Cheng County Moba Gorge Water Source Engineering of Gansu Province
Environmental Management Plan
Construction Unit: Water Source Engineering Construction Management
Department of Moba Gorge for City Water Supply of Cheng County
Assessment unit: Lanzhou University
May 2012
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Environmental Management Plan for Cheng County Moba Gorge Water Source
Engineering of Gansu Province
Cheng County Moba Gorge Water Source Engineering of Gansu Province
Engineering of Gansu Province
Project Name: Cheng County Moba Gorge Water Source Engineering of Gansu Province
Commissioned By: Water Source Engineering Construction Management Department of
Moba Gorge for City Water Supply of Cheng County
Assessed By: Lanzhou University
Supervisor: Wu Junnian
Technical Director: Wu Junnian
Major Establishment Strength: Wu Junnian, Liu Guannan
Environmental Management Plan for Cheng County Moba Gorge Water Source
Engineering of Gansu Province
Directory
1. General Instruction………………………………………………………………………….1
1.1 Project Brief…………………………………………………………………………………..1
1.2 Objectives of Environmental Management Plan………………………………………….2
1.3 Compilation of Environmental Management Plan…………………………………………3
1.4 Design of Environmental Management Plan………………………………………………3
1.5 Details of Compilation Technology………………………………………………………….3
2. Policy, Law and Administrative Management Framework…………………………….5
2.1 Environmental Policies and Regulations Document………………………………………5
2.2 Environmental Management Organizations and Responsibilities……………………. 10
3. Project Description…………………………………………………………………………15
3.1 Construction Objective of the Project……………………………………………………..15
3.2 Implementation Schedule of the Project………………………………………………….15
3.3 Project Overview ……………………………………………………………………………15
4. Environmental Impact of the Project and Mitigation Measures Summary ……….19
4.1 Environmental Impact Assessment………………………………………………………19
4.2 Public Participation…………………………………………………………………………46
5. Environmental Management Organization of the Project……………………………47
5.1 Introduction…………………………………………………………………………………..47
5.2 Environmental Organization of Construction Period……………………………………48
5.3 Environmental Management Organization in Operation Period……………………….51
5.4 Details of Environmental Management Organization of the Project…………………..51
6. Implementation of Environmental Management Plan..............................................53
6.1 Project Environmental Management...........................................................................53
6.2 Detailed Task for Implementation of Environmental Management Plan………………55
6.3 Contract Requirements of Environmental Management………………………………..57
6.4 Information Exchange and Resolution of Undesirable Condition………………………57
6.5 Training-- Necessary Capacity Building and Means Building…………………………..58
6.6 Land Acquisition Compensation and Resettlement Compensation……………………61
6.7 temporary Site Restoration………………………………………………………………...61
7. Environmental Monitoring Plan…………………………………………………………..63
7.1 Monitoring Purposes………………………………………………………………………..63
7.2 Environmental Monitoring Organization…………………………………………………..63
7.3 Detailed Environmental Monitoring Requirements………………………………………63
8. Acceptance Investigation Content of Environmental Protection Measures……...69
8.1 Investigation of Water Environmental Protection Measures……………………………69
8.2 Investigation of Atmospheric Environmental Protection Measures…………………….69
8.3 Investigation of Acoustic Environmental Protection Measures…………………………69
8.4 Investigation of Solid Waste Treatment Measures………………………………………69
8.5 Investigation of Ecological Protection Measures………………………………………...69
8.6 Investigation of Water Loss and Soil Erosion Control…………………………………..70
8.7 Investigation of Population Health Impact and Protection Measures………………….70
8.8 Investigation for Environmental Protection Measures of Resettlement Area…………70
8.9 Investigation of Risk Prevention Measures………………………………………………71
8.10 "Three Meantime" of Project Acceptance……………………………………………….71
9. Environmental Management Cost Budget and Capital Source…………………….73
9.1 Budget Distribution………………………………………………………………………….73
9.2 Capital Source and EMP Budget………………………………………………………….73
10. Information Management of Environmental Management Plan…………………..75
10.1 Environmental Management Plan……………………………………………………….75
10.2 Information Exchange…………………………………………………………………….76
10.3 Recording Mechanism…………………………………………………………………….77
10.4 Reporting Mechanism…………………………………………………………………….77
Appendix………………………………………………………………………………………...79
Appendix 1 Project Involves Environmental Standards.....................................................79
Appendix 2 Detailed Project Environmental Management Standards of Contractor……..83
Appendix 3 Detailed Project Environmental Management Standards of Project Operation
Department………………………………………………………………………………………87
Appendix 4 Summary of Project Environmental Management Plan and Environmental
Action Plan of Construction Period…………………………………………………………….89
Figure
Figure 1 Environmental Protection Measures Layout Figure for Cheng County Moba
Gorge Water Source Engineering of Gansu Province
Figure 2 Water and Soil Conservation Measures Layout Figure for Cheng County Moba
Gorge Water Source Engineering of Gansu Province
Figure 3-1 Atmosphere and Noise Monitoring Points Figure in Construction Period of
Moba Gorge Water Source Engineering of Gansu Province
Figure 3-2 Environmental Monitoring Points Figure in Construction and Operation Period
Cheng County Moba Gorge Water Source Engineering of Gansu Province
Figure 4 Water and Soil Conservation Monitoring Points Figure for Cheng County Moba
Gorge Water Source Engineering of Gansu Province
Environmental Management Plan for Cheng County Moba Gorge Water Source
Engineering of Gansu Province
1. General Instruction
1.1 Project Brief
Cheng County is located in Longnan City of the six parts in southern Gansu Province, and
located in 105°24 '~ 105°57' of east longitude and 33°31'~ 34°02' of north latitude.
The county is east to Hui County, west to Xihe County, southwest to Kang County with
interval of Western Han River, and the southeast is adjacent to the Lueyang County of
Shaanxi Province. The length of north to south is 55 km, the width of east to west is 52 km,
the area is about 1701 km2, the highest elevation within the county is 2377 m, the lowest
elevation is 50 m, and the county is a relatively wide graben basin in West Qinling fold belt.
Cheng County mainly comprises ―One water and three rivers‖, i.e. Western Han River,
Qingni River, Nan River and Luo River, the total water resources of the whole county is
1,276 billion m3, in which the self-produced water is 0.331 billion m3.
The total land area of the county is 1676.54 km2, the total population is 0.2652 million, of
which the agricultural population is 0.218 million people. The benefited area of the project
comprises 3 towns and 38 administrative villages, and the total population thereof is 0.103
million people.
The county town of Cheng County is divided into Hedong District and Hexi District by
taking the East River as the boundary. Hedong District is called as new town, Hexi District
is called as old town, and the south of the Nan River is called as new Nanhe District. The
population of the urban area is about 80,000. according to the ―Urban Master Plan of
Cheng County (2008-2025)‖, the central city comprises Chengguan Town, Paosha Town
and Chenyuan Town; to the recent 2015, the population of the central city planed is
130,000, the construction land area is 13 km2; to the forward 2025, the population is
220,000, and the construction land area is 22 km2; to the forward 2025, Chengnan water
plant, Hedong water plant and Paosha water plant will be built, and the total amount of
urban water supply will be reached to 65,000 m3/d.
At present, Cheng County has two tap water supply units for supplying water to the urban
area, namely County Tap Water Company and Gaofeng Water Supply Company; the
water supply source of County Tap Water Company is the well located in West Bank of
Qingni River in the Chengguan Shunjia Dam, the water of the well belongs to the
quaternary gap sedimentary water and occurs in gravel layer, and the water is mainly
supplied by the water of Qingni River and the atmospheric precipitation; however, the
contents of lead and COD contained in the surface water of Qingni River exceed the
standards of Class IV in the standard of water environmental quality, and due to the
influence of Wenchuan earthquake of Sichuan, the turbidity of the well water in the water
source is increased, odor and floaters are presented, and the health of urban residents is
impacted seriously; the water supply source of Gaofeng Water Supply Company is
Gaofeng water reservoir, and the actual daily water supply capacity of the company is
1000 m3 only as the drainage area of the water reservoir is less than 10 km2 and the
spatial and temporal distribution of precipitation is uneven. According to the survey, the
existing water supply project of the urban area cannot meet the urban water demand.
In order to solve the contradiction of urban water supply, improve water quality, reduce
cost of water supply, achieve the sustainable economic and social development of Cheng
County and improve the physical health of urban residents, the Water Authority of Cheng
County consults with the relevant personnel of the World Bank to build a new urban water
supply dam by means of the loans of the World Bank, and the loan planned is 226.563
million Yuan.
Cheng County Moba gorge water source project is located in the west of the Cheng
County with 11 km, is apart from Paosha Town with 6 km and is located downstream the
Nan River basin; the geographic location of the project is as follows: 33°45' -33°38 ' of
northern latitude and 105°33'55" - 105°37'60" of east longitude, and the project belongs
to Jialing River system upstream the Yangtze River. The content of project construction
comprises project construction and management system and institutional capacity
building. The project construction mainly comprises dams, water intake structures, water
pipelines, and dam roads and etc. The content of management system institutional
capacity building comprises water resources and comprehensive environmental
management projects based on the concepts and methods of integrated river basin
management. The content of institutional capacity building comprises water source
engineering construction management department of Moba gorge for city water supply of
Cheng County, monitoring and assessment, and management of information system;
when the project is completed, the problem of difficult water supply in the urban area of
Cheng County can be solved, so that the project has good social and economic benefits.
The objectives of the project are as follows: comprehensively and effectively use the water
resources of Cheng County, solve the problem that the domestic water of Cheng County
after the disaster is difficult, and improve the water environment of Cheng County.
1.2 Objectives of Environmental Management Plan
The compilation of EMP aims at developing a set of detailed, technically feasible,
financially sustainable and workable environmental measures by targeting to the
inevitable potential adverse impact of the project to the environment, clearing the
environmental mitigation, environmental management and institution building measures to
be implemented by project contractors, supervision side, operators, environment
management department in the project construction and operation period, so as to
eliminate or compensate the adverse environmental and social impact of the project, and
reduce the adverse environmental and social impact to an acceptable level. The specific
objectives are as follows:
(1) Clear the environmental management obligations of the contractor and the operator
The environmental protection bureau of Gansu Province, the environmental protection
bureau of Longnan City, the environmental assessment unit and the design unit carry out
detailed onsite check and confirmation to the environmental protection targets, and
provide effective environmental mitigation measures, wherein the measures are
incorporated into the project design and are taken as the contractual obligations of the
contractor and the operator of the project construction.
(2) Operational guidelines for environmental management
The environmental monitoring plan of construction period and operation period provided in
the environmental management plan can ensure the effective implementation of
environmental mitigation measures, and the monitoring plan will be provided to the
construction supervision unit, the environmental supervision unit and other relevant units
as an environmental protection file, so as to clear the responsibilities and the roles of the
relevant functional departments, and provide the various communication channels and
methods among the departments.
(3) Ensure the cost of environmental management action
In the environmental management plan, the cost of environmental management,
environmental supervision and capacity building are estimated, and the capital sources
are described, so as to ensure the various environmental management activities can be
implemented, wherein the management cost comprises staff salaries, office costs and
transportation costs.
The role of environmental management plan is in avoiding and controlling the adverse
environment effect in the construction and operation process of the project, so that the
impact mitigation measures, monitoring measures, legal regulatory means and safeguard
measures of the measures above to be implemented are provided; at the same time, the
environmental management plan is a critical link in connecting the impact mitigation
measures and replacement measures for the assessment and detailed description in the
environmental impact and environment assessment. For each environmental
management measure, the environmental management plan provides the technical
content, the investment estimation, the implementation plan, the functions of government
agencies, the capital sources, and the monitoring schemes of the measure. In order to
achieve reduction objective, the method involved by the environmental impact
assessment report and the environmental management plan must be implemented.
1.3 Compilation of Environmental Management Plan
The environmental management plan of the ―Cheng County Moba Gorge Water Source
Engineering of Gansu Province‖ is compiled by the engineering environmental
assessment unit, the environmental management plan is compiled by strictly complying
with national and provincial environmental management regulations. Meanwhile, the
environmental management plan particularly paid attention to the requirements of security
regulations of the World Bank under the premise of meeting the requirements of China's
environmental assessment, specifically refers to relevant provisions of the operation
regulation 4.01.
The information source for the environmental management plan of the project is as
follows:
(1) Feasibility evaluation report of the project
(2) Preliminary design of the project
(3) Environmental assessment of the project
(4) Soil and water conservation scheme of the project
1.4 Design of Environmental Management Plan
For the detailed description of environmental management, environmental supervision
and environmental monitoring and other aspects, the environmental management plan
compiled is a guiding document in the implementation process of the project, and the
action plan thereof mainly includes the following four parts:
Environmental impacts and mitigation measures: the main environmental impacts in
project construction period and operation period, and project measures and management
measures taken for preventing or mitigating the adverse environmental impact caused by
the project.
Environmental management and monitoring plan: environmental monitoring action taken
for ensuring the synchronous implementation of environmental protection measures and
the project construction.
Environmental monitoring plan: environmental monitoring action taken for supervising
whether the environment of construction period and operation period is standard and
ensuring the safe operation of the project and the improvement of project condition in the
project area.
Capacity building plan (i.e. personnel training): knowledge and skills training of the
management personnel, the environmental supervision personnel, full-time or part-time
personnel in the project implementation process for ensuring the implementation of
environmental management plan.
1.5 Details of Compilation Technology
The environmental management plan is compiled by appropriately altering and
replenishing on the basis of the ―Primary Design of Cheng County Moba Gorge Water
Source Engineering of Gansu Province‖ and the ―Environmental Impact Assessment of
Cheng County Moba Gorge Water Source Engineering of Gansu Province‖. As an
independent file, the environmental management plan comprises all the environmental
management activities to be implemented in the construction period and operation period
of the project; and the plan further provides action guidelines and working framework to
the adverse impact mitigation measures, environmental supervision, environmental
management and environmental monitoring in the construction period and the operation
period.
Environmental Management Plan for Cheng County Moba Gorge Water Source
Engineering of Gansu Province
2. Policy, Law and Administrative Management Framework
2.1 Environmental Policies and Regulations Document
2.1.1 Overview
Through the comprehensive analysis for the type, the size, the location, the environmental
sensitivity and the characteristic and degree of potential environmental impact of the
project, the main basis of the environmental assessment of the project and the revolved
policies, laws and regulations and standards comprise:
(1) Environmental protection laws and regulations;
(2) Pollution control technology policy;
(3) Socio-economic development and environmental protection plans and programs;
(4) Overall urban planning;
(5) Technical guidelines of environmental impact assessment;
(6) Environmental quality standards;
(7) Control of pollutant emission standards;
(8) Safeguard policies of the World Bank.
The policies, laws and regulations and standards above construct a frame for the policies,
laws and regulations and standards in guiding and regulating the environmental
assessment work of the project.
In addition, the environmental assessment of the project takes the feasibility study report
and the administrative examination and approval documents of the government
administrative authorities and the relevant documents with specific embodiment and
application of the policies, laws and regulations and standards above as one of the basis
of environmental assessment.
2.1.2 Environmental protection Laws and Regulations
(1) ―Environmental Protection Law of the People‘s Republic of China‖, (December 1989);
(2) ―Air Pollution Prevention Law of the People‘s Republic of China‖, (September 2009);
(3) " Water Pollution Prevention Law of the People‘s Republic of China", (June 1, 2008);
(4) " Environmental Noise Pollution Prevention Law of the People‘s Republic of China",
(March 1997);
(5) "Solid Waste Pollution Prevention Law of the People‘s Republic of China", (April 2005);
(6) "Environmental Impact Assessment Law of the People‘s Republic of China",
(September 1, 2003);
(7) "Cleaner Production Promotion Law of the People‘s Republic of China", (January 1,
2003);
(8) " Water and Soil Conservation Law of the People‘s Republic of China", (June 1991);
(9) "Forest Law of the People‘s Republic of China", (January 1998);
(10) "Wildlife Protection Law of the People‘s Republic of China", (adopted by the fourth
meeting of the Standing Committee of the Seventh National People's Congress on
November 8, 1988, and implemented from March 1, 1989. The amendment for the
―Decision on the Amendments to the ‗Wildlife Protection Law of the People‘s Republic of
China‘‖ in the eleventh meeting of the Standing Committee of the Tenth National People's
Congress on August 28, 2004);
(11) "Land Management Law of the People‘s Republic of China", (August 28, 2004);
(12) "Flood Control Law of the People‘s Republic of China", (January 1, 1998).
2. 1.3 Environmental Protection Regulations, Ministries Rules and Protection List
(1) "Implementation Regulations of Soil and Water Conservation Law of the People‘s
Republic of China", (August 1, 1993);
(2) " Wild Plant Protection Regulations of the People‘s Republic of China", (September 30,
1996);
(3) " Regulations on the Nature Protection Regions of the People's Republic of China",
(October 9, 1994);
(4) "Regulations of the People's Republic of China Governing the Administration of River",
(June 10, 1988);
(5) "Regulations on the Administration of Construction Project Environmental Protection",
(November 29, 1998);
(6) "Outline of National Ecological Environmental Protection", (April 10, 2001);
(7) "‘Eleventh Five-Year Plan‘ of National Eco-protection", (UNCED 2006 [158]);
(8) "Regulations on Pollution Control of Drinking Water Source Protection Area‖, (July 10,
1989);
(9) "Public Participation and Interim Measures of Environmental Impact Assessment",
(UNCED 2006 [28]);
(9) "Notice for Strengthening Environmental Impact Assessment Work of Loan
Construction Projects of International Financial Organization‖ (four ministries, EM [1993]
No. 324).
(10) "Notice for Strengthening Environmental Protection Work of Hydropower
Construction ―, (UNCED [2005] No. 13);
(11) "Notice for Printing and Issuing ‗National Ecological Environmental Protection
Program‘ of State Environmental Protection Administration of the State Council‖,
(December 21, 2000);
(12) ―UNCED [2005] No. 24‖ Document ―Suggestion for Strengthening Ecological
Environment Protection Supervision Work of Resource Development‖ of the State
Environmental Protection Administration;
(13) "Notice for Strengthening Ecological Environment Management of Natural Resources
Development and Construction Project‖ (National Environmental Protection Agency,
December 1994);
(14) "Case for Issuing the Meeting Summary of Water Environment and Aquatic
Ecosystem Protection Technology Seminar Minutes of Water Conservancy and
Hydropower Construction Project‖ (Environmental Office letter [2006] No. 11);
(15) "Notice for Strengthening Environmental Impact Assessment Management and
Environmental Risk Prevention‖, (UNCED [2005] No. 152);
(16) "Construction Project Environmental Protection Classification Management List"
(2008);
(17) "List for National Nature Reserve of China", (2004)
(18) "List of National Key Protected Wild Animals" (National Bureau of Forestry Decree No.
7 revised, February 2003);
(19) " List of National Key Protected Wild Plants (the First Amendment)‖ (August 4, 2001).
2. 1.4 Local Environmental Protection Regulations and List
(1) "Geological Environmental Protection Regulations of Gansu Province" (Gansu
Provincial People's Congress Standing Committee);
(2) "Basic Farmland Protection Regulations of Gansu Province" (Gansu Provincial
People's Congress, September 29, 1997);
(3) "Provisions (Amendments) for Implementation of Forest Law of Gansu Province‖
(Gansu Provincial People's Congress, July 30, 1997)
(4) "Measures (Amendments) for Implementation of Water Law of Gansu Province"
(Gansu Provincial People's Congress, May 28, 1997);
(5) "Measures (Amendments) for Implementation of Land Administration Law of Gansu
Province" (Gansu Provincial People's Congress, September 29, 1997)
(6) "Measures for Implementation of Fisheries Act of Gansu Province" (Gansu Provincial
People's Congress, September 29, 1997);
(7) "Measures for Implementation of Water and Soil Conservation Law of Gansu Province"
(amended by Gansu Provincial People's Congress in May 28, 1997);
(8) "Decision on Environmental Protection Problems of People's Government of Gansu
Province‖ (February 20, 1997).
2.1.5 Socio-economic Development and Environmental Protection Plan
(1) "Overall Plan for Urban Area of Cheng County" (2001-2020);
(2) "Eleventh Five-Year" Development Plan of Longnan City;
(3) "Eleventh Five-Year" Development Plan of Cheng County;
(4) Overall Plan for Restoration and Reconstruction of Cheng County after 5.12
Wenchuan Earthquake;
(5) "Eleventh Five-Year" Plan for Reasonable Use of Water Resources and Water
Resources Guarantee of Cheng County;
(6) Security Guarantee Plan of Drinking Water Source for Area of Cheng County;
(7) Special Plan for Prevention of Geological Disasters of Cheng County (2008 ~ 2015);
(8) Planning Report for Geological Disaster Prevention of Cheng County of Gansu
Province;
(9) Overall Plan of Mineral Resources of Cheng County.
2.1.6 Technical Guidelines and Specifications of Environmental Impact Assessment
(1) "Technical Guidelines of Environmental Impact Assessment--Master"
(HJ/T2.1-2.3-1993);
(2) "Technical Guidelines of Environmental Impact Assessment--Surface Water"
(HJ/T2.3-93);
(3) "Technical Guidelines of Environmental Impact Assessment--Acoustic Environment"
(HJ2.4-2008);
(4) "Technical Guidelines of Environmental Impact Assessment--Atmospheric
Environment" (HJ2.2-2008);
(5) "Technical Guidelines of Environmental Impact Assessment--Non-pollution Ecological
Impact" (HJ/T19-1997);
(6) "Technical Guidelines of Environmental Impact Assessment--Hydropower Project"
(HJ/T88-2003);
(7) "Technical Specification for Water and Soil Conservation of Development and
Construction project‖ (GB50433-2008);
(8) "Technical Guidelines for Environmental Risk Assessment of Construction Project‖
(HJ/T169-2004);
(9) "Technical Specification for Management and Protection Infrastructure Construction of
Nature Reserves‖ (HJ/T129-2003);
(10) "Technical Specification for Water and Soil Conservation of Development and
Construction Projects" (GB50433-2008);
(11) "Technical Specification for Eco-environment Evaluation" (HJ/T192-2006);
(12) "Technical Specification for Comprehensive Treatment of Soil and Water
Conservation" (GB/T-16453-2008);
(13) "Quality Standard of Surface Water Environment" (GB3838-2002);
(14) "Quality Standard of Ambient Air" (GB3095-1996);
(15) "Quality Standard of Acoustic environmental" (GB3-96-2008);
(16) "Health Standards of Drinking Water" (GB5749-2006);
(17) "Noise Limit of Construction Site Boundary" (GB12523-90);
(18) "Quality Standard of Soil Environmental" (GB15618-1995);
(19) "Integrated Wastewater Discharge Standard" (GB8978-1996);
(20) "Technical Specification for Cleaning Solid Waste on the Bottom of Three Gorges
Reservoir" (HJ85-2005);
(21) "Technical Guidelines for Construction Waste of earthquake Area" (trial).
2.1.7 Environmental Quality Standard
(1) "Surface Water Environmental Quality Standard" (GB3838-2002);
(2) "Ambient Air Quality Standard" (GB3095-1996);
(3) "Acoustic Environmental Quality Standards" (GB3096-2008);
(4) "Soil Environmental Quality Standard" (GB15618-1996).
The environmental quality assessment standards and the assessment factors used in the
environmental impact assessment of the project are shown in Table 2.1-1.
The relevant environmental quality standards are shown in the Appendix 1-1 to the
Appendix 1-5.
