ENVIRONMENTAL MONITORING REPORT
AIR, NOISE & EFFLUENT
SOUTH EASTERN COALFIELDS LIMITED
(A Mini Ratna Company)
JANUARY - 2021
(RAIGARH AREA)
ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘JANUARY’ 2021
CONTENTS No. of
samples Page No.
Sl.No. Name of Air Sampling Station
CHHAL OC
1 Mine Office 9 1
2 Lat Village 9 1
3 Khedapali Village 9 2
4 Chhal Village 9 2
5 Quarry No.1(Coal loading Pt.) for fugitive dust 9 3
6 Quarry No.1(Weigh Bridge) for fugitive dust 9 3
7 SAM Office 9 4
8 Nawapara Colony 9 4
DHARAM INCLINE
9 Mine Office 2 5
10 Edu Village 2 5
11 Dharam Colony 2 5
12 In between tippler and workshop 2 5
BAROUD OC
13 500m from coal bench near barrier No.2 2 6
14 500m from coal stock near MPCC camp 2 6
15 500m from OB dump near main sump 2 6
16 500m from mine pit near workshop/substation 2 6
17 Kudumkela Camp 2 6
18 Baroud Colony 2 6
19 Bijari Village 2 6
20 Bulekaera Village 2 6
Sl.No. Name of Air Sampling Station No. of
samples Page No.
Jampali OC
21 Sub area manager office 2 7
22 Singmojhavillage 2 7
23 Kosamghat village 2 7
24 Posalda village 2 7
25 Kudumkela village 2 7
26 Saraipali village 2 7
27 Howramoda village 2 7
28 Jampali Village 2 7
Gare-Pelma IV/1 OC
29 Mine Office (DCPP office) 2 8
30 500m from Coal Bench Near Mine Boundary 2 8
31 500m from Coal stock near Diamond square 2 8
32 Dongamouha Village 2 8
33 Janjgir Village 2 8
34 Nagramuda Village 2 8
35 Tapranga Village 2 8
36 Dourabhatha Village 2 8
Gare-Pelma IV/2&3 OC
37 500m from OB dump near Switch Yard 2 9
38 500m from CoalBench Near KJS Camp 2 9
39 500m from OB dump near Lamp room 2 9
40 500m from Mine Pit 2 near mine boundary 2 9
41 Gare Village 2 9
42 Dongamouha Village 2 9
43 Kosampali Village 2 9
44 Libra Village 2 9
BIJARI OC
45 Manager Office-Bijari OC 2 10
46 Check point-Barrier A 2 10
47 Check point-Barrier B 2 10
48 500 m From Mine Boundary at Mine dip direction 2 10
49 Rumkera 2 10
50 Khurmibhaona 2 10
51 Porda 2 10
52 Faguram 2 10
Total 160
Sl.No. Name of Noise Sampling Station No. of
samples Page No.
CHHALOC
1 Mine Office 2 11
2 Lat Village 2 11
3 Khedapali Village 2 11
4 Chhal Village 2 11
5 Quarry No.1(Coal loading Pt.) for fugitive dust 2 11
6 Quarry No.1(Weigh Bridge) for fugitive dust 2 11
7 SAM Office 2 11
8 Nawapara Colony 2 11
DHARAM INCLINE
9 Mine Office 2 12
10 Edu Village 2 12
11 Dharam Colony 2 12
12 In between tippler and workshop 2 12
BAROUD OC
13 500m from coal bench near barrier No.2 2 13
14 500m from coal stock near MPCC camp 2 13
15 500m from OB dump near main sump 2 13
16 500m from mine pit near workshop/substation 2 13
17 Kudumkela Camp 2 13
18 Baroud Colony 2 13
19 Bijari Village 2 13
20 Bulekaera Village 2 13
Sl.No. Name of Noise Sampling Station No. of
samples Page No.
Jampali OC
21 Sub area manager office 2 14
22 Singmojha village 2 14
23 Kosamghat village 2 14
24 Posalda village 2 14
25 Kudumkela village 2 14
26 Saraipali village 2 14
27 Howramoda village 2 14
28 Jampali Village 2 14
Gare-Pelma IV/1 OC
29 Mine Office (DCPP office) 2 15
30 500m from Coal Bench Near Mine Boundary 2 15
31 500m from Coal stock near Diamond square 2 15
32 Dongamouha Village 2 15
33 Janjgir Village 2 15
34 Nagramuda Village 2 15
35 Tapranga Village 2 15
36 Dourabhatha Village 2 15
Gare-Pelma IV/2&3 OC
37 500m from OB dump near Switch Yard 2 16
38 500m from Coal Bench Near KJS Camp 2 16
39 500m from OB dump near Lamp room 2 16
40 500m from Mine Pit 2 near mine boundary 2 16
41 Gare Village 2 16
42 Dongamouha Village 2 16
43 Kosampali Village 2 16
44 Libra Village 2 16
BIJARI OC
45 Manager Office-Bijari OC 2 17
46 Check point-Barrier A 2 17
47 Check point-Barrier B 2 17
48 500 m From Mine Boundary at Mine dip direction 2 17
49 Rumkera 2 17
50 Khurmibhaona 2 17
51 Porda 2 17
52 Faguram 2 17
Total 104
Sl.No. Name of Effluent Sampling Station No. of
samples Page No.
CHHAL OC
1 Water course before entering OB dump 2 18
2 Water course leaving the mine OB dump 2 18
3 Discharge at pumping station Qr.No- 2 2 18
DHARAM UG
4 Mine water sample at Discharge point 2 19
BAROUD OC
5 Mine sump water 2 20
6 Nalla water 2 20
7 Upstream of Kurket river 2 20
8 Downstreamof Kurket river 2 20
Jampali OC
9 Mine discharge water 2 21
10 At Kurket River 100m up stream 2 21
11 At Kurket River 100m down stream 2 21
Gare-PelmaIV/1 OC
12 Mine water discharge of Gare– Pelma IV/1 OC Mine 2 22
13 At Mixing point of Mine discharge and Pendra Nalla 2 22
14 100 m Upstream to mixing point in Upstream of Pendra Nalla 2 22
15 100 m Downstream to mixing point in Upstream of Pendra Nalla 2 22
Gare-PelmaIV/2&3 OC
16 Mine pit 1 sump water of Gare– Pelma IV/2&3 OC mine 2 23
17 Mine pit 2 sump water of Gare– Pelma IV/2&3 OC mine 2 23
18 Mine pit 1 discharge water after OB dump of Gare– Pelma IV/2&3
OC mine
2 23
19
Mine pit 2 discharge water after settling tank of Gare– Pelma IV/2&3
OC mine 2 23
BIJARI OC
20 Final Mine Discharge from Patch A 2 24
21 Final Mine Discharge from Patch B 2 24
Total 42
Analyzed by Dy.Manager-Environment
Page 1 of 17
Note: 1) The results above relate to the samples tested.
