Epc for module mm1 mm2 baseline schedule level 3

72
Activity ID Activity Name Original Duration Start Finish 0 TC2A - Man 0 TC2A - Manifolding Topsides Modules-(baseline) 333 13-Mar-15 08-Apr-16 0.D.26 Process 0.D.26 Process System 333 13-Mar-15 08-Apr-16 0.D.26.0000 Sub 0.D.26.0000 Sub System Code Level 333 13-Mar-15 08-Apr-16 0.D.26.0000.MM1 M 0.D.26.0000.MM1 MM1-Manifold and Pigging 333 13-Mar-15 08-Apr-16 0.D.26.0000.MM1.A 0.D.26.0000.MM1.A Milestone 333 13-Mar-15 08-Apr-16 MM1-10010 Effective date (LOI) 0 13-Mar-15* MM1-101000 Commence Basic & Detail Engineering Modules MM1 0 13-Mar-15* MM1-101040 HAZID Review Workshop 0 23-Mar-15* MM1-101060 HAZOP Review Workshop 0 27-Apr-15* MM1-101080 Commence Fab Modules MM1 0 17-Sep-15 MM1-101020 Completion Basic & Detail Engineering Modules MM1 0 23-Sep-15* MM1-10070 MCD for MM1 0 24-Mar-16* MM1-10090 Commence Load-out Modules MM1 0 26-Mar-16* MM1-101100 Modules MM1 available at Singapore Yard 0 08-Apr-16* 0.D.26.0000.MM1.B 0.D.26.0000.MM1.B Engineering 327 13-Mar-15 01-Apr-16 0.D.26.0000.MM1. 0.D.26.0000.MM1.B.0 General 321 13-Mar-15 01-Apr-16 0.D.26.0000.MM1 0.D.26.0000.MM1.B.0.92 PTSC 321 13-Mar-15 01-Apr-16 MM1-10130 General for PMT (Meeting, Project Management, Project Coordinati 321 13-Mar-15 01-Apr-16 MM1-1305-PT-00 MM1 & MM2 - Detailed Engineering Execution Plan 40 13-Mar-15 29-Apr-15 MM1-1305-PT-00 MM1 & MM2 - Detailed Engineering Execution Plan-IDC 8 13-Mar-15* 21-Mar-15 MM1-1305-PT-00 MM1 & MM2 - Detailed Engineering Execution Plan-IFR 6 23-Mar-15 28-Mar-15 MM1-1305-PT-00 MM1 & MM2 - Detailed Engineering Execution Plan-IFD 11 30-Mar-15 10-Apr-15 MM1-1305-PT-00 MM1 & MM2 - Detailed Engineering Execution Plan-IFC 15 11-Apr-15 29-Apr-15 MM1-1305-PT-00 MM1 & MM2 - Detailed Engineering Coordination Procedure 31 13-Mar-15 17-Apr-15 MM1-1305-PT-00 MM1 & MM2 - Detailed Engineering Coordination Procedure-IDC 8 13-Mar-15* 21-Mar-15 MM1-1305-PT-00 MM1 & MM2 - Detailed Engineering Coordination Procedure-IFR 6 23-Mar-15 28-Mar-15 MM1-1305-PT-00 MM1 & MM2 - Detailed Engineering Coordination Procedure-IFD 0 30-Mar-15 30-Mar-15 MM1-1305-PT-00 MM1 & MM2 - Detailed Engineering Coordination Procedure-IFC 17 30-Mar-15 17-Apr-15 0.D.26.0000.MM1. 0.D.26.0000.MM1.B.9 3D Modelling 65 12-May-15 25-Jul-15 0.D.26.0000.MM1 0.D.26.0000.MM1.B.9.92 PTSC 65 12-May-15 25-Jul-15 MM1-1305-PT-00 MM1 & MM2 - PDMS 30% model review report 17 12-May-15 30-May-15 MM1-1305-PT-00 MM1 & MM2 - PDMS 30% model review report-IDC 7 12-May-15* 19-May-15 MM1-1305-PT-00 MM1 & MM2 - PDMS 30% model review report-IFR 4 20-May-15 23-May-15 MM1-1305-PT-00 MM1 & MM2 - PDMS 30% model review report-IFD 0 25-May-15 25-May-15 MM1-1305-PT-00 MM1 & MM2 - PDMS 30% model review report-IFC 6 25-May-15 30-May-15 MM1-1305-PT-00 MM1 & MM2 - PDMS 60% model review report 17 09-Jun-15 27-Jun-15 MM1-1305-PT-00 MM1 & MM2 - PDMS 60% model review report-IDC 7 09-Jun-15* 16-Jun-15 MM1-1305-PT-00 MM1 & MM2 - PDMS 60% model review report-IFR 4 17-Jun-15 20-Jun-15 MM1-1305-PT-00 MM1 & MM2 - PDMS 60% model review report-IFD 0 22-Jun-15 22-Jun-15 MM1-1305-PT-00 MM1 & MM2 - PDMS 60% model review report-IFC 6 22-Jun-15 27-Jun-15 MM1-1305-PT-00 MM1 & MM2 - PDMS 90% model review report 17 07-Jul-15 25-Jul-15 MM1-1305-PT-00 MM1 & MM2 - PDMS 90% model review report -IDC 7 07-Jul-15* 14-Jul-15 n Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun 2015 2016 Effective date (LOI) Commence Basic & Detail Engineering Modules MM1 HAZID Review Workshop HAZOP Review Workshop Commence Fab Modules MM1 Completion Basic & Detail Engineering Modules MM MCD for MM1 Commence Lo Modules MM Ghana OCTP Development Project, FPSO EPC for Module MM1 & MM2 Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Milestone Su mma ry Schedule Level 3 Page 1 of 72 Date Revision Checked Ap pro ve d 28-Mar-15 Baseline Schedule Level 3

Transcript of Epc for module mm1 mm2 baseline schedule level 3

Activity ID Activity Name OriginalDuration

Start Finish

0 TC2A - Manifolding Topsides Modules-(baseline)0 TC2A - Manifolding Topsides Modules-(baseline) 333 13-Mar-15 08-Apr-16

0.D.26 Process System0.D.26 Process System 333 13-Mar-15 08-Apr-16

0.D.26.0000 Sub System Code Level0.D.26.0000 Sub System Code Level 333 13-Mar-15 08-Apr-160.D.26.0000.MM1 MM1-Manifold and Pigging0.D.26.0000.MM1 MM1-Manifold and Pigging 333 13-Mar-15 08-Apr-160.D.26.0000.MM1.A Milestone0.D.26.0000.MM1.A Milestone 333 13-Mar-15 08-Apr-16MM1-10010 Effective date (LOI) 0 13-Mar-15*MM1-101000 Commence Basic & Detail Engineering Modules MM1 0 13-Mar-15*MM1-101040 HAZID Review Workshop 0 23-Mar-15*MM1-101060 HAZOP Review Workshop 0 27-Apr-15*MM1-101080 Commence Fab Modules MM1 0 17-Sep-15MM1-101020 Completion Basic & Detail Engineering Modules MM1 0 23-Sep-15*MM1-10070 MCD for MM1 0 24-Mar-16*MM1-10090 Commence Load-out Modules MM1 0 26-Mar-16*MM1-101100 Modules MM1 available at Singapore Yard 0 08-Apr-16*

0.D.26.0000.MM1.B Engineering0.D.26.0000.MM1.B Engineering 327 13-Mar-15 01-Apr-160.D.26.0000.MM1.B.0 General0.D.26.0000.MM1.B.0 General 321 13-Mar-15 01-Apr-160.D.26.0000.MM1.B.0.92 PTSC0.D.26.0000.MM1.B.0.92 PTSC 321 13-Mar-15 01-Apr-16MM1-10130 General for PMT (Meeting, Project Management, Project Coordination, Engineering review, etc)321 13-Mar-15 01-Apr-16MM1-1305-PT-00-A-TB-00001MM1 & MM2 - Detailed Engineering Execution Plan 40 13-Mar-15 29-Apr-15MM1-1305-PT-00-A-TB-00001-1MM1 & MM2 - Detailed Engineering Execution Plan-IDC 8 13-Mar-15* 21-Mar-15MM1-1305-PT-00-A-TB-00001-2MM1 & MM2 - Detailed Engineering Execution Plan-IFR 6 23-Mar-15 28-Mar-15MM1-1305-PT-00-A-TB-00001-3MM1 & MM2 - Detailed Engineering Execution Plan-IFD 11 30-Mar-15 10-Apr-15MM1-1305-PT-00-A-TB-00001-4MM1 & MM2 - Detailed Engineering Execution Plan-IFC 15 11-Apr-15 29-Apr-15MM1-1305-PT-00-A-KA-00001MM1 & MM2 - Detailed Engineering Coordination Procedure 31 13-Mar-15 17-Apr-15MM1-1305-PT-00-A-KA-00001-1MM1 & MM2 - Detailed Engineering Coordination Procedure-IDC 8 13-Mar-15* 21-Mar-15MM1-1305-PT-00-A-KA-00001-2MM1 & MM2 - Detailed Engineering Coordination Procedure-IFR 6 23-Mar-15 28-Mar-15MM1-1305-PT-00-A-KA-00001-3MM1 & MM2 - Detailed Engineering Coordination Procedure-IFD 0 30-Mar-15 30-Mar-15MM1-1305-PT-00-A-KA-00001-4MM1 & MM2 - Detailed Engineering Coordination Procedure-IFC 17 30-Mar-15 17-Apr-15

0.D.26.0000.MM1.B.9 3D Modelling0.D.26.0000.MM1.B.9 3D Modelling 65 12-May-15 25-Jul-150.D.26.0000.MM1.B.9.92 PTSC0.D.26.0000.MM1.B.9.92 PTSC 65 12-May-15 25-Jul-15MM1-1305-PT-00-L-RA-00001MM1 & MM2 - PDMS 30% model review report 17 12-May-15 30-May-15MM1-1305-PT-00-L-RA-00001-1MM1 & MM2 - PDMS 30% model review report-IDC 7 12-May-15* 19-May-15MM1-1305-PT-00-L-RA-00001-2MM1 & MM2 - PDMS 30% model review report-IFR 4 20-May-15 23-May-15MM1-1305-PT-00-L-RA-00001-3MM1 & MM2 - PDMS 30% model review report-IFD 0 25-May-15 25-May-15MM1-1305-PT-00-L-RA-00001-4MM1 & MM2 - PDMS 30% model review report-IFC 6 25-May-15 30-May-15MM1-1305-PT-00-L-RA-00002MM1 & MM2 - PDMS 60% model review report 17 09-Jun-15 27-Jun-15MM1-1305-PT-00-L-RA-00002-1MM1 & MM2 - PDMS 60% model review report-IDC 7 09-Jun-15* 16-Jun-15MM1-1305-PT-00-L-RA-00002-2MM1 & MM2 - PDMS 60% model review report-IFR 4 17-Jun-15 20-Jun-15MM1-1305-PT-00-L-RA-00002-3MM1 & MM2 - PDMS 60% model review report-IFD 0 22-Jun-15 22-Jun-15MM1-1305-PT-00-L-RA-00002-4MM1 & MM2 - PDMS 60% model review report-IFC 6 22-Jun-15 27-Jun-15MM1-1305-PT-00-L-RA-00003MM1 & MM2 - PDMS 90% model review report 17 07-Jul-15 25-Jul-15MM1-1305-PT-00-L-RA-00003-1MM1 & MM2 - PDMS 90% model review report -IDC 7 07-Jul-15* 14-Jul-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Effective date (LOI)Commence Basic & Detail Engineering Modules MM1

HAZID Review WorkshopHAZOP Review Workshop

Commence Fab Modules MM1Completion Basic & Detail Engineering Modules MM1

MCD for MM1Commence Load-out Modules MM1

Modules MM1 available at Singapore Yard

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 1 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-00-L-RA-00003-2MM1 & MM2 - PDMS 90% model review report -IFR 4 15-Jul-15 18-Jul-15MM1-1305-PT-00-L-RA-00003-3MM1 & MM2 - PDMS 90% model review report -IFD 0 20-Jul-15 20-Jul-15MM1-1305-PT-00-L-RA-00003-4MM1 & MM2 - PDMS 90% model review report -IFC 6 20-Jul-15 25-Jul-15

0.D.26.0000.MM1.B.S Process & Systems0.D.26.0000.MM1.B.S Process & Systems 79 13-Mar-15 16-Jun-150.D.26.0000.MM1.B.S.92 PTSC0.D.26.0000.MM1.B.S.92 PTSC 79 13-Mar-15 16-Jun-15MM1-1305-PT-30-P-FD-00001MM1 & MM2 - Basic Design Data 47 13-Mar-15 09-May-15MM1-1305-PT-30-P-FD-00001-1MM1 & MM2 - Basic Design Data-IDC 9 13-Mar-15* 23-Mar-15MM1-1305-PT-30-P-FD-00001-2MM1 & MM2 - Basic Design Data-IFR 7 24-Mar-15 31-Mar-15MM1-1305-PT-30-P-FD-00001-3MM1 & MM2 - Basic Design Data-IFD 13 01-Apr-15 15-Apr-15MM1-1305-PT-30-P-FD-00001-4MM1 & MM2 - Basic Design Data-IFC 18 16-Apr-15 09-May-15MM1-1305-PT-30-P-RA-00001MM1 & MM2 - Report - HYSYS Simulation 48 13-Mar-15 11-May-15MM1-1305-PT-30-P-RA-00001-1MM1 & MM2 - Report - HYSYS Simulation-IDC 1 13-Mar-15* 13-Mar-15MM1-1305-PT-30-P-RA-00001-2MM1 & MM2 - Report - HYSYS Simulation-IFR 17 14-Mar-15 02-Apr-15MM1-1305-PT-30-P-RA-00001-3MM1 & MM2 - Report - HYSYS Simulation-IFD 13 03-Apr-15 17-Apr-15MM1-1305-PT-30-P-RA-00001-4MM1 & MM2 - Report - HYSYS Simulation-IFC 17 18-Apr-15 11-May-15MM1-1305-PT-30-P-RA-00002MM1 & MM2 - Report - Line Sizing 55 03-Apr-15 09-Jun-15MM1-1305-PT-30-P-RA-00002-1MM1 & MM2 - Report - Line Sizing-IDC 1 03-Apr-15* 03-Apr-15MM1-1305-PT-30-P-RA-00002-2MM1 & MM2 - Report - Line Sizing-IFR 21 04-Apr-15 29-Apr-15MM1-1305-PT-30-P-RA-00002-3MM1 & MM2 - Report - Line Sizing-IFD 13 02-May-15 16-May-15MM1-1305-PT-30-P-RA-00002-4MM1 & MM2 - Report - Line Sizing-IFC 20 18-May-15 09-Jun-15MM1-1305-PT-30-P-RA-00003MM1 & MM2 - Report - Utility Summary 40 22-Apr-15 10-Jun-15MM1-1305-PT-30-P-RA-00003-1MM1 & MM2 - Report - Utility Summary-IDC 1 22-Apr-15* 22-Apr-15MM1-1305-PT-30-P-RA-00003-2MM1 & MM2 - Report - Utility Summary-IFR 6 23-Apr-15 02-May-15MM1-1305-PT-30-P-RA-00003-3MM1 & MM2 - Report - Utility Summary-IFD 12 04-May-15 16-May-15MM1-1305-PT-30-P-RA-00003-4MM1 & MM2 - Report - Utility Summary-IFC 21 18-May-15 10-Jun-15MM1-1305-PT-30-P-CA-00001MM1 & MM2 - Calculation Note - Depressuring 44 23-Mar-15 15-May-15MM1-1305-PT-30-P-CA-00001-1MM1 & MM2 - Calculation Note - Depressuring -IDC 1 23-Mar-15* 23-Mar-15MM1-1305-PT-30-P-CA-00001-2MM1 & MM2 - Calculation Note - Depressuring -IFR 12 24-Mar-15 06-Apr-15MM1-1305-PT-30-P-CA-00001-3MM1 & MM2 - Calculation Note - Depressuring -IFD 13 07-Apr-15 21-Apr-15MM1-1305-PT-30-P-CA-00001-4MM1 & MM2 - Calculation Note - Depressuring -IFC 18 22-Apr-15 15-May-15MM1-1305-PT-30-P-CA-00002MM1 & MM2 - Calculation Note - PSV Sizing 44 07-Apr-15 30-May-15MM1-1305-PT-30-P-CA-00002-1MM1 & MM2 - Calculation Note - PSV Sizing -IDC 1 07-Apr-15* 07-Apr-15MM1-1305-PT-30-P-CA-00002-2MM1 & MM2 - Calculation Note - PSV Sizing -IFR 12 08-Apr-15 21-Apr-15MM1-1305-PT-30-P-CA-00002-3MM1 & MM2 - Calculation Note - PSV Sizing -IFD 10 22-Apr-15 06-May-15MM1-1305-PT-30-P-CA-00002-4MM1 & MM2 - Calculation Note - PSV Sizing -IFC 21 07-May-15 30-May-15MM1-1305-PT-30-P-XA-00001MM1 & MM2 - Process Flow Diagram (PFD) (4 Sheets) 69 13-Mar-15 04-Jun-15MM1-1305-PT-30-P-XA-00001-1MM1 & MM2 - Process Flow Diagram (PFD) (4 Sheets)-IDC 22 13-Mar-15* 07-Apr-15MM1-1305-PT-30-P-XA-00001-2MM1 & MM2 - Process Flow Diagram (PFD) (4 Sheets)-IFR 12 08-Apr-15 21-Apr-15MM1-1305-PT-30-P-XA-00001-3MM1 & MM2 - Process Flow Diagram (PFD) (4 Sheets)-IFD 14 22-Apr-15 11-May-15MM1-1305-PT-30-P-XA-00001-4MM1 & MM2 - Process Flow Diagram (PFD) (4 Sheets)-IFC 21 12-May-15 04-Jun-15MM1-1305-PT-30-P-XA-00002MM1 & MM2 - Utility Flow Diagram (UFD) (2 Sheets) 69 13-Mar-15 04-Jun-15MM1-1305-PT-30-P-XA-00002-1MM1 & MM2 - Utility Flow Diagram (UFD) (2 Sheets)-IDC 22 13-Mar-15* 07-Apr-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 2 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-30-P-XA-00002-2MM1 & MM2 - Utility Flow Diagram (UFD) (2 Sheets)-IFR 12 08-Apr-15 21-Apr-15MM1-1305-PT-30-P-XA-00002-3MM1 & MM2 - Utility Flow Diagram (UFD) (2 Sheets)-IFD 14 22-Apr-15 11-May-15MM1-1305-PT-30-P-XA-00002-4MM1 & MM2 - Utility Flow Diagram (UFD) (2 Sheets)-IFC 21 12-May-15 04-Jun-15MM1-1305-PT-30-P-XA-00003MM1 & MM2 - Material Selection Diagrams (3 Sheets) 69 13-Mar-15 04-Jun-15MM1-1305-PT-30-P-XA-00003-1MM1 & MM2 - Material Selection Diagrams (3 Sheets)-IDC 22 13-Mar-15* 07-Apr-15MM1-1305-PT-30-P-XA-00003-2MM1 & MM2 - Material Selection Diagrams (3 Sheets)-IFR 12 08-Apr-15 21-Apr-15MM1-1305-PT-30-P-XA-00003-3MM1 & MM2 - Material Selection Diagrams (3 Sheets)-IFD 14 22-Apr-15 11-May-15MM1-1305-PT-30-P-XA-00003-4MM1 & MM2 - Material Selection Diagrams (3 Sheets)-IFC 21 12-May-15 04-Jun-15MM1-1305-PT-30-P-XB-00001MM1 & MM2 - P&ID Riser Oil Production 1 - Pig Launcher And Reciever 69 13-Mar-15 04-Jun-15MM1-1305-PT-30-P-XB-00001-1MM1 & MM2 - P&ID Riser Oil Production 1 - Pig Launcher And Reciever -IDC22 13-Mar-15* 07-Apr-15MM1-1305-PT-30-P-XB-00001-2MM1 & MM2 - P&ID Riser Oil Production 1 - Pig Launcher And Reciever -IFR12 08-Apr-15 21-Apr-15MM1-1305-PT-30-P-XB-00001-3MM1 & MM2 - P&ID Riser Oil Production 1 - Pig Launcher And Reciever -IFD14 22-Apr-15 11-May-15MM1-1305-PT-30-P-XB-00001-4MM1 & MM2 - P&ID Riser Oil Production 1 - Pig Launcher And Reciever -IFC21 12-May-15 04-Jun-15MM1-1305-PT-30-P-XB-00002MM1 & MM2 - P&ID Riser Oil Production 2 - Pig Launcher And Reciever 69 13-Mar-15 04-Jun-15MM1-1305-PT-30-P-XB-00002-1MM1 & MM2 - P&ID Riser Oil Production 2 - Pig Launcher And Reciever -IDC22 13-Mar-15* 07-Apr-15MM1-1305-PT-30-P-XB-00002-2MM1 & MM2 - P&ID Riser Oil Production 2 - Pig Launcher And Reciever -IFR12 08-Apr-15 21-Apr-15MM1-1305-PT-30-P-XB-00002-3MM1 & MM2 - P&ID Riser Oil Production 2 - Pig Launcher And Reciever -IFD14 22-Apr-15 11-May-15MM1-1305-PT-30-P-XB-00002-4MM1 & MM2 - P&ID Riser Oil Production 2 - Pig Launcher And Reciever -IFC21 12-May-15 04-Jun-15MM1-1305-PT-30-P-XB-00003MM1 & MM2 - P&ID Riser Oil Production 3 - Pig Launcher And Reciever 69 13-Mar-15 04-Jun-15MM1-1305-PT-30-P-XB-00003-1MM1 & MM2 - P&ID Riser Oil Production 3 - Pig Launcher And Reciever -IDC22 13-Mar-15* 07-Apr-15MM1-1305-PT-30-P-XB-00003-2MM1 & MM2 - P&ID Riser Oil Production 3 - Pig Launcher And Reciever -IFR12 08-Apr-15 21-Apr-15MM1-1305-PT-30-P-XB-00003-3MM1 & MM2 - P&ID Riser Oil Production 3 - Pig Launcher And Reciever -IFD14 22-Apr-15 11-May-15MM1-1305-PT-30-P-XB-00003-4MM1 & MM2 - P&ID Riser Oil Production 3 - Pig Launcher And Reciever -IFC21 12-May-15 04-Jun-15MM1-1305-PT-30-P-XB-00004MM1 & MM2 - P&ID Riser Oil Production 4 - Pig Launcher And Reciever 69 13-Mar-15 04-Jun-15MM1-1305-PT-30-P-XB-00004-1MM1 & MM2 - P&ID Riser Oil Production 4 - Pig Launcher And Reciever -IDC22 13-Mar-15* 07-Apr-15MM1-1305-PT-30-P-XB-00004-2MM1 & MM2 - P&ID Riser Oil Production 4 - Pig Launcher And Reciever -IFR12 08-Apr-15 21-Apr-15MM1-1305-PT-30-P-XB-00004-3MM1 & MM2 - P&ID Riser Oil Production 4 - Pig Launcher And Reciever -IFD14 22-Apr-15 11-May-15MM1-1305-PT-30-P-XB-00004-4MM1 & MM2 - P&ID Riser Oil Production 4 - Pig Launcher And Reciever -IFC21 12-May-15 04-Jun-15MM1-1305-PT-30-P-XB-00005MM1 & MM2 - P&ID Riser Oil Production 5 - Pig Launcher And Reciever 69 13-Mar-15 04-Jun-15MM1-1305-PT-30-P-XB-00005-1MM1 & MM2 - P&ID Riser Oil Production 5 - Pig Launcher And Reciever-IDC 22 13-Mar-15* 07-Apr-15MM1-1305-PT-30-P-XB-00005-2MM1 & MM2 - P&ID Riser Oil Production 5 - Pig Launcher And Reciever-IFR 12 08-Apr-15 21-Apr-15MM1-1305-PT-30-P-XB-00005-3MM1 & MM2 - P&ID Riser Oil Production 5 - Pig Launcher And Reciever-IFD 14 22-Apr-15 11-May-15MM1-1305-PT-30-P-XB-00005-4MM1 & MM2 - P&ID Riser Oil Production 5 - Pig Launcher And Reciever-IFC 21 12-May-15 04-Jun-15MM1-1305-PT-30-P-XB-00006MM1 & MM2 - P&ID Riser Oil Production 6 - Pig Launcher And Reciever 69 13-Mar-15 04-Jun-15MM1-1305-PT-30-P-XB-00006-1MM1 & MM2 - P&ID Riser Oil Production 6 - Pig Launcher And Reciever-IDC 22 13-Mar-15* 07-Apr-15MM1-1305-PT-30-P-XB-00006-2MM1 & MM2 - P&ID Riser Oil Production 6 - Pig Launcher And Reciever-IFR 12 08-Apr-15 21-Apr-15MM1-1305-PT-30-P-XB-00006-3MM1 & MM2 - P&ID Riser Oil Production 6 - Pig Launcher And Reciever-IFD 14 22-Apr-15 11-May-15MM1-1305-PT-30-P-XB-00006-4MM1 & MM2 - P&ID Riser Oil Production 6 - Pig Launcher And Reciever-IFC 21 12-May-15 04-Jun-15MM1-1305-PT-30-P-XB-00007MM1 & MM2 - P&ID Riser Oil Production 7 - Pig Launcher And Reciever 69 13-Mar-15 04-Jun-15MM1-1305-PT-30-P-XB-00007-1MM1 & MM2 - P&ID Riser Oil Production 7 - Pig Launcher And Reciever-IDC 22 13-Mar-15* 07-Apr-15MM1-1305-PT-30-P-XB-00007-2MM1 & MM2 - P&ID Riser Oil Production 7 - Pig Launcher And Reciever-IFR 12 08-Apr-15 21-Apr-15MM1-1305-PT-30-P-XB-00007-3MM1 & MM2 - P&ID Riser Oil Production 7 - Pig Launcher And Reciever-IFD 14 22-Apr-15 11-May-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 3 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-30-P-XB-00007-4MM1 & MM2 - P&ID Riser Oil Production 7 - Pig Launcher And Reciever-IFC 21 12-May-15 04-Jun-15MM1-1305-PT-30-P-XB-00008MM1 & MM2 - P&ID HP Oil Production Manifold 69 13-Mar-15 04-Jun-15MM1-1305-PT-30-P-XB-00008-1MM1 & MM2 - P&ID HP Oil Production Manifold-IDC 22 13-Mar-15* 07-Apr-15MM1-1305-PT-30-P-XB-00008-2MM1 & MM2 - P&ID HP Oil Production Manifold-IFR 12 08-Apr-15 21-Apr-15MM1-1305-PT-30-P-XB-00008-3MM1 & MM2 - P&ID HP Oil Production Manifold-IFD 14 22-Apr-15 11-May-15MM1-1305-PT-30-P-XB-00008-4MM1 & MM2 - P&ID HP Oil Production Manifold-IFC 21 12-May-15 04-Jun-15MM1-1305-PT-30-P-XB-00009MM1 & MM2 - P&ID HHP Oil Production Manifold 69 13-Mar-15 04-Jun-15MM1-1305-PT-30-P-XB-00009-1MM1 & MM2 - P&ID HHP Oil Production Manifold-IDC 22 13-Mar-15* 07-Apr-15MM1-1305-PT-30-P-XB-00009-2MM1 & MM2 - P&ID HHP Oil Production Manifold-IFR 12 08-Apr-15 21-Apr-15MM1-1305-PT-30-P-XB-00009-3MM1 & MM2 - P&ID HHP Oil Production Manifold-IFD 14 22-Apr-15 11-May-15MM1-1305-PT-30-P-XB-00009-4MM1 & MM2 - P&ID HHP Oil Production Manifold-IFC 21 12-May-15 04-Jun-15MM1-1305-PT-30-P-XB-00010MM1 & MM2 - P&ID Gas Production Manifold (2 Sheets) 69 13-Mar-15 04-Jun-15MM1-1305-PT-30-P-XB-00010-1MM1 & MM2 - P&ID Gas Production Manifold (2 Sheets)-IDC 22 13-Mar-15* 07-Apr-15MM1-1305-PT-30-P-XB-00010-2MM1 & MM2 - P&ID Gas Production Manifold (2 Sheets)-IFR 12 08-Apr-15 21-Apr-15MM1-1305-PT-30-P-XB-00010-3MM1 & MM2 - P&ID Gas Production Manifold (2 Sheets)-IFD 14 22-Apr-15 11-May-15MM1-1305-PT-30-P-XB-00010-4MM1 & MM2 - P&ID Gas Production Manifold (2 Sheets)-IFC 21 12-May-15 04-Jun-15MM1-1305-PT-30-P-XB-00011MM1 & MM2 - P&ID Test Manifold 69 13-Mar-15 04-Jun-15MM1-1305-PT-30-P-XB-00011-1MM1 & MM2 - P&ID Test Manifold-IDC 22 13-Mar-15* 07-Apr-15MM1-1305-PT-30-P-XB-00011-2MM1 & MM2 - P&ID Test Manifold-IFR 12 08-Apr-15 21-Apr-15MM1-1305-PT-30-P-XB-00011-3MM1 & MM2 - P&ID Test Manifold-IFD 14 22-Apr-15 11-May-15MM1-1305-PT-30-P-XB-00011-4MM1 & MM2 - P&ID Test Manifold-IFC 21 12-May-15 04-Jun-15MM1-1305-PT-30-P-XB-00012MM1 & MM2 - P&ID Gas Injection Manifold 69 13-Mar-15 04-Jun-15MM1-1305-PT-30-P-XB-00012-1MM1 & MM2 - P&ID Gas Injection Manifold-IDC 22 13-Mar-15* 07-Apr-15MM1-1305-PT-30-P-XB-00012-2MM1 & MM2 - P&ID Gas Injection Manifold-IFR 12 08-Apr-15 21-Apr-15MM1-1305-PT-30-P-XB-00012-3MM1 & MM2 - P&ID Gas Injection Manifold-IFD 14 22-Apr-15 11-May-15MM1-1305-PT-30-P-XB-00012-4MM1 & MM2 - P&ID Gas Injection Manifold-IFC 21 12-May-15 04-Jun-15MM1-1305-PT-30-P-XB-00013MM1 & MM2 - P&ID Water Injection Manifold 69 13-Mar-15 04-Jun-15MM1-1305-PT-30-P-XB-00013-1MM1 & MM2 - P&ID Water Injection Manifold-IDC 22 13-Mar-15* 07-Apr-15MM1-1305-PT-30-P-XB-00013-2MM1 & MM2 - P&ID Water Injection Manifold-IFR 12 08-Apr-15 21-Apr-15MM1-1305-PT-30-P-XB-00013-3MM1 & MM2 - P&ID Water Injection Manifold-IFD 14 22-Apr-15 11-May-15MM1-1305-PT-30-P-XB-00013-4MM1 & MM2 - P&ID Water Injection Manifold-IFC 21 12-May-15 04-Jun-15MM1-1305-PT-30-P-XB-00014MM1 & MM2 - P&ID Gas Export Manifold 69 13-Mar-15 04-Jun-15MM1-1305-PT-30-P-XB-00014-1MM1 & MM2 - P&ID Gas Export Manifold-IDC 22 13-Mar-15* 07-Apr-15MM1-1305-PT-30-P-XB-00014-2MM1 & MM2 - P&ID Gas Export Manifold-IFR 12 08-Apr-15 21-Apr-15MM1-1305-PT-30-P-XB-00014-3MM1 & MM2 - P&ID Gas Export Manifold-IFD 14 22-Apr-15 11-May-15MM1-1305-PT-30-P-XB-00014-4MM1 & MM2 - P&ID Gas Export Manifold-IFC 21 12-May-15 04-Jun-15MM1-1305-PT-30-P-XB-00015MM1 & MM2 - P&ID Gas Lift Manifold 69 13-Mar-15 04-Jun-15MM1-1305-PT-30-P-XB-00015-1MM1 & MM2 - P&ID Gas Lift Manifold-IDC 22 13-Mar-15* 07-Apr-15MM1-1305-PT-30-P-XB-00015-2MM1 & MM2 - P&ID Gas Lift Manifold-IFR 12 08-Apr-15 21-Apr-15MM1-1305-PT-30-P-XB-00015-3MM1 & MM2 - P&ID Gas Lift Manifold-IFD 14 22-Apr-15 11-May-15MM1-1305-PT-30-P-XB-00015-4MM1 & MM2 - P&ID Gas Lift Manifold-IFC 21 12-May-15 04-Jun-15MM1-1305-PT-30-P-XB-00016MM1 & MM2 - P&ID Diesel Manifold 69 13-Mar-15 04-Jun-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 4 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-30-P-XB-00016-1MM1 & MM2 - P&ID Diesel Manifold-IDC 22 13-Mar-15* 07-Apr-15MM1-1305-PT-30-P-XB-00016-2MM1 & MM2 - P&ID Diesel Manifold-IFR 12 08-Apr-15 21-Apr-15MM1-1305-PT-30-P-XB-00016-3MM1 & MM2 - P&ID Diesel Manifold-IFD 14 22-Apr-15 11-May-15MM1-1305-PT-30-P-XB-00016-4MM1 & MM2 - P&ID Diesel Manifold-IFC 21 12-May-15 04-Jun-15MM1-1305-PT-30-P-LA-00001MM1 & MM2 - Line List 56 09-Apr-15 16-Jun-15MM1-1305-PT-30-P-LA-00001-1MM1 & MM2 - Line List-IDC 14 09-Apr-15* 24-Apr-15MM1-1305-PT-30-P-LA-00001-2MM1 & MM2 - Line List-IFR 10 25-Apr-15 09-May-15MM1-1305-PT-30-P-LA-00001-3MM1 & MM2 - Line List-IFD 14 11-May-15 26-May-15MM1-1305-PT-30-P-LA-00001-4MM1 & MM2 - Line List-IFC 18 27-May-15 16-Jun-15MM1-1305-PT-30-P-XM-00001MM1 & MM2 - Safe Chart 52 08-Apr-15 10-Jun-15MM1-1305-PT-30-P-XM-00001-1MM1 & MM2 - Safe Chart-IDC 7 08-Apr-15* 15-Apr-15MM1-1305-PT-30-P-XM-00001-2MM1 & MM2 - Safe Chart-IFR 6 16-Apr-15 22-Apr-15MM1-1305-PT-30-P-XM-00001-3MM1 & MM2 - Safe Chart-IFD 18 23-Apr-15 16-May-15MM1-1305-PT-30-P-XM-00001-4MM1 & MM2 - Safe Chart-IFC 21 18-May-15 10-Jun-15MM1-1305-PT-30-P-XL-00001MM1 & MM2 - ESD Logic Diagram 52 08-Apr-15 10-Jun-15MM1-1305-PT-30-P-XL-00001-1MM1 & MM2 - ESD Logic Diagram-IDC 7 08-Apr-15* 15-Apr-15MM1-1305-PT-30-P-XL-00001-2MM1 & MM2 - ESD Logic Diagram-IFR 6 16-Apr-15 22-Apr-15MM1-1305-PT-30-P-XL-00001-3MM1 & MM2 - ESD Logic Diagram-IFD 18 23-Apr-15 16-May-15MM1-1305-PT-30-P-XL-00001-4MM1 & MM2 - ESD Logic Diagram-IFC 21 18-May-15 10-Jun-15MM1-1305-PT-30-P-LA-00002MM1 & MM2 - Alarm / Trip Schedule 52 08-Apr-15 10-Jun-15MM1-1305-PT-30-P-LA-00002-1MM1 & MM2 - Alarm / Trip Schedule-IDC 7 08-Apr-15* 15-Apr-15MM1-1305-PT-30-P-LA-00002-2MM1 & MM2 - Alarm / Trip Schedule-IFR 6 16-Apr-15 22-Apr-15MM1-1305-PT-30-P-LA-00002-3MM1 & MM2 - Alarm / Trip Schedule-IFD 18 23-Apr-15 16-May-15MM1-1305-PT-30-P-LA-00002-4MM1 & MM2 - Alarm / Trip Schedule-IFC 21 18-May-15 10-Jun-15MM1-1305-PT-30-X-CA-00001MM1 & MM2 - Calculation Note - Deluge System 53 08-Apr-15 11-Jun-15MM1-1305-PT-30-X-CA-00001-1MM1 & MM2 - Calculation Note - Deluge System-IDC 1 08-Apr-15* 08-Apr-15MM1-1305-PT-30-X-CA-00001-2MM1 & MM2 - Calculation Note - Deluge System-IFR 17 09-Apr-15 29-Apr-15MM1-1305-PT-30-X-CA-00001-3MM1 & MM2 - Calculation Note - Deluge System-IFD 14 02-May-15 18-May-15MM1-1305-PT-30-X-CA-00001-4MM1 & MM2 - Calculation Note - Deluge System-IFC 21 19-May-15 11-Jun-15MM1-1305-PT-30-X-CA-00002MM1 & MM2 - Steady State Analysis for Deluge System 51 15-Apr-15 16-Jun-15MM1-1305-PT-30-X-CA-00002-1MM1 & MM2 - Steady State Analysis for Deluge System-IDC 1 15-Apr-15* 15-Apr-15MM1-1305-PT-30-X-CA-00002-2MM1 & MM2 - Steady State Analysis for Deluge System-IFR 15 16-Apr-15 06-May-15MM1-1305-PT-30-X-CA-00002-3MM1 & MM2 - Steady State Analysis for Deluge System-IFD 15 07-May-15 23-May-15MM1-1305-PT-30-X-CA-00002-4MM1 & MM2 - Steady State Analysis for Deluge System-IFC 20 25-May-15 16-Jun-15MM1-1305-PT-30-X-XE-10001MM1 - Hazardous Area Classification - Manifold &Pigging Facilities - Upper Deck Equipment Layout Plan59 26-Mar-15 05-Jun-15MM1-1305-PT-30-X-XE-10001-1MM1 - Hazardous Area Classification - Manifold &Pigging Facilities - Upper Deck Equipment Layout Plan-IDC13 26-Mar-15* 09-Apr-15MM1-1305-PT-30-X-XE-10001-2MM1 - Hazardous Area Classification - Manifold &Pigging Facilities - Upper Deck Equipment Layout Plan-IFR12 10-Apr-15 23-Apr-15MM1-1305-PT-30-X-XE-10001-3MM1 - Hazardous Area Classification - Manifold &Pigging Facilities - Upper Deck Equipment Layout Plan-IFD11 24-Apr-15 09-May-15MM1-1305-PT-30-X-XE-10001-4MM1 - Hazardous Area Classification - Manifold &Pigging Facilities - Upper Deck Equipment Layout Plan-IFC23 11-May-15 05-Jun-15MM1-1305-PT-30-X-XE-10002MM1 - Hazardous Area Classification - Manifold &Pigging Facilities - Main Deck Equipment Layout Plan59 26-Mar-15 05-Jun-15MM1-1305-PT-30-X-XE-10002-1MM1 - Hazardous Area Classification - Manifold &Pigging Facilities - Main Deck Equipment Layout Plan-IDC13 26-Mar-15* 09-Apr-15MM1-1305-PT-30-X-XE-10002-2MM1 - Hazardous Area Classification - Manifold &Pigging Facilities - Main Deck Equipment Layout Plan-IFR12 10-Apr-15 23-Apr-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 5 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-30-X-XE-10002-3MM1 - Hazardous Area Classification - Manifold &Pigging Facilities - Main Deck Equipment Layout Plan-IFD11 24-Apr-15 09-May-15MM1-1305-PT-30-X-XE-10002-4MM1 - Hazardous Area Classification - Manifold &Pigging Facilities - Main Deck Equipment Layout Plan-IFC23 11-May-15 05-Jun-15MM1-1305-PT-30-X-XB-10001MM1 - P&ID Firewater Deluge System 56 08-Apr-15 15-Jun-15MM1-1305-PT-30-X-XB-10001-1MM1 - P&ID Firewater Deluge System-IDC 10 08-Apr-15* 18-Apr-15MM1-1305-PT-30-X-XB-10001-2MM1 - P&ID Firewater Deluge System-IFR 11 20-Apr-15 05-May-15MM1-1305-PT-30-X-XB-10001-3MM1 - P&ID Firewater Deluge System-IFD 15 06-May-15 22-May-15MM1-1305-PT-30-X-XB-10001-4MM1 - P&ID Firewater Deluge System-IFC 20 23-May-15 15-Jun-15

