Cheng County Moba Gorge Water Source Engineering of Gansu Province Environmental Management Plan Construction Unit: Water Source Engineering Construction Management Department of Moba Gorge for City Water Supply of Cheng County Assessment unit: Lanzhou University May 2012 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Transcript of Environmental Management Plan - World...

Page 1: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Cheng County Moba Gorge Water Source Engineering of Gansu Province

Environmental Management Plan

Construction Unit: Water Source Engineering Construction Management

Department of Moba Gorge for City Water Supply of Cheng County

Assessment unit: Lanzhou University

May 2012

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

wb406484
Typewritten Text
E2048 v6
wb406484
Typewritten Text
Page 2: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Environmental Management Plan for Cheng County Moba Gorge Water Source

Engineering of Gansu Province

Cheng County Moba Gorge Water Source Engineering of Gansu Province

Engineering of Gansu Province

Project Name: Cheng County Moba Gorge Water Source Engineering of Gansu Province

Commissioned By: Water Source Engineering Construction Management Department of

Moba Gorge for City Water Supply of Cheng County

Assessed By: Lanzhou University

Supervisor: Wu Junnian

Technical Director: Wu Junnian

Major Establishment Strength: Wu Junnian, Liu Guannan

Page 3: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Environmental Management Plan for Cheng County Moba Gorge Water Source

Engineering of Gansu Province

Directory

1. General Instruction………………………………………………………………………….1

1.1 Project Brief…………………………………………………………………………………..1

1.2 Objectives of Environmental Management Plan………………………………………….2

1.3 Compilation of Environmental Management Plan…………………………………………3

1.4 Design of Environmental Management Plan………………………………………………3

1.5 Details of Compilation Technology………………………………………………………….3

2. Policy, Law and Administrative Management Framework…………………………….5

2.1 Environmental Policies and Regulations Document………………………………………5

2.2 Environmental Management Organizations and Responsibilities……………………. 10

3. Project Description…………………………………………………………………………15

3.1 Construction Objective of the Project……………………………………………………..15

3.2 Implementation Schedule of the Project………………………………………………….15

3.3 Project Overview ……………………………………………………………………………15

4. Environmental Impact of the Project and Mitigation Measures Summary ……….19

4.1 Environmental Impact Assessment………………………………………………………19

4.2 Public Participation…………………………………………………………………………46

5. Environmental Management Organization of the Project……………………………47

5.1 Introduction…………………………………………………………………………………..47

5.2 Environmental Organization of Construction Period……………………………………48

5.3 Environmental Management Organization in Operation Period……………………….51

5.4 Details of Environmental Management Organization of the Project…………………..51

6. Implementation of Environmental Management Plan..............................................53

6.1 Project Environmental Management...........................................................................53

6.2 Detailed Task for Implementation of Environmental Management Plan………………55

6.3 Contract Requirements of Environmental Management………………………………..57

6.4 Information Exchange and Resolution of Undesirable Condition………………………57

6.5 Training-- Necessary Capacity Building and Means Building…………………………..58

6.6 Land Acquisition Compensation and Resettlement Compensation……………………61

6.7 temporary Site Restoration………………………………………………………………...61

7. Environmental Monitoring Plan…………………………………………………………..63

7.1 Monitoring Purposes………………………………………………………………………..63

7.2 Environmental Monitoring Organization…………………………………………………..63

7.3 Detailed Environmental Monitoring Requirements………………………………………63

8. Acceptance Investigation Content of Environmental Protection Measures……...69

8.1 Investigation of Water Environmental Protection Measures……………………………69

8.2 Investigation of Atmospheric Environmental Protection Measures…………………….69

8.3 Investigation of Acoustic Environmental Protection Measures…………………………69

8.4 Investigation of Solid Waste Treatment Measures………………………………………69

8.5 Investigation of Ecological Protection Measures………………………………………...69

8.6 Investigation of Water Loss and Soil Erosion Control…………………………………..70

Page 4: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

8.7 Investigation of Population Health Impact and Protection Measures………………….70

8.8 Investigation for Environmental Protection Measures of Resettlement Area…………70

8.9 Investigation of Risk Prevention Measures………………………………………………71

8.10 "Three Meantime" of Project Acceptance……………………………………………….71

9. Environmental Management Cost Budget and Capital Source…………………….73

9.1 Budget Distribution………………………………………………………………………….73

9.2 Capital Source and EMP Budget………………………………………………………….73

10. Information Management of Environmental Management Plan…………………..75

10.1 Environmental Management Plan……………………………………………………….75

10.2 Information Exchange…………………………………………………………………….76

10.3 Recording Mechanism…………………………………………………………………….77

10.4 Reporting Mechanism…………………………………………………………………….77

Appendix………………………………………………………………………………………...79

Appendix 1 Project Involves Environmental Standards.....................................................79

Appendix 2 Detailed Project Environmental Management Standards of Contractor……..83

Appendix 3 Detailed Project Environmental Management Standards of Project Operation

Department………………………………………………………………………………………87

Appendix 4 Summary of Project Environmental Management Plan and Environmental

Action Plan of Construction Period…………………………………………………………….89

Figure

Figure 1 Environmental Protection Measures Layout Figure for Cheng County Moba

Gorge Water Source Engineering of Gansu Province

Figure 2 Water and Soil Conservation Measures Layout Figure for Cheng County Moba

Gorge Water Source Engineering of Gansu Province

Figure 3-1 Atmosphere and Noise Monitoring Points Figure in Construction Period of

Moba Gorge Water Source Engineering of Gansu Province

Figure 3-2 Environmental Monitoring Points Figure in Construction and Operation Period

Cheng County Moba Gorge Water Source Engineering of Gansu Province

Figure 4 Water and Soil Conservation Monitoring Points Figure for Cheng County Moba

Gorge Water Source Engineering of Gansu Province

Page 5: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water
Page 6: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water
Page 7: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Environmental Management Plan for Cheng County Moba Gorge Water Source

Engineering of Gansu Province

1. General Instruction

1.1 Project Brief

Cheng County is located in Longnan City of the six parts in southern Gansu Province, and

located in 105°24 '~ 105°57' of east longitude and 33°31'~ 34°02' of north latitude.

The county is east to Hui County, west to Xihe County, southwest to Kang County with

interval of Western Han River, and the southeast is adjacent to the Lueyang County of

Shaanxi Province. The length of north to south is 55 km, the width of east to west is 52 km,

the area is about 1701 km2, the highest elevation within the county is 2377 m, the lowest

elevation is 50 m, and the county is a relatively wide graben basin in West Qinling fold belt.

Cheng County mainly comprises ―One water and three rivers‖, i.e. Western Han River,

Qingni River, Nan River and Luo River, the total water resources of the whole county is

1,276 billion m3, in which the self-produced water is 0.331 billion m3.

The total land area of the county is 1676.54 km2, the total population is 0.2652 million, of

which the agricultural population is 0.218 million people. The benefited area of the project

comprises 3 towns and 38 administrative villages, and the total population thereof is 0.103

million people.

The county town of Cheng County is divided into Hedong District and Hexi District by

taking the East River as the boundary. Hedong District is called as new town, Hexi District

is called as old town, and the south of the Nan River is called as new Nanhe District. The

population of the urban area is about 80,000. according to the ―Urban Master Plan of

Cheng County (2008-2025)‖, the central city comprises Chengguan Town, Paosha Town

and Chenyuan Town; to the recent 2015, the population of the central city planed is

130,000, the construction land area is 13 km2; to the forward 2025, the population is

220,000, and the construction land area is 22 km2; to the forward 2025, Chengnan water

plant, Hedong water plant and Paosha water plant will be built, and the total amount of

urban water supply will be reached to 65,000 m3/d.

At present, Cheng County has two tap water supply units for supplying water to the urban

area, namely County Tap Water Company and Gaofeng Water Supply Company; the

water supply source of County Tap Water Company is the well located in West Bank of

Qingni River in the Chengguan Shunjia Dam, the water of the well belongs to the

quaternary gap sedimentary water and occurs in gravel layer, and the water is mainly

supplied by the water of Qingni River and the atmospheric precipitation; however, the

contents of lead and COD contained in the surface water of Qingni River exceed the

standards of Class IV in the standard of water environmental quality, and due to the

influence of Wenchuan earthquake of Sichuan, the turbidity of the well water in the water

source is increased, odor and floaters are presented, and the health of urban residents is

impacted seriously; the water supply source of Gaofeng Water Supply Company is

Gaofeng water reservoir, and the actual daily water supply capacity of the company is

1000 m3 only as the drainage area of the water reservoir is less than 10 km2 and the

spatial and temporal distribution of precipitation is uneven. According to the survey, the

Page 8: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

existing water supply project of the urban area cannot meet the urban water demand.

In order to solve the contradiction of urban water supply, improve water quality, reduce

cost of water supply, achieve the sustainable economic and social development of Cheng

County and improve the physical health of urban residents, the Water Authority of Cheng

County consults with the relevant personnel of the World Bank to build a new urban water

supply dam by means of the loans of the World Bank, and the loan planned is 226.563

million Yuan.

Cheng County Moba gorge water source project is located in the west of the Cheng

County with 11 km, is apart from Paosha Town with 6 km and is located downstream the

Nan River basin; the geographic location of the project is as follows: 33°45' -33°38 ' of

northern latitude and 105°33'55" - 105°37'60" of east longitude, and the project belongs

to Jialing River system upstream the Yangtze River. The content of project construction

comprises project construction and management system and institutional capacity

building. The project construction mainly comprises dams, water intake structures, water

pipelines, and dam roads and etc. The content of management system institutional

capacity building comprises water resources and comprehensive environmental

management projects based on the concepts and methods of integrated river basin

management. The content of institutional capacity building comprises water source

engineering construction management department of Moba gorge for city water supply of

Cheng County, monitoring and assessment, and management of information system;

when the project is completed, the problem of difficult water supply in the urban area of

Cheng County can be solved, so that the project has good social and economic benefits.

The objectives of the project are as follows: comprehensively and effectively use the water

resources of Cheng County, solve the problem that the domestic water of Cheng County

after the disaster is difficult, and improve the water environment of Cheng County.

1.2 Objectives of Environmental Management Plan

The compilation of EMP aims at developing a set of detailed, technically feasible,

financially sustainable and workable environmental measures by targeting to the

inevitable potential adverse impact of the project to the environment, clearing the

environmental mitigation, environmental management and institution building measures to

be implemented by project contractors, supervision side, operators, environment

management department in the project construction and operation period, so as to

eliminate or compensate the adverse environmental and social impact of the project, and

reduce the adverse environmental and social impact to an acceptable level. The specific

objectives are as follows:

(1) Clear the environmental management obligations of the contractor and the operator

The environmental protection bureau of Gansu Province, the environmental protection

bureau of Longnan City, the environmental assessment unit and the design unit carry out

detailed onsite check and confirmation to the environmental protection targets, and

provide effective environmental mitigation measures, wherein the measures are

incorporated into the project design and are taken as the contractual obligations of the

contractor and the operator of the project construction.

(2) Operational guidelines for environmental management

The environmental monitoring plan of construction period and operation period provided in

Page 9: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

the environmental management plan can ensure the effective implementation of

environmental mitigation measures, and the monitoring plan will be provided to the

construction supervision unit, the environmental supervision unit and other relevant units

as an environmental protection file, so as to clear the responsibilities and the roles of the

relevant functional departments, and provide the various communication channels and

methods among the departments.

(3) Ensure the cost of environmental management action

In the environmental management plan, the cost of environmental management,

environmental supervision and capacity building are estimated, and the capital sources

are described, so as to ensure the various environmental management activities can be

implemented, wherein the management cost comprises staff salaries, office costs and

transportation costs.

The role of environmental management plan is in avoiding and controlling the adverse

environment effect in the construction and operation process of the project, so that the

impact mitigation measures, monitoring measures, legal regulatory means and safeguard

measures of the measures above to be implemented are provided; at the same time, the

environmental management plan is a critical link in connecting the impact mitigation

measures and replacement measures for the assessment and detailed description in the

environmental impact and environment assessment. For each environmental

management measure, the environmental management plan provides the technical

content, the investment estimation, the implementation plan, the functions of government

agencies, the capital sources, and the monitoring schemes of the measure. In order to

achieve reduction objective, the method involved by the environmental impact

assessment report and the environmental management plan must be implemented.

1.3 Compilation of Environmental Management Plan

The environmental management plan of the ―Cheng County Moba Gorge Water Source

Engineering of Gansu Province‖ is compiled by the engineering environmental

assessment unit, the environmental management plan is compiled by strictly complying

with national and provincial environmental management regulations. Meanwhile, the

environmental management plan particularly paid attention to the requirements of security

regulations of the World Bank under the premise of meeting the requirements of China's

environmental assessment, specifically refers to relevant provisions of the operation

regulation 4.01.

The information source for the environmental management plan of the project is as

follows:

(1) Feasibility evaluation report of the project

(2) Preliminary design of the project

(3) Environmental assessment of the project

(4) Soil and water conservation scheme of the project

1.4 Design of Environmental Management Plan

For the detailed description of environmental management, environmental supervision

and environmental monitoring and other aspects, the environmental management plan

compiled is a guiding document in the implementation process of the project, and the

action plan thereof mainly includes the following four parts:

Page 10: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Environmental impacts and mitigation measures: the main environmental impacts in

project construction period and operation period, and project measures and management

measures taken for preventing or mitigating the adverse environmental impact caused by

the project.

Environmental management and monitoring plan: environmental monitoring action taken

for ensuring the synchronous implementation of environmental protection measures and

the project construction.

Environmental monitoring plan: environmental monitoring action taken for supervising

whether the environment of construction period and operation period is standard and

ensuring the safe operation of the project and the improvement of project condition in the

project area.

Capacity building plan (i.e. personnel training): knowledge and skills training of the

management personnel, the environmental supervision personnel, full-time or part-time

personnel in the project implementation process for ensuring the implementation of

environmental management plan.

1.5 Details of Compilation Technology

The environmental management plan is compiled by appropriately altering and

replenishing on the basis of the ―Primary Design of Cheng County Moba Gorge Water

Source Engineering of Gansu Province‖ and the ―Environmental Impact Assessment of

Cheng County Moba Gorge Water Source Engineering of Gansu Province‖. As an

independent file, the environmental management plan comprises all the environmental

management activities to be implemented in the construction period and operation period

of the project; and the plan further provides action guidelines and working framework to

the adverse impact mitigation measures, environmental supervision, environmental

management and environmental monitoring in the construction period and the operation

period.

Page 11: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Environmental Management Plan for Cheng County Moba Gorge Water Source

Engineering of Gansu Province

2. Policy, Law and Administrative Management Framework

2.1 Environmental Policies and Regulations Document

2.1.1 Overview

Through the comprehensive analysis for the type, the size, the location, the environmental

sensitivity and the characteristic and degree of potential environmental impact of the

project, the main basis of the environmental assessment of the project and the revolved

policies, laws and regulations and standards comprise:

(1) Environmental protection laws and regulations;

(2) Pollution control technology policy;

(3) Socio-economic development and environmental protection plans and programs;

(4) Overall urban planning;

(5) Technical guidelines of environmental impact assessment;

(6) Environmental quality standards;

(7) Control of pollutant emission standards;

(8) Safeguard policies of the World Bank.

The policies, laws and regulations and standards above construct a frame for the policies,

laws and regulations and standards in guiding and regulating the environmental

assessment work of the project.

In addition, the environmental assessment of the project takes the feasibility study report

and the administrative examination and approval documents of the government

administrative authorities and the relevant documents with specific embodiment and

application of the policies, laws and regulations and standards above as one of the basis

of environmental assessment.

2.1.2 Environmental protection Laws and Regulations

(1) ―Environmental Protection Law of the People‘s Republic of China‖, (December 1989);

(2) ―Air Pollution Prevention Law of the People‘s Republic of China‖, (September 2009);

(3) " Water Pollution Prevention Law of the People‘s Republic of China", (June 1, 2008);

(4) " Environmental Noise Pollution Prevention Law of the People‘s Republic of China",

(March 1997);

(5) "Solid Waste Pollution Prevention Law of the People‘s Republic of China", (April 2005);

(6) "Environmental Impact Assessment Law of the People‘s Republic of China",

(September 1, 2003);

(7) "Cleaner Production Promotion Law of the People‘s Republic of China", (January 1,

2003);

(8) " Water and Soil Conservation Law of the People‘s Republic of China", (June 1991);

(9) "Forest Law of the People‘s Republic of China", (January 1998);

(10) "Wildlife Protection Law of the People‘s Republic of China", (adopted by the fourth

meeting of the Standing Committee of the Seventh National People's Congress on

November 8, 1988, and implemented from March 1, 1989. The amendment for the

―Decision on the Amendments to the ‗Wildlife Protection Law of the People‘s Republic of

Page 12: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

China‘‖ in the eleventh meeting of the Standing Committee of the Tenth National People's

Congress on August 28, 2004);

(11) "Land Management Law of the People‘s Republic of China", (August 28, 2004);

(12) "Flood Control Law of the People‘s Republic of China", (January 1, 1998).

2. 1.3 Environmental Protection Regulations, Ministries Rules and Protection List

(1) "Implementation Regulations of Soil and Water Conservation Law of the People‘s

Republic of China", (August 1, 1993);

(2) " Wild Plant Protection Regulations of the People‘s Republic of China", (September 30,

1996);

(3) " Regulations on the Nature Protection Regions of the People's Republic of China",

(October 9, 1994);

(4) "Regulations of the People's Republic of China Governing the Administration of River",

(June 10, 1988);

(5) "Regulations on the Administration of Construction Project Environmental Protection",

(November 29, 1998);

(6) "Outline of National Ecological Environmental Protection", (April 10, 2001);

(7) "‘Eleventh Five-Year Plan‘ of National Eco-protection", (UNCED 2006 [158]);

(8) "Regulations on Pollution Control of Drinking Water Source Protection Area‖, (July 10,

1989);

(9) "Public Participation and Interim Measures of Environmental Impact Assessment",

(UNCED 2006 [28]);

(9) "Notice for Strengthening Environmental Impact Assessment Work of Loan

Construction Projects of International Financial Organization‖ (four ministries, EM [1993]

No. 324).

(10) "Notice for Strengthening Environmental Protection Work of Hydropower

Construction ―, (UNCED [2005] No. 13);

(11) "Notice for Printing and Issuing ‗National Ecological Environmental Protection

Program‘ of State Environmental Protection Administration of the State Council‖,

(December 21, 2000);

(12) ―UNCED [2005] No. 24‖ Document ―Suggestion for Strengthening Ecological

Environment Protection Supervision Work of Resource Development‖ of the State

Environmental Protection Administration;

(13) "Notice for Strengthening Ecological Environment Management of Natural Resources

Development and Construction Project‖ (National Environmental Protection Agency,

December 1994);

(14) "Case for Issuing the Meeting Summary of Water Environment and Aquatic

Ecosystem Protection Technology Seminar Minutes of Water Conservancy and

Hydropower Construction Project‖ (Environmental Office letter [2006] No. 11);

(15) "Notice for Strengthening Environmental Impact Assessment Management and

Environmental Risk Prevention‖, (UNCED [2005] No. 152);

(16) "Construction Project Environmental Protection Classification Management List"

(2008);

(17) "List for National Nature Reserve of China", (2004)

(18) "List of National Key Protected Wild Animals" (National Bureau of Forestry Decree No.

Page 13: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

7 revised, February 2003);

(19) " List of National Key Protected Wild Plants (the First Amendment)‖ (August 4, 2001).

2. 1.4 Local Environmental Protection Regulations and List

(1) "Geological Environmental Protection Regulations of Gansu Province" (Gansu

Provincial People's Congress Standing Committee);

(2) "Basic Farmland Protection Regulations of Gansu Province" (Gansu Provincial

People's Congress, September 29, 1997);

(3) "Provisions (Amendments) for Implementation of Forest Law of Gansu Province‖

(Gansu Provincial People's Congress, July 30, 1997)

(4) "Measures (Amendments) for Implementation of Water Law of Gansu Province"

(Gansu Provincial People's Congress, May 28, 1997);

(5) "Measures (Amendments) for Implementation of Land Administration Law of Gansu

Province" (Gansu Provincial People's Congress, September 29, 1997)

(6) "Measures for Implementation of Fisheries Act of Gansu Province" (Gansu Provincial

People's Congress, September 29, 1997);

(7) "Measures for Implementation of Water and Soil Conservation Law of Gansu Province"

(amended by Gansu Provincial People's Congress in May 28, 1997);

(8) "Decision on Environmental Protection Problems of People's Government of Gansu

Province‖ (February 20, 1997).

2.1.5 Socio-economic Development and Environmental Protection Plan

(1) "Overall Plan for Urban Area of Cheng County" (2001-2020);

(2) "Eleventh Five-Year" Development Plan of Longnan City;

(3) "Eleventh Five-Year" Development Plan of Cheng County;

(4) Overall Plan for Restoration and Reconstruction of Cheng County after 5.12

Wenchuan Earthquake;

(5) "Eleventh Five-Year" Plan for Reasonable Use of Water Resources and Water

Resources Guarantee of Cheng County;

(6) Security Guarantee Plan of Drinking Water Source for Area of Cheng County;

(7) Special Plan for Prevention of Geological Disasters of Cheng County (2008 ~ 2015);

(8) Planning Report for Geological Disaster Prevention of Cheng County of Gansu

Province;

(9) Overall Plan of Mineral Resources of Cheng County.

2.1.6 Technical Guidelines and Specifications of Environmental Impact Assessment

(1) "Technical Guidelines of Environmental Impact Assessment--Master"

(HJ/T2.1-2.3-1993);

(2) "Technical Guidelines of Environmental Impact Assessment--Surface Water"

(HJ/T2.3-93);

(3) "Technical Guidelines of Environmental Impact Assessment--Acoustic Environment"

(HJ2.4-2008);

(4) "Technical Guidelines of Environmental Impact Assessment--Atmospheric

Environment" (HJ2.2-2008);

(5) "Technical Guidelines of Environmental Impact Assessment--Non-pollution Ecological

Impact" (HJ/T19-1997);

(6) "Technical Guidelines of Environmental Impact Assessment--Hydropower Project"

Page 14: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

(HJ/T88-2003);

(7) "Technical Specification for Water and Soil Conservation of Development and

Construction project‖ (GB50433-2008);

(8) "Technical Guidelines for Environmental Risk Assessment of Construction Project‖

(HJ/T169-2004);

(9) "Technical Specification for Management and Protection Infrastructure Construction of

Nature Reserves‖ (HJ/T129-2003);

(10) "Technical Specification for Water and Soil Conservation of Development and

Construction Projects" (GB50433-2008);

(11) "Technical Specification for Eco-environment Evaluation" (HJ/T192-2006);

(12) "Technical Specification for Comprehensive Treatment of Soil and Water

Conservation" (GB/T-16453-2008);

(13) "Quality Standard of Surface Water Environment" (GB3838-2002);

(14) "Quality Standard of Ambient Air" (GB3095-1996);

(15) "Quality Standard of Acoustic environmental" (GB3-96-2008);

(16) "Health Standards of Drinking Water" (GB5749-2006);

(17) "Noise Limit of Construction Site Boundary" (GB12523-90);

(18) "Quality Standard of Soil Environmental" (GB15618-1995);

(19) "Integrated Wastewater Discharge Standard" (GB8978-1996);

(20) "Technical Specification for Cleaning Solid Waste on the Bottom of Three Gorges

Reservoir" (HJ85-2005);

(21) "Technical Guidelines for Construction Waste of earthquake Area" (trial).

2.1.7 Environmental Quality Standard

(1) "Surface Water Environmental Quality Standard" (GB3838-2002);

(2) "Ambient Air Quality Standard" (GB3095-1996);

(3) "Acoustic Environmental Quality Standards" (GB3096-2008);

(4) "Soil Environmental Quality Standard" (GB15618-1996).

The environmental quality assessment standards and the assessment factors used in the

environmental impact assessment of the project are shown in Table 2.1-1.

The relevant environmental quality standards are shown in the Appendix 1-1 to the

Appendix 1-5.

2.1.8 Control Standards of Pollutant Discharge

(1) "Integrated Wastewater Discharge Standard" (GB8978-1996);

(2) "Integrated Discharge Standard of Air Pollutant" (GB16297-1996), wherein the

concentration limit value of unorganized discharged should be monitored.

(3) "Noise Limit of Construction Site Boundary" (GB12523-90).

The control standards of pollutant discharge and the assessment factors used in the

environmental impact assessment of the project are shown in Table 2.1-2.

The relevant control standards of pollutant discharge are shown in the Appendix 1-6 to the

Appendix 1-8.

2.1.9 Health Standards

The water of water source of Moba gorge water supply project should meet the

requirements of ―Drinking Water Health Standards" (GB-5749-2006) after treating,

wherein the quality standards and assessment factors are shown in Table 2.1-3.

Page 15: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

The relevant control standards of pollutant discharge are shown in the Appendix 1-9.

Environmental Quality Standards and Assessment Factors for Environmental

Impact Assessment of the Project

Table 2.1-1

No. Standard Name Level Assessment Factors

1

"Surface Water

Environmental Quality

Standards"

(GB3838-2002)

Class

II

pH, COD, NH3-N, total nitrogen, zinc, selenium, mercury,

lead, cyanide, oil, sulfide, dissolved oxygen, BOD5, total

phosphorus, copper, fluoride, arsenic, cadmium,

chromium (hexavalent), volatile phenols, anionic

surfactants, fecal coliform, potassium permanganate

index, water temperature, sulfate (by SO42-), chloride (by

Cl-), nitrate (by N), iron, manganese

2

"Ambient Air Quality

Standard"

(GB3095-1996)

Grad

e two PM10, NO2, CO, SO2

3

"Acoustic Environment

Quality Standard"

(GB3096-2008)

Class

II Continuous equivalent sound level A

4 "Soil Environmental

Quality Standards"

(GB15618-1995)

Grad

e one

Copper, zinc, cadmium, hexavalent chromium, lead, total

chromium, sulfur, mercury and arsenic

Control Standards of Pollutant Discharge and Assessment Factors for

Environmental Impact Assessment of the Project

Table 2.1-2

No. Standard Name Level Assessment Factors

1 "Surface Water Environment Quality

Standard" (GB3838-2002)

Grade

one

pH, suspended solids, BOD5,

CODcr, ammonia

2

"Integrated Discharge Standard of Air

Pollutant‖ (GB16297-1996), wherein the

concentration limit value of unorganized

discharged should be monitored.