2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],
website: www.cmpdi.co.in
cmpdi
A Mini-Ratna Company
AIR QUALITY REPORT
Month JANUARY Area RAIGARH Report No BSP/2021/01/05
Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 14.02.2021
Name of the Project Chhal OC Sample Reference No. 1-2
Parameter PM100 PM10 PM2.5 SO2 NO2
Remarks Lim
it (
in
µg
/m3)-
24
hrs
Industrial Zone -(G.S.R. 942(E),
dated 25.9.2000)
A-O 600 300 - 120 120
A-N 500 250 - 120 120
Residential Zone-(G.S.R. 926(E),
dated 16.11.2011 and GSR 196 (E),
02.04.1996)
B 200 100 60 90 90
Method of analysis IS-5192
PART
4:2005
IS-5192
PART
23:2006
CPCB Vol-
I, 2013
IS-5192
PART
2:2001
IS-5192
PART
6:2006
Uncertainty Range (in µg/m3) ±19.04 ±0.0699 ±0.4420
Station Name
(Code)
Station
category
Date of
sampling
Date of
analysis
1-Mine Office A-O
05.01.2021 16.01.2021 632 311 84 44 59
07.01.2021 16.01.2021 421 208 62 37 44
09.01.2021 19.01.2021 427 212 55 31 47
10.01.2021 19.01.2021 371 201 52 33 45
13.01.2021 24.01.2021 379 205 51 38 42
19.01.2021 26.01.2021 652 354 84 43 54
22.01.2021 30.01.2021 377 202 54 48 36
29.01.2021 04.02.2021 389 213 57 39 28
31.01.2021 04.02.2021 391 208 53 32 39
2-Lat Village B
05.01.2021 16.01.2021 211 104 61 36 45
07.01.2021 16.01.2021 188 94 55 41 47
09.01.2021 19.01.2021 197 91 52 35 44
10.01.2021 19.01.2021 189 95 47 27 35
13.01.2021 24.01.2021 191 87 51 33 31
19.01.2021 26.01.2021 187 83 49 38 45
22.01.2021 30.01.2021 194 88 52 32 43
29.01.2021 04.02.2021 224 94 61 47 53
31.01.2021 04.02.2021 229 90 51 42 56
Analyzed by Dy.Manager-Environment
Page 2 of 17
Note: 1) The results above relate to the samples tested.
2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],
website: www.cmpdi.co.in
cmpdi
A Mini-Ratna Company
AIR QUALITY REPORT
Month JANUARY Area RAIGARH Report No BSP/2021/01/05
Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 14.02.2021
Name of the Project Chhal OC Sample Reference No. 3-4
Parameter PM110 PM11 PM2.5 SO2 NO2
Remarks Lim
it (
in
µg
/m3)-
24
hrs
Industrial Zone -(G.S.R. 942(E),
dated 25.9.2000)
A-O 600 300 - 120 120
A-N 500 250 - 120 120
Residential Zone-(G.S.R. 926(E),
dated 16.11.2011 and GSR 196 (E),
02.04.1996)
B 200 100 60 90 90
Method of analysis IS-5192
PART
4:2005
IS-5192
PART
23:2006
CPCB Vol-
I, 2013
IS-5192
PART
2:2001
IS-5192
PART
6:2006
Uncertainty Range (in µg/m3) ±19.04 ±0.0699 ±0.4420
Station Name
(Code)
Station
category
Date of
sampling
Date of
analysis
3-Khedapali
Village B
05.01.2021 16.01.2021 192 85 48 34 45
07.01.2021 16.01.2021 219 115 57 41 44
09.01.2021 19.01.2021 181 88 47 33 29
10.01.2021 19.01.2021 185 79 42 37 46
13.01.2021 24.01.2021 178 86 45 35 38
19.01.2021 26.01.2021 188 89 48 30 45
22.01.2021 30.01.2021 211 117 54 42 55
29.01.2021 04.02.2021 187 84 47 29 34
31.01.2021 04.02.2021 184 79 43 36 44
4-Chhal Village B
05.01.2021 16.01.2021 193 87 49 34 41
07.01.2021 16.01.2021 219 119 61 38 45
09.01.2021 19.01.2021 195 99 52 37 46
10.01.2021 19.01.2021 182 85 59 39 44
13.01.2021 24.01.2021 198 94 56 44 37
19.01.2021 26.01.2021 223 87 55 32 45
22.01.2021 30.01.2021 191 89 51 34 46
29.01.2021 04.02.2021 189 94 58 36 42
31.01.2021 04.02.2021 185 86 49 33 39
Analyzed by Dy.Manager-Environment
Page 3 of 17
Note: 1) The results above relate to the samples tested.
2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],
website: www.cmpdi.co.in
cmpdi
A Mini-Ratna Company
AIR QUALITY REPORT
Month JANUARY Area RAIGARH Report No BSP/2021/01/05
Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 14.02.2021
Name of the Project Chhal OC Sample Reference No. 5-6
Parameter PM110 PM11 PM2.5 SO2 NO2
Remarks Lim
it (
in
µg
/m3)-
24
hrs
Industrial Zone -(G.S.R. 942(E),
dated 25.9.2000)
A-O 600 300 - 120 120
A-N 500 250 - 120 120
Residential Zone-(G.S.R. 926(E),
dated 16.11.2011 and GSR 196 (E),
02.04.1996)
B 200 100 60 90 90
Method of analysis IS-5192
PART
4:2005
IS-5192
PART
23:2006
CPCB Vol-
I, 2013
IS-5192
PART
2:2001
IS-5192
PART
6:2006
Uncertainty Range (in µg/m3) ±19.04 ±0.0699 ±0.4420
Station Name
(Code)
Station
category
Date of
sampling
Date of
analysis
5-Qr.No.1
(Coal loading Pt.)
for fugitive test
A-O
04.01.2021 16.01.2021 649 319 71 32 45
06.01.2021 16.01.2021 531 227 58 34 49
08.01.2021 19.01.2021 536 221 55 31 37
11.01.2021 23.01.2021 555 234 51 37 44
15.01.2021 23.01.2021 546 243 59 33 46
18.01.2021 29.01.2021 621 297 64 39 44
20.01.2021 05.02.2021 548 277 48 36 48
27.01.2021 05.02.2021 535 236 51 38 45
30.01.2021 05.02.2021 524 218 55 31 38
6-Qr.No.1
(Weigh Bridge)
for fugitive test
A-O
04.01.2021 16.01.2021 647 316 64 29 43
06.01.2021 16.01.2021 559 229 53 31 47
08.01.2021 19.01.2021 565 222 55 37 42
11.01.2021 23.01.2021 544 238 49 34 45
15.01.2021 23.01.2021 539 242 53 39 47
18.01.2021 29.01.2021 541 216 48 29 41
20.01.2021 05.02.2021 571 227 55 42 37
27.01.2021 05.02.2021 549 231 59 35 46
30.01.2021 05.02.2021 536 221 57 39 47
Analyzed by Dy.Manager-Environment
Page 4 of 17
Note: 1) The results above relate to the samples tested.