0.D.26.0000.MM1.B.N Structural0.D.26.0000.MM1.B.N Structural 315 16-Mar-15 21-Mar-160.D.26.0000.MM1.B.N.92 PTSC0.D.26.0000.MM1.B.N.92 PTSC 315 16-Mar-15 21-Mar-16MM1-1305-PT-95-N-RA-10001MM1 - In-place Analysis Report 82 16-Mar-15 22-Jun-15MM1-1305-PT-95-N-RA-10001-1MM1 - In-place Analysis Report-IDC 0 16-Mar-15* 16-Mar-15MM1-1305-PT-95-N-RA-10001-2MM1 - In-place Analysis Report-IFR 55 16-Mar-15 21-May-15MM1-1305-PT-95-N-RA-10001-3MM1 - In-place Analysis Report-IFD 12 22-May-15 04-Jun-15MM1-1305-PT-95-N-RA-10001-4MM1 - In-place Analysis Report-IFC 15 05-Jun-15 22-Jun-15MM1-1305-PT-95-N-RA-10002MM1 - Preservice Analysis Report 85 16-Mar-15 25-Jun-15MM1-1305-PT-95-N-RA-10002-1MM1 - Preservice Analysis Report-IDC 0 16-Mar-15* 16-Mar-15MM1-1305-PT-95-N-RA-10002-2MM1 - Preservice Analysis Report-IFR 57 16-Mar-15 23-May-15MM1-1305-PT-95-N-RA-10002-3MM1 - Preservice Analysis Report-IFD 12 25-May-15 06-Jun-15MM1-1305-PT-95-N-RA-10002-4MM1 - Preservice Analysis Report-IFC 16 08-Jun-15 25-Jun-15MM1-1305-PT-95-N-RA-10003MM1 - Structural Miscellaneous design 45 06-Jun-15 28-Jul-15MM1-1305-PT-95-N-RA-10003-1MM1 - Structural Miscellaneous design-IDC 1 06-Jun-15* 06-Jun-15MM1-1305-PT-95-N-RA-10003-2MM1 - Structural Miscellaneous design-IFR 17 08-Jun-15 26-Jun-15MM1-1305-PT-95-N-RA-10003-3MM1 - Structural Miscellaneous design-IFD 12 27-Jun-15 10-Jul-15MM1-1305-PT-95-N-RA-10003-4MM1 - Structural Miscellaneous design-IFC 15 11-Jul-15 28-Jul-15MM1-1305-PT-95-N-RA-10005MM1 - Weight Control Report 74 28-Mar-15 25-Jun-15MM1-1305-PT-95-N-RA-10005-1MM1 - Weight Control Report-IDC 33 28-Mar-15* 08-May-15MM1-1305-PT-95-N-RA-10005-2MM1 - Weight Control Report-IFR 13 09-May-15 23-May-15MM1-1305-PT-95-N-RA-10005-3MM1 - Weight Control Report-IFD 12 25-May-15 06-Jun-15MM1-1305-PT-95-N-RA-10005-4MM1 - Weight Control Report-IFC 16 08-Jun-15 25-Jun-15MM1-1305-PT-95-N-RA-10006MM1 - Seafastening Report 50 30-Jun-15 26-Aug-15MM1-1305-PT-95-N-RA-10006-1MM1 - Seafastening Report-IDC 1 30-Jun-15* 30-Jun-15MM1-1305-PT-95-N-RA-10006-2MM1 - Seafastening Report-IFR 16 01-Jul-15 18-Jul-15MM1-1305-PT-95-N-RA-10006-3MM1 - Seafastening Report-IFD 12 20-Jul-15 01-Aug-15MM1-1305-PT-95-N-RA-10006-4MM1 - Seafastening Report-IFC 21 03-Aug-15 26-Aug-15MM1-1305-PT-95-N-LA-00001MM1 & MM2 - Structural Primary & secondary steel MTOs 61 16-Mar-15 28-May-15MM1-1305-PT-95-N-LA-00001-1MM1 & MM2 - Structural Primary & secondary steel MTOs-IDC 0 16-Mar-15* 16-Mar-15MM1-1305-PT-95-N-LA-00001-2MM1 & MM2 - Structural Primary & secondary steel MTOs-IFR 24 16-Mar-15 11-Apr-15MM1-1305-PT-95-N-LA-00001-3MM1 & MM2 - Structural Primary & secondary steel MTOs-IFD 0 13-Apr-15 13-Apr-15MM1-1305-PT-95-N-LA-00001-4MM1 & MM2 - Structural Primary & secondary steel MTOs-IFC 37 13-Apr-15 28-May-15MM1-1305-PT-95-N-LA-00002MM1 & MM2 - Structural Tertiary Steel MTOs 67 04-May-15 20-Jul-15MM1-1305-PT-95-N-LA-00002-1MM1 & MM2 - Structural Tertiary Steel MTOs-IDC 1 04-May-15* 04-May-15MM1-1305-PT-95-N-LA-00002-2MM1 & MM2 - Structural Tertiary Steel MTOs-IFR 25 05-May-15 02-Jun-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 6 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-95-N-LA-00002-3MM1 & MM2 - Structural Tertiary Steel MTOs-IFD 0 03-Jun-15 03-Jun-15MM1-1305-PT-95-N-LA-00002-4MM1 & MM2 - Structural Tertiary Steel MTOs-IFC 41 03-Jun-15 20-Jul-15MM1-1305-PT-95-N-LA-00003MM1 & MM2 - Structural Miscellaneous MTOs 68 22-Jun-15 09-Sep-15MM1-1305-PT-95-N-LA-00003-1MM1 & MM2 - Structural Miscellaneous MTOs-IDC 0 22-Jun-15* 22-Jun-15MM1-1305-PT-95-N-LA-00003-2MM1 & MM2 - Structural Miscellaneous MTOs-IFR 24 22-Jun-15 18-Jul-15MM1-1305-PT-95-N-LA-00003-3MM1 & MM2 - Structural Miscellaneous MTOs-IFD 0 20-Jul-15 20-Jul-15MM1-1305-PT-95-N-LA-00003-4MM1 & MM2 - Structural Miscellaneous MTOs-IFC 44 20-Jul-15 09-Sep-15MM1-1305-PT-95-N-LA-00004MM1 & MM2 - Structural Grating MTOs 71 23-Jun-15 14-Sep-15MM1-1305-PT-95-N-LA-00004-1MM1 & MM2 - Structural Grating MTOs-IDC 1 23-Jun-15* 23-Jun-15MM1-1305-PT-95-N-LA-00004-2MM1 & MM2 - Structural Grating MTOs-IFR 25 24-Jun-15 22-Jul-15MM1-1305-PT-95-N-LA-00004-3MM1 & MM2 - Structural Grating MTOs-IFD 0 23-Jul-15 23-Jul-15MM1-1305-PT-95-N-LA-00004-4MM1 & MM2 - Structural Grating MTOs-IFC 45 23-Jul-15 14-Sep-15MM1-1305-PT-95-N-XG-01001MM1 & MM2 - Structural General Notes 47 24-Mar-15 20-May-15MM1-1305-PT-95-N-XG-01001-1MM1 & MM2 - Structural General Notes-IDC 1 24-Mar-15* 24-Mar-15MM1-1305-PT-95-N-XG-01001-2MM1 & MM2 - Structural General Notes-IFR 18 25-Mar-15 14-Apr-15MM1-1305-PT-95-N-XG-01001-3MM1 & MM2 - Structural General Notes-IFD 11 15-Apr-15 27-Apr-15MM1-1305-PT-95-N-XG-01001-4MM1 & MM2 - Structural General Notes-IFC 17 29-Apr-15 20-May-15MM1-1305-PT-95-N-XG-01002MM1 & MM2 - Typical Weld Details 49 24-Mar-15 22-May-15MM1-1305-PT-95-N-XG-01002-1MM1 & MM2 - Typical Weld Details-IDC 1 24-Mar-15* 24-Mar-15MM1-1305-PT-95-N-XG-01002-2MM1 & MM2 - Typical Weld Details-IFR 20 25-Mar-15 16-Apr-15MM1-1305-PT-95-N-XG-01002-3MM1 & MM2 - Typical Weld Details-IFD 10 17-Apr-15 29-Apr-15MM1-1305-PT-95-N-XG-01002-4MM1 & MM2 - Typical Weld Details-IFC 18 02-May-15 22-May-15MM1-1305-PT-95-N-XG-01003MM1 & MM2 - Typical Connection Details 48 02-Apr-15 30-May-15MM1-1305-PT-95-N-XG-01003-1MM1 & MM2 - Typical Connection Details-IDC 1 02-Apr-15* 02-Apr-15MM1-1305-PT-95-N-XG-01003-2MM1 & MM2 - Typical Connection Details-IFR 20 03-Apr-15 25-Apr-15MM1-1305-PT-95-N-XG-01003-3MM1 & MM2 - Typical Connection Details-IFD 9 27-Apr-15 09-May-15MM1-1305-PT-95-N-XG-01003-4MM1 & MM2 - Typical Connection Details-IFC 18 11-May-15 30-May-15MM1-1305-PT-95-N-XG-01004MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 1 45 28-Mar-15 22-May-15MM1-1305-PT-95-N-XG-01004-1MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 1-IDC 1 28-Mar-15* 28-Mar-15MM1-1305-PT-95-N-XG-01004-2MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 1-IFR 17 30-Mar-15 17-Apr-15MM1-1305-PT-95-N-XG-01004-3MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 1-IFD 9 18-Apr-15 29-Apr-15MM1-1305-PT-95-N-XG-01004-4MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 1-IFC 18 02-May-15 22-May-15MM1-1305-PT-95-N-XG-01005MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 2 45 28-Mar-15 22-May-15MM1-1305-PT-95-N-XG-01005-1MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 2-IDC 1 28-Mar-15* 28-Mar-15MM1-1305-PT-95-N-XG-01005-2MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 2-IFR 17 30-Mar-15 17-Apr-15MM1-1305-PT-95-N-XG-01005-3MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 2-IFD 9 18-Apr-15 29-Apr-15MM1-1305-PT-95-N-XG-01005-4MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 2-IFC 18 02-May-15 22-May-15MM1-1305-PT-95-N-XG-01006MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 1 45 28-Mar-15 22-May-15MM1-1305-PT-95-N-XG-01006-1MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 1-IDC 1 28-Mar-15* 28-Mar-15MM1-1305-PT-95-N-XG-01006-2MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 1-IFR 17 30-Mar-15 17-Apr-15MM1-1305-PT-95-N-XG-01006-3MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 1-IFD 9 18-Apr-15 29-Apr-15MM1-1305-PT-95-N-XG-01006-4MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 1-IFC 18 02-May-15 22-May-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 7 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-95-N-XG-01007MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 2 45 28-Mar-15 22-May-15MM1-1305-PT-95-N-XG-01007-1MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 2-IDC 1 28-Mar-15* 28-Mar-15MM1-1305-PT-95-N-XG-01007-2MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 2-IFR 17 30-Mar-15 17-Apr-15MM1-1305-PT-95-N-XG-01007-3MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 2-IFD 9 18-Apr-15 29-Apr-15MM1-1305-PT-95-N-XG-01007-4MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 2-IFC 18 02-May-15 22-May-15MM1-1305-PT-95-N-XG-01008MM1 & MM2 - Typical Plating & Grating Arrangement & Details 45 28-Mar-15 22-May-15MM1-1305-PT-95-N-XG-01008-1MM1 & MM2 - Typical Plating & Grating Arrangement & Details-IDC 1 28-Mar-15* 28-Mar-15MM1-1305-PT-95-N-XG-01008-2MM1 & MM2 - Typical Plating & Grating Arrangement & Details-IFR 17 30-Mar-15 17-Apr-15MM1-1305-PT-95-N-XG-01008-3MM1 & MM2 - Typical Plating & Grating Arrangement & Details-IFD 9 18-Apr-15 29-Apr-15MM1-1305-PT-95-N-XG-01008-4MM1 & MM2 - Typical Plating & Grating Arrangement & Details-IFC 18 02-May-15 22-May-15MM1-1305-PT-95-N-XG-01009MM1 & MM2 - Typical Handrail Arrangement & Details 45 28-Mar-15 22-May-15MM1-1305-PT-95-N-XG-01009-1MM1 & MM2 - Typical Handrail Arrangement & Details-IDC 1 28-Mar-15* 28-Mar-15MM1-1305-PT-95-N-XG-01009-2MM1 & MM2 - Typical Handrail Arrangement & Details-IFR 17 30-Mar-15 17-Apr-15MM1-1305-PT-95-N-XG-01009-3MM1 & MM2 - Typical Handrail Arrangement & Details-IFD 9 18-Apr-15 29-Apr-15MM1-1305-PT-95-N-XG-01009-4MM1 & MM2 - Typical Handrail Arrangement & Details-IFC 18 02-May-15 22-May-15MM1-1305-PT-95-N-XG-01010MM1 & MM2 - Typical Drain Outlet Details 45 28-Mar-15 22-May-15MM1-1305-PT-95-N-XG-01010-1MM1 & MM2 - Typical Drain Outlet Details-IDC 1 28-Mar-15* 28-Mar-15MM1-1305-PT-95-N-XG-01010-2MM1 & MM2 - Typical Drain Outlet Details-IFR 17 30-Mar-15 17-Apr-15MM1-1305-PT-95-N-XG-01010-3MM1 & MM2 - Typical Drain Outlet Details-IFD 9 18-Apr-15 29-Apr-15MM1-1305-PT-95-N-XG-01010-4MM1 & MM2 - Typical Drain Outlet Details-IFC 18 02-May-15 22-May-15MM1-1305-PT-95-N-XG-12001MM1 - Drawing Index 64 24-Mar-15 09-Jun-15MM1-1305-PT-95-N-XG-12001-1MM1 - Drawing Index-IDC 1 24-Mar-15* 24-Mar-15MM1-1305-PT-95-N-XG-12001-2MM1 - Drawing Index-IFR 27 25-Mar-15 24-Apr-15MM1-1305-PT-95-N-XG-12001-3MM1 - Drawing Index-IFD 0 25-Apr-15 25-Apr-15MM1-1305-PT-95-N-XG-12001-4MM1 - Drawing Index-IFC 36 25-Apr-15 09-Jun-15MM1-1305-PT-95-N-XG-12002MM1 - Structural Perspective View 52 29-Apr-15 30-Jun-15MM1-1305-PT-95-N-XG-12002-1MM1 - Structural Perspective View-IDC 0 29-Apr-15* 29-Apr-15MM1-1305-PT-95-N-XG-12002-2MM1 - Structural Perspective View-IFR 24 29-Apr-15 28-May-15MM1-1305-PT-95-N-XG-12002-3MM1 - Structural Perspective View-IFD 0 29-May-15 29-May-15MM1-1305-PT-95-N-XG-12002-4MM1 - Structural Perspective View-IFC 28 29-May-15 30-Jun-15MM1-1305-PT-95-N-XG-12003MM1 - Deck Load Plan 32 29-Apr-15 06-Jun-15MM1-1305-PT-95-N-XG-12003-1MM1 - Deck Load Plan-IDC 0 29-Apr-15* 29-Apr-15MM1-1305-PT-95-N-XG-12003-2MM1 - Deck Load Plan-IFR 20 29-Apr-15 23-May-15MM1-1305-PT-95-N-XG-12003-3MM1 - Deck Load Plan-IFD 0 25-May-15 25-May-15MM1-1305-PT-95-N-XG-12003-4MM1 - Deck Load Plan-IFC 12 25-May-15 06-Jun-15MM1-1305-PT-95-N-XG-12004MM1 - Upper Deck Primary Framing Plan 36 02-Apr-15 16-May-15MM1-1305-PT-95-N-XG-12004-1MM1 - Upper Deck Primary Framing Plan-IDC 19 02-Apr-15* 23-Apr-15MM1-1305-PT-95-N-XG-12004-2MM1 - Upper Deck Primary Framing Plan-IFR 4 24-Apr-15 29-Apr-15MM1-1305-PT-95-N-XG-12004-3MM1 - Upper Deck Primary Framing Plan-IFD 0 02-May-15 02-May-15MM1-1305-PT-95-N-XG-12004-4MM1 - Upper Deck Primary Framing Plan-IFC 13 02-May-15 16-May-15MM1-1305-PT-95-N-XG-12005MM1 - Mezzanine Deck Primary Framing Plan 36 31-Mar-15 14-May-15MM1-1305-PT-95-N-XG-12005-1MM1 - Mezzanine Deck Primary Framing Plan-IDC 19 31-Mar-15* 21-Apr-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 8 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-95-N-XG-12005-2MM1 - Mezzanine Deck Primary Framing Plan-IFR 5 22-Apr-15 27-Apr-15MM1-1305-PT-95-N-XG-12005-3MM1 - Mezzanine Deck Primary Framing Plan-IFD 0 29-Apr-15 29-Apr-15MM1-1305-PT-95-N-XG-12005-4MM1 - Mezzanine Deck Primary Framing Plan-IFC 12 29-Apr-15 14-May-15MM1-1305-PT-95-N-XG-12006MM1 - Main Deck Primary Framing Plan 36 28-Mar-15 12-May-15MM1-1305-PT-95-N-XG-12006-1MM1 - Main Deck Primary Framing Plan-IDC 19 28-Mar-15* 18-Apr-15MM1-1305-PT-95-N-XG-12006-2MM1 - Main Deck Primary Framing Plan-IFR 6 20-Apr-15 25-Apr-15MM1-1305-PT-95-N-XG-12006-3MM1 - Main Deck Primary Framing Plan-IFD 0 27-Apr-15 27-Apr-15MM1-1305-PT-95-N-XG-12006-4MM1 - Main Deck Primary Framing Plan-IFC 11 27-Apr-15 12-May-15MM1-1305-PT-95-N-XG-12007MM1 - Truss Row 89 & Row 90 36 28-Mar-15 12-May-15MM1-1305-PT-95-N-XG-12007-1MM1 - Truss Row 89 & Row 90-IDC 18 28-Mar-15* 17-Apr-15MM1-1305-PT-95-N-XG-12007-2MM1 - Truss Row 89 & Row 90-IFR 6 18-Apr-15 24-Apr-15MM1-1305-PT-95-N-XG-12007-3MM1 - Truss Row 89 & Row 90-IFD 0 25-Apr-15 25-Apr-15MM1-1305-PT-95-N-XG-12007-4MM1 - Truss Row 89 & Row 90-IFC 12 25-Apr-15 12-May-15MM1-1305-PT-95-N-XG-12008MM1 - Truss Row 91 & Row 92 36 28-Mar-15 12-May-15MM1-1305-PT-95-N-XG-12008-1MM1 - Truss Row 91 & Row 92-IDC 19 28-Mar-15* 18-Apr-15MM1-1305-PT-95-N-XG-12008-2MM1 - Truss Row 91 & Row 92-IFR 6 20-Apr-15 25-Apr-15MM1-1305-PT-95-N-XG-12008-3MM1 - Truss Row 91 & Row 92-IFD 0 27-Apr-15 27-Apr-15MM1-1305-PT-95-N-XG-12008-4MM1 - Truss Row 91 & Row 92-IFC 11 27-Apr-15 12-May-15MM1-1305-PT-95-N-XG-12009MM1 - Truss Row 93 & Row 94 34 02-Apr-15 14-May-15MM1-1305-PT-95-N-XG-12009-1MM1 - Truss Row 93 & Row 94-IDC 17 02-Apr-15* 21-Apr-15MM1-1305-PT-95-N-XG-12009-2MM1 - Truss Row 93 & Row 94-IFR 6 22-Apr-15 29-Apr-15MM1-1305-PT-95-N-XG-12009-3MM1 - Truss Row 93 & Row 94-IFD 0 02-May-15 02-May-15MM1-1305-PT-95-N-XG-12009-4MM1 - Truss Row 93 & Row 94-IFC 11 02-May-15 14-May-15MM1-1305-PT-95-N-XG-12010MM1 - Truss Row 1A 36 28-Mar-15 12-May-15MM1-1305-PT-95-N-XG-12010-1MM1 - Truss Row 1A-IDC 18 28-Mar-15* 17-Apr-15MM1-1305-PT-95-N-XG-12010-2MM1 - Truss Row 1A-IFR 6 18-Apr-15 24-Apr-15MM1-1305-PT-95-N-XG-12010-3MM1 - Truss Row 1A-IFD 0 25-Apr-15 25-Apr-15MM1-1305-PT-95-N-XG-12010-4MM1 - Truss Row 1A-IFC 12 25-Apr-15 12-May-15MM1-1305-PT-95-N-XG-12011MM1 - Truss Row 1B 36 28-Mar-15 12-May-15MM1-1305-PT-95-N-XG-12011-1MM1 - Truss Row 1B-IDC 18 28-Mar-15* 17-Apr-15MM1-1305-PT-95-N-XG-12011-2MM1 - Truss Row 1B-IFR 7 18-Apr-15 25-Apr-15MM1-1305-PT-95-N-XG-12011-3MM1 - Truss Row 1B-IFD 0 27-Apr-15 27-Apr-15MM1-1305-PT-95-N-XG-12011-4MM1 - Truss Row 1B-IFC 11 27-Apr-15 12-May-15MM1-1305-PT-95-N-XG-12012MM1 - Truss Row 1C 35 31-Mar-15 13-May-15MM1-1305-PT-95-N-XG-12012-1MM1 - Truss Row 1C-IDC 17 31-Mar-15* 18-Apr-15MM1-1305-PT-95-N-XG-12012-2MM1 - Truss Row 1C-IFR 6 20-Apr-15 25-Apr-15MM1-1305-PT-95-N-XG-12012-3MM1 - Truss Row 1C-IFD 0 27-Apr-15 27-Apr-15MM1-1305-PT-95-N-XG-12012-4MM1 - Truss Row 1C-IFC 12 27-Apr-15 13-May-15MM1-1305-PT-95-N-XG-12013MM1 - Upper Deck Joint Details Sheet 1 27 17-Apr-15 21-May-15MM1-1305-PT-95-N-XG-12013-1MM1 - Upper Deck Joint Details Sheet 1-IDC 1 17-Apr-15* 17-Apr-15MM1-1305-PT-95-N-XG-12013-2MM1 - Upper Deck Joint Details Sheet 1-IFR 20 18-Apr-15 14-May-15MM1-1305-PT-95-N-XG-12013-3MM1 - Upper Deck Joint Details Sheet 1-IFD 0 15-May-15 15-May-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 9 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-95-N-XG-12013-4MM1 - Upper Deck Joint Details Sheet 1-IFC 6 15-May-15 21-May-15MM1-1305-PT-95-N-XG-12014MM1 - Upper Deck Joint Details Sheet 2 27 17-Apr-15 21-May-15MM1-1305-PT-95-N-XG-12014-1MM1 - Upper Deck Joint Details Sheet 2-IDC 1 17-Apr-15* 17-Apr-15MM1-1305-PT-95-N-XG-12014-2MM1 - Upper Deck Joint Details Sheet 2-IFR 20 18-Apr-15 14-May-15MM1-1305-PT-95-N-XG-12014-3MM1 - Upper Deck Joint Details Sheet 2-IFD 0 15-May-15 15-May-15MM1-1305-PT-95-N-XG-12014-4MM1 - Upper Deck Joint Details Sheet 2-IFC 6 15-May-15 21-May-15MM1-1305-PT-95-N-XG-12015MM1 - Upper Deck Joint Details Sheet 3 31 17-Apr-15 26-May-15MM1-1305-PT-95-N-XG-12015-1MM1 - Upper Deck Joint Details Sheet 3-IDC 1 17-Apr-15* 17-Apr-15MM1-1305-PT-95-N-XG-12015-2MM1 - Upper Deck Joint Details Sheet 3-IFR 22 18-Apr-15 16-May-15MM1-1305-PT-95-N-XG-12015-3MM1 - Upper Deck Joint Details Sheet 3-IFD 0 18-May-15 18-May-15MM1-1305-PT-95-N-XG-12015-4MM1 - Upper Deck Joint Details Sheet 3-IFC 8 18-May-15 26-May-15MM1-1305-PT-95-N-XG-12016MM1 - Upper Deck Joint Details sheet 4 31 17-Apr-15 26-May-15MM1-1305-PT-95-N-XG-12016-1MM1 - Upper Deck Joint Details sheet 4-IDC 1 17-Apr-15* 17-Apr-15MM1-1305-PT-95-N-XG-12016-2MM1 - Upper Deck Joint Details sheet 4-IFR 22 18-Apr-15 16-May-15MM1-1305-PT-95-N-XG-12016-3MM1 - Upper Deck Joint Details sheet 4-IFD 0 18-May-15 18-May-15MM1-1305-PT-95-N-XG-12016-4MM1 - Upper Deck Joint Details sheet 4-IFC 8 18-May-15 26-May-15MM1-1305-PT-95-N-XG-12017MM1 - Upper Deck Joint Details sheet 5 31 17-Apr-15 26-May-15MM1-1305-PT-95-N-XG-12017-1MM1 - Upper Deck Joint Details sheet 5-IDC 1 17-Apr-15* 17-Apr-15MM1-1305-PT-95-N-XG-12017-2MM1 - Upper Deck Joint Details sheet 5-IFR 22 18-Apr-15 16-May-15MM1-1305-PT-95-N-XG-12017-3MM1 - Upper Deck Joint Details sheet 5-IFD 0 18-May-15 18-May-15MM1-1305-PT-95-N-XG-12017-4MM1 - Upper Deck Joint Details sheet 5-IFC 8 18-May-15 26-May-15MM1-1305-PT-95-N-XG-12018MM1 - Mezzanine Deck Joint Details sheet 1 34 14-Apr-15 26-May-15MM1-1305-PT-95-N-XG-12018-1MM1 - Mezzanine Deck Joint Details sheet 1-IDC 1 14-Apr-15* 14-Apr-15MM1-1305-PT-95-N-XG-12018-2MM1 - Mezzanine Deck Joint Details sheet 1-IFR 22 15-Apr-15 13-May-15MM1-1305-PT-95-N-XG-12018-3MM1 - Mezzanine Deck Joint Details sheet 1-IFD 0 14-May-15 14-May-15MM1-1305-PT-95-N-XG-12018-4MM1 - Mezzanine Deck Joint Details sheet 1-IFC 11 14-May-15 26-May-15MM1-1305-PT-95-N-XG-12019MM1 - Mezzanine Deck Joint Details sheet 2 34 14-Apr-15 26-May-15MM1-1305-PT-95-N-XG-12019-1MM1 - Mezzanine Deck Joint Details sheet 2-IDC 1 14-Apr-15* 14-Apr-15MM1-1305-PT-95-N-XG-12019-2MM1 - Mezzanine Deck Joint Details sheet 2-IFR 22 15-Apr-15 13-May-15MM1-1305-PT-95-N-XG-12019-3MM1 - Mezzanine Deck Joint Details sheet 2-IFD 0 14-May-15 14-May-15MM1-1305-PT-95-N-XG-12019-4MM1 - Mezzanine Deck Joint Details sheet 2-IFC 11 14-May-15 26-May-15MM1-1305-PT-95-N-XG-12020MM1 - Mezzanine Deck Joint Details sheet 3 33 15-Apr-15 26-May-15MM1-1305-PT-95-N-XG-12020-1MM1 - Mezzanine Deck Joint Details sheet 3-IDC 1 15-Apr-15* 15-Apr-15MM1-1305-PT-95-N-XG-12020-2MM1 - Mezzanine Deck Joint Details sheet 3-IFR 24 16-Apr-15 16-May-15MM1-1305-PT-95-N-XG-12020-3MM1 - Mezzanine Deck Joint Details sheet 3-IFD 0 18-May-15 18-May-15MM1-1305-PT-95-N-XG-12020-4MM1 - Mezzanine Deck Joint Details sheet 3-IFC 8 18-May-15 26-May-15MM1-1305-PT-95-N-XG-12021MM1 - Mezzanine Deck Joint Details sheet 4 33 15-Apr-15 26-May-15MM1-1305-PT-95-N-XG-12021-1MM1 - Mezzanine Deck Joint Details sheet 4-IDC 1 15-Apr-15* 15-Apr-15MM1-1305-PT-95-N-XG-12021-2MM1 - Mezzanine Deck Joint Details sheet 4-IFR 24 16-Apr-15 16-May-15MM1-1305-PT-95-N-XG-12021-3MM1 - Mezzanine Deck Joint Details sheet 4-IFD 0 18-May-15 18-May-15MM1-1305-PT-95-N-XG-12021-4MM1 - Mezzanine Deck Joint Details sheet 4-IFC 8 18-May-15 26-May-15MM1-1305-PT-95-N-XG-12022MM1 - Mezzanine Deck Joint Details sheet 5 33 15-Apr-15 26-May-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 10 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-95-N-XG-12022-1MM1 - Mezzanine Deck Joint Details sheet 5-IDC 1 15-Apr-15* 15-Apr-15MM1-1305-PT-95-N-XG-12022-2MM1 - Mezzanine Deck Joint Details sheet 5-IFR 24 16-Apr-15 16-May-15MM1-1305-PT-95-N-XG-12022-3MM1 - Mezzanine Deck Joint Details sheet 5-IFD 0 18-May-15 18-May-15MM1-1305-PT-95-N-XG-12022-4MM1 - Mezzanine Deck Joint Details sheet 5-IFC 8 18-May-15 26-May-15MM1-1305-PT-95-N-XG-12023MM1 - Main Deck Joint Details Sheet 1 34 14-Apr-15 26-May-15MM1-1305-PT-95-N-XG-12023-1MM1 - Main Deck Joint Details Sheet 1-IDC 1 14-Apr-15* 14-Apr-15MM1-1305-PT-95-N-XG-12023-2MM1 - Main Deck Joint Details Sheet 1-IFR 19 15-Apr-15 09-May-15MM1-1305-PT-95-N-XG-12023-3MM1 - Main Deck Joint Details Sheet 1-IFD 0 11-May-15 11-May-15MM1-1305-PT-95-N-XG-12023-4MM1 - Main Deck Joint Details Sheet 1-IFC 14 11-May-15 26-May-15MM1-1305-PT-95-N-XG-12024MM1 - Main Deck Joint Details Sheet 2 34 14-Apr-15 26-May-15MM1-1305-PT-95-N-XG-12024-1MM1 - Main Deck Joint Details Sheet 2-IDC 1 14-Apr-15* 14-Apr-15MM1-1305-PT-95-N-XG-12024-2MM1 - Main Deck Joint Details Sheet 2-IFR 19 15-Apr-15 09-May-15MM1-1305-PT-95-N-XG-12024-3MM1 - Main Deck Joint Details Sheet 2-IFD 0 11-May-15 11-May-15MM1-1305-PT-95-N-XG-12024-4MM1 - Main Deck Joint Details Sheet 2-IFC 14 11-May-15 26-May-15MM1-1305-PT-95-N-XG-12025MM1 - Main Deck Joint Details Sheet 3 37 14-Apr-15 29-May-15MM1-1305-PT-95-N-XG-12025-1MM1 - Main Deck Joint Details Sheet 3-IDC 1 14-Apr-15* 14-Apr-15MM1-1305-PT-95-N-XG-12025-2MM1 - Main Deck Joint Details Sheet 3-IFR 21 15-Apr-15 12-May-15MM1-1305-PT-95-N-XG-12025-3MM1 - Main Deck Joint Details Sheet 3-IFD 0 13-May-15 13-May-15MM1-1305-PT-95-N-XG-12025-4MM1 - Main Deck Joint Details Sheet 3-IFC 15 13-May-15 29-May-15MM1-1305-PT-95-N-XG-12026MM1 - Main Deck Joint Details Sheet 4 37 14-Apr-15 29-May-15MM1-1305-PT-95-N-XG-12026-1MM1 - Main Deck Joint Details Sheet 4-IDC 1 14-Apr-15* 14-Apr-15MM1-1305-PT-95-N-XG-12026-2MM1 - Main Deck Joint Details Sheet 4-IFR 21 15-Apr-15 12-May-15MM1-1305-PT-95-N-XG-12026-3MM1 - Main Deck Joint Details Sheet 4-IFD 0 13-May-15 13-May-15MM1-1305-PT-95-N-XG-12026-4MM1 - Main Deck Joint Details Sheet 4-IFC 15 13-May-15 29-May-15MM1-1305-PT-95-N-XG-12027MM1 - Main Deck Joint Details Sheet 5 37 14-Apr-15 29-May-15MM1-1305-PT-95-N-XG-12027-1MM1 - Main Deck Joint Details Sheet 5-IDC 1 14-Apr-15* 14-Apr-15MM1-1305-PT-95-N-XG-12027-2MM1 - Main Deck Joint Details Sheet 5-IFR 21 15-Apr-15 12-May-15MM1-1305-PT-95-N-XG-12027-3MM1 - Main Deck Joint Details Sheet 5-IFD 0 13-May-15 13-May-15MM1-1305-PT-95-N-XG-12027-4MM1 - Main Deck Joint Details Sheet 5-IFC 15 13-May-15 29-May-15MM1-1305-PT-95-N-XG-12028MM1 - Upper Deck Secondary Framing Plan 29 20-Apr-15 26-May-15MM1-1305-PT-95-N-XG-12028-1MM1 - Upper Deck Secondary Framing Plan-IDC 15 20-Apr-15* 09-May-15MM1-1305-PT-95-N-XG-12028-2MM1 - Upper Deck Secondary Framing Plan-IFR 6 11-May-15 16-May-15MM1-1305-PT-95-N-XG-12028-3MM1 - Upper Deck Secondary Framing Plan-IFD 0 18-May-15 18-May-15MM1-1305-PT-95-N-XG-12028-4MM1 - Upper Deck Secondary Framing Plan-IFC 8 18-May-15 26-May-15MM1-1305-PT-95-N-XG-12029MM1 - Mezzanine Deck Secondary Framing Plan 28 18-Apr-15 23-May-15MM1-1305-PT-95-N-XG-12029-1MM1 - Mezzanine Deck Secondary Framing Plan-IDC 15 18-Apr-15* 08-May-15MM1-1305-PT-95-N-XG-12029-2MM1 - Mezzanine Deck Secondary Framing Plan-IFR 6 09-May-15 15-May-15MM1-1305-PT-95-N-XG-12029-3MM1 - Mezzanine Deck Secondary Framing Plan-IFD 0 16-May-15 16-May-15MM1-1305-PT-95-N-XG-12029-4MM1 - Mezzanine Deck Secondary Framing Plan-IFC 7 16-May-15 23-May-15MM1-1305-PT-95-N-XG-12030MM1 - Main Deck Secondary Framing plan 28 18-Apr-15 23-May-15MM1-1305-PT-95-N-XG-12030-1MM1 - Main Deck Secondary Framing plan-IDC 15 18-Apr-15* 08-May-15MM1-1305-PT-95-N-XG-12030-2MM1 - Main Deck Secondary Framing plan-IFR 6 09-May-15 15-May-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 11 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-95-N-XG-12030-3MM1 - Main Deck Secondary Framing plan-IFD 0 16-May-15 16-May-15MM1-1305-PT-95-N-XG-12030-4MM1 - Main Deck Secondary Framing plan-IFC 7 16-May-15 23-May-15MM1-1305-PT-95-N-XG-12031MM1 - Upper Deck Flooring & Handrail Layout 52 23-Apr-15 25-Jun-15MM1-1305-PT-95-N-XG-12031-1MM1 - Upper Deck Flooring & Handrail Layout-IDC 34 23-Apr-15* 04-Jun-15MM1-1305-PT-95-N-XG-12031-2MM1 - Upper Deck Flooring & Handrail Layout-IFR 6 05-Jun-15 11-Jun-15MM1-1305-PT-95-N-XG-12031-3MM1 - Upper Deck Flooring & Handrail Layout-IFD 0 12-Jun-15 12-Jun-15MM1-1305-PT-95-N-XG-12031-4MM1 - Upper Deck Flooring & Handrail Layout-IFC 12 12-Jun-15 25-Jun-15MM1-1305-PT-95-N-XG-12032MM1 - Mezzanine Deck Flooring & Handrail Layout 53 23-Apr-15 26-Jun-15MM1-1305-PT-95-N-XG-12032-1MM1 - Mezzanine Deck Flooring & Handrail Layout-IDC 35 23-Apr-15* 05-Jun-15MM1-1305-PT-95-N-XG-12032-2MM1 - Mezzanine Deck Flooring & Handrail Layout-IFR 6 06-Jun-15 12-Jun-15MM1-1305-PT-95-N-XG-12032-3MM1 - Mezzanine Deck Flooring & Handrail Layout-IFD 0 13-Jun-15 13-Jun-15MM1-1305-PT-95-N-XG-12032-4MM1 - Mezzanine Deck Flooring & Handrail Layout-IFC 12 13-Jun-15 26-Jun-15MM1-1305-PT-95-N-XG-12033MM1 - Main Deck Flooring & Handrail Layout 54 23-Apr-15 27-Jun-15MM1-1305-PT-95-N-XG-12033-1MM1 - Main Deck Flooring & Handrail Layout-IDC 36 23-Apr-15* 06-Jun-15MM1-1305-PT-95-N-XG-12033-2MM1 - Main Deck Flooring & Handrail Layout-IFR 6 08-Jun-15 13-Jun-15MM1-1305-PT-95-N-XG-12033-3MM1 - Main Deck Flooring & Handrail Layout-IFD 0 15-Jun-15 15-Jun-15MM1-1305-PT-95-N-XG-12033-4MM1 - Main Deck Flooring & Handrail Layout-IFC 12 15-Jun-15 27-Jun-15MM1-1305-PT-95-N-XG-12034MM1 - Upper Deck Penetration Layout 52 23-Apr-15 25-Jun-15MM1-1305-PT-95-N-XG-12034-1MM1 - Upper Deck Penetration Layout-IDC 34 23-Apr-15* 04-Jun-15MM1-1305-PT-95-N-XG-12034-2MM1 - Upper Deck Penetration Layout-IFR 6 05-Jun-15 11-Jun-15MM1-1305-PT-95-N-XG-12034-3MM1 - Upper Deck Penetration Layout-IFD 0 12-Jun-15 12-Jun-15MM1-1305-PT-95-N-XG-12034-4MM1 - Upper Deck Penetration Layout-IFC 12 12-Jun-15 25-Jun-15MM1-1305-PT-95-N-XG-12035MM1 - Mezzanine Deck Penetration Layout 52 23-Apr-15 25-Jun-15MM1-1305-PT-95-N-XG-12035-1MM1 - Mezzanine Deck Penetration Layout-IDC 34 23-Apr-15* 04-Jun-15MM1-1305-PT-95-N-XG-12035-2MM1 - Mezzanine Deck Penetration Layout-IFR 6 05-Jun-15 11-Jun-15MM1-1305-PT-95-N-XG-12035-3MM1 - Mezzanine Deck Penetration Layout-IFD 0 12-Jun-15 12-Jun-15MM1-1305-PT-95-N-XG-12035-4MM1 - Mezzanine Deck Penetration Layout-IFC 12 12-Jun-15 25-Jun-15MM1-1305-PT-95-N-XG-12036MM1 - Main Deck Penetration Layout 51 27-Apr-15 27-Jun-15MM1-1305-PT-95-N-XG-12036-1MM1 - Main Deck Penetration Layout-IDC 33 27-Apr-15* 06-Jun-15MM1-1305-PT-95-N-XG-12036-2MM1 - Main Deck Penetration Layout-IFR 6 08-Jun-15 13-Jun-15MM1-1305-PT-95-N-XG-12036-3MM1 - Main Deck Penetration Layout-IFD 0 15-Jun-15 15-Jun-15MM1-1305-PT-95-N-XG-12036-4MM1 - Main Deck Penetration Layout-IFC 12 15-Jun-15 27-Jun-15MM1-1305-PT-95-N-XG-12037MM1 - Lifting Padeye Arrangement & Details Sheet 1 47 29-Apr-15 24-Jun-15MM1-1305-PT-95-N-XG-12037-1MM1 - Lifting Padeye Arrangement & Details Sheet 1-IDC 0 29-Apr-15* 29-Apr-15MM1-1305-PT-95-N-XG-12037-2MM1 - Lifting Padeye Arrangement & Details Sheet 1-IFR 31 29-Apr-15 05-Jun-15MM1-1305-PT-95-N-XG-12037-3MM1 - Lifting Padeye Arrangement & Details Sheet 1-IFD 0 06-Jun-15 06-Jun-15MM1-1305-PT-95-N-XG-12037-4MM1 - Lifting Padeye Arrangement & Details Sheet 1-IFC 16 06-Jun-15 24-Jun-15MM1-1305-PT-95-N-XG-12038MM1 - Lifting Padeye Arrangement & Details Sheet 2 47 29-Apr-15 24-Jun-15MM1-1305-PT-95-N-XG-12038-1MM1 - Lifting Padeye Arrangement & Details Sheet 2-IDC 0 29-Apr-15* 29-Apr-15MM1-1305-PT-95-N-XG-12038-2MM1 - Lifting Padeye Arrangement & Details Sheet 2-IFR 31 29-Apr-15 05-Jun-15MM1-1305-PT-95-N-XG-12038-3MM1 - Lifting Padeye Arrangement & Details Sheet 2-IFD 0 06-Jun-15 06-Jun-15MM1-1305-PT-95-N-XG-12038-4MM1 - Lifting Padeye Arrangement & Details Sheet 2-IFC 16 06-Jun-15 24-Jun-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 12 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-95-N-XG-12039MM1 - Stair Arrangement & Details Sheet 1 50 29-Apr-15 27-Jun-15MM1-1305-PT-95-N-XG-12039-1MM1 - Stair Arrangement & Details Sheet 1-IDC 32 29-Apr-15* 06-Jun-15MM1-1305-PT-95-N-XG-12039-2MM1 - Stair Arrangement & Details Sheet 1-IFR 6 08-Jun-15 13-Jun-15MM1-1305-PT-95-N-XG-12039-3MM1 - Stair Arrangement & Details Sheet 1-IFD 0 15-Jun-15 15-Jun-15MM1-1305-PT-95-N-XG-12039-4MM1 - Stair Arrangement & Details Sheet 1-IFC 12 15-Jun-15 27-Jun-15MM1-1305-PT-95-N-XG-12040MM1 - Stair Arrangement & Details Sheet 2 50 29-Apr-15 27-Jun-15MM1-1305-PT-95-N-XG-12040-1MM1 - Stair Arrangement & Details Sheet 2-IDC 32 29-Apr-15* 06-Jun-15MM1-1305-PT-95-N-XG-12040-2MM1 - Stair Arrangement & Details Sheet 2-IFR 6 08-Jun-15 13-Jun-15MM1-1305-PT-95-N-XG-12040-3MM1 - Stair Arrangement & Details Sheet 2-IFD 0 15-Jun-15 15-Jun-15MM1-1305-PT-95-N-XG-12040-4MM1 - Stair Arrangement & Details Sheet 2-IFC 12 15-Jun-15 27-Jun-15MM1-1305-PT-95-N-XG-12041MM1 - Ladder Arrangement & Details Sheet 1 50 29-Apr-15 27-Jun-15MM1-1305-PT-95-N-XG-12041-1MM1 - Ladder Arrangement & Details Sheet 1-IDC 32 29-Apr-15* 06-Jun-15MM1-1305-PT-95-N-XG-12041-2MM1 - Ladder Arrangement & Details Sheet 1-IFR 6 08-Jun-15 13-Jun-15MM1-1305-PT-95-N-XG-12041-3MM1 - Ladder Arrangement & Details Sheet 1-IFD 0 15-Jun-15 15-Jun-15MM1-1305-PT-95-N-XG-12041-4MM1 - Ladder Arrangement & Details Sheet 1-IFC 12 15-Jun-15 27-Jun-15MM1-1305-PT-95-N-XG-12042MM1 - Ladder Arrangement & Details Sheet 2 50 29-Apr-15 27-Jun-15MM1-1305-PT-95-N-XG-12042-1MM1 - Ladder Arrangement & Details Sheet 2-IDC 32 29-Apr-15* 06-Jun-15MM1-1305-PT-95-N-XG-12042-2MM1 - Ladder Arrangement & Details Sheet 2-IFR 6 08-Jun-15 13-Jun-15MM1-1305-PT-95-N-XG-12042-3MM1 - Ladder Arrangement & Details Sheet 2-IFD 0 15-Jun-15 15-Jun-15MM1-1305-PT-95-N-XG-12042-4MM1 - Ladder Arrangement & Details Sheet 2-IFC 12 15-Jun-15 27-Jun-15MM1-1305-PT-95-N-XG-12043MM1 - Mechanical Handling For Main Deck Equipment - sheet 1 29 01-Jun-15 03-Jul-15MM1-1305-PT-95-N-XG-12043-1MM1 - Mechanical Handling For Main Deck Equipment - sheet 1-IDC 11 01-Jun-15* 12-Jun-15MM1-1305-PT-95-N-XG-12043-2MM1 - Mechanical Handling For Main Deck Equipment - sheet 1-IFR 6 13-Jun-15 19-Jun-15MM1-1305-PT-95-N-XG-12043-3MM1 - Mechanical Handling For Main Deck Equipment - sheet 1-IFD 0 20-Jun-15 20-Jun-15MM1-1305-PT-95-N-XG-12043-4MM1 - Mechanical Handling For Main Deck Equipment - sheet 1-IFC 12 20-Jun-15 03-Jul-15MM1-1305-PT-95-N-XG-12044MM1 - Mechanical Handling For Main Deck Equipment - sheet 2 29 01-Jun-15 03-Jul-15MM1-1305-PT-95-N-XG-12044-1MM1 - Mechanical Handling For Main Deck Equipment - sheet 2-IDC 11 01-Jun-15* 12-Jun-15MM1-1305-PT-95-N-XG-12044-2MM1 - Mechanical Handling For Main Deck Equipment - sheet 2-IFR 6 13-Jun-15 19-Jun-15MM1-1305-PT-95-N-XG-12044-3MM1 - Mechanical Handling For Main Deck Equipment - sheet 2-IFD 0 20-Jun-15 20-Jun-15MM1-1305-PT-95-N-XG-12044-4MM1 - Mechanical Handling For Main Deck Equipment - sheet 2-IFC 12 20-Jun-15 03-Jul-15MM1-1305-PT-95-N-XG-12045MM1 - Mechanical Handling For Main Deck Equipment - sheet 3 29 01-Jun-15 03-Jul-15MM1-1305-PT-95-N-XG-12045-1MM1 - Mechanical Handling For Main Deck Equipment - sheet 3-IDC 11 01-Jun-15* 12-Jun-15MM1-1305-PT-95-N-XG-12045-2MM1 - Mechanical Handling For Main Deck Equipment - sheet 3-IFR 6 13-Jun-15 19-Jun-15MM1-1305-PT-95-N-XG-12045-3MM1 - Mechanical Handling For Main Deck Equipment - sheet 3-IFD 0 20-Jun-15 20-Jun-15MM1-1305-PT-95-N-XG-12045-4MM1 - Mechanical Handling For Main Deck Equipment - sheet 3-IFC 12 20-Jun-15 03-Jul-15MM1-1305-PT-95-N-XG-12046MM1 - Mechanical Handling For Main Deck Equipment - sheet 4 29 01-Jun-15 03-Jul-15MM1-1305-PT-95-N-XG-12046-1MM1 - Mechanical Handling For Main Deck Equipment - sheet 4-IDC 11 01-Jun-15* 12-Jun-15MM1-1305-PT-95-N-XG-12046-2MM1 - Mechanical Handling For Main Deck Equipment - sheet 4-IFR 6 13-Jun-15 19-Jun-15MM1-1305-PT-95-N-XG-12046-3MM1 - Mechanical Handling For Main Deck Equipment - sheet 4-IFD 0 20-Jun-15 20-Jun-15MM1-1305-PT-95-N-XG-12046-4MM1 - Mechanical Handling For Main Deck Equipment - sheet 4-IFC 12 20-Jun-15 03-Jul-15MM1-1305-PT-95-N-XG-12047MM1 - Mechanical Handling For Main Deck Equipment - sheet 5 29 01-Jun-15 03-Jul-15MM1-1305-PT-95-N-XG-12047-1MM1 - Mechanical Handling For Main Deck Equipment - sheet 5-IDC 11 01-Jun-15* 12-Jun-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 13 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-95-N-XG-12047-2MM1 - Mechanical Handling For Main Deck Equipment - sheet 5-IFR 6 13-Jun-15 19-Jun-15MM1-1305-PT-95-N-XG-12047-3MM1 - Mechanical Handling For Main Deck Equipment - sheet 5-IFD 0 20-Jun-15 20-Jun-15MM1-1305-PT-95-N-XG-12047-4MM1 - Mechanical Handling For Main Deck Equipment - sheet 5-IFC 12 20-Jun-15 03-Jul-15MM1-1305-PT-95-N-XG-12048MM1 - Equipment Support- Sheet 1 29 16-Jun-15 18-Jul-15MM1-1305-PT-95-N-XG-12048-1MM1 - Equipment Support- Sheet 1-IDC 11 16-Jun-15* 27-Jun-15MM1-1305-PT-95-N-XG-12048-2MM1 - Equipment Support- Sheet 1-IFR 6 29-Jun-15 04-Jul-15MM1-1305-PT-95-N-XG-12048-3MM1 - Equipment Support- Sheet 1-IFD 0 06-Jul-15 06-Jul-15MM1-1305-PT-95-N-XG-12048-4MM1 - Equipment Support- Sheet 1-IFC 12 06-Jul-15 18-Jul-15MM1-1305-PT-95-N-XG-12049MM1 - Equipment Support- Sheet 2 29 16-Jun-15 18-Jul-15MM1-1305-PT-95-N-XG-12049-1MM1 - Equipment Support- Sheet 2-IDC 11 16-Jun-15* 27-Jun-15MM1-1305-PT-95-N-XG-12049-2MM1 - Equipment Support- Sheet 2-IFR 6 29-Jun-15 04-Jul-15MM1-1305-PT-95-N-XG-12049-3MM1 - Equipment Support- Sheet 2-IFD 0 06-Jul-15 06-Jul-15MM1-1305-PT-95-N-XG-12049-4MM1 - Equipment Support- Sheet 2-IFC 12 06-Jul-15 18-Jul-15MM1-1305-PT-95-N-XG-12050MM1 - Equipment Support- Sheet 3 29 16-Jun-15 18-Jul-15MM1-1305-PT-95-N-XG-12050-1MM1 - Equipment Support- Sheet 3-IDC 11 16-Jun-15* 27-Jun-15MM1-1305-PT-95-N-XG-12050-2MM1 - Equipment Support- Sheet 3-IFR 6 29-Jun-15 04-Jul-15MM1-1305-PT-95-N-XG-12050-3MM1 - Equipment Support- Sheet 3-IFD 0 06-Jul-15 06-Jul-15MM1-1305-PT-95-N-XG-12050-4MM1 - Equipment Support- Sheet 3-IFC 12 06-Jul-15 18-Jul-15MM1-1305-PT-95-N-XG-12051MM1 - Seafastening On Barge Arrangment & Details - Sheet 1 30 29-Jun-15 01-Aug-15MM1-1305-PT-95-N-XG-12051-1MM1 - Seafastening On Barge Arrangment & Details - Sheet 1-IDC 0 29-Jun-15* 29-Jun-15MM1-1305-PT-95-N-XG-12051-2MM1 - Seafastening On Barge Arrangment & Details - Sheet 1-IFR 18 29-Jun-15 18-Jul-15MM1-1305-PT-95-N-XG-12051-3MM1 - Seafastening On Barge Arrangment & Details - Sheet 1-IFD 0 20-Jul-15 20-Jul-15MM1-1305-PT-95-N-XG-12051-4MM1 - Seafastening On Barge Arrangment & Details - Sheet 1-IFC 12 20-Jul-15 01-Aug-15MM1-1305-PT-95-N-XG-12052MM1 - Seafastening On Barge Arrangment & Details - Sheet 2 30 29-Jun-15 01-Aug-15MM1-1305-PT-95-N-XG-12052-1MM1 - Seafastening On Barge Arrangment & Details - Sheet 2-IDC 0 29-Jun-15* 29-Jun-15MM1-1305-PT-95-N-XG-12052-2MM1 - Seafastening On Barge Arrangment & Details - Sheet 2-IFR 18 29-Jun-15 18-Jul-15MM1-1305-PT-95-N-XG-12052-3MM1 - Seafastening On Barge Arrangment & Details - Sheet 2-IFD 0 20-Jul-15 20-Jul-15MM1-1305-PT-95-N-XG-12052-4MM1 - Seafastening On Barge Arrangment & Details - Sheet 2-IFC 12 20-Jul-15 01-Aug-15MM1-1305-PT-95-N-XG-12053MM1 - Seafastening On Barge Arrangment & Details - Sheet 3 30 29-Jun-15 01-Aug-15MM1-1305-PT-95-N-XG-12053-1MM1 - Seafastening On Barge Arrangment & Details - Sheet 3-IDC 0 29-Jun-15* 29-Jun-15MM1-1305-PT-95-N-XG-12053-2MM1 - Seafastening On Barge Arrangment & Details - Sheet 3-IFR 18 29-Jun-15 18-Jul-15MM1-1305-PT-95-N-XG-12053-3MM1 - Seafastening On Barge Arrangment & Details - Sheet 3-IFD 0 20-Jul-15 20-Jul-15MM1-1305-PT-95-N-XG-12053-4MM1 - Seafastening On Barge Arrangment & Details - Sheet 3-IFC 12 20-Jul-15 01-Aug-15MM1-10150 TR/MTO for Primary & Secondary Steel 1 07-Apr-15 07-Apr-15MM1-10170 TR/MTO for Tertiary Steel 1 09-Jun-15 09-Jun-15MM1-10190 TR/MTO for Structural Miscellaneous 1 28-Jul-15 28-Jul-15MM1-10210 TR/MTO for Gratings (including Hilti clip and cartridge) 1 09-Aug-15 09-Aug-15MM1-1000 TR/MTO for SF and Grillage Material 1 10-Oct-15 10-Oct-15MM1-1100 Prepare / Submit/ Approve Structural Shop Drawings 185 11-Aug-15 21-Mar-16

0.D.26.0000.MM1.B.L Piping0.D.26.0000.MM1.B.L Piping 312 14-Mar-15 16-Mar-160.D.26.0000.MM1.B.L.92 PTSC0.D.26.0000.MM1.B.L.92 PTSC 312 14-Mar-15 16-Mar-16MM1-1305-PT-00-L-CA-00001MM1 & MM2 - Stress Analysis Report 50 01-Jun-15 28-Jul-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 14 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-00-L-CA-00001-1MM1 & MM2 - Stress Analysis Report-IDC 20 01-Jun-15* 23-Jun-15MM1-1305-PT-00-L-CA-00001-2MM1 & MM2 - Stress Analysis Report-IFR 6 24-Jun-15 30-Jun-15MM1-1305-PT-00-L-CA-00001-3MM1 & MM2 - Stress Analysis Report-IFD 12 01-Jul-15 14-Jul-15MM1-1305-PT-00-L-CA-00001-4MM1 & MM2 - Stress Analysis Report-IFC 12 15-Jul-15 28-Jul-15MM1-1305-PT-00-L-LA-00001MM1 & MM2 - Special Piping Item List 47 12-May-15 04-Jul-15MM1-1305-PT-00-L-LA-00001-1MM1 & MM2 - Special Piping Item List-IDC 7 12-May-15* 19-May-15MM1-1305-PT-00-L-LA-00001-2MM1 & MM2 - Special Piping Item List-IFR 4 20-May-15 23-May-15MM1-1305-PT-00-L-LA-00001-3MM1 & MM2 - Special Piping Item List-IFD 12 25-May-15 06-Jun-15MM1-1305-PT-00-L-LA-00001-4MM1 & MM2 - Special Piping Item List-IFC 24 08-Jun-15 04-Jul-15MM1-1305-PT-00-L-LA-00002MM1 & MM2 - TIE-IN Schedule 56 26-May-15 29-Jul-15MM1-1305-PT-00-L-LA-00002-1MM1 & MM2 - TIE-IN Schedule-IDC 25 26-May-15* 23-Jun-15MM1-1305-PT-00-L-LA-00002-2MM1 & MM2 - TIE-IN Schedule-IFR 7 24-Jun-15 01-Jul-15MM1-1305-PT-00-L-LA-00002-3MM1 & MM2 - TIE-IN Schedule-IFD 12 02-Jul-15 15-Jul-15MM1-1305-PT-00-L-LA-00002-4MM1 & MM2 - TIE-IN Schedule-IFC 12 16-Jul-15 29-Jul-15MM1-1305-PT-00-L-LA-00003MM1 & MM2 - Manual valve list 49 17-Apr-15 16-Jun-15MM1-1305-PT-00-L-LA-00003-1MM1 & MM2 - Manual valve list-IDC 7 17-Apr-15* 24-Apr-15MM1-1305-PT-00-L-LA-00003-2MM1 & MM2 - Manual valve list-IFR 2 25-Apr-15 27-Apr-15MM1-1305-PT-00-L-LA-00003-3MM1 & MM2 - Manual valve list-IFD 10 29-Apr-15 12-May-15MM1-1305-PT-00-L-LA-00003-4MM1 & MM2 - Manual valve list-IFC 30 13-May-15 16-Jun-15MM1-1305-PT-00-L-SA-00001MM1 & MM2 - Addional piping class 46 14-Mar-15 09-May-15MM1-1305-PT-00-L-SA-00001-1MM1 & MM2 - Addional piping class -IDC 1 14-Mar-15* 14-Mar-15MM1-1305-PT-00-L-SA-00001-2MM1 & MM2 - Addional piping class -IFR 24 16-Mar-15 11-Apr-15MM1-1305-PT-00-L-SA-00001-3MM1 & MM2 - Addional piping class -IFD 12 13-Apr-15 25-Apr-15MM1-1305-PT-00-L-SA-00001-4MM1 & MM2 - Addional piping class -IFC 9 27-Apr-15 09-May-15MM1-1305-PT-00-L-SA-00002MM1 & MM2 - Pipe support standard 46 06-Apr-15 01-Jun-15MM1-1305-PT-00-L-SA-00002-1MM1 & MM2 - Pipe support standard -IDC 1 06-Apr-15* 06-Apr-15MM1-1305-PT-00-L-SA-00002-2MM1 & MM2 - Pipe support standard -IFR 21 07-Apr-15 04-May-15MM1-1305-PT-00-L-SA-00002-3MM1 & MM2 - Pipe support standard -IFD 12 05-May-15 18-May-15MM1-1305-PT-00-L-SA-00002-4MM1 & MM2 - Pipe support standard -IFC 12 19-May-15 01-Jun-15MM1-1305-PT-00-L-DS-00001MM1 & MM2 - Ball valve Data sheets 34 03-Apr-15 15-May-15MM1-1305-PT-00-L-DS-00001-1MM1 & MM2 - Ball valve Data sheets-IDC 1 03-Apr-15* 03-Apr-15MM1-1305-PT-00-L-DS-00001-2MM1 & MM2 - Ball valve Data sheets-IFR 12 04-Apr-15 17-Apr-15MM1-1305-PT-00-L-DS-00001-3MM1 & MM2 - Ball valve Data sheets-IFD 9 18-Apr-15 29-Apr-15MM1-1305-PT-00-L-DS-00001-4MM1 & MM2 - Ball valve Data sheets-IFC 12 02-May-15 15-May-15MM1-1305-PT-00-L-DS-00002MM1 & MM2 - Globe Valve Data sheets 33 06-Apr-15 16-May-15MM1-1305-PT-00-L-DS-00002-1MM1 & MM2 - Globe Valve Data sheets-IDC 0 06-Apr-15* 06-Apr-15MM1-1305-PT-00-L-DS-00002-2MM1 & MM2 - Globe Valve Data sheets-IFR 12 06-Apr-15 18-Apr-15MM1-1305-PT-00-L-DS-00002-3MM1 & MM2 - Globe Valve Data sheets-IFD 9 20-Apr-15 02-May-15MM1-1305-PT-00-L-DS-00002-4MM1 & MM2 - Globe Valve Data sheets-IFC 12 04-May-15 16-May-15MM1-1305-PT-00-L-DS-00003MM1 & MM2 - Check Data sheets 34 07-Apr-15 19-May-15MM1-1305-PT-00-L-DS-00003-1MM1 & MM2 - Check Data sheets-IDC 1 07-Apr-15* 07-Apr-15MM1-1305-PT-00-L-DS-00003-2MM1 & MM2 - Check Data sheets-IFR 12 08-Apr-15 21-Apr-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 15 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-00-L-DS-00003-3MM1 & MM2 - Check Data sheets-IFD 9 22-Apr-15 05-May-15MM1-1305-PT-00-L-DS-00003-4MM1 & MM2 - Check Data sheets-IFC 12 06-May-15 19-May-15MM1-1305-PT-00-L-DS-00004MM1 & MM2 - DBB valve sheets 58 10-Apr-15 19-Jun-15MM1-1305-PT-00-L-DS-00004-1MM1 & MM2 - DBB valve sheets-IDC 1 10-Apr-15* 10-Apr-15MM1-1305-PT-00-L-DS-00004-2MM1 & MM2 - DBB valve sheets-IFR 12 11-Apr-15 24-Apr-15MM1-1305-PT-00-L-DS-00004-3MM1 & MM2 - DBB valve sheets-IFD 9 25-Apr-15 08-May-15MM1-1305-PT-00-L-DS-00004-4MM1 & MM2 - DBB valve sheets-IFC 36 09-May-15 19-Jun-15MM1-1305-PT-00-L-DS-00005MM1 & MM2 - SP Item Data Sheet -Valve Interlock 61 12-May-15 21-Jul-15MM1-1305-PT-00-L-DS-00005-1MM1 & MM2 - SP Item Data Sheet -Valve Interlock -IDC 1 12-May-15* 12-May-15MM1-1305-PT-00-L-DS-00005-2MM1 & MM2 - SP Item Data Sheet -Valve Interlock -IFR 12 13-May-15 26-May-15MM1-1305-PT-00-L-DS-00005-3MM1 & MM2 - SP Item Data Sheet -Valve Interlock -IFD 12 27-May-15 09-Jun-15MM1-1305-PT-00-L-DS-00005-4MM1 & MM2 - SP Item Data Sheet -Valve Interlock -IFC 36 10-Jun-15 21-Jul-15MM1-1305-PT-00-L-DS-00006MM1 & MM2 - SP Item Data Sheet - Barred Tee 52 10-Apr-15 12-Jun-15MM1-1305-PT-00-L-DS-00006-1MM1 & MM2 - SP Item Data Sheet - Barred Tee-IDC 1 10-Apr-15* 10-Apr-15MM1-1305-PT-00-L-DS-00006-2MM1 & MM2 - SP Item Data Sheet - Barred Tee-IFR 12 11-Apr-15 24-Apr-15MM1-1305-PT-00-L-DS-00006-3MM1 & MM2 - SP Item Data Sheet - Barred Tee-IFD 9 25-Apr-15 08-May-15MM1-1305-PT-00-L-DS-00006-4MM1 & MM2 - SP Item Data Sheet - Barred Tee-IFC 30 09-May-15 12-Jun-15MM1-1305-PT-00-L-DS-00007MM1 & MM2 - SP Item Data Sheet - Bends 70 24-Apr-15 17-Jul-15MM1-1305-PT-00-L-DS-00007-1MM1 & MM2 - SP Item Data Sheet - Bends-IDC 1 24-Apr-15* 24-Apr-15MM1-1305-PT-00-L-DS-00007-2MM1 & MM2 - SP Item Data Sheet - Bends-IFR 15 25-Apr-15 15-May-15MM1-1305-PT-00-L-DS-00007-3MM1 & MM2 - SP Item Data Sheet - Bends-IFD 12 16-May-15 29-May-15MM1-1305-PT-00-L-DS-00007-4MM1 & MM2 - SP Item Data Sheet - Bends-IFC 42 30-May-15 17-Jul-15MM1-1305-PT-00-L-DS-00008MM1 & MM2 - SP Item Data Sheets for Sample connection 58 24-Apr-15 03-Jul-15MM1-1305-PT-00-L-DS-00008-1MM1 & MM2 - SP Item Data Sheets for Sample connection -IDC 1 24-Apr-15* 24-Apr-15MM1-1305-PT-00-L-DS-00008-2MM1 & MM2 - SP Item Data Sheets for Sample connection -IFR 9 25-Apr-15 08-May-15MM1-1305-PT-00-L-DS-00008-3MM1 & MM2 - SP Item Data Sheets for Sample connection -IFD 12 09-May-15 22-May-15MM1-1305-PT-00-L-DS-00008-4MM1 & MM2 - SP Item Data Sheets for Sample connection -IFC 36 23-May-15 03-Jul-15MM1-1305-PT-00-L-DS-00009MM1 & MM2 - SP Item Data Sheet - Chemcial injection 58 24-Apr-15 03-Jul-15MM1-1305-PT-00-L-DS-00009-1MM1 & MM2 - SP Item Data Sheet - Chemcial injection-IDC 1 24-Apr-15* 24-Apr-15MM1-1305-PT-00-L-DS-00009-2MM1 & MM2 - SP Item Data Sheet - Chemcial injection-IFR 9 25-Apr-15 08-May-15MM1-1305-PT-00-L-DS-00009-3MM1 & MM2 - SP Item Data Sheet - Chemcial injection-IFD 12 09-May-15 22-May-15MM1-1305-PT-00-L-DS-00009-4MM1 & MM2 - SP Item Data Sheet - Chemcial injection-IFC 36 23-May-15 03-Jul-15MM1-1305-PT-00-L-DS-00010MM1 & MM2 - SP Item Data Sheet - Corrosion probe/coupon 58 24-Apr-15 03-Jul-15MM1-1305-PT-00-L-DS-00010-1MM1 & MM2 - SP Item Data Sheet - Corrosion probe/coupon-IDC 1 24-Apr-15* 24-Apr-15MM1-1305-PT-00-L-DS-00010-2MM1 & MM2 - SP Item Data Sheet - Corrosion probe/coupon-IFR 9 25-Apr-15 08-May-15MM1-1305-PT-00-L-DS-00010-3MM1 & MM2 - SP Item Data Sheet - Corrosion probe/coupon-IFD 12 09-May-15 22-May-15MM1-1305-PT-00-L-DS-00010-4MM1 & MM2 - SP Item Data Sheet - Corrosion probe/coupon-IFC 36 23-May-15 03-Jul-15MM1-1305-PT-00-L-DS-00011MM1 & MM2 - SP Item Data Sheet - Sand probe 58 24-Apr-15 03-Jul-15MM1-1305-PT-00-L-DS-00011-1MM1 & MM2 - SP Item Data Sheet - Sand probe-IDC 1 24-Apr-15* 24-Apr-15MM1-1305-PT-00-L-DS-00011-2MM1 & MM2 - SP Item Data Sheet - Sand probe-IFR 9 25-Apr-15 08-May-15MM1-1305-PT-00-L-DS-00011-3MM1 & MM2 - SP Item Data Sheet - Sand probe-IFD 12 09-May-15 22-May-15MM1-1305-PT-00-L-DS-00011-4MM1 & MM2 - SP Item Data Sheet - Sand probe-IFC 36 23-May-15 03-Jul-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 16 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-00-L-DS-00012MM1 & MM2 - SP Item Data Sheet - Quick coupling 70 05-Jun-15 25-Aug-15MM1-1305-PT-00-L-DS-00012-1MM1 & MM2 - SP Item Data Sheet - Quick coupling-IDC 1 05-Jun-15* 05-Jun-15MM1-1305-PT-00-L-DS-00012-2MM1 & MM2 - SP Item Data Sheet - Quick coupling-IFR 12 06-Jun-15 19-Jun-15MM1-1305-PT-00-L-DS-00012-3MM1 & MM2 - SP Item Data Sheet - Quick coupling-IFD 12 20-Jun-15 03-Jul-15MM1-1305-PT-00-L-DS-00012-4MM1 & MM2 - SP Item Data Sheet - Quick coupling-IFC 45 04-Jul-15 25-Aug-15MM1-1305-PT-00-L-DS-00013MM1 & MM2 - SP Item Data Sheet - HUB CONNECTOR 70 05-Jun-15 25-Aug-15MM1-1305-PT-00-L-DS-00013-1MM1 & MM2 - SP Item Data Sheet - HUB CONNECTOR-IDC 1 05-Jun-15* 05-Jun-15MM1-1305-PT-00-L-DS-00013-2MM1 & MM2 - SP Item Data Sheet - HUB CONNECTOR-IFR 12 06-Jun-15 19-Jun-15MM1-1305-PT-00-L-DS-00013-3MM1 & MM2 - SP Item Data Sheet - HUB CONNECTOR-IFD 12 20-Jun-15 03-Jul-15MM1-1305-PT-00-L-DS-00013-4MM1 & MM2 - SP Item Data Sheet - HUB CONNECTOR-IFC 45 04-Jul-15 25-Aug-15MM1-1305-PT-00-L-XE-10001MM1 - Equipment Layout 40 24-Apr-15 12-Jun-15MM1-1305-PT-00-L-XE-10001-1MM1 - Equipment Layout-IDC 10 24-Apr-15* 08-May-15MM1-1305-PT-00-L-XE-10001-2MM1 - Equipment Layout-IFR 6 09-May-15 15-May-15MM1-1305-PT-00-L-XE-10001-3MM1 - Equipment Layout-IFD 12 16-May-15 29-May-15MM1-1305-PT-00-L-XE-10001-4MM1 - Equipment Layout-IFC 12 30-May-15 12-Jun-15MM1-1305-PT-00-L-XE-10002MM1 - Piping layout 43 30-May-15 18-Jul-15MM1-1305-PT-00-L-XE-10002-1MM1 - Piping layout-IDC 13 30-May-15* 13-Jun-15MM1-1305-PT-00-L-XE-10002-2MM1 - Piping layout-IFR 6 15-Jun-15 20-Jun-15MM1-1305-PT-00-L-XE-10002-3MM1 - Piping layout-IFD 12 22-Jun-15 04-Jul-15MM1-1305-PT-00-L-XE-10002-4MM1 - Piping layout-IFC 12 06-Jul-15 18-Jul-15MM1-1305-PT-00-L-XF-10003MM1 - Pipe support location plan 43 20-Jun-15 08-Aug-15MM1-1305-PT-00-L-XF-10003-1MM1 - Pipe support location plan-IDC 13 20-Jun-15* 04-Jul-15MM1-1305-PT-00-L-XF-10003-2MM1 - Pipe support location plan-IFR 6 06-Jul-15 11-Jul-15MM1-1305-PT-00-L-XF-10003-3MM1 - Pipe support location plan-IFD 0 13-Jul-15 13-Jul-15MM1-1305-PT-00-L-XF-10003-4MM1 - Pipe support location plan-IFC 24 13-Jul-15 08-Aug-15MM1-1305-PT-00-L-XN-10001MM1 - Isometric drawings (n Sheets) 59 16-May-15 23-Jul-15MM1-1305-PT-00-L-XN-10001-1MM1 - Isometric drawings (n Sheets)-IDC 13 16-May-15* 30-May-15MM1-1305-PT-00-L-XN-10001-2MM1 - Isometric drawings (n Sheets)-IFR 12 01-Jun-15 13-Jun-15MM1-1305-PT-00-L-XN-10001-3MM1 - Isometric drawings (n Sheets)-IFD 0 15-Jun-15 15-Jun-15MM1-1305-PT-00-L-XN-10001-4MM1 - Isometric drawings (n Sheets)-IFC 34 15-Jun-15 23-Jul-15MM1-1305-PT-00-L-XO-10001MM1 - Pipe support detail drawings 59 16-May-15 23-Jul-15MM1-1305-PT-00-L-XO-10001-1MM1 - Pipe support detail drawings-IDC 13 16-May-15* 30-May-15MM1-1305-PT-00-L-XO-10001-2MM1 - Pipe support detail drawings-IFR 12 01-Jun-15 13-Jun-15MM1-1305-PT-00-L-XO-10001-3MM1 - Pipe support detail drawings-IFD 0 15-Jun-15 15-Jun-15MM1-1305-PT-00-L-XO-10001-4MM1 - Pipe support detail drawings-IFC 34 15-Jun-15 23-Jul-15MM1-1305-PT-00-L-LA-00004MM1 & MM2 - Material take-off for Manual Valves 45 23-Apr-15 17-Jun-15MM1-1305-PT-00-L-LA-00004-1MM1 & MM2 - Material take-off for Manual Valves-IDC 1 23-Apr-15* 23-Apr-15MM1-1305-PT-00-L-LA-00004-2MM1 & MM2 - Material take-off for Manual Valves-IFR 4 24-Apr-15 29-Apr-15MM1-1305-PT-00-L-LA-00004-3MM1 & MM2 - Material take-off for Manual Valves-IFD 0 02-May-15 02-May-15MM1-1305-PT-00-L-LA-00004-4MM1 & MM2 - Material take-off for Manual Valves-IFC 40 02-May-15 17-Jun-15MM1-1305-PT-00-L-LA-00005MM1 & MM2 - Material take-off for Stub bolts, nuts and gasket 54 26-Jun-15 27-Aug-15MM1-1305-PT-00-L-LA-00005-1MM1 & MM2 - Material take-off for Stub bolts, nuts and gasket-IDC 1 26-Jun-15* 26-Jun-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 17 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-00-L-LA-00005-2MM1 & MM2 - Material take-off for Stub bolts, nuts and gasket-IFR 5 27-Jun-15 02-Jul-15MM1-1305-PT-00-L-LA-00005-3MM1 & MM2 - Material take-off for Stub bolts, nuts and gasket-IFD 0 03-Jul-15 03-Jul-15MM1-1305-PT-00-L-LA-00005-4MM1 & MM2 - Material take-off for Stub bolts, nuts and gasket-IFC 48 03-Jul-15 27-Aug-15MM1-1305-PT-00-L-LA-00006MM1 & MM2 - Material take-off for Pipe Support (Raw Material) 53 30-May-15 30-Jul-15MM1-1305-PT-00-L-LA-00006-1MM1 & MM2 - Material take-off for Pipe Support (Raw Material)-IDC 1 30-May-15* 30-May-15MM1-1305-PT-00-L-LA-00006-2MM1 & MM2 - Material take-off for Pipe Support (Raw Material)-IFR 6 01-Jun-15 06-Jun-15MM1-1305-PT-00-L-LA-00006-3MM1 & MM2 - Material take-off for Pipe Support (Raw Material)-IFD 0 08-Jun-15 08-Jun-15MM1-1305-PT-00-L-LA-00006-4MM1 & MM2 - Material take-off for Pipe Support (Raw Material)-IFC 46 08-Jun-15 30-Jul-15MM1-1305-PT-00-L-LA-00007MM1 & MM2 - Material take-off - Hub Connector 70 11-Jun-15 31-Aug-15MM1-1305-PT-00-L-LA-00007-1MM1 & MM2 - Material take-off - Hub Connector-IDC 1 11-Jun-15* 11-Jun-15MM1-1305-PT-00-L-LA-00007-2MM1 & MM2 - Material take-off - Hub Connector-IFR 12 12-Jun-15 25-Jun-15MM1-1305-PT-00-L-LA-00007-3MM1 & MM2 - Material take-off - Hub Connector-IFD 0 26-Jun-15 26-Jun-15MM1-1305-PT-00-L-LA-00007-4MM1 & MM2 - Material take-off - Hub Connector-IFC 57 26-Jun-15 31-Aug-15MM1-10250 TR/MTO for Piping Bulk 1 10-Apr-15 10-Apr-15MM1-10270 TR/MTO for Manual valves 1 29-Apr-15 29-Apr-15MM1-10290 TR/MTO for Barred Tee 1 29-Apr-15 29-Apr-15MM1-10310 TR/MTO for Cuni fittings 1 08-May-15 08-May-15MM1-10330 TR/MTO for Corrosion, sand probe, sample connection, chemical connection 1 18-May-15 18-May-15MM1-10350 TR/MTO for 3D Bend (free bare pipe to bending contractor) 1 30-May-15 30-May-15MM1-10370 TR/MTO for Pipe Supports 1 06-Jun-15 06-Jun-15MM1-10410 TR/MTO for Piping insulation 1 04-Jul-15 04-Jul-15MM1-10430 TR/MTO for Bolt nut, gasket and other 1 06-Jul-15 06-Jul-15MM1-10390 TR/MTO for Quick Coupling 1 09-Jul-15 09-Jul-15MM1-10450 TR/MTO for Valve Inter-locks 1 16-Sep-15 16-Sep-15MM1-10470 Prepare / Submit/ Approve Piping Shop Drawings 151 16-Sep-15 16-Mar-16