Particulate matter

3 "Noise Limit of Construction Site Boundary"

(GB12523-90)

continuous equivalent sound level A

Health Standards and Assessment Factors for Environmental Impact Assessment

of the Project

Table 2.1-3

Standard Name Indexes Assessment Factors

"Drinking Water Health

Standards"

(GB5749-2006)

Microbial index Total coliforms, heat-resistant coliform

Toxicological index Arsenic, cadmium, chromium (hexavalent),

lead, mercury

Sensory properties and

general chemical index

Chromaticity, turbidity, smell and taste, PH,

aluminum, zinc

Radioactive index Total alpha radioactivity, total beta

Page 16: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

radioactivity

Note: the radioactive indexes are guide values

2.1.10 Security Policies of the World Bank

(1) "Operational Manual of the World Bank—Program of the World Bank" (bp4.01-1999);

(2) "Operational Manual of the World Bank—Operational Policies Environmental Impact

Assessment" (OP4.01);

(3) "Operational Manual of the World Bank—Operational Policies Involuntary

Resettlement" (OP4.12);

(4) "Operational Manual of the World Bank—Operational Policies Natural Habitat"

(OP4.04);

(5) "Operational Manual of the World Bank—Operational Policies Dam Safety" (OP4.37).

The proposed project will not involve indigenous people, will not involve forest sector

activities or have significant impact on forested areas, will not lead to purchase or use of

any pesticides, will not have impact on any known physical cultural resources. It also does

not involve international waters or disputed areas. Therefore, other Bank safeguards

policies are not triggered.

2.1.11 Relevant Documents of the Project

(1) Feasibility study report of the project;

(2) Preliminary design of the project;

(3) Environmental impact assessment report of the project;

(4) Approval for environmental impact assessment report of the project;

(5) Soil and water conservation program report of the project;

(6) Approval for soil and water conservation program report of the project;

(7) Water resources assessment report of the project.

2.2 Environmental Management Organizations and Responsibilities

The Central People's Government and the people's governments of the provinces

(municipalities and autonomous regions, the city (state), county (district) of China set up

environmental authorities according to the laws, and fulfill the corresponding

environmental management responsibilities according to the laws. The environmental

management institution related to the project mainly comprises the Environmental

Protection Bureau of Gansu Province, the Department of Water Resources of Gansu

Province, the Environmental Protection Bureau of Longnan City, the Department of Water

Resources of Longnan City, the Environmental Protection Bureau of Cheng County, and

the Department of Water Resources of Cheng County and etc.

(1) Environmental Protection Bureau of Gansu Province

The environmental protection bureau of Gansu Province is responsible for the

administration of the province's environmental and administrative law enforcement work,

its main responsibilities include:

A. Implement national environmental policies, laws, regulations, administrative rules and

standards; draft environmental regulations across the region, administrative regulations,

and supervise the implementation;

B. Implement environmental impact assessment of province's major economic and

technological policies, development programs and major economic development plans

according to the commission of the Provincial People's Government.

Page 17: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

C. Develop environmental protection plan, organize and compile environmental function

zoning plan and area and watershed pollution prevention plan and ecological

conservation plan, and supervise the implementation;

D. Participate in the compilation of the policies development plans of environmental

protection industry;

E. Be responsible for supervision and management of environmental protection area and

ecological environmental construction project supervision and management; and organize

plans and supervise the implementation of pollution control plan period;

F. Develop the province's total pollutant discharge control program, be responsible for

discharge application registration and permit management, and organize discharge fee

collection and supervision work;

G. Be responsible for administrative audit of environmental supervision and environmental

protection;

H. Organize the activities of international environmental protection treaties in the province;

I. Be responsible for the international economic and technological cooperation and

exchange activities of environmental protection;

J. Deal relevant foreign environmental protection affairs according to the commission of

the provincial government and etc.

The environmental protection bureau of Gansu Province has an environmental impact

assessment division specializing in the administrative work of environmental impact

assessment of each project.

(2) Department of Water Resources of Gansu Province

The department of water resources of Gansu Province is responsible for the

administration of the province's water and administrative law enforcement work, and the

main responsibilities thereof include:

A. Develop the strategies of provincial irrigation, hydropower and aquatic development,

the plans of middle- and long-term water development, and the plans of middle- and

long-term water supply of the whole province;

B. Be responsible for organizing and compiling integrated river basin plan and

professional plan;

C. Organize the compilation, submission and approval works of front plan of key water

conservancy and hydropower project, be responsible for organizing the review of the

project proposal, feasibility study report and preliminary design of the province's water

projects;

D. Be responsible for the supervision and inspection of the plan and capital

implementation and completion conditions of the water conservancy construction project;

E. Organize review, submission and approval works for the application plan of the costs of

flood control and drought protection, the cost of water conservancy construction and the

water charges and other capitals;

F. Research the regulation advices provided in water prices, taxes, fees and credit and

etc.;

G. Be responsible for organizing and guiding water resources and water environment

protection works, organize water quality and water quantity monitoring and analysis work

and dynamic monitoring work of groundwater and etc., organize the division of water

Page 18: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

function zoning and discharge control to the drinking water area and etc., view the

assimilative capacity and the setting of the discharge port of the water area, provide the

advice of total discharge amount, and supervise the implementation;

H. Be responsible for the safety supervision and management of reservoir, hydropower

and dam;

I. Develop the province's soil and water conservation policies and regulations, compile soil

and water conservation plan and annual implementation plan, and organize the

implementation;

J. Organize and guide the province's comprehensive management work of water and soil

conservation, be responsible for organizing the pre-project and construction management

work for the soil and water conservation of a small watershed and the comprehensive

treatment of a small area;

K. Organize dynamic monitoring of the province's water loss and soil erosion, and

regularly publish;

L. Organize he compilation, approval, test and acceptance work of the soil and water

conservation program of the project;

M. Be responsible for the enforcement and supervision work of relevant regulations in the

"Water and Soil Conservation Law".

The department of water resources of Gansu Province has a water and soil conservation

bureau which is responsible for the guidance and supervision work of the province's water

and soil conservation.

(3) Environmental Protection Bureau of Longnan City

The environmental protection bureau of Longnan City is responsible for the administrative

management and administrative law enforcement work of local environment protection,

and the main responsibilities thereof include:

A. Implement national environmental policies, laws, regulations, administrative rules and

standards;

B. Draft environmental regulations and administrative regulations in the region, and

supervise implementation work; implement environmental impact assessment for the

major economic and technological policies, development programs and major economic

development plan in the region according to the commission of the regional administrative

office;

C. Develop environmental protection plan, organize the compilation of river basin pollution

control plan and ecological conservation plan, and supervise the implementation work;

D. Be responsible for supervising and managing the natural ecological environmental

protection work in the jurisdiction and the environmental protection, supervision and

management work of the construction project;

E. Organize, develop and supervise the implementation of pollution control plan period;

F. Develop a total discharge amount plan of the region, be responsible for the discharge

application registration and license management, and organize and implement discharge

fee collection and supervision work;

G. Be responsible for environmental supervision and environmental protection

administrative inspection, and be responsible for international economic and technological

cooperation and exchange activities of environmental protection;

Page 19: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

H. Handel the relevant environmental protection foreign affairs according to the

commission of the local administrative office and etc.

The environmental protection bureau of Longnan City generally has an environmental

assessment management division (or pollution control division, regulatory division, natural

ecology division), which is specifically responsible for the administrative management

work of the local environmental impact assessment, and the main responsibilities of the

division comprises: be responsible for the implementation of the environment impact

assessment in the region and the unified supervision and management of the ―Three

Meantime" system; implement national and regional laws, regulations, rules and policies

about the environmental impact assessment and the ―Three Meantime" system; develop

and implement environmental impact assessment and ―Three Meantime" and other

regional laws, regulations and policies; supervise the implementation work; guide and

supervise the environmental impact assessment approval work of the regional

construction project; be responsible for the administrative license of environmental impact

assessment documents of the construction project in the range of the local environment

protection bureau; and be responsible for the administrative licensing and guidance of trial

production (run) of the construction project in the right of the region and the completion

environmental protection acceptance of the construction project and etc.

(4) Department of Water Resources of Longnan City

The department of water resources of Longnan City is responsible for the city's water

administration and administrative law enforcement work, and the main responsibilities

thereof include:

A. Be responsible for organizing and compiling integrated river basin plan and

professional plan;

B. Be responsible for the supervision and inspection of the plan and capital

implementation and completion conditions of the water conservancy construction project;

C. Organize review, submission and approval works for the application plan of the costs of

flood control and drought protection, the cost of water conservancy construction and the

water charges and other capitals;

D. Be responsible for organizing and guiding water resources and water environment

protection works, organize water quality and water quantity monitoring and analysis work

and dynamic monitoring work of groundwater and etc., organize the division of water

function zoning and discharge control to the drinking water area and etc., view the

assimilative capacity and the setting of the discharge port of the water area, provide the

advice of total discharge amount, and supervise the implementation;

E. Be responsible for the safety supervision and management of reservoir, hydropower

and dam of the whole city;

F. Organize and implement soil and water conservation policies and regulations, compile

soil and water conservation plan and annual implementation plan.

The department of water resources of Longnan City has a water conservation division,

which is mainly responsible for organizing the implementation of regional water and soil

conservation project plan, reviewing and reporting the work, and inspecting and

supervising the soil and water conservation work of the whole region.

(5) Environmental Protection Bureau of Cheng County

Page 20: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

The environmental protection bureau of Cheng County of the project is responsible for the

administrative management and administrative law enforcement work, and the main

responsibilities thereof include:

A. Implement national environmental policies, laws, regulations, administrative rules and

standards;

B. Develop the environmental protection plan of the county, and supervise the

implementation work;

C. Be responsible for supervising the natural ecological environment protection work in

the jurisdiction and the environmental protection supervision and management of the

construction project;

D. Organize, develop and supervise the implementation of the development plan pollution

sources within the specified period;

E. Develop a total pollutant discharge amount control plan of the county, be responsible

for discharge application registration and license management, and organize and

implement discharge fee collection and supervision work;

F. Be responsible for environmental supervision and environmental protection

administrative inspection and etc.

(6) Department of Water Resources of Cheng County

The department of water resources of Cheng County of the project is responsible for

water administrative management and administrative law enforcement of the county. The

department of water resources of Cheng County has a soil and water conservation

agency with the main responsibilities as follows:

A. Develop the soil and water conservation plan and annual implementation plan of the

county, and organize the implementation work;

B. Organize the comprehensive management works of the county soil and water

conservation;

C. Organize the dynamic monitoring of water loss and soil erosion in the county, and

regularly publish;

D. Organize the compilation and implementation work of the soil and water conservation

scheme of the construction project;

E. Guide to the soil and water conservation work of the whole county;

F. Monitor water loss and soil erosion, specifically soil erosion surveys, water loss and soil

erosion monitoring report, water loss and soil erosion notice data providing, integrated

control of water loss and soil erosion, benefits investigation and analysis, information

system construction and management of soil and water conservation;

G. Propagandize and implement personnel training of soil and water conservation.

The administrative framework of environmental management of China (and the relevant

part of the project) is shown in Figure 2.2-1.

Environmental Protection Bureau of Gansu Province

Department of Water Resources of Gansu Province

Environmental Protection Bureau of Longnan City

Department of Water Resources of Longnan City

People's Government of Cheng County

Page 21: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Relevant Institutions of Cheng County Government

Department of Water Resources of Longnan City

Water Source Engineering Construction Management Department of Moba Gorge for City

Water Supply of Cheng County

Figure 2.2-1 administrative framework for environmental management of China

Page 22: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Environmental Management Plan for Cheng County Moba Gorge Water Source

Engineering of Gansu Province

3. Project Description

3.1 Construction Objective of the Project

The construction objectives of the project are as follows: construction of a reservoir with a

total capacity of 1.79 million m3 and an utilizable capacity of 1.04 million m3 in Moba

gorge, wherein the maximum daily water supply of the reservoir is 47,500 m3, the average

annual water supply capacity is 1.651 million m3, and the average daily water supply is

45,200 m3. So that the urban water supply contradiction can be solved, the water quality

can be changed, the cost of water supply can be reduced, the sustainable economic and

social development of Cheng County can be achieved, and the physical health of urban

residents can be improved.

3.2 Implementation Schedule of the Project

The total construction period of the project is 27 months, of which the construction

preparation period is 11 months, the main construction period is 11 months, and the

completion period of the project is 5 months. The preparation period of 6 months of the

project is not included in the total construction period

(1) Construction preparation period

The construction preparation period is 11 months from the January of the first year to the

November, the construction content of the contractors after entering into the field

comprises field engineering, onsite traffic, construction tunnel, aggregate processing

system, concrete mixing system, temporary housing and construction factories, diversion

tunnel and excavation of dam abutments on the two banks which are implemented for the

main construction project. The control project is the diversion tunnel which has

over-current conditions in the October of the first year.

(2) Main construction period

The main construction period is 11 months from the December of the first to the October

of the next year, i.e. from closure to concrete pouring of the dam, instillation of metal

structure, and impletion of curtain grouting. The construction of the dam project is the

control project in the main construction period.

(3) Completion period of the project

The completion period of the project is 5 months from the November of the second year to

the March of the third year, and the content of the period comprises diversion tunnel

closure, reservoir storage, and completion and acceptance.

3.3 Project Overview

The project is a reservoir type project, and the characteristics are shown in Table 3.3-1.

Characteristics Table of the Project

Table 3.3-1

No. Name Unit Quantity Remark

Page 23: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

I Hydrology

1 Basin area

Whole basin km2

401

Over the dam site km2 248.2

2 Age limit of used hydrological system Year 51 Actual measurement,

1959 – 2009

3 Average annual runoff of many years Ten

thousand

m3

4352

4 Representative flow

Average annual flow of many years m3/s 1.38

Normal use (design) of flood standard and

flow

m3/s 954 P=2%

Abnormal use (check) of flood standards

and flow

m3/s 1550 P=0.2%

Diversion standards and flow of diversion

tunnel

m3/s 544 P=10%, yearly

m3/s 29.4 P=20%, October to

May

5 Sediment

Average amount of sediment suspended

sediment of many years

Ten

thousand t

14.72

Average sediment concentration of many

years

kg/m3 3.509

Annual sediment amount of annual

average bed load of many years

Ten

thousand t

2.21

II Project overview

1 Reservoir

Checked flood level m 1098.52

Designed flood level m 1096.38

Normal water level m 1092.70

Dead water level m 1068.0

Total storage capacity Ten

thousand

m3

1790

Utilizable capacity Ten

thousand

m3

1040

Dead storage Ten

thousand

m3

380

The maximum discharge capacity while

checking flood level

m3/s 1410

Page 24: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

The maximum discharge capacity while

designing flood level

m3/s 865

2 Urban water supply

Average annual water supply Ten

thousand

m3

1651

Guaranteed rate of water supply % 96.3

3 Water pipeline

Length of the pipeline km 5.15

Number of the pipeline Pcs 0.65

Design water supply flow m3/s 0.65

Leakage loss rate % 10

III Flood damage and permanent area of the

project

1 Backwater length km 3.5

2 Submerged land hm2 9.86

3 Flooded forest hm2 51.13

4 Relocation of population People 14

5 Residents of flooded area Family 3

6 Important special facilities in flood

affected

10kv line km 1.2

7 Project area Mu 145.17

Arable land thereof Mu 36.17

IV Main building

1 Retaining building

Type Roller compacted

concrete gravity dam

Ground characteristics Limestone

Basic seismic intensity Degree 8

Crest height m 1099.8

Maximum dam height m 91.4

Crest length m 136.5

Crest width m 10

2 Discharge structure

2.1 Crest overflowiring

Ground characteristics Limestone

Crest height m 1092.7

Net width of overflow section m 39

Energy dissipation form Energy dissipation by

trajectory jet

Designed flow discharge flow m3/s 462

Page 25: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Checked flow discharge flow m3/s 1003

2.2 Flood discharge sand flushing hole

Orifice size m 3.5x4.8

Hole length m 46.9

Maximum discharge capacity m3/s 107

3 Road over the dam

Length m 2810

Road width m 7

V Construction

Open excavation of earthwork Ten

thousand

m3

43.16

Earthwork backfilling Ten

thousand

m3

5.54

Rock hole dug Ten

thousand

m3

2.31

Concrete Ten

thousand

m3

25.28

Installation of metal structure t 186.5

Curtain grouting m 8580

Consolidation grouting m 3100

2 Number of major construction material

Cement Ten

thousand t

4.79

Fly ash Ten

thousand t

2.66

Steel bar and steel material Ten

thousand t

1.0

3 Labor required

Labor of construction period Day 100

4 Construction labor and resource

Power supply km 12 35kv, Cheng County

5 External transportation

Distance km 5 Reconstruction of

existing rural road

6 Construction diversion

Mode Cofferdam retaining

water

Type Tunnel division

Dimension of diversion tunnel (length x mxm 6x7.5 Type of gate hole

Page 26: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

width)

7 Construction period

Construction preparation period Month 11

Main construction period Month 11

Completion period Month 5

Total period Month 27

VI Economic Indicator

1 Static total investment Ten

thousand

Yuan

22656.3

Construction project Ten

thousand

Yuan

17032.0

0

Mechanical and electrical equipment and

installation

Ten

thousand

Yuan

920.22

Metal structure equipment and installation

project

Ten

thousand

Yuan

1351.19

Temporary construction project Ten

thousand

Yuan

3675.70

Basic reserve fund Ten

thousand

Yuan

1550.76

Financing interest construction period Ten

thousand

Yuan

458.50

Compensation cost of reservoir

inundation treatment

Ten

thousand

Yuan

3257.40

Acquisition cost of construction and

construction site

Ten

thousand

Yuan

1355.95

Environmental protect engineering cost Ten

thousand

Yuan

408.6

Soil and water conservation cost Ten

thousand

Yuan

1118.67

2 Comprehensive Economic Indicator

Net economic present value Ten

thousand

7493

Page 27: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Yuan

Internal economic rate of return % 10.39

Ratio of economic benefit 1.22

Environmental Management Plan for Cheng County Moba Gorge Water Source

Engineering of Gansu Province

4. Environmental Impact of the Project and Mitigation Measures Summary

4.1 Environmental Impact Assessment

In the implementation process of environmental impact assessment, the layout of the

project, the main environmental protection objectives in surrounding assessment range

and the sensitive points are identified (see the Figure 4.1-1), the possible adverse

environmental impacts caused by the project are as follows:

4.1.1 Impact on the hydrology and sediment

4.1.1.1 Hydrological changes

4.1.1.1.1 Impact on regional water resource

In the Cheng County Moba gorge water supply project, water is stored in a reservoir,

wherein the normal water level of the reservoir is 1092.70 m, the total capacity is1.79

million m3, the backwater length is about 3.5 km, and the designed reference water is

1.651 million m3/a. In running period, the downstream of the dam comprises a diversion

effect river section of 4 km.

4.1.1.1.2 Ecological water of river and mitigation measures

When the reservoir of Moba gorge is completed, the inflow of Nan River over the dam (the

basin area is 248.2 km2) is retained, and the mean runoff of many years is 1.22 million m3

when the reliability is 95%. The ecological water use of the river is calculated according to

the Tennant method recommended by the ―Environmental Impact Assessment

Specification of River Basin Planning‖, in which the ecological water use of Nan River is

the minimum, namely about 10% of the annual average flow as the minimum use of

ecological water, and according to the calculation of the method, the minimum ecological

water use of Nan River is 0.138 m3/s. Thus, the ecological water of the diversion effect

river section is ensured, and the dam should be provided with permanent plug holes while

construction. The plug hole should lower than the water inlet while higher than the flood

discharge sand flushing port, specifically the elevation is 1024 m-1065 m, the discharge

amount is 0.138 m3/s, thereby ensuring the minimum ecological water use of the

diversion effect river section.

4.1.1.1.3 Impact on the diversion effect river section

Due to the abouchement of Nan River from the Fengquan River downstream the dam of 4

km, and the normally annual runoff of the Fengquan River is 2.06 million m3, it can be

determined that the diversion effect river section is 4 km. The section comprises eight

villages, i.e. Zhuanwancun, Ganlushi, Majiaya, Jianjiagou, Xiaozhuang, Zhangjiashan,

Luangoumen and Niujiaya. Zhuanwancun comprises about 900 people or more, Ganlushi

comprises about 1000 people or more, Majiaya comprises about 300 people or more,

Jianjiagou comprises about 350 people or more, Xiaozhuang comprises about 250 people

or more, Zhangjiashan comprises about 600 people or more, Luangoumen comprises

Page 28: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

about 100 people or more, and Niujiaya comprises about 120 people or more. The water

of the eight villages is mainly supplied from the local mountain spring and groundwater

which are not the water in the river section, so that the impact of the project to the water

source is controllable.

The ecological water use can be ensured in case of the discharge flow ensured is 0.138

m3/s.

Figure 4.1-1 Location Diagram of Sensitive Points of the Project

4.1.1.2 Impact on Sediment Load and Mitigation Measures

The factor impacts the bedload sediment is more. According to the current technology and

the test means and equipment thereof, the accuracy of the test data is not high, the

relation of push and suspension ratio of the sediment to the various hydrological factors is

bad. In the project, the bedload sediment of the region is designed to the 15% of the

suspended load sediment by combining with the general relation of the mountain stream

Erliang River

Forest

Along the river

Plantatio

n

Reservoir region

Majiaya

Niujiaya Luangoumen

Zhangjiasha

n

Xiaozhuangcun

Jianjiago

u

Zhuanwancun

Ganlushi

Legend

Sensitive point

Dam

Scale

Page 29: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

push and suspension ratio of 10 to 20%. The annul bedload sediment of the hydrological

station of Cheng County is 133,600 t, the average total sediment load of many years is

1.024 million t, and the average sediment load modulus of many years is 682 t/km2.

According to the calculation, the average suspended load sediment of many years of

Moba gorge dam is about 147,200 t, the annual bedload sediment is about 22,100 t, and

the average total sediment load of many years is 169,000 t.

After completion of the project, the speed of the water floor is reduced, which is conducive

to sediment deposition, and thus sediment deposition speed in the reservoir can be

accelerated. In order to ensure the capacity, the project should discharge sediment to the

downstream irregularly. In the sediment discharge period, the flow of the diversion effect

river section will be increased, the sediment concentration will be increased, but the

impact to the downstream river is in the acceptable range.

4.1.2 Impact on Local Climate

After running of the reservoir, the original undulating land of the submerged area is

replaced by smooth water surface, so that the energy exchange method and intensity

between the underlying surface and the air are changed. As the heat capacity of water is

more than that of the land soil, the temperatures, before and after constructing the

reservoir, of the same point in the submerged are different, the horizontal exchange is

caused due to the temperature difference of land and water, and the temperature of the

land around the reservoir is also changed.

Due to the large-area water storage formed by the construction of the project, the

evaporation capacity is increased and the rainfall is increased; due to the effect of lower

temperature of the reservoir, the distribution of rainfall is changed, the rainfall of the

protected areas over the reservoir and the coastal flow will be reduced, and the rainfall of

the windward slope along the air flow direction will be increased; the underlying surface of

the reservoir region is changed from a land surface into a water surface, and the energy

exchange method and intensity thereof to the air are changed, so that the temperature is

changed, the annual mean temperature is increased slightly, but the regional impact is in

the acceptable range.

4.1.3 Impact on Water Environment and Mitigation Measures

4.1.3.1 Impact of Construction Period on Water Environment and Mitigation

Measures

4.1.3.1.1 Foundation Pit Wastewater Treatment Measures

The foundation pit drainage of the project is mainly composed of precipitation, seepage,

concrete pouring and maintenance water, and foundation pit excavation drainage; the

main pollutant is composed of SS, pH, and oil. According to the foundation pit wastewater

treatment experience of some large-scale hydropower projects, the drainage of the

foundation pit will not be provided with other treatment facilities, excepting the operation of

adding flocculants into the foundation pit, the drainage will be extracted after placing for 2

h; part of the drainage is used for watering to prevent dust, the rest drainage is discharged

to the nearby surrounding drains, and the sludge will be regularly removed by human. As

the treatment effect of the mixture composed of green-vitriol and polyacrylamide to the

wastewater with high SS, alkalinity and oil is good, it is recommended to use the

flocculants of this kind.

Page 30: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

4.1.3.1.2 Aggregate Washing Wastewater Treatment Measures

A primary sedimentation tank and a coagulation sedimentation tank are arranged on the

Xiaozhuang-Gumugou construction area of right bank, both the two tanks use concrete

structure, and the sizes of the tanks are designed according to the largest wastewater

discharge of 142 m3/h, wherein the residence time of the primary sedimentation tank is 1

h, the residence time of the coagulation sedimentation tank is 1.5 h; both the two tanks are

flow settling tank, the flocculant thereof is polymeric aluminum, and the specific process is

shown in the figure 4.1-2. The effective volume of the primary sedimentation tank is 142

m3, a tank is provided with a cell, the size of each cell is 18.9 m x 5.0 m x 2.3 m (length x

width x height); the effective volume of the coagulation sedimentation tank is 213 m3, tank

is provided with a cell, the size of each cell is 22.5 m x 6.3 m x 2.5 m (length x width x

height). The supernatant treated is returned to production process and applied to site

watering.

Washing wastewater, primary sedimentation tank, adding a flocculant, coagulation

sedimentation tank, supernatant, reusing or discharging, sludge transported outside,

residues place

Figure 4.1-2 Aggregate Washing Wastewater Treatment Process Flow

4.1.3.1.3 Alkaline Wastewater Treatment Measures

The Gumugou construction area is equipped with a concrete mixing system, the washing

water of the concrete mixing system is calculated as 6 m3 per shift and two shifts per day,

the sand easy to be deposited can be deposited and removed by means of an intermittent

natural sedimentation method, an appropriate amount of acid is added into the

sedimentation tank to regulate the pH value to neutral, then the sand is placed and

deposited, the clear solution can be returned to the mixing system for washing and further

can be watering the construction road, and the sediment is regularly removed by human.

The place close to the concrete mixing system is equipped with two sedimentation tanks,

wherein the tank body is shown in a concrete structure, the inner wall is corrosion

resistant, and the sizes of the tanks are designed according to the effective volume of 6.0

m3, the interior dimensions are 3 m (length) x 2 m (width) x 1.2 m (height), and the

sedimentation time thereof is more than 7 h.