2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],
website: www.cmpdi.co.in
cmpdi
A Mini-Ratna Company
AIR QUALITY REPORT
Month JANUARY Area RAIGARH Report No BSP/2021/01/05
Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 14.02.2021
Name of the Project Chhal OC Sample Reference No. 7-8
Parameter PM110 PM11 PM2.5 SO2 NO2
Remarks Lim
it (
in
µg
/m3)-
24
hrs
Industrial Zone -(G.S.R. 942(E),
dated 25.9.2000)
A-O 600 300 - 120 120
A-N 500 250 - 120 120
Residential Zone-(G.S.R. 926(E),
dated 16.11.2011 and GSR 196 (E),
02.04.1996)
B 200 100 60 90 90
Method of analysis IS-5192
PART
4:2005
IS-5192
PART
23:2006
CPCB Vol-
I, 2013
IS-5192
PART
2:2001
IS-5192
PART
6:2006
Uncertainty Range (in µg/m3) ±19.04 ±0.0699 ±0.4420
Station Name
(Code)
Station
category
Date of
sampling
Date of
analysis
7-SAM Office A-O
04.01.2021 16.01.2021 224 114 55 34 43
06.01.2021 16.01.2021 195 92 49 38 46
08.01.2021 19.01.2021 189 89 44 34 49
11.01.2021 23.01.2021 197 96 46 29 42
15.01.2021 23.01.2021 219 93 53 37 46
18.01.2021 29.01.2021 196 89 45 33 41
20.01.2021 05.02.2021 218 98 52 38 31
27.01.2021 05.02.2021 225 105 59 34 42
30.01.2021 05.02.2021 214 96 54 38 31
8-Nawapara
Colony B
04.01.2021 16.01.2021 198 89 51 37 45
06.01.2021 16.01.2021 217 104 55 34 39
08.01.2021 19.01.2021 185 86 47 32 44
11.01.2021 23.01.2021 178 82 38 36 41
15.01.2021 23.01.2021 181 85 42 33 37
18.01.2021 29.01.2021 189 81 46 41 33
20.01.2021 05.02.2021 213 111 54 39 47
27.01.2021 05.02.2021 183 89 43 30 41
30.01.2021 05.02.2021 179 86 47 37 46
Analyzed by Dy.Manager-Environment
Page 5 of 17
Note: 1) The results above relate to the samples tested.
2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],
website: www.cmpdi.co.in
cmpdi
A Mini-Ratna Company
AIR QUALITY REPORT
Month JANUARY Area RAIGARH Report No BSP/2021/01/05
Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 14.02.2021
Name of the Project Dharam Incline Sample Reference No. 58-61
Parameter PM110 PM11 PM2.5 SO2 NO2
Remarks Lim
it (
in
µg
/m3)-
24
hrs
Industrial Zone -(G.S.R. 942(E),
dated 25.9.2000)
A-O 600 300 - 120 120
A-N 500 250 - 120 120
Residential Zone-(G.S.R. 926(E),
dated 16.11.2011 and GSR 196 (E),
02.04.1996)
B 200 100 60 90 90
Method of analysis IS-5192
PART
4:2005
IS-5192
PART
23:2006
CPCB Vol-I,
2013
IS-5192
PART
2:2001
IS-5192
PART
6:2006
Uncertainty Range (in µg/m3) ±19.04 ±0.0699 ±0.4420
Station Name
(Code)
Station
category
Date of
sampling
Date of
analysis
9-Mine Office A-O 04.01.2021 11.01.2021 597 222 83 38 46
28.01.2021 04.02.2021 603 257 75 32 38
10-Edu Village B 04.01.2021 11.01.2021 189 85 45 29 45
28.01.2021 04.02.2021 192 92 49 34 44
11- Dharam Colony B 05.01.2021 11.01.2021 185 81 43 42 49
27.01.2021 04.02.2021 181 75 47 34 41
12-In between
tippler &
Workshop
A-O
05.01.2021 11.01.2021 587 233 69 39 43
27.01.2021 04.02.2021 568 227 77 35 47
Analyzed by Dy.Manager-Environment
Page 6 of 17
Note: 1) The results above relate to the samples tested.
2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],
website: www.cmpdi.co.in
cmpdi
A Mini-Ratna Company
AIR QUALITY REPORT
Month JANUARY Area RAIGARH Report No BSP/2021/01/05
Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 14.02.2021
Name of the Project Baroud OC Sample Reference No. 62-67,97,98
Parameter PM110 PM11 PM2.5 SO2 NO2
Remarks Lim
it (
in
µg
/m3)-
24
hrs
Industrial Zone -(G.S.R. 942(E),
dated 25.9.2000)
A-O 600 300 - 120 120
A-N 500 250 - 120 120
Residential Zone-(G.S.R. 926(E),
dated 16.11.2011 and GSR 196 (E),
02.04.1996)
B 200 100 60 90 90
Method of analysis IS-5192
PART
4:2005
IS-5192
PART
23:2006
CPCB Vol-
I, 2013
IS-5192
PART
2:2001
IS-5192
PART
6:2006
Uncertainty Range (in µg/m3) ±19.04 ±0.0699 ±0.4420
Station Name (Code) Station
category
Date of
sampling
Date of
analysis
13-500m from coal
bench near barrier
No.2
A-O
07.01.2021 16.01.2021 531 244 79 38 47
19.01.2021 26.01.2021 544 231 56 36 42
14- 500m from coal
stock near MPCC
camp
A-O
07.01.2021 16.01.2021 637 323 84 33 48
19.01.2021 26.01.2021 591 267 67 29 38
15- 500m from OB
dump near main
sump
A-O
07.01.2021 15.01.2021 633 319 89 34 45
19.01.2021 26.01.2021 544 234 59 37 47
16-500m from mine
pit near
workshop/substation
A-O
07.01.2021 15.01.2021 659 328 86 39 53
19.01.2021 26.01.2021 581 273 64 38 49
17-Kudumkela Camp B
08.01.2021 15.01.2021 197 91 58 33 28
20.01.2021 24.01.2021 211 118 46 29 36
18-Baroud Colony B
08.01.2021 15.01.2021 198 97 53 26 34
20.01.2021 26.01.2021 219 117 44 34 41
19-Bijari Village B 08.01.2021 16.01.2021 183 85 34 28 34
20.01.2021 29.01.2021 191 110 57 35 42
20-Bulekaera Village B
08.01.2021 16.01.2021 189 82 39 39 47
20.01.2021 29.01.2021 185 87 45 36 45
Analyzed by Dy.Manager-Environment
Page 7 of 17
Note: 1) The results above relate to the samples tested.