2.1.8 Control Standards of Pollutant Discharge
(1) "Integrated Wastewater Discharge Standard" (GB8978-1996);
(2) "Integrated Discharge Standard of Air Pollutant" (GB16297-1996), wherein the
concentration limit value of unorganized discharged should be monitored.
(3) "Noise Limit of Construction Site Boundary" (GB12523-90).
The control standards of pollutant discharge and the assessment factors used in the
environmental impact assessment of the project are shown in Table 2.1-2.
The relevant control standards of pollutant discharge are shown in the Appendix 1-6 to the
Appendix 1-8.
2.1.9 Health Standards
The water of water source of Moba gorge water supply project should meet the
requirements of ―Drinking Water Health Standards" (GB-5749-2006) after treating,
wherein the quality standards and assessment factors are shown in Table 2.1-3.
The relevant control standards of pollutant discharge are shown in the Appendix 1-9.
Environmental Quality Standards and Assessment Factors for Environmental
Impact Assessment of the Project
Table 2.1-1
No. Standard Name Level Assessment Factors
1
"Surface Water
Environmental Quality
Standards"
(GB3838-2002)
Class
II
pH, COD, NH3-N, total nitrogen, zinc, selenium, mercury,
lead, cyanide, oil, sulfide, dissolved oxygen, BOD5, total
phosphorus, copper, fluoride, arsenic, cadmium,
chromium (hexavalent), volatile phenols, anionic
surfactants, fecal coliform, potassium permanganate
index, water temperature, sulfate (by SO42-), chloride (by
Cl-), nitrate (by N), iron, manganese
2
"Ambient Air Quality
Standard"
(GB3095-1996)
Grad
e two PM10, NO2, CO, SO2
3
"Acoustic Environment
Quality Standard"
(GB3096-2008)
Class
II Continuous equivalent sound level A
4 "Soil Environmental
Quality Standards"
(GB15618-1995)
Grad
e one
Copper, zinc, cadmium, hexavalent chromium, lead, total
chromium, sulfur, mercury and arsenic
Control Standards of Pollutant Discharge and Assessment Factors for
Environmental Impact Assessment of the Project
Table 2.1-2
No. Standard Name Level Assessment Factors
1 "Surface Water Environment Quality
Standard" (GB3838-2002)
Grade
one
pH, suspended solids, BOD5,
CODcr, ammonia
2
"Integrated Discharge Standard of Air
Pollutant‖ (GB16297-1996), wherein the
concentration limit value of unorganized
discharged should be monitored.
Particulate matter
3 "Noise Limit of Construction Site Boundary"
(GB12523-90)
continuous equivalent sound level A
Health Standards and Assessment Factors for Environmental Impact Assessment
of the Project
Table 2.1-3
Standard Name Indexes Assessment Factors
"Drinking Water Health
Standards"
(GB5749-2006)
Microbial index Total coliforms, heat-resistant coliform
Toxicological index Arsenic, cadmium, chromium (hexavalent),
lead, mercury
Sensory properties and
general chemical index
Chromaticity, turbidity, smell and taste, PH,
aluminum, zinc
Radioactive index Total alpha radioactivity, total beta
radioactivity
Note: the radioactive indexes are guide values
2.1.10 Security Policies of the World Bank
(1) "Operational Manual of the World Bank—Program of the World Bank" (bp4.01-1999);
(2) "Operational Manual of the World Bank—Operational Policies Environmental Impact
Assessment" (OP4.01);
(3) "Operational Manual of the World Bank—Operational Policies Involuntary
Resettlement" (OP4.12);
(4) "Operational Manual of the World Bank—Operational Policies Natural Habitat"
(OP4.04);
(5) "Operational Manual of the World Bank—Operational Policies Dam Safety" (OP4.37).
The proposed project will not involve indigenous people, will not involve forest sector
activities or have significant impact on forested areas, will not lead to purchase or use of
any pesticides, will not have impact on any known physical cultural resources. It also does
not involve international waters or disputed areas. Therefore, other Bank safeguards
policies are not triggered.
2.1.11 Relevant Documents of the Project
(1) Feasibility study report of the project;
(2) Preliminary design of the project;
(3) Environmental impact assessment report of the project;
(4) Approval for environmental impact assessment report of the project;
(5) Soil and water conservation program report of the project;
(6) Approval for soil and water conservation program report of the project;
(7) Water resources assessment report of the project.
2.2 Environmental Management Organizations and Responsibilities
The Central People's Government and the people's governments of the provinces
(municipalities and autonomous regions, the city (state), county (district) of China set up
environmental authorities according to the laws, and fulfill the corresponding
environmental management responsibilities according to the laws. The environmental
management institution related to the project mainly comprises the Environmental
Protection Bureau of Gansu Province, the Department of Water Resources of Gansu
Province, the Environmental Protection Bureau of Longnan City, the Department of Water
Resources of Longnan City, the Environmental Protection Bureau of Cheng County, and
the Department of Water Resources of Cheng County and etc.
(1) Environmental Protection Bureau of Gansu Province
The environmental protection bureau of Gansu Province is responsible for the
administration of the province's environmental and administrative law enforcement work,
its main responsibilities include:
A. Implement national environmental policies, laws, regulations, administrative rules and
standards; draft environmental regulations across the region, administrative regulations,
and supervise the implementation;
B. Implement environmental impact assessment of province's major economic and
technological policies, development programs and major economic development plans
according to the commission of the Provincial People's Government.
C. Develop environmental protection plan, organize and compile environmental function
zoning plan and area and watershed pollution prevention plan and ecological
conservation plan, and supervise the implementation;
D. Participate in the compilation of the policies development plans of environmental
protection industry;
E. Be responsible for supervision and management of environmental protection area and
ecological environmental construction project supervision and management; and organize
plans and supervise the implementation of pollution control plan period;
F. Develop the province's total pollutant discharge control program, be responsible for
discharge application registration and permit management, and organize discharge fee
collection and supervision work;
G. Be responsible for administrative audit of environmental supervision and environmental
protection;
H. Organize the activities of international environmental protection treaties in the province;
I. Be responsible for the international economic and technological cooperation and
exchange activities of environmental protection;
J. Deal relevant foreign environmental protection affairs according to the commission of
the provincial government and etc.
The environmental protection bureau of Gansu Province has an environmental impact
assessment division specializing in the administrative work of environmental impact
assessment of each project.
(2) Department of Water Resources of Gansu Province
The department of water resources of Gansu Province is responsible for the
administration of the province's water and administrative law enforcement work, and the
main responsibilities thereof include:
A. Develop the strategies of provincial irrigation, hydropower and aquatic development,
the plans of middle- and long-term water development, and the plans of middle- and
long-term water supply of the whole province;
B. Be responsible for organizing and compiling integrated river basin plan and
professional plan;
C. Organize the compilation, submission and approval works of front plan of key water
conservancy and hydropower project, be responsible for organizing the review of the
project proposal, feasibility study report and preliminary design of the province's water
projects;
D. Be responsible for the supervision and inspection of the plan and capital
implementation and completion conditions of the water conservancy construction project;
E. Organize review, submission and approval works for the application plan of the costs of
flood control and drought protection, the cost of water conservancy construction and the
water charges and other capitals;
F. Research the regulation advices provided in water prices, taxes, fees and credit and
etc.;
G. Be responsible for organizing and guiding water resources and water environment
protection works, organize water quality and water quantity monitoring and analysis work
and dynamic monitoring work of groundwater and etc., organize the division of water
function zoning and discharge control to the drinking water area and etc., view the
assimilative capacity and the setting of the discharge port of the water area, provide the
advice of total discharge amount, and supervise the implementation;
H. Be responsible for the safety supervision and management of reservoir, hydropower
and dam;
I. Develop the province's soil and water conservation policies and regulations, compile soil
and water conservation plan and annual implementation plan, and organize the
implementation;
J. Organize and guide the province's comprehensive management work of water and soil
conservation, be responsible for organizing the pre-project and construction management
work for the soil and water conservation of a small watershed and the comprehensive
treatment of a small area;
K. Organize dynamic monitoring of the province's water loss and soil erosion, and
regularly publish;
L. Organize he compilation, approval, test and acceptance work of the soil and water
conservation program of the project;
M. Be responsible for the enforcement and supervision work of relevant regulations in the
"Water and Soil Conservation Law".
The department of water resources of Gansu Province has a water and soil conservation
bureau which is responsible for the guidance and supervision work of the province's water
and soil conservation.
(3) Environmental Protection Bureau of Longnan City
The environmental protection bureau of Longnan City is responsible for the administrative
management and administrative law enforcement work of local environment protection,
and the main responsibilities thereof include:
A. Implement national environmental policies, laws, regulations, administrative rules and
standards;
B. Draft environmental regulations and administrative regulations in the region, and
supervise implementation work; implement environmental impact assessment for the
major economic and technological policies, development programs and major economic
development plan in the region according to the commission of the regional administrative
office;
C. Develop environmental protection plan, organize the compilation of river basin pollution
control plan and ecological conservation plan, and supervise the implementation work;
D. Be responsible for supervising and managing the natural ecological environmental
protection work in the jurisdiction and the environmental protection, supervision and
management work of the construction project;
E. Organize, develop and supervise the implementation of pollution control plan period;
F. Develop a total discharge amount plan of the region, be responsible for the discharge
application registration and license management, and organize and implement discharge
fee collection and supervision work;
G. Be responsible for environmental supervision and environmental protection
administrative inspection, and be responsible for international economic and technological
cooperation and exchange activities of environmental protection;
H. Handel the relevant environmental protection foreign affairs according to the
commission of the local administrative office and etc.
The environmental protection bureau of Longnan City generally has an environmental
assessment management division (or pollution control division, regulatory division, natural
ecology division), which is specifically responsible for the administrative management
work of the local environmental impact assessment, and the main responsibilities of the
division comprises: be responsible for the implementation of the environment impact
assessment in the region and the unified supervision and management of the ―Three
Meantime" system; implement national and regional laws, regulations, rules and policies
about the environmental impact assessment and the ―Three Meantime" system; develop
and implement environmental impact assessment and ―Three Meantime" and other
regional laws, regulations and policies; supervise the implementation work; guide and
supervise the environmental impact assessment approval work of the regional
construction project; be responsible for the administrative license of environmental impact
assessment documents of the construction project in the range of the local environment
protection bureau; and be responsible for the administrative licensing and guidance of trial
production (run) of the construction project in the right of the region and the completion
environmental protection acceptance of the construction project and etc.
(4) Department of Water Resources of Longnan City
The department of water resources of Longnan City is responsible for the city's water
administration and administrative law enforcement work, and the main responsibilities
thereof include:
A. Be responsible for organizing and compiling integrated river basin plan and
professional plan;
B. Be responsible for the supervision and inspection of the plan and capital
implementation and completion conditions of the water conservancy construction project;
C. Organize review, submission and approval works for the application plan of the costs of
flood control and drought protection, the cost of water conservancy construction and the
water charges and other capitals;
D. Be responsible for organizing and guiding water resources and water environment
protection works, organize water quality and water quantity monitoring and analysis work
and dynamic monitoring work of groundwater and etc., organize the division of water
function zoning and discharge control to the drinking water area and etc., view the
assimilative capacity and the setting of the discharge port of the water area, provide the
advice of total discharge amount, and supervise the implementation;
E. Be responsible for the safety supervision and management of reservoir, hydropower
and dam of the whole city;
F. Organize and implement soil and water conservation policies and regulations, compile
soil and water conservation plan and annual implementation plan.
The department of water resources of Longnan City has a water conservation division,
which is mainly responsible for organizing the implementation of regional water and soil
conservation project plan, reviewing and reporting the work, and inspecting and
supervising the soil and water conservation work of the whole region.
(5) Environmental Protection Bureau of Cheng County
The environmental protection bureau of Cheng County of the project is responsible for the
administrative management and administrative law enforcement work, and the main
responsibilities thereof include:
A. Implement national environmental policies, laws, regulations, administrative rules and
standards;
B. Develop the environmental protection plan of the county, and supervise the
implementation work;
C. Be responsible for supervising the natural ecological environment protection work in
the jurisdiction and the environmental protection supervision and management of the
construction project;
D. Organize, develop and supervise the implementation of the development plan pollution
sources within the specified period;
E. Develop a total pollutant discharge amount control plan of the county, be responsible
for discharge application registration and license management, and organize and
implement discharge fee collection and supervision work;
F. Be responsible for environmental supervision and environmental protection
administrative inspection and etc.
(6) Department of Water Resources of Cheng County
The department of water resources of Cheng County of the project is responsible for
water administrative management and administrative law enforcement of the county. The
department of water resources of Cheng County has a soil and water conservation
agency with the main responsibilities as follows:
A. Develop the soil and water conservation plan and annual implementation plan of the
county, and organize the implementation work;
B. Organize the comprehensive management works of the county soil and water
conservation;
C. Organize the dynamic monitoring of water loss and soil erosion in the county, and
regularly publish;
D. Organize the compilation and implementation work of the soil and water conservation
scheme of the construction project;
E. Guide to the soil and water conservation work of the whole county;
F. Monitor water loss and soil erosion, specifically soil erosion surveys, water loss and soil
erosion monitoring report, water loss and soil erosion notice data providing, integrated
control of water loss and soil erosion, benefits investigation and analysis, information
system construction and management of soil and water conservation;
G. Propagandize and implement personnel training of soil and water conservation.
The administrative framework of environmental management of China (and the relevant
part of the project) is shown in Figure 2.2-1.
Environmental Protection Bureau of Gansu Province
Department of Water Resources of Gansu Province
Environmental Protection Bureau of Longnan City
Department of Water Resources of Longnan City
People's Government of Cheng County
Relevant Institutions of Cheng County Government
Department of Water Resources of Longnan City
Water Source Engineering Construction Management Department of Moba Gorge for City
Water Supply of Cheng County
Figure 2.2-1 administrative framework for environmental management of China
Environmental Management Plan for Cheng County Moba Gorge Water Source
Engineering of Gansu Province
3. Project Description
3.1 Construction Objective of the Project
The construction objectives of the project are as follows: construction of a reservoir with a
total capacity of 1.79 million m3 and an utilizable capacity of 1.04 million m3 in Moba
gorge, wherein the maximum daily water supply of the reservoir is 47,500 m3, the average
annual water supply capacity is 1.651 million m3, and the average daily water supply is
45,200 m3. So that the urban water supply contradiction can be solved, the water quality
can be changed, the cost of water supply can be reduced, the sustainable economic and
social development of Cheng County can be achieved, and the physical health of urban
residents can be improved.
3.2 Implementation Schedule of the Project
The total construction period of the project is 27 months, of which the construction
preparation period is 11 months, the main construction period is 11 months, and the
completion period of the project is 5 months. The preparation period of 6 months of the
project is not included in the total construction period
(1) Construction preparation period
The construction preparation period is 11 months from the January of the first year to the
November, the construction content of the contractors after entering into the field
comprises field engineering, onsite traffic, construction tunnel, aggregate processing
system, concrete mixing system, temporary housing and construction factories, diversion
tunnel and excavation of dam abutments on the two banks which are implemented for the
main construction project. The control project is the diversion tunnel which has
over-current conditions in the October of the first year.
(2) Main construction period
The main construction period is 11 months from the December of the first to the October
of the next year, i.e. from closure to concrete pouring of the dam, instillation of metal
structure, and impletion of curtain grouting. The construction of the dam project is the
control project in the main construction period.
(3) Completion period of the project
The completion period of the project is 5 months from the November of the second year to
the March of the third year, and the content of the period comprises diversion tunnel
closure, reservoir storage, and completion and acceptance.
3.3 Project Overview
The project is a reservoir type project, and the characteristics are shown in Table 3.3-1.
Characteristics Table of the Project
Table 3.3-1
No. Name Unit Quantity Remark
I Hydrology
1 Basin area
Whole basin km2
401
Over the dam site km2 248.2
2 Age limit of used hydrological system Year 51 Actual measurement,
1959 – 2009
3 Average annual runoff of many years Ten
thousand
m3
4352
4 Representative flow
Average annual flow of many years m3/s 1.38
Normal use (design) of flood standard and
flow
m3/s 954 P=2%
Abnormal use (check) of flood standards
and flow
m3/s 1550 P=0.2%
Diversion standards and flow of diversion
tunnel
m3/s 544 P=10%, yearly
m3/s 29.4 P=20%, October to
May
5 Sediment
Average amount of sediment suspended
sediment of many years
Ten
thousand t
14.72
Average sediment concentration of many
years
kg/m3 3.509
Annual sediment amount of annual
average bed load of many years
Ten
thousand t
2.21
II Project overview
1 Reservoir
Checked flood level m 1098.52
Designed flood level m 1096.38
Normal water level m 1092.70
Dead water level m 1068.0
Total storage capacity Ten
thousand
m3
1790
Utilizable capacity Ten
thousand
m3
1040
Dead storage Ten
thousand
m3
380
The maximum discharge capacity while
checking flood level
m3/s 1410
The maximum discharge capacity while
designing flood level
m3/s 865
2 Urban water supply
Average annual water supply Ten
thousand
m3
1651
Guaranteed rate of water supply % 96.3
3 Water pipeline
Length of the pipeline km 5.15
Number of the pipeline Pcs 0.65
Design water supply flow m3/s 0.65
Leakage loss rate % 10
III Flood damage and permanent area of the
project
1 Backwater length km 3.5
2 Submerged land hm2 9.86
3 Flooded forest hm2 51.13
4 Relocation of population People 14
5 Residents of flooded area Family 3
6 Important special facilities in flood
affected
10kv line km 1.2
7 Project area Mu 145.17
Arable land thereof Mu 36.17
IV Main building
1 Retaining building
Type Roller compacted
concrete gravity dam
Ground characteristics Limestone
Basic seismic intensity Degree 8
Crest height m 1099.8
Maximum dam height m 91.4
Crest length m 136.5
Crest width m 10
2 Discharge structure
2.1 Crest overflowiring
Ground characteristics Limestone
Crest height m 1092.7
Net width of overflow section m 39
Energy dissipation form Energy dissipation by
trajectory jet
Designed flow discharge flow m3/s 462
Checked flow discharge flow m3/s 1003
2.2 Flood discharge sand flushing hole
Orifice size m 3.5x4.8
Hole length m 46.9
Maximum discharge capacity m3/s 107
3 Road over the dam
Length m 2810
Road width m 7
V Construction
Open excavation of earthwork Ten
thousand
m3
43.16
Earthwork backfilling Ten
thousand
m3
5.54
Rock hole dug Ten
thousand
m3
2.31
Concrete Ten
thousand
m3
25.28
Installation of metal structure t 186.5
Curtain grouting m 8580
Consolidation grouting m 3100
2 Number of major construction material
Cement Ten
thousand t
4.79
Fly ash Ten
thousand t
2.66
Steel bar and steel material Ten
thousand t
1.0
3 Labor required
Labor of construction period Day 100
4 Construction labor and resource
Power supply km 12 35kv, Cheng County
5 External transportation
Distance km 5 Reconstruction of
existing rural road
6 Construction diversion
Mode Cofferdam retaining
water
Type Tunnel division
Dimension of diversion tunnel (length x mxm 6x7.5 Type of gate hole
width)
7 Construction period
Construction preparation period Month 11
Main construction period Month 11
Completion period Month 5
Total period Month 27
VI Economic Indicator
1 Static total investment Ten
thousand
Yuan
22656.3
Construction project Ten
thousand
Yuan
17032.0
0
Mechanical and electrical equipment and
installation
Ten
thousand
Yuan
920.22
Metal structure equipment and installation
project
Ten
thousand
Yuan
1351.19
Temporary construction project Ten
thousand
Yuan
3675.70
Basic reserve fund Ten
thousand
Yuan
1550.76
Financing interest construction period Ten
thousand
Yuan
458.50
Compensation cost of reservoir
inundation treatment
Ten
thousand
Yuan
3257.40
Acquisition cost of construction and
construction site
Ten
thousand
Yuan
1355.95
Environmental protect engineering cost Ten
thousand
Yuan
408.6
Soil and water conservation cost Ten
thousand
Yuan
1118.67
2 Comprehensive Economic Indicator
Net economic present value Ten
thousand
7493
Yuan
Internal economic rate of return % 10.39
Ratio of economic benefit 1.22
Environmental Management Plan for Cheng County Moba Gorge Water Source
Engineering of Gansu Province
4. Environmental Impact of the Project and Mitigation Measures Summary
4.1 Environmental Impact Assessment
In the implementation process of environmental impact assessment, the layout of the
project, the main environmental protection objectives in surrounding assessment range
and the sensitive points are identified (see the Figure 4.1-1), the possible adverse
environmental impacts caused by the project are as follows:
4.1.1 Impact on the hydrology and sediment
4.1.1.1 Hydrological changes
4.1.1.1.1 Impact on regional water resource
In the Cheng County Moba gorge water supply project, water is stored in a reservoir,
wherein the normal water level of the reservoir is 1092.70 m, the total capacity is1.79
million m3, the backwater length is about 3.5 km, and the designed reference water is
1.651 million m3/a. In running period, the downstream of the dam comprises a diversion
effect river section of 4 km.
4.1.1.1.2 Ecological water of river and mitigation measures
When the reservoir of Moba gorge is completed, the inflow of Nan River over the dam (the
basin area is 248.2 km2) is retained, and the mean runoff of many years is 1.22 million m3
when the reliability is 95%. The ecological water use of the river is calculated according to
the Tennant method recommended by the ―Environmental Impact Assessment
Specification of River Basin Planning‖, in which the ecological water use of Nan River is
the minimum, namely about 10% of the annual average flow as the minimum use of
ecological water, and according to the calculation of the method, the minimum ecological
water use of Nan River is 0.138 m3/s. Thus, the ecological water of the diversion effect
river section is ensured, and the dam should be provided with permanent plug holes while
construction. The plug hole should lower than the water inlet while higher than the flood
discharge sand flushing port, specifically the elevation is 1024 m-1065 m, the discharge
amount is 0.138 m3/s, thereby ensuring the minimum ecological water use of the
diversion effect river section.
4.1.1.1.3 Impact on the diversion effect river section
Due to the abouchement of Nan River from the Fengquan River downstream the dam of 4
km, and the normally annual runoff of the Fengquan River is 2.06 million m3, it can be
determined that the diversion effect river section is 4 km. The section comprises eight
villages, i.e. Zhuanwancun, Ganlushi, Majiaya, Jianjiagou, Xiaozhuang, Zhangjiashan,
Luangoumen and Niujiaya. Zhuanwancun comprises about 900 people or more, Ganlushi
comprises about 1000 people or more, Majiaya comprises about 300 people or more,
Jianjiagou comprises about 350 people or more, Xiaozhuang comprises about 250 people
or more, Zhangjiashan comprises about 600 people or more, Luangoumen comprises
about 100 people or more, and Niujiaya comprises about 120 people or more. The water
of the eight villages is mainly supplied from the local mountain spring and groundwater
which are not the water in the river section, so that the impact of the project to the water
source is controllable.
The ecological water use can be ensured in case of the discharge flow ensured is 0.138
m3/s.
Figure 4.1-1 Location Diagram of Sensitive Points of the Project
4.1.1.2 Impact on Sediment Load and Mitigation Measures
The factor impacts the bedload sediment is more. According to the current technology and
the test means and equipment thereof, the accuracy of the test data is not high, the
relation of push and suspension ratio of the sediment to the various hydrological factors is
bad. In the project, the bedload sediment of the region is designed to the 15% of the
suspended load sediment by combining with the general relation of the mountain stream
Erliang River
Forest
Along the river
Plantatio
n
Reservoir region
Majiaya
Niujiaya Luangoumen
Zhangjiasha
n
Xiaozhuangcun
Jianjiago
u
Zhuanwancun
Ganlushi
Legend
Sensitive point
Dam
Scale
push and suspension ratio of 10 to 20%. The annul bedload sediment of the hydrological
station of Cheng County is 133,600 t, the average total sediment load of many years is
1.024 million t, and the average sediment load modulus of many years is 682 t/km2.