4.1.3.1.4 Oily Wastewater Treatment Measures

According to the discharge and water quality of construction machinery and vehicle

washing wastewater and the like, the oily wastewater is treated by means of a small-scale

simple oil separation tank. The treatment method is featured with simple structure, low

cost, convenient management, regular cleaning, and recyclable oil slick. The small-scale

oil separation tank comprises two cells, the horizontal velocity is 0.005 m/s, the residence

time is 10 min, the discharge cycle is 7 d, and the specific design is shown in Figure 4.1-3.

The project is totally provided with 5 machinery parking areas, 95 sets of fuel construction

machinery and vehicles to be regularly cleaned, wherein the water of maintaining and

washing of each machine is 0.6 m3 / time and one time per day. In order to facilitate the

collection, the machinery parking area is provided with a special washing site surrounded

by catch drains so as to collect wastewater, and then the wastewater is entered into the oil

separation tank and subsequently reused after reaching to the standard. At the same time,

the oil leakage inspection of the machinery parking area is strengthened, and the

Page 31: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

treatment measures will be taken in time in case of oil leakage. See the Figure 4.1-1 for

the size of the special oil separation tank.

Figure 4.1-3 Design Diagram of Small Oil Separation Tank

List of Oil Separation Tank Size

Table 4.1-1

Construction site

Oily wastewater amount Size of oil

separation tank

(length x width x

height) m

Amount of oil

separation

tank

Amount of

construction

machinery

Wastewater

quantity (m3/d)

Majiaya Qiaotou machinery

parking area of left bank

15 9 3x0.38x1.3 1

Bashang achinery parking

area of left bank

15 9 3x0.38x1.3 1

Gumugou machinery parking

area of right bank

25 15 3x0.64x1.3 1

Machinery parking area of

sand and gravel mining area

20 12 3x0.51x1.3 1

Bashang achinery parking

area of right bank

16 9.6 3x0.41x1.3 1

(5) Domestic wastewater treatment measures

The construction site is provided with temporary pail latrine to collect domestic water, and

the domestic water is regularly treated by the local villagers delegated.

4.1.3.2 Impact of Operation Period on Water Environment and Mitigation Measures

4.1.3.2.1 Impact on Water Temperature

When the project is completed, the temperature of the water is very different to that of the

Water inlet

Degreaser Activated carbon

Water outlet

Page 32: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

natural river before constructing. The change of the water temperature will influence the

vertical structure of the reservoir, so as to form water temperature stratification, according

to the determination based on runoff-storage capacity ratio method, alpha=2.52, the

reservoir is a stable layered reservoir; beta=0.2, and the impact of flood to the water

temperature structure is basically free.

4.1.3.2.2 Impact on Water Quality and Mitigation Measures

According to the survey, the upstream of the reservoir has a lead-zinc concentrator, a gold

concentrator and a gold ore mine. The two concentrators has been closed by the

Environmental Protection Bureau of Cheng County, and the gold ore mine will be closed

down soon.

In addition, the ambitus of the reservoir does not have pollution and industrial pollution

enterprises, when the concentrators and the gold ore mine are closed, the impact on the

water quality of the reservoir is mainly caused by regional soil and water loss and the

organic matters of part soil are entered into the reservoir together with the sediment, so

that the sediment in the reservoir is increased, and the contents of nitrogen and

phosphorus are increased. However, the generation is relatively small, and the water

quality of the reservoir will not be impacted basically; in order to ensure the water quality

of the reservoir, the following measures should be taken when the project is completed, so

as to prevent the impact of unexpected incidents on the water quality:

(1) Strengthen water quality monitoring the reservoir area, complete the cleaning work

well, and regularly fish the floating material on the water surface of the reservoir.

(2) Draw a certain range with clear boundary as the water source protection area on the

upper and lower basins of the water intake port and the deep land-based area, protect

strictly, take practical and effective measures, and prevent water pollution.

(3) In order to ensure standard discharge of the water source, the ―Moba gorge water

source protection regulations‖ must be developed according to the relevant laws and

regulations of the Country and Longnan City, so as to protect the water source effectively.

(4) Strengthen natural vegetation protection and ecological construction, prohibit

deforestation, protect natural vegetation and water source conservation, and reduce water

loss and soil erosion.

4.1.3.2.3 Water Source Protection Measures

(1) When the ―Moba gorge water supply project is completed, the water source

engineering construction management department of Moba gorge for city water supply of

Cheng County should divide a drinking water source protection area according to the

requirements of ―Pollution Control Management Regulations of Drinking Water Source

Protection Area‖ and manage by complying with the regulations completely.

① First-grade Protection Area

Prohibit new construction and extension of the construction projects which are not related

to the water supply facilities and water sources protection, prohibit the discharge to the

basin, and remove the discharge port;

Prohibit the wharf which is not related to the water supply requirements, and prohibit

vessel callings;

Prohibit the industrial waste, municipal waste, manure and other wastes from stacking and

storing;

Page 33: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Prohibit the construction of oil depot;

Prohibit from engaging in cultivation and livestock restocking, and strictly control cage

culture activities;

Prohibit the tourist activities and other activities which may pollute the water source.

② Second-grade Protection Area

Prohibit new construction and extension of the construction projects for discharging

pollutant to the water. The discharge of pollutant in the reconstruction project must be

reduced, the wastewater discharge of the original discharge port must be reduced, and

the water quality in the protection area must be in line with the water quality standards

provided;

Prohibit the construction of the wharf for loading/unloading garbage, manure, oil and toxic

substances.

③ Quasi-protection Area

Wastewater directly or indirectly discharged to the basin must be in line with the national

and regional wastewater discharge standards. When the total discharge amount of the

protection area cannot be in line with the standards provided, the discharge load must be

reduced.

(2) The water source engineering construction management department of Moba gorge

for city water supply of Cheng County should compile an ―Environment Protection Plan of

Drinking Water Source of Cheng County‖ according to the ―Compilation Technical

Specifications of the ‘Environment Protection Plan of National Drinking Water Source‘‖

(May 2006).

(3) Strengthen the construction of water conservation area. In the protection area of Moba

gorge water source, the vegetation construction should be strengthened, the forestation

should be strengthened, the damage to the vegetation cover should be reduced, the forest

coverage should be improved, and the ecological water source should be protected.

(4) Strengthen the use management of farmland pesticide and fertilizer in the protection

area. As the upstream of the Moba gorge water source has part of plantation, the

large-scale use of pesticide and fertilizer will be entered into the surface water bodies

together with the rainwater, so that the ammonia nitrogen, nitrate nitrogen and nitrite

nitrogen in the water quality of water source are obviously exceeded the standards, which

not only affect the water quality of the reservoir, but also affect people's health directly.

Thus, the use of pesticide and fertilizer must be strengthened, and the agricultural

non-point pollution should be reduced.

(5) Order to close the two concentrators upstream the reservoir, and close the gold ore

mine, treat the remaining issues, and develop perfect emergency plan.

(6) Strengthen water quality monitoring of water source

4.1.3.2.4 Impact for Domestic Wastewater of Management Station and Mitigation

Measures

The wastewater discharged in the operation period mainly comprises the domestic

wastewater of managerial personnel of the management station, wherein the fixed staff of

the management station is 35 people, the maximum water consumption of the production

and living area is about 3.5 m3/d on the basis of 100L/person/d. Accordingly, the domestic

wastewater discharge is about 3.3 m3/d. In order to ensure that the pollution of the water

Page 34: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

source caused by the domestic wastewater generated by the managerial personnel of the

management station is prevented from is prevented, the WSZ buried wastewater

treatment equipment is recommended to treat the domestic wastewater generated by the

managerial personnel, wherein the specific process is shown in Figure 4.1-4. After treating

by the equipment, the discharge concentrations of CODcr, BOD5 and SS are 60 mg/L,

30 mg/L and 60 mg/L, respectively; so that the first-grade standard in the ―Integrated

Wastewater Discharge Standard" (GB8978-1996) can be met, the domestic wastewater

treated is used as the surrounding green water, and the sludge settled is used as

agricultural fertilizer. See the Table 4.1-2 for the effects of WSZ buried wastewater

treatment equipment.

Wastewater, primary sedimentation tank, regulation tank, A-level biological tank, pump,

fan, 0-level biological tank, secondary sedimentation tank, disinfection tank, discharge,

sludge collection well, pump, sludge tank, nightcart Sinotrans or mud cake Sinotrans after

dehydration

Figure 4.1-4 Integrated Domestic Wastewater Treatment Flow Chart

List for Treatment Effect of Buried Wastewater Treatment Equipment

Table 4.1-2

Project CODcr BOD5 SS

Discharge

concentration

(mg/L)

Discharge

(t/a) Discharge

concentration

(mg/L)

Discharge

(t/a) Discharge

concentration

(mg/L)

Discharge

(t/a)

Before 300 0.20 180 0.18 200 0.20

After 60 0.04 30 0.03 60 0.06

Treatment

efficiency 80% 83.3% 70%

4.1.4 Impact on Atmospheric Environment and Mitigation Measures

In the project, the atmospheric pollutant is mainly generated in construction period, the

atmospheric pollution of operation period is basically free, and the impact on atmospheric

environment and the mitigation measures are target to the construction period.

4.1.4.1 Construction Dust Impacts and Mitigation Measures

Construction dust mainly comprises transport vehicles dust, natural wind dust, ground

building materials stacking yard dust and construction process dust. In order to reduce the

impact of dust on the environment and the construction workers, the following mitigation

measures should be taken:

(1) In the construction process, the construction site will be provided with blocks and

envelope to reduce dust diffusion, the block and envelope play a significant role in

reducing the pollution of the dust to the environment; when the wind speed is 2.5 m/s, the

impact distance can be shortened by 40%. The surrounding space of the construction site

is continuously equipped with the blocks of less than 2.5 m, and the blocks are firm and

beautiful;

(2) Assign the staff to water the construction site regularly to reduce dust emission on the

construction site, wherein the time of watering is determined according to the weather,

wherein the general frequency is 1 to 2 times per day, and the time can be appropriately

Page 35: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

increased in case of high wind or dry weather. The impact of watering operation on the

construction site is large to the dust; after watering the dust can be reduced by 28 to 75%,

and therefore the impact of the dust on the environment is reduced greatly;

(3) Set a tarpaulin on the vehicle for transporting the building materials and the

construction waste to reduce scatter. At the same time, the tires of the vehicle should be

cleaned with water while accessing the site and loading and unloading on the site, and the

traffic route of the vehicle should be prevented from the residential areas as much as

possible.

(4) In the application of commercial concrete, the construction work of windy weather

should be prevented as much as possible. At present, it is determined that the earthwork

and stonework construction is prohibited in wind of Category 4, the project can learn from

the provision;

(5) Assign a specially-assigned person who is specifically in charge of the treatment,

cleaning and stacking of spoil, construction waste and building material on the

construction site, wherein the stacking yard should be provided with a cloth cover or

watered to prevent secondary dust;

(6) The construction waste and spoil should be treated and cleaned in time, so as to

reduce the space, prevent dust pollution, and improve the environment of construction

site;

(7) In the mechanical excavation process in the tunnel, the intermittent operation method

is used, the ventilation should be in time, and the construction worker should wear a mask,

if necessary.

4.1.4.2 Exhaust Gas Environmental Impact and Mitigation Measures

In the construction process, the fuel exhaust gas generated by the construction machinery

and the transport vehicles mainly comprises CO, NOx and THC. The total amount of the

fuel consumed by the project is 1663.4 t, and the discharge of each pollutant is as follows:

CO is 148.1 t, NOx is 95.78 t and THC is 27.5 t; the tail gas discharge port of the fuel

machine is low, and the discharge belongs to low-point source disorder discharge, and the

discharge mainly in the range of 100 m in relation to the discharge source. In the project,

the environmental sensitive points in the range of 100 m in relation to the construction

area are free, and the discharge mainly impacts the construction area. The impact of the

transport vehicles on the environment along the route in the transportation process is

relatively small.

In order to mitigate the impact of exhaust gas on the environment, the management of

large-scale fuel construction machinery and vehicles should be strengthened, the regular

inspection and maintenance system should be implemented, and all the tail gas discharge

of fuel machinery and vehicles of the contractor should implemented according to the

―Automobile Air Pollutants Discharge Standards‖, and the smoke and dust removal

equipment must be provided in case of the purpose of standard discharge cannot be

achieved. The construction machinery uses unleaded gasoline and other high-quality

fuels. Strictly implement ―In-use Vehicle Rejection Standards‖, implement a mandatory

retirement and update system, and update the old vehicle with more engine fuel

consumption, low efficiency and seriously excessive exhaust gas discharge.

4.1.5 Impact on Acoustic Environment and Mitigation Measures

Page 36: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

The noise impact of the project is mainly presented in the construction period, the noise

impact of the operation period on the environment is relatively small, so that the impact on

acoustic environment and mitigation measures are mainly targeted to the construction

period.

The construction machinery used in the project mainly comprises rock drilling machines,

bulldozers, excavators, mixers and drills and etc., and the noise source will have some

impact on the surrounding acoustic environment without taking measures. The acoustic

pressure level is shown in Table 4.1-3, and the prediction results are shown in Table 4.1-4.

Acoustic Level Test Value and Range of Construction Mechanical Equipment

Table 4.1-3 Unit: dB(A)

No. Construction equipment Distance of the test point to the

construction equipment/m

Maximum acoustic

level/dB

1 Rock drilling machine 5 100

2 Bulldozer 5 86

3 Excavator 5 84

4 Mixer 5 87

5 Drill 5 95

Prediction Value of Environmental Noise Impact of Construction Machinery

Table 4.1-4

Acoustic level

dB(A)

Construction

machinery

Distance (m) Standard value

dB (A)

Standard

distance

(m)

10 20 40 60 80 100 150 Daytim

e

Nightti

me

Daytim

e

Nightti

me

Rock drilling

machine

94.0 88.0 82 76.4 74.0 72.0 70.5 75 55 75 1250

Bulldozer 81.0 75.0 69.0 65.4 63.0 61.0 57.5 75 55 35 170

Excavator 80.0 74.0 68.0 64.4 62.0 60.0 56.5 75 55 18 177

Mixer 78.0 72.0 66.0 62.4 60.0 58.0 54.5 70 55 24 140

Drill 89.0 83.0 77.0 71.4 69.0 67.0 63.5 75 55 50 200

With analysis, the following conclusions can be obtained:

(1) In case of the use of single construction machinery, the ―Noise Limit of Construction

Site Boundary‖ GB12523-90 can be achieve in the place apart from the construction site

with 75 m at daytime, and the standard limit can be achieve in the place apart from the

construction site with 1250 m at nighttime. But in the actual construction process, variety

of machines are always used simultaneously, the noise impact will be greater than the

scope;

(2) In the range with the distance about 5-35 m to the construction site boundary, the

impact of construction noise on the surrounding acoustic environment is relatively large;

(3) With the completion of the project, the construction noise will no longer exist, so that

the adverse impact of construction noise on the environment is temporary and short-term.

In order to mitigate the impact of noise in the construction period, the following mitigation

Page 37: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

measures should be taken:

(1) Control from the acoustic source: construction units should require the main

mechanical equipment used by the construction unit is low-noise mechanical equipment

while signing the contract with the construction unit, meanwhile, the construction unit

should appoint a specially-assigned person to regularly maintain and service the

equipment in the construction process, and the construction unit should be responsible for

training the on-site staff so as to use the various machines by complying with the

operation specifications strictly. Reasonably arrange the service time of hammers, air

hammers and rock drill machine and other high-noise construction machinery, reasonably

arrange blasting time, and reduce the noise generated by the equipment in the abnormal

operation process. As the distance of Majiaya construction site to the Majiaya is 400 mm,

the distance of Xiaozhuang construction site to the Xiaozhuang is 650 m, the nighttime

construction will have a greater impact on them, so that the high-noise construction

machinery (such as rock drilling machine and drill) should be prohibited from night

construction.

(2) In the structure stage of construction, the exterior of the building should be equipped

with a block, so as to reduce the impact of equipment noise on the surrounding

environment.

(3) Personal protective measures of construction workers: strengthen labor protection,

and improve workers' working conditions. For the construction workers in the high-noise

environment of the first production line, the consecutive working hours per day should not

be more than 6 h; the construction workers with large noise impact should be provided

with noise protective equipment; and the workers on the construction site should wear

anti-noise cotton to reduce the impact of noise.

4.1.6 Impact of Solid Waste on Environment and Mitigation Measures Thereof

4.1.6.1 Impact of Solid Waste of Construction Period on Environment and Mitigation

Measures Thereof

4.1.6.1.1 Impact of Construction Waste and Vegetation Cleaning on Environment

and Mitigation Measures

Reference to the ―Technical Specification for Cleaning Solid Waste on the Bottom of Three

Gorges Reservoir" and the requirement of water source protection, the vegetation and the

construction waste of submerged area in the project should be cleaned. According to the

estimation, the vegetation to be cleaned is about 50,000 m3, and the construction waste

cleaned is about 14.13 t. The part of the vegetation cleaned further can be restored, and

the optional stacking of the vegetation not only has impact on the environment, but also

wastes resources. The vegetation which can be restored is recommended to be given the

farmers of the surrounding villages, and the vegetation which cannot be restored is

transported to the landfill site of Cheng County. The construction waste cleaned is

transported to the residues place of the project.

4.1.6.1.2 Impact of Household Wastes of Construction Workers on Environment and

Mitigation Measures

As the huge quantities of the project, the construction workers are more, the random

storage of a lot of household wastes not only pollute the environment, but also easy to

breed mosquitoes, which is harmful to human health. In order to mitigate the

Page 38: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

environmental impact of household wastes, each construction site should be equipped

with two garbage cans, and the total number of the garbage can in the construction site is

28. The household wastes are uniformly stored in a sealed garbage can, regularly

collected by a special car and subsequently transported to the landfill site of Cheng

County to landfill.

4.1.6.2 Impact of Solid Waste of Operation Period on Environment and Mitigation

Measures

When the project is completed, the total establishment determined of the operation

management personnel is 35 people. The household waste generated by each person per

day is 0.8 kg, and the household waste generated by the 35 people per year is 10.22 t. In

order to prevent the impact of household waste on the surrounding environment, the

management station is provided with 2 garbage cans to collect that, and the household

waste will be regularly transported to the landfill site of Cheng County to implement

centralized treatment.

4.1.7 Impact of Environmental Geology and Mitigation Measures

The dam area of Moba gorge water source project and the neighborhoods belong to

east-west Qinling tectonic system and the composite part on the east of the Wudu epsilon

structural system, the project is located in the northwest edge of the emblem basin. Both

the north and south sides are composed of a series of curved folds and fractures of SWW

~ NEE direction. In the early Quaternary Pleistocene, the area also belongs to the general

uplift phase of Qinghai-Tibet Plateau due to the impact of movement of the Himalaya, and

accretion of 10 to 50 m thick of the Quaternary system is accumulated in the area.

In the project area, the movement of the new construction is relatively active, and the

movement mainly comprises differential uplift and subsidence, the movement is more

prominent in the Quaternary; the valley terrace is developed, and the more active

fractures are developed in the periphery of the project area. In the range of the project

area, the active fracture is free, and the construction site is in a relatively stable tectonic

area. The acceleration of peak ground motion of the construction site is 0.20 g, the basic

earthquake intensity is VIII degree, and the ground motion response spectrum

characteristic period is 0.40s. The distance of the latest active fracture to the dam is 6 km.

In order to mitigate the impact of environmental geological disasters on the project, the

purpose of protecting geological environment and preventing and reducing the loss of

geological disasters should be achieved according to the principle of "prevention first,

combining prevention with control", and the following recommendations of control

measures are provided for the various types of geological disasters:

(1) For the collapse of fat rock and soil and caving and other geological disasters which

may be presented while excavating the abutment construction, temporary support or

temporary bracing and other measures can be taken to ensure the security and stability of

abutment construction, and the surface and groundwater discharge work should be

simultaneously completed well.

(2) For the collapse and caving-in and other geological disasters of slope break and

weathered sediment layer which may be presented while excavating the inlet of the water

tunnel, the outlet slope and the construction, temporary support or temporary bracing and

other measures can be taken while combining with the permanent slope protection

Page 39: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

measures of the hole face slope, so as to ensure the security and stability of construction

and operation, and the discharge and guide work of surface and groundwater should be

simultaneously completed well.

(3) When the tunnel through the broken belt or soft interlayer, the stability of surrounding

rock is poor, the collapse, roof collapse and other geological disasters may be caused, the

support should be provided in time while excavating, the support should be provided while

excavating, and the waterproofing work of the tunnel should be made well.

(4) For the lateral sliding of foundation pit geotechnical slope and collapse and other

geological disasters which may be presented in the excavation process of dam foundation,

temporary support or temporary bracing and other measures can be taken, the high slope

formed after excavation should be shown in the form of cascade slope, so as to ensure

the safety of the foundation pit slope in the construction period.

(5) The earthwork and stonework construction should be subjected to the operating for

filling with the excavation as far as possible, so that the unstable slope caused by stacking

the residues can be reduced, the residues must be stacked should be provided with

corresponding protective measures.

4.1.8 Impact on Ecological Environment and Mitigation Measures

4.1.8.1 Impact on Terrestrial Animals and Mitigation Measures

4.1.8.1.1 Impact of Construction Period on Terrestrial Animals and Mitigation

Measures

(1) Impact on mammals

The interference of construction activities of the project to the mammals mainly in the hub,

plant and tunnel construction areas, the impact on the mammals mainly comprises the

drive of construction activities and construction noise to the mammals, namely the

animals fled to other places after frightening, and the food debris and wastes left behind

by human activity will attract rodents (mice) gather in the construction area. As mammals

will avoid the harm caused by the project construction by means of migration, the total

direct impact of the project construction to the mammals is small. With the completion of

the construction activities and the restoration of the construction site and the nearby

natural ecological environment, the animals will return to the original project area, so that

the long-term impact of the project on the mammals is small.

(2) Impact on birds

The construction activities will cause disturbance and destruction in the habitat of the bird,

so that the habitat of the bird will be directly or indirectly destroyed, the nests will be

damaged, and the bird habitat in the shrub niche will be disturbed. Due to theses impacts,

most of the birds will migrate to other places far from the construction site, and a small

part of the bird with shrubs and forest-dwelling habitat will disappear from the project area

due to the loss of the habitat; a part of the bird populations will be reduced as the nest

destruction, particularly the construction period is in the bird breeding season (summer).

The overall result is that the species and number of the bird in the project range are

reduced. Since most birds will fly and make a short-distance migration to avoid the harm

caused by the construction project, the impact of the project construction on the bird is

small. The main indirection impact is the reduction of the foods such as rodents of the

birds in the project area caused by the construction interference, thereby forcing the birds

Page 40: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

to prey in a greater range. With the completion of the construction activities and the

restoration of the line construction site and the nearby natural ecological environment, the

birds in the project area will return to the project area, so that the long-term of the project

on the birds is small.

In order to ease the impact of construction period on the terrestrial organisms, the

education of ecological protection to the construction workers should be strengthened by

means of notice, dissemination of brochures and other methods in the construction period

of the project, the construction workers are strictly prevented from cutting the trees,

outside the construction site, without permission by means of institutionalization, and the

construction workers are prohibited from preying frogs, birds and snakes and other wild

animals. The Majiaya Qiaotou construction site of the left bank, the construction site

upstream the dam of left bank, the Xiaozhuang-Gumugou construction site of right bank,

the dam construction site between the cofferdams, the construction site upstream the dam

of right bank and water pipeline construction site and other sites are provided with 1 to 2

blocks of terrestrial vegetation and wildlife protection warning signs, and the total number

of the warning sign is 15 blocks. The warning signs are thin steel plates with blue bottom

and white words, the specification of the warning sign is 100 cm x 60 cm, (length x width),

and the warning sign has the words of prohibiting vegetation destruction and wildlife

hunting.

The operation mode and time of the construction machinery should be reasonably

arrange, the construction mechanical equipment should be the mechanical equipment

with low acoustic level, and the time of whistle of the transport vehicle should be reduced,

so as to reduce the disturbance of construction noise to the wildlife.

4.1.8.1.2 Impact of Operation Period on Terrestrial Animals and Mitigation Measures

When the project is completed, the impact of the project on the local animals will not be

significant while ensuring the discharge ecological water use. The habitat of the wildlife at

the reservoir area will not be reduced as the water storage of the project, and the project

will impact some species of the reservoir area; however, the impact is short, and the new

habitat environment can be formed after a period of time, so that the impact of the project

on the local wildlife is in an acceptable range. The damage of variety of vegetation and

habitat types caused by the construction should be gradually restored by implementing

ecological restoration measures in the operation period, and the wildlife habitat can be

partially restored.

4.1.8.2 Impact on Aquatic Life and Mitigation Measures

According to the ―Aquatic Life Status Monitoring of Environmental Impact Assessment of

Cheng County Moba Gorge Water Source Engineering of Gansu Province and Apecial

Report of Assessment‖ provided by the Fengyuan ecological counseling center of Gansu,

the following analysis is provided:

(1) Impact on fish and mitigation measures

The construction of the project will change the position for the spawning ground and the

wintering ground of Schizothorax subfamily in a short time, but due to the Schizothorax

fish will soon find a new wintering ground and spawning ground as the same habitat

upstream, so that the wintering and spawning process can be carried out. When the new

wintering ground and spawning ground are found, the impact of the project is free. Thus,

Page 41: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

the impact of the project on the wintering and spawning of the Schizothorax fish is free

while ensuring the discharge water.

In order to mitigate the impact of the project on aquatic life, following measures should be

taken:

① The most basic discharge flow for the growth, reproduction, habitat and wintering and

other survival conditions of the aquatic life (especially fish) must be ensured, particularly

the discharge should be increased in fish breeding and wintering season.

② Effectively implement the spirit of ―Chinese Aquatic Resource Conservation Platform

for Action‖, implement the aquatic organisms maintenance system of "who develops

protection, who benefits compensation, who damages restoration", and ensure the

on-time and in-full funds for the various funds of aquatic life resources, particularly for

the germplasm resources communication and aquatic biological monitoring.

③ The owners should increase the propaganda of the relevant laws and regulations for

the protection of aquatic organisms, strictly crack down the illegal practices of poison

fishing, electric fish, catch fish and excessive catch by coordinating the local fishery

agencies, and resolutely implement the spirit for the notice of natural waters banned of

Gansu Province, so as to ensure sustainable development of fish resources, and

long-term use purpose.