2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],
website: www.cmpdi.co.in
cmpdi
A Mini-Ratna Company
AIR QUALITY REPORT
Month JANUARY Area RAIGARH Report No BSP/2021/01/05
Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 14.02.2021
Name of the Project Jampali OC Sample Reference No. 68-75
Parameter PM100 PM10 PM2.5 SO2 NO2
Remarks Lim
it (
in
µg
/m3)-
24
hrs
Industrial Zone -(G.S.R. 942(E),
dated 25.9.2000)
A-O 600 300 - 120 120
A-N 500 250 - 120 120
Residential Zone-(G.S.R. 926(E),
dated 16.11.2011 and GSR 196 (E),
02.04.1996)
B 200 100 60 90 90
Method of analysis IS-5192
PART
4:2005
IS-5192
PART
23:2006
CPCB Vol-
I, 2013
IS-5192
PART
2:2001
IS-5192
PART
6:2006
Uncertainty Range (in µg/m3) ±19.04 ±0.0699 ±0.4420
Station Name
(Code)
Station
category
Date of
sampling
Date of
analysis
21-Sub area
manager office A-N
06.01.2021 12.01.2021 525 229 81 43 39
17.01.2021 26.01.2021 481 215 74 41 55
22-Singmojha
Village B
06.01.2021 12.01.2021 217 112 52 38 47
17.01.2021 26.01.2021 197 85 48 33 38
23-Kosamghat
Village B
06.01.2021 12.01.2021 213 103 54 29 36
17.01.2021 26.01.2021 189 91 51 37 45
24-Posalda Village B 06.01.2021 12.01.2021 208 94 60 31 41
17.01.2021 26.01.2021 184 83 55 37 48
25-Kudumkela
Village B
05.01.2021 12.01.2021 188 85 52 32 45
19.01.2021 26.01.2021 195 94 56 38 44
26-Saraipali
Village B
05.01.2021 12.01.2021 211 107 65 33 48
19.01.2021 26.01.2021 182 86 51 31 39
27-Howramoda
Village B
05.01.2021 12.01.2021 191 92 54 28 37
19.01.2021 26.01.2021 187 87 47 35 48
28-Jampali Village B 05.01.2021 12.01.2021 219 110 59 34 46
19.01.2021 26.01.2021 194 93 54 37 44
Analyzed by Dy.Manager-Environment
Page 8 of 17
Note: 1) The results above relate to the samples tested.
2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],
website: www.cmpdi.co.in
cmpdi
A Mini-Ratna Company
AIR QUALITY REPORT
Month JANUARY Area RAIGARH Report No BSP/2021/01/05
Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 14.02.2021
Name of the Project Gare-Pelma IV/1 OC Sample Reference No. 76-83
Parameter PM100 PM10 PM2.5 SO2 NO2
Remarks Lim
it (
in
µg
/m3)-
24
hrs
Industrial Zone -(G.S.R. 942(E),
dated 25.9.2000)
A-O 600 300 - 120 120
A-N 500 250 - 120 120
Residential Zone-(G.S.R. 926(E),
dated 16.11.2011 and GSR 196 (E),
02.04.1996)
B 200 100 60 90 90
Method of analysis IS-5192
PART
4:2005
IS-5192
PART
23:2006
CPCB Vol-
I, 2013
IS-5192
PART
2:2001
IS-5192
PART
6:2006
Uncertainty Range (in µg/m3) ±19.04 ±0.0699 ±0.4420
Station Name
(Code)
Station
category
Date of
sampling
Date of
analysis
29-Mine Office
(DCPP office) A-N
15.01.2021 18.01.2021 533 249 65 51 45
29.01.2021 03.02.2021 488 221 63 34 39
30-500m from
Coal Bench
Near Mine
Boundary
A-N 15.01.2021
18.01.2021 574 267 64 32 47
29.01.2021 03.02.2021 489 224 59 34 39
31-500m from
Coal stock
near Diamond
square
A-N
15.01.2021 18.01.2021 537 265 67 31 44
29.01.2021 03.02.2021 477 233 61 37 48
32-Dongamouha
Village B
15.01.2021 18.01.2021 211 102 47 32 37
29.01.2021 03.02.2021 189 84 43 29 35
33-Janjgir Village B 13.01.2021 18.01.2021 181 88 48 34 43
30.01.2021 03.02.2021 189 81 44 37 44
34-Nagramuda
Village B
13.01.2021 18.01.2021 195 87 47 35 41
30.01.2021 04.02.2021 183 79 36 28 36
35-Tapranga
Village B
13.01.2021 18.01.2021 187 82 34 25 33
30.01.2021 04.02.2021 191 89 39 34 39
36-Dourabhatha
Village B
13.01.2021 18.01.2021 209 92 45 37 48
30.01.2021 04.02.2021 192
85 41 28 34
Analyzed by Dy.Manager-Environment
Page 9 of 17
Note: 1) The results above relate to the samples tested.
2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],
website: www.cmpdi.co.in
cmpdi
A Mini-Ratna Company
AIR QUALITY REPORT
Month JANUARY Area RAIGARH Report No BSP/2021/01/05
Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 14.02.2021
Name of the Project Gare-Pelma IV/2&3 OC Sample Reference No. 84-91
Parameter PM100 PM10 PM2.5 SO2 NO2
Remarks Lim
it (
in
µg
/m3)-
24
hrs
Industrial Zone -(G.S.R. 942(E),
dated 25.9.2000)
A-O 600 300 - 120 120
A-N 500 250 - 120 120
Residential Zone-(G.S.R. 926(E),
dated 16.11.2011 and GSR 196 (E),
02.04.1996)
B 200 100 60 90 90
Method of analysis IS-5192
PART
4:2005
IS-5192
PART
23:2006
CPCB Vol-
I, 2013
IS-5192
PART
2:2001
IS-5192
PART
6:2006
Uncertainty Range (in µg/m3) ±19.04 ±0.0699 ±0.4420
Station Name
(Code)
Station
category
Date of
sampling
Date of
analysis
37-500m from OB
dump
near Switch Yard
A-N
12.01.2021 18.01.2021 552 263 71 43 49
28.01.2021 03.02.2021 457 241 57 34 43
38-500m from Coal
Bench Near KJS
Camp
A-N
12.01.2021 18.01.2021 548 252 74 43 55
28.01.2021 03.02.2021 472 229 51 33 41
39-500m from OB
dump
near Lamp room
A-N
12.01.2021 18.01.2021 455 219 54 36 44
28.01.2021 03.02.2021 448 241 59 33 45
40-500m from
Mine Pit 2
near mine
boundary
A-N
12.01.2021 18.01.2021 539 256 71 42 57
28.01.2021 03.02.2021 447 229 65 44 56
41-Gare Village B 11.01.2021 19.01.2021 193 94 47 37 44
27.01.2021 03.02.2021 197 97 50 29 36
42-Dongamouha
Village B
11.01.2021 19.01.2021 191 88 48 32 43
27.01.2021 03.02.2021 194 86 51 35 38
43-Kosampali
Village B
11.01.2021 19.01.2021 189 79 47 37 45
27.01.2021 03.02.2021 183 75 49 33 38
44-Libra Village B 11.01.2021 19.01.2021 217 92 58 32 49
27.01.2021 03.02.2021 184 85 51 41 34
Analyzed by Dy.Manager-Environment
Page 10 of 17
Note: 1) The results above relate to the samples tested.