0.D.26.0000.MM1.B.1 E&I0.D.26.0000.MM1.B.1 E&I 313 13-Mar-15 16-Mar-160.D.26.0000.MM1.B.1.92 PTSC0.D.26.0000.MM1.B.1.92 PTSC 313 13-Mar-15 16-Mar-16MM1-1305-PT-82-E-CA-00001MM1 & MM2 - Electrical Load List 57 04-May-15 08-Jul-15MM1-1305-PT-82-E-CA-00001-1MM1 & MM2 - Electrical Load List-IDC 10 04-May-15* 14-May-15MM1-1305-PT-82-E-CA-00001-2MM1 & MM2 - Electrical Load List-IFR 13 15-May-15 29-May-15MM1-1305-PT-82-E-CA-00001-3MM1 & MM2 - Electrical Load List-IFD 13 30-May-15 13-Jun-15MM1-1305-PT-82-E-CA-00001-4MM1 & MM2 - Electrical Load List-IFC 21 15-Jun-15 08-Jul-15MM1-1305-PT-82-E-CA-00002MM1 & MM2 - Electrical Lighting Calculation 32 20-Mar-15 25-Apr-15MM1-1305-PT-82-E-CA-00002-1MM1 & MM2 - Electrical Lighting Calculation-IDC 9 20-Mar-15* 30-Mar-15MM1-1305-PT-82-E-CA-00002-2MM1 & MM2 - Electrical Lighting Calculation-IFR 6 31-Mar-15 06-Apr-15MM1-1305-PT-82-E-CA-00002-3MM1 & MM2 - Electrical Lighting Calculation-IFD 13 07-Apr-15 21-Apr-15MM1-1305-PT-82-E-CA-00002-4MM1 & MM2 - Electrical Lighting Calculation-IFC 4 22-Apr-15 25-Apr-15MM1-1305-PT-82-E-XX-00001MM1 & MM2 - Electrical General Drawing and Document Index 36 23-Mar-15 06-May-15MM1-1305-PT-82-E-XX-00001-1MM1 & MM2 - Electrical General Drawing and Document Index-IDC 9 23-Mar-15* 01-Apr-15MM1-1305-PT-82-E-XX-00001-2MM1 & MM2 - Electrical General Drawing and Document Index-IFR 13 02-Apr-15 16-Apr-15MM1-1305-PT-82-E-XX-00001-3MM1 & MM2 - Electrical General Drawing and Document Index-IFD 0 17-Apr-15 17-Apr-15MM1-1305-PT-82-E-XX-00001-4MM1 & MM2 - Electrical General Drawing and Document Index-IFC 14 17-Apr-15 06-May-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 18 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-82-E-XX-00002MM1 & MM2 - Electrical Typical Installation Details 48 13-Mar-15 11-May-15MM1-1305-PT-82-E-XX-00002-1MM1 & MM2 - Electrical Typical Installation Details-IDC 9 13-Mar-15* 23-Mar-15MM1-1305-PT-82-E-XX-00002-2MM1 & MM2 - Electrical Typical Installation Details-IFR 13 24-Mar-15 07-Apr-15MM1-1305-PT-82-E-XX-00002-3MM1 & MM2 - Electrical Typical Installation Details-IFD 13 08-Apr-15 22-Apr-15MM1-1305-PT-82-E-XX-00002-4MM1 & MM2 - Electrical Typical Installation Details-IFC 13 23-Apr-15 11-May-15MM1-1305-PT-82-E-DS-00001MM1 & MM2 - Electrical Datasheet 30 02-Apr-15 09-May-15MM1-1305-PT-82-E-DS-00001-1MM1 & MM2 - Electrical Datasheet-IDC 9 02-Apr-15* 11-Apr-15MM1-1305-PT-82-E-DS-00001-2MM1 & MM2 - Electrical Datasheet-IFR 6 13-Apr-15 18-Apr-15MM1-1305-PT-82-E-DS-00001-3MM1 & MM2 - Electrical Datasheet-IFD 10 20-Apr-15 04-May-15MM1-1305-PT-82-E-DS-00001-4MM1 & MM2 - Electrical Datasheet-IFC 5 05-May-15 09-May-15MM1-1305-PT-82-E-XX-10001MM1 - Electrical Drawing Index 37 23-Mar-15 07-May-15MM1-1305-PT-82-E-XX-10001-1MM1 - Electrical Drawing Index -IDC 10 23-Mar-15* 02-Apr-15MM1-1305-PT-82-E-XX-10001-2MM1 - Electrical Drawing Index -IFR 13 03-Apr-15 17-Apr-15MM1-1305-PT-82-E-XX-10001-3MM1 - Electrical Drawing Index -IFD 0 18-Apr-15 18-Apr-15MM1-1305-PT-82-E-XX-10001-4MM1 - Electrical Drawing Index -IFC 14 18-Apr-15 07-May-15MM1-1305-PT-82-E-XX-10002MM1 - Electrical Cable Ladder Support 39 08-May-15 22-Jun-15MM1-1305-PT-82-E-XX-10002-1MM1 - Electrical Cable Ladder Support-IDC 9 08-May-15* 18-May-15MM1-1305-PT-82-E-XX-10002-2MM1 - Electrical Cable Ladder Support-IFR 13 19-May-15 02-Jun-15MM1-1305-PT-82-E-XX-10002-3MM1 - Electrical Cable Ladder Support-IFD 0 03-Jun-15 03-Jun-15MM1-1305-PT-82-E-XX-10002-4MM1 - Electrical Cable Ladder Support-IFC 17 03-Jun-15 22-Jun-15MM1-1305-PT-82-E-XJ-10001MM1 - Electrical Single Line Diagram - MOV Distribution Panel 82EL001 39 13-Mar-15 27-Apr-15MM1-1305-PT-82-E-XJ-10001-1MM1 - Electrical Single Line Diagram - MOV Distribution Panel 82EL001-IDC 9 13-Mar-15* 23-Mar-15MM1-1305-PT-82-E-XJ-10001-2MM1 - Electrical Single Line Diagram - MOV Distribution Panel 82EL001-IFR 13 24-Mar-15 07-Apr-15MM1-1305-PT-82-E-XJ-10001-3MM1 - Electrical Single Line Diagram - MOV Distribution Panel 82EL001-IFD 0 08-Apr-15 08-Apr-15MM1-1305-PT-82-E-XJ-10001-4MM1 - Electrical Single Line Diagram - MOV Distribution Panel 82EL001-IFC 17 08-Apr-15 27-Apr-15MM1-1305-PT-82-E-XJ-10002MM1 - Electrical Single Line Diagram - Heat Tracing Distribution Panel 82EL00239 13-Mar-15 27-Apr-15MM1-1305-PT-82-E-XJ-10002-1MM1 - Electrical Single Line Diagram - Heat Tracing Distribution Panel 82EL002-IDC9 13-Mar-15* 23-Mar-15MM1-1305-PT-82-E-XJ-10002-2MM1 - Electrical Single Line Diagram - Heat Tracing Distribution Panel 82EL002-IFR13 24-Mar-15 07-Apr-15MM1-1305-PT-82-E-XJ-10002-3MM1 - Electrical Single Line Diagram - Heat Tracing Distribution Panel 82EL002-IFD0 08-Apr-15 08-Apr-15MM1-1305-PT-82-E-XJ-10002-4MM1 - Electrical Single Line Diagram - Heat Tracing Distribution Panel 82EL002-IFC17 08-Apr-15 27-Apr-15MM1-1305-PT-82-E-XJ-10003MM1 - Electrical Single Line Diagram - Normal Lighting Distribution Panel 82EL00339 13-Mar-15 27-Apr-15MM1-1305-PT-82-E-XJ-10003-1MM1 - Electrical Single Line Diagram - Normal Lighting Distribution Panel 82EL003-IDC9 13-Mar-15* 23-Mar-15MM1-1305-PT-82-E-XJ-10003-2MM1 - Electrical Single Line Diagram - Normal Lighting Distribution Panel 82EL003-IFR13 24-Mar-15 07-Apr-15MM1-1305-PT-82-E-XJ-10003-3MM1 - Electrical Single Line Diagram - Normal Lighting Distribution Panel 82EL003-IFD0 08-Apr-15 08-Apr-15MM1-1305-PT-82-E-XJ-10003-4MM1 - Electrical Single Line Diagram - Normal Lighting Distribution Panel 82EL003-IFC17 08-Apr-15 27-Apr-15MM1-1305-PT-82-E-XJ-10004MM1 - Electrical Single Line Diagram - Emergency Lighting Distribution Panel 82EL00439 13-Mar-15 27-Apr-15MM1-1305-PT-82-E-XJ-10004-1MM1 - Electrical Single Line Diagram - Emergency Lighting Distribution Panel 82EL004-IDC9 13-Mar-15* 23-Mar-15MM1-1305-PT-82-E-XJ-10004-2MM1 - Electrical Single Line Diagram - Emergency Lighting Distribution Panel 82EL004-IFR13 24-Mar-15 07-Apr-15MM1-1305-PT-82-E-XJ-10004-3MM1 - Electrical Single Line Diagram - Emergency Lighting Distribution Panel 82EL004-IFD0 08-Apr-15 08-Apr-15MM1-1305-PT-82-E-XJ-10004-4MM1 - Electrical Single Line Diagram - Emergency Lighting Distribution Panel 82EL004-IFC17 08-Apr-15 27-Apr-15MM1-1305-PT-82-E-XJ-10005MM1 - Electrical Single Line Diagram - Escape Lighting Distribution Panel 82EL00539 13-Mar-15 27-Apr-15MM1-1305-PT-82-E-XJ-10005-1MM1 - Electrical Single Line Diagram - Escape Lighting Distribution Panel 82EL005-IDC9 13-Mar-15* 23-Mar-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 19 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-82-E-XJ-10005-2MM1 - Electrical Single Line Diagram - Escape Lighting Distribution Panel 82EL005-IFR13 24-Mar-15 07-Apr-15MM1-1305-PT-82-E-XJ-10005-3MM1 - Electrical Single Line Diagram - Escape Lighting Distribution Panel 82EL005-IFD0 08-Apr-15 08-Apr-15MM1-1305-PT-82-E-XJ-10005-4MM1 - Electrical Single Line Diagram - Escape Lighting Distribution Panel 82EL005-IFC17 08-Apr-15 27-Apr-15MM1-1305-PT-82-E-TA-10001MM1 - Electrical Cable Schedule 51 10-Apr-15 11-Jun-15MM1-1305-PT-82-E-TA-10001-1MM1 - Electrical Cable Schedule -IDC 13 10-Apr-15* 24-Apr-15MM1-1305-PT-82-E-TA-10001-2MM1 - Electrical Cable Schedule -IFR 9 25-Apr-15 08-May-15MM1-1305-PT-82-E-TA-10001-3MM1 - Electrical Cable Schedule -IFD 13 09-May-15 23-May-15MM1-1305-PT-82-E-TA-10001-4MM1 - Electrical Cable Schedule -IFC 16 25-May-15 11-Jun-15MM1-1305-PT-82-E-XT-10001MM1 - Electrical Heat Tracing Interconnection Diagram 39 21-May-15 04-Jul-15MM1-1305-PT-82-E-XT-10001-1MM1 - Electrical Heat Tracing Interconnection Diagram-IDC 9 21-May-15* 30-May-15MM1-1305-PT-82-E-XT-10001-2MM1 - Electrical Heat Tracing Interconnection Diagram-IFR 13 01-Jun-15 15-Jun-15MM1-1305-PT-82-E-XT-10001-3MM1 - Electrical Heat Tracing Interconnection Diagram-IFD 0 16-Jun-15 16-Jun-15MM1-1305-PT-82-E-XT-10001-4MM1 - Electrical Heat Tracing Interconnection Diagram-IFC 17 16-Jun-15 04-Jul-15MM1-1305-PT-82-E-XI-10001MM1 - Electrical Heat Tracing Block Diagram 58 25-Apr-15 04-Jul-15MM1-1305-PT-82-E-XI-10001-1MM1 - Electrical Heat Tracing Block Diagram-IDC 6 25-Apr-15* 05-May-15MM1-1305-PT-82-E-XI-10001-2MM1 - Electrical Heat Tracing Block Diagram-IFR 13 06-May-15 20-May-15MM1-1305-PT-82-E-XI-10001-3MM1 - Electrical Heat Tracing Block Diagram-IFD 0 21-May-15 21-May-15MM1-1305-PT-82-E-XI-10001-4MM1 - Electrical Heat Tracing Block Diagram-IFC 39 21-May-15 04-Jul-15MM1-1305-PT-82-E-XI-10002MM1 - Electrical Lighting Interconnection Diagram 36 24-Apr-15 08-Jun-15MM1-1305-PT-82-E-XI-10002-1MM1 - Electrical Lighting Interconnection Diagram-IDC 6 24-Apr-15* 04-May-15MM1-1305-PT-82-E-XI-10002-2MM1 - Electrical Lighting Interconnection Diagram-IFR 13 05-May-15 19-May-15MM1-1305-PT-82-E-XI-10002-3MM1 - Electrical Lighting Interconnection Diagram-IFD 0 20-May-15 20-May-15MM1-1305-PT-82-E-XI-10002-4MM1 - Electrical Lighting Interconnection Diagram-IFC 17 20-May-15 08-Jun-15MM1-1305-PT-82-E-XE-10001MM1 - Electrical Lighting And Small Power Layout - Main Deck 36 24-Apr-15 08-Jun-15MM1-1305-PT-82-E-XE-10001-1MM1 - Electrical Lighting And Small Power Layout - Main Deck -IDC 6 24-Apr-15* 04-May-15MM1-1305-PT-82-E-XE-10001-2MM1 - Electrical Lighting And Small Power Layout - Main Deck -IFR 13 05-May-15 19-May-15MM1-1305-PT-82-E-XE-10001-3MM1 - Electrical Lighting And Small Power Layout - Main Deck -IFD 0 20-May-15 20-May-15MM1-1305-PT-82-E-XE-10001-4MM1 - Electrical Lighting And Small Power Layout - Main Deck -IFC 17 20-May-15 08-Jun-15MM1-1305-PT-82-E-XE-10002MM1 - Electrical Lighting And Small Power Layout - Mezzanine Deck 36 24-Apr-15 08-Jun-15MM1-1305-PT-82-E-XE-10002-1MM1 - Electrical Lighting And Small Power Layout - Mezzanine Deck -IDC 6 24-Apr-15* 04-May-15MM1-1305-PT-82-E-XE-10002-2MM1 - Electrical Lighting And Small Power Layout - Mezzanine Deck -IFR 13 05-May-15 19-May-15MM1-1305-PT-82-E-XE-10002-3MM1 - Electrical Lighting And Small Power Layout - Mezzanine Deck -IFD 0 20-May-15 20-May-15MM1-1305-PT-82-E-XE-10002-4MM1 - Electrical Lighting And Small Power Layout - Mezzanine Deck -IFC 17 20-May-15 08-Jun-15MM1-1305-PT-82-E-XE-10003MM1 - Electrical Lighting And Small Power Layout - Upper Deck 36 24-Apr-15 08-Jun-15MM1-1305-PT-82-E-XE-10003-1MM1 - Electrical Lighting And Small Power Layout - Upper Deck -IDC 6 24-Apr-15* 04-May-15MM1-1305-PT-82-E-XE-10003-2MM1 - Electrical Lighting And Small Power Layout - Upper Deck -IFR 13 05-May-15 19-May-15MM1-1305-PT-82-E-XE-10003-3MM1 - Electrical Lighting And Small Power Layout - Upper Deck -IFD 0 20-May-15 20-May-15MM1-1305-PT-82-E-XE-10003-4MM1 - Electrical Lighting And Small Power Layout - Upper Deck -IFC 17 20-May-15 08-Jun-15MM1-1305-PT-82-E-XE-11001MM1 - Electrical Earthing Layout - Main Deck 35 02-Apr-15 15-May-15MM1-1305-PT-82-E-XE-11001-1MM1 - Electrical Earthing Layout - Main Deck -IDC 8 02-Apr-15* 10-Apr-15MM1-1305-PT-82-E-XE-11001-2MM1 - Electrical Earthing Layout - Main Deck -IFR 13 11-Apr-15 25-Apr-15MM1-1305-PT-82-E-XE-11001-3MM1 - Electrical Earthing Layout - Main Deck -IFD 0 27-Apr-15 27-Apr-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 20 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-82-E-XE-11001-4MM1 - Electrical Earthing Layout - Main Deck -IFC 14 27-Apr-15 15-May-15MM1-1305-PT-82-E-XE-11002MM1 - Electrical Earthing Layout - Mezzanine Deck 35 02-Apr-15 15-May-15MM1-1305-PT-82-E-XE-11002-1MM1 - Electrical Earthing Layout - Mezzanine Deck-IDC 8 02-Apr-15* 10-Apr-15MM1-1305-PT-82-E-XE-11002-2MM1 - Electrical Earthing Layout - Mezzanine Deck-IFR 13 11-Apr-15 25-Apr-15MM1-1305-PT-82-E-XE-11002-3MM1 - Electrical Earthing Layout - Mezzanine Deck-IFD 0 27-Apr-15 27-Apr-15MM1-1305-PT-82-E-XE-11002-4MM1 - Electrical Earthing Layout - Mezzanine Deck-IFC 14 27-Apr-15 15-May-15MM1-1305-PT-82-E-XE-11003MM1 - Electrical Earthing Layout - Upper Deck 35 02-Apr-15 15-May-15MM1-1305-PT-82-E-XE-11003-1MM1 - Electrical Earthing Layout - Upper Deck -IDC 8 02-Apr-15* 10-Apr-15MM1-1305-PT-82-E-XE-11003-2MM1 - Electrical Earthing Layout - Upper Deck -IFR 13 11-Apr-15 25-Apr-15MM1-1305-PT-82-E-XE-11003-3MM1 - Electrical Earthing Layout - Upper Deck -IFD 0 27-Apr-15 27-Apr-15MM1-1305-PT-82-E-XE-11003-4MM1 - Electrical Earthing Layout - Upper Deck -IFC 14 27-Apr-15 15-May-15MM1-1305-PT-82-E-XE-12001MM1 - Electrical Cable Ladder And Support Layout - Main Deck 36 24-Apr-15 08-Jun-15MM1-1305-PT-82-E-XE-12001-1MM1 - Electrical Cable Ladder And Support Layout - Main Deck -IDC 6 24-Apr-15* 04-May-15MM1-1305-PT-82-E-XE-12001-2MM1 - Electrical Cable Ladder And Support Layout - Main Deck -IFR 13 05-May-15 19-May-15MM1-1305-PT-82-E-XE-12001-3MM1 - Electrical Cable Ladder And Support Layout - Main Deck -IFD 0 20-May-15 20-May-15MM1-1305-PT-82-E-XE-12001-4MM1 - Electrical Cable Ladder And Support Layout - Main Deck -IFC 17 20-May-15 08-Jun-15MM1-1305-PT-82-E-XE-12002MM1 - Electrical Cable Ladder And Support Layout - Mezzanine Deck 36 24-Apr-15 08-Jun-15MM1-1305-PT-82-E-XE-12002-1MM1 - Electrical Cable Ladder And Support Layout - Mezzanine Deck -IDC 6 24-Apr-15* 04-May-15MM1-1305-PT-82-E-XE-12002-2MM1 - Electrical Cable Ladder And Support Layout - Mezzanine Deck -IFR 13 05-May-15 19-May-15MM1-1305-PT-82-E-XE-12002-3MM1 - Electrical Cable Ladder And Support Layout - Mezzanine Deck -IFD 0 20-May-15 20-May-15MM1-1305-PT-82-E-XE-12002-4MM1 - Electrical Cable Ladder And Support Layout - Mezzanine Deck -IFC 17 20-May-15 08-Jun-15MM1-1305-PT-82-E-XE-12003MM1 - Electrical Cable Ladder And Support Layout - Upper Deck 36 24-Apr-15 08-Jun-15MM1-1305-PT-82-E-XE-12003-1MM1 - Electrical Cable Ladder And Support Layout - Upper Deck-IDC 6 24-Apr-15* 04-May-15MM1-1305-PT-82-E-XE-12003-2MM1 - Electrical Cable Ladder And Support Layout - Upper Deck-IFR 13 05-May-15 19-May-15MM1-1305-PT-82-E-XE-12003-3MM1 - Electrical Cable Ladder And Support Layout - Upper Deck-IFD 0 20-May-15 20-May-15MM1-1305-PT-82-E-XE-12003-4MM1 - Electrical Cable Ladder And Support Layout - Upper Deck-IFC 17 20-May-15 08-Jun-15MM1-1305-PT-82-E-XE-13001MM1 - Electrical Cable Routing Layout - Main Deck 39 09-May-15 23-Jun-15MM1-1305-PT-82-E-XE-13001-1MM1 - Electrical Cable Routing Layout - Main Deck-IDC 9 09-May-15* 19-May-15MM1-1305-PT-82-E-XE-13001-2MM1 - Electrical Cable Routing Layout - Main Deck-IFR 13 20-May-15 03-Jun-15MM1-1305-PT-82-E-XE-13001-3MM1 - Electrical Cable Routing Layout - Main Deck-IFD 0 04-Jun-15 04-Jun-15MM1-1305-PT-82-E-XE-13001-4MM1 - Electrical Cable Routing Layout - Main Deck-IFC 17 04-Jun-15 23-Jun-15MM1-1305-PT-82-E-XE-13002MM1 - Electrical Cable Routing Layout - Mezzanine Deck 39 09-May-15 23-Jun-15MM1-1305-PT-82-E-XE-13002-1MM1 - Electrical Cable Routing Layout - Mezzanine Deck -IDC 9 09-May-15* 19-May-15MM1-1305-PT-82-E-XE-13002-2MM1 - Electrical Cable Routing Layout - Mezzanine Deck -IFR 13 20-May-15 03-Jun-15MM1-1305-PT-82-E-XE-13002-3MM1 - Electrical Cable Routing Layout - Mezzanine Deck -IFD 0 04-Jun-15 04-Jun-15MM1-1305-PT-82-E-XE-13002-4MM1 - Electrical Cable Routing Layout - Mezzanine Deck -IFC 17 04-Jun-15 23-Jun-15MM1-1305-PT-82-E-XE-13003MM1 - Electrical Cable Routing Layout - Upper Deck 39 09-May-15 23-Jun-15MM1-1305-PT-82-E-XE-13003-1MM1 - Electrical Cable Routing Layout - Upper Deck-IDC 9 09-May-15* 19-May-15MM1-1305-PT-82-E-XE-13003-2MM1 - Electrical Cable Routing Layout - Upper Deck-IFR 13 20-May-15 03-Jun-15MM1-1305-PT-82-E-XE-13003-3MM1 - Electrical Cable Routing Layout - Upper Deck-IFD 0 04-Jun-15 04-Jun-15MM1-1305-PT-82-E-XE-13003-4MM1 - Electrical Cable Routing Layout - Upper Deck-IFC 17 04-Jun-15 23-Jun-15MM1-1305-PT-82-E-LA-00001MM1 & MM2 - Electrical Material Take-Off - Lighting Fixtures 80 05-May-15 05-Aug-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 21 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-82-E-LA-00001-1MM1 & MM2 - Electrical Material Take-Off - Lighting Fixtures-IDC 7 05-May-15* 12-May-15MM1-1305-PT-82-E-LA-00001-2MM1 & MM2 - Electrical Material Take-Off - Lighting Fixtures-IFR 24 13-May-15 09-Jun-15MM1-1305-PT-82-E-LA-00001-3MM1 & MM2 - Electrical Material Take-Off - Lighting Fixtures-IFD 0 10-Jun-15 10-Jun-15MM1-1305-PT-82-E-LA-00001-4MM1 & MM2 - Electrical Material Take-Off - Lighting Fixtures-IFC 49 10-Jun-15 05-Aug-15MM1-1305-PT-82-E-LA-00002MM1 & MM2 - Electrical Material Take-Off - Cable Ladder/Tray And Accessories77 11-May-15 07-Aug-15MM1-1305-PT-82-E-LA-00002-1MM1 & MM2 - Electrical Material Take-Off - Cable Ladder/Tray And Accessories-IDC7 11-May-15* 18-May-15MM1-1305-PT-82-E-LA-00002-2MM1 & MM2 - Electrical Material Take-Off - Cable Ladder/Tray And Accessories-IFR23 19-May-15 13-Jun-15MM1-1305-PT-82-E-LA-00002-3MM1 & MM2 - Electrical Material Take-Off - Cable Ladder/Tray And Accessories-IFD0 15-Jun-15 15-Jun-15MM1-1305-PT-82-E-LA-00002-4MM1 & MM2 - Electrical Material Take-Off - Cable Ladder/Tray And Accessories-IFC47 15-Jun-15 07-Aug-15MM1-1305-PT-82-E-LA-00003MM1 & MM2 - Electrical Material Take-Off - Cables 62 18-May-15 28-Jul-15MM1-1305-PT-82-E-LA-00003-1MM1 & MM2 - Electrical Material Take-Off - Cables-IDC 7 18-May-15* 25-May-15MM1-1305-PT-82-E-LA-00003-2MM1 & MM2 - Electrical Material Take-Off - Cables-IFR 8 26-May-15 03-Jun-15MM1-1305-PT-82-E-LA-00003-3MM1 & MM2 - Electrical Material Take-Off - Cables-IFD 0 04-Jun-15 04-Jun-15MM1-1305-PT-82-E-LA-00003-4MM1 & MM2 - Electrical Material Take-Off - Cables-IFC 47 04-Jun-15 28-Jul-15MM1-1305-PT-82-E-LA-00004MM1 & MM2 - Electrical Material Take-Off - Cable Glands 77 21-May-15 18-Aug-15MM1-1305-PT-82-E-LA-00004-1MM1 & MM2 - Electrical Material Take-Off - Cable Glands-IDC 7 21-May-15* 28-May-15MM1-1305-PT-82-E-LA-00004-2MM1 & MM2 - Electrical Material Take-Off - Cable Glands-IFR 22 29-May-15 23-Jun-15MM1-1305-PT-82-E-LA-00004-3MM1 & MM2 - Electrical Material Take-Off - Cable Glands-IFD 0 24-Jun-15 24-Jun-15MM1-1305-PT-82-E-LA-00004-4MM1 & MM2 - Electrical Material Take-Off - Cable Glands-IFC 48 24-Jun-15 18-Aug-15MM1-1305-PT-82-E-LA-00005MM1 & MM2 - Electrical Material Take-Off - Junction Boxes 83 02-May-15 06-Aug-15MM1-1305-PT-82-E-LA-00005-1MM1 & MM2 - Electrical Material Take-Off - Junction Boxes-IDC 6 02-May-15* 08-May-15MM1-1305-PT-82-E-LA-00005-2MM1 & MM2 - Electrical Material Take-Off - Junction Boxes-IFR 31 09-May-15 13-Jun-15MM1-1305-PT-82-E-LA-00005-3MM1 & MM2 - Electrical Material Take-Off - Junction Boxes-IFD 0 15-Jun-15 15-Jun-15MM1-1305-PT-82-E-LA-00005-4MM1 & MM2 - Electrical Material Take-Off - Junction Boxes-IFC 46 15-Jun-15 06-Aug-15MM1-1305-PT-82-E-LA-00006MM1 & MM2 - Electrical Material Take-Off - Miscellaneous Materials 94 21-May-15 08-Sep-15MM1-1305-PT-82-E-LA-00006-1MM1 & MM2 - Electrical Material Take-Off - Miscellaneous Materials-IDC 7 21-May-15* 28-May-15MM1-1305-PT-82-E-LA-00006-2MM1 & MM2 - Electrical Material Take-Off - Miscellaneous Materials-IFR 38 29-May-15 11-Jul-15MM1-1305-PT-82-E-LA-00006-3MM1 & MM2 - Electrical Material Take-Off - Miscellaneous Materials-IFD 0 13-Jul-15 13-Jul-15MM1-1305-PT-82-E-LA-00006-4MM1 & MM2 - Electrical Material Take-Off - Miscellaneous Materials-IFC 49 13-Jul-15 08-Sep-15MM1-1305-PT-82-E-LA-00007MM1 & MM2 - Electrical Material Take-Off - Steel Support Materials 52 15-May-15 14-Jul-15MM1-1305-PT-82-E-LA-00007-1MM1 & MM2 - Electrical Material Take-Off - Steel Support Materials-IDC 7 15-May-15* 22-May-15MM1-1305-PT-82-E-LA-00007-2MM1 & MM2 - Electrical Material Take-Off - Steel Support Materials-IFR 10 23-May-15 03-Jun-15MM1-1305-PT-82-E-LA-00007-3MM1 & MM2 - Electrical Material Take-Off - Steel Support Materials-IFD 0 04-Jun-15 04-Jun-15MM1-1305-PT-82-E-LA-00007-4MM1 & MM2 - Electrical Material Take-Off - Steel Support Materials-IFC 35 04-Jun-15 14-Jul-15MM1-1305-PT-00-I-LA-00009MM1 & MM2 - Ex Equipment Register 68 11-Jun-15 28-Aug-15MM1-1305-PT-00-I-LA-00009-1MM1 & MM2 - Ex Equipment Register-IDC 27 11-Jun-15* 11-Jul-15MM1-1305-PT-00-I-LA-00009-2MM1 & MM2 - Ex Equipment Register-IFR 12 13-Jul-15 25-Jul-15MM1-1305-PT-00-I-LA-00009-3MM1 & MM2 - Ex Equipment Register-IFD 12 27-Jul-15 08-Aug-15MM1-1305-PT-00-I-LA-00009-4MM1 & MM2 - Ex Equipment Register-IFC 17 10-Aug-15 28-Aug-15MM1-1305-PT-00-I-SA-00001MM1 & MM2 - Instrument Control and Shutdown Philosophy 64 10-Jun-15 22-Aug-15MM1-1305-PT-00-I-SA-00001-1MM1 & MM2 - Instrument Control and Shutdown Philosophy-IDC 27 10-Jun-15* 10-Jul-15MM1-1305-PT-00-I-SA-00001-2MM1 & MM2 - Instrument Control and Shutdown Philosophy-IFR 8 11-Jul-15 20-Jul-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 22 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-00-I-SA-00001-3MM1 & MM2 - Instrument Control and Shutdown Philosophy-IFD 13 21-Jul-15 04-Aug-15MM1-1305-PT-00-I-SA-00001-4MM1 & MM2 - Instrument Control and Shutdown Philosophy-IFC 16 05-Aug-15 22-Aug-15MM1-1305-PT-00-I-XR-00001MM1 & MM2 - Alarm & Shutdown Cause & Effect Matrix 68 15-Jun-15 01-Sep-15MM1-1305-PT-00-I-XR-00001-1MM1 & MM2 - Alarm & Shutdown Cause & Effect Matrix -IDC 27 15-Jun-15* 15-Jul-15MM1-1305-PT-00-I-XR-00001-2MM1 & MM2 - Alarm & Shutdown Cause & Effect Matrix -IFR 13 16-Jul-15 30-Jul-15MM1-1305-PT-00-I-XR-00001-3MM1 & MM2 - Alarm & Shutdown Cause & Effect Matrix -IFD 13 31-Jul-15 14-Aug-15MM1-1305-PT-00-I-XR-00001-4MM1 & MM2 - Alarm & Shutdown Cause & Effect Matrix -IFC 15 15-Aug-15 01-Sep-15MM1-1305-PT-00-I-XT-00001M1 & MM2 - Instrument Cable Block Diagram 44 13-Apr-15 05-Jun-15MM1-1305-PT-00-I-XT-00001-1M1 & MM2 - Instrument Cable Block Diagram-IDC 20 13-Apr-15* 08-May-15MM1-1305-PT-00-I-XT-00001-2M1 & MM2 - Instrument Cable Block Diagram-IFR 6 09-May-15 15-May-15MM1-1305-PT-00-I-XT-00001-3M1 & MM2 - Instrument Cable Block Diagram-IFD 0 16-May-15 16-May-15MM1-1305-PT-00-I-XT-00001-4M1 & MM2 - Instrument Cable Block Diagram-IFC 18 16-May-15 05-Jun-15MM1-1305-PT-00-I-XT-00002MM1 - Instrument Interconnection Wiring diagram 49 13-Apr-15 11-Jun-15MM1-1305-PT-00-I-XT-00002-1MM1 - Instrument Interconnection Wiring diagram -IDC 20 13-Apr-15* 08-May-15MM1-1305-PT-00-I-XT-00002-2MM1 - Instrument Interconnection Wiring diagram -IFR 12 09-May-15 22-May-15MM1-1305-PT-00-I-XT-00002-3MM1 - Instrument Interconnection Wiring diagram -IFD 0 23-May-15 23-May-15MM1-1305-PT-00-I-XT-00002-4MM1 - Instrument Interconnection Wiring diagram -IFC 17 23-May-15 11-Jun-15MM1-1305-PT-00-I-XQ-00001MM1- Instrument Hookup Drawing 47 06-Apr-15 02-Jun-15MM1-1305-PT-00-I-XQ-00001-1MM1- Instrument Hookup Drawing-IDC 14 06-Apr-15* 21-Apr-15MM1-1305-PT-00-I-XQ-00001-2MM1- Instrument Hookup Drawing-IFR 15 22-Apr-15 12-May-15MM1-1305-PT-00-I-XQ-00001-3MM1- Instrument Hookup Drawing-IFD 0 13-May-15 13-May-15MM1-1305-PT-00-I-XQ-00001-4MM1- Instrument Hookup Drawing-IFC 18 13-May-15 02-Jun-15MM1-1305-PT-00-I-XX-00001MM1- Instrument Support Details 41 04-May-15 19-Jun-15MM1-1305-PT-00-I-XX-00001-1MM1- Instrument Support Details-IDC 13 04-May-15* 18-May-15MM1-1305-PT-00-I-XX-00001-2MM1- Instrument Support Details-IFR 12 19-May-15 01-Jun-15MM1-1305-PT-00-I-XX-00001-3MM1- Instrument Support Details-IFD 0 02-Jun-15 02-Jun-15MM1-1305-PT-00-I-XX-00001-4MM1- Instrument Support Details-IFC 16 02-Jun-15 19-Jun-15MM1-1305-PT-00-I-XX-00003MM1 - Instrument Cable Tray Ladder Support Details 36 20-May-15 30-Jun-15MM1-1305-PT-00-I-XX-00003-1MM1 - Instrument Cable Tray Ladder Support Details-IDC 13 20-May-15* 03-Jun-15MM1-1305-PT-00-I-XX-00003-2MM1 - Instrument Cable Tray Ladder Support Details-IFR 6 04-Jun-15 10-Jun-15MM1-1305-PT-00-I-XX-00003-3MM1 - Instrument Cable Tray Ladder Support Details-IFD 0 11-Jun-15 11-Jun-15MM1-1305-PT-00-I-XX-00003-4MM1 - Instrument Cable Tray Ladder Support Details-IFC 17 11-Jun-15 30-Jun-15MM1-1305-PT-00-I-XE-00001MM1 - Instrument cable and cable tray/ ladder routing layout 59 04-May-15 10-Jul-15MM1-1305-PT-00-I-XE-00001-1MM1 - Instrument cable and cable tray/ ladder routing layout-IDC 12 04-May-15* 16-May-15MM1-1305-PT-00-I-XE-00001-2MM1 - Instrument cable and cable tray/ ladder routing layout-IFR 12 18-May-15 30-May-15MM1-1305-PT-00-I-XE-00001-3MM1 - Instrument cable and cable tray/ ladder routing layout-IFD 0 01-Jun-15 01-Jun-15MM1-1305-PT-00-I-XE-00001-4MM1 - Instrument cable and cable tray/ ladder routing layout-IFC 35 01-Jun-15 10-Jul-15MM1-1305-PT-00-I-XE-00003MM1 - Instrument tubing and tubing tray routing layout 53 02-May-15 02-Jul-15MM1-1305-PT-00-I-XE-00003-1MM1 - Instrument tubing and tubing tray routing layout-IDC 13 02-May-15* 16-May-15MM1-1305-PT-00-I-XE-00003-2MM1 - Instrument tubing and tubing tray routing layout-IFR 6 18-May-15 23-May-15MM1-1305-PT-00-I-XE-00003-3MM1 - Instrument tubing and tubing tray routing layout-IFD 0 25-May-15 25-May-15MM1-1305-PT-00-I-XE-00003-4MM1 - Instrument tubing and tubing tray routing layout-IFC 34 25-May-15 02-Jul-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 23 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-00-I-XE-00005MM1- Instrument and JB location layout 43 20-Apr-15 11-Jun-15MM1-1305-PT-00-I-XE-00005-1MM1- Instrument and JB location layout-IDC 24 20-Apr-15* 20-May-15MM1-1305-PT-00-I-XE-00005-2MM1- Instrument and JB location layout-IFR 6 21-May-15 27-May-15MM1-1305-PT-00-I-XE-00005-3MM1- Instrument and JB location layout-IFD 0 28-May-15 28-May-15MM1-1305-PT-00-I-XE-00005-4MM1- Instrument and JB location layout-IFC 13 28-May-15 11-Jun-15MM1-1305-PT-00-I-XE-00007MM1- Fire & Gas layout 82 13-Mar-15 19-Jun-15MM1-1305-PT-00-I-XE-00007-1MM1- Fire & Gas layout-IDC 16 13-Mar-15* 31-Mar-15MM1-1305-PT-00-I-XE-00007-2MM1- Fire & Gas layout-IFR 49 01-Apr-15 30-May-15MM1-1305-PT-00-I-XE-00007-3MM1- Fire & Gas layout-IFD 0 01-Jun-15 01-Jun-15MM1-1305-PT-00-I-XE-00007-4MM1- Fire & Gas layout-IFC 17 01-Jun-15 19-Jun-15MM1-1305-PT-00-I-XE-00009MM1 - PAGA Equipment Location Layout 101 13-Mar-15 11-Jul-15MM1-1305-PT-00-I-XE-00009-1MM1 - PAGA Equipment Location Layout-IDC 35 13-Mar-15* 22-Apr-15MM1-1305-PT-00-I-XE-00009-2MM1 - PAGA Equipment Location Layout-IFR 48 23-Apr-15 20-Jun-15MM1-1305-PT-00-I-XE-00009-3MM1 - PAGA Equipment Location Layout-IFD 0 22-Jun-15 22-Jun-15MM1-1305-PT-00-I-XE-00009-4MM1 - PAGA Equipment Location Layout-IFC 18 22-Jun-15 11-Jul-15MM1-1305-PT-00-I-LA-00001MM1 - Instrument I/O LIST 51 20-Apr-15 20-Jun-15MM1-1305-PT-00-I-LA-00001-1MM1 - Instrument I/O LIST-IDC 16 20-Apr-15* 11-May-15MM1-1305-PT-00-I-LA-00001-2MM1 - Instrument I/O LIST-IFR 6 12-May-15 18-May-15MM1-1305-PT-00-I-LA-00001-3MM1 - Instrument I/O LIST-IFD 13 19-May-15 02-Jun-15MM1-1305-PT-00-I-LA-00001-4MM1 - Instrument I/O LIST-IFC 16 03-Jun-15 20-Jun-15MM1-1305-PT-00-I-LA-00003MM1 - Instrument INDEX 51 20-Apr-15 20-Jun-15MM1-1305-PT-00-I-LA-00003-1MM1 - Instrument INDEX-IDC 16 20-Apr-15* 11-May-15MM1-1305-PT-00-I-LA-00003-2MM1 - Instrument INDEX-IFR 6 12-May-15 18-May-15MM1-1305-PT-00-I-LA-00003-3MM1 - Instrument INDEX-IFD 13 19-May-15 02-Jun-15MM1-1305-PT-00-I-LA-00003-4MM1 - Instrument INDEX-IFC 16 03-Jun-15 20-Jun-15MM1-1305-PT-00-I-LA-00005MM1 - Instrument CABLE SCHEDULE 40 21-Apr-15 09-Jun-15MM1-1305-PT-00-I-LA-00005-1MM1 - Instrument CABLE SCHEDULE-IDC 10 21-Apr-15* 05-May-15MM1-1305-PT-00-I-LA-00005-2MM1 - Instrument CABLE SCHEDULE-IFR 6 06-May-15 12-May-15MM1-1305-PT-00-I-LA-00005-3MM1 - Instrument CABLE SCHEDULE-IFD 0 13-May-15 13-May-15MM1-1305-PT-00-I-LA-00005-4MM1 - Instrument CABLE SCHEDULE-IFC 24 13-May-15 09-Jun-15MM1-1305-PT-00-I-LA-00007MM1 - Instrument TUBING SCHEDULE 58 22-Apr-15 01-Jul-15MM1-1305-PT-00-I-LA-00007-1MM1 - Instrument TUBING SCHEDULE-IDC 22 22-Apr-15* 20-May-15MM1-1305-PT-00-I-LA-00007-2MM1 - Instrument TUBING SCHEDULE-IFR 12 21-May-15 03-Jun-15MM1-1305-PT-00-I-LA-00007-3MM1 - Instrument TUBING SCHEDULE-IFD 0 04-Jun-15 04-Jun-15MM1-1305-PT-00-I-LA-00007-4MM1 - Instrument TUBING SCHEDULE-IFC 24 04-Jun-15 01-Jul-15MM1-1305-PT-00-I-RA-00001MM1 & MM2 - PSV Sizing Calculation Report 45 22-Apr-15 16-Jun-15MM1-1305-PT-00-I-RA-00001-1MM1 & MM2 - PSV Sizing Calculation Report-IDC 10 22-Apr-15* 06-May-15MM1-1305-PT-00-I-RA-00001-2MM1 & MM2 - PSV Sizing Calculation Report-IFR 6 07-May-15 13-May-15MM1-1305-PT-00-I-RA-00001-3MM1 & MM2 - PSV Sizing Calculation Report-IFD 13 14-May-15 28-May-15MM1-1305-PT-00-I-RA-00001-4MM1 & MM2 - PSV Sizing Calculation Report-IFC 16 29-May-15 16-Jun-15MM1-1305-PT-00-I-RA-00002MM1 & MM2 - Choke Valve Sizing Calculation Report 45 23-Apr-15 17-Jun-15MM1-1305-PT-00-I-RA-00002-1MM1 & MM2 - Choke Valve Sizing Calculation Report-IDC 10 23-Apr-15* 07-May-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 24 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-00-I-RA-00002-2MM1 & MM2 - Choke Valve Sizing Calculation Report-IFR 6 08-May-15 14-May-15MM1-1305-PT-00-I-RA-00002-3MM1 & MM2 - Choke Valve Sizing Calculation Report-IFD 13 15-May-15 29-May-15MM1-1305-PT-00-I-RA-00002-4MM1 & MM2 - Choke Valve Sizing Calculation Report-IFC 16 30-May-15 17-Jun-15MM1-1305-PT-00-I-RA-00003MM1 & MM2 - FE/RO Sizing Calculation Report 45 24-Apr-15 18-Jun-15MM1-1305-PT-00-I-RA-00003-1MM1 & MM2 - FE/RO Sizing Calculation Report-IDC 10 24-Apr-15* 08-May-15MM1-1305-PT-00-I-RA-00003-2MM1 & MM2 - FE/RO Sizing Calculation Report-IFR 6 09-May-15 15-May-15MM1-1305-PT-00-I-RA-00003-3MM1 & MM2 - FE/RO Sizing Calculation Report-IFD 13 16-May-15 30-May-15MM1-1305-PT-00-I-RA-00003-4MM1 & MM2 - FE/RO Sizing Calculation Report-IFC 16 01-Jun-15 18-Jun-15MM1-1305-PT-00-I-RA-00004MM1 & MM2 - Instrument utility/ power consumption calculation report 60 25-May-15 01-Aug-15MM1-1305-PT-00-I-RA-00004-1MM1 & MM2 - Instrument utility/ power consumption calculation report-IDC 25 25-May-15* 22-Jun-15MM1-1305-PT-00-I-RA-00004-2MM1 & MM2 - Instrument utility/ power consumption calculation report-IFR 6 23-Jun-15 29-Jun-15MM1-1305-PT-00-I-RA-00004-3MM1 & MM2 - Instrument utility/ power consumption calculation report-IFD 13 30-Jun-15 14-Jul-15MM1-1305-PT-00-I-RA-00004-4MM1 & MM2 - Instrument utility/ power consumption calculation report-IFC 16 15-Jul-15 01-Aug-15MM1-1305-PT-00-I-DS-00001MM1 & MM2 - Instrument Datasheet for On-Off valves 75 13-Mar-15 11-Jun-15MM1-1305-PT-00-I-DS-00001-1MM1 & MM2 - Instrument Datasheet for On-Off valves-IDC 20 13-Mar-15* 04-Apr-15MM1-1305-PT-00-I-DS-00001-2MM1 & MM2 - Instrument Datasheet for On-Off valves-IFR 6 06-Apr-15 11-Apr-15MM1-1305-PT-00-I-DS-00001-3MM1 & MM2 - Instrument Datasheet for On-Off valves-IFD 0 13-Apr-15 13-Apr-15MM1-1305-PT-00-I-DS-00001-4MM1 & MM2 - Instrument Datasheet for On-Off valves-IFC 49 13-Apr-15 11-Jun-15MM1-1305-PT-00-I-DS-00002MM1 & MM2 - Instrument Datasheet for Motor Operated valves 69 13-Mar-15 04-Jun-15MM1-1305-PT-00-I-DS-00002-1MM1 & MM2 - Instrument Datasheet for Motor Operated valves-IDC 20 13-Mar-15* 04-Apr-15MM1-1305-PT-00-I-DS-00002-2MM1 & MM2 - Instrument Datasheet for Motor Operated valves-IFR 2 06-Apr-15 07-Apr-15MM1-1305-PT-00-I-DS-00002-3MM1 & MM2 - Instrument Datasheet for Motor Operated valves-IFD 0 08-Apr-15 08-Apr-15MM1-1305-PT-00-I-DS-00002-4MM1 & MM2 - Instrument Datasheet for Motor Operated valves-IFC 47 08-Apr-15 04-Jun-15MM1-1305-PT-00-I-DS-00003 MM1 & MM2 - Instrument Datasheet for Pressure Safety valves 87 13-Mar-15 25-Jun-15MM1-1305-PT-00-I-DS-00003-1 MM1 & MM2 - Instrument Datasheet for Pressure Safety valves-IDC 20 13-Mar-15* 04-Apr-15MM1-1305-PT-00-I-DS-00003-2 MM1 & MM2 - Instrument Datasheet for Pressure Safety valves-IFR 18 06-Apr-15 25-Apr-15MM1-1305-PT-00-I-DS-00003-3 MM1 & MM2 - Instrument Datasheet for Pressure Safety valves-IFD 0 27-Apr-15 27-Apr-15MM1-1305-PT-00-I-DS-00003-4 MM1 & MM2 - Instrument Datasheet for Pressure Safety valves-IFC 49 27-Apr-15 25-Jun-15MM1-1305-PT-00-I-DS-00004MM1 & MM2 - Instrument Datasheet for Choke valve 89 13-Mar-15 27-Jun-15MM1-1305-PT-00-I-DS-00004-1MM1 & MM2 - Instrument Datasheet for Choke valve-IDC 20 13-Mar-15* 04-Apr-15MM1-1305-PT-00-I-DS-00004-2MM1 & MM2 - Instrument Datasheet for Choke valve-IFR 19 06-Apr-15 27-Apr-15MM1-1305-PT-00-I-DS-00004-3MM1 & MM2 - Instrument Datasheet for Choke valve-IFD 0 29-Apr-15 29-Apr-15MM1-1305-PT-00-I-DS-00004-4MM1 & MM2 - Instrument Datasheet for Choke valve-IFC 50 29-Apr-15 27-Jun-15MM1-1305-PT-00-I-DS-00005MM1 & MM2 - Instrument Datasheet for H2S Analyser 89 13-Mar-15 27-Jun-15MM1-1305-PT-00-I-DS-00005-1MM1 & MM2 - Instrument Datasheet for H2S Analyser-IDC 22 13-Mar-15* 07-Apr-15MM1-1305-PT-00-I-DS-00005-2MM1 & MM2 - Instrument Datasheet for H2S Analyser-IFR 12 08-Apr-15 21-Apr-15MM1-1305-PT-00-I-DS-00005-3MM1 & MM2 - Instrument Datasheet for H2S Analyser-IFD 0 22-Apr-15 22-Apr-15MM1-1305-PT-00-I-DS-00005-4MM1 & MM2 - Instrument Datasheet for H2S Analyser-IFC 55 22-Apr-15 27-Jun-15MM1-1305-PT-00-I-DS-00006MM1 & MM2 - Instrument Datasheet for Pig Signaller 105 13-Mar-15 16-Jul-15MM1-1305-PT-00-I-DS-00006-1MM1 & MM2 - Instrument Datasheet for Pig Signaller-IDC 47 13-Mar-15* 09-May-15MM1-1305-PT-00-I-DS-00006-2MM1 & MM2 - Instrument Datasheet for Pig Signaller-IFR 12 11-May-15 23-May-15MM1-1305-PT-00-I-DS-00006-3MM1 & MM2 - Instrument Datasheet for Pig Signaller-IFD 0 25-May-15 25-May-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 25 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-00-I-DS-00006-4MM1 & MM2 - Instrument Datasheet for Pig Signaller-IFC 46 25-May-15 16-Jul-15MM1-1305-PT-00-I-DS-00007MM1 & MM2 - Instrument Datasheet for Pressure Transmitter 125 13-Mar-15 08-Aug-15MM1-1305-PT-00-I-DS-00007-1MM1 & MM2 - Instrument Datasheet for Pressure Transmitter-IDC 59 13-Mar-15* 23-May-15MM1-1305-PT-00-I-DS-00007-2MM1 & MM2 - Instrument Datasheet for Pressure Transmitter-IFR 12 25-May-15 06-Jun-15MM1-1305-PT-00-I-DS-00007-3MM1 & MM2 - Instrument Datasheet for Pressure Transmitter-IFD 0 08-Jun-15 08-Jun-15MM1-1305-PT-00-I-DS-00007-4MM1 & MM2 - Instrument Datasheet for Pressure Transmitter-IFC 54 08-Jun-15 08-Aug-15MM1-1305-PT-00-I-DS-00008MM1 & MM2 - Instrument Datasheet for Temperature Transmitter 125 13-Mar-15 08-Aug-15MM1-1305-PT-00-I-DS-00008-1MM1 & MM2 - Instrument Datasheet for Temperature Transmitter-IDC 59 13-Mar-15* 23-May-15MM1-1305-PT-00-I-DS-00008-2MM1 & MM2 - Instrument Datasheet for Temperature Transmitter-IFR 12 25-May-15 06-Jun-15MM1-1305-PT-00-I-DS-00008-3MM1 & MM2 - Instrument Datasheet for Temperature Transmitter-IFD 0 08-Jun-15 08-Jun-15MM1-1305-PT-00-I-DS-00008-4MM1 & MM2 - Instrument Datasheet for Temperature Transmitter-IFC 54 08-Jun-15 08-Aug-15MM1-1305-PT-00-I-DS-00009MM1 & MM2 - Instrument Datasheet for Flow Transmitter 125 13-Mar-15 08-Aug-15MM1-1305-PT-00-I-DS-00009-1MM1 & MM2 - Instrument Datasheet for Flow Transmitter-IDC 59 13-Mar-15* 23-May-15MM1-1305-PT-00-I-DS-00009-2MM1 & MM2 - Instrument Datasheet for Flow Transmitter-IFR 12 25-May-15 06-Jun-15MM1-1305-PT-00-I-DS-00009-3MM1 & MM2 - Instrument Datasheet for Flow Transmitter-IFD 0 08-Jun-15 08-Jun-15MM1-1305-PT-00-I-DS-00009-4MM1 & MM2 - Instrument Datasheet for Flow Transmitter-IFC 54 08-Jun-15 08-Aug-15MM1-1305-PT-00-I-DS-00010MM1 & MM2 - Instrument Datasheet for Pressure Gauge 111 13-Mar-15 23-Jul-15MM1-1305-PT-00-I-DS-00010-1MM1 & MM2 - Instrument Datasheet for Pressure Gauge-IDC 51 13-Mar-15* 14-May-15MM1-1305-PT-00-I-DS-00010-2MM1 & MM2 - Instrument Datasheet for Pressure Gauge-IFR 12 15-May-15 28-May-15MM1-1305-PT-00-I-DS-00010-3MM1 & MM2 - Instrument Datasheet for Pressure Gauge-IFD 0 29-May-15 29-May-15MM1-1305-PT-00-I-DS-00010-4MM1 & MM2 - Instrument Datasheet for Pressure Gauge-IFC 48 29-May-15 23-Jul-15MM1-1305-PT-00-I-DS-00011MM1 & MM2 - Instrument Datasheet for Temperature Gauge 111 13-Mar-15 23-Jul-15MM1-1305-PT-00-I-DS-00011-1MM1 & MM2 - Instrument Datasheet for Temperature Gauge-IDC 51 13-Mar-15* 14-May-15MM1-1305-PT-00-I-DS-00011-2MM1 & MM2 - Instrument Datasheet for Temperature Gauge-IFR 12 15-May-15 28-May-15MM1-1305-PT-00-I-DS-00011-3MM1 & MM2 - Instrument Datasheet for Temperature Gauge-IFD 0 29-May-15 29-May-15MM1-1305-PT-00-I-DS-00011-4MM1 & MM2 - Instrument Datasheet for Temperature Gauge-IFC 48 29-May-15 23-Jul-15MM1-1305-PT-00-I-DS-00012MM1 & MM2 - Instrument Datasheet for Restriction Orifice 123 13-Mar-15 06-Aug-15MM1-1305-PT-00-I-DS-00012-1MM1 & MM2 - Instrument Datasheet for Restriction Orifice-IDC 57 13-Mar-15* 21-May-15MM1-1305-PT-00-I-DS-00012-2MM1 & MM2 - Instrument Datasheet for Restriction Orifice-IFR 12 22-May-15 04-Jun-15MM1-1305-PT-00-I-DS-00012-3MM1 & MM2 - Instrument Datasheet for Restriction Orifice-IFD 0 05-Jun-15 05-Jun-15MM1-1305-PT-00-I-DS-00012-4MM1 & MM2 - Instrument Datasheet for Restriction Orifice-IFC 54 05-Jun-15 06-Aug-15MM1-1305-PT-00-I-DS-00013MM1 & MM2 - Instrument Datasheet for Orifice and Flanges 123 13-Mar-15 06-Aug-15MM1-1305-PT-00-I-DS-00013-1MM1 & MM2 - Instrument Datasheet for Orifice and Flanges-IDC 57 13-Mar-15* 21-May-15MM1-1305-PT-00-I-DS-00013-2MM1 & MM2 - Instrument Datasheet for Orifice and Flanges-IFR 12 22-May-15 04-Jun-15MM1-1305-PT-00-I-DS-00013-3MM1 & MM2 - Instrument Datasheet for Orifice and Flanges-IFD 0 05-Jun-15 05-Jun-15MM1-1305-PT-00-I-DS-00013-4MM1 & MM2 - Instrument Datasheet for Orifice and Flanges-IFC 54 05-Jun-15 06-Aug-15MM1-1305-PT-00-I-DS-00014MM1 & MM2 - Instrument Datasheet for Junction Box 116 20-Mar-15 05-Aug-15MM1-1305-PT-00-I-DS-00014-1MM1 & MM2 - Instrument Datasheet for Junction Box-IDC 53 20-Mar-15* 23-May-15MM1-1305-PT-00-I-DS-00014-2MM1 & MM2 - Instrument Datasheet for Junction Box-IFR 12 25-May-15 06-Jun-15MM1-1305-PT-00-I-DS-00014-3MM1 & MM2 - Instrument Datasheet for Junction Box-IFD 0 08-Jun-15 08-Jun-15MM1-1305-PT-00-I-DS-00014-4MM1 & MM2 - Instrument Datasheet for Junction Box-IFC 51 08-Jun-15 05-Aug-15MM1-1305-PT-00-I-LA-00015MM1 & MM2 - Instrument MTO for Tubing, Fitting and Valves 113 20-Mar-15 01-Aug-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 26 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-00-I-LA-00015-1MM1 & MM2 - Instrument MTO for Tubing, Fitting and Valves-IDC 53 20-Mar-15* 23-May-15MM1-1305-PT-00-I-LA-00015-2MM1 & MM2 - Instrument MTO for Tubing, Fitting and Valves-IFR 12 25-May-15 06-Jun-15MM1-1305-PT-00-I-LA-00015-3MM1 & MM2 - Instrument MTO for Tubing, Fitting and Valves-IFD 0 08-Jun-15 08-Jun-15MM1-1305-PT-00-I-LA-00015-4MM1 & MM2 - Instrument MTO for Tubing, Fitting and Valves-IFC 48 08-Jun-15 01-Aug-15MM1-1305-PT-00-I-LA-00016MM1 & MM2 - Instrument MTO for Instrument Steel Support 97 20-Mar-15 14-Jul-15MM1-1305-PT-00-I-LA-00016-1MM1 & MM2 - Instrument MTO for Instrument Steel Support-IDC 55 20-Mar-15* 26-May-15MM1-1305-PT-00-I-LA-00016-2MM1 & MM2 - Instrument MTO for Instrument Steel Support-IFR 12 27-May-15 09-Jun-15MM1-1305-PT-00-I-LA-00016-3MM1 & MM2 - Instrument MTO for Instrument Steel Support-IFD 0 10-Jun-15 10-Jun-15MM1-1305-PT-00-I-LA-00016-4MM1 & MM2 - Instrument MTO for Instrument Steel Support-IFC 30 10-Jun-15 14-Jul-15MM1-1305-PT-00-I-LA-00017MM1 & MM2 - Instrument MTO for Cable 67 12-May-15 28-Jul-15MM1-1305-PT-00-I-LA-00017-1MM1 & MM2 - Instrument MTO for Cable-IDC 14 12-May-15* 27-May-15MM1-1305-PT-00-I-LA-00017-2MM1 & MM2 - Instrument MTO for Cable-IFR 12 28-May-15 10-Jun-15MM1-1305-PT-00-I-LA-00017-3MM1 & MM2 - Instrument MTO for Cable-IFD 0 11-Jun-15 11-Jun-15MM1-1305-PT-00-I-LA-00017-4MM1 & MM2 - Instrument MTO for Cable-IFC 41 11-Jun-15 28-Jul-15MM1-1305-PT-00-I-LA-00018MM1 & MM2 - Instrument MTO for Cable Gland 84 13-May-15 18-Aug-15MM1-1305-PT-00-I-LA-00018-1MM1 & MM2 - Instrument MTO for Cable Gland-IDC 14 13-May-15* 28-May-15MM1-1305-PT-00-I-LA-00018-2MM1 & MM2 - Instrument MTO for Cable Gland-IFR 12 29-May-15 11-Jun-15MM1-1305-PT-00-I-LA-00018-3MM1 & MM2 - Instrument MTO for Cable Gland-IFD 0 12-Jun-15 12-Jun-15MM1-1305-PT-00-I-LA-00018-4MM1 & MM2 - Instrument MTO for Cable Gland-IFC 58 12-Jun-15 18-Aug-15MM1-1305-PT-00-I-LA-00019MM1 & MM2 - Instrument MTO for Miscellaneous Materials 76 11-Jun-15 08-Sep-15MM1-1305-PT-00-I-LA-00019-1MM1 & MM2 - Instrument MTO for Miscellaneous Materials-IDC 9 11-Jun-15* 20-Jun-15MM1-1305-PT-00-I-LA-00019-2MM1 & MM2 - Instrument MTO for Miscellaneous Materials-IFR 12 22-Jun-15 04-Jul-15MM1-1305-PT-00-I-LA-00019-3MM1 & MM2 - Instrument MTO for Miscellaneous Materials-IFD 0 06-Jul-15 06-Jul-15MM1-1305-PT-00-I-LA-00019-4MM1 & MM2 - Instrument MTO for Miscellaneous Materials-IFC 55 06-Jul-15 08-Sep-15MM1-1305-PT-00-I-LA-00020MM1 & MM2 - Instrument MTO for Cable Tray/ladder 60 01-Jun-15 08-Aug-15MM1-1305-PT-00-I-LA-00020-1MM1 & MM2 - Instrument MTO for Cable Tray/ladder-IDC 6 01-Jun-15* 06-Jun-15MM1-1305-PT-00-I-LA-00020-2MM1 & MM2 - Instrument MTO for Cable Tray/ladder-IFR 12 08-Jun-15 20-Jun-15MM1-1305-PT-00-I-LA-00020-3MM1 & MM2 - Instrument MTO for Cable Tray/ladder-IFD 0 22-Jun-15 22-Jun-15MM1-1305-PT-00-I-LA-00020-4MM1 & MM2 - Instrument MTO for Cable Tray/ladder-IFC 42 22-Jun-15 08-Aug-15MM1-10570 TR/MTO for Motor Operated Valve 1 07-Apr-15 07-Apr-15MM1-10530 TR/MTO for ON-OFF Valve 1 11-Apr-15 11-Apr-15MM1-10550 TR/MTO for Choke Valve 1 16-Apr-15 16-Apr-15MM1-10630 TR/MTO for Pressure Safety valves 1 27-Apr-15 27-Apr-15MM1-10710 TR/MTO for H2S analyzer 1 29-Apr-15 29-Apr-15MM1-10590 TR/MTO for Pig Signaller 1 18-May-15 18-May-15MM1-10670 TR/MTO for Gauges (PG/TG/LG) 1 05-Jun-15 05-Jun-15MM1-10610 TR/MTO for Tubing & Fitting 1 10-Jun-15 10-Jun-15MM1-10790 TR/MTO for E&I Cable Tray & Ladder 1 10-Jun-15 10-Jun-15MM1-10830 TR/MTO for E&I Steel Support 1 10-Jun-15 10-Jun-15MM1-10750 TR/MTO for E&I Cable 1 12-Jun-15 12-Jun-15MM1-10650 TR/MTO for ElectronicTransmitter (PT/TT/LT/FT) 1 16-Jun-15 16-Jun-15MM1-10810 TR/MTO for Lighting Fixtures 1 19-Jun-15 19-Jun-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 27 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-10870 TR/MTO for Heat Tracing system 1 19-Jun-15 19-Jun-15MM1-10890 TR/MTO for MOV & Lighting distribution panel 1 19-Jun-15 19-Jun-15MM1-10690 TR/MTO for Orifice Plate/Restriction Orifice 1 20-Jun-15 20-Jun-15MM1-10730 TR/MTO for Junction Box 1 21-Jun-15 21-Jun-15MM1-10770 TR/MTO for E&I Cable Gland 1 02-Jul-15 02-Jul-15MM1-10850 TR/MTO for E&I Miscellaneous (Earthing Bosses, Lug, cable tie, etc.) 1 19-Jul-15 19-Jul-15MM1-10910 Prepare / Submit/ Approve E&I Shop Drawings 116 27-Oct-15 16-Mar-16