④ Purchase Jialing Schizopygopsis Tajiri Schizothorax fish artificially bred to implement

discharge proliferation. When the water project is finished and run, the discharge cycle is

three years, the amount thereof is 2000 Jialing Schizopygopsis Tajiri Schizothorax fishes

with the size of 3 to 4 cm, the discharge is a long-term work, and the discharge fees are

included in the operation costs.

(2) Impact on plankton

After the completion of the dam, a reservoir of water is formed, and lots of land and

vegetation are flooded; due to the nutrient leached from the flooded soil, the organic

matter provided by the decomposition of flooded plants and the scouring effect of the

runoff to the surface, a number of nutrients are provided for the growth of algae. At the

same time, the growth of algae is convenient as the speed of water flow is reduced, the

transparency is improved, and the algal blooms can be promoted. However, when

phytoplankton blooms, the transparency of the water is reduced, the optical radiation

condition of the water is changed, and the phytoplankton in the reservoir is stabilized after

a period of time, so as to reach to a new dynamic equilibrium of algae number.

The zooplankton of the reservoir mainly comprises rotifers, cladocerans and copepods.

The existing volume and production level of the zooplankton are the impact on the existing

volume and production capacity of algae, bacteria and other microorganisms, and the

zooplankton is another biological resource in the water reservoir. The change for the

geographical position, climate, water temperature and water level of the reservoir are

closely related to the reproduction of the zooplankton.

(3) Impact on zoobenthos

The initial stage when the project is completed, the sediment is deposited on the upstream

of the dam, the water surface is expanded, the types of zooplankton, the number of

individuals and biomass are increased and improved, a good growing environment and

food source are provided to the zoobenthos, so that the biomass and the density of the

Page 42: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

zoobenthos will be increased, and a rich food source is provided for many indigenous

fishes; but as time goes on, the silt layer is thickened, the living environment of the

zoobenthos is damaged, and there are some negative impacts on the growth and

reproduction of the zoobenthos. If the normal ecological discharge downstream the dam is

ensured, the adverse impacts to the zoobenthos are basically free.

4.1.8.3 Impact on Terrestrial Plant

In the permanent land of the project, the occupation land of forest is 57.91 hm2 and the

occupation land of cultivation is 15.33 hm2; according to the statistics of Cheng County,

the local annual production of forest land per hectare is 3200 kg, the annual output of

arable land per hectare is 2746.83 kg, the loss of the project to the local biomass is 234.37

t/a, and the details are shown in Table 4.1-5.

List for Losses of Project Land to Local Biomass

Table 4.1-5

Type Land area (hm2) Biomass loss (t/a)

Forest 57.91 185.31

Plantation 15.33 49.06

Total 73.24 234.37

The basin area upstream the Moba gorge of Nan River is 248.2 km, the agricultural

acreage is 3133.3 hm2, the forest area is 17133.3 hm2, grassland is 1800 hm2, and the

vegetation coverage in the area is 69%. Although the project will have some impacts on

the local plant, the impact on the plant of the whole area is in the acceptable range.

4.1.8.4 Impact on Whole Ecological Environment of the Area

According to the existing data and the site investigation, the assessment range of Cheng

County Moba gorge water source engineering is 1200 hm2. According to the calculation

method provided in the ―Technical Regulations of Ecological Environment Status

Assessment (Trail)‖ (HJ/T192-2006), the reference to the comprehensive evaluation for

the ecological environmental quality of Nantong City provided by Shen Weimin and

Qianzhen and others, the study for the environmental quality evaluation of Minjiang River

provided by Zheng Shujuan and the combination of satellite remote sensing data, it can

be obtained that the ecological quality index EI before completing the project is 61.89, and

the ecological quality index EI after completing the project is 61.69, and both the indexes

are good eco-environmental quality evaluation; the absolute value of delta EI is 0.2 <2, so

that it can be proved that the environmental quality before and after the project

construction has no significant change.

4.1.9 Impact on Water Loss and Soil Erosion and Mitigation Measures

4.1.9.1 Project Land Overview

The total land of the project construction is95.36 hm2, in which the disturbance land of the

project construction is 41.51 hm2, and the flooded area of the reservoir area is 53.85 hm2;

according to the land type, the arable land is 12.92 hm2, the forest is 51.64 hm2, and the

unused land is 30.81 hm2; according to the land nature, the land comprises a

permanent land of 71.91 hm2 and temporary land of 23.45 hm2, and the details are

shown in Table 4.1-6.

Statistical Table of Project Land

Table 4.1-6 Unit: hm2

Page 43: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Project Division Area Subtotal

Plantation Forest Unused land

Permanent

Land

Main

project

Dam of

Moba Gorge

5.13 1.27 6.4

Management

Station

0.8 0.07 0.87

Road over

the dam

1.07 2.61 3.68

Water

pipeline

4.4 0.58 2.13 7.11

Land route of reservoir

submerged area

7.45 45.13 1.27 53.85

Subtotal 12.92 51.64 7.35 71.91

Temporary

land

Construction site and

office and living area

8.2 8.2

Residues place 10.9 10.9

Construction road 2.25 2.25

Quarry 2.1 2.1

Subtotal 23.45 23.45

Total 12.92 51.64 30.8 95.36

4.1.9.2 Earth-rock Overview

The total excavation volume of the project is 453,600 m3 ((including cofferdam removal

material of 3,200 m3), wherein the earthwork is 123,300 m3; the fill capacity is 386,300

m3, of which the earth fill is 44,200 m3, the gravel fill is 2,300 m3, the stone fill is 800 m3,

the sand and gravel fill is 14,000 m3, and the artificial aggregate rock is 325,000 m3; the

earthwork used is 61,300 m3; the residual earthwork is 467,300 m3 (including the

residues of mining stripping layer of 75,000 m3), and the earthwork borrowed is 400,000

m3.

4.1.9.3 Material Intake Yard Profile and Rationality Analysis

The material intake yard of natural material of the project is located in Xiaozhuang stock

ground, wherein the stock ground is arranged on the right bank of the Nan River

downstream the dam and the west side of Xiaozhuangcun, the linear distance of the stock

ground to the dam is about 800, the distance to the Xiaozhuangcun is about 650 m, and

there are footpaths and simple roads for communicating with the Xiaozhuangcun, so that

the traffic is relatively convenient.

The stock ground is shown in the form of a spur protruded to east part, the topography of

the east side and the north side is high and steep and is shown in the form of an

escarpment, the slope thereof is nearly vertical, and the rock is exposed; the elevation for

Page 44: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

the bottom of the slope of north side is about 1100 m, the bottom of the slope to the east

direction is gradually lift up to 1125 ~ 1150 m, the slope height of north side is about 100 m,

the slope height of east side is about 25 ~ 50 m; the south side is a colluvial product slope,

of which the slope is smooth, the slope angle is 20 to 25 DEG; the topography of the west

side is the highest, a wide and slow ridge is extended along east-west direction, the

topography is shown in the form that the west part is high and the east part is low, the

slope angles for the north and south sides of the ridge are 30 to 35 DEG, and the surface

layer is colluvial product gravel soil, and the thickness thereof is 3 ~ 15 m.

The engineering properties for the rock of the stock ground are good, the saturated

compressive strength, the softening coefficient and the dry density of the rock are capable

of meeting the requirements of the relevant specifications to the artificial coarse and fine

aggregates, the top of the slope is provided with a colluvial product and residual product

layer of 3 to 15 thick, so that the clean work is necessary. The mining length of north-south

direction is 220 m, the mining length of east-west direction is 120 m, and the excavation

area is about 26,000 m2, wherein the thickness of the useful layer excavated is 50 m, and

the reserve thereof is about 1.30 million m3 by means of the calculation method of

average thickness. The coarse and fine aggregates for the concrete of the RCC gravity

dam are about 327,800 m3, so that the reserve is in line with the requirements of the

regulation.

The material intake yard is located in a mountainous area, the residents surround the

material intake yard are basically free, the noise generated by means of daytime

construction can be reached to the standard on the place outside the yard about 200 m,

the nighttime construction is prevented, and the impact on the Xiaozhuangcun apart from

the yard with 650 m is in the acceptable range; and the land type of the material intake

yard belongs to unused land. Thus, the material intake yard has no environmental

constraint factors. The detailed analysis is shown in Table 4.1-7.

Rationality Analysis for Selection Environment of Stock Ground

Table 4.1-7

Project material intake yard Environm

ent

rationality

assessme

nt

Whether the project is in environmentally

sensitive areas (such as nature

reserves, scenic spots, cultural heritage

and etc.)

The yard is not in environmentally sensitive

areas

Reasonab

le

Whether the project is in an important

resource ground (such as basic

farmland, specialty sites and etc.)

The land type of the yard belongs to useful

land

Reasonab

le

Whether the project is in environmental

risk sections (such as avalanches,

landslides, mudslides, flood channel,

wind tunnel and etc.)

The geology of the yard is stable, and the

yard is not in the risk sections

Reasonab

le

Whether the environment sensitive

objective will be impacted

The surrounding places of the yard have no

residential areas, rare vegetation and other

Reasonab

le

Page 45: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

environmental sensitive targets.

Whether the landscape restoration,

vegetation restoration and land

restoration and the like of the project are

easy

The impact on the vegetation of the mining

process of the yard is relatively small, and

the vegetation can be restored in a certain

degree after mining.

Reasonab

le

Whether the transportation pipeline is

passed through the unsuitable area

((such as urban, concentrated

residential areas, schools and etc.)

The two villages are avoided while designing

the yard, so that the yard did not be passed

through the unsuitable area

Reasonab

le

4.1.9.4 Residues Place Overview and Rationality Analysis

The project is primarily provided with 5 residues places, wherein the 1 # and the 2 #

residues places are located in the construction site upstream the dam of left bank, the 3 #

residues place is located in the construction site upstream the dam of right bank, and the

4 # and the 5 # residues places are located in the Xiaozhuang-Gumugou construction site

of right bank. 1 # residues place: the final elevation of the residues place is 1060 m, the

land area is 21000 m2; 2 # residues place: the final elevation of the residues place is 1060

m, the land area is 18000 m2; 3 # residues place: the final elevation of the residues place

is 1056 m, the land area is 5000 m2; 4 # residues place: the final elevation of the residues

place is 1165 m, the land area is 13000 m2; and 5 # residues place: the final elevation of

the residues place is 1050 m, the land area is 52000 m2. As the residues of the project are

mainly generated by the dam excavation and the primary residues places are too

fragmented, the spoil of the dam is respectively sent to four residues places, and the

earthwork allocation is unreasonable; after the optimization of the environment impact

assessment, the primary 1 # and 2 # residues places are combined, the area is increased,

and the optimized residues place is used as the 1 # residues place; the primary 3 #

residues place is removed, the primary 4 # residues place is used as the 2 # residues

place after optimization and the area thereof is maintained, the area of the primary 5 #

residues place is reduced, descended to the height of the residues and used as the 3 #

after optimization. The details are shown in Table 4.1-8.

Residues Paces Overview

Table 4.1-8

Residues place Area (hm2)

Final elevation

of the dam

top (m)

Storage capacity

Earthwork (ten

thousand m3)

Stonework (ten

thousand m3)

Before

optimizatio

n

1# 2.1 1060 1.5 8.39

2# 1.8 1060 0 1.6

3# 0.5 1056 2.19 4.02

4# 1.3 1165 0 7.5

Page 46: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

5# 5.2 1050 4.22 17.31

Total 10.9 7.91 38.82

After

optimizatio

n

1# 6.5 1060 7.66 25.05

2# 1.6 1165 0 7.5

3# 2.8 1040 0.25 6.27

After optimization, the influence area of the residues place does not have the distribution

of rare wild animals and plants, and the surrounding places of the residues place do not

have residents; from an environmental point of view, the selection scheme of the residues

place is reasonable. However, the residues should be protected in the stacking process,

so as to reduce water loss and soil erosion.

4.1.9.5 Amount of Water Loss and Soil Erosion and Mitigation Measures

The total amount of water loss and soil erosion of the project is 18645.96 t, and the

increased amount of water loss and soil erosion is 13342.71 t, wherein the increased

amount of water loss and soil erosion in the construction period is 12609.27 t, and the

increased amount of water loss and soil erosion in the natural recovery is 12.52 hm2. The

division of water loss and soil erosion control is as follows: a dam hub building control

area, a water pipeline control area, a residues place control area, a quarry control area, a

road construction control area, and a construction enterprise and office and living control

area. The soil and water conservation measures comprise 1640 m of slag wall, 1800 m of

reinforced stone block, 600 m of dry stone pitching, 25140 m of drainage ditch, 2340 m of

bag soil block, 96959 plants, 116 linear meters (the width is 1 m) of holly hedges, 4477 kg

of grass seed, 21.88 hm2 of land reclamation, 17.16 hm2 of green space, and the detailed

layout program is shown in Table 4.1-9.

When the soil and water conservation program is implemented, the control rate of the

disturbed ground in the early construction period is 98.67%, the control degree of water

loss and soil erosion is 98.07%, block slag rate is 100%, the control ratio of water loss and

soil erosion is 1.03, the vegetation restoration rate is 98.76%, the restore coverage is

41.3%, wherein all the indexes are reached to the, and the water conservation measures

are reasonable and reasonable.

Engineering Quantity of Water and Soil Conservation Measures

Table 4.1-9

No. Project name Unit

Hub

buildin

g

control

area

Residu

es

control

area

Quarry

control

area

Water

pipelin

e

control

area

Constr

uction

and

living

control

area

Constr

uction

road

control

area

Total

I Project measures

1.1 Block project

Page 47: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

1.1.1 Earthwork

excavation

m3

825 2951 543 1177 5495

1.1.2 Earthwork

construction

m3

663 663

1.1.3 Grouted stone

pitching

m3

2930 300 3230

1.1.4 Reinforced stone

cage

m3

1980 990 1230 1200 5400

1.1.5 Asphalt unlined

upper garment

board

126 126

1.1.6 Hardcore bed m3

68 15 83

1.1.7 Phi 80mm PVC

drainage pipe

m 563 563

1.1.8 Geotextile 88 88

1.2 Slope protection m 600 600

1.2.1 Earthwork

excavation

m3

125 125

1.2.2 Dry stone pitching m3

7655 7655

1.2.3 Hardcore bed m3

957 957

1.3 Drainage work

1.3.1 Drainage ditch m 5160 240 5400

1.3.1.1 Earthwork

excavation

m3

5973 267 6240

1.3.1.2 Earthwork

construction

m3

896 40 936

1.3.1.3 Grouted stone

pitching

m3

2449 181 2630

1.3.1.4 Dry stone pitching m3

1570 1570

1.3.1.5 DN500 circular culvert

pipe of reinforced

concrete (pipe of

grade II)

m 10 20 10 30 10 80

1.3.1.6 Hardcore bed m3

830 38 868

1.4 Rock slope

greening

1.4.1 ML2.0 x 6.0 nylon net m2

22572 22572

1.4.2 C25 reinforced

concrete panel

m3

36 36

1.4.3

Anchor rod(Phi 12

mm HRB335 grade

steel)

m 438

438

1.5 Land renovation

Page 48: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

engineering

1.5.1 Land levelling 0.61 8 1 10 5 6 30.61

1.5.2 Topsoil stripping m3

15250 3000 36550 15200 7000

1.5.3 Covering m3

15250 3000 36550 15200 7000

1.5.4 Nutrient soil m3

2228 8880 11108

II Plant measures

2.1 Slope

2.1.1 Shrub

2.1.1.1 Lespedeza Plant 4288 2125 3700 10113

2.1.1.2 Amorpha fruticosa Plant 4288 2125 3700 10113

2.1.2 Extending seed

2.1.2.1 Blue grass

137 68

118 324

2.1.2.2 Lolium multiflorum

343 170

296 809

2.1.2.3 Festuca

arundinacea

206 102

178 485

2.2 Plane

2.2.1 Shrub Plant

2.2.1.1 Lespedeza Plant 513

11525 1525 8350 9500

31413

2.2.1.2 Amorpha fruticosa Plant 513

11525 1525 8350 9500

31413

2.2.1.3 Holly hedges Linear

meter

116 116

2.2.1.4 Boston ivy Plant 6841

6841

2.2.1.5 Honeysuckle Plant 6841

6841

2.2.2 Arbor

2.2.2.1 Deodar Plant

6

6

2.2.2.2 Juniperus

formosana

Plant

100 100

2.2.2.3 Spruce Plant

8

8

2.2.2.4 Salix babylonica Plant

100

100

2.2.2.5 Prunus triloba Plant

4

4

2.2.2.6 Sorbaria sorbifolia Plant

4

4

2.2.2.7 Rosa xanthina Plant

4

4

2.2.3 Grass seed

2.2.3.1 Poa annua

184 24 134 152

494

Page 49: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

2.2.3.2 Lolium multiflorum

461 61 334 380

1236

2.2.3.3 Festuca

arundinacea

277 37

200 228 742

2.2.3.4 Larix potaninii 149

184

540 873

2.2.3.5 Alfalfa

III Temporary

measure

3.1 Temporary drain m

420

19320 19740

3.1.1 Earthwork

excavation

m3

364 118 5410 5891

3.1.2 Earthwork fill m3

73 24

1082 1178

3.2 Temporary block

measures

m 420

1420 500 2340

3.2.1 Bag soil fill m3

210 710 250

1170

3.2.2 Bag soil removal m3

210 710 250

1170

3.3 Cover of fiber cloth

4980 8800 4200

17980

4.1.10 Impact on Human Health and Mitigation Measures

4.1.10.1 Impact of Construction Period on Human Health and Mitigation Measures

The construction workers for the construction period of the project are from all sides, and

the field personnel and local personnel form a construction community and frequently

contact with each other in working and living. As the crowd is complex, the lifestyle is

different, the physical conditions are different, the immunity is different, the kinds of

pathogen carriers are possible, the susceptibility is enhanced, and a variety of diseases

transmission method are coexistent. Thus, if the health protection work cannot be

completed well, the infectious diseases can be lead (gastrointestinal, respiratory, and

insect-borne), the cross-infection and epidemic spread are easy to be caused, the

adverse impact on human health will be caused, so that the health protection work should

be paid enough attention.

In order to mitigate the impact of construction period on the construction workers, and the

following measures should be taken:

(1) Hygienic cleaning of construction living area and management area

When the civil engineering works of the temporary construction living area and the

management area are completed, the site should be cleaned. The garbage, human and

animal feces and other contaminants in the site should be cleaned; the sewage pit and the

refuse dump should be filled after sterilizing with lime, and the weeds should be cleaned

up.

(2) Drinking water source protection and drinking water disinfection

The drinking water is purified and disinfected, wherein the specific methods are as follows:

adding bleaching powder into the drinking water to disinfect after depositing and filtering,

adding chlorine into the water for 30 min, so that the killing effect to the variety of intestinal

Page 50: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

infectious disease pathogens in the water is sufficient when the residual chlorine in the

water is more than 0.3 mg/l, and the water purified can be used as drinking water.

As the construction and living water is taken from the river and the water source is open,

the water quality is easy to be impacted by the human actives around the construction site,

so that the protection of the water source should be strengthened, and the protection

measures are as follows: the range which is apart from the water source with 100 m

should not be provided with temporary life area, management area and production area,

and the latrines and seepage pits should be built in the range, and the garbage and other

pollutants should not be stacked in the site.

(3) Innocent treatment of garbage, manure and wastewater

With the collection and treatment facilities arranged on the living area, management area

and production area and applied to domestic wastewater, production wastewater and

household waste and the like, the innocent treatment purposes of garbage, manure and

wastewater are basically carried out.

(4) Mosquito prevention, fly disinfestation and rodent control

When the construction workers are entered into the site, a good breeding ground will be

provided to a variety of animals and insects in case of poor sanitation, the density of

mosquitoes and rodents and the like will be improved, and the opportunity of infectious

diseases will be increased. Thus, the living area should be subjected into mosquito

prevention, fly disinfestation and rodent control, the rodent prevention drugs should be

provided regularly so as to cut off the disease source the transmission method.

(5) Prevention and quarantine of population health

Before entering into the construction site, all the dining room staff of the construction site

should be quarantine, part of the construction worker should be subjected to prevention

and quarantine by means of a sampling method, wherein the sampling ratio thereof is

15% of the construction workers. Through quarantine, the health status of the construction

population can be controlled, and the occurrence of contagious disease in which the

construction worker is the epidemic focus can be completely eradicated in time.

(6) Crowd evacuation of blasting site

The use of explosive on the blasting site is operated by a specially-assigned person, the

places around the blasting site are provided with striped flags so as to define the risk area,

and all the personnel in the blasting area should be evacuated, so that the casualties

caused by blasting can be prevented.

4.1.10.2 Impact of Operation Period on Human Health

As the river valley of the project is mainly shown in the form of a "U"-shaped valley, the

mountains of the two banks are relatively symmetric, the river is deep, the bedrock of the

riverbed is exposed, the falling head is large, and the submerged area does not have

large-scale unleveled low-lying land and pond marshy with aquatic weeds and etc., and

therefore the submergence for the operation period of the project will not cause the

transfer of mosquitoes and the transmission of pathogenesis.

4.1.11 Impact on Reservoir Resettlement and Mitigation Measures

The backwater length for the reservoir of the project is 3.5 km, the area of the submerged

land is 53.85 km2, wherein in the land, the forest is 45.13 km2, the plantation is 7.45 km2

and the unused land is 1.27 hm2. The submerged area of the reservoir mainly comprises

Page 51: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

three towns, i.e. Shaba Town, Paosha Town and Chenyuan Town, part area of 6

administrative villages, and the total immigrants thereof is 3 families.

In allusion to the special resettlement and compensation problems, the Water Authority of

Cheng County develops ―Resettlement Plan of Water Source Project of Cheng County‖,

the resettlement point is located in Baimashi Village of Chenyuan Town of Cheng County,

wherein the distance of the village to the county is 6 km, the village comprises 8

cooperations, the existing residents is 391, the population is 1,600, the acreage under

cultivation of the total village is 2800 Mu, and the net per capita income is 2200 Yuan/year.

The distance of the village to the nearest road is about 0.5 km, so that the traffic is

convenient. The distance to the post office, shops, schools, kindergartens, theaters and

other places is about 1 km. The agricultural products produced therein mainly comprise

wheat, corn, soybeans, canola and tobacco and etc. The settlement point planned

comprises 20 rooms reconstructed from original farm buildings, the land area thereof is

13.5 Mu, the settlement point has a campus testing field of 76 Mu, wherein the irrigation

project thereof is the Lugou reservoir water-saving irrigation project which has been

implemented, the requirements of three families to the relocated of Chenyuan Town and

Shaba Town can be met, and the irrigable land per capita ensured is about 2 Mu.

The compensation measures for the resettlement are in line with the principle of ―ensuring

the ‗feasible moving, stable settling, and feasible enriching‘ of the migrants‖, and the

compensation measures are reasonable and feasible; the resettlement point has

adequate houses for the live of the immigrants, sufficient arable land and good irrigation

conditions to ensure the living and production need of the immigrants; the resettlement

point has relatively complete municipal facilities, convenient transportation, and favorable

new life of the migrants, and the resettlement point can meet the requirements of the

resettlement compensation plan.

4.1.12 Dam Break Risk and Mitigation Measures

4.1.12.1 Dam Break Risk

According to the research results for the dam safety at home and abroad, the reason for

causing the dam break and the break is more and complex, and the reason comprises

natural factors and human factors and their mutual relations and complex effects. With the

probably analysis, the main reason comprises:

(1) Violent earthquake

Small earthquakes are not likely to cause the damage and break of the reservoir dam, but

a strong earthquake (magnitude is not less than 7.0) is more likely to cause the damage

and break of the reservoir dam. As the earthcrust of the place where the reservoir dam is

located is relatively stable, the basic seismic intensity is grade VIII, the earthquake

fortification of the reservoir dam project is implemented according to the same;

furthermore, the reservoir is small (the height of the dam is less than 100), and the

earthquake cannot be induced easily, so that the possibility for the large-scale and

high-intensity damage of the reservoir dam caused by the earthquake is very unlikely.

(2) Temperature change

The local damage accident for the concrete arch dam of the reservoir dam due to the

temperature change is relatively common, the reason thereof is the thickness of the arch

dam is relatively thin, and the arch dam is a highly indeterminate space structure limited

Page 52: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

by the boundaries. In the operation period of the reservoir dam, the change of the ambient

temperature is easy in causing temperature stress in the arch dam body, and the reservoir

dam will be broken as the overstressing in certain conditions. However, the temperature

change just can cause the local damage of the reservoir dam under normal circumstances,

and the suddenly break of the dam can be prevented.

(3) Landslides

Large-scale instability and high-potential fast slope body will cause enormous swell, the

flood downstream the reservoir dam and around the reservoir will be caused, and safety

of the reservoir is endangered. Particularly, the large-scale landslides in the place close to

the dam and the two sides upstream and downstream are easy to cause reservoir

damage and break. Although the project has small-scale hidden danger of slope instability,

the total geological conditions of the reservoir area, the dam and the site engineering are

relatively good as the diastrophic activity of the place where the project is located are

relatively stable, so that the possibility for causing huge surge flood and collapse due to

the large-scale instability of the bank and the high-potential landslide is very unlikely. Here,

it must be emphasized that the many small-scale instable geologic bodies presented in

the slops on the two sides of the river section inside and outside the reservoir area should

be strengthened, prevented and subjected to the treatment of embankment and

supporting project, so as to prevent the large-scale reservoir banks instability caused by

the small-scale reservoir instability can be prevented. In addition, the operation period for

putting into production of the reservoir dam, the stone blasting and fish blasting and other

blasting activities in the place close to the dam and around the dam should be prevented,

and the a large number of materials optionally stacked on the slops of two banks on the

place of the reservoir area and the place close to the river downstream the dam should be

prevented, and the buildings on the places should be prevented to avoid slump.

(4) Destruction of dam foundation

The deformation, permeability and stability of the dam foundation are tightly related to the

safety of the dam. The good dam foundation should have sufficient deformation resistance

and bearing capacity, small permeability and complete and stable rock, so as to prevent

the foundation damage caused by excessive deformation, the excessive uplift pressure

and the unstable dam body or dam seat rock slide caused by excessive penetration water

pressure. The dam foundation of the project can be prevented from the collapse accident

caused by instability and deformation, cracking, sliding and water seepage just be

strengthening and stabilizing to eliminate the hidden troubles completely through a

scientific project processing technology and strict consolidation prevention measures,

(6) War and terrorist attacks

If the reservoir dam of the project is damaged instantaneously in case of war and terrorist

attacks, the flood damage is severe, and the basin-wide disaster may be caused.