2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],
website: www.cmpdi.co.in
cmpdi
A Mini-Ratna Company
AIR QUALITY REPORT
Month JANUARY Area RAIGARH Report No BSP/2021/01/05
Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 14.02.2021
Name of the Project Bijari OC Sample Reference No. 107-114
Parameter PM100 PM10 PM2.5 SO2 NO2
Remarks Lim
it (
in
µg
/m3)-
24
hrs
Industrial Zone -(G.S.R. 942(E),
dated 25.9.2000)
A-O 600 300 - 120 120
A-N 500 250 - 120 120
Residential Zone-(G.S.R. 926(E),
dated 16.11.2011 and GSR 196 (E),
02.04.1996)
B 200 100 60 90 90
Method of analysis IS-5192
PART
4:2005
IS-5192
PART
23:2006
CPCB Vol-
I, 2013
IS-5192
PART
2:2001
IS-5192
PART
6:2006
Uncertainty Range (in µg/m3) ±19.04 ±0.0699 ±0.4420
Station Name
(Code)
Station
category
Date of
sampling
Date of
analysis
45-Manager Office-
Bijari OC A-N
13.01.2021 20.01.2021 462 222 69 38 45
28.01.2021 03.02.2021 493 238 76 35 47
46-Check point-
Barrier A A-N
13.01.2021 20.01.2021 489 241 64 39 44
28.01.2021 03.02.2021 481 237 54 34 42
47- Check point-
Barrier B A-N
13.01.2021 20.01.2021 492 243 61 37 45
28.01.2021 03.02.2021 487 251 67 42 51
48-500m from
Mine Boundary at
south West
direction
A-N 13.01.2021 20.01.2021
434 223 59 32 39
28.01.2021 03.02.2021 458 227 54 38 45
49-Rumkera Village B 12.01.2021 20.01.2021 192 84 47 31 40
29.01.2021 03.02.2021 186 80 44 36 45
50-Khurmibhaona B 12.01.2021 20.01.2021 183 76 33 33 41
29.01.2021 03.02.2021 185 82 36 37 44
51-Porda B 12.01.2021 20.01.2021 194 86 44 29 36
29.01.2021 03.02.2021 184 81 35 38 47
52-Faguram B 12.01.2021 20.01.2021 179 79 38 35 41
29.01.2021 03.02.2021 187 84 45 31 38
Analyzed by Dy.Manager-Environment
Page 11 of 17
Note: 1) The results above relate to the samples tested.
2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],
website: www.cmpdi.co.in
cmpdi
A Mini-Ratna Company
NOISE QUALITY REPORT
Month JANUARY Area RAIGARH Report No BSP/2021/01/05
Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 14.02.2021
Name of the Project CHHAL OC Sample Reference No. N63-N69 & N-72
Parameter The Noise Pollution (R & C) rules, 2000
Remarks
Day Time Night Time
Limit (in dB(A)
Leq
Industrial area A 95 90
Commercial area B 65 55
Residential Area C 55 45
Silence Zone D 50 40
Method of analysis CPCB Protocol For Ambient Level Noise Monitoring
Station (Code) Station
Name
Station
category
Date of
measurement Value in dB(A) Value in dB(A)
1-Mine Office A 15.01.2021 54.6 42.4
22.01.2021 56.4 41.7
2- Lat Village C
15.01.2021 45.2 36.3
22.01.2021 43.4 35.7
3- Khedapali Village C
15.01.2021 45.4 35.2
22.01.2021 46.7 33.5
4- Chhal Village C
15.01.2021 44.5 32.4
22.01.2021 43.5 34.5
5-Quarry No.1 (Coal
loading Pt.) A
15.01.2021 56.7 44.8
22.01.2021 56.2 43.7
6-Quarry No.1(Weigh
Bridge) for fugitive test A
15.01.2021 57.6 45.1
22.01.2021 61.4 44.3
7-SAM Office A
15.01.2021 53.4 43.7
22.01.2021 52.5 44.4
8-Nawapara Colony C
15.01.2021 43.7 32.5
22.01.2021 44.8 34.2
Analyzed by Dy.Manager-Environment
Page 12 of 17
Note: 1) The results above relate to the samples tested.
2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],
website: www.cmpdi.co.in
cmpdi
A Mini-Ratna Company
NOISE QUALITY REPORT
Month JANUARY Area RAIGARH Report No BSP/2021/01/05
Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 14.02.2021
Name of the Project Dharam Incline Sample Reference No. N73-N76
Parameter The Noise Pollution (R & C) rules, 2000
Remarks
Day Time Night Time
Limit (in dB(A)
Leq
Industrial area A 95 90
Commercial area B 65 55
Residential Area C 55 45
Silence Zone D 50 40
Method of analysis CPCB Protocol For Ambient Level Noise Monitoring
Station (Code) Station
Name
Station
category
Date of
measurement Value in dB(A)
Value in
dB(A)
9-Mine Office A 12.01.2021 54.2 42.5
23.01.2021 55.7 43.7
10-Edu Village C
12.01.2021 43.8 33.2
23.01.2021 44.9 35.7
11-Dharam Colony C
12.01.2021 42.4 33.3
23.01.2021 45.8 36.4
12-In between tippler and
workshop A
12.01.2021 56.5 42.2
23.01.2021 54.8 45.1
Analyzed by Dy.Manager-Environment
Page 13 of 17
Note: 1) The results above relate to the samples tested.
2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],
website: www.cmpdi.co.in
cmpdi
A Mini-Ratna Company
NOISE QUALITY REPORT
Month JANUARY Area RAIGARH Report No BSP/2021/01/05
Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 14.02.2021
Name of the Project Baroud OC Sample Reference No. N77-N82, N117,
& N118
Parameter The Noise Pollution (R & C) rules, 2000
Remarks
Day Time Night Time
Limit (in dB(A)
Leq
Industrial area A 95 90
Commercial area B 65 55
Residential Area C 55 45
Silence Zone D 50 40
Method of analysis CPCB Protocol For Ambient Level Noise Monitoring
Station (Code) Station
Name
Station
category
Date of
measurement Value in dB(A) Value in dB(A)
13-500m from Coal Bench
near Barrier No.2 A
12.01.2021 55.3 44.7
20.01.2021 56.4 42.9
14-500m from Coal Stock
near MPCC camp A
12.01.2021 58.7 43.4
20.01.2021 57.6 42.1
15-500m from OB dump
near Main Sump A
12.01.2021 55.5 43.3
20.01.2021 62.8 44.5
16-500m from mine pit
near workshop /
Substation
A
12.01.2021 58.2 43.7
20.01.2021 54.5 42.4
17-Kudumkela Camp C 12.01.2021 53.2 41.3
20.01.2021 45.2 34.4
18-Baroud Colony C 12.01.2021 43.7 35.8
20.01.2021 45.1 36.5
19-Bijari Village C 12.01.2021 43.4 32.5
20.01.2021 45.4 35.7
20-Bulekaera Village C
12.01.2021 44.7 34.4
20.01.2021 44.4 33.2
Analyzed by Dy.Manager-Environment
Page 14 of 17
Note: 1) The results above relate to the samples tested.