According to the calculation, the average suspended load sediment of many years of
Moba gorge dam is about 147,200 t, the annual bedload sediment is about 22,100 t, and
the average total sediment load of many years is 169,000 t.
After completion of the project, the speed of the water floor is reduced, which is conducive
to sediment deposition, and thus sediment deposition speed in the reservoir can be
accelerated. In order to ensure the capacity, the project should discharge sediment to the
downstream irregularly. In the sediment discharge period, the flow of the diversion effect
river section will be increased, the sediment concentration will be increased, but the
impact to the downstream river is in the acceptable range.
4.1.2 Impact on Local Climate
After running of the reservoir, the original undulating land of the submerged area is
replaced by smooth water surface, so that the energy exchange method and intensity
between the underlying surface and the air are changed. As the heat capacity of water is
more than that of the land soil, the temperatures, before and after constructing the
reservoir, of the same point in the submerged are different, the horizontal exchange is
caused due to the temperature difference of land and water, and the temperature of the
land around the reservoir is also changed.
Due to the large-area water storage formed by the construction of the project, the
evaporation capacity is increased and the rainfall is increased; due to the effect of lower
temperature of the reservoir, the distribution of rainfall is changed, the rainfall of the
protected areas over the reservoir and the coastal flow will be reduced, and the rainfall of
the windward slope along the air flow direction will be increased; the underlying surface of
the reservoir region is changed from a land surface into a water surface, and the energy
exchange method and intensity thereof to the air are changed, so that the temperature is
changed, the annual mean temperature is increased slightly, but the regional impact is in
the acceptable range.
4.1.3 Impact on Water Environment and Mitigation Measures
4.1.3.1 Impact of Construction Period on Water Environment and Mitigation
Measures
4.1.3.1.1 Foundation Pit Wastewater Treatment Measures
The foundation pit drainage of the project is mainly composed of precipitation, seepage,
concrete pouring and maintenance water, and foundation pit excavation drainage; the
main pollutant is composed of SS, pH, and oil. According to the foundation pit wastewater
treatment experience of some large-scale hydropower projects, the drainage of the
foundation pit will not be provided with other treatment facilities, excepting the operation of
adding flocculants into the foundation pit, the drainage will be extracted after placing for 2
h; part of the drainage is used for watering to prevent dust, the rest drainage is discharged
to the nearby surrounding drains, and the sludge will be regularly removed by human. As
the treatment effect of the mixture composed of green-vitriol and polyacrylamide to the
wastewater with high SS, alkalinity and oil is good, it is recommended to use the
flocculants of this kind.
4.1.3.1.2 Aggregate Washing Wastewater Treatment Measures
A primary sedimentation tank and a coagulation sedimentation tank are arranged on the
Xiaozhuang-Gumugou construction area of right bank, both the two tanks use concrete
structure, and the sizes of the tanks are designed according to the largest wastewater
discharge of 142 m3/h, wherein the residence time of the primary sedimentation tank is 1
h, the residence time of the coagulation sedimentation tank is 1.5 h; both the two tanks are
flow settling tank, the flocculant thereof is polymeric aluminum, and the specific process is
shown in the figure 4.1-2. The effective volume of the primary sedimentation tank is 142
m3, a tank is provided with a cell, the size of each cell is 18.9 m x 5.0 m x 2.3 m (length x
width x height); the effective volume of the coagulation sedimentation tank is 213 m3, tank
is provided with a cell, the size of each cell is 22.5 m x 6.3 m x 2.5 m (length x width x
height). The supernatant treated is returned to production process and applied to site
watering.
Washing wastewater, primary sedimentation tank, adding a flocculant, coagulation
sedimentation tank, supernatant, reusing or discharging, sludge transported outside,
residues place
Figure 4.1-2 Aggregate Washing Wastewater Treatment Process Flow
4.1.3.1.3 Alkaline Wastewater Treatment Measures
The Gumugou construction area is equipped with a concrete mixing system, the washing
water of the concrete mixing system is calculated as 6 m3 per shift and two shifts per day,
the sand easy to be deposited can be deposited and removed by means of an intermittent
natural sedimentation method, an appropriate amount of acid is added into the
sedimentation tank to regulate the pH value to neutral, then the sand is placed and
deposited, the clear solution can be returned to the mixing system for washing and further
can be watering the construction road, and the sediment is regularly removed by human.
The place close to the concrete mixing system is equipped with two sedimentation tanks,
wherein the tank body is shown in a concrete structure, the inner wall is corrosion
resistant, and the sizes of the tanks are designed according to the effective volume of 6.0
m3, the interior dimensions are 3 m (length) x 2 m (width) x 1.2 m (height), and the
sedimentation time thereof is more than 7 h.
4.1.3.1.4 Oily Wastewater Treatment Measures
According to the discharge and water quality of construction machinery and vehicle
washing wastewater and the like, the oily wastewater is treated by means of a small-scale
simple oil separation tank. The treatment method is featured with simple structure, low
cost, convenient management, regular cleaning, and recyclable oil slick. The small-scale
oil separation tank comprises two cells, the horizontal velocity is 0.005 m/s, the residence
time is 10 min, the discharge cycle is 7 d, and the specific design is shown in Figure 4.1-3.
The project is totally provided with 5 machinery parking areas, 95 sets of fuel construction
machinery and vehicles to be regularly cleaned, wherein the water of maintaining and
washing of each machine is 0.6 m3 / time and one time per day. In order to facilitate the
collection, the machinery parking area is provided with a special washing site surrounded
by catch drains so as to collect wastewater, and then the wastewater is entered into the oil
separation tank and subsequently reused after reaching to the standard. At the same time,
the oil leakage inspection of the machinery parking area is strengthened, and the
treatment measures will be taken in time in case of oil leakage. See the Figure 4.1-1 for
the size of the special oil separation tank.
Figure 4.1-3 Design Diagram of Small Oil Separation Tank
List of Oil Separation Tank Size
Table 4.1-1
Construction site
Oily wastewater amount Size of oil
separation tank
(length x width x
height) m
Amount of oil
separation
tank
Amount of
construction
machinery
Wastewater
quantity (m3/d)
Majiaya Qiaotou machinery
parking area of left bank
15 9 3x0.38x1.3 1
Bashang achinery parking
area of left bank
15 9 3x0.38x1.3 1
Gumugou machinery parking
area of right bank
25 15 3x0.64x1.3 1
Machinery parking area of
sand and gravel mining area
20 12 3x0.51x1.3 1
Bashang achinery parking
area of right bank
16 9.6 3x0.41x1.3 1
(5) Domestic wastewater treatment measures
The construction site is provided with temporary pail latrine to collect domestic water, and
the domestic water is regularly treated by the local villagers delegated.
4.1.3.2 Impact of Operation Period on Water Environment and Mitigation Measures
4.1.3.2.1 Impact on Water Temperature
When the project is completed, the temperature of the water is very different to that of the
Water inlet
Degreaser Activated carbon
Water outlet
natural river before constructing. The change of the water temperature will influence the
vertical structure of the reservoir, so as to form water temperature stratification, according
to the determination based on runoff-storage capacity ratio method, alpha=2.52, the
reservoir is a stable layered reservoir; beta=0.2, and the impact of flood to the water
temperature structure is basically free.
4.1.3.2.2 Impact on Water Quality and Mitigation Measures
According to the survey, the upstream of the reservoir has a lead-zinc concentrator, a gold
concentrator and a gold ore mine. The two concentrators has been closed by the
Environmental Protection Bureau of Cheng County, and the gold ore mine will be closed
down soon.
In addition, the ambitus of the reservoir does not have pollution and industrial pollution
enterprises, when the concentrators and the gold ore mine are closed, the impact on the
water quality of the reservoir is mainly caused by regional soil and water loss and the
organic matters of part soil are entered into the reservoir together with the sediment, so
that the sediment in the reservoir is increased, and the contents of nitrogen and
phosphorus are increased. However, the generation is relatively small, and the water
quality of the reservoir will not be impacted basically; in order to ensure the water quality
of the reservoir, the following measures should be taken when the project is completed, so
as to prevent the impact of unexpected incidents on the water quality:
(1) Strengthen water quality monitoring the reservoir area, complete the cleaning work
well, and regularly fish the floating material on the water surface of the reservoir.
(2) Draw a certain range with clear boundary as the water source protection area on the
upper and lower basins of the water intake port and the deep land-based area, protect
strictly, take practical and effective measures, and prevent water pollution.
(3) In order to ensure standard discharge of the water source, the ―Moba gorge water
source protection regulations‖ must be developed according to the relevant laws and
regulations of the Country and Longnan City, so as to protect the water source effectively.
(4) Strengthen natural vegetation protection and ecological construction, prohibit
deforestation, protect natural vegetation and water source conservation, and reduce water
loss and soil erosion.
4.1.3.2.3 Water Source Protection Measures
(1) When the ―Moba gorge water supply project is completed, the water source
engineering construction management department of Moba gorge for city water supply of
Cheng County should divide a drinking water source protection area according to the
requirements of ―Pollution Control Management Regulations of Drinking Water Source
Protection Area‖ and manage by complying with the regulations completely.
① First-grade Protection Area
Prohibit new construction and extension of the construction projects which are not related
to the water supply facilities and water sources protection, prohibit the discharge to the
basin, and remove the discharge port;
Prohibit the wharf which is not related to the water supply requirements, and prohibit
vessel callings;
Prohibit the industrial waste, municipal waste, manure and other wastes from stacking and
storing;
Prohibit the construction of oil depot;
Prohibit from engaging in cultivation and livestock restocking, and strictly control cage
culture activities;
Prohibit the tourist activities and other activities which may pollute the water source.
② Second-grade Protection Area
Prohibit new construction and extension of the construction projects for discharging
pollutant to the water. The discharge of pollutant in the reconstruction project must be
reduced, the wastewater discharge of the original discharge port must be reduced, and
the water quality in the protection area must be in line with the water quality standards
provided;
Prohibit the construction of the wharf for loading/unloading garbage, manure, oil and toxic
substances.
③ Quasi-protection Area
Wastewater directly or indirectly discharged to the basin must be in line with the national
and regional wastewater discharge standards. When the total discharge amount of the
protection area cannot be in line with the standards provided, the discharge load must be
reduced.
(2) The water source engineering construction management department of Moba gorge
for city water supply of Cheng County should compile an ―Environment Protection Plan of
Drinking Water Source of Cheng County‖ according to the ―Compilation Technical
Specifications of the ‘Environment Protection Plan of National Drinking Water Source‘‖
(May 2006).
(3) Strengthen the construction of water conservation area. In the protection area of Moba
gorge water source, the vegetation construction should be strengthened, the forestation
should be strengthened, the damage to the vegetation cover should be reduced, the forest
coverage should be improved, and the ecological water source should be protected.
(4) Strengthen the use management of farmland pesticide and fertilizer in the protection
area. As the upstream of the Moba gorge water source has part of plantation, the
large-scale use of pesticide and fertilizer will be entered into the surface water bodies
together with the rainwater, so that the ammonia nitrogen, nitrate nitrogen and nitrite
nitrogen in the water quality of water source are obviously exceeded the standards, which
not only affect the water quality of the reservoir, but also affect people's health directly.
Thus, the use of pesticide and fertilizer must be strengthened, and the agricultural
non-point pollution should be reduced.
(5) Order to close the two concentrators upstream the reservoir, and close the gold ore
mine, treat the remaining issues, and develop perfect emergency plan.
(6) Strengthen water quality monitoring of water source
4.1.3.2.4 Impact for Domestic Wastewater of Management Station and Mitigation
Measures
The wastewater discharged in the operation period mainly comprises the domestic
wastewater of managerial personnel of the management station, wherein the fixed staff of
the management station is 35 people, the maximum water consumption of the production
and living area is about 3.5 m3/d on the basis of 100L/person/d. Accordingly, the domestic
wastewater discharge is about 3.3 m3/d. In order to ensure that the pollution of the water
source caused by the domestic wastewater generated by the managerial personnel of the
management station is prevented from is prevented, the WSZ buried wastewater
treatment equipment is recommended to treat the domestic wastewater generated by the
managerial personnel, wherein the specific process is shown in Figure 4.1-4. After treating
by the equipment, the discharge concentrations of CODcr, BOD5 and SS are 60 mg/L,
30 mg/L and 60 mg/L, respectively; so that the first-grade standard in the ―Integrated
Wastewater Discharge Standard" (GB8978-1996) can be met, the domestic wastewater
treated is used as the surrounding green water, and the sludge settled is used as
agricultural fertilizer. See the Table 4.1-2 for the effects of WSZ buried wastewater
treatment equipment.
Wastewater, primary sedimentation tank, regulation tank, A-level biological tank, pump,
fan, 0-level biological tank, secondary sedimentation tank, disinfection tank, discharge,
sludge collection well, pump, sludge tank, nightcart Sinotrans or mud cake Sinotrans after
dehydration
Figure 4.1-4 Integrated Domestic Wastewater Treatment Flow Chart
List for Treatment Effect of Buried Wastewater Treatment Equipment
Table 4.1-2
Project CODcr BOD5 SS
Discharge
concentration
(mg/L)
Discharge
(t/a) Discharge
concentration
(mg/L)
Discharge
(t/a) Discharge
concentration
(mg/L)
Discharge
(t/a)
Before 300 0.20 180 0.18 200 0.20
After 60 0.04 30 0.03 60 0.06
Treatment
efficiency 80% 83.3% 70%
4.1.4 Impact on Atmospheric Environment and Mitigation Measures
In the project, the atmospheric pollutant is mainly generated in construction period, the
atmospheric pollution of operation period is basically free, and the impact on atmospheric
environment and the mitigation measures are target to the construction period.
4.1.4.1 Construction Dust Impacts and Mitigation Measures
Construction dust mainly comprises transport vehicles dust, natural wind dust, ground
building materials stacking yard dust and construction process dust. In order to reduce the
impact of dust on the environment and the construction workers, the following mitigation
measures should be taken:
(1) In the construction process, the construction site will be provided with blocks and
envelope to reduce dust diffusion, the block and envelope play a significant role in
reducing the pollution of the dust to the environment; when the wind speed is 2.5 m/s, the
impact distance can be shortened by 40%. The surrounding space of the construction site
is continuously equipped with the blocks of less than 2.5 m, and the blocks are firm and
beautiful;
(2) Assign the staff to water the construction site regularly to reduce dust emission on the
construction site, wherein the time of watering is determined according to the weather,
wherein the general frequency is 1 to 2 times per day, and the time can be appropriately
increased in case of high wind or dry weather. The impact of watering operation on the
construction site is large to the dust; after watering the dust can be reduced by 28 to 75%,
and therefore the impact of the dust on the environment is reduced greatly;
(3) Set a tarpaulin on the vehicle for transporting the building materials and the
construction waste to reduce scatter. At the same time, the tires of the vehicle should be
cleaned with water while accessing the site and loading and unloading on the site, and the
traffic route of the vehicle should be prevented from the residential areas as much as
possible.
(4) In the application of commercial concrete, the construction work of windy weather
should be prevented as much as possible. At present, it is determined that the earthwork
and stonework construction is prohibited in wind of Category 4, the project can learn from
the provision;
(5) Assign a specially-assigned person who is specifically in charge of the treatment,
cleaning and stacking of spoil, construction waste and building material on the
construction site, wherein the stacking yard should be provided with a cloth cover or
watered to prevent secondary dust;
(6) The construction waste and spoil should be treated and cleaned in time, so as to
reduce the space, prevent dust pollution, and improve the environment of construction
site;
(7) In the mechanical excavation process in the tunnel, the intermittent operation method
is used, the ventilation should be in time, and the construction worker should wear a mask,
if necessary.
4.1.4.2 Exhaust Gas Environmental Impact and Mitigation Measures
In the construction process, the fuel exhaust gas generated by the construction machinery
and the transport vehicles mainly comprises CO, NOx and THC. The total amount of the
fuel consumed by the project is 1663.4 t, and the discharge of each pollutant is as follows:
CO is 148.1 t, NOx is 95.78 t and THC is 27.5 t; the tail gas discharge port of the fuel
machine is low, and the discharge belongs to low-point source disorder discharge, and the
discharge mainly in the range of 100 m in relation to the discharge source. In the project,
the environmental sensitive points in the range of 100 m in relation to the construction
area are free, and the discharge mainly impacts the construction area. The impact of the
transport vehicles on the environment along the route in the transportation process is
relatively small.
In order to mitigate the impact of exhaust gas on the environment, the management of
large-scale fuel construction machinery and vehicles should be strengthened, the regular
inspection and maintenance system should be implemented, and all the tail gas discharge
of fuel machinery and vehicles of the contractor should implemented according to the
―Automobile Air Pollutants Discharge Standards‖, and the smoke and dust removal
equipment must be provided in case of the purpose of standard discharge cannot be
achieved. The construction machinery uses unleaded gasoline and other high-quality
fuels. Strictly implement ―In-use Vehicle Rejection Standards‖, implement a mandatory
retirement and update system, and update the old vehicle with more engine fuel
consumption, low efficiency and seriously excessive exhaust gas discharge.
4.1.5 Impact on Acoustic Environment and Mitigation Measures
The noise impact of the project is mainly presented in the construction period, the noise
impact of the operation period on the environment is relatively small, so that the impact on
acoustic environment and mitigation measures are mainly targeted to the construction
period.
The construction machinery used in the project mainly comprises rock drilling machines,
bulldozers, excavators, mixers and drills and etc., and the noise source will have some
impact on the surrounding acoustic environment without taking measures. The acoustic
pressure level is shown in Table 4.1-3, and the prediction results are shown in Table 4.1-4.
Acoustic Level Test Value and Range of Construction Mechanical Equipment
Table 4.1-3 Unit: dB(A)
No. Construction equipment Distance of the test point to the
construction equipment/m
Maximum acoustic
level/dB
1 Rock drilling machine 5 100
2 Bulldozer 5 86
3 Excavator 5 84
4 Mixer 5 87
5 Drill 5 95
Prediction Value of Environmental Noise Impact of Construction Machinery
Table 4.1-4
Acoustic level
dB(A)
Construction
machinery
Distance (m) Standard value
dB (A)
Standard
distance
(m)
10 20 40 60 80 100 150 Daytim
e
Nightti
me
Daytim
e
Nightti
me
Rock drilling
machine
94.0 88.0 82 76.4 74.0 72.0 70.5 75 55 75 1250
Bulldozer 81.0 75.0 69.0 65.4 63.0 61.0 57.5 75 55 35 170
Excavator 80.0 74.0 68.0 64.4 62.0 60.0 56.5 75 55 18 177
Mixer 78.0 72.0 66.0 62.4 60.0 58.0 54.5 70 55 24 140
Drill 89.0 83.0 77.0 71.4 69.0 67.0 63.5 75 55 50 200
With analysis, the following conclusions can be obtained:
(1) In case of the use of single construction machinery, the ―Noise Limit of Construction
Site Boundary‖ GB12523-90 can be achieve in the place apart from the construction site
with 75 m at daytime, and the standard limit can be achieve in the place apart from the
construction site with 1250 m at nighttime. But in the actual construction process, variety
of machines are always used simultaneously, the noise impact will be greater than the
scope;
(2) In the range with the distance about 5-35 m to the construction site boundary, the
impact of construction noise on the surrounding acoustic environment is relatively large;
(3) With the completion of the project, the construction noise will no longer exist, so that
the adverse impact of construction noise on the environment is temporary and short-term.
In order to mitigate the impact of noise in the construction period, the following mitigation
measures should be taken:
(1) Control from the acoustic source: construction units should require the main
mechanical equipment used by the construction unit is low-noise mechanical equipment
while signing the contract with the construction unit, meanwhile, the construction unit
should appoint a specially-assigned person to regularly maintain and service the
equipment in the construction process, and the construction unit should be responsible for
training the on-site staff so as to use the various machines by complying with the
operation specifications strictly. Reasonably arrange the service time of hammers, air
hammers and rock drill machine and other high-noise construction machinery, reasonably
arrange blasting time, and reduce the noise generated by the equipment in the abnormal
operation process. As the distance of Majiaya construction site to the Majiaya is 400 mm,
the distance of Xiaozhuang construction site to the Xiaozhuang is 650 m, the nighttime
construction will have a greater impact on them, so that the high-noise construction
machinery (such as rock drilling machine and drill) should be prohibited from night
construction.
(2) In the structure stage of construction, the exterior of the building should be equipped
with a block, so as to reduce the impact of equipment noise on the surrounding
environment.
(3) Personal protective measures of construction workers: strengthen labor protection,
and improve workers' working conditions. For the construction workers in the high-noise
environment of the first production line, the consecutive working hours per day should not
be more than 6 h; the construction workers with large noise impact should be provided
with noise protective equipment; and the workers on the construction site should wear
anti-noise cotton to reduce the impact of noise.
4.1.6 Impact of Solid Waste on Environment and Mitigation Measures Thereof
4.1.6.1 Impact of Solid Waste of Construction Period on Environment and Mitigation
Measures Thereof
4.1.6.1.1 Impact of Construction Waste and Vegetation Cleaning on Environment
and Mitigation Measures
Reference to the ―Technical Specification for Cleaning Solid Waste on the Bottom of Three
Gorges Reservoir" and the requirement of water source protection, the vegetation and the
construction waste of submerged area in the project should be cleaned. According to the
estimation, the vegetation to be cleaned is about 50,000 m3, and the construction waste
cleaned is about 14.13 t. The part of the vegetation cleaned further can be restored, and
the optional stacking of the vegetation not only has impact on the environment, but also
wastes resources. The vegetation which can be restored is recommended to be given the
farmers of the surrounding villages, and the vegetation which cannot be restored is
transported to the landfill site of Cheng County. The construction waste cleaned is
transported to the residues place of the project.
4.1.6.1.2 Impact of Household Wastes of Construction Workers on Environment and
Mitigation Measures
As the huge quantities of the project, the construction workers are more, the random
storage of a lot of household wastes not only pollute the environment, but also easy to
breed mosquitoes, which is harmful to human health. In order to mitigate the
environmental impact of household wastes, each construction site should be equipped
with two garbage cans, and the total number of the garbage can in the construction site is
28. The household wastes are uniformly stored in a sealed garbage can, regularly
collected by a special car and subsequently transported to the landfill site of Cheng
County to landfill.
4.1.6.2 Impact of Solid Waste of Operation Period on Environment and Mitigation
Measures
When the project is completed, the total establishment determined of the operation
management personnel is 35 people. The household waste generated by each person per
day is 0.8 kg, and the household waste generated by the 35 people per year is 10.22 t. In
order to prevent the impact of household waste on the surrounding environment, the
management station is provided with 2 garbage cans to collect that, and the household
waste will be regularly transported to the landfill site of Cheng County to implement
centralized treatment.
4.1.7 Impact of Environmental Geology and Mitigation Measures
The dam area of Moba gorge water source project and the neighborhoods belong to
east-west Qinling tectonic system and the composite part on the east of the Wudu epsilon
structural system, the project is located in the northwest edge of the emblem basin. Both
the north and south sides are composed of a series of curved folds and fractures of SWW
~ NEE direction. In the early Quaternary Pleistocene, the area also belongs to the general
uplift phase of Qinghai-Tibet Plateau due to the impact of movement of the Himalaya, and
accretion of 10 to 50 m thick of the Quaternary system is accumulated in the area.