However, from the military point of view, the possibility for taking the dam as a military

target is very unlikely.

(7) Extraordinary flood

In case of extraordinary flood, the extraordinary flood is always accompanied by heavy

rain. Due to the strong erosion effect of the heavy rain, the downstream dam surface will

have scour holes. Although these local scour holes will not affect the stability of the dam,

Page 53: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

the opportunities of overflowing the top of the dam is increased while pushing by the winds

and waves in the reservoir. Theses small scour holes will be rapidly expanded under the

erosion effect of the flood padding through the dam. When the scour holes are reaches a

certain size, the dam will be local instable, and then the dam break phenomenon can be

presented. The engineering grade of the reservoir is grade III, the permanent main

buildings are designed according to the grade 3, the permanent secondary buildings are

designed according to the grade 4, and the temporary buildings are designed according to

the grade 5. The concrete gravity dam is designed according to the flood per 50 years and

is reviewed according the floor per 500 years, the energy dissipation and erosion

prevention buildings are designed according to the flood per 30 years, and these buildings

are in line with the requirements of ―Standard for Flood Control‖ (GB50201-94), so that the

dam break risk caused by the extraordinary flood can be reduced effectively.

(8) Error of survey design

If the early work do not be completed well, the hydrographic survey and the geological

survey are not detailed, the calculation of the water account is incorrect and the design

consider is not thoughtful, the construction may be blind, the hidden danger for the safety

of the reservoir will be caused, and the collapse accident of the reservoir is easy to be

occurred. Thus, for the flood prevention safety of the dam, the correct survey design and

reasonable dispatch application should be paid attention in addition to the reasonable

selection of flood prevention standard. The project has done a lot of preliminary works, so

that a scientific basis is provided to ensure the quality of design.

(9) Quality defects of the dam

During the construction process of the dam, the chance of quality defect is always existed

due to the uncritical local quality control. The weak link is the place for the occurrence of

concentrated seepage and piping, and the dam break can be occurred under the effect of

adverse external dynamic loads. Thus, project supervision in the project should be

strengthened, the supervision, inspection, evaluation and acceptance of the construction

should be organized, and the left tail works should be completed well.

(10) Mismanagement of operation

In the management work of the dam, the probability of man-made omission and

equipment failure is always existed, so that the real-time monitoring for the operation

status of the dam will be influenced, the working status of the dam cannot be reflected in

time, so that the dam will be dangerous and broken. Therefore, the technical management

work of the reservoir should be strengthened, and the safety of the dam should be

ensured.

In summary, the main reason of dam break comprises low flood control standard of the

reservoir, poor construction quality, poor management work and other human factors. But

the safety of the reservoir dam can be ensured and the purpose of promoting benefit and

abolishing harm can be achieved by seriously implementing the Decree [1991] No.77

―Reservoir Dam Safety Management Regulations‖ of the State Council, carefully

implementing survey design while strictly complying with the regulations, strengthening

project quality and technical management work of the reservoir and complying with the

provisions for the safe operation of the reservoir.

4.1.12.2 Risk and Result of Dam Break

Page 54: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Once the dam is broken, the impacts on the upstream and downstream of the dam are

large. In the upstream of the dam, the water of the reservoir area, particularly the water

level before the dam will be sharply reduced due to the suddenly discharge, so that the

bank of the reservoir dam is easy to be unstable, and the bank is easy to be collapsed.

The dam break risk is mainly presented in the downstream, i.e. the dam break wave will

be formed as the suddenly discharge of the water in the reservoir, and the damage to the

human and property downstream the dam is serious. Thus, when the maximum flow of the

dam broken is reached to the flow path L of the downstream dam according to the source

strength of the broken dam, the maximum flow is calculated according to the following

formula:

wherein, QLm represents the maximum flow (m3/s) for the controlled section of the

broken dam apart from the dam with L (m);

Vm represents the largest velocity (m/s) of the river section, the value of that in the

assessment is 3.0 m/s;

K represents the experience factor. The experience factor of the project is 1.2, and the

other parameters are ditto.

According to the topography downstream the project and the resident distribution

condition, the cross-section of rivers of the eight downstream villages which may be

impacted are estimated, wherein the details are shown in Table 4.1-10.

List for Estimation of Cross-section of River of Each Village

Table 4.1-10

village Local dam distance (m) Area of cross-section of river

(m2)

Majiaya 800 748.53

Jianjiagou 1600 394.63

Zhuanwancun 3500 186.19

Ganlushi 4500 144.81

Xiaozhuang 1300 471.05

Zhangjiashan 1800 350.78

Luangoumen 3300 197.47

Niujiaya 4300 151.55

According to the estimation results of 4.1-10, the households lived in the low-lying and the

place close to the river of the eight villages will be submerged, and some villages will be

submerged completely.

4.1.12.3 Management Measures of Dam Break Risk

In order to ensure the safety of the dam, achieve the purpose of promoting benefit and

abolishing harm, prolong the service life of the dam, play the efficiency fully and avoid the

dam collapse disaster and risk, the project should take the various of effective protection

measures and emergency measures in the whole process of survey, design, construction

and operation, so as to take preventive measures and check erroneous ideas at the outset.

According to the environmental risk analysis result of the reservoir dam of the project, the

reference to the reservoir dam safety work research results at home and abroad, the

Page 55: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

following prevention and emergency measures are provided by targeting to the main

reason which may cause dam damage and dam break.

(1) Seriously implement the ―Reservoir Dam Safety Management Regulations‖ (State

Council [1991] Decree No. 77). The Regulations clearly defines and strictly requires the

construction, management and treatment of the reservoir dam with the height of more

than 15 m or the capacity of more than 1 million m3.

(2) Strictly handle affairs according to the hydropower project management procedures. In

order to prevent damage and break of the dam, the survey, design, construction,

acceptance, operation, identification and reinforcement works should be completed well in

order.

(3) Strengthen geology investigation work of the project. In the project, the geological

conditions of the reservoir area, the dam site, and the plant site are relatively complicated,

the detailed geological and groundwater survey work should be carried out, and the

situation should be identified successively.

(4) Carefully design by strictly complying with the specifications.

(5) Enhance quality management of project construction. In order to ensure safe operation

of the reservoir, the construction period for the construction of the reservoir dam should be

provided with the concept of "long-term project, quality first", the supervision work of the

project should be strengthened, the quality supervision, inspection, evaluation and

acceptance works of the project should be organized, the specifications of construction

technology should be carried out, the construction material should be reasonable, the

construction work should be strict, and the left tail work should be treated well, so as to

ensure the quality of the project and eliminate ―purple‖ project.

(6) Strengthen the technical management of reservoir operation. In order to ensure safe

operation of the reservoir, a complete reservoir operation schedule and a safe operation of

technical system should be established in the operation period for putting into production

of the reservoir dam, the level of technical management should be improved, the flood

prevention program and schedule application plan should be compiled reasonably, the

provisions for the safe operation of the reservoir should be complied; the safety monitoring

and identification works of the dam should be emphasized, the dam protection on the

bank of the reservoir and the maintenance of the gate crane should be strengthened, the

facilities meeting the dam safety observation are set, the safety condition of the dam

should be frequently inspected and regularly observed, the flood data should be

rechecked, so as to achieve the purpose for finding the problems in time, taking measures

in time and preventing the reservoir from adventure operation; the reliable forecasting of

construction, early warning systems, transportation and communication facilities

improvement should be paid attention, an emergency flood plan should be developed to

achieve the purpose of preparing before the flood and responding while flooring; and the

power supply and equipment which meet the requirements of gate starting and closing are

set to ensure the timely drain. For the flood caused by extraordinary rainstorm, the

extraordinary drain measures should be prepared, and the notice on the flood fighting

work should be issued in advance.

(7) Prohibit the slump in the reservoir area. In the operation period for putting the reservoir

dam into production, the stone blasting and fish blasting and other blasting activities in the

Page 56: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

place close to the dam and around the dam should be prevented, and the a large number

of materials optionally stacked on the slops of two banks on the place of the reservoir area

and the place close to the river downstream the dam should be prevented, and the

buildings on the places should be prevented to avoid slump.

4.1.12.4 Emergency Plan

The emergency plan for the dam break risk of Moba gorge water source engineering is

"APELL plan" (Awareness Preparedness for Emergencies at Local Level). The information

and organizational flow chart of the "APELL plan" are shown in Figure 4.1-5.

(1) Organization

A coordination group of the "APELL plan" is composed of the leaders of the local

government department and the water source engineering construction management

department of Moba gorge for city water supply of Cheng County, and the local resident

representatives. The responsibilities of the coordination group are shown in Figure 4.1-6.

Meanwhile, the police, medical, rescue, environmental protection, transportation, Red

Cross, communications and other departments of Cheng County should also be involved

in the emergency rescue plan and should bear the corresponding responsibilities.

(1) Emergency rescue plan

① In case of emergency, an emergency rescue headquarters is set up according to the

"APELL plan" so as to effort to ensure people's lives and property and to reduce the loss

to the minimum degree;

② Responsibilities for the onsite commander of the water source engineering

construction management department of Moba gorge for city water supply of Cheng

County: report quickly, convey the information about the accident and injury estimation,

issue police information, organize quick evacuation and evacuate from the dangerous

area;

③ Responsibilities of Moba gorge management station: be responsible for reporting the

nature, intensity and consequences of the incident, be responsible for the emergency

measures taken on the accident site to prevent the accident from expanding, reduce the

risk and rescue the casualties of the accident;

④ Professional rescue team: organize evacuations, medical care and other rescue

operations of the professional team;

⑤ Traffic control: control the traffic of diffusion area, effectively implement evacuation;

⑥ Transportation, supplies, communications, publicity and other supports;

⑦ Allocation of specially-assigned person, equipment and aid medicine;

⑧ Emergency restoration: including de-alerting, site cleaning, care-taking arrangement

and accident investigation.

(2) Plan practice

In order to enhance the scientificity, pertinence, effectiveness and maneuverability of the

plan, the anti-accident training is organized in the area may be impacted by the accident,

wherein the training place comprises the enterprise, the village and the settlement point

and the like in the area; at the same time, the relation to the environmental emergency

response agencies of other reservoir construction project should be established, the local

relief activities should be organized and involved, and the relevant communication and

cooperation should be developed. The exercises are aimed at inspecting the plan, training

Page 57: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

the team and improving the capability, promoting the connection between the Moba gorge

water supply project and the emergency plan of Cheng County and the continuous

improvement of the corresponding emergency plan.

Aid

Page 58: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Figure 4.1-5 APELL Information and Organizational Flow Chart

Responsibilities of the enterprises and villages in the accident area:

1. Ensure safe operation;

2. Ensure personal security;

3. Establish safety procedures;

4. Protect onsite life and property;

5. Coordinate all the staff in the accident;

6. Develop plans and measures to meet emergencies.

Effects of the coordination group:

1. Establish communication systems;

2. Share information;

3. Coordinate emergency plans and measures;

4. Communicate with other accident emergency agencies;

5. Joint education and training;

6. Solve the common problems;

Command, assistance

Comman

d

Aid

Starting the plan, aid

Moba gorge

management station

Report

Report Report

Report

Water authority

of Cheng county

Government of Cheng county

Starting

prevention

plan

Other enterprises

and villages in

the region

Notice Notice

Prevention

Non-governmental

service organization

Local area public

Coordination group

1. Leader of Cheng county

government

2. Principal of Cheng county Water

Authority

3. Principal (police and emergency,

etc.) of each enterprise

4. Surrounding public representative

Public security bureau, hospital

Aid

Aid

Page 59: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

7. Support bilateral assistance.

Responsibilities of the government of Cheng County

1. Provide a safe area;

2. Protect the safety and welfare of the resident in the region and the outsider;

3. Establish public safety programs;

4. Protect life and public and private property;

5. Coordinate the accident emergency power in all accidents;

6. Develop emergency plans and measures;

7. Train and exercise the plan together with other emergency agencies in the region or the

province.

Figure 4.1-6 Responsibilities of Each Emergency Plan Group

4.2 Public Participation

4.2.1 Significance of Public Participation

Public participation is an important component of environmental impact assessment and is

an effective way in improving scientific decision. In the construction project, public

participation is an important method for promoting the two-way communication among the

construction unit, the environmental impact assessment unit and the public. By means of

wide public participation, the public directly or indirectly impacted by the project

construction can fully understand the possible environmental impacts, the environmental

protection measures to be taken for mitigating the impacts and the economic and social

benefits brought by the project construction; at the same time, the various views and

suggestions can be fed back, the advices can be actively provided to the project

construction, the solutions to problems can be jointly found out, the impact of the project

construction on the environment can be minimized, the pollution disputes in the project

construction and operation process can be prevented, and the development and

environmental protection can be coordinated well.

4.2.2 Public Participation Form and Composition of Participants

The project uses three forms, i.e. questionnaire, newspaper publicity and symposium,

wherein the questionnaire is divided into two forms which are government agencies

questionnaire and public questionnaire, and the content of the questionnaire is designed

according to the characteristics, scales and possible impact degree and the like.

(1) Composition of the public questionnaire

The public opinion survey of the project is completed by issuing 100 copies of

questionnaire in the whole range of the Cheng County, wherein the 10 copies are issued

to the reservoir resettlement, the effective questionnaire reclaimed is 100 copies, the

effective questionnaire is 100 copies, and the reclaiming rate is 100%.

(2) Composition of government agencies questionnaire department

The government agencies questionnaire of the project comprises Environmental

Protection Agency of Cheng County, County Land Resources Bureau of Cheng County,

Water Authority of Cheng County, Forestry Bureau of Cheng County, Transportation

Department of Cheng County, people's congress committee of Cheng County, people's

government of Cheng County, Development and Reform Bureau of Cheng County, Public

Security Bureau of Cheng County, construction bureau of Cheng County, Planning Board

of Cheng County, health bureau of Cheng County, tap water companies of Cheng County,

Page 60: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

People's Government of Chenyuan Town, People's Government of Shaba Town, finance

bureau of Cheng County, Board of Education of Cheng County, County Office and

Committee offices of Cheng County of the Chinese People's Political Consultative

Conference and other 20 departments.

(3) Publicity

The project was subjected to publicity to solicit public comments on the project for 10 days

in ―Longnan Daily‖ of January 9, 2011.

(4) Composition of symposium

According to relevant requirements of the World Bank, the symposium is held in

Wujiashan Village of Chenyuan Town and Niuyao Village of Shaba Tow by the staff of the

Water Authority of Cheng County, the overview of the project is introduced to the local

people in the symposium, and the suggestions of the local people to the project are

collected.

4.2.3 Summary of Public Participation Comments

By means of the method above, local people understand the project and provide the

following suggestions to the project:

(1) Since the construction of the project has a greater impact on the local ecological

environment, the relevant departments must strengthen the management of the

construction and operation processes, restore the existing ecological damage, develop a

detailed reservoir vegetation restoration plan and ensure the ecological function of the

reservoir area plays its role.

(2) Strengthen management and supervision, and ensure the resettlement compensation

measures are in place, so that the immigrants can live and work.

(3) Speed up the progress of the project, so that the project can play a role as soon as

possible and problem of water supply of the resident of Cheng County can be solved.

(4) Strictly manage to ensure the guaranteed of quality of water in the operation period.

(5) Strengthen supervision inspections to prevent dam break accident.

Environmental Management Plan for Cheng County Moba Gorge Water Source

Engineering of Gansu Province

Page 61: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

5. Environmental Management Organization of the Project

5.1 Introduction

According to the spirit of management authority of ―Environmental Protection Law of the

People‘s Republic of China‖ and ―Regulations on the Administration of Construction

Project Environmental Protection‖, the environment impact assessment report of the

project is approved by the Provincial Environmental Protection Office of Gansu, and the

soil and water conservation report is approved by the Department of Water Resources of

Gansu Province.

The Environmental Protection Bureau of Gansu Province, the Department of Water

Resources of Gansu Province, the Environmental Protection Bureau of Longnan City and

the Department of Water Resources of Longnan City are the environmental management

agencies of the project, and the responsibilities thereof mainly comprise: providing

environmental protection requirements according to the contents of the environment

impact assessment report of the project and the contents of the soil and water

conservation report, coordinating the environmental protection management among the

various departments, and be responsible for organizing the "Three Meantime" acceptance

inspection work of environmental protection facilities. In the overall administrative

institution framework of the project, the implementation of the entire project is managed by

the Loan Project Office of the World Bank, the project is led by the governments of

Longnan City and Cheng County, and the project owner (the water source engineering

construction management department of Moba gorge for city water supply of Cheng

County) is responsible for the specific matters for the implementation of the project in the

project management office. In order to ensure the smooth implementation of

environmental management action of the project, a number of full-time or part-time

environmental management personnel are set among the project office, project owner,

contractor and operator, so as to implement the environmental management plan

specifically.

The Loan Project Office of the World Bank in Longnan City is responsible for project

planning, design, environmental protection targeting to the project, supervision and

management in the program, and the organization work for the skill training of the

area-wide environmental management personnel of the project; the main responsibilities

of the project office of Cheng County, the Environmental Protection Bureau of Cheng

County and the Water Authority of Cheng County comprise: implementing the

implementation plan of the project, implementing a variety of technical standards of the

project, and implementing daily supervision for the environmental management of the

project; according to the commission of the project owner, the environmental monitoring

station of Cheng County is responsible for monitoring the environmental quality in the

construction and operation period of the project; and the environmental supervision

engineers and the water conservation engineer commissioned by the owner are

responsible for the environmental supervision and the water and soil conservation

supervision in the construction process of the project.

The project owner plans to be set up specialized environmental managers who are

responsible for the environmental management of all stages of the project, the

implementation of environmental protection regulations and programs, the checking work

Page 62: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

for the implementation condition of environmental protection measures of the project, the

promotion and application for the advanced environmental protection technology and

experience, the organization of environmental protection technology training of the

relevant personnel, and the improvement of personnel quality. As the large differences

between the environmental management content of the construction period of the project

and that of the operation period, the work times of the two periods are different in

temporary and long-term properties, so that the organizations are established by the

contractor and the operator according to the difference of the stage, and the

responsibilities are staged. When the construction period is ended, the corresponding

agencies are removed immediately, the management agencies of the operation period are

in operation, and a certain of cross therebetween is allowable according to the specific

circumstances of the work. The institutions establishment figure is shown in Figure 5.1-1.

Provincial level: Department of Water Resources of Gansu Province, Environmental

Protection Department of Gansu Province, the World Bank

City level: water conservancy bureau of Longnan City, environmental protection bureau of

Longnan City, Loan Project Office of the World Bank in Longnan City

County level: environmental protection bureau of Cheng County, Water Authority of Cheng

County

Owners

Enterprise level: environmental monitoring station of Cheng County, environment impact

assessment unit, design unit, construction contractor, environmental supervision

engineers, environmental monitoring station of Cheng County, owners

5.1-1 Diagram of Environmental Protection Organization of the Project

5.2 Environmental Organization of Construction Period

5.2.1 Organization

Technology level: in the technical level of environmental management, the project office of

Longnan City will employ 3 experts to participate in management of the project.

Project office level: the project office of Longnan City will appoint a project environmental

manager for supervising the implementation of environmental management plan, and all

the problems related to the World Bank and environment are responsible by the person.

The project office of Cheng County has an environmental manager who is responsible for

supervising the implementation of environmental management plan in the jurisdiction and

responsible for the communication to the project office of Longnan City on the

environment-related issues.

Contractor level: the contractor has 1 ~ 2 environmental manager coordinators who are

responsible for the supervision of environmental protection measures implementation in

the construction period, and responsible for the contact with the surrounding residents to

solve the environmental issues and the communication with between the project office

and the environmental supervision agency.

Operator level: each enterprise establishes an environmental management department,

the environmental management department is composed of two full-time environmental

protection personnel, and the company's daily staff will assist the two engineers so as to

complete the environmental management work in the operation stage of the company.

The company will configure network, telephone and other communication facilities to

Page 63: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

maintain the communication to the environmental management institutions.

Environmental supervision engineers and water conservation supervision engineer level:

the project owner will hire an environmental supervising engineer and a water protection

supervising engineer so as to carry out the onsite environmental management supervision

in the construction process.

5.2.2 Positions and Responsibilities

A. Technology environmental experts

Technology environmental experts are technical support of local project office. In the first

six months of the project, they will track the project completely and provide regular service

in the 4 years after implementing the project, and the frequency thereof is two weeks

quarterly.

Technology environmental experts will ensure that all necessary requirements will be met

in the beginning of the project and ensure that the environmental management system will

be effectively implemented according to the environmental laws and regulations and the

security requirements of the World Bank.

① For the environmental managers of the project office, the environmental management

personnel and the environmental supervision engineers should be provided with

necessary training by the contractors and operators.

② Provide expert advice to the project office, the owner, the contractor and the operator.

③ Help the environmental management personnel of the enterprise to organize

monitoring activities.

B. Project office: environmental manager

The project office of Longnan City and the project office of Cheng County set an

environmental manager, respectively, wherein the environmental manager of project office

of Longnan City is an expert who is responsible for reporting to the World Bank and

supervising the environment of the project; the environmental manager of project office of

Cheng County is responsible for supervising the local project and reporting to the project

office of Longnan City. The environmental Manager will assist land management agencies

and resettlement agencies, so as to prevent these agencies from obstructing the

implementation of the project, and the responsibilities of the environmental manager are

as follows:

① Provide training for the environmental manager in the assistant's help.

② Develop monitoring plans in the assistant's help.

③ Communicate with environmental managers and construction workers, wherein the

communication methods are as follows:

- Provide monthly and regular monitoring report to the project office and the World Bank

- Provide a special incongruent report in case of the second and the third conditions

- Make oral communication with the construction unit and the operation unit if the solution

of the problem is found, so as to reach a solution.

- Jointly provide corrective measures with the environmental management engineers and

the environmental managers in case of incongruent conditions.

④ Participate in the joint meeting of environment engineers of project office of the

company, environmental managers, construction unit and operation unit.

⑤ Coordinate the communication and report of environmental management experts and

Page 64: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

the World Bank.

C. Project owner: environmental manager coordinator

The owner sets up an EMC who is responsible for monitoring environment and reporting

the environmental protection implementation condition of the construction unit and the

operation unit to the project office of Cheng County and the government agencies, and the

detailed responsibilities of the environmental manager coordinator are as follows:

① Ensure the compilation of environmental protection rules of the construction unit and

the operation unit under the help of the technical assistant in the initial stage of the project,

monitoring details and environmental protection procedures of the construction unit and

the operation unit, and the collection for the framework of project management personnel.

② Commission the project with special monitoring equipment, such as water environment

quality monitoring.

③ Provide reports, implementation conditions and remedial measures of the project and

feasibility to the project office monthly, and monthly hold a meeting with the project office

to report the monitoring condition of the project and discuss the conformance of the

project.

④ Provide training methodology and technology consulting by the experts and

consultants selected from universities and institutions, wherein the training methodology

and technology consulting are determined according to the requirements.

⑤ Organize the special studies and public surveys which are related to the specific

construction requirements of the actual situation of the project or the necessary change.

⑥ Report the solutions and emergency measures for the conformance conditions of

feasibility study to the environment manager of the project office and the environmental

monitoring agency.

⑦ Disclosure the information bye mans of meetings and local media.

D. Environmental supervision engineers and water conservation supervision engineers

The environmental supervision engineers and water conservation supervision engineers

are mainly responsible for the construction activities of the supervision party and other

related activities such as land use and relocation, ensuring that the activities above are in

line with environmental protection requirements, environmental protection investment and

environmental objectives, and responsible for onsite coordination for the relation among

the land management department, the migration department and the environmental

monitoring and control department. The main responsibilities of the environmental

supervision engineers and water conservation supervision engineers are as follows:

① Ensure all project permits and requirements, and the implementation of the

environmental management plan before starting.

② Check that the environmental protection measures and the water conservation

measures are implemented by all employees of the construction unit and the operation

unit according to the contract.

③ Compile standard monthly report for the monthly pay which is in line with the

qualification of the construction unit and the operation unit obtained according to the

efforts and contributions for the environmental protection activities of the project.

④ Assembling file of environmental monitoring.

⑤ Identify the conditions required to be subjected to special studies and special activities,

Page 65: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

simultaneously communicate with EMC, and regularly and effectively implement special

measures.

⑥ Communicate with construction workers to help the construction workers to explain the

onsite environmental requirements, provide recommendations for remedial measures,

provide remedial measures for the project which is not in line with the original intention of

the project, and provide special formal guidelines to the construction unit and the

operation unit according to the requirements.

⑦ Communicate with construction unit, operation unit and construction consultant to

enhance the communication, get some other views on specific issues so as to quickly

response some problems encountered in the construction process to the construction

management engineers to help the engineers to solve the problem; if the project has

potential damage to the sensitive objectives or the project has or relates to serious

discrepancies, it should be stopped according to the application.

⑧ Communicate with construction supervision engineers and construction workers of the

project, compile regular weekly monitoring publication, develop incongruent record, and

provide remedial measures to the project designer, if necessary, in case of the difference

to the project design.

5.3 Environmental Management Organization in Operation Period

The operator of the project sets up a special project environmental management office

which is responsible for the implementation of environment management plan of operation

period. The detailed responsibilities of the environmental management office are as

follows:

(1) Manage the implementation of project environmental protection measures;

(2) Coordination the relevant environment problem with the environmental supervision

and management department and the surrounding residents;

(3) Commission monitoring station of Cheng County to specifically monitor the three

wastes discharged by the project facilities and the regional environmental quality;

(4) Implement environmental risk emergency measures in case of environmental

accidents;

(5) Be responsible for timely reporting the relevant information of enterprise environmental

management to the environmental protection bureau of Longnan City and Cheng County

and the project office of Longnan City;

(6) Record and file the environmental management files of the enterprise.

5.4 Details of Environmental Management Organization of the Project

The setting conditions of the environmental management organization are shown in Table

5.4-1.

