Changing by
HYUNDAI ENGINEERING
현대엔지니어링 (주)
We dream future and move forward for creative with innovation
- 1 -
Changing by
HYUNDAI ENGINEERING
www.hdeng21.com
- Head Office Add : 34, Soto 4-gil, Soto-ri, Yangsan-si, Gyeongsangnam-do, Republic of Korea
- Tel : (82) 55-375-3001
- Fax: (82) 55-375-3007
- Home Page : http://www.hdeng21.com
- Subsidiary : LATIZAN
- Add :70, Sunmoon-ro 221 beon-gil, Tangjeong-myeon, Asan-si, Chungcheongnam-do, Korea
▶ Company Profile ◀
- 2 -
Changing by
HYUNDAI ENGINEERING
www.hdeng21.com
▶ Plant Business ◀
Solar PV Module Solar Power Plant
Waste IncinerationPower Plant
LED Solar Street Light
Biomass Power Plant
ESS
- 3 -
Changing by
HYUNDAI ENGINEERING
www.hdeng21.com
Business StructureSolar Power Plant BusinessWaste Incineration Power Plant BusinessBiomass Power Plant Business
▶ Plant Business ◀
- 4 -
Changing by
HYUNDAI ENGINEERING
www.hdeng21.com
▶ Plant Business ◀
1. Energy Storage System
⊙ With our range of dynamic Battery Energy Storage Systems, HDeng has developed an effective and efficient approach
that enables energy produced by either conventional thermal generation or renewable sources to be stored and then made
available as required.
⊙ As a major contribution to achieving stringent environmental targets, our battery systems do not emit any CO2 emissions.
They also maximize the efficient use of renewable energy sources by reducing their inherent intermittency, facilitating
integration into the power chain.
Portable-ESS (340Wh)
Energy Storage System
Portable-ESS (640Wh)
Portable-ESS (120Wh)
ESS (2.7KWh ~ 4.8KWh)
ESS (10KWh ~ 100KWh)
- 5 -
Changing by
HYUNDAI ENGINEERING
www.hdeng21.com
▶ Plant Business ◀
1. Energy Storage System
⊙ Product safety is assured
- Apply aluminum and flame retardant material (Protection from fire)
⊙ Technology : High efficiency , reliable application BMS(Battery Management System)
- Battery cell monitoring
- Blocking protection
- Accurate battery remaining capacity management
⊙ Economics : Breakthrough reduce fuel costs and long life
- 6 -
Changing by
HYUNDAI ENGINEERING
www.hdeng21.com
▶ Plant Business ◀
1. Energy Storage System
Model
Capacity 120Wh(9A) 340Wh(23A) 640Wh(45A)
Battery SAMSUNG SDI Lithium-ion cell
Charge Time
about 2 hours(19V 5A) about 5 hours(19V 5A) about 9 hours(19V 5A))
Input AC adaptor, Solar Panel, Car Cigar jack
Output
DC(1Port, 12V 5A)
USB(2Port, 5V 2.5A)
Cigar jack(1Port, 12V 10A)
DC(1Port, 12V 5A)
USB(2Port, 5V 2.5A)
Cigar jack(1Port, 12V 10A)
DC(1Port, 12V 5A)
USB(3Port, 5V 2.5A)
Cigar jack(2Port, 12V 10A)
Dimensions 156 x 129 x 56(mm) 296 x 200 x 180(mm) 296 x 200 x 180(mm)
Weight 1.1kg 4.5Kg 6.2Kg
- 7 -
Changing by
HYUNDAI ENGINEERING
www.hdeng21.com
▶ Plant Business ◀
1. Energy Storage System
Model
Capacity 2.7KWh 4.8KWh 10.36KWh
Battery Lithium-ion cell
Charge Time
about 8-10 hours(0.11CA) about 8-10 hours(0.11CA) about 8-10 hours(0.11CA)
Input AC adaptor, Solar Panel
Output 100/220 VAC
Dimensions 340 x 590 x 610(mm) 550 x 700 x 1,200(mm) 660 x 760 x 1,690(mm)
Weight 74kg 120Kg 357Kg
- 8 -
Changing by
HYUNDAI ENGINEERING
www.hdeng21.com
▶ Plant Business ◀
1. Energy Storage System
Model
Panel Type 2X Mono-crystalline,5V/10W 4X Mono-crystalline,5V/20W 8X Mono-crystalline,5V/28W
Input 10 Watts 20 Watts 28 Watts
Output Current
0~2.0A(Max)
Output Dual 5V Standard USB PortsDC 19V Charging Port
Single 5V Standard USB Port
DC 19V Charging Port
Single 5V Standard USB Port
OperatingTemperature
0~35°C
Materials PET laminated solar panel, Canvas
DimensionsFolded 280 X 70 X 15mm
Expanded 500 X 70 X 10mm
Folded 280 X 70 X 30mm
Expanded 830 X 70 X 10mm
Folded 250 X 200 X 50mmExpanded 900 X 140 X 10mm
Weight 400g 790g 1.5Kg
- 9 -
Changing by
HYUNDAI ENGINEERING
www.hdeng21.com
▶ Plant Business ◀
1. Energy Storage System
Medical : Oxygen Generator
Natural Disasters : Temporary shelters
Computer Back-Up
Security Surveillance Back-UpBlackout
Street Vendor
Outdoor
Ambulance Emergency EquipmentMilitary operations and training
- 10 -
Changing by
HYUNDAI ENGINEERING
www.hdeng21.com
▶ Plant Business ◀
1. Energy Storage System
Factory and Office Emergency power
Public institutions
Broadcast Equipment
Home Emergency power Bank Emergency power
Hospital Emergency power
A.P.T Emergency power : Elevator
- 11 -
Changing by
HYUNDAI ENGINEERING
www.hdeng21.com
▶ Plant Business ◀
2. Solar Power Plant Business
A typical solar power plant system employs solar panels, each comprising a number of solar cells, which generate
electrical power. The first step is the photoelectric effect followed by an electrochemical process where crystallized
atoms, ionized in a series, generate an electric current. Solar power plant installations may be ground-mounted,
rooftop mounted or wall mounted. They may be mounted in a permanent orientation to maximize production and
value or they may be mounted on trackers that follow the sun across the sky.