In the project area, the movement of the new construction is relatively active, and the
movement mainly comprises differential uplift and subsidence, the movement is more
prominent in the Quaternary; the valley terrace is developed, and the more active
fractures are developed in the periphery of the project area. In the range of the project
area, the active fracture is free, and the construction site is in a relatively stable tectonic
area. The acceleration of peak ground motion of the construction site is 0.20 g, the basic
earthquake intensity is VIII degree, and the ground motion response spectrum
characteristic period is 0.40s. The distance of the latest active fracture to the dam is 6 km.
In order to mitigate the impact of environmental geological disasters on the project, the
purpose of protecting geological environment and preventing and reducing the loss of
geological disasters should be achieved according to the principle of "prevention first,
combining prevention with control", and the following recommendations of control
measures are provided for the various types of geological disasters:
(1) For the collapse of fat rock and soil and caving and other geological disasters which
may be presented while excavating the abutment construction, temporary support or
temporary bracing and other measures can be taken to ensure the security and stability of
abutment construction, and the surface and groundwater discharge work should be
simultaneously completed well.
(2) For the collapse and caving-in and other geological disasters of slope break and
weathered sediment layer which may be presented while excavating the inlet of the water
tunnel, the outlet slope and the construction, temporary support or temporary bracing and
other measures can be taken while combining with the permanent slope protection
measures of the hole face slope, so as to ensure the security and stability of construction
and operation, and the discharge and guide work of surface and groundwater should be
simultaneously completed well.
(3) When the tunnel through the broken belt or soft interlayer, the stability of surrounding
rock is poor, the collapse, roof collapse and other geological disasters may be caused, the
support should be provided in time while excavating, the support should be provided while
excavating, and the waterproofing work of the tunnel should be made well.
(4) For the lateral sliding of foundation pit geotechnical slope and collapse and other
geological disasters which may be presented in the excavation process of dam foundation,
temporary support or temporary bracing and other measures can be taken, the high slope
formed after excavation should be shown in the form of cascade slope, so as to ensure
the safety of the foundation pit slope in the construction period.
(5) The earthwork and stonework construction should be subjected to the operating for
filling with the excavation as far as possible, so that the unstable slope caused by stacking
the residues can be reduced, the residues must be stacked should be provided with
corresponding protective measures.
4.1.8 Impact on Ecological Environment and Mitigation Measures
4.1.8.1 Impact on Terrestrial Animals and Mitigation Measures
4.1.8.1.1 Impact of Construction Period on Terrestrial Animals and Mitigation
Measures
(1) Impact on mammals
The interference of construction activities of the project to the mammals mainly in the hub,
plant and tunnel construction areas, the impact on the mammals mainly comprises the
drive of construction activities and construction noise to the mammals, namely the
animals fled to other places after frightening, and the food debris and wastes left behind
by human activity will attract rodents (mice) gather in the construction area. As mammals
will avoid the harm caused by the project construction by means of migration, the total
direct impact of the project construction to the mammals is small. With the completion of
the construction activities and the restoration of the construction site and the nearby
natural ecological environment, the animals will return to the original project area, so that
the long-term impact of the project on the mammals is small.
(2) Impact on birds
The construction activities will cause disturbance and destruction in the habitat of the bird,
so that the habitat of the bird will be directly or indirectly destroyed, the nests will be
damaged, and the bird habitat in the shrub niche will be disturbed. Due to theses impacts,
most of the birds will migrate to other places far from the construction site, and a small
part of the bird with shrubs and forest-dwelling habitat will disappear from the project area
due to the loss of the habitat; a part of the bird populations will be reduced as the nest
destruction, particularly the construction period is in the bird breeding season (summer).
The overall result is that the species and number of the bird in the project range are
reduced. Since most birds will fly and make a short-distance migration to avoid the harm
caused by the construction project, the impact of the project construction on the bird is
small. The main indirection impact is the reduction of the foods such as rodents of the
birds in the project area caused by the construction interference, thereby forcing the birds
to prey in a greater range. With the completion of the construction activities and the
restoration of the line construction site and the nearby natural ecological environment, the
birds in the project area will return to the project area, so that the long-term of the project
on the birds is small.
In order to ease the impact of construction period on the terrestrial organisms, the
education of ecological protection to the construction workers should be strengthened by
means of notice, dissemination of brochures and other methods in the construction period
of the project, the construction workers are strictly prevented from cutting the trees,
outside the construction site, without permission by means of institutionalization, and the
construction workers are prohibited from preying frogs, birds and snakes and other wild
animals. The Majiaya Qiaotou construction site of the left bank, the construction site
upstream the dam of left bank, the Xiaozhuang-Gumugou construction site of right bank,
the dam construction site between the cofferdams, the construction site upstream the dam
of right bank and water pipeline construction site and other sites are provided with 1 to 2
blocks of terrestrial vegetation and wildlife protection warning signs, and the total number
of the warning sign is 15 blocks. The warning signs are thin steel plates with blue bottom
and white words, the specification of the warning sign is 100 cm x 60 cm, (length x width),
and the warning sign has the words of prohibiting vegetation destruction and wildlife
hunting.
The operation mode and time of the construction machinery should be reasonably
arrange, the construction mechanical equipment should be the mechanical equipment
with low acoustic level, and the time of whistle of the transport vehicle should be reduced,
so as to reduce the disturbance of construction noise to the wildlife.
4.1.8.1.2 Impact of Operation Period on Terrestrial Animals and Mitigation Measures
When the project is completed, the impact of the project on the local animals will not be
significant while ensuring the discharge ecological water use. The habitat of the wildlife at
the reservoir area will not be reduced as the water storage of the project, and the project
will impact some species of the reservoir area; however, the impact is short, and the new
habitat environment can be formed after a period of time, so that the impact of the project
on the local wildlife is in an acceptable range. The damage of variety of vegetation and
habitat types caused by the construction should be gradually restored by implementing
ecological restoration measures in the operation period, and the wildlife habitat can be
partially restored.
4.1.8.2 Impact on Aquatic Life and Mitigation Measures
According to the ―Aquatic Life Status Monitoring of Environmental Impact Assessment of
Cheng County Moba Gorge Water Source Engineering of Gansu Province and Apecial
Report of Assessment‖ provided by the Fengyuan ecological counseling center of Gansu,
the following analysis is provided:
(1) Impact on fish and mitigation measures
The construction of the project will change the position for the spawning ground and the
wintering ground of Schizothorax subfamily in a short time, but due to the Schizothorax
fish will soon find a new wintering ground and spawning ground as the same habitat
upstream, so that the wintering and spawning process can be carried out. When the new
wintering ground and spawning ground are found, the impact of the project is free. Thus,
the impact of the project on the wintering and spawning of the Schizothorax fish is free
while ensuring the discharge water.
In order to mitigate the impact of the project on aquatic life, following measures should be
taken:
① The most basic discharge flow for the growth, reproduction, habitat and wintering and
other survival conditions of the aquatic life (especially fish) must be ensured, particularly
the discharge should be increased in fish breeding and wintering season.
② Effectively implement the spirit of ―Chinese Aquatic Resource Conservation Platform
for Action‖, implement the aquatic organisms maintenance system of "who develops
protection, who benefits compensation, who damages restoration", and ensure the
on-time and in-full funds for the various funds of aquatic life resources, particularly for
the germplasm resources communication and aquatic biological monitoring.
③ The owners should increase the propaganda of the relevant laws and regulations for
the protection of aquatic organisms, strictly crack down the illegal practices of poison
fishing, electric fish, catch fish and excessive catch by coordinating the local fishery
agencies, and resolutely implement the spirit for the notice of natural waters banned of
Gansu Province, so as to ensure sustainable development of fish resources, and
long-term use purpose.
④ Purchase Jialing Schizopygopsis Tajiri Schizothorax fish artificially bred to implement
discharge proliferation. When the water project is finished and run, the discharge cycle is
three years, the amount thereof is 2000 Jialing Schizopygopsis Tajiri Schizothorax fishes
with the size of 3 to 4 cm, the discharge is a long-term work, and the discharge fees are
included in the operation costs.
(2) Impact on plankton
After the completion of the dam, a reservoir of water is formed, and lots of land and
vegetation are flooded; due to the nutrient leached from the flooded soil, the organic
matter provided by the decomposition of flooded plants and the scouring effect of the
runoff to the surface, a number of nutrients are provided for the growth of algae. At the
same time, the growth of algae is convenient as the speed of water flow is reduced, the
transparency is improved, and the algal blooms can be promoted. However, when
phytoplankton blooms, the transparency of the water is reduced, the optical radiation
condition of the water is changed, and the phytoplankton in the reservoir is stabilized after
a period of time, so as to reach to a new dynamic equilibrium of algae number.
The zooplankton of the reservoir mainly comprises rotifers, cladocerans and copepods.
The existing volume and production level of the zooplankton are the impact on the existing
volume and production capacity of algae, bacteria and other microorganisms, and the
zooplankton is another biological resource in the water reservoir. The change for the
geographical position, climate, water temperature and water level of the reservoir are
closely related to the reproduction of the zooplankton.
(3) Impact on zoobenthos
The initial stage when the project is completed, the sediment is deposited on the upstream
of the dam, the water surface is expanded, the types of zooplankton, the number of
individuals and biomass are increased and improved, a good growing environment and
food source are provided to the zoobenthos, so that the biomass and the density of the
zoobenthos will be increased, and a rich food source is provided for many indigenous
fishes; but as time goes on, the silt layer is thickened, the living environment of the
zoobenthos is damaged, and there are some negative impacts on the growth and
reproduction of the zoobenthos. If the normal ecological discharge downstream the dam is
ensured, the adverse impacts to the zoobenthos are basically free.
4.1.8.3 Impact on Terrestrial Plant
In the permanent land of the project, the occupation land of forest is 57.91 hm2 and the
occupation land of cultivation is 15.33 hm2; according to the statistics of Cheng County,
the local annual production of forest land per hectare is 3200 kg, the annual output of
arable land per hectare is 2746.83 kg, the loss of the project to the local biomass is 234.37
t/a, and the details are shown in Table 4.1-5.
List for Losses of Project Land to Local Biomass
Table 4.1-5
Type Land area (hm2) Biomass loss (t/a)
Forest 57.91 185.31
Plantation 15.33 49.06
Total 73.24 234.37
The basin area upstream the Moba gorge of Nan River is 248.2 km, the agricultural
acreage is 3133.3 hm2, the forest area is 17133.3 hm2, grassland is 1800 hm2, and the
vegetation coverage in the area is 69%. Although the project will have some impacts on
the local plant, the impact on the plant of the whole area is in the acceptable range.
4.1.8.4 Impact on Whole Ecological Environment of the Area
According to the existing data and the site investigation, the assessment range of Cheng
County Moba gorge water source engineering is 1200 hm2. According to the calculation
method provided in the ―Technical Regulations of Ecological Environment Status
Assessment (Trail)‖ (HJ/T192-2006), the reference to the comprehensive evaluation for
the ecological environmental quality of Nantong City provided by Shen Weimin and
Qianzhen and others, the study for the environmental quality evaluation of Minjiang River
provided by Zheng Shujuan and the combination of satellite remote sensing data, it can
be obtained that the ecological quality index EI before completing the project is 61.89, and
the ecological quality index EI after completing the project is 61.69, and both the indexes
are good eco-environmental quality evaluation; the absolute value of delta EI is 0.2 <2, so
that it can be proved that the environmental quality before and after the project
construction has no significant change.
4.1.9 Impact on Water Loss and Soil Erosion and Mitigation Measures
4.1.9.1 Project Land Overview
The total land of the project construction is95.36 hm2, in which the disturbance land of the
project construction is 41.51 hm2, and the flooded area of the reservoir area is 53.85 hm2;
according to the land type, the arable land is 12.92 hm2, the forest is 51.64 hm2, and the
unused land is 30.81 hm2; according to the land nature, the land comprises a
permanent land of 71.91 hm2 and temporary land of 23.45 hm2, and the details are
shown in Table 4.1-6.
Statistical Table of Project Land
Table 4.1-6 Unit: hm2
Project Division Area Subtotal
Plantation Forest Unused land
Permanent
Land
Main
project
Dam of
Moba Gorge
5.13 1.27 6.4
Management
Station
0.8 0.07 0.87
Road over
the dam
1.07 2.61 3.68
Water
pipeline
4.4 0.58 2.13 7.11
Land route of reservoir
submerged area
7.45 45.13 1.27 53.85
Subtotal 12.92 51.64 7.35 71.91
Temporary
land
Construction site and
office and living area
8.2 8.2
Residues place 10.9 10.9
Construction road 2.25 2.25
Quarry 2.1 2.1
Subtotal 23.45 23.45
Total 12.92 51.64 30.8 95.36
4.1.9.2 Earth-rock Overview
The total excavation volume of the project is 453,600 m3 ((including cofferdam removal
material of 3,200 m3), wherein the earthwork is 123,300 m3; the fill capacity is 386,300
m3, of which the earth fill is 44,200 m3, the gravel fill is 2,300 m3, the stone fill is 800 m3,
the sand and gravel fill is 14,000 m3, and the artificial aggregate rock is 325,000 m3; the
earthwork used is 61,300 m3; the residual earthwork is 467,300 m3 (including the
residues of mining stripping layer of 75,000 m3), and the earthwork borrowed is 400,000
m3.
4.1.9.3 Material Intake Yard Profile and Rationality Analysis
The material intake yard of natural material of the project is located in Xiaozhuang stock
ground, wherein the stock ground is arranged on the right bank of the Nan River
downstream the dam and the west side of Xiaozhuangcun, the linear distance of the stock
ground to the dam is about 800, the distance to the Xiaozhuangcun is about 650 m, and
there are footpaths and simple roads for communicating with the Xiaozhuangcun, so that
the traffic is relatively convenient.
The stock ground is shown in the form of a spur protruded to east part, the topography of
the east side and the north side is high and steep and is shown in the form of an
escarpment, the slope thereof is nearly vertical, and the rock is exposed; the elevation for
the bottom of the slope of north side is about 1100 m, the bottom of the slope to the east
direction is gradually lift up to 1125 ~ 1150 m, the slope height of north side is about 100 m,
the slope height of east side is about 25 ~ 50 m; the south side is a colluvial product slope,
of which the slope is smooth, the slope angle is 20 to 25 DEG; the topography of the west
side is the highest, a wide and slow ridge is extended along east-west direction, the
topography is shown in the form that the west part is high and the east part is low, the
slope angles for the north and south sides of the ridge are 30 to 35 DEG, and the surface
layer is colluvial product gravel soil, and the thickness thereof is 3 ~ 15 m.
The engineering properties for the rock of the stock ground are good, the saturated
compressive strength, the softening coefficient and the dry density of the rock are capable
of meeting the requirements of the relevant specifications to the artificial coarse and fine
aggregates, the top of the slope is provided with a colluvial product and residual product
layer of 3 to 15 thick, so that the clean work is necessary. The mining length of north-south
direction is 220 m, the mining length of east-west direction is 120 m, and the excavation
area is about 26,000 m2, wherein the thickness of the useful layer excavated is 50 m, and
the reserve thereof is about 1.30 million m3 by means of the calculation method of
average thickness. The coarse and fine aggregates for the concrete of the RCC gravity
dam are about 327,800 m3, so that the reserve is in line with the requirements of the
regulation.
The material intake yard is located in a mountainous area, the residents surround the
material intake yard are basically free, the noise generated by means of daytime
construction can be reached to the standard on the place outside the yard about 200 m,
the nighttime construction is prevented, and the impact on the Xiaozhuangcun apart from
the yard with 650 m is in the acceptable range; and the land type of the material intake
yard belongs to unused land. Thus, the material intake yard has no environmental
constraint factors. The detailed analysis is shown in Table 4.1-7.
Rationality Analysis for Selection Environment of Stock Ground
Table 4.1-7
Project material intake yard Environm
ent
rationality
assessme
nt
Whether the project is in environmentally
sensitive areas (such as nature
reserves, scenic spots, cultural heritage
and etc.)
The yard is not in environmentally sensitive
areas
Reasonab
le
Whether the project is in an important
resource ground (such as basic
farmland, specialty sites and etc.)
The land type of the yard belongs to useful
land
Reasonab
le
Whether the project is in environmental
risk sections (such as avalanches,
landslides, mudslides, flood channel,
wind tunnel and etc.)
The geology of the yard is stable, and the
yard is not in the risk sections
Reasonab
le
Whether the environment sensitive
objective will be impacted
The surrounding places of the yard have no
residential areas, rare vegetation and other
Reasonab
le
environmental sensitive targets.
Whether the landscape restoration,
vegetation restoration and land
restoration and the like of the project are
easy
The impact on the vegetation of the mining
process of the yard is relatively small, and
the vegetation can be restored in a certain
degree after mining.
Reasonab
le
Whether the transportation pipeline is
passed through the unsuitable area
((such as urban, concentrated
residential areas, schools and etc.)
The two villages are avoided while designing
the yard, so that the yard did not be passed
through the unsuitable area
Reasonab
le
4.1.9.4 Residues Place Overview and Rationality Analysis
The project is primarily provided with 5 residues places, wherein the 1 # and the 2 #
residues places are located in the construction site upstream the dam of left bank, the 3 #
residues place is located in the construction site upstream the dam of right bank, and the
4 # and the 5 # residues places are located in the Xiaozhuang-Gumugou construction site
of right bank. 1 # residues place: the final elevation of the residues place is 1060 m, the
land area is 21000 m2; 2 # residues place: the final elevation of the residues place is 1060
m, the land area is 18000 m2; 3 # residues place: the final elevation of the residues place
is 1056 m, the land area is 5000 m2; 4 # residues place: the final elevation of the residues
place is 1165 m, the land area is 13000 m2; and 5 # residues place: the final elevation of
the residues place is 1050 m, the land area is 52000 m2. As the residues of the project are
mainly generated by the dam excavation and the primary residues places are too
fragmented, the spoil of the dam is respectively sent to four residues places, and the
earthwork allocation is unreasonable; after the optimization of the environment impact
assessment, the primary 1 # and 2 # residues places are combined, the area is increased,
and the optimized residues place is used as the 1 # residues place; the primary 3 #
residues place is removed, the primary 4 # residues place is used as the 2 # residues
place after optimization and the area thereof is maintained, the area of the primary 5 #
residues place is reduced, descended to the height of the residues and used as the 3 #
after optimization. The details are shown in Table 4.1-8.
Residues Paces Overview
Table 4.1-8
Residues place Area (hm2)
Final elevation
of the dam
top (m)
Storage capacity
Earthwork (ten
thousand m3)
Stonework (ten
thousand m3)
Before
optimizatio
n
1# 2.1 1060 1.5 8.39
2# 1.8 1060 0 1.6
3# 0.5 1056 2.19 4.02
4# 1.3 1165 0 7.5
5# 5.2 1050 4.22 17.31
Total 10.9 7.91 38.82
After
optimizatio
n
1# 6.5 1060 7.66 25.05
2# 1.6 1165 0 7.5
3# 2.8 1040 0.25 6.27
After optimization, the influence area of the residues place does not have the distribution
of rare wild animals and plants, and the surrounding places of the residues place do not
have residents; from an environmental point of view, the selection scheme of the residues
place is reasonable. However, the residues should be protected in the stacking process,
so as to reduce water loss and soil erosion.
4.1.9.5 Amount of Water Loss and Soil Erosion and Mitigation Measures
The total amount of water loss and soil erosion of the project is 18645.96 t, and the
increased amount of water loss and soil erosion is 13342.71 t, wherein the increased
amount of water loss and soil erosion in the construction period is 12609.27 t, and the
increased amount of water loss and soil erosion in the natural recovery is 12.52 hm2. The
division of water loss and soil erosion control is as follows: a dam hub building control
area, a water pipeline control area, a residues place control area, a quarry control area, a
road construction control area, and a construction enterprise and office and living control
area. The soil and water conservation measures comprise 1640 m of slag wall, 1800 m of
reinforced stone block, 600 m of dry stone pitching, 25140 m of drainage ditch, 2340 m of
bag soil block, 96959 plants, 116 linear meters (the width is 1 m) of holly hedges, 4477 kg
of grass seed, 21.88 hm2 of land reclamation, 17.16 hm2 of green space, and the detailed
layout program is shown in Table 4.1-9.
When the soil and water conservation program is implemented, the control rate of the
disturbed ground in the early construction period is 98.67%, the control degree of water
loss and soil erosion is 98.07%, block slag rate is 100%, the control ratio of water loss and
soil erosion is 1.03, the vegetation restoration rate is 98.76%, the restore coverage is
41.3%, wherein all the indexes are reached to the, and the water conservation measures
are reasonable and reasonable.
Engineering Quantity of Water and Soil Conservation Measures
Table 4.1-9
No. Project name Unit
Hub
buildin
g
control
area
Residu
es
control
area
Quarry
control
area
Water
pipelin
e
control
area
Constr
uction
and
living
control
area
Constr
uction
road
control
area
Total
I Project measures
1.1 Block project
1.1.1 Earthwork
excavation
m3
825 2951 543 1177 5495
1.1.2 Earthwork
construction
m3
663 663
1.1.3 Grouted stone
pitching
m3
2930 300 3230
1.1.4 Reinforced stone
cage
m3
1980 990 1230 1200 5400
1.1.5 Asphalt unlined
upper garment
board
126 126
1.1.6 Hardcore bed m3
68 15 83
1.1.7 Phi 80mm PVC
drainage pipe
m 563 563
1.1.8 Geotextile 88 88
1.2 Slope protection m 600 600
1.2.1 Earthwork
excavation
m3
125 125
1.2.2 Dry stone pitching m3
7655 7655
1.2.3 Hardcore bed m3
957 957
1.3 Drainage work
1.3.1 Drainage ditch m 5160 240 5400
1.3.1.1 Earthwork
excavation
m3
5973 267 6240
1.3.1.2 Earthwork
construction
m3
896 40 936
1.3.1.3 Grouted stone
pitching
m3
2449 181 2630
1.3.1.4 Dry stone pitching m3
1570 1570
1.3.1.5 DN500 circular culvert
pipe of reinforced
concrete (pipe of
grade II)
m 10 20 10 30 10 80
1.3.1.6 Hardcore bed m3
830 38 868
1.4 Rock slope
greening
1.4.1 ML2.0 x 6.0 nylon net m2
22572 22572
1.4.2 C25 reinforced
concrete panel
m3
36 36
1.4.3
Anchor rod(Phi 12
mm HRB335 grade
steel)
m 438
438
1.5 Land renovation
engineering
1.5.1 Land levelling 0.61 8 1 10 5 6 30.61
1.5.2 Topsoil stripping m3
15250 3000 36550 15200 7000
1.5.3 Covering m3
15250 3000 36550 15200 7000
1.5.4 Nutrient soil m3
2228 8880 11108
II Plant measures
2.1 Slope
2.1.1 Shrub
2.1.1.1 Lespedeza Plant 4288 2125 3700 10113
2.1.1.2 Amorpha fruticosa Plant 4288 2125 3700 10113
2.1.2 Extending seed
2.1.2.1 Blue grass
137 68
118 324
2.1.2.2 Lolium multiflorum
343 170
296 809
2.1.2.3 Festuca
arundinacea
206 102
178 485
2.2 Plane
2.2.1 Shrub Plant
2.2.1.1 Lespedeza Plant 513
11525 1525 8350 9500
31413
2.2.1.2 Amorpha fruticosa Plant 513
11525 1525 8350 9500
31413
2.2.1.3 Holly hedges Linear
meter
116 116
2.2.1.4 Boston ivy Plant 6841
6841
2.2.1.5 Honeysuckle Plant 6841
6841
2.2.2 Arbor
2.2.2.1 Deodar Plant
6
6
2.2.2.2 Juniperus
formosana
Plant
100 100
2.2.2.3 Spruce Plant
8
8
2.2.2.4 Salix babylonica Plant
100
100
2.2.2.5 Prunus triloba Plant
4
4
2.2.2.6 Sorbaria sorbifolia Plant
4
4
2.2.2.7 Rosa xanthina Plant
4
4
2.2.3 Grass seed
2.2.3.1 Poa annua
184 24 134 152
494
2.2.3.2 Lolium multiflorum
461 61 334 380
1236
2.2.3.3 Festuca
arundinacea
277 37
200 228 742
2.2.3.4 Larix potaninii 149
184
540 873
2.2.3.5 Alfalfa
III Temporary
measure
3.1 Temporary drain m
420
19320 19740
3.1.1 Earthwork
excavation
m3
364 118 5410 5891
3.1.2 Earthwork fill m3
73 24
1082 1178
3.2 Temporary block
measures
m 420
1420 500 2340
3.2.1 Bag soil fill m3
210 710 250
1170
3.2.2 Bag soil removal m3
210 710 250
1170
3.3 Cover of fiber cloth
4980 8800 4200
17980
4.1.10 Impact on Human Health and Mitigation Measures
4.1.10.1 Impact of Construction Period on Human Health and Mitigation Measures
The construction workers for the construction period of the project are from all sides, and
the field personnel and local personnel form a construction community and frequently
contact with each other in working and living. As the crowd is complex, the lifestyle is
different, the physical conditions are different, the immunity is different, the kinds of
pathogen carriers are possible, the susceptibility is enhanced, and a variety of diseases
transmission method are coexistent. Thus, if the health protection work cannot be
completed well, the infectious diseases can be lead (gastrointestinal, respiratory, and
insect-borne), the cross-infection and epidemic spread are easy to be caused, the
adverse impact on human health will be caused, so that the health protection work should
be paid enough attention.