Environmental Management Personnel Setting of the Project

Table 5.4-1

Organization Environmental Manager Environmental expert

Project office of Longnan City 1 3

Project office of Cheng County 1 1

Total 2 4

Page 66: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Environmental Management Plan for Cheng County Moba Gorge Water Source

Engineering of Gansu Province

Page 67: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

6. Implementation of Environmental Management Plan

6.1 Project Environmental Management

6.1.1 Overall Management

The Environmental Protection Bureau of Longnan City is responsible for overall

management of the entire project as the Loan Project Office of the World Bank is led and

commissioned by the government of Longnan City. The project office of Cheng County is

responsible for coordinating and supervising the project environmental management of

the project, the owner is responsible for the implementation of relevant environmental

management plan of the project, the environmental management plan is implemented

under the assistance of the environmental supervision engineers, and the project office is

provided with at least one environmental supervision engineer.

The specific responsibilities of the environmental protection management agency are as

follows: the project office of Longnan City is totally responsible for managing the

environmental protection works, organizing the feasibility study of the project, developing

the plan of environmental protection work of the project, coordinating the environmental

management works among the management departments and the construction unit,

guiding the construction unit in implementing the various management measures; the

project office of Cheng County is responsible for coordinating project preparation and

operation issues; the environmental protection manager of the project office is responsible

for environmental protection plan and environmental management of design stage; the

owner is responsible for the implementation and management of environmental protection

measures in the construction period and operation period. The environmental protection

bureau of each level is responsible for supervising the implementation of environmental

management plan of the project.

The specific implementing organization of the environmental management plan mainly

comprises owners and project contractors, and the responsibilities thereof are shown in

Table 6.1-1.

Main Responsibilities of Project Implementing Organization

Table 6.1-1

Organizatio

n name

Main responsibilities

Owner

Subject the environmental protection to the supervision of environmental protection departments at all levels, project office and the World Bank; Commission the environment impact assessment unit with the relevant qualifications to develop the carry out environmental impact report and the environmental management plan; Design the tendering company according to the requirements, wherein the various environmental management measures of the environmental management plan are involved into the design and written into the statement specification, so as to implement environmental protection laws and regulations, the environmental protection measures in the environment impact assessment report, and the plan of environmental protection work; Ensure the normal operation of environmental protection facilities, inspect by the environmental protection departments, establish environmental protection files and report to the project office and the environmental protection management departments of all levels; Sign a commissioned monitoring agreement (contract) with the environmental monitoring department, and implement environmental management plan;

Page 68: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Provide funds of environmental protection inspection or sampling. In the construction process of the project, the contractor plays a key role in implementing environmental management, pollution control and prevention measures; Commission and implement the environmental supervision work, and write the environmental supervision plan to the establishment contract; Select contractor with strength and qualifications, and write the environmental management plan into the contract agreement so as to ensure the environmental management plan is implemented effectively.

Contractor

Subject the contractors and construction supervisors to relevant environmental protection and environmental management training before starting; The environmental impact mitigation measures during construction period should be included in the tender documents of the contractor and finally included in construction contract as the contract requirement to the contractor; Subject the contractor to environmental activities monitoring, regularly provide an environmental performance log for one time, and supervise and review these records by the project office and the construction supervision team; Contractor should provide a full-time environmental staff for the section, and the staff should receive the training of the training plan so as to be competent to their work; In the construction process, the contractor should communicate and coordinate with the masses of the project area, establish bulletin board in each construction unit to inform the public of specific construction activities and construction time, and simultaneously provide the contact and contact phone to provide complaints and advices of the masses to the construction activities.

6.1.2 Management Supervision

The environmental supervision organization of environmental construction project of

Gansu province is composed of the Environmental Protection Bureau of Gansu Province,

the Environmental Protection Bureau of Longnan City and the Environmental Protection

Agency of Cheng County. The management and supervision functions of the organization

of each stage are shown in Table 6.1-2.

Staged implementation of supervision organization:

(1) Feasibility study stage: this stage is responsible by Environmental Protection Bureau

of Gansu Province, Department of Water Resources of Gansu Province, Environmental

Protection Bureau of Longnan City, Water Conservancy Bureau of Longnan City,

Environmental Protection Bureau of Cheng County, and Water Authority of Cheng County.

The Environmental Protection Bureau of Gansu Province guides the implementation of

the various regulations of the Environmental Protection Bureau of Longnan City and the

Environmental Protection Bureau of Cheng County and is responsible for the completion

acceptance of environmental protection facilities.

The Department of Water Resources of Gansu Province guides the implementation of the

various regulations of the Water Conservancy Bureau of Longnan City and the Water

Authority of Cheng County and is responsible for the completion acceptance of soil and

water conservation facilities.

The Environmental Protection Bureau of Longnan City is responsible for supervising and

managing the environmental protection work of the project, organizing and coordinating

the relevant organizations to service for the environmental protection work of the project,

supervising the implementation of environmental action plan of the project, and is further

responsible for completion acceptance of environmental protection facilities of the project

and the guidance of the Environmental Protection Bureau of Cheng County to the

environmental supervision and management of the construction period and operation

period of the project.

Page 69: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

The Water Conservancy Bureau of Longnan City has a water conservation division which

is responsible for supervising and managing soil and water conservation work of the

project, organizing and coordinating the relevant organizations to service for soil and

water conservation works, and is further responsible for the completion acceptance of soil

and water conservation facilities and the guidance of the Environmental Protection Bureau

of Cheng County to the supervision and management of water loss and soil erosion in the

construction period and operation period of the project.

(2) Design stage: the stage is responsible by the Loan Project Office of the World Bank in

Longnan City and is supervised by the Department of Water Resources of Gansu

Province in the preliminary design check.

(3) Construction stage: the stage is responsible by the Environmental Protection Bureau

of Longnan City. The Environmental Protection Bureau of Cheng County is subjected to

the work guidance of the Environmental Protection Bureau of Longnan City and is

responsible for supervising the implementation of environmental action plans of the

construction unit and the implementation of the relevant environmental management

regulations and standards. The Environmental Protection Bureau of Cheng County is

responsible for the coordination of the environmental protection works along the

departments, the construction, completion acceptance, operation inspection, and

supervision management of the environmental protection facilities of the project.

(4) Operation stage: the stage is responsible by the Environmental Protection Bureau of

Longnan City, the Environmental Protection Bureau of Cheng County and the competent

authority of the project. The competent authority of the project is responsible for the

implementation of environmental protection regulations and standards, the development

and implementation of environmental protection regulations and the understanding of

environmental condition of the project, so as to check the environmental quality control

objectives, provide control measures, submit to the higher authorities, the administrative

departments and the water conservancy department, organize employment with

certificates of the environmental protection personnel and personnel training, and be

responsible for carrying out environmental protection and technological exchanges and

scientific research.

(5) The environmental monitoring works of construction period and operation period are

implemented by the environmental monitoring station of Cheng County. The

environmental supervision work is specifically implemented by the project supervision

company of Cheng County. When the project is completed, an environmental

management organization will be set, and full-time staff in charge of the project's

environmental protection work will be set.

Environmental Protection Supervision Plan of the Project

Table 6.1-2

Stage Organization Supervision content Supervision purpose

Feasibil

ity

study

stage

Environmental

Protection Bureau

of Gansu Province

Environmental

Protection Bureau

1. Review environmental impact

report

2. Review EMP

3. Review CEA

4. Review the feasibility study

1. Ensure that the environment

impact assessment is

comprehensive, the feature set is

proper, and the focus is

outstanding;

2. Ensure that the significant

Page 70: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

of Longnan City

The World Bank

Department of

Water Resources

of Gansu Province

report

5. Review soil and water

conservation plan

potential problems may be caused

by the project have been

reflected;

3. Ensure the specific and

feasible implementation plan for

the mitigation measures of

environmental impact;

Prelimi

nary

design

and

constru

ction

phase

Government of

Gansu Province

Environmental

Protection Bureau

of Gansu Province

Department of

Water Resources

of Gansu Province

Government of

Longnan City

Environmental

Protection Bureau

of Longnan City

Department of

Water Resources

of Longnan City

1. Review preliminary design of

environmental protection and

EAP

2. Check the reduction of

construction temporary land

occupation, vegetation reduction,

and environmental rehabilitation

3. Check the dust and noise

pollution control measures,

construction time decision

4. Check the emission of air

pollutants

5. Check the discharge of

domestic water of construction

site and the treatment of waste

engine oil

6. Recovery and processing of

soil intake and spoil sites

1. Strictly implement ―Three

Meantime‖;

2. Ensure that these sites are in

line with the environmental

protection requirements;

3. Reduce the impact of

construction on the surrounding

environment, and implement the

relevant environmental

regulations and standards;

4. Reduce the impact of

construction on the surrounding

environment, and implement the

relevant environmental

regulations and standards;

5. Ensure that the river water is

not contaminated;

6. Ensure that the landscape and

the land resources are not being

seriously damaged, and avoid

water loss and soil erosion;

Operati

onal

stage

Environmental

Protection Bureau

of Longnan City

Environmental

Protection Bureau

of Cheng County

Water Conservancy

Bureau of Longnan

City

Water Authority of

Cheng County

Public Security and

Fire Department of

Cheng County

1. Check the implementation of

EMP in operation period;

2. Check the implementation of

environmental monitoring plan;

3. Check the sensitive points to

be provided with further

environmental protection

measures which may appear

environmental problems not

estimated)

4. Check whether the quality of

the environmentally sensitive

points is in line with the

corresponding environmental

quality standards;

5. Check the implementation of

soil and water conservation plan

1. Implement EMP and soil

conservation programs;

2. Implement monitoring program;

3. Effectively protect the

environment;

4. Strengthen environmental

management, and effectively

protect human health;

Page 71: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

6. Check the implementation of

water loss and soil erosion

monitoring program

7. Strengthen supervision to

prevent incidents, pre-establish

emergency plan in the event of

an accident, and eliminate the

hazard in time.

6.2 Detailed Task for Implementation of Environmental Management Plan

The project has adverse environmental impacts during the construction period and

operation period, in relation to the characteristics of adverse environmental impacts in the

construction period and operation period, the corresponding environmental protection

measures are taken, so that the various impacts are reduced to acceptable level. In order

to ensure that environmental measures to be effective, environmental management and

monitoring procedures are provided.

The project office of the World Bank will track and report the monitoring conditions of

environmental measures while carrying out its project management functions. This

chapter describes the general environmental measures and the responsibilities of relevant

units. In the project, the project office is responsible for tracking and reporting the

implementation conditions of each measures of environmental monitoring. The list for the

implementation management and monitoring activities of environmental measures is

shown in Table 6.2-1.

List for Detailed Activities of Environmental Management Organization

Table 6.2-1

Page 72: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Plan Activities Responsibilities Remark

Manageme

nt

organizatio

n

Implementation

organization

Supervising

organization

Earlier construction period

11

months

Establish an environmental management design team, and

call the members

PMO Owner PMO Call the members, select office,

purchase traffic equipment, and

raise operating costs

11

months

Select or designate an environmental supervisor for each

CSE

CSE EMD CSE

11

months

Implement the environmental supervisor training for each

CSE

CSE EMD CSE

11

months

Compile and implement the training plan of EMO and PMO

environmental manager

PMO (TA) Technical

assistant

manager

PMO Implement part of global training of

the project

11

months

Compile work plan of the EMO and the environmental

supervisor

PMO Technical

assistant

manager

PMO Including the operation for clearing

the role and responsibilities of the

EMO and the environmental

supervisor

11

months

Develop working files: standards, onsite inspection table

and different activities report format

PMO EMD PMO Regulate the primary file in a

certain degree, regulate while

using in site

11

months

Develop detailed steps of EMD by targeting to the

incongruent phenomenon found in the supervision and

report

PMO TA PMO

11

months

Provide appropriate evaluation for the environmental

elements and the negotiations

PMO 0 TA helps EMD PMO/WB

11

months

Compile commission contract for the EMD for activities

supervision (the specific supervision equipment such as

water quality and atmospheric monitoring is required)

PMO EMD

Ensure the consistency between

the implementation of the process

and the working plan and the land

use

Construction period

16

months

File and process for the discussion between the

environmental supervisor and the EMD for the project

adjustment and improvement

― EMD/

environmental

supervisor

PMO In order to improve the regulation

process of efficiency requirements

16

months

The contractor of each section must appoint a full-time staff

with rich environmental responsibility to work together with

the environmental supervisor and the EMD

Owner and

constructio

n unit

Construction

unit PMO Enterprise licensing

16

months

The construction unit of each section should organize its

labor force to learn environment knowledge and measures

Owner and

constructio

n unit

Construction

unit

EMD/

environment

al supervisor

Introduce onsite management and

environmental problems by the

EMD

16

months

Organize public communication and provide support

material

PMO EMD Owner Establish exchange regulations

and procedures, and establish

exchange regulations and

procedures through radio and

television

Operation period

Confirm the procedures for reporting the environmental

problems of operation period

Owner Environment

al Protection

Bureau of

Cheng

County

Confirm the solid waste generated by the project is

intensively stacked and stored and is treated safely

Owner and

sanitation

department

Environment

al Protection

Bureau of

Cheng

County

Page 73: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

6.3 Contract Requirements of Environmental Management

In the project construction, the contractor plays a key role in environmental management,

pollution control and prevention measure and other factors, and therefore the contractors

should be required as follows:

(1) Select the contractor with strength to ensure the effective implementation of

environmental management plan;

(2) The contractors and the construction supervisor must be subjected to the relevant

environmental protection and environmental management training organized by the TA

before starting;

(3) The environmental impact mitigation measures during the construction period above

should be included in the tender documents of the contractor and finally included in the

construction contract as the contract requirements of the contractor of the project.

(4) The environmental activities of the contractor should be monitored, provide a daily or

weekly environmental performance record, and monitor and review these records by the

project office and the construction supervision team.

(5) The contractor should provide a full-time environmental staff for each section. These

environmental staff should be subject to the training of the training plan so as to qualify

their works.

(6) In the construction process, the contractor should communicate and coordinate with the

masses of the project area, establish bulletin board in each construction unit to inform

the public of specific construction activities and construction time, and simultaneously

provide the contact and contact phone to provide complaints and advices of the masses

to the construction activities.

(7) In the project contract funds, the contractors should obligate the deposit of

environmental management and other factors according to the annual budget, wherein

the amount of the proportion should be about 3% of the budget account.

6.4 Information Exchange and Resolution of Undesirable Condition

In the environmental monitoring work, the information should be exposed to the onsite

environmental supervisors, the environmental management managers of the enterprise

and the project office, wherein the information is monthly exposed for one time, the

monitoring report is developed by an environmental monitoring staff and is distributed to

the onsite environmental supervisors, the environmental management managers of the

enterprise and the direction of the project office. In order to focus on the most important

issue of management, the importance of non-compliance basis of the project is divided

into three different levels as following:

Level 1

Definition: the condition of the non-compliance is defined as the project is incongruent to

the original requirement, but the non-compliance will not cause immediate impact on the

particularly important resource. If the recurring of the first level did not be paid attention,

the second level will be caused. Measures: properly handle the situation of the first level

by means of appropriate cooperation and regular exchange. For example, discussing with

the staff of the construction unit and the operation unit, quickly implement remedial

measures, wherein the typically formal communication from is a weekly case report from

the environment supervision engineer to the environmental management manager of the

Page 74: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

enterprise and the onsite construction manager.

Level 2

Definition: the non-compliance condition does not cause obvious damage and irreversible

impacts on the sensitive and important resource, but the non-compliance condition should

be remedied and treated immediately to prevent the impacts above. If the recurring of the

second level did not be paid attention, the third level will be caused. Measures: in case of

the discovery of the event of the second level, the event must be reported to the

environmental manager of the project office and the onsite construction manager by the

environmental management manager of the enterprise, so as to achieve remedial

measures as soon as possible, and the remedial measures will be provided in a week

after the discovery, generally.

Level 3

Definition: the level includes the damage to the sensitive objectives paid special attention

or foreseeable and coming damage. The particular behavior internationally prohibited is

also divided into three levels. Measures: report the conditions to the environmental

manager of the project office and the onsite construction manager by the environmental

management manager of the enterprise once discovering, achieve remedial measures as

soon as possible, and the remedial measures will be provided in three days after the

discovery, generally. The time will be longer in case of special conditions. If necessary, the

environmental management manager of the enterprise can require the construction

manager to stop some special projects for protecting the resources before implementing

the remedial measures.

6.5 Training-- Necessary Capacity Building and Means Building

6.5.1 Training Requirement

The objective of environmental capacity building mainly comprises environmental

management personnel and environmental supervisor, and the training thereof is one of

the technical support parts of the project. In the construction process of the project, the

training courses comprise construction party training and worker training. Before starting

the construction of the project, all the construction units, operation units and construction

supervision personnel should participate in the mandatory environment, health and safety

training.

6.5.2 Training

(1) Environmental management personnel and environmental supervision engineers

The training is organized by the project office of Longnan City, the environmental manager

of Cheng County project office, the environmental manager coordinators of the project

and the environmental supervision engineers and other related personnel are subjected to

centralized training before one year of starting the project in Longnan City, and the specific

training is carried out by the technical experts of environment. The content of the training

is shown in Table 6.5-1.

(2) Contractors and construction workers

The training is organized by the project office of Cheng County or the construction owners

of the project in the place where the project is locate before starting the project, and the

specific training can be carried out by the technical experts of environment or trained

environmental managers of the enterprise. The specific training content and duration are

Page 75: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

shown in Table 6.5-2.

Training of Environmental Managers and Environmental Supervision Engineers,

Water Conservation Supervision Engineers

Table 6.5-1

Problem Training content Duration

Operation capability

(environmental

manager,

environmental

supervisor and water

conservation

supervisor)

Quick identification Word, Excel and PowerPoint hotkey

function to learn the security policy of the World Bank

Reinforcement learning for the building-designated

environmental conditions, technical consultants after the

compilation of environmental details, wherein each detailed

detail should comprises a monitoring description. Learn the

environmental impacts on the project and the environmental

projects required to be monitored.

4 days

Compliance

monitoring

(environmental

manager,

environmental

supervisor and water

conservation

supervisor)

The onsite monitoring process of the training project comprises

organization, communication, roles and responsibilities,

decision-making process, and the observation procedures of

report and standard.

1 day

Emergency response

team (environmental

manager,

environmental

supervisor and water

conservation

supervisor)

Onsite knowledge of hazardous materials

Potential leakage and overflow

Environmental and personal impact of leakage

and overflow

The emergency response process comprises

priority response

Location and use of response facilities,

Communications and reporting facilities

1/2 day

Emergency relief and

medical assistance

(environmental

manager,

environmental

supervisor and water

conservation

supervisor)

Process for finding medical assistance in emergency and

non-emergency state, and process for finding other related

medical aids. (For example, long-distance calls, medical

advice)

1/2 day

Hazardous materials

and waste

management,

including the disposal

of explosive waste

(environmental

manager and

environmental

supervisor)

Correct use and storage process

Correct use process comprises fuel filling process, calculation

of use amount, and ensured effective use of the equipment

Correction treatment of used storage tank

Storage process of hazardous waste

Management of borrowed land and slash

Management of non-hazardous waste

Medical problems expose to hazardous waste

Emergency response process

1/2 day

Page 76: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Health and safety

inspection and

reporting process

(environmental

manager,

environmental

supervisor and water

conservation

supervisor)

Health and safety issues

Health and safety requirements

How to implement health and safety

inspection

Process of reporting and problem solving

1 day

Traffic safety

(environmental

manager,

environmental

supervisor and water

conservation

supervisor)

Traffic rule

Safe dive training

Vehicle maintenance process

Fuel filling process

Emergency response process

1/2 day

Water quality

monitoring and

analysis

(environmental

manager,

environmental

supervisor and water

conservation

supervisor)

The use of the equipment comprises standards, testing,

methods, sample transport, data quality control monitoring and

reporting requirements

1/2 day

Training of Construction Workers

Table 6.5-2

Mode Training content Training period

General

environmental

knowledge of

construction

workers

Description for the environmental impact factors and

environmental protection measures related to the environment

Description for particularly sensitive area of environment and

problem in the construction area, and introduction of nearby

area in the construction area

Roles and responsibilities of environmental management

design engineers, environmental supervisor and construction

supervisor, and key points of environmental report

Waste management of construction camp and construction

site

Pollution control measures of construction site

Illegal provisions, and fines of laws and regulations

Half-day

classes in

each venue

General health

knowledge of

construction

workers

Transmission and protection methods, prevention of HIV/AIDS

and STD.

Alcohol and drug prohibition

Process for finding medical assistance in emergency and

non-emergency state, and process for finding other related

medical aids. (For example, STD detection, and counseling)

Half-day

classes in

each venue

Page 77: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Health and safety knowledge comprises some basic

processes as follows: traffic safety, electrical safety, explosion,

fire, hazardous waste management

Use of personal protective equipment

Fines for the violation of laws and regulations

(3) Operators

Training of Environmental Management Personnel of Operator

Table 6.5-3

Objective Training content Training period

Environmental

management

personnel

Project management process of the World Bank

Environmental information file, open, communication, and

reporting mechanism

Emergency response of environmental risk

Health and safety inspection and application process

One day of classes

held in Cheng

County

Advanced technology and environmental management

study

Investigation of

advanced domestic

municipal

engineering

Environmental

staff

The use of the equipment comprises standards, testing,

methods, sample transfer and data quality control and

reporting requirements

Environmental emergency response: potential leaks and

spills, impact of potential leaks and spills on environment

and human, wherein the emergency response process

comprises priority response, the location and use of the

response facilities

Two-day of classes

held in Cheng

County

6.5.3 Budget of Personnel Training Funds

The budget for the capacity building of the project is shown in Table 6.5-4.

Training Plan of Environmental Protection Personnel of the Project

Table 6.5-4

Stage Type Number (people) Time Cost (ten

thousand

Yuan))

Environmental manager

training

1 2011 2

Project manager coordinator 6 Before

implemtning the

project

6

Construction

period

Environmental supervision

engineer

3 Before

operation

3

Water conservation

supervision engineer

3 Before

operation

3

Page 78: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Subtotal 14

Environmental

management

personnel training

3 Before

enterprise

operation

6

Operation

period

Environmental risk

emergency

response personnel

3 Before

enterprise

operation

3

Subtotal 9

Total cost 23

6.6 Land Acquisition Compensation and Resettlement Compensation

(1) In accordance with the national and local policies and compensation methods of land

acquisition and resettlement, the villagers involved in land acquisition and resettlement

are provided with reasonable compensation, the project office should carefully listen the

views of immigrants and ensure that the working and living conditions immigrants are not

less than the current level.

(2) For the staged construction of pipeline and road sub, the excavation and backfill work

should be completed as soon as possible, the temporary access roads close to the

schools and other public facilities should be particularly paid attention and are provided

with traffic warning signs, traffic police should be in a rush to ease and dispatch so as to

pedestrians and vehicle flow; and materials transport should be avoided from traffic peak,

so as to reduce urban traffic pressure.

(3) Strengthen the training of the management and construction personnel in the

conservation education and awareness, due to the large amount of earth excavation work

of the project, the work should be taken seriously; in case of the discovery of cultural relics,

ancient tombs and other signs, it should be immediately notified to the local cultural relic

protection departments and excavated in a timely, and the construction can be continued

after treating the cultural relics by the cultural relics department well.

(4) If the stronger vibration works (such as pier compaction, vibration roller operation and

etc.) are carried out in residential areas, the old houses close to the construction site

should be monitored to prevent accidents. For the houses greatly impacted by the

vibration construction for ensuring the project should be provided with necessary remedial

measures.

6.7 temporary Site Restoration

The contractor has the obligation to implement ecological restoration of the temporary

land where the construction is completed in the construction period of the project, and

implement the restoration works of all the temporary lands before completing the project

completely.

Page 79: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Environmental Management Plan for Cheng County Moba Gorge Water Source

Engineering of Gansu Province

7. Environmental Monitoring Plan

7.1 Monitoring Purposes

According to the characteristics for the impacts of Moba gorge water source engineering

on the environment, the main environmental factors of the project construction area and

the reservoir area before and after the project construction are monitored, the change

conditions of the various environmental factors in the impact range of the project and the

effects after implementing the environmental protection measures are grasped, so that the

basis for finding environmental issues in time, providing the corresponding measures,

reducing the adverse effects of the project, strengthening environmental management and

project completion and acceptance..

In different stages, the focuses of environmental monitoring tasks are different. In the

earlier stage of project construction and water storage, the main monitoring objectives

mainly comprise the change conditions of the environmental factors caused by the

construction activities, the change of the environmental factors caused by dam

construction and water pipeline pavement; when the project is completed and put into

water storage operation, the monitoring objectives mainly comprise the change conditions

of the environmental factors around the reservoir caused by water storage, scheduling

and operation period, and the ecological change in the water pipeline pavement area.

7.2 Environmental Monitoring Organization

The environmental monitoring work in the construction period and operation period is

responsible by the Hydrographic Office of Cheng County, the environmental monitoring

station and the water conservation monitoring center according to the commission of the

project contractor or the operator, wherein all the responsible units are national

environmental quality monitoring units and are featured with complete equipment, thick

technical force, so that these units can carry out the environmental monitoring tasks well.

According to the environmental impact prediction results, the sensitive concerns with

obvious pollution are used as monitoring points so as to track and monitor the pollution

condition of construction period and operation period of the project, wherein the

monitoring content comprises the noise with large impact on the environment, air

environment and surface water environment. The monitoring factors are determined

according to the characteristic factors of project pollution. The monitoring analysis

methods are the monitoring analysis methods for the corresponding items in the

―Environmental Monitoring Technical Specifications" and the ―Water and Soil Conservation

Monitoring Technical Regulations" which are issued by the national environmental

protection administration.

The detailed and key steps required by the construction site and activities required by

effective monitoring are listed in Table 7.2-1.

7.3 Detailed Environmental Monitoring Requirements

The detailed environmental monitoring plan of the project is shown in Table 7.3-1 to 7.3-4,

and the cost budget table 7.3-5.