0.D.26.0000.MM1.B.R Mechanical/ Material Handling0.D.26.0000.MM1.B.R Mechanical/ Material Handling 261 13-Mar-15 15-Jan-160.D.26.0000.MM1.B.R.92 PTSC0.D.26.0000.MM1.B.R.92 PTSC 261 13-Mar-15 15-Jan-16MM1-1305-PT-00-R-RA-00001MM1 & MM2 - Material Handling Study Report 44 27-Apr-15 19-Jun-15MM1-1305-PT-00-R-RA-00001-1MM1 & MM2 - Material Handling Study Report-IDC 7 27-Apr-15* 07-May-15MM1-1305-PT-00-R-RA-00001-2MM1 & MM2 - Material Handling Study Report-IFR 7 08-May-15 15-May-15MM1-1305-PT-00-R-RA-00001-3MM1 & MM2 - Material Handling Study Report-IFD 7 16-May-15 23-May-15MM1-1305-PT-00-R-RA-00001-4MM1 & MM2 - Material Handling Study Report-IFC 23 25-May-15 19-Jun-15MM1-1305-PT-00-R-LA-00002MM1 & MM2 - Equipment List 53 13-Mar-15 16-May-15MM1-1305-PT-00-R-LA-00002-1MM1 & MM2 - Equipment List-IDC 19 13-Mar-15* 03-Apr-15MM1-1305-PT-00-R-LA-00002-2MM1 & MM2 - Equipment List-IFR 7 04-Apr-15 11-Apr-15MM1-1305-PT-00-R-LA-00002-3MM1 & MM2 - Equipment List-IFD 7 13-Apr-15 20-Apr-15MM1-1305-PT-00-R-LA-00002-4MM1 & MM2 - Equipment List-IFC 20 21-Apr-15 16-May-15MM1-1305-PT-00-R-DS-00001MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL001 58 13-Mar-15 22-May-15MM1-1305-PT-00-R-DS-00001-1MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL001-IDC25 13-Mar-15* 10-Apr-15MM1-1305-PT-00-R-DS-00001-2MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL001-IFR6 11-Apr-15 17-Apr-15MM1-1305-PT-00-R-DS-00001-3MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL001-IFD7 18-Apr-15 25-Apr-15MM1-1305-PT-00-R-DS-00001-4MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL001-IFC20 27-Apr-15 22-May-15MM1-1305-PT-00-R-DS-00002MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL002 60 13-Mar-15 25-May-15MM1-1305-PT-00-R-DS-00002-1MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL002-IDC27 13-Mar-15* 13-Apr-15MM1-1305-PT-00-R-DS-00002-2MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL002-IFR6 14-Apr-15 20-Apr-15MM1-1305-PT-00-R-DS-00002-3MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL002-IFD7 21-Apr-15 29-Apr-15MM1-1305-PT-00-R-DS-00002-4MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL002-IFC20 02-May-15 25-May-15MM1-1305-PT-00-R-DS-00003MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL003 58 13-Mar-15 22-May-15MM1-1305-PT-00-R-DS-00003-1MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL003-IDC25 13-Mar-15* 10-Apr-15MM1-1305-PT-00-R-DS-00003-2MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL003-IFR6 11-Apr-15 17-Apr-15MM1-1305-PT-00-R-DS-00003-3MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL003-IFD7 18-Apr-15 25-Apr-15MM1-1305-PT-00-R-DS-00003-4MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL003-IFC20 27-Apr-15 22-May-15MM1-1305-PT-00-R-DS-00004MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL004 60 13-Mar-15 25-May-15MM1-1305-PT-00-R-DS-00004-1MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL004-IDC27 13-Mar-15* 13-Apr-15MM1-1305-PT-00-R-DS-00004-2MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL004-IFR6 14-Apr-15 20-Apr-15MM1-1305-PT-00-R-DS-00004-3MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL004-IFD7 21-Apr-15 29-Apr-15MM1-1305-PT-00-R-DS-00004-4MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL004-IFC20 02-May-15 25-May-15MM1-1305-PT-00-R-DS-00005MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL005 58 13-Mar-15 22-May-15MM1-1305-PT-00-R-DS-00005-1MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL005-IDC25 13-Mar-15* 10-Apr-15MM1-1305-PT-00-R-DS-00005-2MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL005-IFR6 11-Apr-15 17-Apr-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 28 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-00-R-DS-00005-3MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL005-IFD7 18-Apr-15 25-Apr-15MM1-1305-PT-00-R-DS-00005-4MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL005-IFC20 27-Apr-15 22-May-15MM1-1305-PT-00-R-DS-00006MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL007 60 13-Mar-15 25-May-15MM1-1305-PT-00-R-DS-00006-1MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL007-IDC27 13-Mar-15* 13-Apr-15MM1-1305-PT-00-R-DS-00006-2MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL007-IFR6 14-Apr-15 20-Apr-15MM1-1305-PT-00-R-DS-00006-3MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL007-IFD7 21-Apr-15 29-Apr-15MM1-1305-PT-00-R-DS-00006-4MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL007-IFC20 02-May-15 25-May-15MM1-1305-PT-00-R-XD-00001MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL001 82 13-Mar-15 19-Jun-15MM1-1305-PT-00-R-XD-00001-1MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL001-IDC46 13-Mar-15* 08-May-15MM1-1305-PT-00-R-XD-00001-2MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL001-IFR6 09-May-15 15-May-15MM1-1305-PT-00-R-XD-00001-3MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL001-IFD0 16-May-15 16-May-15MM1-1305-PT-00-R-XD-00001-4MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL001-IFC30 16-May-15 19-Jun-15MM1-1305-PT-00-R-XD-00002MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL002 82 13-Mar-15 19-Jun-15MM1-1305-PT-00-R-XD-00002-1MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL002-IDC46 13-Mar-15* 08-May-15MM1-1305-PT-00-R-XD-00002-2MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL002-IFR6 09-May-15 15-May-15MM1-1305-PT-00-R-XD-00002-3MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL002-IFD0 16-May-15 16-May-15MM1-1305-PT-00-R-XD-00002-4MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL002-IFC30 16-May-15 19-Jun-15MM1-1305-PT-00-R-XD-00003MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL003 82 13-Mar-15 19-Jun-15MM1-1305-PT-00-R-XD-00003-1MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL003-IDC46 13-Mar-15* 08-May-15MM1-1305-PT-00-R-XD-00003-2MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL003-IFR6 09-May-15 15-May-15MM1-1305-PT-00-R-XD-00003-3MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL003-IFD0 16-May-15 16-May-15MM1-1305-PT-00-R-XD-00003-4MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL003-IFC30 16-May-15 19-Jun-15MM1-1305-PT-00-R-XD-00004MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL004 82 13-Mar-15 19-Jun-15MM1-1305-PT-00-R-XD-00004-1MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL004-IDC46 13-Mar-15* 08-May-15MM1-1305-PT-00-R-XD-00004-2MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL004-IFR6 09-May-15 15-May-15MM1-1305-PT-00-R-XD-00004-3MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL004-IFD0 16-May-15 16-May-15MM1-1305-PT-00-R-XD-00004-4MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL004-IFC30 16-May-15 19-Jun-15MM1-1305-PT-00-R-XD-00005MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL005 82 13-Mar-15 19-Jun-15MM1-1305-PT-00-R-XD-00005-1MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL005-IDC46 13-Mar-15* 08-May-15MM1-1305-PT-00-R-XD-00005-2MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL005-IFR6 09-May-15 15-May-15MM1-1305-PT-00-R-XD-00005-3MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL005-IFD0 16-May-15 16-May-15MM1-1305-PT-00-R-XD-00005-4MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL005-IFC30 16-May-15 19-Jun-15MM1-1305-PT-00-R-XD-00006MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL007 82 13-Mar-15 19-Jun-15MM1-1305-PT-00-R-XD-00006-1MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL007-IDC46 13-Mar-15* 08-May-15MM1-1305-PT-00-R-XD-00006-2MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL007-IFR6 09-May-15 15-May-15MM1-1305-PT-00-R-XD-00006-3MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL007-IFD0 16-May-15 16-May-15MM1-1305-PT-00-R-XD-00006-4MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL007-IFC30 16-May-15 19-Jun-15MM1-1305-PT-00-R-XS-00001MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL001 71 03-Apr-15 27-Jun-15MM1-1305-PT-00-R-XS-00001-1MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL001-IDC34 03-Apr-15* 15-May-15MM1-1305-PT-00-R-XS-00001-2MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL001-IFR7 16-May-15 23-May-15MM1-1305-PT-00-R-XS-00001-3MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL001-IFD0 25-May-15 25-May-15MM1-1305-PT-00-R-XS-00001-4MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL001-IFC30 25-May-15 27-Jun-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 29 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-00-R-XS-00002MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL002 71 03-Apr-15 27-Jun-15MM1-1305-PT-00-R-XS-00002-1MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL002-IDC34 03-Apr-15* 15-May-15MM1-1305-PT-00-R-XS-00002-2MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL002-IFR7 16-May-15 23-May-15MM1-1305-PT-00-R-XS-00002-3MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL002-IFD0 25-May-15 25-May-15MM1-1305-PT-00-R-XS-00002-4MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL002-IFC30 25-May-15 27-Jun-15MM1-1305-PT-00-R-XS-00003MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL003 71 03-Apr-15 27-Jun-15MM1-1305-PT-00-R-XS-00003-1MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL003-IDC34 03-Apr-15* 15-May-15MM1-1305-PT-00-R-XS-00003-2MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL003-IFR7 16-May-15 23-May-15MM1-1305-PT-00-R-XS-00003-3MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL003-IFD0 25-May-15 25-May-15MM1-1305-PT-00-R-XS-00003-4MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL003-IFC30 25-May-15 27-Jun-15MM1-1305-PT-00-R-XS-00004MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL004 71 03-Apr-15 27-Jun-15MM1-1305-PT-00-R-XS-00004-1MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL004-IDC34 03-Apr-15* 15-May-15MM1-1305-PT-00-R-XS-00004-2MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL004-IFR7 16-May-15 23-May-15MM1-1305-PT-00-R-XS-00004-3MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL004-IFD0 25-May-15 25-May-15MM1-1305-PT-00-R-XS-00004-4MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL004-IFC30 25-May-15 27-Jun-15MM1-1305-PT-00-R-XS-00005MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL005 71 03-Apr-15 27-Jun-15MM1-1305-PT-00-R-XS-00005-1MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL005-IDC34 03-Apr-15* 15-May-15MM1-1305-PT-00-R-XS-00005-2MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL005-IFR7 16-May-15 23-May-15MM1-1305-PT-00-R-XS-00005-3MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL005-IFD0 25-May-15 25-May-15MM1-1305-PT-00-R-XS-00005-4MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL005-IFC30 25-May-15 27-Jun-15MM1-1305-PT-00-R-XS-00006MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL007 71 03-Apr-15 27-Jun-15MM1-1305-PT-00-R-XS-00006-1MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL007-IDC34 03-Apr-15* 15-May-15MM1-1305-PT-00-R-XS-00006-2MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL007-IFR7 16-May-15 23-May-15MM1-1305-PT-00-R-XS-00006-3MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL007-IFD0 25-May-15 25-May-15MM1-1305-PT-00-R-XS-00006-4MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL007-IFC30 25-May-15 27-Jun-15MM1-1305-PT-00-R-CA-00001MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL00159 20-Mar-15 30-May-15MM1-1305-PT-00-R-CA-00001-1MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL001-IDC25 20-Mar-15* 17-Apr-15MM1-1305-PT-00-R-CA-00001-2MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL001-IFR7 18-Apr-15 25-Apr-15MM1-1305-PT-00-R-CA-00001-3MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL001-IFD0 27-Apr-15 27-Apr-15MM1-1305-PT-00-R-CA-00001-4MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL001-IFC27 27-Apr-15 30-May-15MM1-1305-PT-00-R-CA-00002MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL00259 20-Mar-15 30-May-15MM1-1305-PT-00-R-CA-00002-1MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL002-IDC25 20-Mar-15* 17-Apr-15MM1-1305-PT-00-R-CA-00002-2MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL002-IFR7 18-Apr-15 25-Apr-15MM1-1305-PT-00-R-CA-00002-3MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL002-IFD0 27-Apr-15 27-Apr-15MM1-1305-PT-00-R-CA-00002-4MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL002-IFC27 27-Apr-15 30-May-15MM1-1305-PT-00-R-CA-00003MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL00359 20-Mar-15 30-May-15MM1-1305-PT-00-R-CA-00003-1MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL003-IDC25 20-Mar-15* 17-Apr-15MM1-1305-PT-00-R-CA-00003-2MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL003-IFR7 18-Apr-15 25-Apr-15MM1-1305-PT-00-R-CA-00003-3MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL003-IFD0 27-Apr-15 27-Apr-15MM1-1305-PT-00-R-CA-00003-4MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL003-IFC27 27-Apr-15 30-May-15MM1-1305-PT-00-R-CA-00004MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL00459 20-Mar-15 30-May-15MM1-1305-PT-00-R-CA-00004-1MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL004-IDC25 20-Mar-15* 17-Apr-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 30 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-1305-PT-00-R-CA-00004-2MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL004-IFR7 18-Apr-15 25-Apr-15MM1-1305-PT-00-R-CA-00004-3MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL004-IFD0 27-Apr-15 27-Apr-15MM1-1305-PT-00-R-CA-00004-4MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL004-IFC27 27-Apr-15 30-May-15MM1-1305-PT-00-R-CA-00005MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL00559 20-Mar-15 30-May-15MM1-1305-PT-00-R-CA-00005-1MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL005-IDC25 20-Mar-15* 17-Apr-15MM1-1305-PT-00-R-CA-00005-2MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL005-IFR7 18-Apr-15 25-Apr-15MM1-1305-PT-00-R-CA-00005-3MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL005-IFD0 27-Apr-15 27-Apr-15MM1-1305-PT-00-R-CA-00005-4MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL005-IFC27 27-Apr-15 30-May-15MM1-1305-PT-00-R-CA-00006MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL00759 20-Mar-15 30-May-15MM1-1305-PT-00-R-CA-00006-1MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL007-IDC25 20-Mar-15* 17-Apr-15MM1-1305-PT-00-R-CA-00006-2MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL007-IFR7 18-Apr-15 25-Apr-15MM1-1305-PT-00-R-CA-00006-3MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL007-IFD0 27-Apr-15 27-Apr-15MM1-1305-PT-00-R-CA-00006-4MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL007-IFC27 27-Apr-15 30-May-15MM1-1305-PT-00-R-SA-00001MM1 & MM2 - Technical Requisition for QOC 45 13-Apr-15 06-Jun-15MM1-1305-PT-00-R-SA-00001-1MM1 & MM2 - Technical Requisition for QOC-IDC 16 13-Apr-15* 04-May-15MM1-1305-PT-00-R-SA-00001-2MM1 & MM2 - Technical Requisition for QOC-IFR 4 05-May-15 08-May-15MM1-1305-PT-00-R-SA-00001-3MM1 & MM2 - Technical Requisition for QOC-IFD 0 09-May-15 09-May-15MM1-1305-PT-00-R-SA-00001-4MM1 & MM2 - Technical Requisition for QOC-IFC 25 09-May-15 06-Jun-15MM1-10490 TR/MTO for Pig Receivers (Q.O.C) 1 07-May-15 07-May-15MM1-10510 Prepare / Submit/ Approve Mechanical Shop Drawings 84 09-Oct-15 15-Jan-16

0.D.26.0000.MM1.C Procurement0.D.26.0000.MM1.C Procurement 314 08-Apr-15 15-Feb-160.D.26.0000.MM1.C.N Structural0.D.26.0000.MM1.C.N Structural 293 08-Apr-15 25-Jan-160.D.26.0000.MM1.C.N.92 PTSC0.D.26.0000.MM1.C.N.92 PTSC 293 08-Apr-15 25-Jan-16MM1-10000 RFQ/TBE/CBE/PO for Primary & Secondary Steel 39 08-Apr-15 16-May-15MM1-11100 Delivery for Primary & Secondary Steel 119 17-May-15 12-Sep-15MM1-11900 RFQ/TBE/CBE/PO for Tertiary Steel 35 10-Jun-15 14-Jul-15MM1-14400 Delivery for Tertiary Steel 91 15-Jul-15 13-Oct-15MM1-15100 RFQ/TBE/CBE/PO for Structural Miscellaneous 37 29-Jul-15 03-Sep-15MM1-16600 Delivery for Structural Miscellaneous 77 04-Sep-15 19-Nov-15MM1-15800 RFQ/TBE/CBE/PO for Gratings 37 10-Aug-15 15-Sep-15MM1-16800 Delivery for Gratings 91 16-Sep-15 15-Dec-15MM1-18700 RFQ/TBE/CBE/PO for SF and Grillage Material 37 11-Oct-15 16-Nov-15MM1-21900 Delivery for SF and Grillage Material 70 17-Nov-15 25-Jan-16

0.D.26.0000.MM1.C.1 E&I0.D.26.0000.MM1.C.1 E&I 296 08-Apr-15 28-Jan-160.D.26.0000.MM1.C.1.91 Yinson0.D.26.0000.MM1.C.1.91 Yinson 0 04-Jan-16 04-Jan-16MM1-25400 ROS for ICSS RIO panels 0 04-Jan-16MM1-25500 ROS for F&G detectors 0 04-Jan-16MM1-25600 ROS for PA Systems 0 04-Jan-16

0.D.26.0000.MM1.C.1.92 PTSC0.D.26.0000.MM1.C.1.92 PTSC 296 08-Apr-15 28-Jan-16MM1-10100 RFQ/TBE/CBE/PO for Motor Operated Valve 58 08-Apr-15 04-Jun-15MM1-11600 Delivery for Motor Operated Valve 238 05-Jun-15 28-Jan-16MM1-10300 RFQ/TBE/CBE/PO for ON-OFF Valve 61 12-Apr-15 11-Jun-15MM1-12300 Delivery for ON-OFF Valve 231 12-Jun-15 28-Jan-16

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

ROS for ICSS RIO panelsROS for F&G detectorsROS for PA Systems

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 31 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-10800 RFQ/TBE/CBE/PO for H2S analyzer 52 30-Apr-15 20-Jun-15MM1-13100 Delivery for H2S analyzer 189 21-Jun-15 26-Dec-15MM1-12800 RFQ/TBE/CBE/PO for Lighting Fixtures 48 20-Jun-15 06-Aug-15MM1-15500 Delivery for Lighting Fixtures 133 07-Aug-15 17-Dec-15MM1-10500 RFQ/TBE/CBE/PO for Pressure Safety valves 59 28-Apr-15 25-Jun-15MM1-13500 Delivery for Pressure Safety valves 217 26-Jun-15 28-Jan-16MM1-12000 RFQ/TBE/CBE/PO for E&I Cable Tray & Ladder 48 11-Jun-15 28-Jul-15MM1-15200 Delivery for E&I Cable Tray & Ladder 106 29-Jul-15 11-Nov-15MM1-10400 RFQ/TBE/CBE/PO for Choke Valve 58 17-Apr-15 13-Jun-15MM1-12500 Delivery for Choke Valve 229 14-Jun-15 28-Jan-16MM1-13300 RFQ/TBE/CBE/PO for Junction Box 59 22-Jun-15 19-Aug-15MM1-16200 Delivery for Junction Box 105 20-Aug-15 02-Dec-15MM1-11300 RFQ/TBE/CBE/PO for Pig Signaller 53 19-May-15 10-Jul-15MM1-14300 Delivery for Pig Signaller 167 11-Jul-15 24-Dec-15MM1-12100 RFQ/TBE/CBE/PO for E&I Steel Support 35 11-Jun-15 15-Jul-15MM1-14600 Delivery for E&I Steel Support 77 16-Jul-15 30-Sep-15MM1-12700 RFQ/TBE/CBE/PO for ElectronicTransmitter (PT/TT/LT/FT) 48 17-Jun-15 03-Aug-15MM1-15300 Delivery for ElectronicTransmitter (PT/TT/LT/FT) 147 04-Aug-15 28-Dec-15MM1-12400 RFQ/TBE/CBE/PO for E&I Cable 62 13-Jun-15 13-Aug-15MM1-15900 Delivery for E&I Cable 111 14-Aug-15 02-Dec-15MM1-11700 RFQ/TBE/CBE/PO for Gauges (PG/TG/LG) 41 06-Jun-15 16-Jul-15MM1-14700 Delivery for Gauges (PG/TG/LG) 161 17-Jul-15 24-Dec-15MM1-13900 RFQ/TBE/CBE/PO for E&I Cable Gland 48 03-Jul-15 19-Aug-15MM1-16100 Delivery for E&I Cable Gland 105 20-Aug-15 02-Dec-15MM1-15000 RFQ/TBE/CBE/PO for E&I Miscellaneous (Earthing Bosses, Lug, cable tie, etc.)52 20-Jul-15 09-Sep-15MM1-16700 Delivery for E&I Miscellaneous (Earthing Bosses, Lug, cable tie, etc.) 84 10-Sep-15 02-Dec-15MM1-13000 RFQ/TBE/CBE/PO for MOV & Lighting distribution panel 48 20-Jun-15 06-Aug-15MM1-15700 Delivery for MOV & Lighting distribution panel 126 07-Aug-15 10-Dec-15MM1-13200 RFQ/TBE/CBE/PO for Orifice Plate/Restriction Orifice 47 21-Jun-15 06-Aug-15MM1-15400 Delivery for Orifice Plate/Restriction Orifice 140 07-Aug-15 24-Dec-15MM1-12200 RFQ/TBE/CBE/PO for Tubing & Fitting 39 11-Jun-15 19-Jul-15MM1-14900 Delivery for Tubing & Fitting 140 20-Jul-15 06-Dec-15MM1-12900 RFQ/TBE/CBE/PO for Heat Tracing system 48 20-Jun-15 06-Aug-15MM1-15600 Delivery for Heat Tracing system 126 07-Aug-15 10-Dec-15

0.D.26.0000.MM1.C.R Mechanical/ Material Handling0.D.26.0000.MM1.C.R Mechanical/ Material Handling 251 08-May-15 13-Jan-160.D.26.0000.MM1.C.R.91 Yinson0.D.26.0000.MM1.C.R.91 Yinson 5 08-Jan-16 13-Jan-16MM1-26200 ROS for Material Handling Equipment 0 08-Jan-16MM1-26500 ROS for Safety equipment 0 13-Jan-16

0.D.26.0000.MM1.C.R.92 PTSC0.D.26.0000.MM1.C.R.92 PTSC 197 08-May-15 20-Nov-15MM1-10900 RFQ/TBE/CBE/PO for Pig Receivers (Q.O.C) 48 08-May-15 24-Jun-15MM1-13400 Delivery Pig Receivers (Q.O.C) 149 25-Jun-15 20-Nov-15

0.D.26.0000.MM1.C.L Piping0.D.26.0000.MM1.C.L Piping 311 11-Apr-15 15-Feb-160.D.26.0000.MM1.C.L.92 PTSC0.D.26.0000.MM1.C.L.92 PTSC 311 11-Apr-15 15-Feb-16

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

ROS for Material Handling EquipmentROS for Safety equipment

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 32 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-10200 RFQ/TBE/CBE/PO for Piping Bulk 46 11-Apr-15 26-May-15MM1-11400 Delivery for Piping Bulk 127 27-May-15 30-Sep-15MM1-10700 RFQ/TBE/CBE/PO for Manual valves 58 30-Apr-15 26-Jun-15MM1-13600 Delivery for Manual valves 182 27-Jun-15 25-Dec-15MM1-10600 RFQ/TBE/CBE/PO for Barred Tee 47 29-Apr-15 14-Jun-15MM1-12600 Delivery for Barred Tee 176 15-Jun-15 07-Dec-15MM1-11000 RFQ/TBE/CBE/PO for Cuni fittings 53 09-May-15 30-Jun-15MM1-13800 Delivery for Cuni fittings 108 01-Jul-15 16-Oct-15MM1-11200 RFQ/TBE/CBE/PO for Corrosion, sand probe, sample connection, chemical connection… I41 19-May-15 28-Jun-15MM1-13700 Delivery for Corrosion, sand probe, sample connection, chemical connection131 29-Jun-15 06-Nov-15MM1-11500 RFQ/TBE/CBE/PO for 3D Bend (free bare pipe to bending contractor) 48 31-May-15 17-Jul-15MM1-14800 Delivery for 3D Bend (free bare pipe to bending contractor) 213 18-Jul-15 15-Feb-16MM1-11800 RFQ/TBE/CBE/PO for Pipe Supports 39 07-Jun-15 15-Jul-15MM1-14500 Delivery for Pipe Supports 85 16-Jul-15 08-Oct-15MM1-14200 RFQ/TBE/CBE/PO for Quick Coupling 52 10-Jul-15 30-Aug-15MM1-16500 Delivery for Quick Coupling 98 31-Aug-15 06-Dec-15MM1-14000 RFQ/TBE/CBE/PO for Piping insulation 55 05-Jul-15 28-Aug-15MM1-16300 Delivery for Piping insulation 99 29-Aug-15 05-Dec-15MM1-14100 RFQ/TBE/CBE/PO for Bolt nut, gasket and other 53 07-Jul-15 28-Aug-15MM1-16400 Delivery for Bolt nut, gasket and other 71 29-Aug-15 07-Nov-15MM1-17100 RFQ/TBE/CBE/PO for Valve Inter-locks 56 17-Sep-15 11-Nov-15MM1-21500 Delivery for Valve Inter-locks 70 12-Nov-15 20-Jan-16

0.D.26.0000.MM1.D Construction0.D.26.0000.MM1.D Construction 194 18-Aug-15 01-Apr-160.D.26.0000.MM1.D.N Structural0.D.26.0000.MM1.D.N Structural 182 18-Aug-15 24-Mar-160.D.26.0000.MM1.D.N.20 Blasting & Painting0.D.26.0000.MM1.D.N.20 Blasting & Painting 154 21-Sep-15 24-Mar-16MM1-17200 Blast, primer, tie coat for primary beam of Main Deck 10 21-Sep-15 01-Oct-15MM1-17600 Blast, primer, tie coat for primary beam of Mezz deck 10 26-Sep-15 07-Oct-15MM1-18400 Blast, primer, tie coat for secondary beam of main deck 10 08-Oct-15 19-Oct-15MM1-18600 Blast, primer, tie coat for primary beam of upper deck 10 10-Oct-15 21-Oct-15MM1-18900 Blast, primer, tie coat for secondary beam of Mezz deck 10 13-Oct-15 23-Oct-15MM1-19400 Blast, primer, tie coat for deck plate of main deck 10 17-Oct-15 28-Oct-15MM1-19500 Blast, primer, tie coat for secondary beam of upper deck 10 17-Oct-15 28-Oct-15MM1-20200 Blast, primer, tie coat for deck plate of Mezz deck 10 22-Oct-15 02-Nov-15MM1-20700 Blast, primer, tie coat for Legs and Braces for MD & Mezz Deck 14 26-Oct-15 10-Nov-15MM1-21000 Blast, primer, tie coat for deck plate of upper deck 10 04-Nov-15 14-Nov-15MM1-22100 Third coat for Mezz deck 10 20-Nov-15 01-Dec-15MM1-22200 Third coat for main deck 10 21-Nov-15 02-Dec-15MM1-23400 Third coat for upper deck 10 09-Dec-15 19-Dec-15MM1-24200 Sweep blast and painting for handrail 10 16-Dec-15 26-Dec-15MM1-24700 Blast to galvanizing hand rail 14 28-Dec-15 13-Jan-16MM1-26600 Touch up for column and bracing 14 18-Jan-16 02-Feb-16MM1-28000 Touch up for deck plate 14 03-Feb-16 24-Feb-16

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 33 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-29200 Final and touch up for main deck 14 02-Mar-16 17-Mar-16MM1-29300 Final and touch up painting for upper deck 14 02-Mar-16 17-Mar-16MM1-29400 Final and touch up painting for Mezz deck 14 02-Mar-16 17-Mar-16MM1-29600 Cleaning and hand over MM1 14 09-Mar-16 24-Mar-16

0.D.26.0000.MM1.D.N.05 Pre-Fabrication0.D.26.0000.MM1.D.N.05 Pre-Fabrication 30 18-Aug-15 22-Sep-15MM1-16000 Pre-fab & Assembly for LOSF 30 18-Aug-15 22-Sep-15

0.D.26.0000.MM1.D.N.10 Fabrication0.D.26.0000.MM1.D.N.10 Fabrication 134 17-Sep-15 26-Feb-160.D.26.0000.MM1.D.N.10.1 Main Deck0.D.26.0000.MM1.D.N.10.1 Main Deck 122 17-Sep-15 12-Feb-16MM1-16900 Cut & prep Main Deck Primary Beams 10 17-Sep-15 28-Sep-15MM1-17000 Fab Main Deck nodes & Joints 10 17-Sep-15 28-Sep-15MM1-18100 Cut & prep Main Deck Secondary Beams & Stiffeners 10 05-Oct-15 15-Oct-15MM1-19100 Fab Main Deck Plates 10 14-Oct-15 24-Oct-15MM1-19300 Fab column and bracing 14 17-Oct-15 02-Nov-15MM1-22700 Fab Handrail, landing & Sockets... 60 28-Nov-15 12-Feb-16

0.D.26.0000.MM1.D.N.10.2 Mezz Deck0.D.26.0000.MM1.D.N.10.2 Mezz Deck 126 21-Sep-15 20-Feb-16MM1-17300 Cut & prep Mezz Deck Primary Beams 10 21-Sep-15 01-Oct-15MM1-17400 Fab Mezz Deck nodes & Joints 10 21-Sep-15 01-Oct-15MM1-18200 Cut & prep Mezz Deck Secondary Beams & Stiffeners 10 05-Oct-15 15-Oct-15MM1-19800 Fab column and bracing 14 17-Oct-15 02-Nov-15MM1-20000 Fab Mezz Deck Plates 10 19-Oct-15 29-Oct-15MM1-23300 Fab Handrail, landing & Sockets... 60 07-Dec-15 20-Feb-16

0.D.26.0000.MM1.D.N.10.3 Upper Deck0.D.26.0000.MM1.D.N.10.3 Upper Deck 120 03-Oct-15 26-Feb-16MM1-17800 Cut & prep Upper Deck Primary Beams 10 03-Oct-15 14-Oct-15MM1-17900 Fab Upper Deck nodes & Joints 10 03-Oct-15 14-Oct-15MM1-18500 Cut & prep Upper Deck Secondary Beams & Stiffeners 10 09-Oct-15 20-Oct-15MM1-20600 Fab Upper Deck Plates 14 26-Oct-15 10-Nov-15MM1-24000 Fab Handrail, landing & Sockets... 60 12-Dec-15 26-Feb-16

0.D.26.0000.MM1.D.N.25 Installation0.D.26.0000.MM1.D.N.25 Installation 137 24-Sep-15 08-Mar-160.D.26.0000.MM1.D.N.25.1 Main Deck0.D.26.0000.MM1.D.N.25.1 Main Deck 133 24-Sep-15 03-Mar-16MM1-17500 Assembly Main Deck Primary Beams & Deck nodes above LOSF 30 24-Sep-15 28-Oct-15MM1-19700 Assembly Main Deck Secondary Beams & Stiffemers above LOSF 14 17-Oct-15 02-Nov-15MM1-20900 Installation Main Deck Plate 16 03-Nov-15 20-Nov-15MM1-21300 Installation Columns onto Main Deck (for Mezz Deck) 10 10-Nov-15 20-Nov-15MM1-23800 Installation Bracings onto Main Deck 24 11-Dec-15 08-Jan-16MM1-24100 Installation Remaining Legs onto Main Deck 8 12-Dec-15 21-Dec-15MM1-25000 Installation Handrail, landing & Sockets, Gratings... 50 30-Dec-15 03-Mar-16MM1-28900 Weighting for MM1 1 24-Feb-16 24-Feb-16

0.D.26.0000.MM1.D.N.25.2 Mezz Deck0.D.26.0000.MM1.D.N.25.2 Mezz Deck 127 01-Oct-15 03-Mar-16MM1-17700 Assembly Mezz Deck Primary Beams & Deck nodes 21 01-Oct-15 24-Oct-15MM1-20100 Assembly Mezz Deck Secondary Beams & Stiffemers 14 21-Oct-15 05-Nov-15MM1-21200 Installation Mezz Deck Plate 12 06-Nov-15 19-Nov-15MM1-22800 Install Mezz Deck onto Main Deck 6 03-Dec-15 09-Dec-15MM1-23900 Installation Columns onto Mezz Deck 8 12-Dec-15 21-Dec-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 34 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-25200 Installation Bracings onto Mezz Deck 10 31-Dec-15 12-Jan-16MM1-26000 Installation Handrail, landing & Sockets, Gratings... 45 06-Jan-16 03-Mar-16

0.D.26.0000.MM1.D.N.25.3 Upper Deck0.D.26.0000.MM1.D.N.25.3 Upper Deck 117 17-Oct-15 08-Mar-16MM1-19600 Assembly Upper Deck Primary Beams & Deck nodes 30 17-Oct-15 20-Nov-15MM1-21100 Assembly Upper Deck Secondary Beams & Stiffemers 14 04-Nov-15 19-Nov-15MM1-22000 Installation Upper Deck Plate 16 20-Nov-15 08-Dec-15MM1-24400 Install Upper Deck onto Main Deck & Mezz Deck 6 22-Dec-15 28-Dec-15MM1-25800 Installation Handrail, landing & Sockets, Gratings... 50 05-Jan-16 08-Mar-16

0.D.26.0000.MM1.D.R Mechanical/ Material Handling0.D.26.0000.MM1.D.R Mechanical/ Material Handling 112 26-Oct-15 10-Mar-160.D.26.0000.MM1.D.R.20 Blasting & Painting Equipment support0.D.26.0000.MM1.D.R.20 Blasting & Painting Equipment support 93 17-Nov-15 10-Mar-16MM1-21800 Blast, primer for equipment support 21 17-Nov-15 10-Dec-15MM1-28700 Touch up for equipment support and final coat 14 24-Feb-16 10-Mar-16

0.D.26.0000.MM1.D.R.25 Installation0.D.26.0000.MM1.D.R.25 Installation 40 26-Oct-15 10-Dec-15MM1-20500 Fabrication and installation euipment support 40 26-Oct-15 10-Dec-15

0.D.26.0000.MM1.D.R.80 Equipment Securing0.D.26.0000.MM1.D.R.80 Equipment Securing 74 07-Dec-15 08-Mar-16MM1-22900 Installation ROP3 - Oil Production Pig Launcher / Receiver 4 07-Dec-15 10-Dec-15MM1-23000 Installation ROP4 - Oil Production Pig Launcher / Receiver 4 07-Dec-15 10-Dec-15MM1-23100 Installation ROP5 - Oil Production Pig Launcher / Receiver 4 07-Dec-15 10-Dec-15MM1-23200 Installation ROP7 - Oil Production Pig Launcher / Receiver 4 07-Dec-15 10-Dec-15MM1-27900 Installation safty sign and safety equipment 25 03-Feb-16 08-Mar-16

0.D.26.0000.MM1.D.L Piping0.D.26.0000.MM1.D.L Piping 135 05-Oct-15 16-Mar-160.D.26.0000.MM1.D.L.20 Blasting & Painting0.D.26.0000.MM1.D.L.20 Blasting & Painting 126 15-Oct-15 16-Mar-16MM1-19900 Blast & Paint for piping spool, SS 60 19-Oct-15 26-Dec-15MM1-19200 Blast & Paint for piping spool, Duplex SS & Cladding 60 15-Oct-15 23-Dec-15MM1-20300 Blast & Paint for Pipe support 55 24-Oct-15 26-Dec-15MM1-20800 Blast & Paint for piping spool CS 90 30-Oct-15 18-Feb-16MM1-26300 Touch up painting for piping 50 13-Jan-16 16-Mar-16MM1-28100 Touch up for piping support 14 12-Feb-16 27-Feb-16MM1-28400 Touch up painting for valve 14 16-Feb-16 02-Mar-16

0.D.26.0000.MM1.D.L.10 Fabrication0.D.26.0000.MM1.D.L.10 Fabrication 107 05-Oct-15 12-Feb-16MM1-18000 Fabrication Carbon steel piping spool work 107 05-Oct-15 12-Feb-16MM1-18800 Fabrication Stainless steel piping spool work 60 13-Oct-15 21-Dec-15MM1-18300 Fabrication Duplex SS & Cladding piping spool work 60 07-Oct-15 15-Dec-15MM1-19000 Fabrication Pipe support 60 14-Oct-15 22-Dec-15MM1-20400 Fabrication CUNI piping spool work 35 26-Oct-15 04-Dec-15

0.D.26.0000.MM1.D.L.25 Installation0.D.26.0000.MM1.D.L.25 Installation 84 11-Nov-15 23-Feb-16MM1-21400 Pipe support installation 60 11-Nov-15 20-Jan-16MM1-22300 Installation Carbon steel piping spool work 56 25-Nov-15 29-Jan-16MM1-22400 Installation Stainless steel piping spool work 55 26-Nov-15 29-Jan-16MM1-22500 Installation Duplex SS & Cladding piping spool work 55 26-Nov-15 29-Jan-16MM1-25300 Installation Manual valve 30 02-Jan-16 05-Feb-16MM1-25700 Installation CUNI piping spool work 22 05-Jan-16 29-Jan-16MM1-27400 Installation MOV valve 15 30-Jan-16 22-Feb-16

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 35 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-27500 Installation Choke valve 15 30-Jan-16 22-Feb-16MM1-27600 Installation On-off valve 15 01-Feb-16 23-Feb-16

0.D.26.0000.MM1.D.L.40 Testing0.D.26.0000.MM1.D.L.40 Testing 42 31-Dec-15 24-Feb-16MM1-25100 Flushing and hydro test 30 31-Dec-15 04-Feb-16MM1-26100 Flangemanagement & reinstatement 37 07-Jan-16 24-Feb-16

0.D.26.0000.MM1.D.1 E&I0.D.26.0000.MM1.D.1 E&I 101 13-Nov-15 16-Mar-160.D.26.0000.MM1.D.1.20 Blasting & Painting0.D.26.0000.MM1.D.1.20 Blasting & Painting 88 28-Nov-15 16-Mar-16MM1-22600 Blast & Paint E&I support 40 28-Nov-15 14-Jan-16MM1-29100 Touch up for E&I support 14 01-Mar-16 16-Mar-16

0.D.26.0000.MM1.D.1.10 Fabrication0.D.26.0000.MM1.D.1.10 Fabrication 50 13-Nov-15 11-Jan-16MM1-21600 Fabrication Electrical Support 50 13-Nov-15 11-Jan-16MM1-21700 Fabrication Instrument Support 50 13-Nov-15 11-Jan-16

0.D.26.0000.MM1.D.1.25 Installation0.D.26.0000.MM1.D.1.25 Installation 70 10-Dec-15 07-Mar-16MM1-23500 Installation Electrical Support 48 10-Dec-15 04-Feb-16MM1-24300 Installation of Instrument Support 41 18-Dec-15 04-Feb-16MM1-24500 Installation Electrical cable Ladder/Tray 35 26-Dec-15 05-Feb-16MM1-24900 Installation Instrument cable and Tubing Ladder/Tray 35 29-Dec-15 13-Feb-16MM1-27000 Installation Instrument equipments 30 27-Jan-16 07-Mar-16MM1-26900 Installation Electrical Equipments 30 26-Jan-16 05-Mar-16MM1-27200 Installation Tubing 28 29-Jan-16 07-Mar-16MM1-26800 Install Heat tracing 25 25-Jan-16 27-Feb-16