2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],
website: www.cmpdi.co.in
cmpdi
A Mini-Ratna Company
NOISE QUALITY REPORT
Month JANUARY Area RAIGARH Report No BSP/2021/01/05
Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 14.02.2021
Name of the Project JAMPALI OC Sample Reference No. N83-N90
Parameter The Noise Pollution (R & C) rules, 2000
Remarks
Day Time Night Time
Limit (in dB(A)
Leq
Industrial area A 95 90
Commercial area B 65 55
Residential Area C 55 45
Silence Zone D 50 40
Method of analysis CPCB Protocol For Ambient Level Noise Monitoring
Station (Code) Station
Name
Station
category
Date of
measurement Value in dB(A) Value in dB(A)
21-SAM Office- Jampali OC A 11.01.2021 57.1 44.7
21.01.2021 55.3 42.4
22-Singmojha Village C
11.01.2021 46.4 34.1
21.01.2021 44.1 32.3
23-Kosamghat Village C
11.01.2021 45.4 36.7
21.01.2021 46.3 35.2
24-Posalda Village C
11.01.2021 45.8 33.4
21.01.2021 42.5 34.8
25-Kudumkela Village C
11.01.2021 43.2 33.1
21.01.2021 41.7 33.7
26-Saraipali Village C
11.01.2021 44.2 34.5
21.01.2021 45.3 36.7
27-Howramoda Village C
11.01.2021 47.8 35.3
21.01.2021 45.3 36.5
28-Jampali Village C
11.01.2021 46.5 34.2
21.01.2021 44.4 36.1
Analyzed by Dy.Manager-Environment
Page 15 of 17
Note: 1) The results above relate to the samples tested.
2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],
website: www.cmpdi.co.in
cmpdi
A Mini-Ratna Company
NOISE QUALITY REPORT
Month JANUARY Area RAIGARH Report No BSP/2021/01/05
Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 14.02.2021
Name of the Project Gare-Pelma IV/1 OC Sample Reference No. N91-N98
Parameter The Noise Pollution (R & C) rules, 2000
Remarks
Day Time Night Time
Limit (in dB(A)
Leq
Industrial area A 95 90
Commercial area B 65 55
Residential Area C 55 45
Silence Zone D 50 40
Method of analysis CPCB Protocol For Ambient Level Noise Monitoring
Station (Code) Station
Name
Station
category
Date of
measurement Value in dB(A) Value in dB(A)
29-Mine Office
(DCPP office) A
06.01.2021 60.2 46.4
27.01.2021 54.7 45.3
30-500m from Coal Bench
Near Mine Boundary A
06.01.2021 57.4 44.5
27.01.2021 54.8 43.2
31-500m from Coal stock
near Diamond square A
06.01.2021 55.7 45.3
27.01.2021 54.5 44.1
32-Dongamouha Village C
06.01.2021 44.2 36.4
27.01.2021 46.7 35.2
33-Janjgir Village C
06.01.2021 45.8 34.3
27.01.2021 44.5 35.1
34-Nagramuda Village C
06.01.2021 45.3 34.4
27.01.2021 44.2 35.7
35-Tapranga Village C
06.01.2021 46.8 36.3
27.01.2021 44.6 33.3
36-Dourabhatha Village C
06.01.2021 45.5 36.4
27.01.2021 43.7 34.2
Analyzed by Dy.Manager-Environment
Page 16 of 17
Note: 1) The results above relate to the samples tested.
2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],
website: www.cmpdi.co.in
cmpdi
A Mini-Ratna Company
NOISE QUALITY REPORT
Month JANUARY Area RAIGARH Report No BSP/2021/01/05
Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 14.02.2021
Name of the Project Gare-Pelma IV/ 2& 3 OC Sample Reference No. N99-N116
Parameter The Noise Pollution (R & C) rules, 2000
Remarks
Day Time Night Time
Limit (in dB(A)
Leq
Industrial area A 95 90
Commercial area B 65 55
Residential Area C 55 45
Silence Zone D 50 40
Method of analysis CPCB Protocol For Ambient Level Noise Monitoring
Station (Code) Station
Name
Station
category
Date of
measurement Value in dB(A) Value in dB(A)
37-500m from OB dump
near Switch Yard A
07.01.2021 55.4 43.3
29.01.2021 57.5 45.8
38-500m from Coal Bench
Near KJS Camp A
07.01.2021 55.1 42.5
29.01.2021 54.4 44.2
39-500m from OB dump
near Lamp room A
07.01.2021 57.3 43.8
29.01.2021 56.3 45.1
40-500m from Mine Pit 2
near mine boundary A
07.01.2021 55.2 43.4
29.01.2021 52.5 43.4
41-Gare Village C 07.01.2021 45.2 34.1
29.01.2021 46.5 34.4
42-Dongamouha Village C 07.01.2021 48.4 35.2
29.01.2021 44.5 32.4
43-Kosampali Village C 07.01.2021 46.6 36.3
29.01.2021 48.2 35.1
44-Libra Village C 07.01.2021 47.7 34.6
29.01.2021 45.5 37.2
Analyzed by Dy.Manager-Environment
Page 17 of 17
Note: 1) The results above relate to the samples tested.
2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],
website: www.cmpdi.co.in
cmpdi
A Mini-Ratna Company
NOISE QUALITY REPORT
Month JANUARY Area RAIGARH Report No BSP/2021/01/05
Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 14.02.2021
Name of the Project BIJARI OC Sample Reference No. N117-N124
Parameter The Noise Pollution (R & C) rules, 2000
Remarks
Day Time Night Time
Limit (in dB(A)
Leq
Industrial area A 95 90
Commercial area B 65 55
Residential Area C 55 45
Silence Zone D 50 40
Method of analysis CPCB Protocol For Ambient Level Noise Monitoring
Station (Code) Station
Name
Station
category
Date of
measurement Value in dB(A) Value in dB(A)
45-Manager Office- Bijari
OC A
08.01.2021 56.5 42.4
28.01.2021 57.7 44.7
46-Check point-
Barrier A A
08.01.2021 54.2 43.3
28.01.2021 61.5 47.6
47- Check point-
Barrier B A
08.01.2021 57.1 46.2
28.01.2021 55.4 44.1
48-500m from Mine
Boundary at south West
direction
A
08.01.2021 59.2 46.3
28.01.2021 57.5 45.8
49-Rumkera Village C 08.01.2021 43.2 38.2
28.01.2021 45.6 37.1
50-Khurmibhaona C 08.01.2021 38.5 33.8
28.01.2021 45.1 37.3
51-Porda C 08.01.2021 41.9 33.5
28.01.2021 47.3 36.6
52-Faguram C 08.01.2021 49.4 41.7
28.01.2021 48.7 37.3
Analyzed by Dy.Manager-Environment
Page 1 of 7
Note: 1) The results above relate to the samples tested.
2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],
website: www.cmpdi.co.in
cmpdi
A Mini-Ratna Company
EFFLUENT WATER QUALITY REPORT
Month JANUARY Area RAIGARH Report No BSP/2021/01/05
Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 18.02.2021
Name of the Project Chhal OC
Parameter pH Value Total suspended
Solids, mg/l C.O.D, mg/l
Oil &
Grease,
mg/l
Lower Detection Limit 1.00 10 8 4
General Standards for Discharge of Environmental
Pollution (Part A: Effluent) as per Schedule VI,
Environment (Protection) Rules (max)
5.5 to 9.0
100
250
10
Method of Analysis
IS 3025 (Part 08):2083, (RA
:2096), Electrometric
Method
IS 3025 (Part
18):2084, (RA: 2096), Gravimetric Method
APHA, 23rd Edition, 2018,
5200C, Closed Reflux, Titration
Method
IS 3025 (Part 39):2091,(RA :
2003), Partition Gravimetric
Method
Uncertainty of Measurement (at
95% C.L & K= 1.96) ±0.0884
at 4.025
±0.445mg/l
at 24.429 mg/l
±6.209 mg/l
at 247.427 mg/l
±1.81 mg/l
at 9.94 mg/l
Station
Station Name FN
Date of
sampling Date of analysis
1. Water
course before
entering O.B
dump
1st 06.01.2021 07.01.2021 to
27.01.2021 8.07 BDL BDL BDL
2nd 20.01.2021 21.01.2021 to
02.02.2021 8.05 BDL BDL BDL
2. Water course
leaving
the mine O.B.