Key points of Monitoring Plan of Construction Period and Operation Period

Page 80: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Table 7.2-1

Page 81: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Plan Activities Responsibility Remark

Implement

ation

Supervision Financing

Construction period

1 year

(January to

February)

Compile onsite environmental management

plan

Constructi

on unit

EMC/PIU/EPB Owner Develop a plan in one month after signing

the contract, finally complete the plan in two

months, and approve and permit by the

EMC

Construction

period

Provide project implementation boundary of

each project area by the project construction

unit and the operation unit, and permission

Owner

EMC/PIU/EPB Compile a map by the construction unit and

the operation unit before constructing the

project

1 year

(January to

M)arch

Compile a pollution control plan, air pollution

and noise

Owner EMC/PIU/EPB

Department of

Water Resources of

Gansu Province

Owner Consult with relevant agencies and

residents, and approve and permit by the

EMC

Construction

period

Atmospheric, noise and water monitoring Specific Part

Construction

period

The pollution control plan and all the pollution

control measures provided by the EMP must be

implemented, all the delay measures should be

carried out by the construction unit, and all the

construction camps and facilities should be

inspected weekly

Constructi

on unit

EMC/PIU/EPB

Daily visit the construction camps and

facilities by CSEE and inspect the EMC2

monthly

Construction

period

The environmental protection measures of the

construction unit should be reported by filling in

monthly reports

Constructi

on unit

EMC/PIU/EPB The proposal of CSE is the basis of final

payment of PIU/PMO

Construction

period

According to the different processed and

serious levels, observe and report the

inconsistencies of the project

Constructi

on unit

EMC/PIU/EPB Level one: EMC; level two: EMC and PIU;

level three: EMC, PIU, PMO

Construction

period

Decide whether to postpone or refuse to pay

for projects construction units

Owner EMC/PIU/EPB

Construction

period

Ensure that the land acquisition process can

meet the needs of the construction plan

Owner POIU and

immigration office

Construction

period

Declare daily, weekly and monthly Constructi

on unit

EMC/PIU/EPB Onsite weekly, SRS monthly

Construction

period

Quarterly report Constructi

on unit

PIU If it is required by the organizations of the

relevant projects, it should be declared

Construction

period

Semi-annual declarations Constructi

on unit

EMC/PIU/EPB If it is required by the organizations of the

relevant projects, it should be declared

Completion

of

construction

period

When the temporary land is recovered, all the

building materials and equipments will be

removed

Constructi

on unit

EMC/PIU/EPB Owner

Operation period

Restore the temporary land when the

construction is completed

Owner EPB/Department of

Water Resources of

Gansu Province

Sum up the experience of the project for the

similar project

EPB/Depar

tment of

Water

Resources

of Gansu

Province

Standardization process and organization

for the training of intermediary agency,

demonstration for the results and benefits of

the project

Water and Soil Conservation Fixed-point Monitoring Plan

Table 7.3-1

Monitoring

time

Monitoring area Monitoring point Monitoring content Monitoring method Monitoring

frequency

Project

construction

period and

natural

recovery

period

Residues place control area

Residues place top of

piling slope

① Change of water

erosion amount Erosion gully measuring method

The residues

place is

monitored for

one time per

day, and the

other areas are

monitored for

one time per

30 days, and

the time will be

Residues place top ① Change of water

erosion amount

Erosion gully measuring method

Surface soil pilling yard ③ Surface soil erosion Erosion gully measuring method

Hub building control area

Slope excavation, and

temporary mound

① Change of water

erosion amount

Erosion gully measuring method

② Erosion amount of

temporary soil field

Erosion gully measuring method

Quarry control area Slope excavation ① Change of water Erosion gully measuring method

Page 82: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

erosion amount increased by

one in case of

the rainfall of

24 h is not less

than 50 mm.

Surface soil pilling yard ② Surface soil erosion Erosion gully measuring method

Construction road control area

Road excavation and

backfill surface

① Change of water

erosion amount

Survey monitoring method and

erosion gully measuring method

and etc.

Temporary residues ① Change of water

erosion amount

Erosion gully measuring method

Water pipeline control area

Road excavation and

backfill surface

① Change of water

erosion amount

Survey monitoring method and

erosion gully measuring method

and etc.

Temporary residues ① Change of water

erosion amount

Erosion gully measuring method

Construction enterprises and

office and living control area

Perturbation surface of

the construction area in

the site

① Change of water

erosion amount

Survey monitoring method and

erosion gully measuring method

and etc.

Survey Monitoring Plan of Water and Soil Conservation

Table 7.3-2

Monitoring

time

Monitoring

area

Monitoring content Monitoring method Monitoring frequency

Before the

constructio

n

preparatio

n period

Range of

control

responsibility

① Characteristics of water loss and soil erosion impact factor,

quantity, quality and protective effect of soil and water

conservation facilities, and status of water loss and soil erosion

and etc.

Remote sensing, census

survey method combined with

plots

Survey the background

value before the

construction preparation

period

② Background value of water loss and soil erosion

Constructi

on of

preparatio

n and

constructio

n period

Project

Construction

area ① Change of topography and vegetation of the construction

area, and number of damaged water loss and soil erosion

conservation facilities

Remote monitoring, inspection

method

Inspection at any time after

starting

② Number of dug and filled earth and stone, amount of spoil

and residues, location, land area, area of perturbation surface,

area and degree of damaged vegetation

Combination of the census

method and inspection

1 time in the construction

period and the end,

respectively

③ Number and effect of project control measures implemented Screening method, inspection

method

1 time in the construction

period and the end,

respectively

④ Hazards of water loss and soil erosion Combination of a sample

survey and access

1 time in the construction

period and the end,

respectively

Reservoir

inundation

area

① Unstable slope and landslide and the like in the reservoir

bank

Combination of a sample

survey and access

1 time in the construction

period

② Hazards of water loss and soil erosion Inspection method 1 time in the construction

period and the end,

respectively

Natural

recovery Project

Construction

area

① Regional change condition of water erosion Census and sample survey

method

1 time before, during and

after the flood, respectively

② Grass growth, survival rate, coverage and anti-erosion

effects and etc.

Quadrat survey 1 time before, during and

after the flood, respectively

③ Number and effects of control measures implemented, the

area of water loss and soil erosion, reduction for the amount of

water loss and soil erosion

Sample survey 1 time before, during and

after the flood, respectively

Reservoir

inundation

area

① Unstable slope and landslide and the like in the reservoir

bank Survey method, sampling 1 time before, during and

after the flood, respectively

② Hazards of water loss and soil erosion Survey method, sampling 1 time before, during and

after the flood, respectively

Page 83: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

List for Environmental Monitoring Plan of Construction Period

Table 7.3-3

Na

me

Monitoring

content

Monitoring point Monitoring frequency Monitoring item

Wat

er

qua

lity

mo

nito

ring

Water quality

change

condition of the

construction

site upstream

and

downstream

the river,

pollution

condition of

construction to

the water

quality

Set a section on the

place apart from the

upstream of the

intersection of the

river and Erlang

River with 500 m,

set a section in the

reservoir area, set a

section in the

downstream point

apart from the

reservoir area with

100 m, and there

are four monitoring

sections totally.

When the construction

is began, the annual

abundance, flat and

dry season will be

monitored for one

time, and the

monitoring is

appropriately

increased for 1 to 2

times in the peak

construction period

Temperature, pH, dissolved

oxygen, chemical oxygen

demand, 8005, total nitrogen,

total phosphorus, suspended

solids, ammonia nitrogen,

copper, zinc, arsenic, mercury,

cadmium, chromium

(hexavalent), lead, fluoride,

cyanide, volatile phenol,

petroleum, anion surfactant and

sulfide and fecal coliform

Atm

osp

heri

c

mo

nito

ring

Construction

and

transportation

impact on the

atmosphere

Construction area

When the construction

is began, monitoring

for one time per six

months, the

successive sampling

time of each time is 3

days, and sampling at

07:00, 12:00 and

18:00; the monitoring

will be appropriately

increased in the peak

construction period

SO2, TSP and NOx

Noi

se

mo

nito

ring

Noise

generated by

the

construction

machinery,

blasting and

transportation

Set a monitoring

point on the outer

boundary of 1 m to

the active

construction site

In the construction

period, quarterly

monitoring for one

time, the monitoring

will be appropriately

increased in the peak

construction period,

the successive

sampling time of each

time is 3 days, and

respectively sampling

at daytime and

nighttime for one time

Equivalent A sound level Leq

Ter

rest

rial

biol

Vegetation

type, dominant

species, grass

base height,

Processes involved

grass and woodland

area

One time before and

after the construction

Vegetation type, dominant

species, grass base height,

vegetation cover and etc.

Page 84: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

ogic

al

mo

nito

ring

vegetation

cover and etc.

Aqu

atic

biol

ogic

al

mo

nito

ring

Monitoring of

plankton,

benthos and

indigenous fish

Set two monitoring

points on the

upstream point

apart from the dam

with 100 m, and the

downstream point

apart from the dam

with 300 m

One time before and

after the construction

Monitoring the species and

number of the plankton,

benthos, and indigenous fish

Hu

man

heal

th

mo

nito

ring

Construction

camp

sanitation and

health of

construction

workers

Construction camps Monthly

Construction camp health,

physical health of construction

workers

List for Environmental Monitoring Plan of Operation Period

Table 7.3-4

Na

me

Monitoring

content

Monitoring point Monitoring

frequency

Monitoring item

Wa

ter

qua

lity

mo

nito

ring

Water quality

monitoring of

reservoir area

and

downstream

the reservoir

area in

operation

period

Set monitoring

sections in the

reservoir area

and the

downstream

point apart from

the reservoir

area with 100m

Monitor the

reservoir area for

one time per

day, and monitor

downstream

reservoir for one

time in

abundance, dry

and flat-water

period,

respectively

Temperature, pH, dissolved oxygen,

chemical oxygen demand, BOD5, total

nitrogen, total phosphorus, suspended

solids, ammonia nitrogen, copper, zinc,

arsenic, mercury, cadmium, chromium

(hexavalent), lead, fluoride, cyanide,

volatile phenol, petroleum, anion

surfactant and sulfide and fecal coliform

Aq

uati

c

biol

ogi

cal

mo

nito

ring

Monitoring of

plankton,

benthos and

indigenous

fish

Set two

monitoring points

on the upstream

point apart from

the dam with 100

m, and the

downstream

point apart from

the dam with 300

m

Every three

years is a cycle,

there are five

monitoring

cycles, and the

aquatic

organisms are

monitored for

one time of each

quarter, per

cycle

Monitoring of plankton, benthic species

and biomass changes, proliferation of

fish germplasm resources exchange

changes, and indigenous fish growth,

reproduction

Dis Discharge Downstream the Monthly Placement of water gauge card, monitor

Page 85: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

cha

rge

mo

nito

ring

flow of outlet

entrance of

the dam

dam of 100 mm dam leakage of water meets the

minimum ecological water

Monitoring Investment Budget Table

Table 7.3-5

Item Cost Remark

Water quality

monitoring Construction period Operation period

137000 Yuan 10300 Yuan/year

Atmospheric

monitoring

216000 Yuan Construction period

Noise monitoring 54000 Yuan Construction period

Terrestrial biological

monitoring

120000 Yuan Construction period

Aquatic biological

monitoring Construction period Operation period

100000 Yuan 60000 Yuan/3 years

Human health

monitoring

64000 Yuan Construction period

Water conservation

monitoring

589100 Yuan Construction period

Discharge monitoring 5000 Yuan/year Operation period

Page 86: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Environmental Management Plan for Cheng County Moba Gorge Water Source

Engineering of Gansu Province

8. Acceptance Investigation Content of Environmental Protection Measures

8.1 Investigation of Water Environmental Protection Measures

Investigate bottom cleaning condition of the reservoir, acceptance and conclusion.

Investigate the water environmental protection measures for the domestic wastewater of

operation period, effects and the corresponding investment by means of data collection,

field survey and other methods while combining with the data provided by completion and

acceptance monitoring.

Focus on the investigation of wastewater treatment facilities and treatment processes,

treatment capability and effects, and discharge direction and the like in the construction

site of operation period, and the investment of all the facilities and operation cost and etc.

8.2 Investigation of Atmospheric Environmental Protection Measures

Investigate the prevention, protection or management measures taken for reducing the

impacts of dust, exhaust gas of construction machinery and tail has of transport vehicles

and the like on the onsite construction workers.

8.3 Investigation of Acoustic Environmental Protection Measures

Investigate the implementation condition and implementation effect of acoustic

environmental protection measures by visiting the construction workers and checking data

and other methods. The investigation content mainly comprises: whether the construction

equipment is the mechanical equipment required by environmental protection, whether

the noise management of construction period is strengthened, implementation of noise

abatement measures for the high-noise machinery, and the prevention for the night work

of high-noise construction equipment, whether the maintenance of the high-noise

construction equipment is strengthened so as to ensure the normal operation, reduce the

noise generated by means of abnormal operation of the equipment, whether the vehicle

management is strengthened, and the vehicle noise is controlled and etc.

8.4 Investigation of Solid Waste Treatment Measures

Investigate the location, size and capacity of waste soil and stone disposal place, and the

implementation conditions for the project and measures which are taken after the

treatment of the residues place. Investigate the amount of the residues place and the

operation conditions.

8.5 Investigation of Ecological Protection Measures

8.5.1 Investigation of Terrestrial Ecological Protection Measures

Mainly investigate the restoration condition of the temporary land, and the greening

project condition taken on the living management area of the reservoir and etc.

8.5.2 Investigation of Aquatic Ecological Protection Measures

Investigate the implementation condition for the safeguard measures of discharge

ecological base flow, and whether the young fishes put according to the requirements.

Page 87: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

8.6 Investigation of Water Loss and Soil Erosion Control

8.5.1.1 Water Loss and Soil Erosion Control Measures of Construction Period

Investigate the condition of soil and stone transportation of the project in the construction

period, the land position and the actual use condition of the residues place and protection

conditions thereof, mainly comprising the amount of the residues place, the actual

residues amount and the utilization ratio; the actual land area of planned residues place,

the amount of residues and the stacking height; the construction condition of the residues

place wall, the length and height of the wall, and the configuration conditions of

surrounding drainage ditches and other draining facilities.

Investigate the mining situation of the stock ground, the type of the original land,

ecological restoration measures taken and restoration effects, and the setting conditions

for the slope drainage ditches of the temporary roads and the quarry.

8.5.1.2 Investigation for Soil and Water Conservation Measures after Construction

Investigate the restoration condition of temporary construction area when the construction

is ended, investigate the land use type of the temporary construction road, two sides of

the new road, exposed land caused by the damage of the vegetation within the temporary

construction area, the temporary living and office area and the residues place and other

slashes after restoring, the greening area and greening rate and etc. Mainly investigate

whether the project measures and vegetation restoring measures of each project have

been implemented according to the requirements of environment impact assessment and

project design. Investigate the water and soil conversation protection condition after taking

project, plant and management measures.

8.7 Investigation of Population Health Impact and Protection Measures

Investigate the implementation conditions of environmental health management and

epidemic disposal and others in the construction site of construction period.

Investigate and understand the environmental health conditions of project construction

area and reservoir area, comprising medical institutions setting, medical equipment

configuration, file and regular inspection of health data of the construction workers and etc;

the infectious diseases comprises main disease type, number of cases, infected, and

epidemic control situation; drinking water purification and disinfection conditions; and

other conditions of population health protective measures.

According to the investigation results and the combination for the requirements of

environment impact assessment, the implementation conditions of population health

protection measures can be judges, the population health conditions in the construction

period can be evaluated, so that the effect for the series of measures taken for protecting

the population health can be analyzed.

Investigate and understand the environmental health conditions of reservoir area in the

operation period, and the conditions of other population health protection measures taken.

8.8 Investigation for Environmental Protection Measures of Resettlement Area

Investigate the relocation and resettlement areas and resettlement areas of production

distribution, environmental profile; population resettlement, resettlement method and

resettlement profile; and whether the resettlement compensation is implemented actually

and etc.

8.9 Investigation of Risk Prevention Measures

Page 88: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Investigate the environmental risk factors presented in the construction period and the

operation period of the project, whether there is a risk incident; investigate the situation,

reason and caused environment impacts of environmental risk accident in the

construction period and operation period; investigate the environment risk prevention

measures of the project and the compilation condition of the emergency response plan,

the implementation conditions of national, local and related industries in the accident

prevention and emergency response, the necessary emergency facilities and training

conditions of emergency response team; and investigate the environment risk prevention

measures of the project and the setting conditions of emergency management agencies.

8.10 "Three Meantime" of Project Acceptance

The water source engineering construction management department of Moba gorge for

city water supply of Cheng County should timely provide completion acceptance

application of environmental protection facilities to the environmental protection

department according to the relevant requirements in the ―Completion Acceptance

Management Regulations for Environmental Protection Facilities of Construction Project‖,

so as to implement acceptance. The list for the completion acceptance of environmental

protection facilities is shown in Table 8.9-1.

List for "Three Meantime" Acceptance of Environmental Protection Facilities

Table 8.9-1

Item Content Measures Acceptance

standard

Wastewater

Domestic wastewater

Treat the domestic

wastewater by means

of WSZ buried

wastewater treatment

equipment

The first level of

"Integrated

Wastewater Discharge

Standard"

(GB8978-1996)

Water source protection

Divide drinking water

source protection areas

according to the

requirements of the

―Regulations for

Pollution of Prevention

Control and

Management of

Drinking Water Source

Protection Area‖

Reservoir water

quality meets the

standards of Class III

in the "Surface Water

Environmental Quality

Standard" and the

threshold value of the

water source

supplementary items

Compile an

―Environmental

Protection Plan of

Drinking Water Source

of Cheng County‖

Solid waste Household waste

Set 2 garbage barrels

in the management

station

Proper disposal of

household waste

Water loss and soil

erosion Site regulation

Implement land

formation on the stock

Project provided by

water conservation

Page 89: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

yard, the construction

camps, the

construction access

road and the water

pipeline when the

construction is

completed

program

Slope protection work

Protect the slope of the

stock yard and the

residues place

Drainage work

Set drainage facilities in

dam management

station, dam road and

construction stock yard

Greening measures

Green the dam

management station,

stock yard, construction

camp, construction

access roads, water

pipeline and two sides

of the roadbed of the

dam road when the

construction is

completed

Resettlement and

ecological

compensation

Place immigration

properly, and

compensate flooded

farmland and forest

land

Resettlement plan and

land compensation

plan

Landscape protection

Pavement of the water

pipeline should be hidden

by the terrain as far as

possible and should be

prevented from the

residential area

Prevent the damage of

the landscape caused

by the water pipeline

Aquatic organism Young fish releasing

Release young fish in

April to June for every

three years

Release 2000 Jialing

Schizopygopsis Tajiri

Schizothorax fish

species with the size

of 3 to 4 cm

Discharge amount Ecological water discharge Set permanent outlet

entrance on the dam

The discharge amount

is 0.138m3/s

Environmental

monitoring and

management

Normal operation

Page 90: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Environmental Management Plan for Cheng County Moba Gorge Water Source

Engineering of Gansu Province

9. Environmental Management Cost Budget and Capital Source

9.1 Budget Distribution

The implementation of EMP measures involves to many units, so that the capital sources

are different. Most of environmental protection activities are project measures, and thereof

the activities should be provided by the project construction unit and the operation unit

and involved in project cost, wherein these costs will be cleared and listed in the tender of

competitive bidding.

The cost of EMP is mainly applied to the environmental management of the construction

period and the operation period, and mainly comprises environmental monitoring cost,

environmental supervision cost, training cost and the environmental management agency

operation cost, and part of project further has risk prevention cost. The activities of EMC

will be covered with the PMO and PIUS international project management costs, the

monitoring of water quality, atmosphere and noise, the CSEE and EFSI are the same. The

monitoring and surveillance activities of CSEE are part of the construction and supervision

costs. The local environmental monitoring station will monitor water, atmosphere and

noise in the operation process of the project according to the commission of the project

owner, and the monitoring cost thereof will be paid by the project owner. If the normal

monitoring of the local environmental protection department is synchronous with the

project, the normal monitoring data of the environmental protection department can be

used.

9.2 Capital Source and EMP Budget

Investments for various environmental protection measures proposed in the evaluation

report are estimated as 15.2673 million RMB, which takes 6.74% of total investment cost.

Please see table 9.2-1 for details.

Table 9.2-1 Environmental Protection Investment

Variety of measure

Name of measure

Content of measure

Expected effect Investment cost (10,000RMB)

Pollutant control during

construction

Disposal for domestic

sewage from constructors

Disposed by t6he toilet pit of

each construction

site.

Relieve the influence on environment

caused by waste water.

6.54

Waste water from the

foundation pit

Add flocculating agent.

Relieve the influence on environment

caused by waste water.

40.2

Waste water Oil separation Relieve the 5.32

Page 91: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

containing oil tank influence on environment

caused by waste water.

Waste water for sand stone materials

Sedimentation tank

Relieve the influence on environment

caused by waste water.

25.89

Alkaline waste water

Sedimentation tank and the

agent for adjusting pH

value

Relieve the influence on environment

caused by waste water.

6.37

Watering construction

area

Water construction

area.

Relieve dust raise in

construction site.

8.1

Household waste from constructor

Arrange 28 trash cans and

transport the waste in time.

Relieve the influence on the

environment caused by household

waste during construction.

10.8

Barrier facilities around the

construction site

Barrier facilities are arranged

around the site.

Relieve dust raise and noise

influence caused by

construction.

5

Preventive measures for constructor

Mask, earplug and so on

Relieve the influence for the

constructor caused by

construction process.

4

Protection of human health

Disinfect the construction

area, implement deratization and

eradicate mosquito and

fly.

Protect body health of

constructor. 23.61

Waste water control

Domestic sewage

Adopt WSZ buried sewage

disposal equipment to

dispose domestic sewage.

Standard LI (GB8979-1996)

of Comprehensive

Sewage Discharge Standard

15.0

Protection of water source

area

Divide protection zone for drinking

water source according to the requirements of ―Administrative Regulations for

Preventing Pollution of

The water quality in the reservoir area reaches the III

standard of ―Environmental

Quality Standard of Surface

Water‖

50.0

Page 92: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Drinking Water Source

Protection Zone‖.

(GB3838-2002) and the

boundary value of

supplementary items.

Compile ―Environmental Protection Plan

for Cheng County Drinking Water Source

Area‖.

Household waste

Household wastes

Arrange two trash cans for

the management

station.

Properly dispose household

wastes. 0.04

Soil and water conservation

Engineering measures,

planting measures and

temporary engineering measures

Prevent and control the

region in which water loss and

soil erosion occur.

After soil and water

conservation scheme is

implemented, by the final period of construction,

treatment rate of disturbed land

reaches 98.67%; treating degree for water

loss and soil erosion reaches 98.07% and slag

blocking rate reaches 100%; control rate for water loss and

soil erosion reaches 1.03;

vegetation recovery

coefficient reaches 98.76%

and coverage area of forest and grasses

reaches 41.3%.

1118.67

Page 93: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Ecological protection

Schizopygopsis kialingensis and

Schizothorax davidi which are bought and bred

via manual domestication are released to

breed.

Every 3 years is a releasing

period and 2000 Schizopygopsis kialingensis and

Schizothorax davidi in the

specification of 3-4cm are

released every time.

10

Set ecological protection signs

Warning signs 0.9

Environmental monitoring

Water quality monitoring

Work normally

137

Environmental air monitoring

216.6

Noise monitoring

5.4

Human health monitoring

6.4

Ecological survey and monitoring

22

Other charge 127.17

Total 1526.73

Within the above budget, the summary for the management cost of construction period of

the project is shown in Table 9.2-2.

Budget Summary for Environmental Management Cost of the Project in

Construction Period

Table 9.2-2

No. Cots name Total cost of construction

period of the project

(10,000RMB)

1 EMD operation Salary 22.5

Office expense 9

Travelling expense 5.63

2 Environment monitoring cost 69.10

3 Environmental supervision cost 21.6

4 Personnel environmental protection training 23

5 Water and soil conservation monitoring cost 58.91

6 Water and soil conservation supervision cost 39.20

7 Total 248.94

Page 94: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

10. Information Management of Environmental Management Plan

10.1 Environmental Management Plan

10.101 Environmental Management System

Provincial level: Department of Water Resources of Gansu Province, Environmental

Protection Department of Gansu Province, the World Bank

City level: water conservancy bureau of Longnan City, environmental protection bureau of

Longnan City, Loan Project Office of the World Bank in Longnan City

County level: environmental protection bureau of Cheng County, Water Authority of Cheng

County

Owners

Enterprise level: environmental monitoring station of Cheng County, environment impact

assessment unit, design unit, construction contractor, environmental supervision

engineers, environmental monitoring station of Cheng County, owners

Figure 10.1-1 Chart of Environmental Management System

Organizational Chart of Environmental Management System

Table 10.1-1

Organizational

properties

Organizational name Organizational task

Management

organization

Project management office of

Longnan City

Project management organization

Environmental management

office of Longnan City

Project environmental management organization

Supervision

organization the World Bank

Supervision and inspection the implementation of

environmental management plan

Department of Environmental

Protection of Gansu Province,

Environmental Protection

Agency of Longnan City, and

Environmental Protection

Agency of Cheng County

Government administrative supervision and

management organization

Implementatio

n organization

Contractor Implement the environmental protection measures

of construction period

Consultation

organization Experts Group on the

Environment

Implement environmental review, consultation and

technical support according to the commission of

the project environmental management

organization

Environmental supervisor Manage the environmental supervision of the

contractor according to the commission of the

project environmental management organization

Project supervisor Sign and issue formal letters between the

environmental supervisor and the contractor

Environmental monitoring Undertake professional environmental monitoring

Page 95: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

organization task according to the commission of the project

environmental management organization

10.1.2 Environmental Management Task of Each Stage of the Project

(1) Feasibility study stage

The main environmental management task of the feasibility study stage is environmental

assessment of construction project, and mainly comprises the compilation of

environmental assessment report and environmental management plan.

(2) Design stage

The main environmental management task of the project design stage comprises:

inspecting the final design report of the project, ensuring the various environmental

protection measures (environmental protection measures of project design, environmental

protection measures of construction period, and environmental protection measures of

operation period) proposed by the EA and included in the final design of the project.

(3) Bidding stage

The main environmental management task of the bidding stage of the project comprises:

ensuring the environmental protection measures of construction period provided by the

EA are included in the construction contract of the project.

(4) Construction stage

The main environmental management task of the bidding stage of the construction stage

comprises: implementing the environmental protection measures of construction period

provided by the EA and the monitoring plan of construction stage.

The environmental protection measures of construction period are specifically

implemented by the contractor, and the environmental supervisor is responsible for

supervising and managing the onsite construction activities of the contractor.

(4) Operational stage

The main environmental management task of the operational stage comprises:

implementing the environmental protection measures of construction period provided by

the EA and the monitoring plan of operational stage.

10.2 Information Exchange

Environmental management requirements necessary information exchange among the

different departments and positions of the project office, the owner, the contractor and the

operator of the organization, and simultaneously notices the relevant information to the

outside (the relevant parties and social publics and etc.).