0.D.26.0000.MM1.D.1.40 Testing0.D.26.0000.MM1.D.1.40 Testing 48 11-Dec-15 05-Feb-16MM1-23600 Testing Electrical Cable 40 11-Dec-15 27-Jan-16MM1-23700 Testing Instrument Cable 40 11-Dec-15 27-Jan-16MM1-24600 Calibration of instrument equipments 25 28-Dec-15 26-Jan-16MM1-27300 Function test/ Leak test (Choke Valve, On-off Valve) 7 29-Jan-16 05-Feb-16

0.D.26.0000.MM1.D.1.30 Cabling & Termination0.D.26.0000.MM1.D.1.30 Cabling & Termination 55 06-Jan-16 15-Mar-16MM1-25900 Pulling Electrical Cable 35 06-Jan-16 20-Feb-16MM1-26400 Pulling Instrument Cable 30 13-Jan-16 22-Feb-16MM1-27100 Glanding and Termination Electrical 35 28-Jan-16 14-Mar-16MM1-27800 Glanding and Termination Instrument 32 02-Feb-16 15-Mar-16

0.D.26.0000.MM1.D.4 Insulation0.D.26.0000.MM1.D.4 Insulation 35 01-Feb-16 17-Mar-160.D.26.0000.MM1.D.4.25 Installation0.D.26.0000.MM1.D.4.25 Installation 35 01-Feb-16 17-Mar-16MM1-27700 Insulation for Mechanical equipment & Piping 35 01-Feb-16 17-Mar-16

0.D.26.0000.MM1.D.5 Mechanical Completion ("A" Scope)0.D.26.0000.MM1.D.5 Mechanical Completion ("A" Scope) 48 23-Jan-16 24-Mar-160.D.26.0000.MM1.D.5.60 Finishing0.D.26.0000.MM1.D.5.60 Finishing 43 23-Jan-16 18-Mar-16MM1-26700 ITR checksheet for Piping 40 23-Jan-16 15-Mar-16MM1-28300 ITR checksheet for Instrument 30 13-Feb-16 18-Mar-16MM1-28200 ITR checksheet for Electrical 30 12-Feb-16 17-Mar-16

0.D.26.0000.MM1.D.5.70 Pre-commissioning0.D.26.0000.MM1.D.5.70 Pre-commissioning 33 16-Feb-16 24-Mar-16MM1-28500 Pre-com for Modules MM1 ( Leak Test, Heatracing...) 33 16-Feb-16 24-Mar-16MM1-29000 Disciplines Acceptance Certificate (DAC) 20 27-Feb-16 21-Mar-16MM1-29500 Loop Test from Instrument devices to RIO panels 16 04-Mar-16 22-Mar-16

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 36 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM1-28800 Full power up of the module lighting 4 24-Feb-16 27-Feb-16MM1-29700 Mechanical & Pre-com Completion date for MM1 0 24-Mar-16

0.D.26.0000.MM1.D.6 Finishing/ Load-Out0.D.26.0000.MM1.D.6 Finishing/ Load-Out 33 24-Feb-16 01-Apr-160.D.26.0000.MM1.D.6.1 Load-Out0.D.26.0000.MM1.D.6.1 Load-Out 33 24-Feb-16 01-Apr-16MM1-28600 Fab Seafastening & Install Grillage on Barge for MM1 20 24-Feb-16 17-Mar-16MM1-29800 Load-Out for Modules MM1 7 26-Mar-16 01-Apr-16

0.D.26.0000.MM1.T Transportation (Optional)0.D.26.0000.MM1.T Transportation (Optional) 7 02-Apr-16 08-Apr-160.D.26.0000.MM1.T.7 Delivery0.D.26.0000.MM1.T.7 Delivery 7 02-Apr-16 08-Apr-160.D.26.0000.MM1.T.7.70 Delivery0.D.26.0000.MM1.T.7.70 Delivery 7 02-Apr-16 08-Apr-16MM1-29900 Transportation Modules MM1 to Singapore Yard 7 02-Apr-16 08-Apr-16

0.D.26.0000.MM2 MM2-Manifold and Pigging0.D.26.0000.MM2 MM2-Manifold and Pigging 333 13-Mar-15 08-Apr-160.D.26.0000.MM2.A Milestone0.D.26.0000.MM2.A Milestone 333 13-Mar-15 08-Apr-16MM2-11020 Effective date (LOI) 0 13-Mar-15*MM2-101000 Commence Basic & Detail Engineering Modules MM2 0 13-Mar-15*MM2-101040 HAZID Review Workshop 0 23-Mar-15*MM2-101060 HAZOP Review Workshop 0 27-Apr-15*MM2-101080 Commence Fab Modules MM2 0 17-Sep-15MM2-101020 Completion Basic & Detail Engineering Modules MM2 0 23-Sep-15*MM2-11800 MCD for MM2 0 24-Mar-16*MM2-12040 Commence Load-out Modules MM2 0 26-Mar-16*MM2-101100 Modules MM2 available at Singapore Yard 0 08-Apr-16*

0.D.26.0000.MM2.B Engineering0.D.26.0000.MM2.B Engineering 327 13-Mar-15 01-Apr-160.D.26.0000.MM2.B.0 General0.D.26.0000.MM2.B.0 General 321 13-Mar-15 01-Apr-160.D.26.0000.MM2.B.0.92 PTSC0.D.26.0000.MM2.B.0.92 PTSC 321 13-Mar-15 01-Apr-16MM2-12260 General for PMT (Meeting, Project Management, Project Coordination, Engineering review, etc)321 13-Mar-15 01-Apr-16MM2-1305-PT-00-A-TB-00001MM1 & MM2 - Detailed Engineering Execution Plan 40 13-Mar-15 29-Apr-15MM2-1305-PT-00-A-TB-00001-1MM1 & MM2 - Detailed Engineering Execution Plan-IDC 8 13-Mar-15* 21-Mar-15MM2-1305-PT-00-A-TB-00001-2MM1 & MM2 - Detailed Engineering Execution Plan-IFR 6 23-Mar-15 28-Mar-15MM2-1305-PT-00-A-TB-00001-3MM1 & MM2 - Detailed Engineering Execution Plan-IFD 11 30-Mar-15 10-Apr-15MM2-1305-PT-00-A-TB-00001-4MM1 & MM2 - Detailed Engineering Execution Plan-IFC 15 11-Apr-15 29-Apr-15MM2-1305-PT-00-A-KA-00001MM1 & MM2 - Detailed Engineering Coordination Procedure 31 13-Mar-15 17-Apr-15MM2-1305-PT-00-A-KA-00001-1MM1 & MM2 - Detailed Engineering Coordination Procedure-IDC 8 13-Mar-15* 21-Mar-15MM2-1305-PT-00-A-KA-00001-2MM1 & MM2 - Detailed Engineering Coordination Procedure-IFR 6 23-Mar-15 28-Mar-15MM2-1305-PT-00-A-KA-00001-3MM1 & MM2 - Detailed Engineering Coordination Procedure-IFD 0 30-Mar-15 30-Mar-15MM2-1305-PT-00-A-KA-00001-4MM1 & MM2 - Detailed Engineering Coordination Procedure-IFC 17 30-Mar-15 17-Apr-15

0.D.26.0000.MM2.B.9 3D Modelling0.D.26.0000.MM2.B.9 3D Modelling 65 12-May-15 25-Jul-150.D.26.0000.MM2.B.9.92 PTSC0.D.26.0000.MM2.B.9.92 PTSC 65 12-May-15 25-Jul-15MM2-1305-PT-00-L-RA-00001MM1 & MM2 - PDMS 30% model review report 17 12-May-15 30-May-15MM2-1305-PT-00-L-RA-00001-1MM1 & MM2 - PDMS 30% model review report-IDC 7 12-May-15* 19-May-15MM2-1305-PT-00-L-RA-00001-2MM1 & MM2 - PDMS 30% model review report-IFR 4 20-May-15 23-May-15MM2-1305-PT-00-L-RA-00001-3MM1 & MM2 - PDMS 30% model review report-IFD 0 25-May-15 25-May-15MM2-1305-PT-00-L-RA-00001-4MM1 & MM2 - PDMS 30% model review report-IFC 6 25-May-15 30-May-15MM2-1305-PT-00-L-RA-00002MM1 & MM2 - PDMS 60% model review report 17 09-Jun-15 27-Jun-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Mechanical & Pre-com Completion date for MM1

Effective date (LOI)Commence Basic & Detail Engineering Modules MM2

HAZID Review WorkshopHAZOP Review Workshop

Commence Fab Modules MM2Completion Basic & Detail Engineering Modules MM2

MCD for MM2Commence Load-out Modules MM2

Modules MM2 available at Singapore Yard

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 37 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-00-L-RA-00002-1MM1 & MM2 - PDMS 60% model review report-IDC 7 09-Jun-15* 16-Jun-15MM2-1305-PT-00-L-RA-00002-2MM1 & MM2 - PDMS 60% model review report-IFR 4 17-Jun-15 20-Jun-15MM2-1305-PT-00-L-RA-00002-3MM1 & MM2 - PDMS 60% model review report-IFD 0 22-Jun-15 22-Jun-15MM2-1305-PT-00-L-RA-00002-4MM1 & MM2 - PDMS 60% model review report-IFC 6 22-Jun-15 27-Jun-15MM2-1305-PT-00-L-RA-00003MM1 & MM2 - PDMS 90% model review report 17 07-Jul-15 25-Jul-15MM2-1305-PT-00-L-RA-00003-1MM1 & MM2 - PDMS 90% model review report -IDC 7 07-Jul-15* 14-Jul-15MM2-1305-PT-00-L-RA-00003-2MM1 & MM2 - PDMS 90% model review report -IFR 4 15-Jul-15 18-Jul-15MM2-1305-PT-00-L-RA-00003-3MM1 & MM2 - PDMS 90% model review report -IFD 0 20-Jul-15 20-Jul-15MM2-1305-PT-00-L-RA-00003-4MM1 & MM2 - PDMS 90% model review report -IFC 6 20-Jul-15 25-Jul-15

0.D.26.0000.MM2.B.S Process & Systems0.D.26.0000.MM2.B.S Process & Systems 79 13-Mar-15 16-Jun-150.D.26.0000.MM2.B.S.92 PTSC0.D.26.0000.MM2.B.S.92 PTSC 79 13-Mar-15 16-Jun-15MM2-1305-PT-30-P-FD-00001MM1 & MM2 - Basic Design Data 47 13-Mar-15 09-May-15MM2-1305-PT-30-P-FD-00001-1MM1 & MM2 - Basic Design Data-IDC 9 13-Mar-15* 23-Mar-15MM2-1305-PT-30-P-FD-00001-2MM1 & MM2 - Basic Design Data-IFR 7 24-Mar-15 31-Mar-15MM2-1305-PT-30-P-FD-00001-3MM1 & MM2 - Basic Design Data-IFD 13 01-Apr-15 15-Apr-15MM2-1305-PT-30-P-FD-00001-4MM1 & MM2 - Basic Design Data-IFC 18 16-Apr-15 09-May-15MM2-1305-PT-30-P-RA-00001MM1 & MM2 - Report - HYSYS Simulation 48 13-Mar-15 11-May-15MM2-1305-PT-30-P-RA-00001-1MM1 & MM2 - Report - HYSYS Simulation-IDC 1 13-Mar-15* 13-Mar-15MM2-1305-PT-30-P-RA-00001-2MM1 & MM2 - Report - HYSYS Simulation-IFR 17 14-Mar-15 02-Apr-15MM2-1305-PT-30-P-RA-00001-3MM1 & MM2 - Report - HYSYS Simulation-IFD 13 03-Apr-15 17-Apr-15MM2-1305-PT-30-P-RA-00001-4MM1 & MM2 - Report - HYSYS Simulation-IFC 17 18-Apr-15 11-May-15MM2-1305-PT-30-P-RA-00002MM1 & MM2 - Report - Line Sizing 55 03-Apr-15 09-Jun-15MM2-1305-PT-30-P-RA-00002-1MM1 & MM2 - Report - Line Sizing-IDC 1 03-Apr-15* 03-Apr-15MM2-1305-PT-30-P-RA-00002-2MM1 & MM2 - Report - Line Sizing-IFR 21 04-Apr-15 29-Apr-15MM2-1305-PT-30-P-RA-00002-3MM1 & MM2 - Report - Line Sizing-IFD 13 02-May-15 16-May-15MM2-1305-PT-30-P-RA-00002-4MM1 & MM2 - Report - Line Sizing-IFC 20 18-May-15 09-Jun-15MM2-1305-PT-30-P-RA-00003MM1 & MM2 - Report - Utility Summary 40 22-Apr-15 10-Jun-15MM2-1305-PT-30-P-RA-00003-1MM1 & MM2 - Report - Utility Summary-IDC 1 22-Apr-15* 22-Apr-15MM2-1305-PT-30-P-RA-00003-2MM1 & MM2 - Report - Utility Summary-IFR 6 23-Apr-15 02-May-15MM2-1305-PT-30-P-RA-00003-3MM1 & MM2 - Report - Utility Summary-IFD 12 04-May-15 16-May-15MM2-1305-PT-30-P-RA-00003-4MM1 & MM2 - Report - Utility Summary-IFC 21 18-May-15 10-Jun-15MM2-1305-PT-30-P-CA-00001MM1 & MM2 - Calculation Note - Depressuring 44 23-Mar-15 15-May-15MM2-1305-PT-30-P-CA-00001-1MM1 & MM2 - Calculation Note - Depressuring -IDC 1 23-Mar-15* 23-Mar-15MM2-1305-PT-30-P-CA-00001-2MM1 & MM2 - Calculation Note - Depressuring -IFR 12 24-Mar-15 06-Apr-15MM2-1305-PT-30-P-CA-00001-3MM1 & MM2 - Calculation Note - Depressuring -IFD 13 07-Apr-15 21-Apr-15MM2-1305-PT-30-P-CA-00001-4MM1 & MM2 - Calculation Note - Depressuring -IFC 18 22-Apr-15 15-May-15MM2-1305-PT-30-P-CA-00002MM1 & MM2 - Calculation Note - PSV Sizing 44 07-Apr-15 30-May-15MM2-1305-PT-30-P-CA-00002-1MM1 & MM2 - Calculation Note - PSV Sizing -IDC 1 07-Apr-15* 07-Apr-15MM2-1305-PT-30-P-CA-00002-2MM1 & MM2 - Calculation Note - PSV Sizing -IFR 12 08-Apr-15 21-Apr-15MM2-1305-PT-30-P-CA-00002-3MM1 & MM2 - Calculation Note - PSV Sizing -IFD 10 22-Apr-15 06-May-15MM2-1305-PT-30-P-CA-00002-4MM1 & MM2 - Calculation Note - PSV Sizing -IFC 21 07-May-15 30-May-15MM2-1305-PT-30-P-XA-00001MM1 & MM2 - Process Flow Diagram (PFD) (4 Sheets) 69 13-Mar-15 04-Jun-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 38 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-30-P-XA-00001-1MM1 & MM2 - Process Flow Diagram (PFD) (4 Sheets)-IDC 22 13-Mar-15* 07-Apr-15MM2-1305-PT-30-P-XA-00001-2MM1 & MM2 - Process Flow Diagram (PFD) (4 Sheets)-IFR 12 08-Apr-15 21-Apr-15MM2-1305-PT-30-P-XA-00001-3MM1 & MM2 - Process Flow Diagram (PFD) (4 Sheets)-IFD 14 22-Apr-15 11-May-15MM2-1305-PT-30-P-XA-00001-4MM1 & MM2 - Process Flow Diagram (PFD) (4 Sheets)-IFC 21 12-May-15 04-Jun-15MM2-1305-PT-30-P-XA-00002MM1 & MM2 - Utility Flow Diagram (UFD) (2 Sheets) 69 13-Mar-15 04-Jun-15MM2-1305-PT-30-P-XA-00002-1MM1 & MM2 - Utility Flow Diagram (UFD) (2 Sheets)-IDC 22 13-Mar-15* 07-Apr-15MM2-1305-PT-30-P-XA-00002-2MM1 & MM2 - Utility Flow Diagram (UFD) (2 Sheets)-IFR 12 08-Apr-15 21-Apr-15MM2-1305-PT-30-P-XA-00002-3MM1 & MM2 - Utility Flow Diagram (UFD) (2 Sheets)-IFD 14 22-Apr-15 11-May-15MM2-1305-PT-30-P-XA-00002-4MM1 & MM2 - Utility Flow Diagram (UFD) (2 Sheets)-IFC 21 12-May-15 04-Jun-15MM2-1305-PT-30-P-XA-00003MM1 & MM2 - Material Selection Diagrams (3 Sheets) 69 13-Mar-15 04-Jun-15MM2-1305-PT-30-P-XA-00003-1MM1 & MM2 - Material Selection Diagrams (3 Sheets)-IDC 22 13-Mar-15* 07-Apr-15MM2-1305-PT-30-P-XA-00003-2MM1 & MM2 - Material Selection Diagrams (3 Sheets)-IFR 12 08-Apr-15 21-Apr-15MM2-1305-PT-30-P-XA-00003-3MM1 & MM2 - Material Selection Diagrams (3 Sheets)-IFD 14 22-Apr-15 11-May-15MM2-1305-PT-30-P-XA-00003-4MM1 & MM2 - Material Selection Diagrams (3 Sheets)-IFC 21 12-May-15 04-Jun-15MM2-1305-PT-30-P-XB-00001MM1 & MM2 - P&ID Riser Oil Production 1 - Pig Launcher And Reciever 69 13-Mar-15 04-Jun-15MM2-1305-PT-30-P-XB-00001-1MM1 & MM2 - P&ID Riser Oil Production 1 - Pig Launcher And Reciever -IDC22 13-Mar-15* 07-Apr-15MM2-1305-PT-30-P-XB-00001-2MM1 & MM2 - P&ID Riser Oil Production 1 - Pig Launcher And Reciever -IFR12 08-Apr-15 21-Apr-15MM2-1305-PT-30-P-XB-00001-3MM1 & MM2 - P&ID Riser Oil Production 1 - Pig Launcher And Reciever -IFD14 22-Apr-15 11-May-15MM2-1305-PT-30-P-XB-00001-4MM1 & MM2 - P&ID Riser Oil Production 1 - Pig Launcher And Reciever -IFC21 12-May-15 04-Jun-15MM2-1305-PT-30-P-XB-00002MM1 & MM2 - P&ID Riser Oil Production 2 - Pig Launcher And Reciever 69 13-Mar-15 04-Jun-15MM2-1305-PT-30-P-XB-00002-1MM1 & MM2 - P&ID Riser Oil Production 2 - Pig Launcher And Reciever -IDC22 13-Mar-15* 07-Apr-15MM2-1305-PT-30-P-XB-00002-2MM1 & MM2 - P&ID Riser Oil Production 2 - Pig Launcher And Reciever -IFR12 08-Apr-15 21-Apr-15MM2-1305-PT-30-P-XB-00002-3MM1 & MM2 - P&ID Riser Oil Production 2 - Pig Launcher And Reciever -IFD14 22-Apr-15 11-May-15MM2-1305-PT-30-P-XB-00002-4MM1 & MM2 - P&ID Riser Oil Production 2 - Pig Launcher And Reciever -IFC21 12-May-15 04-Jun-15MM2-1305-PT-30-P-XB-00003MM1 & MM2 - P&ID Riser Oil Production 3 - Pig Launcher And Reciever 69 13-Mar-15 04-Jun-15MM2-1305-PT-30-P-XB-00003-1MM1 & MM2 - P&ID Riser Oil Production 3 - Pig Launcher And Reciever -IDC22 13-Mar-15* 07-Apr-15MM2-1305-PT-30-P-XB-00003-2MM1 & MM2 - P&ID Riser Oil Production 3 - Pig Launcher And Reciever -IFR12 08-Apr-15 21-Apr-15MM2-1305-PT-30-P-XB-00003-3MM1 & MM2 - P&ID Riser Oil Production 3 - Pig Launcher And Reciever -IFD14 22-Apr-15 11-May-15MM2-1305-PT-30-P-XB-00003-4MM1 & MM2 - P&ID Riser Oil Production 3 - Pig Launcher And Reciever -IFC21 12-May-15 04-Jun-15MM2-1305-PT-30-P-XB-00004MM1 & MM2 - P&ID Riser Oil Production 4 - Pig Launcher And Reciever 69 13-Mar-15 04-Jun-15MM2-1305-PT-30-P-XB-00004-1MM1 & MM2 - P&ID Riser Oil Production 4 - Pig Launcher And Reciever -IDC22 13-Mar-15* 07-Apr-15MM2-1305-PT-30-P-XB-00004-2MM1 & MM2 - P&ID Riser Oil Production 4 - Pig Launcher And Reciever -IFR12 08-Apr-15 21-Apr-15MM2-1305-PT-30-P-XB-00004-3MM1 & MM2 - P&ID Riser Oil Production 4 - Pig Launcher And Reciever -IFD14 22-Apr-15 11-May-15MM2-1305-PT-30-P-XB-00004-4MM1 & MM2 - P&ID Riser Oil Production 4 - Pig Launcher And Reciever -IFC21 12-May-15 04-Jun-15MM2-1305-PT-30-P-XB-00005MM1 & MM2 - P&ID Riser Oil Production 5 - Pig Launcher And Reciever 69 13-Mar-15 04-Jun-15MM2-1305-PT-30-P-XB-00005-1MM1 & MM2 - P&ID Riser Oil Production 5 - Pig Launcher And Reciever-IDC 22 13-Mar-15* 07-Apr-15MM2-1305-PT-30-P-XB-00005-2MM1 & MM2 - P&ID Riser Oil Production 5 - Pig Launcher And Reciever-IFR 12 08-Apr-15 21-Apr-15MM2-1305-PT-30-P-XB-00005-3MM1 & MM2 - P&ID Riser Oil Production 5 - Pig Launcher And Reciever-IFD 14 22-Apr-15 11-May-15MM2-1305-PT-30-P-XB-00005-4MM1 & MM2 - P&ID Riser Oil Production 5 - Pig Launcher And Reciever-IFC 21 12-May-15 04-Jun-15MM2-1305-PT-30-P-XB-00006MM1 & MM2 - P&ID Riser Oil Production 6 - Pig Launcher And Reciever 69 13-Mar-15 04-Jun-15MM2-1305-PT-30-P-XB-00006-1MM1 & MM2 - P&ID Riser Oil Production 6 - Pig Launcher And Reciever-IDC 22 13-Mar-15* 07-Apr-15MM2-1305-PT-30-P-XB-00006-2MM1 & MM2 - P&ID Riser Oil Production 6 - Pig Launcher And Reciever-IFR 12 08-Apr-15 21-Apr-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 39 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-30-P-XB-00006-3MM1 & MM2 - P&ID Riser Oil Production 6 - Pig Launcher And Reciever-IFD 14 22-Apr-15 11-May-15MM2-1305-PT-30-P-XB-00006-4MM1 & MM2 - P&ID Riser Oil Production 6 - Pig Launcher And Reciever-IFC 21 12-May-15 04-Jun-15MM2-1305-PT-30-P-XB-00007MM1 & MM2 - P&ID Riser Oil Production 7 - Pig Launcher And Reciever 69 13-Mar-15 04-Jun-15MM2-1305-PT-30-P-XB-00007-1MM1 & MM2 - P&ID Riser Oil Production 7 - Pig Launcher And Reciever-IDC 22 13-Mar-15* 07-Apr-15MM2-1305-PT-30-P-XB-00007-2MM1 & MM2 - P&ID Riser Oil Production 7 - Pig Launcher And Reciever-IFR 12 08-Apr-15 21-Apr-15MM2-1305-PT-30-P-XB-00007-3MM1 & MM2 - P&ID Riser Oil Production 7 - Pig Launcher And Reciever-IFD 14 22-Apr-15 11-May-15MM2-1305-PT-30-P-XB-00007-4MM1 & MM2 - P&ID Riser Oil Production 7 - Pig Launcher And Reciever-IFC 21 12-May-15 04-Jun-15MM2-1305-PT-30-P-XB-00008MM1 & MM2 - P&ID HP Oil Production Manifold 69 13-Mar-15 04-Jun-15MM2-1305-PT-30-P-XB-00008-1MM1 & MM2 - P&ID HP Oil Production Manifold-IDC 22 13-Mar-15* 07-Apr-15MM2-1305-PT-30-P-XB-00008-2MM1 & MM2 - P&ID HP Oil Production Manifold-IFR 12 08-Apr-15 21-Apr-15MM2-1305-PT-30-P-XB-00008-3MM1 & MM2 - P&ID HP Oil Production Manifold-IFD 14 22-Apr-15 11-May-15MM2-1305-PT-30-P-XB-00008-4MM1 & MM2 - P&ID HP Oil Production Manifold-IFC 21 12-May-15 04-Jun-15MM2-1305-PT-30-P-XB-00009MM1 & MM2 - P&ID HHP Oil Production Manifold 69 13-Mar-15 04-Jun-15MM2-1305-PT-30-P-XB-00009-1MM1 & MM2 - P&ID HHP Oil Production Manifold-IDC 22 13-Mar-15* 07-Apr-15MM2-1305-PT-30-P-XB-00009-2MM1 & MM2 - P&ID HHP Oil Production Manifold-IFR 12 08-Apr-15 21-Apr-15MM2-1305-PT-30-P-XB-00009-3MM1 & MM2 - P&ID HHP Oil Production Manifold-IFD 14 22-Apr-15 11-May-15MM2-1305-PT-30-P-XB-00009-4MM1 & MM2 - P&ID HHP Oil Production Manifold-IFC 21 12-May-15 04-Jun-15MM2-1305-PT-30-P-XB-00010MM1 & MM2 - P&ID Gas Production Manifold (2 Sheets) 69 13-Mar-15 04-Jun-15MM2-1305-PT-30-P-XB-00010-1MM1 & MM2 - P&ID Gas Production Manifold (2 Sheets)-IDC 22 13-Mar-15* 07-Apr-15MM2-1305-PT-30-P-XB-00010-2MM1 & MM2 - P&ID Gas Production Manifold (2 Sheets)-IFR 12 08-Apr-15 21-Apr-15MM2-1305-PT-30-P-XB-00010-3MM1 & MM2 - P&ID Gas Production Manifold (2 Sheets)-IFD 14 22-Apr-15 11-May-15MM2-1305-PT-30-P-XB-00010-4MM1 & MM2 - P&ID Gas Production Manifold (2 Sheets)-IFC 21 12-May-15 04-Jun-15MM2-1305-PT-30-P-XB-00011MM1 & MM2 - P&ID Test Manifold 69 13-Mar-15 04-Jun-15MM2-1305-PT-30-P-XB-00011-1MM1 & MM2 - P&ID Test Manifold-IDC 22 13-Mar-15* 07-Apr-15MM2-1305-PT-30-P-XB-00011-2MM1 & MM2 - P&ID Test Manifold-IFR 12 08-Apr-15 21-Apr-15MM2-1305-PT-30-P-XB-00011-3MM1 & MM2 - P&ID Test Manifold-IFD 14 22-Apr-15 11-May-15MM2-1305-PT-30-P-XB-00011-4MM1 & MM2 - P&ID Test Manifold-IFC 21 12-May-15 04-Jun-15MM2-1305-PT-30-P-XB-00012MM1 & MM2 - P&ID Gas Injection Manifold 69 13-Mar-15 04-Jun-15MM2-1305-PT-30-P-XB-00012-1MM1 & MM2 - P&ID Gas Injection Manifold-IDC 22 13-Mar-15* 07-Apr-15MM2-1305-PT-30-P-XB-00012-2MM1 & MM2 - P&ID Gas Injection Manifold-IFR 12 08-Apr-15 21-Apr-15MM2-1305-PT-30-P-XB-00012-3MM1 & MM2 - P&ID Gas Injection Manifold-IFD 14 22-Apr-15 11-May-15MM2-1305-PT-30-P-XB-00012-4MM1 & MM2 - P&ID Gas Injection Manifold-IFC 21 12-May-15 04-Jun-15MM2-1305-PT-30-P-XB-00013MM1 & MM2 - P&ID Water Injection Manifold 69 13-Mar-15 04-Jun-15MM2-1305-PT-30-P-XB-00013-1MM1 & MM2 - P&ID Water Injection Manifold-IDC 22 13-Mar-15* 07-Apr-15MM2-1305-PT-30-P-XB-00013-2MM1 & MM2 - P&ID Water Injection Manifold-IFR 12 08-Apr-15 21-Apr-15MM2-1305-PT-30-P-XB-00013-3MM1 & MM2 - P&ID Water Injection Manifold-IFD 14 22-Apr-15 11-May-15MM2-1305-PT-30-P-XB-00013-4MM1 & MM2 - P&ID Water Injection Manifold-IFC 21 12-May-15 04-Jun-15MM2-1305-PT-30-P-XB-00014MM1 & MM2 - P&ID Gas Export Manifold 69 13-Mar-15 04-Jun-15MM2-1305-PT-30-P-XB-00014-1MM1 & MM2 - P&ID Gas Export Manifold-IDC 22 13-Mar-15* 07-Apr-15MM2-1305-PT-30-P-XB-00014-2MM1 & MM2 - P&ID Gas Export Manifold-IFR 12 08-Apr-15 21-Apr-15MM2-1305-PT-30-P-XB-00014-3MM1 & MM2 - P&ID Gas Export Manifold-IFD 14 22-Apr-15 11-May-15MM2-1305-PT-30-P-XB-00014-4MM1 & MM2 - P&ID Gas Export Manifold-IFC 21 12-May-15 04-Jun-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 40 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-30-P-XB-00015MM1 & MM2 - P&ID Gas Lift Manifold 69 13-Mar-15 04-Jun-15MM2-1305-PT-30-P-XB-00015-1MM1 & MM2 - P&ID Gas Lift Manifold-IDC 22 13-Mar-15* 07-Apr-15MM2-1305-PT-30-P-XB-00015-2MM1 & MM2 - P&ID Gas Lift Manifold-IFR 12 08-Apr-15 21-Apr-15MM2-1305-PT-30-P-XB-00015-3MM1 & MM2 - P&ID Gas Lift Manifold-IFD 14 22-Apr-15 11-May-15MM2-1305-PT-30-P-XB-00015-4MM1 & MM2 - P&ID Gas Lift Manifold-IFC 21 12-May-15 04-Jun-15MM2-1305-PT-30-P-XB-00016MM1 & MM2 - P&ID Diesel Manifold 69 13-Mar-15 04-Jun-15MM2-1305-PT-30-P-XB-00016-1MM1 & MM2 - P&ID Diesel Manifold-IDC 22 13-Mar-15* 07-Apr-15MM2-1305-PT-30-P-XB-00016-2MM1 & MM2 - P&ID Diesel Manifold-IFR 12 08-Apr-15 21-Apr-15MM2-1305-PT-30-P-XB-00016-3MM1 & MM2 - P&ID Diesel Manifold-IFD 14 22-Apr-15 11-May-15MM2-1305-PT-30-P-XB-00016-4MM1 & MM2 - P&ID Diesel Manifold-IFC 21 12-May-15 04-Jun-15MM2-1305-PT-30-P-LA-00001MM1 & MM2 - Line List 56 09-Apr-15 16-Jun-15MM2-1305-PT-30-P-LA-00001-1MM1 & MM2 - Line List-IDC 14 09-Apr-15* 24-Apr-15MM2-1305-PT-30-P-LA-00001-2MM1 & MM2 - Line List-IFR 10 25-Apr-15 09-May-15MM2-1305-PT-30-P-LA-00001-3MM1 & MM2 - Line List-IFD 14 11-May-15 26-May-15MM2-1305-PT-30-P-LA-00001-4MM1 & MM2 - Line List-IFC 18 27-May-15 16-Jun-15MM2-1305-PT-30-P-XM-00001MM1 & MM2 - Safe Chart 52 08-Apr-15 10-Jun-15MM2-1305-PT-30-P-XM-00001-1MM1 & MM2 - Safe Chart-IDC 7 08-Apr-15* 15-Apr-15MM2-1305-PT-30-P-XM-00001-2MM1 & MM2 - Safe Chart-IFR 6 16-Apr-15 22-Apr-15MM2-1305-PT-30-P-XM-00001-3MM1 & MM2 - Safe Chart-IFD 18 23-Apr-15 16-May-15MM2-1305-PT-30-P-XM-00001-4MM1 & MM2 - Safe Chart-IFC 21 18-May-15 10-Jun-15MM2-1305-PT-30-P-XL-00001MM1 & MM2 - ESD Logic Diagram 52 08-Apr-15 10-Jun-15MM2-1305-PT-30-P-XL-00001-1MM1 & MM2 - ESD Logic Diagram-IDC 7 08-Apr-15* 15-Apr-15MM2-1305-PT-30-P-XL-00001-2MM1 & MM2 - ESD Logic Diagram-IFR 6 16-Apr-15 22-Apr-15MM2-1305-PT-30-P-XL-00001-3MM1 & MM2 - ESD Logic Diagram-IFD 18 23-Apr-15 16-May-15MM2-1305-PT-30-P-XL-00001-4MM1 & MM2 - ESD Logic Diagram-IFC 21 18-May-15 10-Jun-15MM2-1305-PT-30-P-LA-00002MM1 & MM2 - Alarm / Trip Schedule 52 08-Apr-15 10-Jun-15MM2-1305-PT-30-P-LA-00002-1MM1 & MM2 - Alarm / Trip Schedule-IDC 7 08-Apr-15* 15-Apr-15MM2-1305-PT-30-P-LA-00002-2MM1 & MM2 - Alarm / Trip Schedule-IFR 6 16-Apr-15 22-Apr-15MM2-1305-PT-30-P-LA-00002-3MM1 & MM2 - Alarm / Trip Schedule-IFD 18 23-Apr-15 16-May-15MM2-1305-PT-30-P-LA-00002-4MM1 & MM2 - Alarm / Trip Schedule-IFC 21 18-May-15 10-Jun-15MM2-1305-PT-30-X-CA-00001MM1 & MM2 - Calculation Note - Deluge System 53 08-Apr-15 11-Jun-15MM2-1305-PT-30-X-CA-00001-1MM1 & MM2 - Calculation Note - Deluge System-IDC 1 08-Apr-15* 08-Apr-15MM2-1305-PT-30-X-CA-00001-2MM1 & MM2 - Calculation Note - Deluge System-IFR 17 09-Apr-15 29-Apr-15MM2-1305-PT-30-X-CA-00001-3MM1 & MM2 - Calculation Note - Deluge System-IFD 14 02-May-15 18-May-15MM2-1305-PT-30-X-CA-00001-4MM1 & MM2 - Calculation Note - Deluge System-IFC 21 19-May-15 11-Jun-15MM2-1305-PT-30-X-CA-00002MM1 & MM2 - Steady State Analysis for Deluge System 51 15-Apr-15 16-Jun-15MM2-1305-PT-30-X-CA-00002-1MM1 & MM2 - Steady State Analysis for Deluge System-IDC 1 15-Apr-15* 15-Apr-15MM2-1305-PT-30-X-CA-00002-2MM1 & MM2 - Steady State Analysis for Deluge System-IFR 15 16-Apr-15 06-May-15MM2-1305-PT-30-X-CA-00002-3MM1 & MM2 - Steady State Analysis for Deluge System-IFD 15 07-May-15 23-May-15MM2-1305-PT-30-X-CA-00002-4MM1 & MM2 - Steady State Analysis for Deluge System-IFC 20 25-May-15 16-Jun-15MM2-1305-PT-30-X-XE-20001MM2 - Hazardous Area Classification - Manifold &Pigging Facilities - Upper Deck Equipment Layout Plan59 26-Mar-15 05-Jun-15MM2-1305-PT-30-X-XE-20001-1MM2 - Hazardous Area Classification - Manifold &Pigging Facilities - Upper Deck Equipment Layout Plan-IDC13 26-Mar-15* 09-Apr-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 41 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-30-X-XE-20001-2MM2 - Hazardous Area Classification - Manifold &Pigging Facilities - Upper Deck Equipment Layout Plan-IFR12 10-Apr-15 23-Apr-15MM2-1305-PT-30-X-XE-20001-3MM2 - Hazardous Area Classification - Manifold &Pigging Facilities - Upper Deck Equipment Layout Plan-IFD11 24-Apr-15 09-May-15MM2-1305-PT-30-X-XE-20001-4MM2 - Hazardous Area Classification - Manifold &Pigging Facilities - Upper Deck Equipment Layout Plan-IFC23 11-May-15 05-Jun-15MM2-1305-PT-30-X-XE-20002MM2 - Hazardous Area Classification - Manifold &Pigging Facilities - Main Deck Equipment Layout Plan59 26-Mar-15 05-Jun-15MM2-1305-PT-30-X-XE-20002-1MM2 - Hazardous Area Classification - Manifold &Pigging Facilities - Main Deck Equipment Layout Plan-IDC13 26-Mar-15* 09-Apr-15MM2-1305-PT-30-X-XE-20002-2MM2 - Hazardous Area Classification - Manifold &Pigging Facilities - Main Deck Equipment Layout Plan-IFR12 10-Apr-15 23-Apr-15MM2-1305-PT-30-X-XE-20002-3MM2 - Hazardous Area Classification - Manifold &Pigging Facilities - Main Deck Equipment Layout Plan-IFD11 24-Apr-15 09-May-15MM2-1305-PT-30-X-XE-20002-4MM2 - Hazardous Area Classification - Manifold &Pigging Facilities - Main Deck Equipment Layout Plan-IFC23 11-May-15 05-Jun-15MM2-1305-PT-30-X-XB-20001MM2 - P&ID Firewater Deluge System 56 08-Apr-15 15-Jun-15MM2-1305-PT-30-X-XB-20001-1MM2 - P&ID Firewater Deluge System-IDC 10 08-Apr-15* 18-Apr-15MM2-1305-PT-30-X-XB-20001-2MM2 - P&ID Firewater Deluge System-IFR 11 20-Apr-15 05-May-15MM2-1305-PT-30-X-XB-20001-3MM2 - P&ID Firewater Deluge System-IFD 15 06-May-15 22-May-15MM2-1305-PT-30-X-XB-20001-4MM2 - P&ID Firewater Deluge System-IFC 20 23-May-15 15-Jun-15

