

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    44/64

    Rehabilitation-Deferred ProjectsPROJECT NAME COST

    Planned Sewer Line Phase 3 $2,500,000

    Planned Water Line Phase 8 $2,440,880

    Planned Water Line Phase 9 $1,131,400

    Planned Water Line Phase 10 $1,060,250Planned Water Line Phase 11 $ 800,000

    Mesa-Crestmont 24Water Line $1,000,000

    Lone Star Force Main $ 430,000

    Boone Siphon Rehab $ 180,000

    Total $9,542,530

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    45/64

    Strategic, Financial &Management Services

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    46/64

    Financial Planning

    Rate increases Continued drought and emphasis on conservation will likely

    decrease revenue Maintaining bond ratings

    Debt service coverage at 2X

    Need to increase cash reserves Additional revenue will be needed to fund major water supply

    projects Reserve fund needed for major water supply projects

    Continue to take advantage of low interest rate

    environment by refunding bonds and buildinginfrastructure

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    47/64

    Land Management

    Phasing of master planned land Need to budget for infrastructure needed to serve the

    development Land management in accordance with revised City/PSB

    Land MOU Proactive approach to land management Annual declaration of inexpedient land City involved earlier in process

    Biannual report to City Council

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    48/64

    Human Resources

    Transition of President/CEO Succession Planning

    Many employees, including key managers, will beeligible for retirement within the next 1-5 years.

    Recruitment Would like to make amendments to City Charter

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    49/64

    Information Technology

    Maximize use of systems Cloud technology Access to date thru technology

    Shift from traditional IT infrastructure to an always-on,

    work anytime, anywhere environment Standardize SCADA system Continue following the recommendations in the IT

    Strategic Plan

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    50/64

    Customer Service

    Automated Meter Reading (AMR) Implement for new development in master planned

    communities

    Call Center and Emergency Response DispatchAnalysis

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    51/64

    Out of City Projects,Research, Government Affairs

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    52/64

    Out of City Services Colonias

    Approach the Border Environment CooperationCommission (BECC) about funding to update CountyMaster Plan

    Identify funding for remaining Colonias

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    53/64

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    54/64

    Research

    Define and identify CHIWAWA priorities CHIWAWA Concentrate Management Policy Analysis

    Project In progress with WateReuse and Water Research

    Foundation funds Could allow for opportunities to develop additional

    desal projects Possible additional research projects

    Triple bottom line analysis of desalination versusconventional water treatment

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    55/64

    State Legislative Session in 2013

    Water Conservation (reduce consumption - statewide) Implementation of State Water Plan (regional solutions) Desalination (concentrate disposal issues) Energy/Water (State monitoring Fed. Legislation for

    increased barriers, regulations, fees, etc.) Taxes (Revenue Generation, Education, increased sales

    tax, etc.) Expanded SRF Program

    Solar Power (not a priority)

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    56/64

    Government/Legislative

    Agendas to include: Federal:

    Water supply projects Providing reclaimed water to UTEP, Blackie Chesher

    Park, others State:

    Legislative Agenda Defense Funding for the State Water Plan Inclusion of water supply costs when charging impact

    fee City:

    - Possible assumption of Rio Bosque Park- Transfer of Palisades to City

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    57/64

    Conservation &Communications

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    58/64

    Per Capita Consumption

    120

    130

    140

    150

    160

    170

    180

    190

    200

    210

    220

    230

    1985

    1987

    1989

    1991

    1993

    1995

    1997

    1999

    2001

    2003

    2005

    2007

    2009

    2011

    2012

    2013

    GPCD

    Water ConservationOrdinance Adopted

    Year 2010 Goal 140 gpcd

    Goal for 2020 130 gpcd

    2012135 gpcdYear 2000 Goal 160 gpcd

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    59/64

    Conservation Goals 2013-14

    Decrease consumption Enforcement of water conservation ordinance to

    achieve compliance and increase awareness Voluntary reduction through conservation education

    campaign Convene Water Conservation Advisory Committee

    Water Smart Home Revisions to drought and water management rule

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    60/64

    Conservation Goals 2013-14

    Increase our visibility that fosters exposure of TecH2Oto the region Increase attendance Robust events and workshops schedule

    Maintain the quality and manage the quantity of oureducational programs

    Increase attendance and exposure of satellite facilities Increase revenue and funding streams that support our

    goals

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    61/64

    Communications Update

    Increased awareness of EPWU programs and initiatives Media relations and special events Social Media

    Twitter YouTube Facebook

    26,957 El Paso residents reached Website

    Increased visits to conservation page by 75%

    Public education campaigns Conservation Less is the New More Stormwater (Illegal dumping and system

    improvements)

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    62/64

    Communications Goals 2013-14

    Keep customers at our website Re-design

    More user-friendly, simplified Make website a true marketing tool

    More updated information Increased IT support

    Continue public education campaigns Conservation (increased efforts) Stormwater (Illegal Dumping and System

    Improvements) Sustainability

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    63/64

    Public Comment

  • 7/31/2019 EPWU 2013-14 Strategic Planning Slide Show

    64/64

    Next Steps

    Review and agreement on parking lot items

    Tomorrow's session

    Final Outcomes and Report