- 12 -
Changing by
HYUNDAI ENGINEERING
www.hdeng21.com
No. Project Name Country Capacity1 DongHae Power Plant Korea 1.0 MW
2 Muan Solartopia Korea 1.0 MW
3 Jangsu Dong Hwa PV Power Plant Korea 1.0 MW
4 Buan IUSNB Korea 1.3 MW
5 Kimcheon PV Power Plant Korea 2.5 MW
6 Jindo Samsung Solluce Korea 3.0 MW
7 Imsil PV Power Plant Korea 1.0 MW
8 Tomsan Project Czech Republic 0.9 MW
9 Alps Project (Alps Winter Olympic Park) Germany 1.5 MW
10 Efico Project, Zeebrugge Belgium 1.0 MW
11 T.E. Project Czech Republic 10.0 MW
12 Juseong Univercity Korea 1.5 MW
13 Elk Grove Project U.S.A 4.8 MW
14 Kuala Perlis Project Malaysia 6.0 MW
15 Pajam Project Malaysia 5.0 MW
16 Kuala Sawah Project Malaysia 7.0 MW
17 Gamma Project Romania 28.0 MW
18 Minami Awaji Project Japan 10.7 MW
19 Tojo Project Japan 33.0 MW
2. Solar Power Plant Business
Majar Performance
- 13 -
Changing by
HYUNDAI ENGINEERING
www.hdeng21.com
2. Solar Power Plant Business
Major Performance
1. Dong-hae PV-Anlage
2. Muan Solartopis
3. Jin-do power plant of Samsung C&T “SolLuce”
4. Schlutterhal Project (Germany)
5. EFICO Project (Belgium)
6. Tomsan Project (Czech Republic)
7. T.E. Project (Czech Republic)
8. Elk Grove Project (U.S.A)
9. Kuala Perlis Project (Malaysia)
10. Gamma Project (Romania)
- 14 -
Changing by
HYUNDAI ENGINEERING
www.hdeng21.com
Haenam Hampyeong
Guemo Seoul Amsa
▶ Plant Business ◀
2. Solar Power Plant Business
Etc. Performance
- 15 -
Changing by
HYUNDAI ENGINEERING
www.hdeng21.com
Gwangju Hampyeong
Haenam Gokseong
▶ Plant Business ◀
2. Solar Power Plant Business
Etc. Performance
- 16 -
Changing by
HYUNDAI ENGINEERING
www.hdeng21.com
▶ Plant Business ◀
3. Biomass Power Plant Business
Combusting biomass feedstock to create electricity does not contribute to global warming and helps avoid the
release of other harmful emissions. Also, viable fuels are produced in many industries with no additional processing
costs involved, further strengthening the financial feasibility of new plants on favorable sites.
- 17 -
Changing by
HYUNDAI ENGINEERING
www.hdeng21.com
▶ Plant Business ◀
3. Biomass Plant Business
Biomass Plant Schematics
- 18 -
Changing by
HYUNDAI ENGINEERING
www.hdeng21.com
▶ Plant Business ◀
4. Waste Incineration Power Plant Business
Municipal solid waste (MSW), often called garbage, is used to produce energy at waste-to-energy plants and at
landfills in the Korea. MSW contains biomass (or biogenic) materials like paper, cardboard, food waste, grass clippings,
leaves, wood, leather products, and other non-biomass combustible materials like plastics and other synthetic
materials made from petroleum.
Burning waste also reduces the amount of material that would probably be buried in landfills. Burning MSW reduces
the volume of waste by about 87%.
- 19 -
Changing by
HYUNDAI ENGINEERING
www.hdeng21.com
▶ Plant Business ◀
4. Waste Incineration Power Plant Business
In Garbage Moving Garbage Incineration plants Flue gas cooling equipment
Waste Incineration Power Plant Schematics
- 20 -
Changing by
HYUNDAI ENGINEERING
www.hdeng21.com
ROLL STAND
DONGHAE STEEL Co.
Sungwon Steel Co. JAPAN KOBESTEEL
JAPAN KOBESTEEL INI STEEL
▶ Etc. Accomplishment ◀
- 21 -
Changing by
HYUNDAI ENGINEERING
www.hdeng21.com
ROLL GUIDE(INI STEEL)
▶ Etc. Accomplishment ◀
- 22 -
Changing by
HYUNDAI ENGINEERING
www.hdeng21.com
STAMPING M/C(SeAH Besteel Co.)
▶ Etc. Accomplishment ◀
- 23 -
Changing by
HYUNDAI ENGINEERING
www.hdeng21.com
UNIVERSAC JOINT
㈜코스틸 현대제철㈜
현대제철㈜한국특수형강㈜
▶ Etc. Accomplishment ◀
- 24 -
Changing by
HYUNDAI ENGINEERING
www.hdeng21.com
▶ Certification ◀
- 25 -
Changing by
HYUNDAI ENGINEERING
www.hdeng21.com