0.D.26.0000.MM2.B.N Structural0.D.26.0000.MM2.B.N Structural 315 16-Mar-15 21-Mar-160.D.26.0000.MM2.B.N.92 PTSC0.D.26.0000.MM2.B.N.92 PTSC 315 16-Mar-15 21-Mar-16MM2-1305-PT-95-N-RA-20001MM2 - In-place Analysis Report 75 28-Mar-15 26-Jun-15MM2-1305-PT-95-N-RA-20001-1MM2 - In-place Analysis Report-IDC 1 28-Mar-15* 28-Mar-15MM2-1305-PT-95-N-RA-20001-2MM2 - In-place Analysis Report-IFR 43 30-Mar-15 21-May-15MM2-1305-PT-95-N-RA-20001-3MM2 - In-place Analysis Report-IFD 12 22-May-15 04-Jun-15MM2-1305-PT-95-N-RA-20001-4MM2 - In-place Analysis Report-IFC 19 05-Jun-15 26-Jun-15MM2-1305-PT-95-N-RA-20002MM2 - Preservice Analysis Report 75 31-Mar-15 29-Jun-15MM2-1305-PT-95-N-RA-20002-1MM2 - Preservice Analysis Report-IDC 1 31-Mar-15* 31-Mar-15MM2-1305-PT-95-N-RA-20002-2MM2 - Preservice Analysis Report-IFR 43 01-Apr-15 23-May-15MM2-1305-PT-95-N-RA-20002-3MM2 - Preservice Analysis Report-IFD 12 25-May-15 06-Jun-15MM2-1305-PT-95-N-RA-20002-4MM2 - Preservice Analysis Report-IFC 19 08-Jun-15 29-Jun-15MM2-1305-PT-95-N-RA-20003MM2 - Structural Miscellaneous design 49 19-Jun-15 14-Aug-15MM2-1305-PT-95-N-RA-20003-1MM2 - Structural Miscellaneous design-IDC 1 19-Jun-15* 19-Jun-15MM2-1305-PT-95-N-RA-20003-2MM2 - Structural Miscellaneous design-IFR 17 20-Jun-15 09-Jul-15MM2-1305-PT-95-N-RA-20003-3MM2 - Structural Miscellaneous design-IFD 12 10-Jul-15 23-Jul-15MM2-1305-PT-95-N-RA-20003-4MM2 - Structural Miscellaneous design-IFC 19 24-Jul-15 14-Aug-15MM2-1305-PT-95-N-RA-20005MM2 - Weight Control Report 73 02-Apr-15 29-Jun-15MM2-1305-PT-95-N-RA-20005-1MM2 - Weight Control Report-IDC 33 02-Apr-15* 13-May-15MM2-1305-PT-95-N-RA-20005-2MM2 - Weight Control Report-IFR 9 14-May-15 23-May-15MM2-1305-PT-95-N-RA-20005-3MM2 - Weight Control Report-IFD 12 25-May-15 06-Jun-15MM2-1305-PT-95-N-RA-20005-4MM2 - Weight Control Report-IFC 19 08-Jun-15 29-Jun-15MM2-1305-PT-95-N-RA-20006MM2 - Seafastening Report 49 19-Jun-15 14-Aug-15MM2-1305-PT-95-N-RA-20006-1MM2 - Seafastening Report-IDC 1 19-Jun-15* 19-Jun-15MM2-1305-PT-95-N-RA-20006-2MM2 - Seafastening Report-IFR 17 20-Jun-15 09-Jul-15MM2-1305-PT-95-N-RA-20006-3MM2 - Seafastening Report-IFD 12 10-Jul-15 23-Jul-15MM2-1305-PT-95-N-RA-20006-4MM2 - Seafastening Report-IFC 19 24-Jul-15 14-Aug-15MM2-1305-PT-95-N-LA-00001MM1 & MM2 - Structural Primary & secondary steel MTOs 61 16-Mar-15 28-May-15MM2-1305-PT-95-N-LA-00001-1MM1 & MM2 - Structural Primary & secondary steel MTOs-IDC 0 16-Mar-15* 16-Mar-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 42 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-95-N-LA-00001-2MM1 & MM2 - Structural Primary & secondary steel MTOs-IFR 24 16-Mar-15 11-Apr-15MM2-1305-PT-95-N-LA-00001-3MM1 & MM2 - Structural Primary & secondary steel MTOs-IFD 0 13-Apr-15 13-Apr-15MM2-1305-PT-95-N-LA-00001-4MM1 & MM2 - Structural Primary & secondary steel MTOs-IFC 37 13-Apr-15 28-May-15MM2-1305-PT-95-N-LA-00002MM1 & MM2 - Structural Tertiary Steel MTOs 67 04-May-15 20-Jul-15MM2-1305-PT-95-N-LA-00002-1MM1 & MM2 - Structural Tertiary Steel MTOs-IDC 1 04-May-15* 04-May-15MM2-1305-PT-95-N-LA-00002-2MM1 & MM2 - Structural Tertiary Steel MTOs-IFR 25 05-May-15 02-Jun-15MM2-1305-PT-95-N-LA-00002-3MM1 & MM2 - Structural Tertiary Steel MTOs-IFD 0 03-Jun-15 03-Jun-15MM2-1305-PT-95-N-LA-00002-4MM1 & MM2 - Structural Tertiary Steel MTOs-IFC 41 03-Jun-15 20-Jul-15MM2-1305-PT-95-N-LA-00003MM1 & MM2 - Structural Miscellaneous MTOs 68 22-Jun-15 09-Sep-15MM2-1305-PT-95-N-LA-00003-1MM1 & MM2 - Structural Miscellaneous MTOs-IDC 0 22-Jun-15* 22-Jun-15MM2-1305-PT-95-N-LA-00003-2MM1 & MM2 - Structural Miscellaneous MTOs-IFR 24 22-Jun-15 18-Jul-15MM2-1305-PT-95-N-LA-00003-3MM1 & MM2 - Structural Miscellaneous MTOs-IFD 0 20-Jul-15 20-Jul-15MM2-1305-PT-95-N-LA-00003-4MM1 & MM2 - Structural Miscellaneous MTOs-IFC 44 20-Jul-15 09-Sep-15MM2-1305-PT-95-N-LA-00004MM1 & MM2 - Structural Grating MTOs 71 23-Jun-15 14-Sep-15MM2-1305-PT-95-N-LA-00004-1MM1 & MM2 - Structural Grating MTOs-IDC 1 23-Jun-15* 23-Jun-15MM2-1305-PT-95-N-LA-00004-2MM1 & MM2 - Structural Grating MTOs-IFR 25 24-Jun-15 22-Jul-15MM2-1305-PT-95-N-LA-00004-3MM1 & MM2 - Structural Grating MTOs-IFD 0 23-Jul-15 23-Jul-15MM2-1305-PT-95-N-LA-00004-4MM1 & MM2 - Structural Grating MTOs-IFC 45 23-Jul-15 14-Sep-15MM2-1305-PT-95-N-XG-01001MM1 & MM2 - Structural General Notes 47 24-Mar-15 20-May-15MM2-1305-PT-95-N-XG-01001-1MM1 & MM2 - Structural General Notes-IDC 1 24-Mar-15* 24-Mar-15MM2-1305-PT-95-N-XG-01001-2MM1 & MM2 - Structural General Notes-IFR 18 25-Mar-15 14-Apr-15MM2-1305-PT-95-N-XG-01001-3MM1 & MM2 - Structural General Notes-IFD 11 15-Apr-15 27-Apr-15MM2-1305-PT-95-N-XG-01001-4MM1 & MM2 - Structural General Notes-IFC 17 29-Apr-15 20-May-15MM2-1305-PT-95-N-XG-01002MM1 & MM2 - Typical Weld Details 49 24-Mar-15 22-May-15MM2-1305-PT-95-N-XG-01002-1MM1 & MM2 - Typical Weld Details-IDC 1 24-Mar-15* 24-Mar-15MM2-1305-PT-95-N-XG-01002-2MM1 & MM2 - Typical Weld Details-IFR 20 25-Mar-15 16-Apr-15MM2-1305-PT-95-N-XG-01002-3MM1 & MM2 - Typical Weld Details-IFD 10 17-Apr-15 29-Apr-15MM2-1305-PT-95-N-XG-01002-4MM1 & MM2 - Typical Weld Details-IFC 18 02-May-15 22-May-15MM2-1305-PT-95-N-XG-01003MM1 & MM2 - Typical Connection Details 48 02-Apr-15 30-May-15MM2-1305-PT-95-N-XG-01003-1MM1 & MM2 - Typical Connection Details-IDC 1 02-Apr-15* 02-Apr-15MM2-1305-PT-95-N-XG-01003-2MM1 & MM2 - Typical Connection Details-IFR 20 03-Apr-15 25-Apr-15MM2-1305-PT-95-N-XG-01003-3MM1 & MM2 - Typical Connection Details-IFD 9 27-Apr-15 09-May-15MM2-1305-PT-95-N-XG-01003-4MM1 & MM2 - Typical Connection Details-IFC 18 11-May-15 30-May-15MM2-1305-PT-95-N-XG-01004MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 1 45 28-Mar-15 22-May-15MM2-1305-PT-95-N-XG-01004-1MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 1-IDC 1 28-Mar-15* 28-Mar-15MM2-1305-PT-95-N-XG-01004-2MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 1-IFR 17 30-Mar-15 17-Apr-15MM2-1305-PT-95-N-XG-01004-3MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 1-IFD 9 18-Apr-15 29-Apr-15MM2-1305-PT-95-N-XG-01004-4MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 1-IFC 18 02-May-15 22-May-15MM2-1305-PT-95-N-XG-01005MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 2 45 28-Mar-15 22-May-15MM2-1305-PT-95-N-XG-01005-1MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 2-IDC 1 28-Mar-15* 28-Mar-15MM2-1305-PT-95-N-XG-01005-2MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 2-IFR 17 30-Mar-15 17-Apr-15MM2-1305-PT-95-N-XG-01005-3MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 2-IFD 9 18-Apr-15 29-Apr-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 43 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-95-N-XG-01005-4MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 2-IFC 18 02-May-15 22-May-15MM2-1305-PT-95-N-XG-01006MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 1 45 28-Mar-15 22-May-15MM2-1305-PT-95-N-XG-01006-1MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 1-IDC 1 28-Mar-15* 28-Mar-15MM2-1305-PT-95-N-XG-01006-2MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 1-IFR 17 30-Mar-15 17-Apr-15MM2-1305-PT-95-N-XG-01006-3MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 1-IFD 9 18-Apr-15 29-Apr-15MM2-1305-PT-95-N-XG-01006-4MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 1-IFC 18 02-May-15 22-May-15MM2-1305-PT-95-N-XG-01007MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 2 45 28-Mar-15 22-May-15MM2-1305-PT-95-N-XG-01007-1MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 2-IDC 1 28-Mar-15* 28-Mar-15MM2-1305-PT-95-N-XG-01007-2MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 2-IFR 17 30-Mar-15 17-Apr-15MM2-1305-PT-95-N-XG-01007-3MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 2-IFD 9 18-Apr-15 29-Apr-15MM2-1305-PT-95-N-XG-01007-4MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 2-IFC 18 02-May-15 22-May-15MM2-1305-PT-95-N-XG-01008MM1 & MM2 - Typical Plating & Grating Arrangement & Details 45 28-Mar-15 22-May-15MM2-1305-PT-95-N-XG-01008-1MM1 & MM2 - Typical Plating & Grating Arrangement & Details-IDC 1 28-Mar-15* 28-Mar-15MM2-1305-PT-95-N-XG-01008-2MM1 & MM2 - Typical Plating & Grating Arrangement & Details-IFR 17 30-Mar-15 17-Apr-15MM2-1305-PT-95-N-XG-01008-3MM1 & MM2 - Typical Plating & Grating Arrangement & Details-IFD 9 18-Apr-15 29-Apr-15MM2-1305-PT-95-N-XG-01008-4MM1 & MM2 - Typical Plating & Grating Arrangement & Details-IFC 18 02-May-15 22-May-15MM2-1305-PT-95-N-XG-01009MM1 & MM2 - Typical Handrail Arrangement & Details 45 28-Mar-15 22-May-15MM2-1305-PT-95-N-XG-01009-1MM1 & MM2 - Typical Handrail Arrangement & Details-IDC 1 28-Mar-15* 28-Mar-15MM2-1305-PT-95-N-XG-01009-2MM1 & MM2 - Typical Handrail Arrangement & Details-IFR 17 30-Mar-15 17-Apr-15MM2-1305-PT-95-N-XG-01009-3MM1 & MM2 - Typical Handrail Arrangement & Details-IFD 9 18-Apr-15 29-Apr-15MM2-1305-PT-95-N-XG-01009-4MM1 & MM2 - Typical Handrail Arrangement & Details-IFC 18 02-May-15 22-May-15MM2-1305-PT-95-N-XG-01010MM1 & MM2 - Typical Drain Outlet Details 45 28-Mar-15 22-May-15MM2-1305-PT-95-N-XG-01010-1MM1 & MM2 - Typical Drain Outlet Details-IDC 1 28-Mar-15* 28-Mar-15MM2-1305-PT-95-N-XG-01010-2MM1 & MM2 - Typical Drain Outlet Details-IFR 17 30-Mar-15 17-Apr-15MM2-1305-PT-95-N-XG-01010-3MM1 & MM2 - Typical Drain Outlet Details-IFD 9 18-Apr-15 29-Apr-15MM2-1305-PT-95-N-XG-01010-4MM1 & MM2 - Typical Drain Outlet Details-IFC 18 02-May-15 22-May-15MM2-1305-PT-95-N-XG-22001MM2 - Drawing Index 64 24-Mar-15 09-Jun-15MM2-1305-PT-95-N-XG-22001-1MM2 - Drawing Index-IDC 1 24-Mar-15* 24-Mar-15MM2-1305-PT-95-N-XG-22001-2MM2 - Drawing Index-IFR 27 25-Mar-15 24-Apr-15MM2-1305-PT-95-N-XG-22001-3MM2 - Drawing Index-IFD 0 25-Apr-15 25-Apr-15MM2-1305-PT-95-N-XG-22001-4MM2 - Drawing Index-IFC 36 25-Apr-15 09-Jun-15MM2-1305-PT-95-N-XG-22002MM2 - Structural Perspective View 51 29-Apr-15 29-Jun-15MM2-1305-PT-95-N-XG-22002-1MM2 - Structural Perspective View-IDC 0 29-Apr-15* 29-Apr-15MM2-1305-PT-95-N-XG-22002-2MM2 - Structural Perspective View-IFR 24 29-Apr-15 28-May-15MM2-1305-PT-95-N-XG-22002-3MM2 - Structural Perspective View-IFD 0 29-May-15 29-May-15MM2-1305-PT-95-N-XG-22002-4MM2 - Structural Perspective View-IFC 27 29-May-15 29-Jun-15MM2-1305-PT-95-N-XG-22003MM2 - Deck Load Plan 32 29-Apr-15 06-Jun-15MM2-1305-PT-95-N-XG-22003-1MM2 - Deck Load Plan-IDC 0 29-Apr-15* 29-Apr-15MM2-1305-PT-95-N-XG-22003-2MM2 - Deck Load Plan-IFR 20 29-Apr-15 23-May-15MM2-1305-PT-95-N-XG-22003-3MM2 - Deck Load Plan-IFD 0 25-May-15 25-May-15MM2-1305-PT-95-N-XG-22003-4MM2 - Deck Load Plan-IFC 12 25-May-15 06-Jun-15MM2-1305-PT-95-N-XG-22004MM2 - Upper Deck Primary Framing Plan 39 28-Mar-15 15-May-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 44 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-95-N-XG-22004-1MM2 - Upper Deck Primary Framing Plan-IDC 21 28-Mar-15* 21-Apr-15MM2-1305-PT-95-N-XG-22004-2MM2 - Upper Deck Primary Framing Plan-IFR 5 22-Apr-15 27-Apr-15MM2-1305-PT-95-N-XG-22004-3MM2 - Upper Deck Primary Framing Plan-IFD 0 29-Apr-15 29-Apr-15MM2-1305-PT-95-N-XG-22004-4MM2 - Upper Deck Primary Framing Plan-IFC 13 29-Apr-15 15-May-15MM2-1305-PT-95-N-XG-22005MM2 - Mezzanine Deck Primary Framing Plan 37 28-Mar-15 13-May-15MM2-1305-PT-95-N-XG-22005-1MM2 - Mezzanine Deck Primary Framing Plan-IDC 19 28-Mar-15* 18-Apr-15MM2-1305-PT-95-N-XG-22005-2MM2 - Mezzanine Deck Primary Framing Plan-IFR 6 20-Apr-15 25-Apr-15MM2-1305-PT-95-N-XG-22005-3MM2 - Mezzanine Deck Primary Framing Plan-IFD 0 27-Apr-15 27-Apr-15MM2-1305-PT-95-N-XG-22005-4MM2 - Mezzanine Deck Primary Framing Plan-IFC 12 27-Apr-15 13-May-15MM2-1305-PT-95-N-XG-22006MM2 - Main Deck Primary Framing Plan 37 28-Mar-15 13-May-15MM2-1305-PT-95-N-XG-22006-1MM2 - Main Deck Primary Framing Plan-IDC 19 28-Mar-15* 18-Apr-15MM2-1305-PT-95-N-XG-22006-2MM2 - Main Deck Primary Framing Plan-IFR 6 20-Apr-15 25-Apr-15MM2-1305-PT-95-N-XG-22006-3MM2 - Main Deck Primary Framing Plan-IFD 0 27-Apr-15 27-Apr-15MM2-1305-PT-95-N-XG-22006-4MM2 - Main Deck Primary Framing Plan-IFC 12 27-Apr-15 13-May-15MM2-1305-PT-95-N-XG-22007MM2 - Truss Row 89 & Row 91 37 28-Mar-15 13-May-15MM2-1305-PT-95-N-XG-22007-1MM2 - Truss Row 89 & Row 91-IDC 19 28-Mar-15* 18-Apr-15MM2-1305-PT-95-N-XG-22007-2MM2 - Truss Row 89 & Row 91-IFR 6 20-Apr-15 25-Apr-15MM2-1305-PT-95-N-XG-22007-3MM2 - Truss Row 89 & Row 91-IFD 0 27-Apr-15 27-Apr-15MM2-1305-PT-95-N-XG-22007-4MM2 - Truss Row 89 & Row 91-IFC 12 27-Apr-15 13-May-15MM2-1305-PT-95-N-XG-22008MM2 - Truss Row 93 & Row 94 37 28-Mar-15 13-May-15MM2-1305-PT-95-N-XG-22008-1MM2 - Truss Row 93 & Row 94-IDC 19 28-Mar-15* 18-Apr-15MM2-1305-PT-95-N-XG-22008-2MM2 - Truss Row 93 & Row 94-IFR 6 20-Apr-15 25-Apr-15MM2-1305-PT-95-N-XG-22008-3MM2 - Truss Row 93 & Row 94-IFD 0 27-Apr-15 27-Apr-15MM2-1305-PT-95-N-XG-22008-4MM2 - Truss Row 93 & Row 94-IFC 12 27-Apr-15 13-May-15MM2-1305-PT-95-N-XG-22009MM2 - Truss Row 2A 37 01-Apr-15 16-May-15MM2-1305-PT-95-N-XG-22009-1MM2 - Truss Row 2A-IDC 19 01-Apr-15* 22-Apr-15MM2-1305-PT-95-N-XG-22009-2MM2 - Truss Row 2A-IFR 5 23-Apr-15 29-Apr-15MM2-1305-PT-95-N-XG-22009-3MM2 - Truss Row 2A-IFD 0 02-May-15 02-May-15MM2-1305-PT-95-N-XG-22009-4MM2 - Truss Row 2A-IFC 13 02-May-15 16-May-15MM2-1305-PT-95-N-XG-22010MM2 - Truss Row 2B 37 01-Apr-15 16-May-15MM2-1305-PT-95-N-XG-22010-1MM2 - Truss Row 2B-IDC 19 01-Apr-15* 22-Apr-15MM2-1305-PT-95-N-XG-22010-2MM2 - Truss Row 2B-IFR 5 23-Apr-15 29-Apr-15MM2-1305-PT-95-N-XG-22010-3MM2 - Truss Row 2B-IFD 0 02-May-15 02-May-15MM2-1305-PT-95-N-XG-22010-4MM2 - Truss Row 2B-IFC 13 02-May-15 16-May-15MM2-1305-PT-95-N-XG-22011MM2 - Truss Row 2C 37 01-Apr-15 16-May-15MM2-1305-PT-95-N-XG-22011-1MM2 - Truss Row 2C-IDC 19 01-Apr-15* 22-Apr-15MM2-1305-PT-95-N-XG-22011-2MM2 - Truss Row 2C-IFR 5 23-Apr-15 29-Apr-15MM2-1305-PT-95-N-XG-22011-3MM2 - Truss Row 2C-IFD 0 02-May-15 02-May-15MM2-1305-PT-95-N-XG-22011-4MM2 - Truss Row 2C-IFC 13 02-May-15 16-May-15MM2-1305-PT-95-N-XG-22012MM2 - Truss Row 2D 37 01-Apr-15 16-May-15MM2-1305-PT-95-N-XG-22012-1MM2 - Truss Row 2D-IDC 19 01-Apr-15* 22-Apr-15MM2-1305-PT-95-N-XG-22012-2MM2 - Truss Row 2D-IFR 5 23-Apr-15 29-Apr-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 45 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-95-N-XG-22012-3MM2 - Truss Row 2D-IFD 0 02-May-15 02-May-15MM2-1305-PT-95-N-XG-22012-4MM2 - Truss Row 2D-IFC 13 02-May-15 16-May-15MM2-1305-PT-95-N-XG-22013MM2 - Upper Deck Joint Details Sheet 1 34 14-Apr-15 26-May-15MM2-1305-PT-95-N-XG-22013-1MM2 - Upper Deck Joint Details Sheet 1-IDC 1 14-Apr-15* 14-Apr-15MM2-1305-PT-95-N-XG-22013-2MM2 - Upper Deck Joint Details Sheet 1-IFR 21 15-Apr-15 12-May-15MM2-1305-PT-95-N-XG-22013-3MM2 - Upper Deck Joint Details Sheet 1-IFD 0 13-May-15 13-May-15MM2-1305-PT-95-N-XG-22013-4MM2 - Upper Deck Joint Details Sheet 1-IFC 12 13-May-15 26-May-15MM2-1305-PT-95-N-XG-22014MM2 - Upper Deck Joint Details Sheet 2 34 14-Apr-15 26-May-15MM2-1305-PT-95-N-XG-22014-1MM2 - Upper Deck Joint Details Sheet 2-IDC 1 14-Apr-15* 14-Apr-15MM2-1305-PT-95-N-XG-22014-2MM2 - Upper Deck Joint Details Sheet 2-IFR 21 15-Apr-15 12-May-15MM2-1305-PT-95-N-XG-22014-3MM2 - Upper Deck Joint Details Sheet 2-IFD 0 13-May-15 13-May-15MM2-1305-PT-95-N-XG-22014-4MM2 - Upper Deck Joint Details Sheet 2-IFC 12 13-May-15 26-May-15MM2-1305-PT-95-N-XG-22015MM2 - Upper Deck Joint Details Sheet 3 34 14-Apr-15 26-May-15MM2-1305-PT-95-N-XG-22015-1MM2 - Upper Deck Joint Details Sheet 3-IDC 1 14-Apr-15* 14-Apr-15MM2-1305-PT-95-N-XG-22015-2MM2 - Upper Deck Joint Details Sheet 3-IFR 21 15-Apr-15 12-May-15MM2-1305-PT-95-N-XG-22015-3MM2 - Upper Deck Joint Details Sheet 3-IFD 0 13-May-15 13-May-15MM2-1305-PT-95-N-XG-22015-4MM2 - Upper Deck Joint Details Sheet 3-IFC 12 13-May-15 26-May-15MM2-1305-PT-95-N-XG-22016MM2 - Upper Deck Joint Details sheet 4 34 14-Apr-15 26-May-15MM2-1305-PT-95-N-XG-22016-1MM2 - Upper Deck Joint Details sheet 4-IDC 1 14-Apr-15* 14-Apr-15MM2-1305-PT-95-N-XG-22016-2MM2 - Upper Deck Joint Details sheet 4-IFR 21 15-Apr-15 12-May-15MM2-1305-PT-95-N-XG-22016-3MM2 - Upper Deck Joint Details sheet 4-IFD 0 13-May-15 13-May-15MM2-1305-PT-95-N-XG-22016-4MM2 - Upper Deck Joint Details sheet 4-IFC 12 13-May-15 26-May-15MM2-1305-PT-95-N-XG-22017MM2 - Upper Deck Joint Details sheet 5 34 14-Apr-15 26-May-15MM2-1305-PT-95-N-XG-22017-1MM2 - Upper Deck Joint Details sheet 5-IDC 1 14-Apr-15* 14-Apr-15MM2-1305-PT-95-N-XG-22017-2MM2 - Upper Deck Joint Details sheet 5-IFR 21 15-Apr-15 12-May-15MM2-1305-PT-95-N-XG-22017-3MM2 - Upper Deck Joint Details sheet 5-IFD 0 13-May-15 13-May-15MM2-1305-PT-95-N-XG-22017-4MM2 - Upper Deck Joint Details sheet 5-IFC 12 13-May-15 26-May-15MM2-1305-PT-95-N-XG-22018MM2 - Mezzanine Deck Joint Details sheet 1 31 13-Apr-15 21-May-15MM2-1305-PT-95-N-XG-22018-1MM2 - Mezzanine Deck Joint Details sheet 1-IDC 0 13-Apr-15* 13-Apr-15MM2-1305-PT-95-N-XG-22018-2MM2 - Mezzanine Deck Joint Details sheet 1-IFR 21 13-Apr-15 09-May-15MM2-1305-PT-95-N-XG-22018-3MM2 - Mezzanine Deck Joint Details sheet 1-IFD 0 11-May-15 11-May-15MM2-1305-PT-95-N-XG-22018-4MM2 - Mezzanine Deck Joint Details sheet 1-IFC 10 11-May-15 21-May-15MM2-1305-PT-95-N-XG-22019MM2 - Mezzanine Deck Joint Details sheet 2 32 13-Apr-15 22-May-15MM2-1305-PT-95-N-XG-22019-1MM2 - Mezzanine Deck Joint Details sheet 2-IDC 0 13-Apr-15* 13-Apr-15MM2-1305-PT-95-N-XG-22019-2MM2 - Mezzanine Deck Joint Details sheet 2-IFR 21 13-Apr-15 09-May-15MM2-1305-PT-95-N-XG-22019-3MM2 - Mezzanine Deck Joint Details sheet 2-IFD 0 11-May-15 11-May-15MM2-1305-PT-95-N-XG-22019-4MM2 - Mezzanine Deck Joint Details sheet 2-IFC 11 11-May-15 22-May-15MM2-1305-PT-95-N-XG-22020MM2 - Mezzanine Deck Joint Details sheet 3 32 13-Apr-15 22-May-15MM2-1305-PT-95-N-XG-22020-1MM2 - Mezzanine Deck Joint Details sheet 3-IDC 0 13-Apr-15* 13-Apr-15MM2-1305-PT-95-N-XG-22020-2MM2 - Mezzanine Deck Joint Details sheet 3-IFR 21 13-Apr-15 09-May-15MM2-1305-PT-95-N-XG-22020-3MM2 - Mezzanine Deck Joint Details sheet 3-IFD 0 11-May-15 11-May-15MM2-1305-PT-95-N-XG-22020-4MM2 - Mezzanine Deck Joint Details sheet 3-IFC 11 11-May-15 22-May-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 46 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-95-N-XG-22021MM2 - Main Deck Joint Details Sheet 1 31 13-Apr-15 21-May-15MM2-1305-PT-95-N-XG-22021-1MM2 - Main Deck Joint Details Sheet 1-IDC 0 13-Apr-15* 13-Apr-15MM2-1305-PT-95-N-XG-22021-2MM2 - Main Deck Joint Details Sheet 1-IFR 21 13-Apr-15 09-May-15MM2-1305-PT-95-N-XG-22021-3MM2 - Main Deck Joint Details Sheet 1-IFD 0 11-May-15 11-May-15MM2-1305-PT-95-N-XG-22021-4MM2 - Main Deck Joint Details Sheet 1-IFC 10 11-May-15 21-May-15MM2-1305-PT-95-N-XG-22022MM2 - Main Deck Joint Details Sheet 2 31 13-Apr-15 21-May-15MM2-1305-PT-95-N-XG-22022-1MM2 - Main Deck Joint Details Sheet 2-IDC 0 13-Apr-15* 13-Apr-15MM2-1305-PT-95-N-XG-22022-2MM2 - Main Deck Joint Details Sheet 2-IFR 21 13-Apr-15 09-May-15MM2-1305-PT-95-N-XG-22022-3MM2 - Main Deck Joint Details Sheet 2-IFD 0 11-May-15 11-May-15MM2-1305-PT-95-N-XG-22022-4MM2 - Main Deck Joint Details Sheet 2-IFC 10 11-May-15 21-May-15MM2-1305-PT-95-N-XG-22023MM2 - Main Deck Joint Details Sheet 3 32 13-Apr-15 22-May-15MM2-1305-PT-95-N-XG-22023-1MM2 - Main Deck Joint Details Sheet 3-IDC 0 13-Apr-15* 13-Apr-15MM2-1305-PT-95-N-XG-22023-2MM2 - Main Deck Joint Details Sheet 3-IFR 21 13-Apr-15 09-May-15MM2-1305-PT-95-N-XG-22023-3MM2 - Main Deck Joint Details Sheet 3-IFD 0 11-May-15 11-May-15MM2-1305-PT-95-N-XG-22023-4MM2 - Main Deck Joint Details Sheet 3-IFC 11 11-May-15 22-May-15MM2-1305-PT-95-N-XG-22024MM2 - Main Deck Joint Details Sheet 4 32 13-Apr-15 22-May-15MM2-1305-PT-95-N-XG-22024-1MM2 - Main Deck Joint Details Sheet 4-IDC 0 13-Apr-15* 13-Apr-15MM2-1305-PT-95-N-XG-22024-2MM2 - Main Deck Joint Details Sheet 4-IFR 21 13-Apr-15 09-May-15MM2-1305-PT-95-N-XG-22024-3MM2 - Main Deck Joint Details Sheet 4-IFD 0 11-May-15 11-May-15MM2-1305-PT-95-N-XG-22024-4MM2 - Main Deck Joint Details Sheet 4-IFC 11 11-May-15 22-May-15MM2-1305-PT-95-N-XG-22025MM2 - Main Deck Joint Details Sheet 5 32 13-Apr-15 22-May-15MM2-1305-PT-95-N-XG-22025-1MM2 - Main Deck Joint Details Sheet 5-IDC 0 13-Apr-15* 13-Apr-15MM2-1305-PT-95-N-XG-22025-2MM2 - Main Deck Joint Details Sheet 5-IFR 21 13-Apr-15 09-May-15MM2-1305-PT-95-N-XG-22025-3MM2 - Main Deck Joint Details Sheet 5-IFD 0 11-May-15 11-May-15MM2-1305-PT-95-N-XG-22025-4MM2 - Main Deck Joint Details Sheet 5-IFC 11 11-May-15 22-May-15MM2-1305-PT-95-N-XG-22026MM2 - Upper Deck Secondary Framing Plan 34 18-Apr-15 30-May-15MM2-1305-PT-95-N-XG-22026-1MM2 - Upper Deck Secondary Framing Plan-IDC 20 18-Apr-15* 14-May-15MM2-1305-PT-95-N-XG-22026-2MM2 - Upper Deck Secondary Framing Plan-IFR 7 15-May-15 22-May-15MM2-1305-PT-95-N-XG-22026-3MM2 - Upper Deck Secondary Framing Plan-IFD 0 23-May-15 23-May-15MM2-1305-PT-95-N-XG-22026-4MM2 - Upper Deck Secondary Framing Plan-IFC 7 23-May-15 30-May-15MM2-1305-PT-95-N-XG-22027MM2 - Mezzanine Deck Secondary Framing Plan 34 18-Apr-15 30-May-15MM2-1305-PT-95-N-XG-22027-1MM2 - Mezzanine Deck Secondary Framing Plan-IDC 18 18-Apr-15* 12-May-15MM2-1305-PT-95-N-XG-22027-2MM2 - Mezzanine Deck Secondary Framing Plan-IFR 7 13-May-15 20-May-15MM2-1305-PT-95-N-XG-22027-3MM2 - Mezzanine Deck Secondary Framing Plan-IFD 0 21-May-15 21-May-15MM2-1305-PT-95-N-XG-22027-4MM2 - Mezzanine Deck Secondary Framing Plan-IFC 9 21-May-15 30-May-15MM2-1305-PT-95-N-XG-22028MM2 - Main Deck Secondary Framing plan 34 18-Apr-15 30-May-15MM2-1305-PT-95-N-XG-22028-1MM2 - Main Deck Secondary Framing plan-IDC 18 18-Apr-15* 12-May-15MM2-1305-PT-95-N-XG-22028-2MM2 - Main Deck Secondary Framing plan-IFR 7 13-May-15 20-May-15MM2-1305-PT-95-N-XG-22028-3MM2 - Main Deck Secondary Framing plan-IFD 0 21-May-15 21-May-15MM2-1305-PT-95-N-XG-22028-4MM2 - Main Deck Secondary Framing plan-IFC 9 21-May-15 30-May-15MM2-1305-PT-95-N-XG-22029MM2 - Upper Deck Flooring & Handrail Layout 51 27-Apr-15 27-Jun-15MM2-1305-PT-95-N-XG-22029-1MM2 - Upper Deck Flooring & Handrail Layout-IDC 33 27-Apr-15* 06-Jun-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 47 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-95-N-XG-22029-2MM2 - Upper Deck Flooring & Handrail Layout-IFR 6 08-Jun-15 13-Jun-15MM2-1305-PT-95-N-XG-22029-3MM2 - Upper Deck Flooring & Handrail Layout-IFD 0 15-Jun-15 15-Jun-15MM2-1305-PT-95-N-XG-22029-4MM2 - Upper Deck Flooring & Handrail Layout-IFC 12 15-Jun-15 27-Jun-15MM2-1305-PT-95-N-XG-22030MM2 - Mezzanine Deck Flooring & Handrail Layout 51 27-Apr-15 27-Jun-15MM2-1305-PT-95-N-XG-22030-1MM2 - Mezzanine Deck Flooring & Handrail Layout-IDC 33 27-Apr-15* 06-Jun-15MM2-1305-PT-95-N-XG-22030-2MM2 - Mezzanine Deck Flooring & Handrail Layout-IFR 6 08-Jun-15 13-Jun-15MM2-1305-PT-95-N-XG-22030-3MM2 - Mezzanine Deck Flooring & Handrail Layout-IFD 0 15-Jun-15 15-Jun-15MM2-1305-PT-95-N-XG-22030-4MM2 - Mezzanine Deck Flooring & Handrail Layout-IFC 12 15-Jun-15 27-Jun-15MM2-1305-PT-95-N-XG-22031MM2 - Main Deck Flooring & Handrail Layout 51 27-Apr-15 27-Jun-15MM2-1305-PT-95-N-XG-22031-1MM2 - Main Deck Flooring & Handrail Layout-IDC 33 27-Apr-15* 06-Jun-15MM2-1305-PT-95-N-XG-22031-2MM2 - Main Deck Flooring & Handrail Layout-IFR 6 08-Jun-15 13-Jun-15MM2-1305-PT-95-N-XG-22031-3MM2 - Main Deck Flooring & Handrail Layout-IFD 0 15-Jun-15 15-Jun-15MM2-1305-PT-95-N-XG-22031-4MM2 - Main Deck Flooring & Handrail Layout-IFC 12 15-Jun-15 27-Jun-15MM2-1305-PT-95-N-XG-22032MM2 - Upper Deck Penetration Layout 51 27-Apr-15 27-Jun-15MM2-1305-PT-95-N-XG-22032-1MM2 - Upper Deck Penetration Layout-IDC 33 27-Apr-15* 06-Jun-15MM2-1305-PT-95-N-XG-22032-2MM2 - Upper Deck Penetration Layout-IFR 6 08-Jun-15 13-Jun-15MM2-1305-PT-95-N-XG-22032-3MM2 - Upper Deck Penetration Layout-IFD 0 15-Jun-15 15-Jun-15MM2-1305-PT-95-N-XG-22032-4MM2 - Upper Deck Penetration Layout-IFC 12 15-Jun-15 27-Jun-15MM2-1305-PT-95-N-XG-22033MM2 - Mezzanine Deck Penetration Layout 51 27-Apr-15 27-Jun-15MM2-1305-PT-95-N-XG-22033-1MM2 - Mezzanine Deck Penetration Layout-IDC 33 27-Apr-15* 06-Jun-15MM2-1305-PT-95-N-XG-22033-2MM2 - Mezzanine Deck Penetration Layout-IFR 6 08-Jun-15 13-Jun-15MM2-1305-PT-95-N-XG-22033-3MM2 - Mezzanine Deck Penetration Layout-IFD 0 15-Jun-15 15-Jun-15MM2-1305-PT-95-N-XG-22033-4MM2 - Mezzanine Deck Penetration Layout-IFC 12 15-Jun-15 27-Jun-15MM2-1305-PT-95-N-XG-22034MM2 - Main Deck Penetration Layout 51 27-Apr-15 27-Jun-15MM2-1305-PT-95-N-XG-22034-1MM2 - Main Deck Penetration Layout-IDC 33 27-Apr-15* 06-Jun-15MM2-1305-PT-95-N-XG-22034-2MM2 - Main Deck Penetration Layout-IFR 6 08-Jun-15 13-Jun-15MM2-1305-PT-95-N-XG-22034-3MM2 - Main Deck Penetration Layout-IFD 0 15-Jun-15 15-Jun-15MM2-1305-PT-95-N-XG-22034-4MM2 - Main Deck Penetration Layout-IFC 12 15-Jun-15 27-Jun-15MM2-1305-PT-95-N-XG-22035MM2 - Lifting Padeye Arrangement & Details Sheet 1 47 29-Apr-15 24-Jun-15MM2-1305-PT-95-N-XG-22035-1MM2 - Lifting Padeye Arrangement & Details Sheet 1-IDC 0 29-Apr-15* 29-Apr-15MM2-1305-PT-95-N-XG-22035-2MM2 - Lifting Padeye Arrangement & Details Sheet 1-IFR 31 29-Apr-15 05-Jun-15MM2-1305-PT-95-N-XG-22035-3MM2 - Lifting Padeye Arrangement & Details Sheet 1-IFD 0 06-Jun-15 06-Jun-15MM2-1305-PT-95-N-XG-22035-4MM2 - Lifting Padeye Arrangement & Details Sheet 1-IFC 16 06-Jun-15 24-Jun-15MM2-1305-PT-95-N-XG-22036MM2 - Lifting Padeye Arrangement & Details Sheet 2 47 29-Apr-15 24-Jun-15MM2-1305-PT-95-N-XG-22036-1MM2 - Lifting Padeye Arrangement & Details Sheet 2-IDC 0 29-Apr-15* 29-Apr-15MM2-1305-PT-95-N-XG-22036-2MM2 - Lifting Padeye Arrangement & Details Sheet 2-IFR 31 29-Apr-15 05-Jun-15MM2-1305-PT-95-N-XG-22036-3MM2 - Lifting Padeye Arrangement & Details Sheet 2-IFD 0 06-Jun-15 06-Jun-15MM2-1305-PT-95-N-XG-22036-4MM2 - Lifting Padeye Arrangement & Details Sheet 2-IFC 16 06-Jun-15 24-Jun-15MM2-1305-PT-95-N-XG-22037MM2 - Stair Arrangement & Details Sheet 1 50 29-Apr-15 27-Jun-15MM2-1305-PT-95-N-XG-22037-1MM2 - Stair Arrangement & Details Sheet 1-IDC 32 29-Apr-15* 06-Jun-15MM2-1305-PT-95-N-XG-22037-2MM2 - Stair Arrangement & Details Sheet 1-IFR 6 08-Jun-15 13-Jun-15MM2-1305-PT-95-N-XG-22037-3MM2 - Stair Arrangement & Details Sheet 1-IFD 0 15-Jun-15 15-Jun-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 48 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-95-N-XG-22037-4MM2 - Stair Arrangement & Details Sheet 1-IFC 12 15-Jun-15 27-Jun-15MM2-1305-PT-95-N-XG-22038MM2 - Stair Arrangement & Details Sheet 2 50 29-Apr-15 27-Jun-15MM2-1305-PT-95-N-XG-22038-1MM2 - Stair Arrangement & Details Sheet 2-IDC 32 29-Apr-15* 06-Jun-15MM2-1305-PT-95-N-XG-22038-2MM2 - Stair Arrangement & Details Sheet 2-IFR 6 08-Jun-15 13-Jun-15MM2-1305-PT-95-N-XG-22038-3MM2 - Stair Arrangement & Details Sheet 2-IFD 0 15-Jun-15 15-Jun-15MM2-1305-PT-95-N-XG-22038-4MM2 - Stair Arrangement & Details Sheet 2-IFC 12 15-Jun-15 27-Jun-15MM2-1305-PT-95-N-XG-22039MM2 - Ladder Arrangement & Details Sheet 1 50 29-Apr-15 27-Jun-15MM2-1305-PT-95-N-XG-22039-1MM2 - Ladder Arrangement & Details Sheet 1-IDC 32 29-Apr-15* 06-Jun-15MM2-1305-PT-95-N-XG-22039-2MM2 - Ladder Arrangement & Details Sheet 1-IFR 6 08-Jun-15 13-Jun-15MM2-1305-PT-95-N-XG-22039-3MM2 - Ladder Arrangement & Details Sheet 1-IFD 0 15-Jun-15 15-Jun-15MM2-1305-PT-95-N-XG-22039-4MM2 - Ladder Arrangement & Details Sheet 1-IFC 12 15-Jun-15 27-Jun-15MM2-1305-PT-95-N-XG-22040MM2 - Ladder Arrangement & Details Sheet 2 50 29-Apr-15 27-Jun-15MM2-1305-PT-95-N-XG-22040-1MM2 - Ladder Arrangement & Details Sheet 2-IDC 32 29-Apr-15* 06-Jun-15MM2-1305-PT-95-N-XG-22040-2MM2 - Ladder Arrangement & Details Sheet 2-IFR 6 08-Jun-15 13-Jun-15MM2-1305-PT-95-N-XG-22040-3MM2 - Ladder Arrangement & Details Sheet 2-IFD 0 15-Jun-15 15-Jun-15MM2-1305-PT-95-N-XG-22040-4MM2 - Ladder Arrangement & Details Sheet 2-IFC 12 15-Jun-15 27-Jun-15MM2-1305-PT-95-N-XG-22041MM2 - Mechanical Handling For Main Deck Equipment - sheet 1 29 01-Jun-15 03-Jul-15MM2-1305-PT-95-N-XG-22041-1MM2 - Mechanical Handling For Main Deck Equipment - sheet 1-IDC 11 01-Jun-15* 12-Jun-15MM2-1305-PT-95-N-XG-22041-2MM2 - Mechanical Handling For Main Deck Equipment - sheet 1-IFR 6 13-Jun-15 19-Jun-15MM2-1305-PT-95-N-XG-22041-3MM2 - Mechanical Handling For Main Deck Equipment - sheet 1-IFD 0 20-Jun-15 20-Jun-15MM2-1305-PT-95-N-XG-22041-4MM2 - Mechanical Handling For Main Deck Equipment - sheet 1-IFC 12 20-Jun-15 03-Jul-15MM2-1305-PT-95-N-XG-22042MM2 - Mechanical Handling For Main Deck Equipment - sheet 2 29 01-Jun-15 03-Jul-15MM2-1305-PT-95-N-XG-22042-1MM2 - Mechanical Handling For Main Deck Equipment - sheet 2-IDC 11 01-Jun-15* 12-Jun-15MM2-1305-PT-95-N-XG-22042-2MM2 - Mechanical Handling For Main Deck Equipment - sheet 2-IFR 6 13-Jun-15 19-Jun-15MM2-1305-PT-95-N-XG-22042-3MM2 - Mechanical Handling For Main Deck Equipment - sheet 2-IFD 0 20-Jun-15 20-Jun-15MM2-1305-PT-95-N-XG-22042-4MM2 - Mechanical Handling For Main Deck Equipment - sheet 2-IFC 12 20-Jun-15 03-Jul-15MM2-1305-PT-95-N-XG-22043MM2 - Mechanical Handling For Main Deck Equipment - sheet 3 29 01-Jun-15 03-Jul-15MM2-1305-PT-95-N-XG-22043-1MM2 - Mechanical Handling For Main Deck Equipment - sheet 3-IDC 11 01-Jun-15* 12-Jun-15MM2-1305-PT-95-N-XG-22043-2MM2 - Mechanical Handling For Main Deck Equipment - sheet 3-IFR 6 13-Jun-15 19-Jun-15MM2-1305-PT-95-N-XG-22043-3MM2 - Mechanical Handling For Main Deck Equipment - sheet 3-IFD 0 20-Jun-15 20-Jun-15MM2-1305-PT-95-N-XG-22043-4MM2 - Mechanical Handling For Main Deck Equipment - sheet 3-IFC 12 20-Jun-15 03-Jul-15MM2-1305-PT-95-N-XG-22044MM2 - Mechanical Handling For Main Deck Equipment - sheet 4 29 01-Jun-15 03-Jul-15MM2-1305-PT-95-N-XG-22044-1MM2 - Mechanical Handling For Main Deck Equipment - sheet 4-IDC 11 01-Jun-15* 12-Jun-15MM2-1305-PT-95-N-XG-22044-2MM2 - Mechanical Handling For Main Deck Equipment - sheet 4-IFR 6 13-Jun-15 19-Jun-15MM2-1305-PT-95-N-XG-22044-3MM2 - Mechanical Handling For Main Deck Equipment - sheet 4-IFD 0 20-Jun-15 20-Jun-15MM2-1305-PT-95-N-XG-22044-4MM2 - Mechanical Handling For Main Deck Equipment - sheet 4-IFC 12 20-Jun-15 03-Jul-15MM2-1305-PT-95-N-XG-22045MM2 - Mechanical Handling For Main Deck Equipment - sheet 5 29 01-Jun-15 03-Jul-15MM2-1305-PT-95-N-XG-22045-1MM2 - Mechanical Handling For Main Deck Equipment - sheet 5-IDC 11 01-Jun-15* 12-Jun-15MM2-1305-PT-95-N-XG-22045-2MM2 - Mechanical Handling For Main Deck Equipment - sheet 5-IFR 6 13-Jun-15 19-Jun-15MM2-1305-PT-95-N-XG-22045-3MM2 - Mechanical Handling For Main Deck Equipment - sheet 5-IFD 0 20-Jun-15 20-Jun-15MM2-1305-PT-95-N-XG-22045-4MM2 - Mechanical Handling For Main Deck Equipment - sheet 5-IFC 12 20-Jun-15 03-Jul-15MM2-1305-PT-95-N-XG-22046MM2 - Equipment Support - sheet 1 29 16-Jun-15 18-Jul-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 49 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-95-N-XG-22046-1MM2 - Equipment Support - sheet 1-IDC 11 16-Jun-15* 27-Jun-15MM2-1305-PT-95-N-XG-22046-2MM2 - Equipment Support - sheet 1-IFR 6 29-Jun-15 04-Jul-15MM2-1305-PT-95-N-XG-22046-3MM2 - Equipment Support - sheet 1-IFD 0 06-Jul-15 06-Jul-15MM2-1305-PT-95-N-XG-22046-4MM2 - Equipment Support - sheet 1-IFC 12 06-Jul-15 18-Jul-15MM2-1305-PT-95-N-XG-22047MM2 - Equipment Support - sheet 2 29 16-Jun-15 18-Jul-15MM2-1305-PT-95-N-XG-22047-1MM2 - Equipment Support - sheet 2-IDC 11 16-Jun-15* 27-Jun-15MM2-1305-PT-95-N-XG-22047-2MM2 - Equipment Support - sheet 2-IFR 6 29-Jun-15 04-Jul-15MM2-1305-PT-95-N-XG-22047-3MM2 - Equipment Support - sheet 2-IFD 0 06-Jul-15 06-Jul-15MM2-1305-PT-95-N-XG-22047-4MM2 - Equipment Support - sheet 2-IFC 12 06-Jul-15 18-Jul-15MM2-1305-PT-95-N-XG-22048MM2 - Equipment Support - sheet 3 29 16-Jun-15 18-Jul-15MM2-1305-PT-95-N-XG-22048-1MM2 - Equipment Support - sheet 3-IDC 11 16-Jun-15* 27-Jun-15MM2-1305-PT-95-N-XG-22048-2MM2 - Equipment Support - sheet 3-IFR 6 29-Jun-15 04-Jul-15MM2-1305-PT-95-N-XG-22048-3MM2 - Equipment Support - sheet 3-IFD 0 06-Jul-15 06-Jul-15MM2-1305-PT-95-N-XG-22048-4MM2 - Equipment Support - sheet 3-IFC 12 06-Jul-15 18-Jul-15MM2-1305-PT-95-N-XG-22049MM2 - Seafastening On Barge Arrangment & Details - Sheet 1 30 29-Jun-15 01-Aug-15MM2-1305-PT-95-N-XG-22049-1MM2 - Seafastening On Barge Arrangment & Details - Sheet 1-IDC 0 29-Jun-15* 29-Jun-15MM2-1305-PT-95-N-XG-22049-2MM2 - Seafastening On Barge Arrangment & Details - Sheet 1-IFR 18 29-Jun-15 18-Jul-15MM2-1305-PT-95-N-XG-22049-3MM2 - Seafastening On Barge Arrangment & Details - Sheet 1-IFD 0 20-Jul-15 20-Jul-15MM2-1305-PT-95-N-XG-22049-4MM2 - Seafastening On Barge Arrangment & Details - Sheet 1-IFC 12 20-Jul-15 01-Aug-15MM2-1305-PT-95-N-XG-22050MM2 - Seafastening On Barge Arrangment & Details - Sheet 2 30 29-Jun-15 01-Aug-15MM2-1305-PT-95-N-XG-22050-1MM2 - Seafastening On Barge Arrangment & Details - Sheet 2-IDC 0 29-Jun-15* 29-Jun-15MM2-1305-PT-95-N-XG-22050-2MM2 - Seafastening On Barge Arrangment & Details - Sheet 2-IFR 18 29-Jun-15 18-Jul-15MM2-1305-PT-95-N-XG-22050-3MM2 - Seafastening On Barge Arrangment & Details - Sheet 2-IFD 0 20-Jul-15 20-Jul-15MM2-1305-PT-95-N-XG-22050-4MM2 - Seafastening On Barge Arrangment & Details - Sheet 2-IFC 12 20-Jul-15 01-Aug-15MM2-1305-PT-95-N-XG-22051MM2 - Seafastening On Barge Arrangment & Details - Sheet 3 30 29-Jun-15 01-Aug-15MM2-1305-PT-95-N-XG-22051-1MM2 - Seafastening On Barge Arrangment & Details - Sheet 3-IDC 0 29-Jun-15* 29-Jun-15MM2-1305-PT-95-N-XG-22051-2MM2 - Seafastening On Barge Arrangment & Details - Sheet 3-IFR 18 29-Jun-15 18-Jul-15MM2-1305-PT-95-N-XG-22051-3MM2 - Seafastening On Barge Arrangment & Details - Sheet 3-IFD 0 20-Jul-15 20-Jul-15MM2-1305-PT-95-N-XG-22051-4MM2 - Seafastening On Barge Arrangment & Details - Sheet 3-IFC 12 20-Jul-15 01-Aug-15MM2-14100 TR/MTO for Primary & Secondary Steel 1 07-Apr-15 07-Apr-15MM2-14120 TR/MTO for Tertiary Steel 1 09-Jun-15 09-Jun-15MM2-14140 TR/MTO for Structural Miscellaneous 1 28-Jul-15 28-Jul-15MM2-14160 TR/MTO for Gratings (including Hilti clip and cartridge) 1 09-Aug-15 09-Aug-15MM2-1000 TR/MTO for SF and Grillage Material 1 10-Oct-15 10-Oct-15MM2-1100 Prepare / Submit/ Approve Structural Shop Drawings 185 11-Aug-15 21-Mar-16

0.D.26.0000.MM2.B.L Piping0.D.26.0000.MM2.B.L Piping 312 14-Mar-15 16-Mar-160.D.26.0000.MM2.B.L.92 PTSC0.D.26.0000.MM2.B.L.92 PTSC 312 14-Mar-15 16-Mar-16MM2-1305-PT-00-L-CA-00001MM1 & MM2 - Stress Analysis Report 50 01-Jun-15 28-Jul-15MM2-1305-PT-00-L-CA-00001-1MM1 & MM2 - Stress Analysis Report-IDC 20 01-Jun-15* 23-Jun-15MM2-1305-PT-00-L-CA-00001-2MM1 & MM2 - Stress Analysis Report-IFR 6 24-Jun-15 30-Jun-15MM2-1305-PT-00-L-CA-00001-3MM1 & MM2 - Stress Analysis Report-IFD 12 01-Jul-15 14-Jul-15MM2-1305-PT-00-L-CA-00001-4MM1 & MM2 - Stress Analysis Report-IFC 12 15-Jul-15 28-Jul-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 50 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-00-L-LA-00001MM1 & MM2 - Special Piping Item List 47 12-May-15 04-Jul-15MM2-1305-PT-00-L-LA-00001-1MM1 & MM2 - Special Piping Item List-IDC 7 12-May-15* 19-May-15MM2-1305-PT-00-L-LA-00001-2MM1 & MM2 - Special Piping Item List-IFR 4 20-May-15 23-May-15MM2-1305-PT-00-L-LA-00001-3MM1 & MM2 - Special Piping Item List-IFD 12 25-May-15 06-Jun-15MM2-1305-PT-00-L-LA-00001-4MM1 & MM2 - Special Piping Item List-IFC 24 08-Jun-15 04-Jul-15MM2-1305-PT-00-L-LA-00002MM1 & MM2 - TIE-IN Schedule 56 26-May-15 29-Jul-15MM2-1305-PT-00-L-LA-00002-1MM1 & MM2 - TIE-IN Schedule-IDC 25 26-May-15* 23-Jun-15MM2-1305-PT-00-L-LA-00002-2MM1 & MM2 - TIE-IN Schedule-IFR 7 24-Jun-15 01-Jul-15MM2-1305-PT-00-L-LA-00002-3MM1 & MM2 - TIE-IN Schedule-IFD 12 02-Jul-15 15-Jul-15MM2-1305-PT-00-L-LA-00002-4MM1 & MM2 - TIE-IN Schedule-IFC 12 16-Jul-15 29-Jul-15MM2-1305-PT-00-L-LA-00003MM1 & MM2 - Manual valve list 49 17-Apr-15 16-Jun-15MM2-1305-PT-00-L-LA-00003-1MM1 & MM2 - Manual valve list-IDC 7 17-Apr-15* 24-Apr-15MM2-1305-PT-00-L-LA-00003-2MM1 & MM2 - Manual valve list-IFR 2 25-Apr-15 27-Apr-15MM2-1305-PT-00-L-LA-00003-3MM1 & MM2 - Manual valve list-IFD 10 29-Apr-15 12-May-15MM2-1305-PT-00-L-LA-00003-4MM1 & MM2 - Manual valve list-IFC 30 13-May-15 16-Jun-15MM2-1305-PT-00-L-SA-00001MM1 & MM2 - Addional piping class 46 14-Mar-15 09-May-15MM2-1305-PT-00-L-SA-00001-1MM1 & MM2 - Addional piping class -IDC 1 14-Mar-15* 14-Mar-15MM2-1305-PT-00-L-SA-00001-2MM1 & MM2 - Addional piping class -IFR 24 16-Mar-15 11-Apr-15MM2-1305-PT-00-L-SA-00001-3MM1 & MM2 - Addional piping class -IFD 12 13-Apr-15 25-Apr-15MM2-1305-PT-00-L-SA-00001-4MM1 & MM2 - Addional piping class -IFC 9 27-Apr-15 09-May-15MM2-1305-PT-00-L-SA-00002MM1 & MM2 - Pipe support standard 46 06-Apr-15 01-Jun-15MM2-1305-PT-00-L-SA-00002-1MM1 & MM2 - Pipe support standard -IDC 1 06-Apr-15* 06-Apr-15MM2-1305-PT-00-L-SA-00002-2MM1 & MM2 - Pipe support standard -IFR 21 07-Apr-15 04-May-15MM2-1305-PT-00-L-SA-00002-3MM1 & MM2 - Pipe support standard -IFD 12 05-May-15 18-May-15MM2-1305-PT-00-L-SA-00002-4MM1 & MM2 - Pipe support standard -IFC 12 19-May-15 01-Jun-15MM2-1305-PT-00-L-DS-00001MM1 & MM2 - Ball valve Data sheets 34 03-Apr-15 15-May-15MM2-1305-PT-00-L-DS-00001-1MM1 & MM2 - Ball valve Data sheets-IDC 1 03-Apr-15* 03-Apr-15MM2-1305-PT-00-L-DS-00001-2MM1 & MM2 - Ball valve Data sheets-IFR 12 04-Apr-15 17-Apr-15MM2-1305-PT-00-L-DS-00001-3MM1 & MM2 - Ball valve Data sheets-IFD 9 18-Apr-15 29-Apr-15MM2-1305-PT-00-L-DS-00001-4MM1 & MM2 - Ball valve Data sheets-IFC 12 02-May-15 15-May-15MM2-1305-PT-00-L-DS-00002MM1 & MM2 - Globe Valve Data sheets 33 06-Apr-15 16-May-15MM2-1305-PT-00-L-DS-00002-1MM1 & MM2 - Globe Valve Data sheets-IDC 0 06-Apr-15* 06-Apr-15MM2-1305-PT-00-L-DS-00002-2MM1 & MM2 - Globe Valve Data sheets-IFR 12 06-Apr-15 18-Apr-15MM2-1305-PT-00-L-DS-00002-3MM1 & MM2 - Globe Valve Data sheets-IFD 9 20-Apr-15 02-May-15MM2-1305-PT-00-L-DS-00002-4MM1 & MM2 - Globe Valve Data sheets-IFC 12 04-May-15 16-May-15MM2-1305-PT-00-L-DS-00003MM1 & MM2 - Check Data sheets 34 07-Apr-15 19-May-15MM2-1305-PT-00-L-DS-00003-1MM1 & MM2 - Check Data sheets-IDC 1 07-Apr-15* 07-Apr-15MM2-1305-PT-00-L-DS-00003-2MM1 & MM2 - Check Data sheets-IFR 12 08-Apr-15 21-Apr-15MM2-1305-PT-00-L-DS-00003-3MM1 & MM2 - Check Data sheets-IFD 9 22-Apr-15 05-May-15MM2-1305-PT-00-L-DS-00003-4MM1 & MM2 - Check Data sheets-IFC 12 06-May-15 19-May-15MM2-1305-PT-00-L-DS-00004MM1 & MM2 - DBB valve sheets 58 10-Apr-15 19-Jun-15MM2-1305-PT-00-L-DS-00004-1MM1 & MM2 - DBB valve sheets-IDC 1 10-Apr-15* 10-Apr-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 51 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-00-L-DS-00004-2MM1 & MM2 - DBB valve sheets-IFR 12 11-Apr-15 24-Apr-15MM2-1305-PT-00-L-DS-00004-3MM1 & MM2 - DBB valve sheets-IFD 9 25-Apr-15 08-May-15MM2-1305-PT-00-L-DS-00004-4MM1 & MM2 - DBB valve sheets-IFC 36 09-May-15 19-Jun-15MM2-1305-PT-00-L-DS-00005MM1 & MM2 - SP Item Data Sheet -Valve Interlock 61 12-May-15 21-Jul-15MM2-1305-PT-00-L-DS-00005-1MM1 & MM2 - SP Item Data Sheet -Valve Interlock -IDC 1 12-May-15* 12-May-15MM2-1305-PT-00-L-DS-00005-2MM1 & MM2 - SP Item Data Sheet -Valve Interlock -IFR 12 13-May-15 26-May-15MM2-1305-PT-00-L-DS-00005-3MM1 & MM2 - SP Item Data Sheet -Valve Interlock -IFD 12 27-May-15 09-Jun-15MM2-1305-PT-00-L-DS-00005-4MM1 & MM2 - SP Item Data Sheet -Valve Interlock -IFC 36 10-Jun-15 21-Jul-15MM2-1305-PT-00-L-DS-00006MM1 & MM2 - SP Item Data Sheet - Barred Tee 52 10-Apr-15 12-Jun-15MM2-1305-PT-00-L-DS-00006-1MM1 & MM2 - SP Item Data Sheet - Barred Tee-IDC 1 10-Apr-15* 10-Apr-15MM2-1305-PT-00-L-DS-00006-2MM1 & MM2 - SP Item Data Sheet - Barred Tee-IFR 12 11-Apr-15 24-Apr-15MM2-1305-PT-00-L-DS-00006-3MM1 & MM2 - SP Item Data Sheet - Barred Tee-IFD 9 25-Apr-15 08-May-15MM2-1305-PT-00-L-DS-00006-4MM1 & MM2 - SP Item Data Sheet - Barred Tee-IFC 30 09-May-15 12-Jun-15MM2-1305-PT-00-L-DS-00007MM1 & MM2 - SP Item Data Sheet - Bends 70 24-Apr-15 17-Jul-15MM2-1305-PT-00-L-DS-00007-1MM1 & MM2 - SP Item Data Sheet - Bends-IDC 1 24-Apr-15* 24-Apr-15MM2-1305-PT-00-L-DS-00007-2MM1 & MM2 - SP Item Data Sheet - Bends-IFR 15 25-Apr-15 15-May-15MM2-1305-PT-00-L-DS-00007-3MM1 & MM2 - SP Item Data Sheet - Bends-IFD 12 16-May-15 29-May-15MM2-1305-PT-00-L-DS-00007-4MM1 & MM2 - SP Item Data Sheet - Bends-IFC 42 30-May-15 17-Jul-15MM2-1305-PT-00-L-DS-00008MM1 & MM2 - SP Item Data Sheets for Sample connection 58 24-Apr-15 03-Jul-15MM2-1305-PT-00-L-DS-00008-1MM1 & MM2 - SP Item Data Sheets for Sample connection -IDC 1 24-Apr-15* 24-Apr-15MM2-1305-PT-00-L-DS-00008-2MM1 & MM2 - SP Item Data Sheets for Sample connection -IFR 9 25-Apr-15 08-May-15MM2-1305-PT-00-L-DS-00008-3MM1 & MM2 - SP Item Data Sheets for Sample connection -IFD 12 09-May-15 22-May-15MM2-1305-PT-00-L-DS-00008-4MM1 & MM2 - SP Item Data Sheets for Sample connection -IFC 36 23-May-15 03-Jul-15MM2-1305-PT-00-L-DS-00009MM1 & MM2 - SP Item Data Sheet - Chemcial injection 58 24-Apr-15 03-Jul-15MM2-1305-PT-00-L-DS-00009-1MM1 & MM2 - SP Item Data Sheet - Chemcial injection-IDC 1 24-Apr-15* 24-Apr-15MM2-1305-PT-00-L-DS-00009-2MM1 & MM2 - SP Item Data Sheet - Chemcial injection-IFR 9 25-Apr-15 08-May-15MM2-1305-PT-00-L-DS-00009-3MM1 & MM2 - SP Item Data Sheet - Chemcial injection-IFD 12 09-May-15 22-May-15MM2-1305-PT-00-L-DS-00009-4MM1 & MM2 - SP Item Data Sheet - Chemcial injection-IFC 36 23-May-15 03-Jul-15MM2-1305-PT-00-L-DS-00010MM1 & MM2 - SP Item Data Sheet - Corrosion probe/coupon 58 24-Apr-15 03-Jul-15MM2-1305-PT-00-L-DS-00010-1MM1 & MM2 - SP Item Data Sheet - Corrosion probe/coupon-IDC 1 24-Apr-15* 24-Apr-15MM2-1305-PT-00-L-DS-00010-2MM1 & MM2 - SP Item Data Sheet - Corrosion probe/coupon-IFR 9 25-Apr-15 08-May-15MM2-1305-PT-00-L-DS-00010-3MM1 & MM2 - SP Item Data Sheet - Corrosion probe/coupon-IFD 12 09-May-15 22-May-15MM2-1305-PT-00-L-DS-00010-4MM1 & MM2 - SP Item Data Sheet - Corrosion probe/coupon-IFC 36 23-May-15 03-Jul-15MM2-1305-PT-00-L-DS-00011MM1 & MM2 - SP Item Data Sheet - Sand probe 58 24-Apr-15 03-Jul-15MM2-1305-PT-00-L-DS-00011-1MM1 & MM2 - SP Item Data Sheet - Sand probe-IDC 1 24-Apr-15* 24-Apr-15MM2-1305-PT-00-L-DS-00011-2MM1 & MM2 - SP Item Data Sheet - Sand probe-IFR 9 25-Apr-15 08-May-15MM2-1305-PT-00-L-DS-00011-3MM1 & MM2 - SP Item Data Sheet - Sand probe-IFD 12 09-May-15 22-May-15MM2-1305-PT-00-L-DS-00011-4MM1 & MM2 - SP Item Data Sheet - Sand probe-IFC 36 23-May-15 03-Jul-15MM2-1305-PT-00-L-DS-00012MM1 & MM2 - SP Item Data Sheet - Quick coupling 70 05-Jun-15 25-Aug-15MM2-1305-PT-00-L-DS-00012-1MM1 & MM2 - SP Item Data Sheet - Quick coupling-IDC 1 05-Jun-15* 05-Jun-15MM2-1305-PT-00-L-DS-00012-2MM1 & MM2 - SP Item Data Sheet - Quick coupling-IFR 12 06-Jun-15 19-Jun-15MM2-1305-PT-00-L-DS-00012-3MM1 & MM2 - SP Item Data Sheet - Quick coupling-IFD 12 20-Jun-15 03-Jul-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 52 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-00-L-DS-00012-4MM1 & MM2 - SP Item Data Sheet - Quick coupling-IFC 45 04-Jul-15 25-Aug-15MM2-1305-PT-00-L-DS-00013MM1 & MM2 - SP Item Data Sheet - HUB CONNECTOR 70 05-Jun-15 25-Aug-15MM2-1305-PT-00-L-DS-00013-1MM1 & MM2 - SP Item Data Sheet - HUB CONNECTOR-IDC 1 05-Jun-15* 05-Jun-15MM2-1305-PT-00-L-DS-00013-2MM1 & MM2 - SP Item Data Sheet - HUB CONNECTOR-IFR 12 06-Jun-15 19-Jun-15MM2-1305-PT-00-L-DS-00013-3MM1 & MM2 - SP Item Data Sheet - HUB CONNECTOR-IFD 12 20-Jun-15 03-Jul-15MM2-1305-PT-00-L-DS-00013-4MM1 & MM2 - SP Item Data Sheet - HUB CONNECTOR-IFC 45 04-Jul-15 25-Aug-15MM2-1305-PT-00-L-XE-20001MM2 - Equipment Layout 40 24-Apr-15 12-Jun-15MM2-1305-PT-00-L-XE-20001-1MM2 - Equipment Layout-IDC 10 24-Apr-15* 08-May-15MM2-1305-PT-00-L-XE-20001-2MM2 - Equipment Layout-IFR 6 09-May-15 15-May-15MM2-1305-PT-00-L-XE-20001-3MM2 - Equipment Layout-IFD 12 16-May-15 29-May-15MM2-1305-PT-00-L-XE-20001-4MM2 - Equipment Layout-IFC 12 30-May-15 12-Jun-15MM2-1305-PT-00-L-XE-20002MM2 - Piping layout 43 30-May-15 18-Jul-15MM2-1305-PT-00-L-XE-20002-1MM2 - Piping layout-IDC 13 30-May-15* 13-Jun-15MM2-1305-PT-00-L-XE-20002-2MM2 - Piping layout-IFR 6 15-Jun-15 20-Jun-15MM2-1305-PT-00-L-XE-20002-3MM2 - Piping layout-IFD 12 22-Jun-15 04-Jul-15MM2-1305-PT-00-L-XE-20002-4MM2 - Piping layout-IFC 12 06-Jul-15 18-Jul-15MM2-1305-PT-00-L-XF-20003MM2 - Pipe support location plan 43 20-Jun-15 08-Aug-15MM2-1305-PT-00-L-XF-20003-1MM2 - Pipe support location plan-IDC 13 20-Jun-15* 04-Jul-15MM2-1305-PT-00-L-XF-20003-2MM2 - Pipe support location plan-IFR 6 06-Jul-15 11-Jul-15MM2-1305-PT-00-L-XF-20003-3MM2 - Pipe support location plan-IFD 0 13-Jul-15 13-Jul-15MM2-1305-PT-00-L-XF-20003-4MM2 - Pipe support location plan-IFC 24 13-Jul-15 08-Aug-15MM2-1305-PT-00-L-XN-20001MM2 - Isometric drawings (n Sheets) 59 16-May-15 23-Jul-15MM2-1305-PT-00-L-XN-20001-1MM2 - Isometric drawings (n Sheets)-IDC 13 16-May-15* 30-May-15MM2-1305-PT-00-L-XN-20001-2MM2 - Isometric drawings (n Sheets)-IFR 12 01-Jun-15 13-Jun-15MM2-1305-PT-00-L-XN-20001-3MM2 - Isometric drawings (n Sheets)-IFD 0 15-Jun-15 15-Jun-15MM2-1305-PT-00-L-XN-20001-4MM2 - Isometric drawings (n Sheets)-IFC 34 15-Jun-15 23-Jul-15MM2-1305-PT-00-L-XO-20001MM2 - Pipe support detail drawings 59 16-May-15 23-Jul-15MM2-1305-PT-00-L-XO-20001-1MM2 - Pipe support detail drawings-IDC 13 16-May-15* 30-May-15MM2-1305-PT-00-L-XO-20001-2MM2 - Pipe support detail drawings-IFR 12 01-Jun-15 13-Jun-15MM2-1305-PT-00-L-XO-20001-3MM2 - Pipe support detail drawings-IFD 0 15-Jun-15 15-Jun-15MM2-1305-PT-00-L-XO-20001-4MM2 - Pipe support detail drawings-IFC 34 15-Jun-15 23-Jul-15MM2-1305-PT-00-L-LA-00004MM1 & MM2 - Material take-off for Manual Valves 45 23-Apr-15 17-Jun-15MM2-1305-PT-00-L-LA-00004-1MM1 & MM2 - Material take-off for Manual Valves-IDC 1 23-Apr-15* 23-Apr-15MM2-1305-PT-00-L-LA-00004-2MM1 & MM2 - Material take-off for Manual Valves-IFR 4 24-Apr-15 29-Apr-15MM2-1305-PT-00-L-LA-00004-3MM1 & MM2 - Material take-off for Manual Valves-IFD 0 02-May-15 02-May-15MM2-1305-PT-00-L-LA-00004-4MM1 & MM2 - Material take-off for Manual Valves-IFC 40 02-May-15 17-Jun-15MM2-1305-PT-00-L-LA-00005MM1 & MM2 - Material take-off for Stub bolts, nuts and gasket 54 26-Jun-15 27-Aug-15MM2-1305-PT-00-L-LA-00005-1MM1 & MM2 - Material take-off for Stub bolts, nuts and gasket-IDC 1 26-Jun-15* 26-Jun-15MM2-1305-PT-00-L-LA-00005-2MM1 & MM2 - Material take-off for Stub bolts, nuts and gasket-IFR 5 27-Jun-15 02-Jul-15MM2-1305-PT-00-L-LA-00005-3MM1 & MM2 - Material take-off for Stub bolts, nuts and gasket-IFD 0 03-Jul-15 03-Jul-15MM2-1305-PT-00-L-LA-00005-4MM1 & MM2 - Material take-off for Stub bolts, nuts and gasket-IFC 48 03-Jul-15 27-Aug-15MM2-1305-PT-00-L-LA-00006MM1 & MM2 - Material take-off for Pipe Support (Raw Material) 53 30-May-15 30-Jul-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 53 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-00-L-LA-00006-1MM1 & MM2 - Material take-off for Pipe Support (Raw Material)-IDC 1 30-May-15* 30-May-15MM2-1305-PT-00-L-LA-00006-2MM1 & MM2 - Material take-off for Pipe Support (Raw Material)-IFR 6 01-Jun-15 06-Jun-15MM2-1305-PT-00-L-LA-00006-3MM1 & MM2 - Material take-off for Pipe Support (Raw Material)-IFD 0 08-Jun-15 08-Jun-15MM2-1305-PT-00-L-LA-00006-4MM1 & MM2 - Material take-off for Pipe Support (Raw Material)-IFC 46 08-Jun-15 30-Jul-15MM2-1305-PT-00-L-LA-00007MM1 & MM2 - Material take-off - Hub Connector 70 11-Jun-15 31-Aug-15MM2-1305-PT-00-L-LA-00007-1MM1 & MM2 - Material take-off - Hub Connector-IDC 1 11-Jun-15* 11-Jun-15MM2-1305-PT-00-L-LA-00007-2MM1 & MM2 - Material take-off - Hub Connector-IFR 12 12-Jun-15 25-Jun-15MM2-1305-PT-00-L-LA-00007-3MM1 & MM2 - Material take-off - Hub Connector-IFD 0 26-Jun-15 26-Jun-15MM2-1305-PT-00-L-LA-00007-4MM1 & MM2 - Material take-off - Hub Connector-IFC 57 26-Jun-15 31-Aug-15MM2-14200 TR/MTO for Piping Bulk 1 10-Apr-15 10-Apr-15MM2-14220 TR/MTO for Manual valves 1 29-Apr-15 29-Apr-15MM2-14240 TR/MTO for Barred Tee 1 29-Apr-15 29-Apr-15MM2-14260 TR/MTO for Cuni fittings 1 08-May-15 08-May-15MM2-14280 TR/MTO for Corrosion, sand probe, sample connection, chemical connection 1 18-May-15 18-May-15MM2-14300 TR/MTO for 3D Bend (free bare pipe to bending contractor) 1 30-May-15 30-May-15MM2-14320 TR/MTO for Pipe Supports 1 06-Jun-15 06-Jun-15MM2-14340 TR/MTO for Quick Coupling 1 09-Jul-15 09-Jul-15MM2-14360 TR/MTO for Piping insulation 1 04-Jul-15 04-Jul-15MM2-14380 TR/MTO for Bolt nut, gasket and other 1 06-Jul-15 06-Jul-15MM2-14400 TR/MTO for Valve Inter-locks 1 16-Sep-15 16-Sep-15MM2-14420 Prepare / Submit/ Approve Piping Shop Drawings 151 16-Sep-15 16-Mar-16