Dump
1st 06.01.2021 07.01.2021 to
27.01.2021 7.99 BDL BDL BDL
2nd 20.01.2021 21.01.2021 to
02.02.2021 8.01 BDL BDL BDL
3. Discharge
at pumping station Quarry
No.2
1st 06.01.2021 07.01.2021 to
27.01.2021 7.98 BDL 8 BDL
2nd 20.01.2021 21.01.2021 to
02.02.2021 7.96 BDL 8 BDL
Analyzed by Dy.Manager-Environment
Page 2 of 7
Note: 1) The results above relate to the samples tested.
2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],
website: www.cmpdi.co.in
cmpdi
A Mini-Ratna Company
EFFLUENT WATER QUALITY REPORT
Month JANUARY Area RAIGARH Report No BSP/2021/01/05
Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 18.02.2021
Name of the Project DHARAM UG
Parameter pH Value Total suspended
Solids, mg/l C.O.D, mg/l
Oil & Grease,
mg/l
Lower Detection Limit 1.00 10 8 4
General Standards for Discharge of Environmental
Pollution (Part A: Effluent) as per Schedule VI,
Environment (Protection) Rules (max)
5.5 to 9.0
100
250
10
Method of Analysis
IS 3025 (Part 08):2083, (RA :
2096), Electrometric
Method
IS 3025 (Part
18):2084, (RA: 2096), Gravimetric Method
APHA, 23rd Edition, 2018,
5200C, Closed Reflux, Titration
Method
IS 3025 (Part 39):2091,(RA :
2003), Partition Gravimetric
Method
Uncertainty of Measurement
(at 95% C.L & K= 1.96) ±0.0884
at 4.025
±0.445mg/l
at 24.429 mg/l
±6.209 mg/l
at 247.427 mg/l
±1.81 mg/l
at 9.94 mg/l
Station
Station Name FN
Date of
sampling Date of analysis
4. Mine water
sample at
discharge
point
1st 06.01.2021 07.01.2021 to
27.01.2021 7.53 BDL 8 BDL
2nd 20.01.2021 21.01.2021 to
02.02.2021 7.56 BDL 8 BDL
Analyzed by Dy.Manager-Environment
Page 3 of 7
Note: 1) The results above relate to the samples tested.
2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],
website: www.cmpdi.co.in
cmpdi
A Mini-Ratna Company
EFFLUENT WATER QUALITY REPORT
Month JANUARY Area RAIGARH Report No BSP/2021/01/05
Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 18.02.2021
Name of the Project BAROUD OC
Parameter pH Value Total suspended
Solids, mg/l C.O.D, mg/l
Oil & Grease,
mg/l
Lower Detection Limit 1.00 10 8 4
General Standards for Discharge of Environmental
Pollution (Part A: Effluent) as per Schedule VI,
Environment (Protection) Rules (max)
5.5 to 9.0
100
250
10
Method of Analysis
IS 3025 (Part 08):2083, (RA :
2096), Electrometric
Method
IS 3025 (Part
18):2084, (RA: 2096), Gravimetric Method
APHA, 23rd Edition, 2018,
5200C, Closed Reflux, Titration
Method
IS 3025 (Part 39):2091,(RA :
2003), Partition Gravimetric
Method
Uncertainty of Measurement
(at 95% C.L & K= 1.96) ±0.0884
at 4.025
±0.445mg/l
at 24.429 mg/l
±6.209 mg/l
at 247.427 mg/l
±1.81 mg/l
at 9.94 mg/l
Station
Station Name FN
Date of
sampling Date of analysis
5. Mine sump
water
1st 08.01.2021
09.01.2021 to
28.01.2021 7.82 BDL BDL BDL
2nd 20.01.2021
21.01.2021 to
03.02.2021 8.15 11 8 BDL
6. Nalla Water
1st 08.01.2021
09.01.2021 to
28.01.2021 7.87 BDL BDL BDL
2nd
20.01.2021 21.01.2021 to
03.02.2021 8.20 BDL BDL BDL
7. U/S of Kurket
River
1st 08.01.2021
09.01.2021 to
28.01.2021 7.89 BDL 8 BDL
2nd
20.01.2021 21.01.2021 to
03.02.2021 8.29 BDL 8 BDL
8. D/S of Kurket
River
1st 08.01.2021
09.01.2021 to
28.01.2021 7.83 BDL BDL BDL
2nd
20.01.2021 21.01.2021 to
03.02.2021 8.19 10 BDL BDL
Analyzed by Dy.Manager-Environment
Page 4 of 7
Note: 1) The results above relate to the samples tested.
2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],
website: www.cmpdi.co.in
cmpdi
A Mini-Ratna Company
EFFLUENT WATER QUALITY REPORT
Month JANUARY Area RAIGARH Report No BSP/2021/01/05
Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 18.02.2021
Name of the Project JAMPALI OC
Parameter pH Value Total suspended
Solids, mg/l C.O.D, mg/l
Oil & Grease,
mg/l
Lower Detection Limit 1.00 10 8 4
General Standards for Discharge of Environmental
Pollution (Part A: Effluent) as per Schedule VI,
Environment (Protection) Rules (max)
5.5 to 9.0
100
250
10
Method of Analysis
IS 3025 (Part 08):2083, (RA :
2096), Electrometric
Method
IS 3025 (Part
18):2084, (RA: 2096), Gravimetric Method
APHA, 23rd Edition, 2018,
5200C, Closed Reflux, Titration
Method
IS 3025 (Part 39):2091,(RA :
2003), Partition Gravimetric
Method
Uncertainty of Measurement
(at 95% C.L & K= 1.96) ±0.0884
at 4.025
±0.445mg/l
at 24.429 mg/l
±6.209 mg/l
at 247.427 mg/l
±1.81 mg/l
at 9.94 mg/l
Station
Station Name FN
Date of
Sampling Date of analysis
9. Mine
discharge
water
1st 08.01.2021 09.01.2021 to
28.01.2021 8.04 BDL 8 BDL
2nd 20.01.2021 21.01.2021 to
03.02.2021 8.03 BDL 16 BDL
10. At Kurket
river 100m up
stream
1st 08.01.2021 09.01.2021 to
28.01.2021 8.06 BDL BDL BDL
2nd 20.01.2021 21.01.2021 to
03.02.2021 8.19 BDL BDL BDL
11. At Kurket
river 100m
down stream
1st 08.01.2021 09.01.2021 to
28.01.2021 7.83 10 BDL BDL
2nd 20.01.2021 21.01.2021 to
03.02.2021 7.97 BDL BDL BDL
Analyzed by Dy.Manager-Environment
Page 5 of 7
Note: 1) The results above relate to the samples tested.