In order to mitigate the impact of construction period on the construction workers, and the
following measures should be taken:
(1) Hygienic cleaning of construction living area and management area
When the civil engineering works of the temporary construction living area and the
management area are completed, the site should be cleaned. The garbage, human and
animal feces and other contaminants in the site should be cleaned; the sewage pit and the
refuse dump should be filled after sterilizing with lime, and the weeds should be cleaned
up.
(2) Drinking water source protection and drinking water disinfection
The drinking water is purified and disinfected, wherein the specific methods are as follows:
adding bleaching powder into the drinking water to disinfect after depositing and filtering,
adding chlorine into the water for 30 min, so that the killing effect to the variety of intestinal
infectious disease pathogens in the water is sufficient when the residual chlorine in the
water is more than 0.3 mg/l, and the water purified can be used as drinking water.
As the construction and living water is taken from the river and the water source is open,
the water quality is easy to be impacted by the human actives around the construction site,
so that the protection of the water source should be strengthened, and the protection
measures are as follows: the range which is apart from the water source with 100 m
should not be provided with temporary life area, management area and production area,
and the latrines and seepage pits should be built in the range, and the garbage and other
pollutants should not be stacked in the site.
(3) Innocent treatment of garbage, manure and wastewater
With the collection and treatment facilities arranged on the living area, management area
and production area and applied to domestic wastewater, production wastewater and
household waste and the like, the innocent treatment purposes of garbage, manure and
wastewater are basically carried out.
(4) Mosquito prevention, fly disinfestation and rodent control
When the construction workers are entered into the site, a good breeding ground will be
provided to a variety of animals and insects in case of poor sanitation, the density of
mosquitoes and rodents and the like will be improved, and the opportunity of infectious
diseases will be increased. Thus, the living area should be subjected into mosquito
prevention, fly disinfestation and rodent control, the rodent prevention drugs should be
provided regularly so as to cut off the disease source the transmission method.
(5) Prevention and quarantine of population health
Before entering into the construction site, all the dining room staff of the construction site
should be quarantine, part of the construction worker should be subjected to prevention
and quarantine by means of a sampling method, wherein the sampling ratio thereof is
15% of the construction workers. Through quarantine, the health status of the construction
population can be controlled, and the occurrence of contagious disease in which the
construction worker is the epidemic focus can be completely eradicated in time.
(6) Crowd evacuation of blasting site
The use of explosive on the blasting site is operated by a specially-assigned person, the
places around the blasting site are provided with striped flags so as to define the risk area,
and all the personnel in the blasting area should be evacuated, so that the casualties
caused by blasting can be prevented.
4.1.10.2 Impact of Operation Period on Human Health
As the river valley of the project is mainly shown in the form of a "U"-shaped valley, the
mountains of the two banks are relatively symmetric, the river is deep, the bedrock of the
riverbed is exposed, the falling head is large, and the submerged area does not have
large-scale unleveled low-lying land and pond marshy with aquatic weeds and etc., and
therefore the submergence for the operation period of the project will not cause the
transfer of mosquitoes and the transmission of pathogenesis.
4.1.11 Impact on Reservoir Resettlement and Mitigation Measures
The backwater length for the reservoir of the project is 3.5 km, the area of the submerged
land is 53.85 km2, wherein in the land, the forest is 45.13 km2, the plantation is 7.45 km2
and the unused land is 1.27 hm2. The submerged area of the reservoir mainly comprises
three towns, i.e. Shaba Town, Paosha Town and Chenyuan Town, part area of 6
administrative villages, and the total immigrants thereof is 3 families.
In allusion to the special resettlement and compensation problems, the Water Authority of
Cheng County develops ―Resettlement Plan of Water Source Project of Cheng County‖,
the resettlement point is located in Baimashi Village of Chenyuan Town of Cheng County,
wherein the distance of the village to the county is 6 km, the village comprises 8
cooperations, the existing residents is 391, the population is 1,600, the acreage under
cultivation of the total village is 2800 Mu, and the net per capita income is 2200 Yuan/year.
The distance of the village to the nearest road is about 0.5 km, so that the traffic is
convenient. The distance to the post office, shops, schools, kindergartens, theaters and
other places is about 1 km. The agricultural products produced therein mainly comprise
wheat, corn, soybeans, canola and tobacco and etc. The settlement point planned
comprises 20 rooms reconstructed from original farm buildings, the land area thereof is
13.5 Mu, the settlement point has a campus testing field of 76 Mu, wherein the irrigation
project thereof is the Lugou reservoir water-saving irrigation project which has been
implemented, the requirements of three families to the relocated of Chenyuan Town and
Shaba Town can be met, and the irrigable land per capita ensured is about 2 Mu.
The compensation measures for the resettlement are in line with the principle of ―ensuring
the ‗feasible moving, stable settling, and feasible enriching‘ of the migrants‖, and the
compensation measures are reasonable and feasible; the resettlement point has
adequate houses for the live of the immigrants, sufficient arable land and good irrigation
conditions to ensure the living and production need of the immigrants; the resettlement
point has relatively complete municipal facilities, convenient transportation, and favorable
new life of the migrants, and the resettlement point can meet the requirements of the
resettlement compensation plan.
4.1.12 Dam Break Risk and Mitigation Measures
4.1.12.1 Dam Break Risk
According to the research results for the dam safety at home and abroad, the reason for
causing the dam break and the break is more and complex, and the reason comprises
natural factors and human factors and their mutual relations and complex effects. With the
probably analysis, the main reason comprises:
(1) Violent earthquake
Small earthquakes are not likely to cause the damage and break of the reservoir dam, but
a strong earthquake (magnitude is not less than 7.0) is more likely to cause the damage
and break of the reservoir dam. As the earthcrust of the place where the reservoir dam is
located is relatively stable, the basic seismic intensity is grade VIII, the earthquake
fortification of the reservoir dam project is implemented according to the same;
furthermore, the reservoir is small (the height of the dam is less than 100), and the
earthquake cannot be induced easily, so that the possibility for the large-scale and
high-intensity damage of the reservoir dam caused by the earthquake is very unlikely.
(2) Temperature change
The local damage accident for the concrete arch dam of the reservoir dam due to the
temperature change is relatively common, the reason thereof is the thickness of the arch
dam is relatively thin, and the arch dam is a highly indeterminate space structure limited
by the boundaries. In the operation period of the reservoir dam, the change of the ambient
temperature is easy in causing temperature stress in the arch dam body, and the reservoir
dam will be broken as the overstressing in certain conditions. However, the temperature
change just can cause the local damage of the reservoir dam under normal circumstances,
and the suddenly break of the dam can be prevented.
(3) Landslides
Large-scale instability and high-potential fast slope body will cause enormous swell, the
flood downstream the reservoir dam and around the reservoir will be caused, and safety
of the reservoir is endangered. Particularly, the large-scale landslides in the place close to
the dam and the two sides upstream and downstream are easy to cause reservoir
damage and break. Although the project has small-scale hidden danger of slope instability,
the total geological conditions of the reservoir area, the dam and the site engineering are
relatively good as the diastrophic activity of the place where the project is located are
relatively stable, so that the possibility for causing huge surge flood and collapse due to
the large-scale instability of the bank and the high-potential landslide is very unlikely. Here,
it must be emphasized that the many small-scale instable geologic bodies presented in
the slops on the two sides of the river section inside and outside the reservoir area should
be strengthened, prevented and subjected to the treatment of embankment and
supporting project, so as to prevent the large-scale reservoir banks instability caused by
the small-scale reservoir instability can be prevented. In addition, the operation period for
putting into production of the reservoir dam, the stone blasting and fish blasting and other
blasting activities in the place close to the dam and around the dam should be prevented,
and the a large number of materials optionally stacked on the slops of two banks on the
place of the reservoir area and the place close to the river downstream the dam should be
prevented, and the buildings on the places should be prevented to avoid slump.
(4) Destruction of dam foundation
The deformation, permeability and stability of the dam foundation are tightly related to the
safety of the dam. The good dam foundation should have sufficient deformation resistance
and bearing capacity, small permeability and complete and stable rock, so as to prevent
the foundation damage caused by excessive deformation, the excessive uplift pressure
and the unstable dam body or dam seat rock slide caused by excessive penetration water
pressure. The dam foundation of the project can be prevented from the collapse accident
caused by instability and deformation, cracking, sliding and water seepage just be
strengthening and stabilizing to eliminate the hidden troubles completely through a
scientific project processing technology and strict consolidation prevention measures,
(6) War and terrorist attacks
If the reservoir dam of the project is damaged instantaneously in case of war and terrorist
attacks, the flood damage is severe, and the basin-wide disaster may be caused.
However, from the military point of view, the possibility for taking the dam as a military
target is very unlikely.
(7) Extraordinary flood
In case of extraordinary flood, the extraordinary flood is always accompanied by heavy
rain. Due to the strong erosion effect of the heavy rain, the downstream dam surface will
have scour holes. Although these local scour holes will not affect the stability of the dam,
the opportunities of overflowing the top of the dam is increased while pushing by the winds
and waves in the reservoir. Theses small scour holes will be rapidly expanded under the
erosion effect of the flood padding through the dam. When the scour holes are reaches a
certain size, the dam will be local instable, and then the dam break phenomenon can be
presented. The engineering grade of the reservoir is grade III, the permanent main
buildings are designed according to the grade 3, the permanent secondary buildings are
designed according to the grade 4, and the temporary buildings are designed according to
the grade 5. The concrete gravity dam is designed according to the flood per 50 years and
is reviewed according the floor per 500 years, the energy dissipation and erosion
prevention buildings are designed according to the flood per 30 years, and these buildings
are in line with the requirements of ―Standard for Flood Control‖ (GB50201-94), so that the
dam break risk caused by the extraordinary flood can be reduced effectively.
(8) Error of survey design
If the early work do not be completed well, the hydrographic survey and the geological
survey are not detailed, the calculation of the water account is incorrect and the design
consider is not thoughtful, the construction may be blind, the hidden danger for the safety
of the reservoir will be caused, and the collapse accident of the reservoir is easy to be
occurred. Thus, for the flood prevention safety of the dam, the correct survey design and
reasonable dispatch application should be paid attention in addition to the reasonable
selection of flood prevention standard. The project has done a lot of preliminary works, so
that a scientific basis is provided to ensure the quality of design.
(9) Quality defects of the dam
During the construction process of the dam, the chance of quality defect is always existed
due to the uncritical local quality control. The weak link is the place for the occurrence of
concentrated seepage and piping, and the dam break can be occurred under the effect of
adverse external dynamic loads. Thus, project supervision in the project should be
strengthened, the supervision, inspection, evaluation and acceptance of the construction
should be organized, and the left tail works should be completed well.
(10) Mismanagement of operation
In the management work of the dam, the probability of man-made omission and
equipment failure is always existed, so that the real-time monitoring for the operation
status of the dam will be influenced, the working status of the dam cannot be reflected in
time, so that the dam will be dangerous and broken. Therefore, the technical management
work of the reservoir should be strengthened, and the safety of the dam should be
ensured.
In summary, the main reason of dam break comprises low flood control standard of the
reservoir, poor construction quality, poor management work and other human factors. But
the safety of the reservoir dam can be ensured and the purpose of promoting benefit and
abolishing harm can be achieved by seriously implementing the Decree [1991] No.77
―Reservoir Dam Safety Management Regulations‖ of the State Council, carefully
implementing survey design while strictly complying with the regulations, strengthening
project quality and technical management work of the reservoir and complying with the
provisions for the safe operation of the reservoir.
4.1.12.2 Risk and Result of Dam Break
Once the dam is broken, the impacts on the upstream and downstream of the dam are
large. In the upstream of the dam, the water of the reservoir area, particularly the water
level before the dam will be sharply reduced due to the suddenly discharge, so that the
bank of the reservoir dam is easy to be unstable, and the bank is easy to be collapsed.
The dam break risk is mainly presented in the downstream, i.e. the dam break wave will
be formed as the suddenly discharge of the water in the reservoir, and the damage to the
human and property downstream the dam is serious. Thus, when the maximum flow of the
dam broken is reached to the flow path L of the downstream dam according to the source
strength of the broken dam, the maximum flow is calculated according to the following
formula:
wherein, QLm represents the maximum flow (m3/s) for the controlled section of the
broken dam apart from the dam with L (m);
Vm represents the largest velocity (m/s) of the river section, the value of that in the
assessment is 3.0 m/s;
K represents the experience factor. The experience factor of the project is 1.2, and the
other parameters are ditto.
According to the topography downstream the project and the resident distribution
condition, the cross-section of rivers of the eight downstream villages which may be
impacted are estimated, wherein the details are shown in Table 4.1-10.
List for Estimation of Cross-section of River of Each Village
Table 4.1-10
village Local dam distance (m) Area of cross-section of river
(m2)
Majiaya 800 748.53
Jianjiagou 1600 394.63
Zhuanwancun 3500 186.19
Ganlushi 4500 144.81
Xiaozhuang 1300 471.05
Zhangjiashan 1800 350.78
Luangoumen 3300 197.47
Niujiaya 4300 151.55
According to the estimation results of 4.1-10, the households lived in the low-lying and the
place close to the river of the eight villages will be submerged, and some villages will be
submerged completely.
4.1.12.3 Management Measures of Dam Break Risk
In order to ensure the safety of the dam, achieve the purpose of promoting benefit and
abolishing harm, prolong the service life of the dam, play the efficiency fully and avoid the
dam collapse disaster and risk, the project should take the various of effective protection
measures and emergency measures in the whole process of survey, design, construction
and operation, so as to take preventive measures and check erroneous ideas at the outset.
According to the environmental risk analysis result of the reservoir dam of the project, the
reference to the reservoir dam safety work research results at home and abroad, the
following prevention and emergency measures are provided by targeting to the main
reason which may cause dam damage and dam break.
(1) Seriously implement the ―Reservoir Dam Safety Management Regulations‖ (State
Council [1991] Decree No. 77). The Regulations clearly defines and strictly requires the
construction, management and treatment of the reservoir dam with the height of more
than 15 m or the capacity of more than 1 million m3.
(2) Strictly handle affairs according to the hydropower project management procedures. In
order to prevent damage and break of the dam, the survey, design, construction,
acceptance, operation, identification and reinforcement works should be completed well in
order.
(3) Strengthen geology investigation work of the project. In the project, the geological
conditions of the reservoir area, the dam site, and the plant site are relatively complicated,
the detailed geological and groundwater survey work should be carried out, and the
situation should be identified successively.
(4) Carefully design by strictly complying with the specifications.
(5) Enhance quality management of project construction. In order to ensure safe operation
of the reservoir, the construction period for the construction of the reservoir dam should be
provided with the concept of "long-term project, quality first", the supervision work of the
project should be strengthened, the quality supervision, inspection, evaluation and
acceptance works of the project should be organized, the specifications of construction
technology should be carried out, the construction material should be reasonable, the
construction work should be strict, and the left tail work should be treated well, so as to
ensure the quality of the project and eliminate ―purple‖ project.
(6) Strengthen the technical management of reservoir operation. In order to ensure safe
operation of the reservoir, a complete reservoir operation schedule and a safe operation of
technical system should be established in the operation period for putting into production
of the reservoir dam, the level of technical management should be improved, the flood
prevention program and schedule application plan should be compiled reasonably, the
provisions for the safe operation of the reservoir should be complied; the safety monitoring
and identification works of the dam should be emphasized, the dam protection on the
bank of the reservoir and the maintenance of the gate crane should be strengthened, the
facilities meeting the dam safety observation are set, the safety condition of the dam
should be frequently inspected and regularly observed, the flood data should be
rechecked, so as to achieve the purpose for finding the problems in time, taking measures
in time and preventing the reservoir from adventure operation; the reliable forecasting of
construction, early warning systems, transportation and communication facilities
improvement should be paid attention, an emergency flood plan should be developed to
achieve the purpose of preparing before the flood and responding while flooring; and the
power supply and equipment which meet the requirements of gate starting and closing are
set to ensure the timely drain. For the flood caused by extraordinary rainstorm, the
extraordinary drain measures should be prepared, and the notice on the flood fighting
work should be issued in advance.
(7) Prohibit the slump in the reservoir area. In the operation period for putting the reservoir
dam into production, the stone blasting and fish blasting and other blasting activities in the
place close to the dam and around the dam should be prevented, and the a large number
of materials optionally stacked on the slops of two banks on the place of the reservoir area
and the place close to the river downstream the dam should be prevented, and the
buildings on the places should be prevented to avoid slump.
4.1.12.4 Emergency Plan
The emergency plan for the dam break risk of Moba gorge water source engineering is
"APELL plan" (Awareness Preparedness for Emergencies at Local Level). The information
and organizational flow chart of the "APELL plan" are shown in Figure 4.1-5.
(1) Organization
A coordination group of the "APELL plan" is composed of the leaders of the local
government department and the water source engineering construction management
department of Moba gorge for city water supply of Cheng County, and the local resident
representatives. The responsibilities of the coordination group are shown in Figure 4.1-6.
Meanwhile, the police, medical, rescue, environmental protection, transportation, Red
Cross, communications and other departments of Cheng County should also be involved
in the emergency rescue plan and should bear the corresponding responsibilities.
(1) Emergency rescue plan
① In case of emergency, an emergency rescue headquarters is set up according to the
"APELL plan" so as to effort to ensure people's lives and property and to reduce the loss
to the minimum degree;
② Responsibilities for the onsite commander of the water source engineering
construction management department of Moba gorge for city water supply of Cheng
County: report quickly, convey the information about the accident and injury estimation,
issue police information, organize quick evacuation and evacuate from the dangerous
area;
③ Responsibilities of Moba gorge management station: be responsible for reporting the
nature, intensity and consequences of the incident, be responsible for the emergency
measures taken on the accident site to prevent the accident from expanding, reduce the
risk and rescue the casualties of the accident;
④ Professional rescue team: organize evacuations, medical care and other rescue
operations of the professional team;
⑤ Traffic control: control the traffic of diffusion area, effectively implement evacuation;
⑥ Transportation, supplies, communications, publicity and other supports;
⑦ Allocation of specially-assigned person, equipment and aid medicine;
⑧ Emergency restoration: including de-alerting, site cleaning, care-taking arrangement
and accident investigation.
(2) Plan practice
In order to enhance the scientificity, pertinence, effectiveness and maneuverability of the
plan, the anti-accident training is organized in the area may be impacted by the accident,
wherein the training place comprises the enterprise, the village and the settlement point
and the like in the area; at the same time, the relation to the environmental emergency
response agencies of other reservoir construction project should be established, the local
relief activities should be organized and involved, and the relevant communication and
cooperation should be developed. The exercises are aimed at inspecting the plan, training
the team and improving the capability, promoting the connection between the Moba gorge
water supply project and the emergency plan of Cheng County and the continuous
improvement of the corresponding emergency plan.
Aid
Figure 4.1-5 APELL Information and Organizational Flow Chart
Responsibilities of the enterprises and villages in the accident area:
1. Ensure safe operation;
2. Ensure personal security;
3. Establish safety procedures;
4. Protect onsite life and property;
5. Coordinate all the staff in the accident;
6. Develop plans and measures to meet emergencies.
Effects of the coordination group:
1. Establish communication systems;
2. Share information;
3. Coordinate emergency plans and measures;
4. Communicate with other accident emergency agencies;
5. Joint education and training;
6. Solve the common problems;
Command, assistance
Comman
d
Aid
Starting the plan, aid
Moba gorge
management station
Report
Report Report
Report
Water authority
of Cheng county
Government of Cheng county
Starting
prevention
plan
Other enterprises
and villages in
the region
Notice Notice
Prevention
Non-governmental
service organization
Local area public
Coordination group
1. Leader of Cheng county
government
2. Principal of Cheng county Water
Authority
3. Principal (police and emergency,
etc.) of each enterprise
4. Surrounding public representative
Public security bureau, hospital
Aid
Aid
7. Support bilateral assistance.
Responsibilities of the government of Cheng County
1. Provide a safe area;
2. Protect the safety and welfare of the resident in the region and the outsider;
3. Establish public safety programs;
4. Protect life and public and private property;
5. Coordinate the accident emergency power in all accidents;
6. Develop emergency plans and measures;
7. Train and exercise the plan together with other emergency agencies in the region or the
province.
Figure 4.1-6 Responsibilities of Each Emergency Plan Group
4.2 Public Participation
4.2.1 Significance of Public Participation
Public participation is an important component of environmental impact assessment and is
an effective way in improving scientific decision. In the construction project, public
participation is an important method for promoting the two-way communication among the
construction unit, the environmental impact assessment unit and the public. By means of
wide public participation, the public directly or indirectly impacted by the project
construction can fully understand the possible environmental impacts, the environmental
protection measures to be taken for mitigating the impacts and the economic and social
benefits brought by the project construction; at the same time, the various views and
suggestions can be fed back, the advices can be actively provided to the project
construction, the solutions to problems can be jointly found out, the impact of the project
construction on the environment can be minimized, the pollution disputes in the project
construction and operation process can be prevented, and the development and
environmental protection can be coordinated well.
4.2.2 Public Participation Form and Composition of Participants
The project uses three forms, i.e. questionnaire, newspaper publicity and symposium,
wherein the questionnaire is divided into two forms which are government agencies
questionnaire and public questionnaire, and the content of the questionnaire is designed
according to the characteristics, scales and possible impact degree and the like.
(1) Composition of the public questionnaire
The public opinion survey of the project is completed by issuing 100 copies of
questionnaire in the whole range of the Cheng County, wherein the 10 copies are issued
to the reservoir resettlement, the effective questionnaire reclaimed is 100 copies, the
effective questionnaire is 100 copies, and the reclaiming rate is 100%.