0.D.26.0000.MM2.B.1 E&I0.D.26.0000.MM2.B.1 E&I 313 13-Mar-15 16-Mar-160.D.26.0000.MM2.B.1.92 PTSC0.D.26.0000.MM2.B.1.92 PTSC 313 13-Mar-15 16-Mar-16MM2-1305-PT-82-E-CA-00001MM1 & MM2 - Electrical Load List 57 04-May-15 08-Jul-15MM2-1305-PT-82-E-CA-00001-1MM1 & MM2 - Electrical Load List-IDC 10 04-May-15* 14-May-15MM2-1305-PT-82-E-CA-00001-2MM1 & MM2 - Electrical Load List-IFR 13 15-May-15 29-May-15MM2-1305-PT-82-E-CA-00001-3MM1 & MM2 - Electrical Load List-IFD 13 30-May-15 13-Jun-15MM2-1305-PT-82-E-CA-00001-4MM1 & MM2 - Electrical Load List-IFC 21 15-Jun-15 08-Jul-15MM2-1305-PT-82-E-CA-00002MM1 & MM2 - Electrical Lighting Calculation 32 20-Mar-15 25-Apr-15MM2-1305-PT-82-E-CA-00002-1MM1 & MM2 - Electrical Lighting Calculation-IDC 9 20-Mar-15* 30-Mar-15MM2-1305-PT-82-E-CA-00002-2MM1 & MM2 - Electrical Lighting Calculation-IFR 6 31-Mar-15 06-Apr-15MM2-1305-PT-82-E-CA-00002-3MM1 & MM2 - Electrical Lighting Calculation-IFD 13 07-Apr-15 21-Apr-15MM2-1305-PT-82-E-CA-00002-4MM1 & MM2 - Electrical Lighting Calculation-IFC 4 22-Apr-15 25-Apr-15MM2-1305-PT-82-E-XX-00001MM1 & MM2 - Electrical General Drawing and Document Index 36 23-Mar-15 06-May-15MM2-1305-PT-82-E-XX-00001-1MM1 & MM2 - Electrical General Drawing and Document Index-IDC 9 23-Mar-15* 01-Apr-15MM2-1305-PT-82-E-XX-00001-2MM1 & MM2 - Electrical General Drawing and Document Index-IFR 13 02-Apr-15 16-Apr-15MM2-1305-PT-82-E-XX-00001-3MM1 & MM2 - Electrical General Drawing and Document Index-IFD 0 17-Apr-15 17-Apr-15MM2-1305-PT-82-E-XX-00001-4MM1 & MM2 - Electrical General Drawing and Document Index-IFC 14 17-Apr-15 06-May-15MM2-1305-PT-82-E-XX-00002MM1 & MM2 - Electrical Typical Installation Details 48 13-Mar-15 11-May-15MM2-1305-PT-82-E-XX-00002-1MM1 & MM2 - Electrical Typical Installation Details-IDC 9 13-Mar-15* 23-Mar-15MM2-1305-PT-82-E-XX-00002-2MM1 & MM2 - Electrical Typical Installation Details-IFR 13 24-Mar-15 07-Apr-15MM2-1305-PT-82-E-XX-00002-3MM1 & MM2 - Electrical Typical Installation Details-IFD 13 08-Apr-15 22-Apr-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 54 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-82-E-XX-00002-4MM1 & MM2 - Electrical Typical Installation Details-IFC 13 23-Apr-15 11-May-15MM2-1305-PT-82-E-DS-00001MM1 & MM2 - Electrical Datasheet 30 02-Apr-15 09-May-15MM2-1305-PT-82-E-DS-00001-1MM1 & MM2 - Electrical Datasheet-IDC 9 02-Apr-15* 11-Apr-15MM2-1305-PT-82-E-DS-00001-2MM1 & MM2 - Electrical Datasheet-IFR 6 13-Apr-15 18-Apr-15MM2-1305-PT-82-E-DS-00001-3MM1 & MM2 - Electrical Datasheet-IFD 10 20-Apr-15 04-May-15MM2-1305-PT-82-E-DS-00001-4MM1 & MM2 - Electrical Datasheet-IFC 5 05-May-15 09-May-15MM2-1305-PT-82-E-XX-20001MM2 - Electrical Drawing Index 36 23-Mar-15 06-May-15MM2-1305-PT-82-E-XX-20001-1MM2 - Electrical Drawing Index-IDC 9 23-Mar-15* 01-Apr-15MM2-1305-PT-82-E-XX-20001-2MM2 - Electrical Drawing Index-IFR 13 02-Apr-15 16-Apr-15MM2-1305-PT-82-E-XX-20001-3MM2 - Electrical Drawing Index-IFD 0 17-Apr-15 17-Apr-15MM2-1305-PT-82-E-XX-20001-4MM2 - Electrical Drawing Index-IFC 14 17-Apr-15 06-May-15MM2-1305-PT-82-E-XX-20002MM2 - Electrical Cable Ladder Support 39 07-May-15 20-Jun-15MM2-1305-PT-82-E-XX-20002-1MM2 - Electrical Cable Ladder Support-IDC 9 07-May-15* 16-May-15MM2-1305-PT-82-E-XX-20002-2MM2 - Electrical Cable Ladder Support-IFR 13 18-May-15 01-Jun-15MM2-1305-PT-82-E-XX-20002-3MM2 - Electrical Cable Ladder Support-IFD 0 02-Jun-15 02-Jun-15MM2-1305-PT-82-E-XX-20002-4MM2 - Electrical Cable Ladder Support-IFC 17 02-Jun-15 20-Jun-15MM2-1305-PT-82-E-XJ-20001MM2 - Electrical Single Line Diagram - MOV Distribution Panel 82EL101 39 13-Mar-15 27-Apr-15MM2-1305-PT-82-E-XJ-20001-1MM2 - Electrical Single Line Diagram - MOV Distribution Panel 82EL101-IDC 9 13-Mar-15* 23-Mar-15MM2-1305-PT-82-E-XJ-20001-2MM2 - Electrical Single Line Diagram - MOV Distribution Panel 82EL101-IFR 13 24-Mar-15 07-Apr-15MM2-1305-PT-82-E-XJ-20001-3MM2 - Electrical Single Line Diagram - MOV Distribution Panel 82EL101-IFD 0 08-Apr-15 08-Apr-15MM2-1305-PT-82-E-XJ-20001-4MM2 - Electrical Single Line Diagram - MOV Distribution Panel 82EL101-IFC 17 08-Apr-15 27-Apr-15MM2-1305-PT-82-E-XJ-20002MM2 - Electrical Single Line Diagram - Heat Tracing Distribution Panel 82EL10239 13-Mar-15 27-Apr-15MM2-1305-PT-82-E-XJ-20002-1MM2 - Electrical Single Line Diagram - Heat Tracing Distribution Panel 82EL102-IDC9 13-Mar-15* 23-Mar-15MM2-1305-PT-82-E-XJ-20002-2MM2 - Electrical Single Line Diagram - Heat Tracing Distribution Panel 82EL102-IFR13 24-Mar-15 07-Apr-15MM2-1305-PT-82-E-XJ-20002-3MM2 - Electrical Single Line Diagram - Heat Tracing Distribution Panel 82EL102-IFD0 08-Apr-15 08-Apr-15MM2-1305-PT-82-E-XJ-20002-4MM2 - Electrical Single Line Diagram - Heat Tracing Distribution Panel 82EL102-IFC17 08-Apr-15 27-Apr-15MM2-1305-PT-82-E-XJ-20003MM2 - Electrical Single Line Diagram - Normal Lighting Distribution Panel 82EL10339 13-Mar-15 27-Apr-15MM2-1305-PT-82-E-XJ-20003-1MM2 - Electrical Single Line Diagram - Normal Lighting Distribution Panel 82EL103-IDC9 13-Mar-15* 23-Mar-15MM2-1305-PT-82-E-XJ-20003-2MM2 - Electrical Single Line Diagram - Normal Lighting Distribution Panel 82EL103-IFR13 24-Mar-15 07-Apr-15MM2-1305-PT-82-E-XJ-20003-3MM2 - Electrical Single Line Diagram - Normal Lighting Distribution Panel 82EL103-IFD0 08-Apr-15 08-Apr-15MM2-1305-PT-82-E-XJ-20003-4MM2 - Electrical Single Line Diagram - Normal Lighting Distribution Panel 82EL103-IFC17 08-Apr-15 27-Apr-15MM2-1305-PT-82-E-XJ-20004MM2 - Electrical Single Line Diagram - Emergency Lighting Distribution Panel 82EL10439 13-Mar-15 27-Apr-15MM2-1305-PT-82-E-XJ-20004-1MM2 - Electrical Single Line Diagram - Emergency Lighting Distribution Panel 82EL104-IDC9 13-Mar-15* 23-Mar-15MM2-1305-PT-82-E-XJ-20004-2MM2 - Electrical Single Line Diagram - Emergency Lighting Distribution Panel 82EL104-IFR13 24-Mar-15 07-Apr-15MM2-1305-PT-82-E-XJ-20004-3MM2 - Electrical Single Line Diagram - Emergency Lighting Distribution Panel 82EL104-IFD0 08-Apr-15 08-Apr-15MM2-1305-PT-82-E-XJ-20004-4MM2 - Electrical Single Line Diagram - Emergency Lighting Distribution Panel 82EL104-IFC17 08-Apr-15 27-Apr-15MM2-1305-PT-82-E-XJ-20005MM2 - Electrical Single Line Diagram - Escape Lighting Distribution Panel 82EL10539 13-Mar-15 27-Apr-15MM2-1305-PT-82-E-XJ-20005-1MM2 - Electrical Single Line Diagram - Escape Lighting Distribution Panel 82EL105-IDC9 13-Mar-15* 23-Mar-15MM2-1305-PT-82-E-XJ-20005-2MM2 - Electrical Single Line Diagram - Escape Lighting Distribution Panel 82EL105-IFR13 24-Mar-15 07-Apr-15MM2-1305-PT-82-E-XJ-20005-3MM2 - Electrical Single Line Diagram - Escape Lighting Distribution Panel 82EL105-IFD0 08-Apr-15 08-Apr-15MM2-1305-PT-82-E-XJ-20005-4MM2 - Electrical Single Line Diagram - Escape Lighting Distribution Panel 82EL105-IFC17 08-Apr-15 27-Apr-15MM2-1305-PT-82-E-TA-20001MM2 - Electrical Cable Schedule 51 10-Apr-15 11-Jun-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 55 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-82-E-TA-20001-1MM2 - Electrical Cable Schedule -IDC 13 10-Apr-15* 24-Apr-15MM2-1305-PT-82-E-TA-20001-2MM2 - Electrical Cable Schedule -IFR 9 25-Apr-15 08-May-15MM2-1305-PT-82-E-TA-20001-3MM2 - Electrical Cable Schedule -IFD 13 09-May-15 23-May-15MM2-1305-PT-82-E-TA-20001-4MM2 - Electrical Cable Schedule -IFC 16 25-May-15 11-Jun-15MM2-1305-PT-82-E-XT-20001MM2 - Electrical Heat Tracing Interconnection Diagram 40 20-May-15 04-Jul-15MM2-1305-PT-82-E-XT-20001-1MM2 - Electrical Heat Tracing Interconnection Diagram-IDC 10 20-May-15* 30-May-15MM2-1305-PT-82-E-XT-20001-2MM2 - Electrical Heat Tracing Interconnection Diagram-IFR 12 01-Jun-15 13-Jun-15MM2-1305-PT-82-E-XT-20001-3MM2 - Electrical Heat Tracing Interconnection Diagram-IFD 0 15-Jun-15 15-Jun-15MM2-1305-PT-82-E-XT-20001-4MM2 - Electrical Heat Tracing Interconnection Diagram-IFC 18 15-Jun-15 04-Jul-15MM2-1305-PT-82-E-XI-20001MM2 - Electrical Heat Tracing Block Diagram 59 24-Apr-15 04-Jul-15MM2-1305-PT-82-E-XI-20001-1MM2 - Electrical Heat Tracing Block Diagram-IDC 6 24-Apr-15* 04-May-15MM2-1305-PT-82-E-XI-20001-2MM2 - Electrical Heat Tracing Block Diagram-IFR 13 05-May-15 19-May-15MM2-1305-PT-82-E-XI-20001-3MM2 - Electrical Heat Tracing Block Diagram-IFD 0 20-May-15 20-May-15MM2-1305-PT-82-E-XI-20001-4MM2 - Electrical Heat Tracing Block Diagram-IFC 40 20-May-15 04-Jul-15MM2-1305-PT-82-E-XI-20002MM2 - Electrical Lighting Interconnection Diagram 36 23-Apr-15 06-Jun-15MM2-1305-PT-82-E-XI-20002-1MM2 - Electrical Lighting Interconnection Diagram-IDC 6 23-Apr-15* 02-May-15MM2-1305-PT-82-E-XI-20002-2MM2 - Electrical Lighting Interconnection Diagram-IFR 13 04-May-15 18-May-15MM2-1305-PT-82-E-XI-20002-3MM2 - Electrical Lighting Interconnection Diagram-IFD 0 19-May-15 19-May-15MM2-1305-PT-82-E-XI-20002-4MM2 - Electrical Lighting Interconnection Diagram-IFC 17 19-May-15 06-Jun-15MM2-1305-PT-82-E-XE-20001MM2 - Electrical Lighting And Small Power Layout - Main Deck 36 23-Apr-15 06-Jun-15MM2-1305-PT-82-E-XE-20001-1MM2 - Electrical Lighting And Small Power Layout - Main Deck-IDC 6 23-Apr-15* 02-May-15MM2-1305-PT-82-E-XE-20001-2MM2 - Electrical Lighting And Small Power Layout - Main Deck-IFR 13 04-May-15 18-May-15MM2-1305-PT-82-E-XE-20001-3MM2 - Electrical Lighting And Small Power Layout - Main Deck-IFD 0 19-May-15 19-May-15MM2-1305-PT-82-E-XE-20001-4MM2 - Electrical Lighting And Small Power Layout - Main Deck-IFC 17 19-May-15 06-Jun-15MM2-1305-PT-82-E-XE-20002MM2 - Electrical Lighting And Small Power Layout - Mezzanine Deck 36 23-Apr-15 06-Jun-15MM2-1305-PT-82-E-XE-20002-1MM2 - Electrical Lighting And Small Power Layout - Mezzanine Deck-IDC 6 23-Apr-15* 02-May-15MM2-1305-PT-82-E-XE-20002-2MM2 - Electrical Lighting And Small Power Layout - Mezzanine Deck-IFR 13 04-May-15 18-May-15MM2-1305-PT-82-E-XE-20002-3MM2 - Electrical Lighting And Small Power Layout - Mezzanine Deck-IFD 0 19-May-15 19-May-15MM2-1305-PT-82-E-XE-20002-4MM2 - Electrical Lighting And Small Power Layout - Mezzanine Deck-IFC 17 19-May-15 06-Jun-15MM2-1305-PT-82-E-XE-20003MM2 - Electrical Lighting And Small Power Layout - Upper Deck 36 23-Apr-15 06-Jun-15MM2-1305-PT-82-E-XE-20003-1MM2 - Electrical Lighting And Small Power Layout - Upper Deck-IDC 6 23-Apr-15* 02-May-15MM2-1305-PT-82-E-XE-20003-2MM2 - Electrical Lighting And Small Power Layout - Upper Deck-IFR 13 04-May-15 18-May-15MM2-1305-PT-82-E-XE-20003-3MM2 - Electrical Lighting And Small Power Layout - Upper Deck-IFD 0 19-May-15 19-May-15MM2-1305-PT-82-E-XE-20003-4MM2 - Electrical Lighting And Small Power Layout - Upper Deck-IFC 17 19-May-15 06-Jun-15MM2-1305-PT-82-E-XE-21001MM2 - Electrical Earthing Layout - Main Deck 35 01-Apr-15 14-May-15MM2-1305-PT-82-E-XE-21001-1MM2 - Electrical Earthing Layout - Main Deck -IDC 8 01-Apr-15* 09-Apr-15MM2-1305-PT-82-E-XE-21001-2MM2 - Electrical Earthing Layout - Main Deck -IFR 13 10-Apr-15 24-Apr-15MM2-1305-PT-82-E-XE-21001-3MM2 - Electrical Earthing Layout - Main Deck -IFD 0 25-Apr-15 25-Apr-15MM2-1305-PT-82-E-XE-21001-4MM2 - Electrical Earthing Layout - Main Deck -IFC 14 25-Apr-15 14-May-15MM2-1305-PT-82-E-XE-21002MM2 - Electrical Earthing Layout - Mezzanine Deck 35 01-Apr-15 14-May-15MM2-1305-PT-82-E-XE-21002-1MM2 - Electrical Earthing Layout - Mezzanine Deck-IDC 8 01-Apr-15* 09-Apr-15MM2-1305-PT-82-E-XE-21002-2MM2 - Electrical Earthing Layout - Mezzanine Deck-IFR 13 10-Apr-15 24-Apr-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 56 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-82-E-XE-21002-3MM2 - Electrical Earthing Layout - Mezzanine Deck-IFD 0 25-Apr-15 25-Apr-15MM2-1305-PT-82-E-XE-21002-4MM2 - Electrical Earthing Layout - Mezzanine Deck-IFC 14 25-Apr-15 14-May-15MM2-1305-PT-82-E-XE-21003MM2 - Electrical Earthing Layout - Upper Deck 35 01-Apr-15 14-May-15MM2-1305-PT-82-E-XE-21003-1MM2 - Electrical Earthing Layout - Upper Deck -IDC 8 01-Apr-15* 09-Apr-15MM2-1305-PT-82-E-XE-21003-2MM2 - Electrical Earthing Layout - Upper Deck -IFR 13 10-Apr-15 24-Apr-15MM2-1305-PT-82-E-XE-21003-3MM2 - Electrical Earthing Layout - Upper Deck -IFD 0 25-Apr-15 25-Apr-15MM2-1305-PT-82-E-XE-21003-4MM2 - Electrical Earthing Layout - Upper Deck -IFC 14 25-Apr-15 14-May-15MM2-1305-PT-82-E-XE-22001MM2 - Electrical Cable Ladder And Support Layout - Main Deck 36 23-Apr-15 06-Jun-15MM2-1305-PT-82-E-XE-22001-1MM2 - Electrical Cable Ladder And Support Layout - Main Deck -IDC 6 23-Apr-15* 02-May-15MM2-1305-PT-82-E-XE-22001-2MM2 - Electrical Cable Ladder And Support Layout - Main Deck -IFR 13 04-May-15 18-May-15MM2-1305-PT-82-E-XE-22001-3MM2 - Electrical Cable Ladder And Support Layout - Main Deck -IFD 0 19-May-15 19-May-15MM2-1305-PT-82-E-XE-22001-4MM2 - Electrical Cable Ladder And Support Layout - Main Deck -IFC 17 19-May-15 06-Jun-15MM2-1305-PT-82-E-XE-22002MM2 - Electrical Cable Ladder And Support Layout - Mezzanine Deck 36 23-Apr-15 06-Jun-15MM2-1305-PT-82-E-XE-22002-1MM2 - Electrical Cable Ladder And Support Layout - Mezzanine Deck-IDC 6 23-Apr-15* 02-May-15MM2-1305-PT-82-E-XE-22002-2MM2 - Electrical Cable Ladder And Support Layout - Mezzanine Deck-IFR 13 04-May-15 18-May-15MM2-1305-PT-82-E-XE-22002-3MM2 - Electrical Cable Ladder And Support Layout - Mezzanine Deck-IFD 0 19-May-15 19-May-15MM2-1305-PT-82-E-XE-22002-4MM2 - Electrical Cable Ladder And Support Layout - Mezzanine Deck-IFC 17 19-May-15 06-Jun-15MM2-1305-PT-82-E-XE-22003MM2 - Electrical Cable Ladder And Support Layout - Upper Deck 36 23-Apr-15 06-Jun-15MM2-1305-PT-82-E-XE-22003-1MM2 - Electrical Cable Ladder And Support Layout - Upper Deck-IDC 6 23-Apr-15* 02-May-15MM2-1305-PT-82-E-XE-22003-2MM2 - Electrical Cable Ladder And Support Layout - Upper Deck-IFR 13 04-May-15 18-May-15MM2-1305-PT-82-E-XE-22003-3MM2 - Electrical Cable Ladder And Support Layout - Upper Deck-IFD 0 19-May-15 19-May-15MM2-1305-PT-82-E-XE-22003-4MM2 - Electrical Cable Ladder And Support Layout - Upper Deck-IFC 17 19-May-15 06-Jun-15MM2-1305-PT-82-E-XE-23001MM2 - Electrical Cable Routing Layout - Main Deck 39 08-May-15 22-Jun-15MM2-1305-PT-82-E-XE-23001-1MM2 - Electrical Cable Routing Layout - Main Deck-IDC 9 08-May-15* 18-May-15MM2-1305-PT-82-E-XE-23001-2MM2 - Electrical Cable Routing Layout - Main Deck-IFR 13 19-May-15 02-Jun-15MM2-1305-PT-82-E-XE-23001-3MM2 - Electrical Cable Routing Layout - Main Deck-IFD 0 03-Jun-15 03-Jun-15MM2-1305-PT-82-E-XE-23001-4MM2 - Electrical Cable Routing Layout - Main Deck-IFC 17 03-Jun-15 22-Jun-15MM2-1305-PT-82-E-XE-23002MM2 - Electrical Cable Routing Layout - Mezzanine Deck 39 08-May-15 22-Jun-15MM2-1305-PT-82-E-XE-23002-1MM2 - Electrical Cable Routing Layout - Mezzanine Deck-IDC 9 08-May-15* 18-May-15MM2-1305-PT-82-E-XE-23002-2MM2 - Electrical Cable Routing Layout - Mezzanine Deck-IFR 13 19-May-15 02-Jun-15MM2-1305-PT-82-E-XE-23002-3MM2 - Electrical Cable Routing Layout - Mezzanine Deck-IFD 0 03-Jun-15 03-Jun-15MM2-1305-PT-82-E-XE-23002-4MM2 - Electrical Cable Routing Layout - Mezzanine Deck-IFC 17 03-Jun-15 22-Jun-15MM2-1305-PT-82-E-XE-23003MM2 - Electrical Cable Routing Layout - Upper Deck 39 08-May-15 22-Jun-15MM2-1305-PT-82-E-XE-23003-1MM2 - Electrical Cable Routing Layout - Upper Deck-IDC 9 08-May-15* 18-May-15MM2-1305-PT-82-E-XE-23003-2MM2 - Electrical Cable Routing Layout - Upper Deck-IFR 13 19-May-15 02-Jun-15MM2-1305-PT-82-E-XE-23003-3MM2 - Electrical Cable Routing Layout - Upper Deck-IFD 0 03-Jun-15 03-Jun-15MM2-1305-PT-82-E-XE-23003-4MM2 - Electrical Cable Routing Layout - Upper Deck-IFC 17 03-Jun-15 22-Jun-15MM2-1305-PT-82-E-LA-00001MM1 & MM2 - Electrical Material Take-Off - Lighting Fixtures 80 05-May-15 05-Aug-15MM2-1305-PT-82-E-LA-00001-1MM1 & MM2 - Electrical Material Take-Off - Lighting Fixtures-IDC 7 05-May-15* 12-May-15MM2-1305-PT-82-E-LA-00001-2MM1 & MM2 - Electrical Material Take-Off - Lighting Fixtures-IFR 24 13-May-15 09-Jun-15MM2-1305-PT-82-E-LA-00001-3MM1 & MM2 - Electrical Material Take-Off - Lighting Fixtures-IFD 0 10-Jun-15 10-Jun-15MM2-1305-PT-82-E-LA-00001-4MM1 & MM2 - Electrical Material Take-Off - Lighting Fixtures-IFC 49 10-Jun-15 05-Aug-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 57 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-82-E-LA-00002MM1 & MM2 - Electrical Material Take-Off - Cable Ladder/Tray And Accessories77 11-May-15 07-Aug-15MM2-1305-PT-82-E-LA-00002-1MM1 & MM2 - Electrical Material Take-Off - Cable Ladder/Tray And Accessories-IDC7 11-May-15* 18-May-15MM2-1305-PT-82-E-LA-00002-2MM1 & MM2 - Electrical Material Take-Off - Cable Ladder/Tray And Accessories-IFR23 19-May-15 13-Jun-15MM2-1305-PT-82-E-LA-00002-3MM1 & MM2 - Electrical Material Take-Off - Cable Ladder/Tray And Accessories-IFD0 15-Jun-15 15-Jun-15MM2-1305-PT-82-E-LA-00002-4MM1 & MM2 - Electrical Material Take-Off - Cable Ladder/Tray And Accessories-IFC47 15-Jun-15 07-Aug-15MM2-1305-PT-82-E-LA-00003MM1 & MM2 - Electrical Material Take-Off - Cables 62 18-May-15 28-Jul-15MM2-1305-PT-82-E-LA-00003-1MM1 & MM2 - Electrical Material Take-Off - Cables-IDC 7 18-May-15* 25-May-15MM2-1305-PT-82-E-LA-00003-2MM1 & MM2 - Electrical Material Take-Off - Cables-IFR 8 26-May-15 03-Jun-15MM2-1305-PT-82-E-LA-00003-3MM1 & MM2 - Electrical Material Take-Off - Cables-IFD 0 04-Jun-15 04-Jun-15MM2-1305-PT-82-E-LA-00003-4MM1 & MM2 - Electrical Material Take-Off - Cables-IFC 47 04-Jun-15 28-Jul-15MM2-1305-PT-82-E-LA-00004MM1 & MM2 - Electrical Material Take-Off - Cable Glands 77 21-May-15 18-Aug-15MM2-1305-PT-82-E-LA-00004-1MM1 & MM2 - Electrical Material Take-Off - Cable Glands-IDC 7 21-May-15* 28-May-15MM2-1305-PT-82-E-LA-00004-2MM1 & MM2 - Electrical Material Take-Off - Cable Glands-IFR 22 29-May-15 23-Jun-15MM2-1305-PT-82-E-LA-00004-3MM1 & MM2 - Electrical Material Take-Off - Cable Glands-IFD 0 24-Jun-15 24-Jun-15MM2-1305-PT-82-E-LA-00004-4MM1 & MM2 - Electrical Material Take-Off - Cable Glands-IFC 48 24-Jun-15 18-Aug-15MM2-1305-PT-82-E-LA-00005MM1 & MM2 - Electrical Material Take-Off - Junction Boxes 83 02-May-15 06-Aug-15MM2-1305-PT-82-E-LA-00005-1MM1 & MM2 - Electrical Material Take-Off - Junction Boxes-IDC 6 02-May-15* 08-May-15MM2-1305-PT-82-E-LA-00005-2MM1 & MM2 - Electrical Material Take-Off - Junction Boxes-IFR 31 09-May-15 13-Jun-15MM2-1305-PT-82-E-LA-00005-3MM1 & MM2 - Electrical Material Take-Off - Junction Boxes-IFD 0 15-Jun-15 15-Jun-15MM2-1305-PT-82-E-LA-00005-4MM1 & MM2 - Electrical Material Take-Off - Junction Boxes-IFC 46 15-Jun-15 06-Aug-15MM2-1305-PT-82-E-LA-00006MM1 & MM2 - Electrical Material Take-Off - Miscellaneous Materials 94 21-May-15 08-Sep-15MM2-1305-PT-82-E-LA-00006-1MM1 & MM2 - Electrical Material Take-Off - Miscellaneous Materials-IDC 7 21-May-15* 28-May-15MM2-1305-PT-82-E-LA-00006-2MM1 & MM2 - Electrical Material Take-Off - Miscellaneous Materials-IFR 38 29-May-15 11-Jul-15MM2-1305-PT-82-E-LA-00006-3MM1 & MM2 - Electrical Material Take-Off - Miscellaneous Materials-IFD 0 13-Jul-15 13-Jul-15MM2-1305-PT-82-E-LA-00006-4MM1 & MM2 - Electrical Material Take-Off - Miscellaneous Materials-IFC 49 13-Jul-15 08-Sep-15MM2-1305-PT-82-E-LA-00007MM1 & MM2 - Electrical Material Take-Off - Steel Support Materials 52 15-May-15 14-Jul-15MM2-1305-PT-82-E-LA-00007-1MM1 & MM2 - Electrical Material Take-Off - Steel Support Materials-IDC 7 15-May-15* 22-May-15MM2-1305-PT-82-E-LA-00007-2MM1 & MM2 - Electrical Material Take-Off - Steel Support Materials-IFR 10 23-May-15 03-Jun-15MM2-1305-PT-82-E-LA-00007-3MM1 & MM2 - Electrical Material Take-Off - Steel Support Materials-IFD 0 04-Jun-15 04-Jun-15MM2-1305-PT-82-E-LA-00007-4MM1 & MM2 - Electrical Material Take-Off - Steel Support Materials-IFC 35 04-Jun-15 14-Jul-15MM2-1305-PT-00-I-LA-00009MM1 & MM2 - Ex Equipment Register 68 11-Jun-15 28-Aug-15MM2-1305-PT-00-I-LA-00009-1MM1 & MM2 - Ex Equipment Register-IDC 27 11-Jun-15* 11-Jul-15MM2-1305-PT-00-I-LA-00009-2MM1 & MM2 - Ex Equipment Register-IFR 12 13-Jul-15 25-Jul-15MM2-1305-PT-00-I-LA-00009-3MM1 & MM2 - Ex Equipment Register-IFD 12 27-Jul-15 08-Aug-15MM2-1305-PT-00-I-LA-00009-4MM1 & MM2 - Ex Equipment Register-IFC 17 10-Aug-15 28-Aug-15MM2-1305-PT-00-I-SA-00001MM1 & MM2 - Instrument Control and Shutdown Philosophy 64 10-Jun-15 22-Aug-15MM2-1305-PT-00-I-SA-00001-1MM1 & MM2 - Instrument Control and Shutdown Philosophy-IDC 27 10-Jun-15* 10-Jul-15MM2-1305-PT-00-I-SA-00001-2MM1 & MM2 - Instrument Control and Shutdown Philosophy-IFR 8 11-Jul-15 20-Jul-15MM2-1305-PT-00-I-SA-00001-3MM1 & MM2 - Instrument Control and Shutdown Philosophy-IFD 13 21-Jul-15 04-Aug-15MM2-1305-PT-00-I-SA-00001-4MM1 & MM2 - Instrument Control and Shutdown Philosophy-IFC 16 05-Aug-15 22-Aug-15MM2-1305-PT-00-I-XR-00001MM1 & MM2 - Alarm & Shutdown Cause & Effect Matrix 68 15-Jun-15 01-Sep-15MM2-1305-PT-00-I-XR-00001-1MM1 & MM2 - Alarm & Shutdown Cause & Effect Matrix -IDC 27 15-Jun-15* 15-Jul-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 58 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-00-I-XR-00001-2MM1 & MM2 - Alarm & Shutdown Cause & Effect Matrix -IFR 13 16-Jul-15 30-Jul-15MM2-1305-PT-00-I-XR-00001-3MM1 & MM2 - Alarm & Shutdown Cause & Effect Matrix -IFD 13 31-Jul-15 14-Aug-15MM2-1305-PT-00-I-XR-00001-4MM1 & MM2 - Alarm & Shutdown Cause & Effect Matrix -IFC 15 15-Aug-15 01-Sep-15MM2-1305-PT-00-I-XT-00001MM1 & MM2 - Instrument Cable Block Diagram 44 13-Apr-15 05-Jun-15MM2-1305-PT-00-I-XT-00001-1MM1 & MM2 - Instrument Cable Block Diagram-IDC 20 13-Apr-15* 08-May-15MM2-1305-PT-00-I-XT-00001-2MM1 & MM2 - Instrument Cable Block Diagram-IFR 6 09-May-15 15-May-15MM2-1305-PT-00-I-XT-00001-3MM1 & MM2 - Instrument Cable Block Diagram-IFD 0 16-May-15 16-May-15MM2-1305-PT-00-I-XT-00001-4MM1 & MM2 - Instrument Cable Block Diagram-IFC 18 16-May-15 05-Jun-15MM2-1305-PT-00-I-XT-00003MM2 - Instrument Interconnection Wiring diagram 49 13-Apr-15 11-Jun-15MM2-1305-PT-00-I-XT-00003-1MM2 - Instrument Interconnection Wiring diagram -IDC 20 13-Apr-15* 08-May-15MM2-1305-PT-00-I-XT-00003-2MM2 - Instrument Interconnection Wiring diagram -IFR 12 09-May-15 22-May-15MM2-1305-PT-00-I-XT-00003-3MM2 - Instrument Interconnection Wiring diagram -IFD 0 23-May-15 23-May-15MM2-1305-PT-00-I-XT-00003-4MM2 - Instrument Interconnection Wiring diagram -IFC 17 23-May-15 11-Jun-15MM2-1305-PT-00-I-XQ-00002MM2- Instrument Hookup Drawing 47 06-Apr-15 02-Jun-15MM2-1305-PT-00-I-XQ-00002-1MM2- Instrument Hookup Drawing-IDC 14 06-Apr-15* 21-Apr-15MM2-1305-PT-00-I-XQ-00002-2MM2- Instrument Hookup Drawing-IFR 15 22-Apr-15 12-May-15MM2-1305-PT-00-I-XQ-00002-3MM2- Instrument Hookup Drawing-IFD 0 13-May-15 13-May-15MM2-1305-PT-00-I-XQ-00002-4MM2- Instrument Hookup Drawing-IFC 18 13-May-15 02-Jun-15MM2-1305-PT-00-I-XX-00002MM2- Instrument Support Details 41 04-May-15 19-Jun-15MM2-1305-PT-00-I-XX-00002-1MM2- Instrument Support Details-IDC 13 04-May-15* 18-May-15MM2-1305-PT-00-I-XX-00002-2MM2- Instrument Support Details-IFR 12 19-May-15 01-Jun-15MM2-1305-PT-00-I-XX-00002-3MM2- Instrument Support Details-IFD 0 02-Jun-15 02-Jun-15MM2-1305-PT-00-I-XX-00002-4MM2- Instrument Support Details-IFC 16 02-Jun-15 19-Jun-15MM2-1305-PT-00-I-XX-00004MM2 - Instrument Cable Tray Ladder Support Details 36 20-May-15 30-Jun-15MM2-1305-PT-00-I-XX-00004-1MM2 - Instrument Cable Tray Ladder Support Details-IDC 13 20-May-15* 03-Jun-15MM2-1305-PT-00-I-XX-00004-2MM2 - Instrument Cable Tray Ladder Support Details-IFR 6 04-Jun-15 10-Jun-15MM2-1305-PT-00-I-XX-00004-3MM2 - Instrument Cable Tray Ladder Support Details-IFD 0 11-Jun-15 11-Jun-15MM2-1305-PT-00-I-XX-00004-4MM2 - Instrument Cable Tray Ladder Support Details-IFC 17 11-Jun-15 30-Jun-15MM2-1305-PT-00-I-XE-00002MM2 - Instrument cable and cable tray/ ladder routing layout 59 04-May-15 10-Jul-15MM2-1305-PT-00-I-XE-00002-1MM2 - Instrument cable and cable tray/ ladder routing layout-IDC 12 04-May-15* 16-May-15MM2-1305-PT-00-I-XE-00002-2MM2 - Instrument cable and cable tray/ ladder routing layout-IFR 12 18-May-15 30-May-15MM2-1305-PT-00-I-XE-00002-3MM2 - Instrument cable and cable tray/ ladder routing layout-IFD 0 01-Jun-15 01-Jun-15MM2-1305-PT-00-I-XE-00002-4MM2 - Instrument cable and cable tray/ ladder routing layout-IFC 35 01-Jun-15 10-Jul-15MM2-1305-PT-00-I-XE-00004MM2 - Instrument tubing and tubing tray routing layout 53 02-May-15 02-Jul-15MM2-1305-PT-00-I-XE-00004-1MM2 - Instrument tubing and tubing tray routing layout-IDC 13 02-May-15* 16-May-15MM2-1305-PT-00-I-XE-00004-2MM2 - Instrument tubing and tubing tray routing layout-IFR 6 18-May-15 23-May-15MM2-1305-PT-00-I-XE-00004-3MM2 - Instrument tubing and tubing tray routing layout-IFD 0 25-May-15 25-May-15MM2-1305-PT-00-I-XE-00004-4MM2 - Instrument tubing and tubing tray routing layout-IFC 34 25-May-15 02-Jul-15MM2-1305-PT-00-I-XE-00006MM2- Instrument and JB location layout 43 20-Apr-15 11-Jun-15MM2-1305-PT-00-I-XE-00006-1MM2- Instrument and JB location layout-IDC 24 20-Apr-15* 20-May-15MM2-1305-PT-00-I-XE-00006-2MM2- Instrument and JB location layout-IFR 6 21-May-15 27-May-15MM2-1305-PT-00-I-XE-00006-3MM2- Instrument and JB location layout-IFD 0 28-May-15 28-May-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 59 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-00-I-XE-00006-4MM2- Instrument and JB location layout-IFC 13 28-May-15 11-Jun-15MM2-1305-PT-00-I-XE-00008MM2- Fire & Gas layout 82 13-Mar-15 19-Jun-15MM2-1305-PT-00-I-XE-00008-1MM2- Fire & Gas layout-IDC 16 13-Mar-15* 31-Mar-15MM2-1305-PT-00-I-XE-00008-2MM2- Fire & Gas layout-IFR 49 01-Apr-15 30-May-15MM2-1305-PT-00-I-XE-00008-3MM2- Fire & Gas layout-IFD 0 01-Jun-15 01-Jun-15MM2-1305-PT-00-I-XE-00008-4MM2- Fire & Gas layout-IFC 17 01-Jun-15 19-Jun-15MM2-1305-PT-00-I-XE-00010MM2 - PAGA Equipment Location Layout 101 13-Mar-15 11-Jul-15MM2-1305-PT-00-I-XE-00010-1MM2 - PAGA Equipment Location Layout-IDC 35 13-Mar-15* 22-Apr-15MM2-1305-PT-00-I-XE-00010-2MM2 - PAGA Equipment Location Layout-IFR 48 23-Apr-15 20-Jun-15MM2-1305-PT-00-I-XE-00010-3MM2 - PAGA Equipment Location Layout-IFD 0 22-Jun-15 22-Jun-15MM2-1305-PT-00-I-XE-00010-4MM2 - PAGA Equipment Location Layout-IFC 18 22-Jun-15 11-Jul-15MM2-1305-PT-00-I-LA-00002MM2 - Instrument I/O LIST 51 20-Apr-15 20-Jun-15MM2-1305-PT-00-I-LA-00002-1MM2 - Instrument I/O LIST-IDC 16 20-Apr-15* 11-May-15MM2-1305-PT-00-I-LA-00002-2MM2 - Instrument I/O LIST-IFR 6 12-May-15 18-May-15MM2-1305-PT-00-I-LA-00002-3MM2 - Instrument I/O LIST-IFD 13 19-May-15 02-Jun-15MM2-1305-PT-00-I-LA-00002-4MM2 - Instrument I/O LIST-IFC 16 03-Jun-15 20-Jun-15MM2-1305-PT-00-I-LA-00004MM2 - Instrument INDEX 51 20-Apr-15 20-Jun-15MM2-1305-PT-00-I-LA-00004-1MM2 - Instrument INDEX-IDC 16 20-Apr-15* 11-May-15MM2-1305-PT-00-I-LA-00004-2MM2 - Instrument INDEX-IFR 6 12-May-15 18-May-15MM2-1305-PT-00-I-LA-00004-3MM2 - Instrument INDEX-IFD 13 19-May-15 02-Jun-15MM2-1305-PT-00-I-LA-00004-4MM2 - Instrument INDEX-IFC 16 03-Jun-15 20-Jun-15MM2-1305-PT-00-I-LA-00006MM2 - Instrument CABLE SCHEDULE 40 21-Apr-15 09-Jun-15MM2-1305-PT-00-I-LA-00006-1MM2 - Instrument CABLE SCHEDULE-IDC 10 21-Apr-15* 05-May-15MM2-1305-PT-00-I-LA-00006-2MM2 - Instrument CABLE SCHEDULE-IFR 6 06-May-15 12-May-15MM2-1305-PT-00-I-LA-00006-3MM2 - Instrument CABLE SCHEDULE-IFD 0 13-May-15 13-May-15MM2-1305-PT-00-I-LA-00006-4MM2 - Instrument CABLE SCHEDULE-IFC 24 13-May-15 09-Jun-15MM2-1305-PT-00-I-LA-00008MM2 - Instrument TUBING SCHEDULE 58 22-Apr-15 01-Jul-15MM2-1305-PT-00-I-LA-00008-1MM2 - Instrument TUBING SCHEDULE-IDC 22 22-Apr-15* 20-May-15MM2-1305-PT-00-I-LA-00008-2MM2 - Instrument TUBING SCHEDULE-IFR 12 21-May-15 03-Jun-15MM2-1305-PT-00-I-LA-00008-3MM2 - Instrument TUBING SCHEDULE-IFD 0 04-Jun-15 04-Jun-15MM2-1305-PT-00-I-LA-00008-4MM2 - Instrument TUBING SCHEDULE-IFC 24 04-Jun-15 01-Jul-15MM2-1305-PT-00-I-RA-00001MM1 & MM2 - PSV Sizing Calculation Report 45 22-Apr-15 16-Jun-15MM2-1305-PT-00-I-RA-00001-1MM1 & MM2 - PSV Sizing Calculation Report-IDC 10 22-Apr-15* 06-May-15MM2-1305-PT-00-I-RA-00001-2MM1 & MM2 - PSV Sizing Calculation Report-IFR 6 07-May-15 13-May-15MM2-1305-PT-00-I-RA-00001-3MM1 & MM2 - PSV Sizing Calculation Report-IFD 13 14-May-15 28-May-15MM2-1305-PT-00-I-RA-00001-4MM1 & MM2 - PSV Sizing Calculation Report-IFC 16 29-May-15 16-Jun-15MM2-1305-PT-00-I-RA-00002MM1 & MM2 - Choke Valve Sizing Calculation Report 45 23-Apr-15 17-Jun-15MM2-1305-PT-00-I-RA-00002-1MM1 & MM2 - Choke Valve Sizing Calculation Report-IDC 10 23-Apr-15* 07-May-15MM2-1305-PT-00-I-RA-00002-2MM1 & MM2 - Choke Valve Sizing Calculation Report-IFR 6 08-May-15 14-May-15MM2-1305-PT-00-I-RA-00002-3MM1 & MM2 - Choke Valve Sizing Calculation Report-IFD 13 15-May-15 29-May-15MM2-1305-PT-00-I-RA-00002-4MM1 & MM2 - Choke Valve Sizing Calculation Report-IFC 16 30-May-15 17-Jun-15MM2-1305-PT-00-I-RA-00003MM1 & MM2 - FE/RO Sizing Calculation Report 45 24-Apr-15 18-Jun-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 60 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-00-I-RA-00003-1MM1 & MM2 - FE/RO Sizing Calculation Report-IDC 10 24-Apr-15* 08-May-15MM2-1305-PT-00-I-RA-00003-2MM1 & MM2 - FE/RO Sizing Calculation Report-IFR 6 09-May-15 15-May-15MM2-1305-PT-00-I-RA-00003-3MM1 & MM2 - FE/RO Sizing Calculation Report-IFD 13 16-May-15 30-May-15MM2-1305-PT-00-I-RA-00003-4MM1 & MM2 - FE/RO Sizing Calculation Report-IFC 16 01-Jun-15 18-Jun-15MM2-1305-PT-00-I-RA-00004MM1 & MM2 - Instrument utility/ power consumption calculation report 60 25-May-15 01-Aug-15MM2-1305-PT-00-I-RA-00004-1MM1 & MM2 - Instrument utility/ power consumption calculation report-IDC 25 25-May-15* 22-Jun-15MM2-1305-PT-00-I-RA-00004-2MM1 & MM2 - Instrument utility/ power consumption calculation report-IFR 6 23-Jun-15 29-Jun-15MM2-1305-PT-00-I-RA-00004-3MM1 & MM2 - Instrument utility/ power consumption calculation report-IFD 13 30-Jun-15 14-Jul-15MM2-1305-PT-00-I-RA-00004-4MM1 & MM2 - Instrument utility/ power consumption calculation report-IFC 16 15-Jul-15 01-Aug-15MM2-1305-PT-00-I-DS-00001MM1 & MM2 - Instrument Datasheet for On-Off valves 75 13-Mar-15 11-Jun-15MM2-1305-PT-00-I-DS-00001-1MM1 & MM2 - Instrument Datasheet for On-Off valves-IDC 20 13-Mar-15* 04-Apr-15MM2-1305-PT-00-I-DS-00001-2MM1 & MM2 - Instrument Datasheet for On-Off valves-IFR 6 06-Apr-15 11-Apr-15MM2-1305-PT-00-I-DS-00001-3MM1 & MM2 - Instrument Datasheet for On-Off valves-IFD 0 13-Apr-15 13-Apr-15MM2-1305-PT-00-I-DS-00001-4MM1 & MM2 - Instrument Datasheet for On-Off valves-IFC 49 13-Apr-15 11-Jun-15MM2-1305-PT-00-I-DS-00002MM1 & MM2 - Instrument Datasheet for Motor Operated valves 69 13-Mar-15 04-Jun-15MM2-1305-PT-00-I-DS-00002-1MM1 & MM2 - Instrument Datasheet for Motor Operated valves-IDC 20 13-Mar-15* 04-Apr-15MM2-1305-PT-00-I-DS-00002-2MM1 & MM2 - Instrument Datasheet for Motor Operated valves-IFR 2 06-Apr-15 07-Apr-15MM2-1305-PT-00-I-DS-00002-3MM1 & MM2 - Instrument Datasheet for Motor Operated valves-IFD 0 08-Apr-15 08-Apr-15MM2-1305-PT-00-I-DS-00002-4MM1 & MM2 - Instrument Datasheet for Motor Operated valves-IFC 47 08-Apr-15 04-Jun-15MM2-1305-PT-00-I-DS-00003MM1 & MM2 - Instrument Datasheet for Pressure Safety valves 87 13-Mar-15 25-Jun-15MM2-1305-PT-00-I-DS-00003-1MM1 & MM2 - Instrument Datasheet for Pressure Safety valves-IDC 20 13-Mar-15* 04-Apr-15MM2-1305-PT-00-I-DS-00003-2MM1 & MM2 - Instrument Datasheet for Pressure Safety valves-IFR 18 06-Apr-15 25-Apr-15MM2-1305-PT-00-I-DS-00003-3MM1 & MM2 - Instrument Datasheet for Pressure Safety valves-IFD 0 27-Apr-15 27-Apr-15MM2-1305-PT-00-I-DS-00003-4MM1 & MM2 - Instrument Datasheet for Pressure Safety valves-IFC 49 27-Apr-15 25-Jun-15MM2-1305-PT-00-I-DS-00004MM1 & MM2 - Instrument Datasheet for Choke valve 89 13-Mar-15 27-Jun-15MM2-1305-PT-00-I-DS-00004-1MM1 & MM2 - Instrument Datasheet for Choke valve-IDC 20 13-Mar-15* 04-Apr-15MM2-1305-PT-00-I-DS-00004-2MM1 & MM2 - Instrument Datasheet for Choke valve-IFR 19 06-Apr-15 27-Apr-15MM2-1305-PT-00-I-DS-00004-3MM1 & MM2 - Instrument Datasheet for Choke valve-IFD 0 29-Apr-15 29-Apr-15MM2-1305-PT-00-I-DS-00004-4MM1 & MM2 - Instrument Datasheet for Choke valve-IFC 50 29-Apr-15 27-Jun-15MM2-1305-PT-00-I-DS-00005MM1 & MM2 - Instrument Datasheet for H2S Analyser 89 13-Mar-15 27-Jun-15MM2-1305-PT-00-I-DS-00005-1MM1 & MM2 - Instrument Datasheet for H2S Analyser-IDC 22 13-Mar-15* 07-Apr-15MM2-1305-PT-00-I-DS-00005-2MM1 & MM2 - Instrument Datasheet for H2S Analyser-IFR 12 08-Apr-15 21-Apr-15MM2-1305-PT-00-I-DS-00005-3MM1 & MM2 - Instrument Datasheet for H2S Analyser-IFD 0 22-Apr-15 22-Apr-15MM2-1305-PT-00-I-DS-00005-4MM1 & MM2 - Instrument Datasheet for H2S Analyser-IFC 55 22-Apr-15 27-Jun-15MM2-1305-PT-00-I-DS-00006MM1 & MM2 - Instrument Datasheet for Pig Signaller 105 13-Mar-15 16-Jul-15MM2-1305-PT-00-I-DS-00006-1MM1 & MM2 - Instrument Datasheet for Pig Signaller-IDC 47 13-Mar-15* 09-May-15MM2-1305-PT-00-I-DS-00006-2MM1 & MM2 - Instrument Datasheet for Pig Signaller-IFR 12 11-May-15 23-May-15MM2-1305-PT-00-I-DS-00006-3MM1 & MM2 - Instrument Datasheet for Pig Signaller-IFD 0 25-May-15 25-May-15MM2-1305-PT-00-I-DS-00006-4MM1 & MM2 - Instrument Datasheet for Pig Signaller-IFC 46 25-May-15 16-Jul-15MM2-1305-PT-00-I-DS-00007MM1 & MM2 - Instrument Datasheet for Pressure Transmitter 125 13-Mar-15 08-Aug-15MM2-1305-PT-00-I-DS-00007-1MM1 & MM2 - Instrument Datasheet for Pressure Transmitter-IDC 59 13-Mar-15* 23-May-15MM2-1305-PT-00-I-DS-00007-2MM1 & MM2 - Instrument Datasheet for Pressure Transmitter-IFR 12 25-May-15 06-Jun-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 61 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-00-I-DS-00007-3MM1 & MM2 - Instrument Datasheet for Pressure Transmitter-IFD 0 08-Jun-15 08-Jun-15MM2-1305-PT-00-I-DS-00007-4MM1 & MM2 - Instrument Datasheet for Pressure Transmitter-IFC 54 08-Jun-15 08-Aug-15MM2-1305-PT-00-I-DS-00008MM1 & MM2 - Instrument Datasheet for Temperature Transmitter 125 13-Mar-15 08-Aug-15MM2-1305-PT-00-I-DS-00008-1MM1 & MM2 - Instrument Datasheet for Temperature Transmitter-IDC 59 13-Mar-15* 23-May-15MM2-1305-PT-00-I-DS-00008-2MM1 & MM2 - Instrument Datasheet for Temperature Transmitter-IFR 12 25-May-15 06-Jun-15MM2-1305-PT-00-I-DS-00008-3MM1 & MM2 - Instrument Datasheet for Temperature Transmitter-IFD 0 08-Jun-15 08-Jun-15MM2-1305-PT-00-I-DS-00008-4MM1 & MM2 - Instrument Datasheet for Temperature Transmitter-IFC 54 08-Jun-15 08-Aug-15MM2-1305-PT-00-I-DS-00009MM1 & MM2 - Instrument Datasheet for Flow Transmitter 125 13-Mar-15 08-Aug-15MM2-1305-PT-00-I-DS-00009-1MM1 & MM2 - Instrument Datasheet for Flow Transmitter-IDC 59 13-Mar-15* 23-May-15MM2-1305-PT-00-I-DS-00009-2MM1 & MM2 - Instrument Datasheet for Flow Transmitter-IFR 12 25-May-15 06-Jun-15MM2-1305-PT-00-I-DS-00009-3MM1 & MM2 - Instrument Datasheet for Flow Transmitter-IFD 0 08-Jun-15 08-Jun-15MM2-1305-PT-00-I-DS-00009-4MM1 & MM2 - Instrument Datasheet for Flow Transmitter-IFC 54 08-Jun-15 08-Aug-15MM2-1305-PT-00-I-DS-00010MM1 & MM2 - Instrument Datasheet for Pressure Gauge 111 13-Mar-15 23-Jul-15MM2-1305-PT-00-I-DS-00010-1MM1 & MM2 - Instrument Datasheet for Pressure Gauge-IDC 51 13-Mar-15* 14-May-15MM2-1305-PT-00-I-DS-00010-2MM1 & MM2 - Instrument Datasheet for Pressure Gauge-IFR 12 15-May-15 28-May-15MM2-1305-PT-00-I-DS-00010-3MM1 & MM2 - Instrument Datasheet for Pressure Gauge-IFD 0 29-May-15 29-May-15MM2-1305-PT-00-I-DS-00010-4MM1 & MM2 - Instrument Datasheet for Pressure Gauge-IFC 48 29-May-15 23-Jul-15MM2-1305-PT-00-I-DS-00011MM1 & MM2 - Instrument Datasheet for Temperature Gauge 111 13-Mar-15 23-Jul-15MM2-1305-PT-00-I-DS-00011-1MM1 & MM2 - Instrument Datasheet for Temperature Gauge-IDC 51 13-Mar-15* 14-May-15MM2-1305-PT-00-I-DS-00011-2MM1 & MM2 - Instrument Datasheet for Temperature Gauge-IFR 12 15-May-15 28-May-15MM2-1305-PT-00-I-DS-00011-3MM1 & MM2 - Instrument Datasheet for Temperature Gauge-IFD 0 29-May-15 29-May-15MM2-1305-PT-00-I-DS-00011-4MM1 & MM2 - Instrument Datasheet for Temperature Gauge-IFC 48 29-May-15 23-Jul-15MM2-1305-PT-00-I-DS-00012MM1 & MM2 - Instrument Datasheet for Restriction Orifice 123 13-Mar-15 06-Aug-15MM2-1305-PT-00-I-DS-00012-1MM1 & MM2 - Instrument Datasheet for Restriction Orifice-IDC 57 13-Mar-15* 21-May-15MM2-1305-PT-00-I-DS-00012-2MM1 & MM2 - Instrument Datasheet for Restriction Orifice-IFR 12 22-May-15 04-Jun-15MM2-1305-PT-00-I-DS-00012-3MM1 & MM2 - Instrument Datasheet for Restriction Orifice-IFD 0 05-Jun-15 05-Jun-15MM2-1305-PT-00-I-DS-00012-4MM1 & MM2 - Instrument Datasheet for Restriction Orifice-IFC 54 05-Jun-15 06-Aug-15MM2-1305-PT-00-I-DS-00013MM1 & MM2 - Instrument Datasheet for Orifice and Flanges 123 13-Mar-15 06-Aug-15MM2-1305-PT-00-I-DS-00013-1MM1 & MM2 - Instrument Datasheet for Orifice and Flanges-IDC 57 13-Mar-15* 21-May-15MM2-1305-PT-00-I-DS-00013-2MM1 & MM2 - Instrument Datasheet for Orifice and Flanges-IFR 12 22-May-15 04-Jun-15MM2-1305-PT-00-I-DS-00013-3MM1 & MM2 - Instrument Datasheet for Orifice and Flanges-IFD 0 05-Jun-15 05-Jun-15MM2-1305-PT-00-I-DS-00013-4MM1 & MM2 - Instrument Datasheet for Orifice and Flanges-IFC 54 05-Jun-15 06-Aug-15MM2-1305-PT-00-I-DS-00014MM1 & MM2 - Instrument Datasheet for Junction Box 116 20-Mar-15 05-Aug-15MM2-1305-PT-00-I-DS-00014-1MM1 & MM2 - Instrument Datasheet for Junction Box-IDC 53 20-Mar-15* 23-May-15MM2-1305-PT-00-I-DS-00014-2MM1 & MM2 - Instrument Datasheet for Junction Box-IFR 12 25-May-15 06-Jun-15MM2-1305-PT-00-I-DS-00014-3MM1 & MM2 - Instrument Datasheet for Junction Box-IFD 0 08-Jun-15 08-Jun-15MM2-1305-PT-00-I-DS-00014-4MM1 & MM2 - Instrument Datasheet for Junction Box-IFC 51 08-Jun-15 05-Aug-15MM2-1305-PT-00-I-LA-00015MM1 & MM2 - Instrument MTO for Tubing, Fitting and Valves 113 20-Mar-15 01-Aug-15MM2-1305-PT-00-I-LA-00015-1MM1 & MM2 - Instrument MTO for Tubing, Fitting and Valves-IDC 53 20-Mar-15* 23-May-15MM2-1305-PT-00-I-LA-00015-2MM1 & MM2 - Instrument MTO for Tubing, Fitting and Valves-IFR 12 25-May-15 06-Jun-15MM2-1305-PT-00-I-LA-00015-3MM1 & MM2 - Instrument MTO for Tubing, Fitting and Valves-IFD 0 08-Jun-15 08-Jun-15MM2-1305-PT-00-I-LA-00015-4MM1 & MM2 - Instrument MTO for Tubing, Fitting and Valves-IFC 48 08-Jun-15 01-Aug-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 62 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-00-I-LA-00016MM1 & MM2 - Instrument MTO for Instrument Steel Support 97 20-Mar-15 14-Jul-15MM2-1305-PT-00-I-LA-00016-1MM1 & MM2 - Instrument MTO for Instrument Steel Support-IDC 55 20-Mar-15* 26-May-15MM2-1305-PT-00-I-LA-00016-2MM1 & MM2 - Instrument MTO for Instrument Steel Support-IFR 12 27-May-15 09-Jun-15MM2-1305-PT-00-I-LA-00016-3MM1 & MM2 - Instrument MTO for Instrument Steel Support-IFD 0 10-Jun-15 10-Jun-15MM2-1305-PT-00-I-LA-00016-4MM1 & MM2 - Instrument MTO for Instrument Steel Support-IFC 30 10-Jun-15 14-Jul-15MM2-1305-PT-00-I-LA-00017MM1 & MM2 - Instrument MTO for Cable 67 12-May-15 28-Jul-15MM2-1305-PT-00-I-LA-00017-1MM1 & MM2 - Instrument MTO for Cable-IDC 14 12-May-15* 27-May-15MM2-1305-PT-00-I-LA-00017-2MM1 & MM2 - Instrument MTO for Cable-IFR 12 28-May-15 10-Jun-15MM2-1305-PT-00-I-LA-00017-3MM1 & MM2 - Instrument MTO for Cable-IFD 0 11-Jun-15 11-Jun-15MM2-1305-PT-00-I-LA-00017-4MM1 & MM2 - Instrument MTO for Cable-IFC 41 11-Jun-15 28-Jul-15MM2-1305-PT-00-I-LA-00018MM1 & MM2 - Instrument MTO for Cable Gland 84 13-May-15 18-Aug-15MM2-1305-PT-00-I-LA-00018-1MM1 & MM2 - Instrument MTO for Cable Gland-IDC 14 13-May-15* 28-May-15MM2-1305-PT-00-I-LA-00018-2MM1 & MM2 - Instrument MTO for Cable Gland-IFR 12 29-May-15 11-Jun-15MM2-1305-PT-00-I-LA-00018-3MM1 & MM2 - Instrument MTO for Cable Gland-IFD 0 12-Jun-15 12-Jun-15MM2-1305-PT-00-I-LA-00018-4MM1 & MM2 - Instrument MTO for Cable Gland-IFC 58 12-Jun-15 18-Aug-15MM2-1305-PT-00-I-LA-00019MM1 & MM2 - Instrument MTO for Miscellaneous Materials 76 11-Jun-15 08-Sep-15MM2-1305-PT-00-I-LA-00019-1MM1 & MM2 - Instrument MTO for Miscellaneous Materials-IDC 9 11-Jun-15* 20-Jun-15MM2-1305-PT-00-I-LA-00019-2MM1 & MM2 - Instrument MTO for Miscellaneous Materials-IFR 12 22-Jun-15 04-Jul-15MM2-1305-PT-00-I-LA-00019-3MM1 & MM2 - Instrument MTO for Miscellaneous Materials-IFD 0 06-Jul-15 06-Jul-15MM2-1305-PT-00-I-LA-00019-4MM1 & MM2 - Instrument MTO for Miscellaneous Materials-IFC 55 06-Jul-15 08-Sep-15MM2-1305-PT-00-I-LA-00020MM1 & MM2 - Instrument MTO for Cable Tray/ladder 60 01-Jun-15 08-Aug-15MM2-1305-PT-00-I-LA-00020-1MM1 & MM2 - Instrument MTO for Cable Tray/ladder-IDC 6 01-Jun-15* 06-Jun-15MM2-1305-PT-00-I-LA-00020-2MM1 & MM2 - Instrument MTO for Cable Tray/ladder-IFR 12 08-Jun-15 20-Jun-15MM2-1305-PT-00-I-LA-00020-3MM1 & MM2 - Instrument MTO for Cable Tray/ladder-IFD 0 22-Jun-15 22-Jun-15MM2-1305-PT-00-I-LA-00020-4MM1 & MM2 - Instrument MTO for Cable Tray/ladder-IFC 42 22-Jun-15 08-Aug-15MM2-14480 TR/MTO for ON-OFF Valve 1 11-Apr-15 11-Apr-15MM2-14500 TR/MTO for Choke Valve 1 16-Apr-15 16-Apr-15MM2-14520 TR/MTO for Motor Operated Valve 1 07-Apr-15 07-Apr-15MM2-14540 TR/MTO for Pig Signaller 1 18-May-15 18-May-15MM2-14560 TR/MTO for Tubing & Fitting 1 10-Jun-15 10-Jun-15MM2-14580 TR/MTO for Pressure Safety valves 1 27-Apr-15 27-Apr-15MM2-14600 TR/MTO for ElectronicTransmitter (PT/TT/LT/FT) 1 16-Jun-15 16-Jun-15MM2-14620 TR/MTO for Gauges (PG/TG/LG) 1 05-Jun-15 05-Jun-15MM2-14640 TR/MTO for Orifice Plate/Restriction Orifice 1 20-Jun-15 20-Jun-15MM2-14660 TR/MTO for H2S analyzer 1 29-Apr-15 29-Apr-15MM2-14680 TR/MTO for Junction Box 1 21-Jun-15 21-Jun-15MM2-14700 TR/MTO for E&I Cable 1 12-Jun-15 12-Jun-15MM2-14720 TR/MTO for E&I Cable Gland 1 02-Jul-15 02-Jul-15MM2-14740 TR/MTO for E&I Cable Tray & Ladder 1 10-Jun-15 10-Jun-15MM2-14760 TR/MTO for Lighting Fixtures 1 19-Jun-15 19-Jun-15MM2-14780 TR/MTO for E&I Steel Support 1 10-Jun-15 10-Jun-15MM2-14800 TR/MTO for E&I Miscellaneous (Earthing Bosses, Lug, cable tie, etc.) 1 19-Jul-15 19-Jul-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 63 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-14820 TR/MTO for Heat Tracing system 1 19-Jun-15 19-Jun-15MM2-14840 TR/MTO for MOV & Lighting distribution panel 1 19-Jun-15 19-Jun-15MM2-14860 Prepare / Submit/ Approve E&I Shop Drawings 116 27-Oct-15 16-Mar-16