2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],
website: www.cmpdi.co.in
cmpdi
A Mini-Ratna Company
EFFLUENT WATER QUALITY REPORT
Month JANUARY Area RAIGARH Report No BSP/2021/01/05
Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 18.02.2021
Name of the Project GARE-PELMA IV/1 OC
Parameter pH Value Total suspended
Solids, mg/l C.O.D, mg/l
Oil & Grease,
mg/l
Lower Detection Limit 1.00 10 8 4
General Standards for Discharge of Environmental
Pollution (Part A: Effluent) as per Schedule VI,
Environment (Protection) Rules (max)
5.5 to 9.0
100
250
10
Method of Analysis
IS 3025 (Part 08):2083, (RA :
2096), Electrometric
Method
IS 3025 (Part
18):2084, (RA: 2096), Gravimetric Method
APHA, 23rd Edition, 2018,
5200C, Closed Reflux, Titration
Method
IS 3025 (Part 39):2091,(RA :
2003), Partition Gravimetric
Method
Uncertainty of Measurement
(at 95% C.L & K= 1.96) ±0.0884
at 4.025
±0.445mg/l
at 24.429 mg/l
±6.209 mg/l
at 247.427 mg/l
±1.81 mg/l
at 9.94 mg/l
Station
Station Name FN
Date of
Sampling Date of analysis
12.Mine
water
discharge of
Gare-Pelma
IV/1 OC mine
1st 11.01.2021 15.01.2021 to
02.02.2021 8.94 12 8 BDL
2nd 29.01.2021 30.01.2021 to
11.02.2021 8.86 15 8 BDL
13. At mixing
point of mine
discharge and
Pendra Nalla
1st 11.01.2021 15.01.2021 to
02.02.2021 8.80 20 16 BDL
2nd 29.01.2021 30.01.2021 to
11.02.2021 8.72 22 8 BDL
14. 100m upstream to mixing point in upstream
of Pendra Nalla
1st 11.01.2021 15.01.2021 to
02.02.2021 8.58 14 8 BDL
2nd 29.01.2021 30.01.2021 to
11.02.2021 8.61 18 8 BDL
15.100m
downstream
to mixing
point in
upstream of
Pendra Nalla
1st 11.01.2021 15.01.2021 to
02.02.2021 8.77 24 8 BDL
2nd 29.01.2021 30.01.2021 to
11.02.2021 8.72 25 8 BDL
Analyzed by Dy.Manager-Environment
Page 6 of 7
Note: 1) The results above relate to the samples tested.
2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],
website: www.cmpdi.co.in
cmpdi
A Mini-Ratna Company
EFFLUENT WATER QUALITY REPORT
Month JANUARY Area RAIGARH Report No BSP/2021/01/05
Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 18.02.2021
Name of the Project GARE-PELMA IV/2&3 OC
Parameter pH Value Total suspended
Solids, mg/l C.O.D, mg/l
Oil & Grease,
mg/l
Lower Detection Limit 1.00 10 8 4
General Standards for Discharge of Environmental
Pollution (Part A: Effluent) as per Schedule VI,
Environment (Protection) Rules (max)
5.5 to 9.0
100
250
10
Method of Analysis
IS 3025 (Part
08):2083, (RA :
2096),
Electrometric
Method
IS 3025 (Part
18):2084, (RA: 2096),
Gravimetric Method
APHA, 23rd
Edition, 2018,
5200C, Closed
Reflux, Titration
Method
IS 3025 (Part
39):2091,(RA :
2003), Partition
Gravimetric
Method
Uncertainty of Measurement
(at 95% C.L & K= 1.96) ±0.0884
at 4.025
±0.445mg/l
at 24.429 mg/l
±6.209 mg/l
at 247.427 mg/l
±1.81 mg/l
at 9.94 mg/l
Station
Station Name FN
Date of
Sampling Date of analysis
16. Main pit
1 sump water
of Gare-
Pelma IV/2&3
OC Mine
1st 11.01.2021 15.01.2021 to
02.02.2021 8.00 BDL 8 BDL
2nd 29.01.2021 30.01.2021 to
03.02.2021 8.01 BDL 8 BDL
17. Main pit 2
sump water of
Gare-Pelma
IV/2&3 OC
Mine
1st 11.01.2021 15.01.2021 to
02.02.2021 8.00 BDL BDL BDL
2nd 29.01.2021
30.01.2021 to
03.02.2021 7.99 BDL BDL BDL
18. Main pit
1 discharge
water after
OB dump of
Gare-Pelma
IV/2&3 OC
mine.
1st 11.01.2021
15.01.2021 to
02.02.2021 7.98 BDL BDL BDL
2nd 29.01.2021
30.01.2021 to
03.02.2021 8.01 BDL BDL BDL
19. Main pit
2 discharge
water after
OB dump of
Gare-Pelma
IV/2&3 OC
mine
1st 11.01.2021
15.01.2021 to
02.02.2021 8.00 BDL 8 BDL
2nd 29.01.2021 30.01.2021 to
03.02.2021 8.01 BDL 8 BDL
Analyzed by Dy.Manager-Environment
Page 7 of 7
Note: 1) The results above relate to the samples tested.
2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],
website: www.cmpdi.co.in
cmpdi
A Mini-Ratna Company
EFFLUENT WATER QUALITY REPORT
Month JANUARY Area RAIGARH Report No BSP/2021/01/05
Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 18.02.2021
Name of the Project BIJARI OC
Parameter pH Value Total suspended
Solids, mg/l C.O.D, mg/l
Oil & Grease,
mg/l
Lower Detection Limit 1.00 10 8 4
General Standards for Discharge of Environmental
Pollution (Part A: Effluent) as per Schedule VI,
Environment (Protection) Rules (max)
5.5 to 9.0
100
250
10
Method of Analysis
IS 3025 (Part
08):2083, (RA :
2096),
Electrometric
Method
IS 3025 (Part
18):2084, (RA: 2096),
Gravimetric Method
APHA, 23rd
Edition, 2018,
5200C, Closed
Reflux, Titration
Method
IS 3025 (Part
39):2091,(RA :
2003), Partition
Gravimetric
Method
Uncertainty of Measurement
(at 95% C.L & K= 1.96) ±0.0884
at 4.025
±0.445mg/l
at 24.429 mg/l
±6.209 mg/l
at 247.427 mg/l
±1.81 mg/l
at 9.94 mg/l
Station
Station Name FN
Date of
Sampling Date of analysis
20. Final
Mine
Discharge
from Patch A
1st 08.01.2021 09.01.2021 to
28.01.2021 8.08 BDL BDL BDL
2nd 20.01.2021 21.01.2021 to
03.02.2021 7.82 BDL BDL BDL
21. Final Mine Discharge from
Patch B
1st 08.01.2021 09.01.2021 to
28.01.2021 8.11 BDL BDL BDL
2nd 20.01.2021 21.01.2021 to
02.02.2021 8.10 BDL BDL BDL