The internal information exchange can be carried out in the form of meetings and internal

briefings and other method, but there must be a formal monthly meeting, all the

information exchanged should be recorded and archived. External information exchange

is carried out for every six months or one year, and the information exchanged with the

coordination unit should be formed into a summary and archived.

10.3 Recording Mechanism

For the effective operation of environmental management system, a comprehensive

recording system must be established, and the following contents should be recorded:

(1) Legal and regulatory requirements;

(2) Licensing;

(3) Environmental factors and related environmental impacts;

Page 96: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

(4) Training;

(5) Inspection, check and maintenance activities;

(6) Monitoring data;

(7) Effectiveness of corrective and preventive measures;

(8) Information of related party;

(9) Audit;

(10) Review.

In addition, the records of the various types above must also be necessary in controlling,

and the records comprise identification, collection, cataloging, archiving, storage,

management, maintenance, inquiry, retention period, disposal and other sectors.

10.4 Reporting Mechanism

The contractors, operators, monitoring unit, environmental supervision engineers and

project office should record the project progress, the EMP implementation conditions and

the environmental monitoring results and the like in the project construction process, and

report the information to the relevant department in time. The record mainly comprises the

following six parts:

(1) The project environment supervision engineers should monthly and detailedly record

the implementation condition of the EMP in the month, timely provide the weekly and

monthly to the project owners and project office of Cheng County, wherein the weekly and

monthly reports should include the implementation of environmental protection measures,

as well as implementation condition of environmental monitoring and monitoring data.

(2) The contractor and operator should quarterly and detailedly record the project

progress and the implementation condition of the EMP, timely submit the quarterly report

to the project office, and simultaneously copy the quarterly report to the Environmental

Protection Agency of Cheng County.

(3) The monitoring unit should timely submit monitoring report to the contractor (carrier)

and the environmental supervision engineer when the monitoring task is completed;

(4) The project office of Cheng County should timely submit the project progress report of

the project office of Longnan City, and copy the report to the Environmental Protection

Bureau of Longnan City. The project progress report (such as monthly, quarterly, annual

reports and etc.) prepared by the project office must comprises the content of EMP

progress, e.g. the implementation progress and implementation effect of the EMP,

particularly the environmental monitoring results and etc.;

(5) In case of the special violation of environmental protection matter, environmental

supervision engineer and the project office will inform the matter to the local

environmental protection administration department, and report to the superior, if

necessary.

(6) The EMP implementation report of the project should be completed and submitted to

the World Bank before March 31, and the EMP implementation report can comprise the

following main contents:

① Implementation of training plan;

② Progress of projects, such as the diversion tunnel and road works on the dam, main

project of the dam, water pipeline construction progress and etc.;

③ Implementation of project environmental measures, implementation condition of

Page 97: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

environmental monitoring and main monitoring results;

④ Public complaints, if there is a complaint, the main content of the complaint, the

solution and the public satisfaction should be recorded;

⑤ EMP implementation plan of the next year.

Environmental Management Plan for Cheng County Moba Gorge Water Source

Page 98: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Engineering of Gansu Province

Appendix

Appendix 1 Project Involves Environmental Standards

“Environmental Quality Standards for Surface Water” (GB3838-2002)

Appendix 1

No. Project name Standard value

(mg/L)

Grade

1 pH ( non-dimensional) 6-9

2 COD <= 20

3 NH3-N <= 1.0

4 Total nitrogen <= 1.0

5 Zinc <= 1.0

6 Selenium <= 0.01

7 Mercury <= 0.0001

8 Lead <= 0.05

9 Cyanide <= 0.2

10 Petroleum <= 0.05

11 Sulphide <= 0.2

12 Dissolved oxygen

>=

3

Standard of

Class III

13 BOD5 <= 4

14 Total phosphorus <= 0.2

15 Copper <= 1.0

16 Fluoride <= 1.0

17 Arsenic <= 0.05

18 Cadmium <= 0.005

19 Chromium (hexavalent) <= 0.05

20 Volatile phenol <= 0.005

21 Anionic surfactant <= 0.2

22 Dung escherichia coli (Pcs/L)) <= 10000

23 Potassium permanganate index <= 6

24 Water temperature (DEG C)

Threshold Value for Supplementary Item of Water Source

Appendix 1-2

No. Item name Maximum allowable concentration (mg/L)

1 Sulphate (by SO42-) 250

2 Chloride (by Cl-) 250

3 Nitrate (by N) 10

4 Iron 0.3

5 Manganese 0.1

Page 99: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

“Ambient Air Quality Standard” (GB3095-1996)

Appendix 1-3

No.

Item

Pollutant concentration limit (mg/m3) Grade

Hourly average Daily average

1 PM10 / 0.15 Secondary

standard 2 NO2 0.24 0.12

3 CO 10.00 4.00

4 SO2 0.5 0.15

"Sound Environmental Quality Atandards" (GB3096-2008)

Appendix 1-4

Type Daytime dB (A) Nighttime dB (A)

Class II 60 50

"Environmental Quality Standard for Soils” (GB15618-1995)

Appendix 1-5

No. Item name Maximum allowable

concentration

Grade

1 Copper 35

2 Cadmium 0.20

3 Lead 35

4 Zinc 100

5 Mercury 0.15 Primary standard

6 Hexavalent chromium Lack of standard

7 Arsenic 15

8 Total chrome 90

9 sulphide Lack of standard

Note: As the river sediment is no uniform standards currently, the environment impact

assessment of the project is carried out by means of the "Environmental Quality

Standards for Soil" (GB15618-1995).

“Integrated Draining Standard of Sewage” (Gb8978-1996)

Appendix 1-6

No. Item name Unit Maximum allowable

concentration

Grade

1 pH value 6.0-9.0

2 Suspended matter mg/L 70

3 BOD5 mg/L 30 Primary standard

4 CODcr mg/L 100

5 Ammonia nitrogen mg/L 15

Page 100: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

"Atmospheric Pollution Material Integrated Emission Standard" (GB16297-1996)

Appendix 1-7

Item name Unit Controlled concentration limit Grade

Particle mg/m3 The highest concentration of outer

concentration is 1.0

Fugitive emission

“Noise Limits for Construction Site” (GB12523-90)

Appendix 1-8

Construction

period Main noise source

Noise limit (dB)

Daytime Nighttime

Soil and stone Bulldozers, loader and excavator and etc. 75 55

Piling Various hammers and etc. 85 Prohibit

construction

Structure Concrete mixer, vibrating rod and electric saw

and etc.

70 55

Fitment Crane and lift and etc. 65 55

“Sanitary Standard for Drinking Water” (GB5749-2006)

Appendix 1-9

Index Unit Limit value

1. Microbiological index Total coliform MPN/100 ml Negative

Thermotolerant

coliform

MPN/100 ml Negative

2. Toxicological index Arsenic mg/L 0.01

Cadmium mg/L 0.005

Chromium

(hexavalent)

mg/L 0.05

Lead mg/L 0.01

Mercury mg/L 0.001

3. Sensory properties and general

chemical index

Chromaticity Platinum cobalt

chromaticity

15

Turbidity NTU 1

Smell and taste PH Without abnormal odor and

peculiar smell

PH Not less than 6.5 and not

more than 8.5

Aluminium mg/L 0.2

Page 101: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

zinc mg/L 1.0

4. Radioactive indexes Total alpha activity Bq/L 0.5

Total beta activity Bq/L 1

Note: the radioactive indexes are guide values

Appendix 2 Detailed Project Environmental Management Standards of Contractor

In construction period, environmental protection is the responsibility of the contractor. The

article 19.1 of the soil mold engineering evaluation Contract of the International

Federation of Consulting Engineers (FIDIC) states that ―in the whole process of

construction, completion and repair other defects, the contractor should take all

reasonable steps to protect the site and its vicinity environment, so as to avoid the

pollution, noise or other results caused by construction and prevent the injury or prejudice

on human and property and other aspects.‖

1. Control measures of air environmental pollution

① Implement civilized construction during the construction period, develop the measures

for preventing dust pollution according to the construction plan, for example, adding

baffles, watering and timely removing earthwork, wherein the transport vehicles should be

covered with a canvas before leaving from the site to the road, meanwhile the material

should be prevented from loading/unloading in wind as much as possible.

② For powdery materials, they are piled up intensively and provided with covering and

sheltering measures to reduce the production of dust.

③ Regularly inspection the working site, subject the sensitive point to TSP monitoring,

and reform the overweight phenomenon in a given time.

④ For the construction which is in violation to the provisions or the problem did not be

reformed in time, administrative and financial penalties should be taken.

2. Control measures of water environmental pollution

① Production and living wastewater is strictly prohibited from discharging without treating,

the construction site should be provided with a wastewater collecting and depositing tank,

and the wastewater is used for watering to reduce the dust or used for concrete mixing

and the like after treating simply.

② The management of the construction site should be strengthened to prevent earthwork

and construction materials and the like from entering into the water close to the piling

place.

3. Control measures of noise environmental pollution

① Replace behind high-noise construction process with advanced low-noise construction

process.

② The speed of the bulldozers, excavators, loading and unloading vehicles should be

limited will accessing the site, and the maintenance of the mechanical equipment and

transport vehicles should be strengthened.

③ Reasonably arrange the schedule and construction time, and avoid the continuing

Page 102: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

impact of strong-noise operating machinery on the surrounding residents.

④ Operate the equipment according to the provision, and minimize the impact noise.

⑤ When the construction site through schools, residential and other sensitive points, the

temporary noise barriers (walls) should be set, if necessary.

⑥ Regularly monitor the noise level of the sensitive point, and provide control measures

to the excessive points.

4. Control measures of ecological environmental pollution

① For the land and forest and the like must be occupied in the construction process, the

land acquisition must be completed before starting the project and must be in line with

relevant domestic regulations and the security policy OP4.12 of the World Bank and the

requirements of 4.20.

② For the temporary land occupation of construction, the mellow soil of cultivating in the

original land surface should be stacked aside and leveled when the construction is

completed, so as to restore the land surface.

③ Strengthen the education of the construction worker, promote civil construction, and

protect the wildlife in the construction area.

5. Control measures of solid waste pollution

① The construction waste and residues should be uniformly treated according to the

provisions of the relevant local department, the household waste will be subjected to

landfill in the designated landfill of the sanitation department.

② The solid waste and waste oil and the like generated in the construction site should be

intensively stacked in the designated place. When the construction is completed, the solid

wastes are sent to a refuse landfill to subject to landfill, and for the waste oil, the leaked oil

of construction machinery and the like will be collected by means of onsite leakage

collection method.

③ The construction waste and abandoned soil should be promptly disposed so as to

reduce the time for piling in the construction site.

6. Social environment safeguard measures

① According to the policies of land acquisition and resettlement and the compensation

methods of Chinese government and the region, the villagers involved in land acquired

will be provided with a reasonable compensation, and the suggestion of the villagers will

be listened carefully.

② Implement staged construction of the pipeline, so as to complete the excavation and

backfill work as soon as possible.

7. Environmental monitoring measures

Compliance with environmental monitoring plan of the project, and commission the

environmental monitoring station of Cheng County and the qualified soil and water

conservation monitoring unit to monitor the major environmental impacts, the conditions of

surrounding environmental quality and the soil and water conservation situation in the

construction period according to the frequency and point distribution requirements of the

monitoring plan.

Detailedly record the results for the implementation of environmental monitoring and

monitoring report, and involve that into monthly and quarterly reports, timely submit the

reports to the local project office, and copy the records to the local Environmental

Page 103: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Protection Agency.

8. Environmental supervision and water conservation supervision measures

The environmental supervision and water conservation supervision work should run

through the entire process of construction, so as to ensure the smooth development of

environmental protection work in the construction period of the project and ensure the

effective implementation of environmental protection measures and soil and water

conservation measures. In order to ensure that the environmental protection measures

and the soil and water conservation measures are completed according to the plan, and

the quality of the environmental project is ensured, the supervisor should be entrusted by

the owner and should have environmental project supervision qualification and water and

soil conservation supervision qualification; due to the stage and period implementation

characteristics of the project, three full-time supervisors and water conservation

supervisors are primarily considered, the establishment of other environmental

management personnel can be the staff of other departments in part-time according to the

requirements, and the number of the worker is determined according to the requirements.

8.1 Working method of environmental supervisor and water conservation supervisor

① Environmental supervision and water conservation supervision are involved in the

range of project supervision and are uniformly managed by the supervision management

department of the construction headquarters. The environmental supervisor and water

conservation supervisor will participate in monthly meeting of engineering director, and

submit weekly and monthly and the like contents to the chief inspector office.

② Regularly convene environmental supervision and water conservation supervision

conferences, solve the existing problems by combining with the recent environmental

supervision and water conservation supervision work, and provide the working plan of the

next stage.

③ The sub-departments of environmental supervision and water conservation

supervision will regularly convene environment supervision meetings monthly.

④ Form a complete onsite environmental protection management system, establish an

environmental protection lead group in each participation project department, wherein the

group is responsible for the environmental protection and lead work of the project

department, the organization is extended to the construction team and group, the

responsibility area is divided, and the person in charge is determined.

8.2 Content of environmental supervision and water conservation supervision work

① Environmental supervision of project preparation period:

Review the environmental protection articles in the "Construction Organization Plan"

compiled by the construction unit, inspect whether the environmental protection system

established by the construction unit is reasonable, participate, approve and submit the

application of ―Unit Project Start Report‖, and implement project supervision for the

construction of pollutant treatment project, and supervise the implementation.

② Environmental supervision and water conservation supervision of construction period:

Design and compile "Environmental Protection Focus" according to the construction

organization of each section, and propagandize environmental protection work to the

construction unit, point out environmental pollution sensitive point for the construction unit,

provide special environmental protection measures according to the main pollutant in the

Page 104: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

construction process, check the ―Environmental Protection Plan of Project Construction‖

provided by the construction unit, inspect whether the operation of environmental

protection system of the construction unit is normal, and inspect the implementation

condition of the environmental protection measures and etc., and supervise the

construction of water and soil conservation measures. Supervise the implementation of

environmental monitoring plan, and supervise the monitoring result.

③ Environment supervision and water conservation supervision of project operation

period:

Review the ―Summary Report of Environmental Protection Work of Project Construction‖

developed and reported by the construction unit, file environmental protection completed

document and environmental protection acceptance inspection of the project item, and

compile ―Environmental Supervision Summary Report" and ―Summary Report of Water

Conservation Supervision Work‖ and etc.

8.3 Responsibilities of environmental supervision and water conservation supervision

① Supervisors should strictly carry out supervisory responsibilities, effectively play the

role of the supervision and management, so as to effectively implement the environmental

protection measures and soil and water conservation measures to be taken on the site,

and ensure the effective implementation of environmental protection work.

② Implement the propagandizing and implementation work of environmental protection

and soil and water conservation laws and regulations, improve the environmental

protection consciousness of the whole personnel participating in the construction to

consciously participate in and implement the environmental protection work well.

③ Develop staged environmental supervision and water conservation supervision plan,

subject the completion of unit project to environmental supervision and water conservation

supervision acceptance, and ensure the complete process of environmental protection

and complete data when the project is completed.

④ Sign environmental protection contract in the agreement in relation to the construction

project without bidding, review the content of environmental protection in the construction

organization design, add environmental protection sections with detailed contents in the

construction organization design.

⑤ Detailedly record the implementation of EMP of the project, compile weekly and

monthly reports, and timely submit the reports to the local project office and the

environmental protection agency.

Page 105: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Appendix 3 Detailed Project Environmental Management Standards of Project

Operation Department

The environmental management of operation period mainly comprises the following

aspects:

I. Management measures of operation technology

① Establish an operation management and operation responsibility system of treatment

facilities;

② Train the management personnel and the operator, establish technical assessment

files, and prohibit unqualified staff;

③ Hire an experienced professional and technical personnel who is responsible for

technical management;

④ Strengthen the maintenance and management of equipment and facilities, wherein the

key equipment should be provided with a standby machine;

⑤ Regularly visit the residents nearby the project, listen the suggestions, inform the

relevant environmental information, and coordinate the relationship with nearby residents

II. Environmental monitoring measures

Comply with project environmental monitoring plan, and commission the environmental

monitoring station of Cheng County and the qualified soil and water conservation

monitoring unit to monitor the major environmental impacts, the conditions of surrounding

environmental quality and the soil and water conservation situation in the construction

period according to the frequency and point distribution requirements of the monitoring

plan.

Detailedly record the results for the implementation of environmental monitoring and

monitoring report, and involve that into monthly and quarterly reports, timely submit the

reports to the local project office, and copy the records to the local Environmental

Protection Agency.

Page 106: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

Appendix 4 Summary of Project Environmental Management Plan and

Environmental Action Plan of Construction Period

List for Environmental Management Plan of Construction Period

Table 4-1

Task Schedule Imple

menta

tion

organi

zation

Super

vision

organi

zation

Capita

l

source

Item Content of

environmental

management

Mitigation measures taken by

the project

Water

quality

protecti

on

Aggregate

washing

wastewater

management

Treat the wastewater with

sedimentation tanks

Completed ahead

of schedule while

using aggregate

system

Constr

uction

unit

In the

constr

uction

period

, the

enviro

nment

al

mana

geme

nt plan

is

superv

ised

by the

Enviro

nment

al

Protec

tion

Agenc

y and

the

Water

In the

constr

uction

period,

the

capital

requir

ed by

the

enviro

nment

al

manag

ement

plan is

obtain

ed

from

the

invest

ment

of the

main

project

Oily wastewater

management

Treat the wastewater with oil

separation tanks

Completed while

arranging the

construction site

Constr

uction

unit

Domestic

wastewater

Set pail latrine in the

construction camp to

implement centralized

wastewater collection and

treatment

Completed

before the

approach of the

construction

workers

Constr

uction

unit

Acousti

c

environ

mental

quality

control

Noise

generated by

construction

mechanical

equipment and

traffic

transportation

Control the operation time of

high-noise equipment and

transportation, reduce the

impact of the noise on the

residential area, and

strengthen personal labor

protection of the construction

workers

Simultaneous

with the

equipment while

putting into

operation

Constr

uction

unit

Environ

mental

air

quality

control

Dust and tail

gas of fuel

machinery

Select sealed sand producing

equipment to produce sand,

use wet method operation

while implementing

excavation and blasting

operations, provide a dust

collector for the concrete

mixing system, transport

Simultaneous

with the

equipment while

putting into

operation

Constr

uction

unit

Page 107: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

concrete with a sealed

container, and implement

sealed raw material and

production transmission of

port to port

Author

ity of

Cheng

Count

y Solid

waste

disposa

l

Collection,

transportation

and treatment of

household

waste

Set garbage can and other

household waste collection

devices in the construction

living area

Completed

before entering

the construction

worker into the

camp

Constr

uction

unit

People

health

protecti

on

Health of

construction

workers body

Regularly check the body of

the construction workers and

disinfect the construction area

so prevent infectious

diseases

Completed

before entering

the construction

worker into the

camp, and

regularly

implemented in

the construction

period

Constr

uction

unit

Soil

and

water

conserv

ation

Water loss and

soil erosion

Timely restore construction

slash, and take

corresponding protection

measures in the construction

process.

Gradually

implemented by

following the

construction

period

Constr

uction

unit

Terresti

ral

ecosyst

em

Terrestrial

vegetation and

animal

The construction process

should be avoided from the

local wildlife activities as

much as possible, strictly

prohibit capturing activities,

and prevent the damage to

the vegetation outside the

project area

Gradually

implemented by

following the

construction

period

Constr

uction

unit

Person

nel

training

Construction technology and

management requirements training

Befoore

construction

Constr

uction

unit

List for Environmental Management Plan of Operation Period

Table 4-2

Task

Schedule

Implementati

on

organization

Superv

ision

organiz

ation

Capital

source

Item Content of

environme

ntal

managem

ent

Mitigation measures taken by the

project

Geolog

ical

Geological

disaster

Implement slope protection and

foot protection of the section

Before

impoundi

Water

Authority of

In the

operati

In the

operati

Page 108: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

environ

ment

protecti

on

which is easy in occurring

landslide of the reservoir bank,

and strengthen the seismic

monitoring of the region

ng Cheng

County

on

period,

the

environ

mental

manag

ement

plan is

supervi

sed by

the

Enviro

nmenta

l

Protect

ion

Agency

of

Cheng

County

on

period,

the

capital

require

d by the

environ

mental

manag

ement

plan is

the

income

of water

supply

in the

operati

on

period

Aquati

c life

protecti

on

Aquatic life

Maintain the discharge amount

under the suitable living

conditions of the aquatic life, and

reasonably introduce foreign

species on the basis of scientific

argumentation so as to increase

the value of fishery resources

Release

young fish

in April to

June in

the

operation

period of

each year

Water

Authority of

Cheng

County

Water

quality

protecti

on

Water

quality

change

Complete the cleaning work of

the reservoir, and supervise the

quality of water

Completio

n before

completio

n

acceptanc

e

Water

Authority of

Cheng

County

Solid

waste

dispos

al

Household

waste

Reasonably set garbage can in

the living area to collect garbage,

regularly transport the garbage to

the household waste landfill field

to implement centralized

treatment

Completio

n before

completio

n

acceptanc

e

Water

Authority of

Cheng

County

Person

nel

training

Environmental basic theories and monitoring

methods, compilation of monitoring reports,

and job training

Before

reservoir

operation

Water

Authority of

Cheng

County

List for Environmental Action of Construction Period

Table 4-3

No. Monitoring

worksite

Monitoring content Monitoring

time

Implement

ation

organizatio

n

Supervisio

n

organizati

on

1 Constructio

n camp

Determine the construction area; set

enclosing material around the

construction site, and set pail latrine in

the site, wherein each construction site

is provided with two garbage cans; the

Xiaozhuang-Gumugou construction site

is provided with a primary

sedimentation tank and flocculation

sedimentation tank, and the place close

Before

construction

Constructi

on unit

Environm

ental

Protection

Agency of

Cheng

County

and

Environm

ental

Page 109: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

to the concrete mixing system is

equipped with two sedimentation tanks;

the Majiaya Qiaotou machinery parking

area of left bank, Bashang achinery

parking area of left bank, Gumugou

machinery parking area of right bank,

Machinery parking area of sand and

gravel mining area and the Bashang

achinery parking area of right bank are

respectively provided with an oil

separation tank; the Majiaya Qiaotou

construction site of the left bank, the

construction site upstream the dam of

left bank, the Xiaozhuang-Gumugou

construction site of right bank, the dam

construction site between the

cofferdams, the construction site

upstream the dam of right bank and

water pipeline construction site and

other sites are provided with 1 to 2

blocks of terrestrial vegetation and

wildlife protection warning signs; the

drainage ditches are provided; and the

grouted stone pitching wall and

reinforced stone cage facilities

Protection

Agency of

Longnan

City

In the process of high-noise

construction, construction workers

should wear ear muffs and ear plugs; in

high-dust content construction process,

construction workers should wear

masks; water and dust are regularly

swept and removed; straw bag retaining

wall is set while implementing

temporary stacking, and the stacked

material will be covered

Construction

period

Implement backfill of the topsoil, land

remediation and vegetation restoration

After

construction

2 Constructio

n living area

Determine the living area; the living

area is provided with toilets and

garbage cans, drainage ditches,

grouted stone pitching wall and

reinforced stone cage facilities, wherein

when the topsoil is stripped, the

temporary stacking place should be

Before

construction

Page 110: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

provided with straw bag retaining walls

and covered

Regularly watering to reduce dust,

implement cleaning and disinfection for

every three months

Construction

period

Implement backfill of the topsoil, land

remediation and vegetation restoration

After

construction

3 Water

pipeline

Set grouted stone pitching wall, set

straw bag retaining wall in the

temporary stacking place after stripping

the topsoil, and cover the stacking place

Construction

period

Implement backfill of the topsoil, land

remediation and vegetation restoration

After

construction

4 Road Grouted stone pitching wall and

reinforced stone cage facilities,

temporary stacking place should be

provided with straw bag retaining walls

and covered when the topsoil is

stripped, and the intercepting drain is

provided

Construction

period

Implement backfill of the topsoil, land

remediation and vegetation restoration

After

construction

5 Residues

place

Determine the range of the residues

place; provide reinforced stone cage

block; set surrounding intercepting

drain; set straw bag retaining walls in

temporary stacking place, and cover

Before

construction

Dry stone pitching; straw bag retaining

wall; and coverage of the slag after the

daily construction

Construction

period

Implement backfill of the topsoil, land

remediation and vegetation restoration;

and set slag top drainage ditch

After

construction

6

Quarry

Determine the mining area around

intercepting drain, set straw bag

retaining walls in the temporary

stacking place, and cover

Before

constructio

n

Spray mix bracing, bolting, slope

drainage holes;

Constructio

n period

Implement backfill of the topsoil, land

remediation and vegetation

restoration; and set slag top drainage

ditch

After

constructio

n

Page 111: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

7

Main

project of

the dam

Scoping; dam dredging; surrounding

drainage ditches

Before

constructio

n

Grouted stone pitching wall, reinforced

stone cage facilities, slope bolting, and

surface concrete spray

Constructio

n period

Vertical green of excavated slope After

constructio

n

8 Flooded

area

Flooded area dredging Before

constructio

n

9 Diversion

tunnel

Spray mix bracing, bolting; scaffolding

support of inlet/outlet side walls and

roof arch. Framework composed of

combined templates

Constructio

n period

Lower gate blocking of the diversion

tunnel

Before

project

operation

10 Cofferdam Impermeable property of

high-pressure spray wall and

impermeable property of waistcoat

curtain grouting

Constructio

n period

Residues of cofferdam removal are

sent to the designated residue field

After

constructio

n

11 Ecological

measures

the Majiaya Qiaotou construction site

of the left bank, the construction site

upstream the dam of left bank, the

Xiaozhuang-Gumugou construction

site of right bank, the dam construction

site between the cofferdams, the

construction site upstream the dam of

right bank and water pipeline

construction site and other sites are

provided with 1 to 2 blocks of

terrestrial vegetation and wildlife

protection warning signs;

Before

constructio

n

Strengthen management, implement

regular inspection, prevent hunting

and fishing activities of the

construction workers

Constructio

n period

Renovate disturbed land, and restore

vegetation

After

constructio

Page 112: Environmental Management Plan - World Bankdocuments.worldbank.org/curated/en/686731468219298455/... · 2016-07-11 · Environmental Management Plan for Cheng County Moba Gorge Water

n

Release young fish in April to June of

each year

Project

operation

period