0.D.26.0000.MM2.B.R Mechanical/ Material Handling0.D.26.0000.MM2.B.R Mechanical/ Material Handling 261 13-Mar-15 15-Jan-160.D.26.0000.MM2.B.R.92 PTSC0.D.26.0000.MM2.B.R.92 PTSC 261 13-Mar-15 15-Jan-16MM2-1305-PT-00-R-RA-00001MM1 & MM2 - Material Handling Study Report 44 27-Apr-15 19-Jun-15MM2-1305-PT-00-R-RA-00001-1MM1 & MM2 - Material Handling Study Report-IDC 7 27-Apr-15* 07-May-15MM2-1305-PT-00-R-RA-00001-2MM1 & MM2 - Material Handling Study Report-IFR 7 08-May-15 15-May-15MM2-1305-PT-00-R-RA-00001-3MM1 & MM2 - Material Handling Study Report-IFD 7 16-May-15 23-May-15MM2-1305-PT-00-R-RA-00001-4MM1 & MM2 - Material Handling Study Report-IFC 23 25-May-15 19-Jun-15MM2-1305-PT-00-R-LA-00002MM1 & MM2 - Equipment List 53 13-Mar-15 16-May-15MM2-1305-PT-00-R-LA-00002-1MM1 & MM2 - Equipment List-IDC 19 13-Mar-15* 03-Apr-15MM2-1305-PT-00-R-LA-00002-2MM1 & MM2 - Equipment List-IFR 7 04-Apr-15 11-Apr-15MM2-1305-PT-00-R-LA-00002-3MM1 & MM2 - Equipment List-IFD 7 13-Apr-15 20-Apr-15MM2-1305-PT-00-R-LA-00002-4MM1 & MM2 - Equipment List-IFC 20 21-Apr-15 16-May-15MM2-1305-PT-00-R-DS-00001MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL001 58 13-Mar-15 22-May-15MM2-1305-PT-00-R-DS-00001-1MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL001-IDC25 13-Mar-15* 10-Apr-15MM2-1305-PT-00-R-DS-00001-2MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL001-IFR6 11-Apr-15 17-Apr-15MM2-1305-PT-00-R-DS-00001-3MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL001-IFD7 18-Apr-15 25-Apr-15MM2-1305-PT-00-R-DS-00001-4MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL001-IFC20 27-Apr-15 22-May-15MM2-1305-PT-00-R-DS-00002MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL002 60 13-Mar-15 25-May-15MM2-1305-PT-00-R-DS-00002-1MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL002-IDC27 13-Mar-15* 13-Apr-15MM2-1305-PT-00-R-DS-00002-2MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL002-IFR6 14-Apr-15 20-Apr-15MM2-1305-PT-00-R-DS-00002-3MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL002-IFD7 21-Apr-15 29-Apr-15MM2-1305-PT-00-R-DS-00002-4MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL002-IFC20 02-May-15 25-May-15MM2-1305-PT-00-R-DS-00003MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL003 58 13-Mar-15 22-May-15MM2-1305-PT-00-R-DS-00003-1MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL003-IDC25 13-Mar-15* 10-Apr-15MM2-1305-PT-00-R-DS-00003-2MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL003-IFR6 11-Apr-15 17-Apr-15MM2-1305-PT-00-R-DS-00003-3MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL003-IFD7 18-Apr-15 25-Apr-15MM2-1305-PT-00-R-DS-00003-4MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL003-IFC20 27-Apr-15 22-May-15MM2-1305-PT-00-R-DS-00004MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL004 60 13-Mar-15 25-May-15MM2-1305-PT-00-R-DS-00004-1MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL004-IDC27 13-Mar-15* 13-Apr-15MM2-1305-PT-00-R-DS-00004-2MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL004-IFR6 14-Apr-15 20-Apr-15MM2-1305-PT-00-R-DS-00004-3MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL004-IFD7 21-Apr-15 29-Apr-15MM2-1305-PT-00-R-DS-00004-4MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL004-IFC20 02-May-15 25-May-15MM2-1305-PT-00-R-DS-00005MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL005 58 13-Mar-15 22-May-15MM2-1305-PT-00-R-DS-00005-1MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL005-IDC25 13-Mar-15* 10-Apr-15MM2-1305-PT-00-R-DS-00005-2MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL005-IFR6 11-Apr-15 17-Apr-15MM2-1305-PT-00-R-DS-00005-3MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL005-IFD7 18-Apr-15 25-Apr-15MM2-1305-PT-00-R-DS-00005-4MM1 & MM2 - Mechanical Datasheet Pig Launcher/receiver - 001900VL005-IFC20 27-Apr-15 22-May-15MM2-1305-PT-00-R-DS-00006MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL007 60 13-Mar-15 25-May-15MM2-1305-PT-00-R-DS-00006-1MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL007-IDC27 13-Mar-15* 13-Apr-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 64 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-00-R-DS-00006-2MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL007-IFR6 14-Apr-15 20-Apr-15MM2-1305-PT-00-R-DS-00006-3MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL007-IFD7 21-Apr-15 29-Apr-15MM2-1305-PT-00-R-DS-00006-4MM1 & MM2 - Mechanical Datasheet Pig launcher/receiver - 001900VL007-IFC20 02-May-15 25-May-15MM2-1305-PT-00-R-XD-00001MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL001 82 13-Mar-15 19-Jun-15MM2-1305-PT-00-R-XD-00001-1MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL001-IDC46 13-Mar-15* 08-May-15MM2-1305-PT-00-R-XD-00001-2MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL001-IFR6 09-May-15 15-May-15MM2-1305-PT-00-R-XD-00001-3MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL001-IFD0 16-May-15 16-May-15MM2-1305-PT-00-R-XD-00001-4MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL001-IFC30 16-May-15 19-Jun-15MM2-1305-PT-00-R-XD-00002MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL002 82 13-Mar-15 19-Jun-15MM2-1305-PT-00-R-XD-00002-1MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL002-IDC46 13-Mar-15* 08-May-15MM2-1305-PT-00-R-XD-00002-2MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL002-IFR6 09-May-15 15-May-15MM2-1305-PT-00-R-XD-00002-3MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL002-IFD0 16-May-15 16-May-15MM2-1305-PT-00-R-XD-00002-4MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL002-IFC30 16-May-15 19-Jun-15MM2-1305-PT-00-R-XD-00003MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL003 82 13-Mar-15 19-Jun-15MM2-1305-PT-00-R-XD-00003-1MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL003-IDC46 13-Mar-15* 08-May-15MM2-1305-PT-00-R-XD-00003-2MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL003-IFR6 09-May-15 15-May-15MM2-1305-PT-00-R-XD-00003-3MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL003-IFD0 16-May-15 16-May-15MM2-1305-PT-00-R-XD-00003-4MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL003-IFC30 16-May-15 19-Jun-15MM2-1305-PT-00-R-XD-00004MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL004 82 13-Mar-15 19-Jun-15MM2-1305-PT-00-R-XD-00004-1MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL004-IDC46 13-Mar-15* 08-May-15MM2-1305-PT-00-R-XD-00004-2MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL004-IFR6 09-May-15 15-May-15MM2-1305-PT-00-R-XD-00004-3MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL004-IFD0 16-May-15 16-May-15MM2-1305-PT-00-R-XD-00004-4MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL004-IFC30 16-May-15 19-Jun-15MM2-1305-PT-00-R-XD-00005MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL005 82 13-Mar-15 19-Jun-15MM2-1305-PT-00-R-XD-00005-1MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL005-IDC46 13-Mar-15* 08-May-15MM2-1305-PT-00-R-XD-00005-2MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL005-IFR6 09-May-15 15-May-15MM2-1305-PT-00-R-XD-00005-3MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL005-IFD0 16-May-15 16-May-15MM2-1305-PT-00-R-XD-00005-4MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL005-IFC30 16-May-15 19-Jun-15MM2-1305-PT-00-R-XD-00006MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL007 82 13-Mar-15 19-Jun-15MM2-1305-PT-00-R-XD-00006-1MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL007-IDC46 13-Mar-15* 08-May-15MM2-1305-PT-00-R-XD-00006-2MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL007-IFR6 09-May-15 15-May-15MM2-1305-PT-00-R-XD-00006-3MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL007-IFD0 16-May-15 16-May-15MM2-1305-PT-00-R-XD-00006-4MM1 & MM2 - General drawing for Pig Launchers/Receivers - 001900VL007-IFC30 16-May-15 19-Jun-15MM2-1305-PT-00-R-XS-00001MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL001 71 03-Apr-15 27-Jun-15MM2-1305-PT-00-R-XS-00001-1MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL001-IDC34 03-Apr-15* 15-May-15MM2-1305-PT-00-R-XS-00001-2MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL001-IFR7 16-May-15 23-May-15MM2-1305-PT-00-R-XS-00001-3MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL001-IFD0 25-May-15 25-May-15MM2-1305-PT-00-R-XS-00001-4MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL001-IFC30 25-May-15 27-Jun-15MM2-1305-PT-00-R-XS-00002MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL002 71 03-Apr-15 27-Jun-15MM2-1305-PT-00-R-XS-00002-1MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL002-IDC34 03-Apr-15* 15-May-15MM2-1305-PT-00-R-XS-00002-2MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL002-IFR7 16-May-15 23-May-15MM2-1305-PT-00-R-XS-00002-3MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL002-IFD0 25-May-15 25-May-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 65 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-00-R-XS-00002-4MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL002-IFC30 25-May-15 27-Jun-15MM2-1305-PT-00-R-XS-00003MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL003 71 03-Apr-15 27-Jun-15MM2-1305-PT-00-R-XS-00003-1MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL003-IDC34 03-Apr-15* 15-May-15MM2-1305-PT-00-R-XS-00003-2MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL003-IFR7 16-May-15 23-May-15MM2-1305-PT-00-R-XS-00003-3MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL003-IFD0 25-May-15 25-May-15MM2-1305-PT-00-R-XS-00003-4MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL003-IFC30 25-May-15 27-Jun-15MM2-1305-PT-00-R-XS-00004MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL004 71 03-Apr-15 27-Jun-15MM2-1305-PT-00-R-XS-00004-1MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL004-IDC34 03-Apr-15* 15-May-15MM2-1305-PT-00-R-XS-00004-2MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL004-IFR7 16-May-15 23-May-15MM2-1305-PT-00-R-XS-00004-3MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL004-IFD0 25-May-15 25-May-15MM2-1305-PT-00-R-XS-00004-4MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL004-IFC30 25-May-15 27-Jun-15MM2-1305-PT-00-R-XS-00005MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL005 71 03-Apr-15 27-Jun-15MM2-1305-PT-00-R-XS-00005-1MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL005-IDC34 03-Apr-15* 15-May-15MM2-1305-PT-00-R-XS-00005-2MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL005-IFR7 16-May-15 23-May-15MM2-1305-PT-00-R-XS-00005-3MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL005-IFD0 25-May-15 25-May-15MM2-1305-PT-00-R-XS-00005-4MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL005-IFC30 25-May-15 27-Jun-15MM2-1305-PT-00-R-XS-00006MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL007 71 03-Apr-15 27-Jun-15MM2-1305-PT-00-R-XS-00006-1MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL007-IDC34 03-Apr-15* 15-May-15MM2-1305-PT-00-R-XS-00006-2MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL007-IFR7 16-May-15 23-May-15MM2-1305-PT-00-R-XS-00006-3MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL007-IFD0 25-May-15 25-May-15MM2-1305-PT-00-R-XS-00006-4MM1 & MM2 - Detail drawing for Pig Launchers/Receivers - 001900VL007-IFC30 25-May-15 27-Jun-15MM2-1305-PT-00-R-CA-00001MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL00159 20-Mar-15 30-May-15MM2-1305-PT-00-R-CA-00001-1MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL001-IDC25 20-Mar-15* 17-Apr-15MM2-1305-PT-00-R-CA-00001-2MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL001-IFR7 18-Apr-15 25-Apr-15MM2-1305-PT-00-R-CA-00001-3MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL001-IFD0 27-Apr-15 27-Apr-15MM2-1305-PT-00-R-CA-00001-4MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL001-IFC27 27-Apr-15 30-May-15MM2-1305-PT-00-R-CA-00002MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL00259 20-Mar-15 30-May-15MM2-1305-PT-00-R-CA-00002-1MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL002-IDC25 20-Mar-15* 17-Apr-15MM2-1305-PT-00-R-CA-00002-2MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL002-IFR7 18-Apr-15 25-Apr-15MM2-1305-PT-00-R-CA-00002-3MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL002-IFD0 27-Apr-15 27-Apr-15MM2-1305-PT-00-R-CA-00002-4MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL002-IFC27 27-Apr-15 30-May-15MM2-1305-PT-00-R-CA-00003MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL00359 20-Mar-15 30-May-15MM2-1305-PT-00-R-CA-00003-1MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL003-IDC25 20-Mar-15* 17-Apr-15MM2-1305-PT-00-R-CA-00003-2MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL003-IFR7 18-Apr-15 25-Apr-15MM2-1305-PT-00-R-CA-00003-3MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL003-IFD0 27-Apr-15 27-Apr-15MM2-1305-PT-00-R-CA-00003-4MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL003-IFC27 27-Apr-15 30-May-15MM2-1305-PT-00-R-CA-00004MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL00459 20-Mar-15 30-May-15MM2-1305-PT-00-R-CA-00004-1MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL004-IDC25 20-Mar-15* 17-Apr-15MM2-1305-PT-00-R-CA-00004-2MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL004-IFR7 18-Apr-15 25-Apr-15MM2-1305-PT-00-R-CA-00004-3MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL004-IFD0 27-Apr-15 27-Apr-15MM2-1305-PT-00-R-CA-00004-4MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL004-IFC27 27-Apr-15 30-May-15MM2-1305-PT-00-R-CA-00005MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL00559 20-Mar-15 30-May-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 66 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-1305-PT-00-R-CA-00005-1MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL005-IDC25 20-Mar-15* 17-Apr-15MM2-1305-PT-00-R-CA-00005-2MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL005-IFR7 18-Apr-15 25-Apr-15MM2-1305-PT-00-R-CA-00005-3MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL005-IFD0 27-Apr-15 27-Apr-15MM2-1305-PT-00-R-CA-00005-4MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL005-IFC27 27-Apr-15 30-May-15MM2-1305-PT-00-R-CA-00006MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL00759 20-Mar-15 30-May-15MM2-1305-PT-00-R-CA-00006-1MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL007-IDC25 20-Mar-15* 17-Apr-15MM2-1305-PT-00-R-CA-00006-2MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL007-IFR7 18-Apr-15 25-Apr-15MM2-1305-PT-00-R-CA-00006-3MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL007-IFD0 27-Apr-15 27-Apr-15MM2-1305-PT-00-R-CA-00006-4MM1 & MM2 - Mechanical Calculation for Pig Lauchers/Receivers - 001900VL007-IFC27 27-Apr-15 30-May-15MM2-14440 TR/MTO for Pig Receivers (Q.O.C) 1 07-May-15 07-May-15MM2-14460 Prepare / Submit/ Approve Mechanical Shop Drawings 84 09-Oct-15 15-Jan-16

0.D.26.0000.MM2.C Procurement0.D.26.0000.MM2.C Procurement 314 08-Apr-15 15-Feb-160.D.26.0000.MM2.C.N Structural0.D.26.0000.MM2.C.N Structural 293 08-Apr-15 25-Jan-160.D.26.0000.MM2.C.N.92 PTSC0.D.26.0000.MM2.C.N.92 PTSC 293 08-Apr-15 25-Jan-16MM2-11180 RFQ/TBE/CBE/PO for Primary & Secondary Steel 39 08-Apr-15 16-May-15MM2-11440 Delivery for Primary & Secondary Steel 119 17-May-15 12-Sep-15MM2-11720 RFQ/TBE/CBE/PO for Tertiary Steel 35 10-Jun-15 14-Jul-15MM2-11960 Delivery for Tertiary Steel 91 15-Jul-15 13-Oct-15MM2-12180 RFQ/TBE/CBE/PO for Structural Miscellaneous 37 29-Jul-15 03-Sep-15MM2-12400 Delivery for Structural Miscellaneous 77 04-Sep-15 19-Nov-15MM2-12540 RFQ/TBE/CBE/PO for Gratings 37 10-Aug-15 15-Sep-15MM2-12640 Delivery for Gratings 91 16-Sep-15 15-Dec-15MM2-12720 RFQ/TBE/CBE/PO for SF and Grillage Material 37 11-Oct-15 16-Nov-15MM2-12800 Delivery for SF and Grillage Material 70 17-Nov-15 25-Jan-16

0.D.26.0000.MM2.C.L Piping0.D.26.0000.MM2.C.L Piping 311 11-Apr-15 15-Feb-160.D.26.0000.MM2.C.L.92 PTSC0.D.26.0000.MM2.C.L.92 PTSC 311 11-Apr-15 15-Feb-16MM2-10700 RFQ/TBE/CBE/PO for Piping Bulk 46 11-Apr-15 26-May-15MM2-10940 Delivery for Piping Bulk 127 27-May-15 30-Sep-15MM2-11200 RFQ/TBE/CBE/PO for Manual valves 58 30-Apr-15 26-Jun-15MM2-11460 Delivery for Manual valves 182 27-Jun-15 25-Dec-15MM2-11740 RFQ/TBE/CBE/PO for Barred Tee 47 29-Apr-15 14-Jun-15MM2-11980 Delivery for Barred Tee 176 15-Jun-15 07-Dec-15MM2-12200 RFQ/TBE/CBE/PO for Cuni fittings 53 09-May-15 30-Jun-15MM2-12420 Delivery for Cuni fittings 108 01-Jul-15 16-Oct-15MM2-12560 RFQ/TBE/CBE/PO for Corrosion, sand probe, sample connection, chemical connection… I41 19-May-15 28-Jun-15MM2-12660 Delivery for Corrosion, sand probe, sample connection, chemical connection131 29-Jun-15 06-Nov-15MM2-12740 RFQ/TBE/CBE/PO for 3D Bend (free bare pipe to bending contractor) 48 31-May-15 17-Jul-15MM2-12820 Delivery for 3D Bend (free bare pipe to bending contractor) 213 18-Jul-15 15-Feb-16MM2-12860 RFQ/TBE/CBE/PO for Pipe Supports 39 07-Jun-15 15-Jul-15MM2-12920 Delivery for Pipe Supports 85 16-Jul-15 08-Oct-15MM2-12960 RFQ/TBE/CBE/PO for Quick Coupling 52 10-Jul-15 30-Aug-15MM2-12980 Delivery for Quick Coupling 98 31-Aug-15 06-Dec-15MM2-13040 RFQ/TBE/CBE/PO for Piping insulation 55 05-Jul-15 28-Aug-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 67 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-13080 Delivery for Piping insulation 99 29-Aug-15 05-Dec-15MM2-13100 RFQ/TBE/CBE/PO for Bolt nut, gasket and other 53 07-Jul-15 28-Aug-15MM2-13160 Delivery for Bolt nut, gasket and other 71 29-Aug-15 07-Nov-15MM2-13200 RFQ/TBE/CBE/PO for Valve Inter-locks 56 17-Sep-15 11-Nov-15MM2-13240 Delivery for Valve Inter-locks 70 12-Nov-15 20-Jan-16

0.D.26.0000.MM2.C.R Mechanical/ Material Handling0.D.26.0000.MM2.C.R Mechanical/ Material Handling 251 08-May-15 13-Jan-160.D.26.0000.MM2.C.R.91 Yinson0.D.26.0000.MM2.C.R.91 Yinson 5 08-Jan-16 13-Jan-16MM2-11780 ROS for Material Handling Equipment 0 08-Jan-16MM2-12020 ROS for Safety equipment 0 13-Jan-16

0.D.26.0000.MM2.C.R.92 PTSC0.D.26.0000.MM2.C.R.92 PTSC 197 08-May-15 20-Nov-15MM2-11000 RFQ/TBE/CBE/PO for Pig Receivers (Q.O.C) 48 08-May-15 24-Jun-15MM2-11240 Delivery Pig Receivers (Q.O.C) 149 25-Jun-15 20-Nov-15

0.D.26.0000.MM2.C.1 E&I0.D.26.0000.MM2.C.1 E&I 296 08-Apr-15 28-Jan-160.D.26.0000.MM2.C.1.91 Yinson0.D.26.0000.MM2.C.1.91 Yinson 0 04-Jan-16 04-Jan-16MM2-10980 ROS for ICSS RIO panels 0 04-Jan-16MM2-11220 ROS for F&G detectors 0 04-Jan-16MM2-11500 ROS for PA Systems 0 04-Jan-16

0.D.26.0000.MM2.C.1.92 PTSC0.D.26.0000.MM2.C.1.92 PTSC 296 08-Apr-15 28-Jan-16MM2-10960 RFQ/TBE/CBE/PO for Motor Operated Valve 58 08-Apr-15 04-Jun-15MM2-11480 Delivery for Motor Operated Valve 238 05-Jun-15 28-Jan-16MM2-11760 RFQ/TBE/CBE/PO for ON-OFF Valve 61 12-Apr-15 11-Jun-15MM2-12000 Delivery for ON-OFF Valve 231 12-Jun-15 28-Jan-16MM2-12220 RFQ/TBE/CBE/PO for H2S analyzer 52 30-Apr-15 20-Jun-15MM2-12440 Delivery for H2S analyzer 189 21-Jun-15 26-Dec-15MM2-13220 RFQ/TBE/CBE/PO for Lighting Fixtures 48 20-Jun-15 06-Aug-15MM2-13260 Delivery for Lighting Fixtures 133 07-Aug-15 17-Dec-15MM2-13320 RFQ/TBE/CBE/PO for Pressure Safety valves 59 28-Apr-15 25-Jun-15MM2-13360 Delivery for Pressure Safety valves 217 26-Jun-15 28-Jan-16MM2-13400 RFQ/TBE/CBE/PO for E&I Cable Tray & Ladder 48 11-Jun-15 28-Jul-15MM2-13440 Delivery for E&I Cable Tray & Ladder 106 29-Jul-15 11-Nov-15MM2-13480 RFQ/TBE/CBE/PO for Choke Valve 58 17-Apr-15 13-Jun-15MM2-13520 Delivery for Choke Valve 229 14-Jun-15 28-Jan-16MM2-13560 RFQ/TBE/CBE/PO for Junction Box 59 22-Jun-15 19-Aug-15MM2-13600 Delivery for Junction Box 105 20-Aug-15 02-Dec-15MM2-13620 RFQ/TBE/CBE/PO for Pig Signaller 53 19-May-15 10-Jul-15MM2-13680 Delivery for Pig Signaller 167 11-Jul-15 24-Dec-15MM2-13700 RFQ/TBE/CBE/PO for E&I Steel Support 35 11-Jun-15 15-Jul-15MM2-13720 Delivery for E&I Steel Support 77 16-Jul-15 30-Sep-15MM2-13740 RFQ/TBE/CBE/PO for ElectronicTransmitter (PT/TT/LT/FT) 48 17-Jun-15 03-Aug-15MM2-13760 Delivery for ElectronicTransmitter (PT/TT/LT/FT) 147 04-Aug-15 28-Dec-15MM2-13780 RFQ/TBE/CBE/PO for E&I Cable 62 13-Jun-15 13-Aug-15MM2-13800 Delivery for E&I Cable 111 14-Aug-15 02-Dec-15MM2-13820 RFQ/TBE/CBE/PO for Gauges (PG/TG/LG) 41 06-Jun-15 16-Jul-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

ROS for Material Handling EquipmentROS for Safety equipment

ROS for ICSS RIO panelsROS for F&G detectorsROS for PA Systems

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 68 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-13840 Delivery for Gauges (PG/TG/LG) 161 17-Jul-15 24-Dec-15MM2-13860 RFQ/TBE/CBE/PO for E&I Cable Gland 48 03-Jul-15 19-Aug-15MM2-13880 Delivery for E&I Cable Gland 105 20-Aug-15 02-Dec-15MM2-13900 RFQ/TBE/CBE/PO for E&I Miscellaneous (Earthing Bosses, Lug, cable tie, etc.)52 20-Jul-15 09-Sep-15MM2-13920 Delivery for E&I Miscellaneous (Earthing Bosses, Lug, cable tie, etc.) 84 10-Sep-15 02-Dec-15MM2-13940 RFQ/TBE/CBE/PO for MOV & Lighting distribution panel 48 20-Jun-15 06-Aug-15MM2-13960 Delivery for MOV & Lighting distribution panel 126 07-Aug-15 10-Dec-15MM2-13980 RFQ/TBE/CBE/PO for Orifice Plate/Restriction Orifice 47 21-Jun-15 06-Aug-15MM2-14000 Delivery for Orifice Plate/Restriction Orifice 140 07-Aug-15 24-Dec-15MM2-14020 RFQ/TBE/CBE/PO for Tubing & Fitting 39 11-Jun-15 19-Jul-15MM2-14040 Delivery for Tubing & Fitting 140 20-Jul-15 06-Dec-15MM2-14060 RFQ/TBE/CBE/PO for Heat Tracing system 48 20-Jun-15 06-Aug-15MM2-14080 Delivery for Heat Tracing system 126 07-Aug-15 10-Dec-15

0.D.26.0000.MM2.D Construction0.D.26.0000.MM2.D Construction 194 18-Aug-15 01-Apr-160.D.26.0000.MM2.D.N Structural0.D.26.0000.MM2.D.N Structural 182 18-Aug-15 24-Mar-160.D.26.0000.MM2.D.N.20 Blasting & Painting0.D.26.0000.MM2.D.N.20 Blasting & Painting 154 21-Sep-15 24-Mar-16MM2-10880 Blast, primer, tie coat for primary beam of Main Deck 10 21-Sep-15 01-Oct-15MM2-12880 Blast, primer, tie coat for primary beam of Mezz deck 10 26-Sep-15 07-Oct-15MM2-12900 Blast, primer, tie coat for secondary beam of main deck 10 08-Oct-15 19-Oct-15MM2-12940 Blast, primer, tie coat for primary beam of upper deck 10 10-Oct-15 21-Oct-15MM2-13000 Blast, primer, tie coat for secondary beam of Mezz deck 10 13-Oct-15 23-Oct-15MM2-13020 Blast, primer, tie coat for deck plate of main deck 10 17-Oct-15 28-Oct-15MM2-13060 Blast, primer, tie coat for secondary beam of upper deck 10 17-Oct-15 28-Oct-15MM2-13120 Blast, primer, tie coat for deck plate of Mezz deck 10 22-Oct-15 02-Nov-15MM2-13140 Blast, primer, tie coat for Legs and Braces for MD & Mezz Deck 14 26-Oct-15 10-Nov-15MM2-13180 Blast, primer, tie coat for deck plate of upper deck 10 04-Nov-15 14-Nov-15MM2-13280 Third coat for Mezz deck 10 20-Nov-15 01-Dec-15MM2-13300 Third coat for main deck 10 21-Nov-15 02-Dec-15MM2-13340 Third coat for upper deck 10 09-Dec-15 19-Dec-15MM2-13380 Sweep blast and painting for handrail 10 16-Dec-15 26-Dec-15MM2-13420 Blast to galvanizing hand rail 14 28-Dec-15 13-Jan-16MM2-13460 Touch up for column and bracing 14 18-Jan-16 02-Feb-16MM2-13500 Touch up for deck plate 14 03-Feb-16 24-Feb-16MM2-13540 Final and touch up for main deck 14 02-Mar-16 17-Mar-16MM2-13580 Final and touch up painting for upper deck 14 02-Mar-16 17-Mar-16MM2-13640 Final and touch up painting for Mezz deck 14 02-Mar-16 17-Mar-16MM2-13660 Cleaning and hand over MM2 14 09-Mar-16 24-Mar-16

0.D.26.0000.MM2.D.N.05 Pre-Fabrication0.D.26.0000.MM2.D.N.05 Pre-Fabrication 30 18-Aug-15 22-Sep-15MM2-10820 Pre-fab & Assembly for LOSF 30 18-Aug-15 22-Sep-15

0.D.26.0000.MM2.D.N.10 Fabrication0.D.26.0000.MM2.D.N.10 Fabrication 134 17-Sep-15 26-Feb-160.D.26.0000.MM2.D.N.10.1 Main Deck0.D.26.0000.MM2.D.N.10.1 Main Deck 122 17-Sep-15 12-Feb-16MM2-10840 Cut & prep Main Deck Primary Beams 10 17-Sep-15 28-Sep-15MM2-11120 Fab Main Deck nodes & Joints 10 17-Sep-15 28-Sep-15

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 69 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-11360 Cut & prep Main Deck Secondary Beams & Stiffeners 10 05-Oct-15 15-Oct-15MM2-11640 Fab Main Deck Plates 10 14-Oct-15 24-Oct-15MM2-11900 Fab column and bracing 14 17-Oct-15 02-Nov-15MM2-12160 Fab Handrail, landing & Sockets... 60 28-Nov-15 12-Feb-16

0.D.26.0000.MM2.D.N.10.2 Mezz Deck0.D.26.0000.MM2.D.N.10.2 Mezz Deck 126 21-Sep-15 20-Feb-16MM2-11040 Cut & prep Mezz Deck Primary Beams 10 21-Sep-15 01-Oct-15MM2-11280 Fab Mezz Deck nodes & Joints 10 21-Sep-15 01-Oct-15MM2-11540 Cut & prep Mezz Deck Secondary Beams & Stiffeners 10 05-Oct-15 15-Oct-15MM2-11820 Fab column and bracing 14 17-Oct-15 02-Nov-15MM2-12060 Fab Mezz Deck Plates 10 19-Oct-15 29-Oct-15MM2-12280 Fab Handrail, landing & Sockets... 60 07-Dec-15 20-Feb-16

0.D.26.0000.MM2.D.N.10.3 Upper Deck0.D.26.0000.MM2.D.N.10.3 Upper Deck 120 03-Oct-15 26-Feb-16MM2-10860 Cut & prep Upper Deck Primary Beams 10 03-Oct-15 14-Oct-15MM2-11380 Fab Upper Deck nodes & Joints 10 03-Oct-15 14-Oct-15MM2-11660 Cut & prep Upper Deck Secondary Beams & Stiffeners 10 09-Oct-15 20-Oct-15MM2-11920 Fab Upper Deck Plates 14 26-Oct-15 10-Nov-15MM2-12320 Fab Handrail, landing & Sockets... 60 12-Dec-15 26-Feb-16

0.D.26.0000.MM2.D.N.25 Installation0.D.26.0000.MM2.D.N.25 Installation 137 24-Sep-15 08-Mar-160.D.26.0000.MM2.D.N.25.1 Main Deck0.D.26.0000.MM2.D.N.25.1 Main Deck 133 24-Sep-15 03-Mar-16MM2-10920 Assembly Main Deck Primary Beams & Deck nodes above LOSF 30 24-Sep-15 28-Oct-15MM2-11160 Assembly Main Deck Secondary Beams & Stiffemers above LOSF 14 17-Oct-15 02-Nov-15MM2-11420 Installation Main Deck Plate 16 03-Nov-15 20-Nov-15MM2-11700 Installation Columns onto Main Deck (for Mezz Deck) 10 10-Nov-15 20-Nov-15MM2-11940 Installation Bracings onto Main Deck 24 11-Dec-15 08-Jan-16MM2-12480 Installation Remaining Legs onto Main Deck 8 12-Dec-15 21-Dec-15MM2-12520 Installation Handrail, landing & Sockets, Gratings... 50 30-Dec-15 03-Mar-16MM2-12620 Weighting for MM2 1 24-Feb-16 24-Feb-16

0.D.26.0000.MM2.D.N.25.2 Mezz Deck0.D.26.0000.MM2.D.N.25.2 Mezz Deck 127 01-Oct-15 03-Mar-16MM2-11060 Assembly Mezz Deck Primary Beams & Deck nodes 21 01-Oct-15 24-Oct-15MM2-11300 Assembly Mezz Deck Secondary Beams & Stiffemers 14 21-Oct-15 05-Nov-15MM2-11560 Installation Mezz Deck Plate 12 06-Nov-15 19-Nov-15MM2-11840 Install Mezz Deck onto Main Deck 6 03-Dec-15 09-Dec-15MM2-12080 Installation Columns onto Mezz Deck 8 12-Dec-15 21-Dec-15MM2-12300 Installation Bracings onto Mezz Deck 10 31-Dec-15 12-Jan-16MM2-12460 Installation Handrail, landing & Sockets, Gratings... 45 06-Jan-16 03-Mar-16

0.D.26.0000.MM2.D.N.25.3 Upper Deck0.D.26.0000.MM2.D.N.25.3 Upper Deck 117 17-Oct-15 08-Mar-16MM2-10900 Assembly Upper Deck Primary Beams & Deck nodes 30 17-Oct-15 20-Nov-15MM2-11140 Assembly Upper Deck Secondary Beams & Stiffemers 14 04-Nov-15 19-Nov-15MM2-11400 Installation Upper Deck Plate 16 20-Nov-15 08-Dec-15MM2-11680 Install Upper Deck onto Main Deck & Mezz Deck 6 22-Dec-15 28-Dec-15MM2-12340 Installation Handrail, landing & Sockets, Gratings... 50 05-Jan-16 08-Mar-16

0.D.26.0000.MM2.D.R Mechanical/ Material Handling0.D.26.0000.MM2.D.R Mechanical/ Material Handling 112 26-Oct-15 10-Mar-160.D.26.0000.MM2.D.R.20 Blasting & Painting Equipment support0.D.26.0000.MM2.D.R.20 Blasting & Painting Equipment support 93 17-Nov-15 10-Mar-16

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 70 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

MM2-10800 Blast, primer for equipment support 21 17-Nov-15 10-Dec-15MM2-11620 Touch up for equipment support and final coat 14 24-Feb-16 10-Mar-16

0.D.26.0000.MM2.D.R.25 Installation0.D.26.0000.MM2.D.R.25 Installation 40 26-Oct-15 10-Dec-15MM2-10780 Fabrication and installation euipment support 40 26-Oct-15 10-Dec-15

0.D.26.0000.MM2.D.R.80 Equipment Securing0.D.26.0000.MM2.D.R.80 Equipment Securing 74 07-Dec-15 08-Mar-16MM2-10120 Installation ROP1 - Oil Production Pig Launcher / Receiver 4 07-Dec-15 10-Dec-15MM2-10420 Installation ROP2 - Oil Production Pig Launcher / Receiver 4 07-Dec-15 10-Dec-15MM2-10540 Installation safty sign and safety equipment 25 03-Feb-16 08-Mar-16

0.D.26.0000.MM2.D.L Piping0.D.26.0000.MM2.D.L Piping 135 05-Oct-15 16-Mar-160.D.26.0000.MM2.D.L.20 Blasting & Painting0.D.26.0000.MM2.D.L.20 Blasting & Painting 126 15-Oct-15 16-Mar-16MM2-12100 Blast & Paint for piping spool, SS 60 19-Oct-15 26-Dec-15MM2-12360 Blast & Paint for piping spool, Duplex SS & Cladding 60 15-Oct-15 23-Dec-15MM2-12500 Blast & Paint for Pipe support 55 24-Oct-15 26-Dec-15MM2-12580 Blast & Paint for piping spool CS 90 30-Oct-15 18-Feb-16MM2-12680 Touch up painting for piping 50 13-Jan-16 16-Mar-16MM2-12760 Touch up for piping support 14 12-Feb-16 27-Feb-16MM2-12840 Touch up painting for valve 14 16-Feb-16 02-Mar-16

0.D.26.0000.MM2.D.L.10 Fabrication0.D.26.0000.MM2.D.L.10 Fabrication 107 05-Oct-15 12-Feb-16MM2-10720 Fabrication Carbon steel piping spool work 107 05-Oct-15 12-Feb-16MM2-11100 Fabrication Stainless steel piping spool work 60 13-Oct-15 21-Dec-15MM2-11320 Fabrication Duplex SS & Cladding piping spool work 60 07-Oct-15 15-Dec-15MM2-11580 Fabrication Pipe support 60 14-Oct-15 22-Dec-15MM2-11860 Fabrication CUNI piping spool work 35 26-Oct-15 04-Dec-15

0.D.26.0000.MM2.D.L.25 Installation0.D.26.0000.MM2.D.L.25 Installation 84 11-Nov-15 23-Feb-16MM2-10740 Pipe support installation 60 11-Nov-15 20-Jan-16MM2-11340 Installation Carbon steel piping spool work 56 25-Nov-15 29-Jan-16MM2-11600 Installation Stainless steel piping spool work 55 26-Nov-15 29-Jan-16MM2-11880 Installation Duplex SS & Cladding piping spool work 55 26-Nov-15 29-Jan-16MM2-12120 Installation Manual valve 30 02-Jan-16 05-Feb-16MM2-12380 Installation CUNI piping spool work 22 05-Jan-16 29-Jan-16MM2-12600 Installation MOV valve 15 30-Jan-16 22-Feb-16MM2-12700 Installation Choke valve 15 30-Jan-16 22-Feb-16MM2-12780 Installation On-off valve 15 01-Feb-16 23-Feb-16

0.D.26.0000.MM2.D.L.40 Testing0.D.26.0000.MM2.D.L.40 Testing 42 31-Dec-15 24-Feb-16MM2-10220 Flushing and hydro test 30 31-Dec-15 04-Feb-16MM2-10300 Flangemanagement & reinstatement 37 07-Jan-16 24-Feb-16

0.D.26.0000.MM2.D.1 E&I0.D.26.0000.MM2.D.1 E&I 101 13-Nov-15 16-Mar-160.D.26.0000.MM2.D.1.20 Blasting & Painting0.D.26.0000.MM2.D.1.20 Blasting & Painting 88 28-Nov-15 16-Mar-16MM2-10760 Blast & Paint E&I support 40 28-Nov-15 14-Jan-16MM2-12140 Touch up for E&I support 14 01-Mar-16 16-Mar-16

0.D.26.0000.MM2.D.1.10 Fabrication0.D.26.0000.MM2.D.1.10 Fabrication 50 13-Nov-15 11-Jan-16MM2-10100 Fabrication Electrical Support 50 13-Nov-15 11-Jan-16MM2-10280 Fabrication Instrument Support 50 13-Nov-15 11-Jan-16

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 71 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3

Activity ID Activity Name OriginalDuration

Start Finish

0.D.26.0000.MM2.D.1.25 Installation0.D.26.0000.MM2.D.1.25 Installation 70 10-Dec-15 07-Mar-16MM2-10060 Installation Electrical Support 48 10-Dec-15 04-Feb-16MM2-10400 Installation of Instrument Support 41 18-Dec-15 04-Feb-16MM2-10520 Installation Electrical cable Ladder/Tray 35 26-Dec-15 05-Feb-16MM2-10580 Installation Instrument cable and Tubing Ladder/Tray 35 29-Dec-15 13-Feb-16MM2-10620 Installation Instrument equipments 30 27-Jan-16 07-Mar-16MM2-10660 Installation Electrical Equipments 30 26-Jan-16 05-Mar-16MM2-10680 Installation Tubing 28 29-Jan-16 07-Mar-16MM2-11080 Install Heat tracing 25 25-Jan-16 27-Feb-16

0.D.26.0000.MM2.D.1.40 Testing0.D.26.0000.MM2.D.1.40 Testing 48 11-Dec-15 05-Feb-16MM2-10080 Testing Electrical Cable 40 11-Dec-15 27-Jan-16MM2-10260 Testing Instrument Cable 40 11-Dec-15 27-Jan-16MM2-10320 Calibration of instrument equipments 25 28-Dec-15 26-Jan-16MM2-10480 Function test/ Leak test (Choke Valve, On-off Valve) 7 29-Jan-16 05-Feb-16

0.D.26.0000.MM2.D.1.30 Cabling & Termination0.D.26.0000.MM2.D.1.30 Cabling & Termination 55 06-Jan-16 15-Mar-16MM2-10040 Pulling Electrical Cable 35 06-Jan-16 20-Feb-16MM2-10240 Pulling Instrument Cable 30 13-Jan-16 22-Feb-16MM2-10380 Glanding and Termination Electrical 35 28-Jan-16 14-Mar-16MM2-10500 Glanding and Termination Instrument 32 02-Feb-16 15-Mar-16

0.D.26.0000.MM2.D.4 Insulation0.D.26.0000.MM2.D.4 Insulation 35 01-Feb-16 17-Mar-160.D.26.0000.MM2.D.4.25 Installation0.D.26.0000.MM2.D.4.25 Installation 35 01-Feb-16 17-Mar-16MM2-10160 Insulation for Mechanical equipment & Piping 35 01-Feb-16 17-Mar-16

0.D.26.0000.MM2.D.5 Mechanical Completion ("A" Scope)0.D.26.0000.MM2.D.5 Mechanical Completion ("A" Scope) 48 23-Jan-16 24-Mar-160.D.26.0000.MM2.D.5.60 Finishing0.D.26.0000.MM2.D.5.60 Finishing 43 23-Jan-16 18-Mar-16MM2-10140 ITR checksheet for Piping 40 23-Jan-16 15-Mar-16MM2-10340 ITR checksheet for Instrument 30 13-Feb-16 18-Mar-16MM2-10440 ITR checksheet for Electrical 30 12-Feb-16 17-Mar-16

0.D.26.0000.MM2.D.5.70 Pre-commissioning0.D.26.0000.MM2.D.5.70 Pre-commissioning 33 16-Feb-16 24-Mar-16MM2-10360 Pre-com for Modules MM1 ( Leak Test, Heatracing...) 33 16-Feb-16 24-Mar-16MM2-10460 Disciplines Acceptance Certificate (DAC) 20 27-Feb-16 21-Mar-16MM2-10560 Loop Test from Instrument devices to RIO panels 16 04-Mar-16 22-Mar-16MM2-10600 Full power up of the module lighting 4 24-Feb-16 27-Feb-16MM2-10640 Mechanical & Pre-com Completion date for MM2 0 24-Mar-16

0.D.26.0000.MM2.D.6 Finishing/ Load-Out0.D.26.0000.MM2.D.6 Finishing/ Load-Out 33 24-Feb-16 01-Apr-160.D.26.0000.MM2.D.6.1 Load-Out0.D.26.0000.MM2.D.6.1 Load-Out 33 24-Feb-16 01-Apr-16MM2-10000 Fab Seafastening & Install Grillage on Barge for MM2 20 24-Feb-16 17-Mar-16MM2-10200 Load-Out for Modules MM2 7 26-Mar-16 01-Apr-16

0.D.26.0000.MM2.T Transportation (Optional)0.D.26.0000.MM2.T Transportation (Optional) 7 02-Apr-16 08-Apr-160.D.26.0000.MM2.T.7 Delivery0.D.26.0000.MM2.T.7 Delivery 7 02-Apr-16 08-Apr-160.D.26.0000.MM2.T.7.70 Delivery0.D.26.0000.MM2.T.7.70 Delivery 7 02-Apr-16 08-Apr-16MM2-10180 Transportation Modules MM2 to Singapore Yard 7 02-Apr-16 08-Apr-16

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2015 2016

Mechanical & Pre-com Completion date for MM2

Ghana OCTP Development Project, FPSO

EPC for Module MM1 & MM2

Remaining Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

Schedule Level 3

Page 72 of 72

Date Revision Checked Approved

28-Mar-15 Baseline Schedule Level 3