(2) Composition of government agencies questionnaire department
The government agencies questionnaire of the project comprises Environmental
Protection Agency of Cheng County, County Land Resources Bureau of Cheng County,
Water Authority of Cheng County, Forestry Bureau of Cheng County, Transportation
Department of Cheng County, people's congress committee of Cheng County, people's
government of Cheng County, Development and Reform Bureau of Cheng County, Public
Security Bureau of Cheng County, construction bureau of Cheng County, Planning Board
of Cheng County, health bureau of Cheng County, tap water companies of Cheng County,
People's Government of Chenyuan Town, People's Government of Shaba Town, finance
bureau of Cheng County, Board of Education of Cheng County, County Office and
Committee offices of Cheng County of the Chinese People's Political Consultative
Conference and other 20 departments.
(3) Publicity
The project was subjected to publicity to solicit public comments on the project for 10 days
in ―Longnan Daily‖ of January 9, 2011.
(4) Composition of symposium
According to relevant requirements of the World Bank, the symposium is held in
Wujiashan Village of Chenyuan Town and Niuyao Village of Shaba Tow by the staff of the
Water Authority of Cheng County, the overview of the project is introduced to the local
people in the symposium, and the suggestions of the local people to the project are
collected.
4.2.3 Summary of Public Participation Comments
By means of the method above, local people understand the project and provide the
following suggestions to the project:
(1) Since the construction of the project has a greater impact on the local ecological
environment, the relevant departments must strengthen the management of the
construction and operation processes, restore the existing ecological damage, develop a
detailed reservoir vegetation restoration plan and ensure the ecological function of the
reservoir area plays its role.
(2) Strengthen management and supervision, and ensure the resettlement compensation
measures are in place, so that the immigrants can live and work.
(3) Speed up the progress of the project, so that the project can play a role as soon as
possible and problem of water supply of the resident of Cheng County can be solved.
(4) Strictly manage to ensure the guaranteed of quality of water in the operation period.
(5) Strengthen supervision inspections to prevent dam break accident.
Environmental Management Plan for Cheng County Moba Gorge Water Source
Engineering of Gansu Province
5. Environmental Management Organization of the Project
5.1 Introduction
According to the spirit of management authority of ―Environmental Protection Law of the
People‘s Republic of China‖ and ―Regulations on the Administration of Construction
Project Environmental Protection‖, the environment impact assessment report of the
project is approved by the Provincial Environmental Protection Office of Gansu, and the
soil and water conservation report is approved by the Department of Water Resources of
Gansu Province.
The Environmental Protection Bureau of Gansu Province, the Department of Water
Resources of Gansu Province, the Environmental Protection Bureau of Longnan City and
the Department of Water Resources of Longnan City are the environmental management
agencies of the project, and the responsibilities thereof mainly comprise: providing
environmental protection requirements according to the contents of the environment
impact assessment report of the project and the contents of the soil and water
conservation report, coordinating the environmental protection management among the
various departments, and be responsible for organizing the "Three Meantime" acceptance
inspection work of environmental protection facilities. In the overall administrative
institution framework of the project, the implementation of the entire project is managed by
the Loan Project Office of the World Bank, the project is led by the governments of
Longnan City and Cheng County, and the project owner (the water source engineering
construction management department of Moba gorge for city water supply of Cheng
County) is responsible for the specific matters for the implementation of the project in the
project management office. In order to ensure the smooth implementation of
environmental management action of the project, a number of full-time or part-time
environmental management personnel are set among the project office, project owner,
contractor and operator, so as to implement the environmental management plan
specifically.
The Loan Project Office of the World Bank in Longnan City is responsible for project
planning, design, environmental protection targeting to the project, supervision and
management in the program, and the organization work for the skill training of the
area-wide environmental management personnel of the project; the main responsibilities
of the project office of Cheng County, the Environmental Protection Bureau of Cheng
County and the Water Authority of Cheng County comprise: implementing the
implementation plan of the project, implementing a variety of technical standards of the
project, and implementing daily supervision for the environmental management of the
project; according to the commission of the project owner, the environmental monitoring
station of Cheng County is responsible for monitoring the environmental quality in the
construction and operation period of the project; and the environmental supervision
engineers and the water conservation engineer commissioned by the owner are
responsible for the environmental supervision and the water and soil conservation
supervision in the construction process of the project.
The project owner plans to be set up specialized environmental managers who are
responsible for the environmental management of all stages of the project, the
implementation of environmental protection regulations and programs, the checking work
for the implementation condition of environmental protection measures of the project, the
promotion and application for the advanced environmental protection technology and
experience, the organization of environmental protection technology training of the
relevant personnel, and the improvement of personnel quality. As the large differences
between the environmental management content of the construction period of the project
and that of the operation period, the work times of the two periods are different in
temporary and long-term properties, so that the organizations are established by the
contractor and the operator according to the difference of the stage, and the
responsibilities are staged. When the construction period is ended, the corresponding
agencies are removed immediately, the management agencies of the operation period are
in operation, and a certain of cross therebetween is allowable according to the specific
circumstances of the work. The institutions establishment figure is shown in Figure 5.1-1.
Provincial level: Department of Water Resources of Gansu Province, Environmental
Protection Department of Gansu Province, the World Bank
City level: water conservancy bureau of Longnan City, environmental protection bureau of
Longnan City, Loan Project Office of the World Bank in Longnan City
County level: environmental protection bureau of Cheng County, Water Authority of Cheng
County
Owners
Enterprise level: environmental monitoring station of Cheng County, environment impact
assessment unit, design unit, construction contractor, environmental supervision
engineers, environmental monitoring station of Cheng County, owners
5.1-1 Diagram of Environmental Protection Organization of the Project
5.2 Environmental Organization of Construction Period
5.2.1 Organization
Technology level: in the technical level of environmental management, the project office of
Longnan City will employ 3 experts to participate in management of the project.
Project office level: the project office of Longnan City will appoint a project environmental
manager for supervising the implementation of environmental management plan, and all
the problems related to the World Bank and environment are responsible by the person.
The project office of Cheng County has an environmental manager who is responsible for
supervising the implementation of environmental management plan in the jurisdiction and
responsible for the communication to the project office of Longnan City on the
environment-related issues.
Contractor level: the contractor has 1 ~ 2 environmental manager coordinators who are
responsible for the supervision of environmental protection measures implementation in
the construction period, and responsible for the contact with the surrounding residents to
solve the environmental issues and the communication with between the project office
and the environmental supervision agency.
Operator level: each enterprise establishes an environmental management department,
the environmental management department is composed of two full-time environmental
protection personnel, and the company's daily staff will assist the two engineers so as to
complete the environmental management work in the operation stage of the company.
The company will configure network, telephone and other communication facilities to
maintain the communication to the environmental management institutions.
Environmental supervision engineers and water conservation supervision engineer level:
the project owner will hire an environmental supervising engineer and a water protection
supervising engineer so as to carry out the onsite environmental management supervision
in the construction process.
5.2.2 Positions and Responsibilities
A. Technology environmental experts
Technology environmental experts are technical support of local project office. In the first
six months of the project, they will track the project completely and provide regular service
in the 4 years after implementing the project, and the frequency thereof is two weeks
quarterly.
Technology environmental experts will ensure that all necessary requirements will be met
in the beginning of the project and ensure that the environmental management system will
be effectively implemented according to the environmental laws and regulations and the
security requirements of the World Bank.
① For the environmental managers of the project office, the environmental management
personnel and the environmental supervision engineers should be provided with
necessary training by the contractors and operators.
② Provide expert advice to the project office, the owner, the contractor and the operator.
③ Help the environmental management personnel of the enterprise to organize
monitoring activities.
B. Project office: environmental manager
The project office of Longnan City and the project office of Cheng County set an
environmental manager, respectively, wherein the environmental manager of project office
of Longnan City is an expert who is responsible for reporting to the World Bank and
supervising the environment of the project; the environmental manager of project office of
Cheng County is responsible for supervising the local project and reporting to the project
office of Longnan City. The environmental Manager will assist land management agencies
and resettlement agencies, so as to prevent these agencies from obstructing the
implementation of the project, and the responsibilities of the environmental manager are
as follows:
① Provide training for the environmental manager in the assistant's help.
② Develop monitoring plans in the assistant's help.
③ Communicate with environmental managers and construction workers, wherein the
communication methods are as follows:
- Provide monthly and regular monitoring report to the project office and the World Bank
- Provide a special incongruent report in case of the second and the third conditions
- Make oral communication with the construction unit and the operation unit if the solution
of the problem is found, so as to reach a solution.
- Jointly provide corrective measures with the environmental management engineers and
the environmental managers in case of incongruent conditions.
④ Participate in the joint meeting of environment engineers of project office of the
company, environmental managers, construction unit and operation unit.
⑤ Coordinate the communication and report of environmental management experts and
the World Bank.
C. Project owner: environmental manager coordinator
The owner sets up an EMC who is responsible for monitoring environment and reporting
the environmental protection implementation condition of the construction unit and the
operation unit to the project office of Cheng County and the government agencies, and the
detailed responsibilities of the environmental manager coordinator are as follows:
① Ensure the compilation of environmental protection rules of the construction unit and
the operation unit under the help of the technical assistant in the initial stage of the project,
monitoring details and environmental protection procedures of the construction unit and
the operation unit, and the collection for the framework of project management personnel.
② Commission the project with special monitoring equipment, such as water environment
quality monitoring.
③ Provide reports, implementation conditions and remedial measures of the project and
feasibility to the project office monthly, and monthly hold a meeting with the project office
to report the monitoring condition of the project and discuss the conformance of the
project.
④ Provide training methodology and technology consulting by the experts and
consultants selected from universities and institutions, wherein the training methodology
and technology consulting are determined according to the requirements.
⑤ Organize the special studies and public surveys which are related to the specific
construction requirements of the actual situation of the project or the necessary change.
⑥ Report the solutions and emergency measures for the conformance conditions of
feasibility study to the environment manager of the project office and the environmental
monitoring agency.
⑦ Disclosure the information bye mans of meetings and local media.
D. Environmental supervision engineers and water conservation supervision engineers
The environmental supervision engineers and water conservation supervision engineers
are mainly responsible for the construction activities of the supervision party and other
related activities such as land use and relocation, ensuring that the activities above are in
line with environmental protection requirements, environmental protection investment and
environmental objectives, and responsible for onsite coordination for the relation among
the land management department, the migration department and the environmental
monitoring and control department. The main responsibilities of the environmental
supervision engineers and water conservation supervision engineers are as follows:
① Ensure all project permits and requirements, and the implementation of the
environmental management plan before starting.
② Check that the environmental protection measures and the water conservation
measures are implemented by all employees of the construction unit and the operation
unit according to the contract.
③ Compile standard monthly report for the monthly pay which is in line with the
qualification of the construction unit and the operation unit obtained according to the
efforts and contributions for the environmental protection activities of the project.
④ Assembling file of environmental monitoring.
⑤ Identify the conditions required to be subjected to special studies and special activities,
simultaneously communicate with EMC, and regularly and effectively implement special
measures.
⑥ Communicate with construction workers to help the construction workers to explain the
onsite environmental requirements, provide recommendations for remedial measures,
provide remedial measures for the project which is not in line with the original intention of
the project, and provide special formal guidelines to the construction unit and the
operation unit according to the requirements.
⑦ Communicate with construction unit, operation unit and construction consultant to
enhance the communication, get some other views on specific issues so as to quickly
response some problems encountered in the construction process to the construction
management engineers to help the engineers to solve the problem; if the project has
potential damage to the sensitive objectives or the project has or relates to serious
discrepancies, it should be stopped according to the application.
⑧ Communicate with construction supervision engineers and construction workers of the
project, compile regular weekly monitoring publication, develop incongruent record, and
provide remedial measures to the project designer, if necessary, in case of the difference
to the project design.
5.3 Environmental Management Organization in Operation Period
The operator of the project sets up a special project environmental management office
which is responsible for the implementation of environment management plan of operation
period. The detailed responsibilities of the environmental management office are as
follows:
(1) Manage the implementation of project environmental protection measures;
(2) Coordination the relevant environment problem with the environmental supervision
and management department and the surrounding residents;
(3) Commission monitoring station of Cheng County to specifically monitor the three
wastes discharged by the project facilities and the regional environmental quality;
(4) Implement environmental risk emergency measures in case of environmental
accidents;
(5) Be responsible for timely reporting the relevant information of enterprise environmental
management to the environmental protection bureau of Longnan City and Cheng County
and the project office of Longnan City;
(6) Record and file the environmental management files of the enterprise.
5.4 Details of Environmental Management Organization of the Project
The setting conditions of the environmental management organization are shown in Table
5.4-1.
Environmental Management Personnel Setting of the Project
Table 5.4-1
Organization Environmental Manager Environmental expert
Project office of Longnan City 1 3
Project office of Cheng County 1 1
Total 2 4
Environmental Management Plan for Cheng County Moba Gorge Water Source
Engineering of Gansu Province
6. Implementation of Environmental Management Plan
6.1 Project Environmental Management
6.1.1 Overall Management
The Environmental Protection Bureau of Longnan City is responsible for overall
management of the entire project as the Loan Project Office of the World Bank is led and
commissioned by the government of Longnan City. The project office of Cheng County is
responsible for coordinating and supervising the project environmental management of
the project, the owner is responsible for the implementation of relevant environmental
management plan of the project, the environmental management plan is implemented
under the assistance of the environmental supervision engineers, and the project office is
provided with at least one environmental supervision engineer.
The specific responsibilities of the environmental protection management agency are as
follows: the project office of Longnan City is totally responsible for managing the
environmental protection works, organizing the feasibility study of the project, developing
the plan of environmental protection work of the project, coordinating the environmental
management works among the management departments and the construction unit,
guiding the construction unit in implementing the various management measures; the
project office of Cheng County is responsible for coordinating project preparation and
operation issues; the environmental protection manager of the project office is responsible
for environmental protection plan and environmental management of design stage; the
owner is responsible for the implementation and management of environmental protection
measures in the construction period and operation period. The environmental protection
bureau of each level is responsible for supervising the implementation of environmental
management plan of the project.
The specific implementing organization of the environmental management plan mainly
comprises owners and project contractors, and the responsibilities thereof are shown in
Table 6.1-1.
Main Responsibilities of Project Implementing Organization
Table 6.1-1
Organizatio
n name
Main responsibilities
Owner
Subject the environmental protection to the supervision of environmental protection departments at all levels, project office and the World Bank; Commission the environment impact assessment unit with the relevant qualifications to develop the carry out environmental impact report and the environmental management plan; Design the tendering company according to the requirements, wherein the various environmental management measures of the environmental management plan are involved into the design and written into the statement specification, so as to implement environmental protection laws and regulations, the environmental protection measures in the environment impact assessment report, and the plan of environmental protection work; Ensure the normal operation of environmental protection facilities, inspect by the environmental protection departments, establish environmental protection files and report to the project office and the environmental protection management departments of all levels; Sign a commissioned monitoring agreement (contract) with the environmental monitoring department, and implement environmental management plan;
Provide funds of environmental protection inspection or sampling. In the construction process of the project, the contractor plays a key role in implementing environmental management, pollution control and prevention measures; Commission and implement the environmental supervision work, and write the environmental supervision plan to the establishment contract; Select contractor with strength and qualifications, and write the environmental management plan into the contract agreement so as to ensure the environmental management plan is implemented effectively.
Contractor
Subject the contractors and construction supervisors to relevant environmental protection and environmental management training before starting; The environmental impact mitigation measures during construction period should be included in the tender documents of the contractor and finally included in construction contract as the contract requirement to the contractor; Subject the contractor to environmental activities monitoring, regularly provide an environmental performance log for one time, and supervise and review these records by the project office and the construction supervision team; Contractor should provide a full-time environmental staff for the section, and the staff should receive the training of the training plan so as to be competent to their work; In the construction process, the contractor should communicate and coordinate with the masses of the project area, establish bulletin board in each construction unit to inform the public of specific construction activities and construction time, and simultaneously provide the contact and contact phone to provide complaints and advices of the masses to the construction activities.
6.1.2 Management Supervision
The environmental supervision organization of environmental construction project of
Gansu province is composed of the Environmental Protection Bureau of Gansu Province,
the Environmental Protection Bureau of Longnan City and the Environmental Protection
Agency of Cheng County. The management and supervision functions of the organization
of each stage are shown in Table 6.1-2.
Staged implementation of supervision organization:
(1) Feasibility study stage: this stage is responsible by Environmental Protection Bureau
of Gansu Province, Department of Water Resources of Gansu Province, Environmental
Protection Bureau of Longnan City, Water Conservancy Bureau of Longnan City,
Environmental Protection Bureau of Cheng County, and Water Authority of Cheng County.
The Environmental Protection Bureau of Gansu Province guides the implementation of
the various regulations of the Environmental Protection Bureau of Longnan City and the
Environmental Protection Bureau of Cheng County and is responsible for the completion
acceptance of environmental protection facilities.
The Department of Water Resources of Gansu Province guides the implementation of the
various regulations of the Water Conservancy Bureau of Longnan City and the Water
Authority of Cheng County and is responsible for the completion acceptance of soil and
water conservation facilities.
The Environmental Protection Bureau of Longnan City is responsible for supervising and
managing the environmental protection work of the project, organizing and coordinating
the relevant organizations to service for the environmental protection work of the project,
supervising the implementation of environmental action plan of the project, and is further
responsible for completion acceptance of environmental protection facilities of the project
and the guidance of the Environmental Protection Bureau of Cheng County to the
environmental supervision and management of the construction period and operation
period of the project.
The Water Conservancy Bureau of Longnan City has a water conservation division which
is responsible for supervising and managing soil and water conservation work of the
project, organizing and coordinating the relevant organizations to service for soil and
water conservation works, and is further responsible for the completion acceptance of soil
and water conservation facilities and the guidance of the Environmental Protection Bureau
of Cheng County to the supervision and management of water loss and soil erosion in the
construction period and operation period of the project.
(2) Design stage: the stage is responsible by the Loan Project Office of the World Bank in
Longnan City and is supervised by the Department of Water Resources of Gansu
Province in the preliminary design check.
(3) Construction stage: the stage is responsible by the Environmental Protection Bureau
of Longnan City. The Environmental Protection Bureau of Cheng County is subjected to
the work guidance of the Environmental Protection Bureau of Longnan City and is
responsible for supervising the implementation of environmental action plans of the
construction unit and the implementation of the relevant environmental management
regulations and standards. The Environmental Protection Bureau of Cheng County is
responsible for the coordination of the environmental protection works along the
departments, the construction, completion acceptance, operation inspection, and
supervision management of the environmental protection facilities of the project.
(4) Operation stage: the stage is responsible by the Environmental Protection Bureau of
Longnan City, the Environmental Protection Bureau of Cheng County and the competent
authority of the project. The competent authority of the project is responsible for the
implementation of environmental protection regulations and standards, the development
and implementation of environmental protection regulations and the understanding of
environmental condition of the project, so as to check the environmental quality control
objectives, provide control measures, submit to the higher authorities, the administrative
departments and the water conservancy department, organize employment with
certificates of the environmental protection personnel and personnel training, and be
responsible for carrying out environmental protection and technological exchanges and
scientific research.
(5) The environmental monitoring works of construction period and operation period are
implemented by the environmental monitoring station of Cheng County. The
environmental supervision work is specifically implemented by the project supervision
company of Cheng County. When the project is completed, an environmental
management organization will be set, and full-time staff in charge of the project's
environmental protection work will be set.
Environmental Protection Supervision Plan of the Project
Table 6.1-2
Stage Organization Supervision content Supervision purpose
Feasibil
ity
study
stage
Environmental
Protection Bureau
of Gansu Province
Environmental
Protection Bureau
1. Review environmental impact
report
2. Review EMP
3. Review CEA
4. Review the feasibility study
1. Ensure that the environment
impact assessment is
comprehensive, the feature set is
proper, and the focus is
outstanding;
2. Ensure that the significant
of Longnan City
The World Bank
Department of
Water Resources
of Gansu Province
report
5. Review soil and water
conservation plan
potential problems may be caused
by the project have been
reflected;
3. Ensure the specific and
feasible implementation plan for
the mitigation measures of
environmental impact;
Prelimi
nary
design
and
constru
ction
phase
Government of
Gansu Province
Environmental
Protection Bureau
of Gansu Province
Department of
Water Resources
of Gansu Province
Government of
Longnan City
Environmental
Protection Bureau
of Longnan City
Department of
Water Resources
of Longnan City
1. Review preliminary design of
environmental protection and
EAP
2. Check the reduction of
construction temporary land
occupation, vegetation reduction,
and environmental rehabilitation
3. Check the dust and noise
pollution control measures,
construction time decision
4. Check the emission of air
pollutants
5. Check the discharge of
domestic water of construction
site and the treatment of waste
engine oil
6. Recovery and processing of
soil intake and spoil sites
1. Strictly implement ―Three
Meantime‖;
2. Ensure that these sites are in
line with the environmental
protection requirements;
3. Reduce the impact of
construction on the surrounding
environment, and implement the
relevant environmental
regulations and standards;
4. Reduce the impact of
construction on the surrounding
environment, and implement the
relevant environmental
regulations and standards;
5. Ensure that the river water is
not contaminated;
6. Ensure that the landscape and
the land resources are not being
seriously damaged, and avoid
water loss and soil erosion;
Operati
onal
stage
Environmental
Protection Bureau
of Longnan City
Environmental
Protection Bureau
of Cheng County
Water Conservancy
Bureau of Longnan
City
Water Authority of
Cheng County
Public Security and
Fire Department of
Cheng County
1. Check the implementation of
EMP in operation period;
2. Check the implementation of
environmental monitoring plan;
3. Check the sensitive points to
be provided with further
environmental protection
measures which may appear
environmental problems not
estimated)
4. Check whether the quality of
the environmentally sensitive
points is in line with the
corresponding environmental
quality standards;
5. Check the implementation of
soil and water conservation plan
1. Implement EMP and soil
conservation programs;
2. Implement monitoring program;
3. Effectively protect the
environment;
4. Strengthen environmental
management, and effectively
protect human health;
6. Check the implementation of
water loss and soil erosion
monitoring program
7. Strengthen supervision to
prevent incidents, pre-establish
emergency plan in the event of
an accident, and eliminate the
hazard in time.
6.2 Detailed Task for Implementation of Environmental Management Plan
The project has adverse environmental impacts during the construction period and
operation period, in relation to the characteristics of adverse environmental impacts in the
construction period and operation period, the corresponding environmental protection
measures are taken, so that the various impacts are reduced to acceptable level. In order
to ensure that environmental measures to be effective, environmental management and
monitoring procedures are provided.
The project office of the World Bank will track and report the monitoring conditions of
environmental measures while carrying out its project management functions. This
chapter describes the general environmental measures and the responsibilities of relevant
units. In the project, the project office is responsible for tracking and reporting the
implementation conditions of each measures of environmental monitoring. The list for the
implementation management and monitoring activities of environmental measures is
shown in Table 6.2-1.
List for Detailed Activities of Environmental Management Organization
Table 6.2-1
Plan Activities Responsibilities Remark
Manageme
nt
organizatio
n
Implementation
organization
Supervising
organization
Earlier construction period
11
months
Establish an environmental management design team, and
call the members
PMO Owner PMO Call the members, select office,
purchase traffic equipment, and
raise operating costs
11
months
Select or designate an environmental supervisor for each
CSE
CSE EMD CSE
11
months
Implement the environmental supervisor training for each
CSE
CSE EMD CSE
11
months
Compile and implement the training plan of EMO and PMO
environmental manager
PMO (TA) Technical
assistant
manager
PMO Implement part of global training of
the project
11
months
Compile work plan of the EMO and the environmental
supervisor
PMO Technical
assistant
manager
PMO Including the operation for clearing
the role and responsibilities of the
EMO and the environmental
supervisor
11
months
Develop working files: standards, onsite inspection table
and different activities report format
PMO EMD PMO Regulate the primary file in a
certain degree, regulate while
using in site
11
months
Develop detailed steps of EMD by targeting to the
incongruent phenomenon found in the supervision and
report
PMO TA PMO
11
months
Provide appropriate evaluation for the environmental
elements and the negotiations
PMO 0 TA helps EMD PMO/WB
11
months
Compile commission contract for the EMD for activities
supervision (the specific supervision equipment such as
water quality and atmospheric monitoring is required)
PMO EMD
Ensure the consistency between
the implementation of the process
and the working plan and the land
use
Construction period
16
months
File and process for the discussion between the
environmental supervisor and the EMD for the project
adjustment and improvement
― EMD/
environmental
supervisor
PMO In order to improve the regulation
process of efficiency requirements
16
months
The contractor of each section must appoint a full-time staff
with rich environmental responsibility to work together with
the environmental supervisor and the EMD
Owner and
constructio
n unit
Construction
unit PMO Enterprise licensing
16
months
The construction unit of each section should organize its
labor force to learn environment knowledge and measures
Owner and
constructio
n unit
Construction
unit
EMD/
environment
al supervisor
Introduce onsite management and
environmental problems by the
EMD
16
months
Organize public communication and provide support
material
PMO EMD Owner Establish exchange regulations
and procedures, and establish
exchange regulations and
procedures through radio and
television
Operation period
Confirm the procedures for reporting the environmental
problems of operation period
Owner Environment
al Protection
Bureau of
Cheng
County
Confirm the solid waste generated by the project is
intensively stacked and stored and is treated safely
Owner and
sanitation
department
Environment
al Protection
Bureau of
Cheng
County
6.3 Contract Requirements of Environmental Management
In the project construction, the contractor plays a key role in environmental management,
pollution control and prevention measure and other factors, and therefore the contractors
should be required as follows:
(1) Select the contractor with strength to ensure the effective implementation of
environmental management plan;
(2) The contractors and the construction supervisor must be subjected to the relevant
environmental protection and environmental management training organized by the TA
before starting;
(3) The environmental impact mitigation measures during the construction period above
should be included in the tender documents of the contractor and finally included in the
construction contract as the contract requirements of the contractor of the project.
(4) The environmental activities of the contractor should be monitored, provide a daily or
weekly environmental performance record, and monitor and review these records by the
project office and the construction supervision team.
(5) The contractor should provide a full-time environmental staff for each section. These
environmental staff should be subject to the training of the training plan so as to qualify
their works.
(6) In the construction process, the contractor should communicate and coordinate with the
masses of the project area, establish bulletin board in each construction unit to inform
the public of specific construction activities and construction time, and simultaneously
provide the contact and contact phone to provide complaints and advices of the masses
to the construction activities.
(7) In the project contract funds, the contractors should obligate the deposit of
environmental management and other factors according to the annual budget, wherein
the amount of the proportion should be about 3% of the budget account.
6.4 Information Exchange and Resolution of Undesirable Condition
In the environmental monitoring work, the information should be exposed to the onsite
environmental supervisors, the environmental management managers of the enterprise
and the project office, wherein the information is monthly exposed for one time, the
monitoring report is developed by an environmental monitoring staff and is distributed to
the onsite environmental supervisors, the environmental management managers of the
enterprise and the direction of the project office. In order to focus on the most important
issue of management, the importance of non-compliance basis of the project is divided
into three different levels as following:
Level 1
Definition: the condition of the non-compliance is defined as the project is incongruent to
the original requirement, but the non-compliance will not cause immediate impact on the
particularly important resource. If the recurring of the first level did not be paid attention,
the second level will be caused. Measures: properly handle the situation of the first level
by means of appropriate cooperation and regular exchange. For example, discussing with
the staff of the construction unit and the operation unit, quickly implement remedial
measures, wherein the typically formal communication from is a weekly case report from
the environment supervision engineer to the environmental management manager of the
enterprise and the onsite construction manager.
Level 2
Definition: the non-compliance condition does not cause obvious damage and irreversible
impacts on the sensitive and important resource, but the non-compliance condition should
be remedied and treated immediately to prevent the impacts above. If the recurring of the
second level did not be paid attention, the third level will be caused. Measures: in case of
the discovery of the event of the second level, the event must be reported to the
environmental manager of the project office and the onsite construction manager by the
environmental management manager of the enterprise, so as to achieve remedial
measures as soon as possible, and the remedial measures will be provided in a week
after the discovery, generally.
Level 3
Definition: the level includes the damage to the sensitive objectives paid special attention
or foreseeable and coming damage. The particular behavior internationally prohibited is
also divided into three levels. Measures: report the conditions to the environmental
manager of the project office and the onsite construction manager by the environmental
management manager of the enterprise once discovering, achieve remedial measures as
soon as possible, and the remedial measures will be provided in three days after the
discovery, generally. The time will be longer in case of special conditions. If necessary, the
environmental management manager of the enterprise can require the construction
manager to stop some special projects for protecting the resources before implementing
the remedial measures.
6.5 Training-- Necessary Capacity Building and Means Building
6.5.1 Training Requirement
The objective of environmental capacity building mainly comprises environmental
management personnel and environmental supervisor, and the training thereof is one of
the technical support parts of the project. In the construction process of the project, the
training courses comprise construction party training and worker training. Before starting
the construction of the project, all the construction units, operation units and construction
supervision personnel should participate in the mandatory environment, health and safety
training.
6.5.2 Training
(1) Environmental management personnel and environmental supervision engineers
The training is organized by the project office of Longnan City, the environmental manager
of Cheng County project office, the environmental manager coordinators of the project
and the environmental supervision engineers and other related personnel are subjected to
centralized training before one year of starting the project in Longnan City, and the specific
training is carried out by the technical experts of environment. The content of the training
is shown in Table 6.5-1.
(2) Contractors and construction workers
The training is organized by the project office of Cheng County or the construction owners
of the project in the place where the project is locate before starting the project, and the
specific training can be carried out by the technical experts of environment or trained
environmental managers of the enterprise. The specific training content and duration are
shown in Table 6.5-2.
Training of Environmental Managers and Environmental Supervision Engineers,
Water Conservation Supervision Engineers
Table 6.5-1
Problem Training content Duration
Operation capability
(environmental
manager,
environmental
supervisor and water
conservation
supervisor)
Quick identification Word, Excel and PowerPoint hotkey
function to learn the security policy of the World Bank
Reinforcement learning for the building-designated
environmental conditions, technical consultants after the
compilation of environmental details, wherein each detailed
detail should comprises a monitoring description. Learn the
environmental impacts on the project and the environmental
projects required to be monitored.
4 days
Compliance
monitoring
(environmental
manager,
environmental
supervisor and water
conservation
supervisor)
The onsite monitoring process of the training project comprises
organization, communication, roles and responsibilities,
decision-making process, and the observation procedures of
report and standard.
1 day
Emergency response
team (environmental
manager,
environmental
supervisor and water
conservation
supervisor)
Onsite knowledge of hazardous materials
Potential leakage and overflow
Environmental and personal impact of leakage
and overflow
The emergency response process comprises
priority response
Location and use of response facilities,
Communications and reporting facilities
1/2 day
Emergency relief and
medical assistance
(environmental
manager,
environmental
supervisor and water
conservation
supervisor)
Process for finding medical assistance in emergency and
non-emergency state, and process for finding other related
medical aids. (For example, long-distance calls, medical
advice)
1/2 day
Hazardous materials
and waste
management,
including the disposal
of explosive waste
(environmental
manager and
environmental
supervisor)
Correct use and storage process
Correct use process comprises fuel filling process, calculation
of use amount, and ensured effective use of the equipment
Correction treatment of used storage tank
Storage process of hazardous waste
Management of borrowed land and slash
Management of non-hazardous waste
Medical problems expose to hazardous waste
Emergency response process
1/2 day
Health and safety
inspection and
reporting process
(environmental
manager,
environmental
supervisor and water
conservation
supervisor)
Health and safety issues
Health and safety requirements
How to implement health and safety
inspection
Process of reporting and problem solving
1 day
Traffic safety
(environmental
manager,
environmental
supervisor and water
conservation
supervisor)
Traffic rule
Safe dive training
Vehicle maintenance process
Fuel filling process
Emergency response process
1/2 day
Water quality
monitoring and
analysis
(environmental
manager,
environmental
supervisor and water
conservation
supervisor)
The use of the equipment comprises standards, testing,
methods, sample transport, data quality control monitoring and
reporting requirements
1/2 day
Training of Construction Workers
Table 6.5-2
Mode Training content Training period
General
environmental
knowledge of
construction
workers
Description for the environmental impact factors and
environmental protection measures related to the environment
Description for particularly sensitive area of environment and
problem in the construction area, and introduction of nearby
area in the construction area
Roles and responsibilities of environmental management
design engineers, environmental supervisor and construction
supervisor, and key points of environmental report
Waste management of construction camp and construction
site
Pollution control measures of construction site
Illegal provisions, and fines of laws and regulations
Half-day
classes in
each venue
General health
knowledge of
construction
workers
Transmission and protection methods, prevention of HIV/AIDS
and STD.
Alcohol and drug prohibition
Process for finding medical assistance in emergency and
non-emergency state, and process for finding other related
medical aids. (For example, STD detection, and counseling)
Half-day
classes in
each venue
Health and safety knowledge comprises some basic
processes as follows: traffic safety, electrical safety, explosion,
fire, hazardous waste management
Use of personal protective equipment
Fines for the violation of laws and regulations
(3) Operators
Training of Environmental Management Personnel of Operator
Table 6.5-3
Objective Training content Training period
Environmental
management
personnel
Project management process of the World Bank
Environmental information file, open, communication, and
reporting mechanism
Emergency response of environmental risk
Health and safety inspection and application process
One day of classes
held in Cheng
County
Advanced technology and environmental management
study
Investigation of
advanced domestic
municipal
engineering
Environmental
staff
The use of the equipment comprises standards, testing,
methods, sample transfer and data quality control and
reporting requirements
Environmental emergency response: potential leaks and
spills, impact of potential leaks and spills on environment
and human, wherein the emergency response process
comprises priority response, the location and use of the
response facilities
Two-day of classes
held in Cheng
County
6.5.3 Budget of Personnel Training Funds
The budget for the capacity building of the project is shown in Table 6.5-4.
Training Plan of Environmental Protection Personnel of the Project
Table 6.5-4
Stage Type Number (people) Time Cost (ten
thousand
Yuan))
Environmental manager
training
1 2011 2
Project manager coordinator 6 Before
implemtning the
project
6
Construction
period
Environmental supervision
engineer
3 Before
operation
3
Water conservation
supervision engineer
3 Before
operation
3
Subtotal 14
Environmental
management
personnel training
3 Before
enterprise
operation
6
Operation
period
Environmental risk
emergency
response personnel
3 Before
enterprise
operation
3
Subtotal 9
Total cost 23
6.6 Land Acquisition Compensation and Resettlement Compensation
(1) In accordance with the national and local policies and compensation methods of land
acquisition and resettlement, the villagers involved in land acquisition and resettlement
are provided with reasonable compensation, the project office should carefully listen the
views of immigrants and ensure that the working and living conditions immigrants are not
less than the current level.
(2) For the staged construction of pipeline and road sub, the excavation and backfill work
should be completed as soon as possible, the temporary access roads close to the
schools and other public facilities should be particularly paid attention and are provided
with traffic warning signs, traffic police should be in a rush to ease and dispatch so as to
pedestrians and vehicle flow; and materials transport should be avoided from traffic peak,
so as to reduce urban traffic pressure.
(3) Strengthen the training of the management and construction personnel in the
conservation education and awareness, due to the large amount of earth excavation work
of the project, the work should be taken seriously; in case of the discovery of cultural relics,
ancient tombs and other signs, it should be immediately notified to the local cultural relic
protection departments and excavated in a timely, and the construction can be continued
after treating the cultural relics by the cultural relics department well.
(4) If the stronger vibration works (such as pier compaction, vibration roller operation and
etc.) are carried out in residential areas, the old houses close to the construction site
should be monitored to prevent accidents. For the houses greatly impacted by the
vibration construction for ensuring the project should be provided with necessary remedial
measures.
6.7 temporary Site Restoration
The contractor has the obligation to implement ecological restoration of the temporary
land where the construction is completed in the construction period of the project, and
implement the restoration works of all the temporary lands before completing the project
completely.
Environmental Management Plan for Cheng County Moba Gorge Water Source
Engineering of Gansu Province
7. Environmental Monitoring Plan
7.1 Monitoring Purposes
According to the characteristics for the impacts of Moba gorge water source engineering
on the environment, the main environmental factors of the project construction area and
the reservoir area before and after the project construction are monitored, the change
conditions of the various environmental factors in the impact range of the project and the
effects after implementing the environmental protection measures are grasped, so that the
basis for finding environmental issues in time, providing the corresponding measures,
reducing the adverse effects of the project, strengthening environmental management and
project completion and acceptance..
In different stages, the focuses of environmental monitoring tasks are different. In the
earlier stage of project construction and water storage, the main monitoring objectives
mainly comprise the change conditions of the environmental factors caused by the
construction activities, the change of the environmental factors caused by dam
construction and water pipeline pavement; when the project is completed and put into
water storage operation, the monitoring objectives mainly comprise the change conditions
of the environmental factors around the reservoir caused by water storage, scheduling
and operation period, and the ecological change in the water pipeline pavement area.
7.2 Environmental Monitoring Organization
The environmental monitoring work in the construction period and operation period is
responsible by the Hydrographic Office of Cheng County, the environmental monitoring
station and the water conservation monitoring center according to the commission of the
project contractor or the operator, wherein all the responsible units are national
environmental quality monitoring units and are featured with complete equipment, thick
technical force, so that these units can carry out the environmental monitoring tasks well.
According to the environmental impact prediction results, the sensitive concerns with
obvious pollution are used as monitoring points so as to track and monitor the pollution
condition of construction period and operation period of the project, wherein the
monitoring content comprises the noise with large impact on the environment, air
environment and surface water environment. The monitoring factors are determined
according to the characteristic factors of project pollution. The monitoring analysis
methods are the monitoring analysis methods for the corresponding items in the
―Environmental Monitoring Technical Specifications" and the ―Water and Soil Conservation
Monitoring Technical Regulations" which are issued by the national environmental
protection administration.
The detailed and key steps required by the construction site and activities required by
effective monitoring are listed in Table 7.2-1.
7.3 Detailed Environmental Monitoring Requirements
The detailed environmental monitoring plan of the project is shown in Table 7.3-1 to 7.3-4,
and the cost budget table 7.3-5.
Key points of Monitoring Plan of Construction Period and Operation Period
Table 7.2-1
Plan Activities Responsibility Remark
Implement
ation
Supervision Financing
Construction period
1 year
(January to
February)
Compile onsite environmental management
plan
Constructi
on unit
EMC/PIU/EPB Owner Develop a plan in one month after signing
the contract, finally complete the plan in two
months, and approve and permit by the
EMC
Construction
period
Provide project implementation boundary of
each project area by the project construction
unit and the operation unit, and permission
Owner
EMC/PIU/EPB Compile a map by the construction unit and
the operation unit before constructing the
project
1 year
(January to
M)arch
Compile a pollution control plan, air pollution
and noise
Owner EMC/PIU/EPB
Department of
Water Resources of
Gansu Province
Owner Consult with relevant agencies and
residents, and approve and permit by the
EMC
Construction
period
Atmospheric, noise and water monitoring Specific Part
Construction
period
The pollution control plan and all the pollution
control measures provided by the EMP must be
implemented, all the delay measures should be
carried out by the construction unit, and all the
construction camps and facilities should be
inspected weekly
Constructi
on unit
EMC/PIU/EPB
Daily visit the construction camps and
facilities by CSEE and inspect the EMC2
monthly
Construction
period
The environmental protection measures of the
construction unit should be reported by filling in
monthly reports
Constructi
on unit
EMC/PIU/EPB The proposal of CSE is the basis of final
payment of PIU/PMO
Construction
period
According to the different processed and
serious levels, observe and report the
inconsistencies of the project
Constructi
on unit
EMC/PIU/EPB Level one: EMC; level two: EMC and PIU;
level three: EMC, PIU, PMO
Construction
period
Decide whether to postpone or refuse to pay
for projects construction units
Owner EMC/PIU/EPB
Construction
period
Ensure that the land acquisition process can
meet the needs of the construction plan
Owner POIU and
immigration office
Construction
period
Declare daily, weekly and monthly Constructi
on unit
EMC/PIU/EPB Onsite weekly, SRS monthly
Construction
period
Quarterly report Constructi
on unit
PIU If it is required by the organizations of the
relevant projects, it should be declared
Construction
period
Semi-annual declarations Constructi
on unit
EMC/PIU/EPB If it is required by the organizations of the
relevant projects, it should be declared
Completion
of
construction
period
When the temporary land is recovered, all the
building materials and equipments will be
removed
Constructi
on unit
EMC/PIU/EPB Owner
Operation period
Restore the temporary land when the
construction is completed
Owner EPB/Department of
Water Resources of
Gansu Province
Sum up the experience of the project for the
similar project
EPB/Depar
tment of
Water
Resources
of Gansu
Province
Standardization process and organization
for the training of intermediary agency,
demonstration for the results and benefits of
the project
Water and Soil Conservation Fixed-point Monitoring Plan
Table 7.3-1
Monitoring
time
Monitoring area Monitoring point Monitoring content Monitoring method Monitoring
frequency
Project
construction
period and
natural
recovery
period
Residues place control area
Residues place top of
piling slope
① Change of water
erosion amount Erosion gully measuring method
The residues
place is
monitored for
one time per
day, and the
other areas are
monitored for
one time per
30 days, and
the time will be
Residues place top ① Change of water
erosion amount
Erosion gully measuring method
Surface soil pilling yard ③ Surface soil erosion Erosion gully measuring method
Hub building control area
Slope excavation, and
temporary mound
① Change of water
erosion amount
Erosion gully measuring method
② Erosion amount of
temporary soil field
Erosion gully measuring method
Quarry control area Slope excavation ① Change of water Erosion gully measuring method
erosion amount increased by
one in case of
the rainfall of
24 h is not less
than 50 mm.
Surface soil pilling yard ② Surface soil erosion Erosion gully measuring method
Construction road control area
Road excavation and
backfill surface
① Change of water
erosion amount
Survey monitoring method and
erosion gully measuring method
and etc.
Temporary residues ① Change of water
erosion amount
Erosion gully measuring method
Water pipeline control area
Road excavation and
backfill surface
① Change of water
erosion amount
Survey monitoring method and
erosion gully measuring method
and etc.
Temporary residues ① Change of water
erosion amount
Erosion gully measuring method
Construction enterprises and
office and living control area
Perturbation surface of
the construction area in
the site
① Change of water
erosion amount
Survey monitoring method and
erosion gully measuring method
and etc.
Survey Monitoring Plan of Water and Soil Conservation
Table 7.3-2
Monitoring
time
Monitoring
area
Monitoring content Monitoring method Monitoring frequency
Before the
constructio
n
preparatio
n period
Range of
control
responsibility
① Characteristics of water loss and soil erosion impact factor,
quantity, quality and protective effect of soil and water
conservation facilities, and status of water loss and soil erosion
and etc.
Remote sensing, census
survey method combined with
plots
Survey the background
value before the
construction preparation
period
② Background value of water loss and soil erosion
Constructi
on of
preparatio
n and
constructio
n period
Project
Construction
area ① Change of topography and vegetation of the construction
area, and number of damaged water loss and soil erosion
conservation facilities
Remote monitoring, inspection
method
Inspection at any time after
starting
② Number of dug and filled earth and stone, amount of spoil
and residues, location, land area, area of perturbation surface,
area and degree of damaged vegetation
Combination of the census
method and inspection
1 time in the construction
period and the end,
respectively
③ Number and effect of project control measures implemented Screening method, inspection
method
1 time in the construction
period and the end,
respectively
④ Hazards of water loss and soil erosion Combination of a sample
survey and access
1 time in the construction
period and the end,
respectively
Reservoir
inundation
area
① Unstable slope and landslide and the like in the reservoir
bank
Combination of a sample
survey and access
1 time in the construction
period
② Hazards of water loss and soil erosion Inspection method 1 time in the construction
period and the end,
respectively
Natural
recovery Project
Construction
area
① Regional change condition of water erosion Census and sample survey
method
1 time before, during and
after the flood, respectively
② Grass growth, survival rate, coverage and anti-erosion
effects and etc.
Quadrat survey 1 time before, during and
after the flood, respectively
③ Number and effects of control measures implemented, the
area of water loss and soil erosion, reduction for the amount of
water loss and soil erosion
Sample survey 1 time before, during and
after the flood, respectively
Reservoir
inundation
area
① Unstable slope and landslide and the like in the reservoir
bank Survey method, sampling 1 time before, during and
after the flood, respectively
② Hazards of water loss and soil erosion Survey method, sampling 1 time before, during and
after the flood, respectively
List for Environmental Monitoring Plan of Construction Period
Table 7.3-3
Na
me
Monitoring
content
Monitoring point Monitoring frequency Monitoring item
Wat
er
qua
lity
mo
nito
ring
Water quality
change
condition of the
construction
site upstream
and
downstream
the river,
pollution
condition of
construction to
the water
quality
Set a section on the
place apart from the
upstream of the
intersection of the
river and Erlang
River with 500 m,
set a section in the
reservoir area, set a
section in the
downstream point
apart from the
reservoir area with
100 m, and there
are four monitoring
sections totally.
When the construction
is began, the annual
abundance, flat and
dry season will be
monitored for one
time, and the
monitoring is
appropriately
increased for 1 to 2
times in the peak
construction period
Temperature, pH, dissolved
oxygen, chemical oxygen
demand, 8005, total nitrogen,
total phosphorus, suspended
solids, ammonia nitrogen,
copper, zinc, arsenic, mercury,
cadmium, chromium
(hexavalent), lead, fluoride,
cyanide, volatile phenol,
petroleum, anion surfactant and
sulfide and fecal coliform
Atm
osp
heri
c
mo
nito
ring
Construction
and
transportation
impact on the
atmosphere
Construction area
When the construction
is began, monitoring
for one time per six
months, the
successive sampling
time of each time is 3
days, and sampling at
07:00, 12:00 and
18:00; the monitoring
will be appropriately
increased in the peak
construction period
SO2, TSP and NOx
Noi
se
mo
nito
ring
Noise
generated by
the
construction
machinery,
blasting and
transportation
Set a monitoring
point on the outer
boundary of 1 m to
the active
construction site
In the construction
period, quarterly
monitoring for one
time, the monitoring
will be appropriately
increased in the peak
construction period,
the successive
sampling time of each
time is 3 days, and
respectively sampling
at daytime and
nighttime for one time
Equivalent A sound level Leq
Ter
rest
rial
biol
Vegetation
type, dominant
species, grass
base height,
Processes involved
grass and woodland
area
One time before and
after the construction
Vegetation type, dominant
species, grass base height,
vegetation cover and etc.
ogic
al
mo
nito
ring
vegetation
cover and etc.
Aqu
atic
biol
ogic
al
mo
nito
ring
Monitoring of
plankton,
benthos and
indigenous fish
Set two monitoring
points on the
upstream point
apart from the dam
with 100 m, and the
downstream point
apart from the dam
with 300 m
One time before and
after the construction
Monitoring the species and
number of the plankton,
benthos, and indigenous fish
Hu
man
heal
th
mo
nito
ring
Construction
camp
sanitation and
health of
construction
workers
Construction camps Monthly
Construction camp health,
physical health of construction
workers
List for Environmental Monitoring Plan of Operation Period
Table 7.3-4
Na
me
Monitoring
content
Monitoring point Monitoring
frequency
Monitoring item
Wa
ter
qua
lity
mo
nito
ring
Water quality
monitoring of
reservoir area
and
downstream
the reservoir
area in
operation
period
Set monitoring
sections in the
reservoir area
and the
downstream
point apart from
the reservoir
area with 100m
Monitor the
reservoir area for
one time per
day, and monitor
downstream
reservoir for one
time in
abundance, dry
and flat-water
period,
respectively
Temperature, pH, dissolved oxygen,
chemical oxygen demand, BOD5, total
nitrogen, total phosphorus, suspended
solids, ammonia nitrogen, copper, zinc,
arsenic, mercury, cadmium, chromium
(hexavalent), lead, fluoride, cyanide,
volatile phenol, petroleum, anion
surfactant and sulfide and fecal coliform
Aq
uati
c
biol
ogi
cal
mo
nito
ring
Monitoring of
plankton,
benthos and
indigenous
fish
Set two
monitoring points
on the upstream
point apart from
the dam with 100
m, and the
downstream
point apart from
the dam with 300
m
Every three
years is a cycle,
there are five
monitoring
cycles, and the
aquatic
organisms are
monitored for
one time of each
quarter, per
cycle
Monitoring of plankton, benthic species
and biomass changes, proliferation of
fish germplasm resources exchange
changes, and indigenous fish growth,
reproduction
Dis Discharge Downstream the Monthly Placement of water gauge card, monitor
cha
rge
mo
nito
ring
flow of outlet
entrance of
the dam
dam of 100 mm dam leakage of water meets the
minimum ecological water
Monitoring Investment Budget Table
Table 7.3-5
Item Cost Remark
Water quality
monitoring Construction period Operation period
137000 Yuan 10300 Yuan/year
Atmospheric
monitoring
216000 Yuan Construction period
Noise monitoring 54000 Yuan Construction period
Terrestrial biological
monitoring
120000 Yuan Construction period
Aquatic biological
monitoring Construction period Operation period
100000 Yuan 60000 Yuan/3 years
Human health
monitoring
64000 Yuan Construction period
Water conservation
monitoring
589100 Yuan Construction period
Discharge monitoring 5000 Yuan/year Operation period
Environmental Management Plan for Cheng County Moba Gorge Water Source
Engineering of Gansu Province
8. Acceptance Investigation Content of Environmental Protection Measures
8.1 Investigation of Water Environmental Protection Measures
Investigate bottom cleaning condition of the reservoir, acceptance and conclusion.
Investigate the water environmental protection measures for the domestic wastewater of
operation period, effects and the corresponding investment by means of data collection,
field survey and other methods while combining with the data provided by completion and
acceptance monitoring.
Focus on the investigation of wastewater treatment facilities and treatment processes,
treatment capability and effects, and discharge direction and the like in the construction
site of operation period, and the investment of all the facilities and operation cost and etc.
8.2 Investigation of Atmospheric Environmental Protection Measures
Investigate the prevention, protection or management measures taken for reducing the
impacts of dust, exhaust gas of construction machinery and tail has of transport vehicles
and the like on the onsite construction workers.
8.3 Investigation of Acoustic Environmental Protection Measures
Investigate the implementation condition and implementation effect of acoustic
environmental protection measures by visiting the construction workers and checking data
and other methods. The investigation content mainly comprises: whether the construction
equipment is the mechanical equipment required by environmental protection, whether
the noise management of construction period is strengthened, implementation of noise
abatement measures for the high-noise machinery, and the prevention for the night work
of high-noise construction equipment, whether the maintenance of the high-noise
construction equipment is strengthened so as to ensure the normal operation, reduce the
noise generated by means of abnormal operation of the equipment, whether the vehicle
management is strengthened, and the vehicle noise is controlled and etc.
8.4 Investigation of Solid Waste Treatment Measures
Investigate the location, size and capacity of waste soil and stone disposal place, and the
implementation conditions for the project and measures which are taken after the
treatment of the residues place. Investigate the amount of the residues place and the
operation conditions.
8.5 Investigation of Ecological Protection Measures
8.5.1 Investigation of Terrestrial Ecological Protection Measures
Mainly investigate the restoration condition of the temporary land, and the greening
project condition taken on the living management area of the reservoir and etc.
8.5.2 Investigation of Aquatic Ecological Protection Measures
Investigate the implementation condition for the safeguard measures of discharge
ecological base flow, and whether the young fishes put according to the requirements.
8.6 Investigation of Water Loss and Soil Erosion Control
8.5.1.1 Water Loss and Soil Erosion Control Measures of Construction Period
Investigate the condition of soil and stone transportation of the project in the construction
period, the land position and the actual use condition of the residues place and protection
conditions thereof, mainly comprising the amount of the residues place, the actual
residues amount and the utilization ratio; the actual land area of planned residues place,
the amount of residues and the stacking height; the construction condition of the residues
place wall, the length and height of the wall, and the configuration conditions of
surrounding drainage ditches and other draining facilities.
Investigate the mining situation of the stock ground, the type of the original land,
ecological restoration measures taken and restoration effects, and the setting conditions
for the slope drainage ditches of the temporary roads and the quarry.
8.5.1.2 Investigation for Soil and Water Conservation Measures after Construction
Investigate the restoration condition of temporary construction area when the construction
is ended, investigate the land use type of the temporary construction road, two sides of
the new road, exposed land caused by the damage of the vegetation within the temporary
construction area, the temporary living and office area and the residues place and other
slashes after restoring, the greening area and greening rate and etc. Mainly investigate
whether the project measures and vegetation restoring measures of each project have
been implemented according to the requirements of environment impact assessment and
project design. Investigate the water and soil conversation protection condition after taking
project, plant and management measures.
8.7 Investigation of Population Health Impact and Protection Measures
Investigate the implementation conditions of environmental health management and
epidemic disposal and others in the construction site of construction period.
Investigate and understand the environmental health conditions of project construction
area and reservoir area, comprising medical institutions setting, medical equipment
configuration, file and regular inspection of health data of the construction workers and etc;
the infectious diseases comprises main disease type, number of cases, infected, and
epidemic control situation; drinking water purification and disinfection conditions; and
other conditions of population health protective measures.
According to the investigation results and the combination for the requirements of
environment impact assessment, the implementation conditions of population health
protection measures can be judges, the population health conditions in the construction
period can be evaluated, so that the effect for the series of measures taken for protecting
the population health can be analyzed.
Investigate and understand the environmental health conditions of reservoir area in the
operation period, and the conditions of other population health protection measures taken.
8.8 Investigation for Environmental Protection Measures of Resettlement Area
Investigate the relocation and resettlement areas and resettlement areas of production
distribution, environmental profile; population resettlement, resettlement method and
resettlement profile; and whether the resettlement compensation is implemented actually
and etc.
8.9 Investigation of Risk Prevention Measures
Investigate the environmental risk factors presented in the construction period and the
operation period of the project, whether there is a risk incident; investigate the situation,
reason and caused environment impacts of environmental risk accident in the
construction period and operation period; investigate the environment risk prevention
measures of the project and the compilation condition of the emergency response plan,
the implementation conditions of national, local and related industries in the accident
prevention and emergency response, the necessary emergency facilities and training
conditions of emergency response team; and investigate the environment risk prevention
measures of the project and the setting conditions of emergency management agencies.
8.10 "Three Meantime" of Project Acceptance
The water source engineering construction management department of Moba gorge for
city water supply of Cheng County should timely provide completion acceptance
application of environmental protection facilities to the environmental protection
department according to the relevant requirements in the ―Completion Acceptance
Management Regulations for Environmental Protection Facilities of Construction Project‖,
so as to implement acceptance. The list for the completion acceptance of environmental
protection facilities is shown in Table 8.9-1.
List for "Three Meantime" Acceptance of Environmental Protection Facilities
Table 8.9-1
Item Content Measures Acceptance
standard
Wastewater
Domestic wastewater
Treat the domestic
wastewater by means
of WSZ buried
wastewater treatment
equipment
The first level of
"Integrated
Wastewater Discharge
Standard"
(GB8978-1996)
Water source protection
Divide drinking water
source protection areas
according to the
requirements of the
―Regulations for
Pollution of Prevention
Control and
Management of
Drinking Water Source
Protection Area‖
Reservoir water
quality meets the
standards of Class III
in the "Surface Water
Environmental Quality
Standard" and the
threshold value of the
water source
supplementary items
Compile an
―Environmental
Protection Plan of
Drinking Water Source
of Cheng County‖
Solid waste Household waste
Set 2 garbage barrels
in the management
station
Proper disposal of
household waste
Water loss and soil
erosion Site regulation
Implement land
formation on the stock
Project provided by
water conservation
yard, the construction
camps, the
construction access
road and the water
pipeline when the
construction is
completed
program
Slope protection work
Protect the slope of the
stock yard and the
residues place
Drainage work
Set drainage facilities in
dam management
station, dam road and
construction stock yard
Greening measures
Green the dam
management station,
stock yard, construction
camp, construction
access roads, water
pipeline and two sides
of the roadbed of the
dam road when the
construction is
completed
Resettlement and
ecological
compensation
Place immigration
properly, and
compensate flooded
farmland and forest
land
Resettlement plan and
land compensation
plan
Landscape protection
Pavement of the water
pipeline should be hidden
by the terrain as far as
possible and should be
prevented from the
residential area
Prevent the damage of
the landscape caused
by the water pipeline
Aquatic organism Young fish releasing
Release young fish in
April to June for every
three years
Release 2000 Jialing
Schizopygopsis Tajiri
Schizothorax fish
species with the size
of 3 to 4 cm
Discharge amount Ecological water discharge Set permanent outlet
entrance on the dam
The discharge amount
is 0.138m3/s
Environmental
monitoring and
management
Normal operation
Environmental Management Plan for Cheng County Moba Gorge Water Source
Engineering of Gansu Province
9. Environmental Management Cost Budget and Capital Source
9.1 Budget Distribution
The implementation of EMP measures involves to many units, so that the capital sources
are different. Most of environmental protection activities are project measures, and thereof
the activities should be provided by the project construction unit and the operation unit
and involved in project cost, wherein these costs will be cleared and listed in the tender of
competitive bidding.
The cost of EMP is mainly applied to the environmental management of the construction
period and the operation period, and mainly comprises environmental monitoring cost,
environmental supervision cost, training cost and the environmental management agency
operation cost, and part of project further has risk prevention cost. The activities of EMC
will be covered with the PMO and PIUS international project management costs, the
monitoring of water quality, atmosphere and noise, the CSEE and EFSI are the same. The
monitoring and surveillance activities of CSEE are part of the construction and supervision
costs. The local environmental monitoring station will monitor water, atmosphere and
noise in the operation process of the project according to the commission of the project
owner, and the monitoring cost thereof will be paid by the project owner. If the normal
monitoring of the local environmental protection department is synchronous with the
project, the normal monitoring data of the environmental protection department can be
used.
9.2 Capital Source and EMP Budget
Investments for various environmental protection measures proposed in the evaluation
report are estimated as 15.2673 million RMB, which takes 6.74% of total investment cost.
Please see table 9.2-1 for details.
Table 9.2-1 Environmental Protection Investment
Variety of measure
Name of measure
Content of measure
Expected effect Investment cost (10,000RMB)
Pollutant control during
construction
Disposal for domestic
sewage from constructors
Disposed by t6he toilet pit of
each construction
site.
Relieve the influence on environment
caused by waste water.
6.54
Waste water from the
foundation pit
Add flocculating agent.
Relieve the influence on environment
caused by waste water.
40.2
Waste water Oil separation Relieve the 5.32
containing oil tank influence on environment
caused by waste water.
Waste water for sand stone materials
Sedimentation tank
Relieve the influence on environment
caused by waste water.
25.89
Alkaline waste water
Sedimentation tank and the
agent for adjusting pH
value
Relieve the influence on environment
caused by waste water.
6.37
Watering construction
area
Water construction
area.
Relieve dust raise in
construction site.
8.1
Household waste from constructor
Arrange 28 trash cans and
transport the waste in time.
Relieve the influence on the
environment caused by household
waste during construction.
10.8
Barrier facilities around the
construction site
Barrier facilities are arranged
around the site.
Relieve dust raise and noise
influence caused by
construction.
5
Preventive measures for constructor
Mask, earplug and so on
Relieve the influence for the
constructor caused by
construction process.
4
Protection of human health
Disinfect the construction
area, implement deratization and
eradicate mosquito and
fly.
Protect body health of
constructor. 23.61
Waste water control
Domestic sewage
Adopt WSZ buried sewage
disposal equipment to
dispose domestic sewage.
Standard LI (GB8979-1996)
of Comprehensive
Sewage Discharge Standard
15.0
Protection of water source
area
Divide protection zone for drinking
water source according to the requirements of ―Administrative Regulations for
Preventing Pollution of
The water quality in the reservoir area reaches the III
standard of ―Environmental
Quality Standard of Surface
Water‖
50.0
Drinking Water Source
Protection Zone‖.
(GB3838-2002) and the
boundary value of
supplementary items.
Compile ―Environmental Protection Plan
for Cheng County Drinking Water Source
Area‖.
Household waste
Household wastes
Arrange two trash cans for
the management
station.
Properly dispose household
wastes. 0.04
Soil and water conservation
Engineering measures,
planting measures and
temporary engineering measures
Prevent and control the
region in which water loss and
soil erosion occur.
After soil and water
conservation scheme is
implemented, by the final period of construction,
treatment rate of disturbed land
reaches 98.67%; treating degree for water
loss and soil erosion reaches 98.07% and slag
blocking rate reaches 100%; control rate for water loss and
soil erosion reaches 1.03;
vegetation recovery
coefficient reaches 98.76%
and coverage area of forest and grasses
reaches 41.3%.
1118.67
Ecological protection
Schizopygopsis kialingensis and
Schizothorax davidi which are bought and bred
via manual domestication are released to
breed.
Every 3 years is a releasing
period and 2000 Schizopygopsis kialingensis and
Schizothorax davidi in the
specification of 3-4cm are
released every time.
10
Set ecological protection signs
Warning signs 0.9
Environmental monitoring
Water quality monitoring
Work normally
137
Environmental air monitoring
216.6
Noise monitoring
5.4
Human health monitoring
6.4
Ecological survey and monitoring
22
Other charge 127.17
Total 1526.73
Within the above budget, the summary for the management cost of construction period of
the project is shown in Table 9.2-2.
Budget Summary for Environmental Management Cost of the Project in
Construction Period
Table 9.2-2
No. Cots name Total cost of construction
period of the project
(10,000RMB)
1 EMD operation Salary 22.5
Office expense 9
Travelling expense 5.63
2 Environment monitoring cost 69.10
3 Environmental supervision cost 21.6
4 Personnel environmental protection training 23
5 Water and soil conservation monitoring cost 58.91
6 Water and soil conservation supervision cost 39.20
7 Total 248.94
10. Information Management of Environmental Management Plan
10.1 Environmental Management Plan
10.101 Environmental Management System
Provincial level: Department of Water Resources of Gansu Province, Environmental
Protection Department of Gansu Province, the World Bank
City level: water conservancy bureau of Longnan City, environmental protection bureau of
Longnan City, Loan Project Office of the World Bank in Longnan City
County level: environmental protection bureau of Cheng County, Water Authority of Cheng
County
Owners
Enterprise level: environmental monitoring station of Cheng County, environment impact
assessment unit, design unit, construction contractor, environmental supervision
engineers, environmental monitoring station of Cheng County, owners
Figure 10.1-1 Chart of Environmental Management System
Organizational Chart of Environmental Management System
Table 10.1-1
Organizational
properties
Organizational name Organizational task
Management
organization
Project management office of
Longnan City
Project management organization
Environmental management
office of Longnan City
Project environmental management organization
Supervision
organization the World Bank
Supervision and inspection the implementation of
environmental management plan
Department of Environmental
Protection of Gansu Province,
Environmental Protection
Agency of Longnan City, and
Environmental Protection
Agency of Cheng County
Government administrative supervision and
management organization
Implementatio
n organization
Contractor Implement the environmental protection measures
of construction period
Consultation
organization Experts Group on the
Environment
Implement environmental review, consultation and
technical support according to the commission of
the project environmental management
organization
Environmental supervisor Manage the environmental supervision of the
contractor according to the commission of the
project environmental management organization
Project supervisor Sign and issue formal letters between the
environmental supervisor and the contractor
Environmental monitoring Undertake professional environmental monitoring
organization task according to the commission of the project
environmental management organization
10.1.2 Environmental Management Task of Each Stage of the Project
(1) Feasibility study stage
The main environmental management task of the feasibility study stage is environmental
assessment of construction project, and mainly comprises the compilation of
environmental assessment report and environmental management plan.
(2) Design stage
The main environmental management task of the project design stage comprises:
inspecting the final design report of the project, ensuring the various environmental
protection measures (environmental protection measures of project design, environmental
protection measures of construction period, and environmental protection measures of
operation period) proposed by the EA and included in the final design of the project.
(3) Bidding stage
The main environmental management task of the bidding stage of the project comprises:
ensuring the environmental protection measures of construction period provided by the
EA are included in the construction contract of the project.
(4) Construction stage
The main environmental management task of the bidding stage of the construction stage
comprises: implementing the environmental protection measures of construction period
provided by the EA and the monitoring plan of construction stage.
The environmental protection measures of construction period are specifically
implemented by the contractor, and the environmental supervisor is responsible for
supervising and managing the onsite construction activities of the contractor.
(4) Operational stage
The main environmental management task of the operational stage comprises:
implementing the environmental protection measures of construction period provided by
the EA and the monitoring plan of operational stage.
10.2 Information Exchange
Environmental management requirements necessary information exchange among the
different departments and positions of the project office, the owner, the contractor and the
operator of the organization, and simultaneously notices the relevant information to the
outside (the relevant parties and social publics and etc.).
The internal information exchange can be carried out in the form of meetings and internal
briefings and other method, but there must be a formal monthly meeting, all the
information exchanged should be recorded and archived. External information exchange
is carried out for every six months or one year, and the information exchanged with the
coordination unit should be formed into a summary and archived.
10.3 Recording Mechanism
For the effective operation of environmental management system, a comprehensive
recording system must be established, and the following contents should be recorded:
(1) Legal and regulatory requirements;
(2) Licensing;
(3) Environmental factors and related environmental impacts;
(4) Training;
(5) Inspection, check and maintenance activities;
(6) Monitoring data;
(7) Effectiveness of corrective and preventive measures;
(8) Information of related party;
(9) Audit;
(10) Review.
In addition, the records of the various types above must also be necessary in controlling,
and the records comprise identification, collection, cataloging, archiving, storage,
management, maintenance, inquiry, retention period, disposal and other sectors.
10.4 Reporting Mechanism
The contractors, operators, monitoring unit, environmental supervision engineers and
project office should record the project progress, the EMP implementation conditions and
the environmental monitoring results and the like in the project construction process, and
report the information to the relevant department in time. The record mainly comprises the
following six parts:
(1) The project environment supervision engineers should monthly and detailedly record
the implementation condition of the EMP in the month, timely provide the weekly and
monthly to the project owners and project office of Cheng County, wherein the weekly and
monthly reports should include the implementation of environmental protection measures,
as well as implementation condition of environmental monitoring and monitoring data.
(2) The contractor and operator should quarterly and detailedly record the project
progress and the implementation condition of the EMP, timely submit the quarterly report
to the project office, and simultaneously copy the quarterly report to the Environmental
Protection Agency of Cheng County.
(3) The monitoring unit should timely submit monitoring report to the contractor (carrier)
and the environmental supervision engineer when the monitoring task is completed;
(4) The project office of Cheng County should timely submit the project progress report of
the project office of Longnan City, and copy the report to the Environmental Protection
Bureau of Longnan City. The project progress report (such as monthly, quarterly, annual
reports and etc.) prepared by the project office must comprises the content of EMP
progress, e.g. the implementation progress and implementation effect of the EMP,
particularly the environmental monitoring results and etc.;
(5) In case of the special violation of environmental protection matter, environmental
supervision engineer and the project office will inform the matter to the local
environmental protection administration department, and report to the superior, if
necessary.
(6) The EMP implementation report of the project should be completed and submitted to
the World Bank before March 31, and the EMP implementation report can comprise the
following main contents:
① Implementation of training plan;
② Progress of projects, such as the diversion tunnel and road works on the dam, main
project of the dam, water pipeline construction progress and etc.;
③ Implementation of project environmental measures, implementation condition of
environmental monitoring and main monitoring results;
④ Public complaints, if there is a complaint, the main content of the complaint, the
solution and the public satisfaction should be recorded;
⑤ EMP implementation plan of the next year.
Environmental Management Plan for Cheng County Moba Gorge Water Source
Engineering of Gansu Province
Appendix
Appendix 1 Project Involves Environmental Standards
“Environmental Quality Standards for Surface Water” (GB3838-2002)
Appendix 1
No. Project name Standard value
(mg/L)
Grade
1 pH ( non-dimensional) 6-9
2 COD <= 20
3 NH3-N <= 1.0
4 Total nitrogen <= 1.0
5 Zinc <= 1.0
6 Selenium <= 0.01
7 Mercury <= 0.0001
8 Lead <= 0.05
9 Cyanide <= 0.2
10 Petroleum <= 0.05
11 Sulphide <= 0.2
12 Dissolved oxygen
>=
3
Standard of
Class III
13 BOD5 <= 4
14 Total phosphorus <= 0.2
15 Copper <= 1.0
16 Fluoride <= 1.0
17 Arsenic <= 0.05
18 Cadmium <= 0.005
19 Chromium (hexavalent) <= 0.05
20 Volatile phenol <= 0.005
21 Anionic surfactant <= 0.2
22 Dung escherichia coli (Pcs/L)) <= 10000
23 Potassium permanganate index <= 6
24 Water temperature (DEG C)
Threshold Value for Supplementary Item of Water Source
Appendix 1-2
No. Item name Maximum allowable concentration (mg/L)
1 Sulphate (by SO42-) 250
2 Chloride (by Cl-) 250
3 Nitrate (by N) 10
4 Iron 0.3
5 Manganese 0.1
“Ambient Air Quality Standard” (GB3095-1996)
Appendix 1-3
No.
Item
Pollutant concentration limit (mg/m3) Grade
Hourly average Daily average
1 PM10 / 0.15 Secondary
standard 2 NO2 0.24 0.12
3 CO 10.00 4.00
4 SO2 0.5 0.15
"Sound Environmental Quality Atandards" (GB3096-2008)
Appendix 1-4
Type Daytime dB (A) Nighttime dB (A)
Class II 60 50
"Environmental Quality Standard for Soils” (GB15618-1995)
Appendix 1-5
No. Item name Maximum allowable
concentration
Grade
1 Copper 35
2 Cadmium 0.20
3 Lead 35
4 Zinc 100
5 Mercury 0.15 Primary standard
6 Hexavalent chromium Lack of standard
7 Arsenic 15
8 Total chrome 90
9 sulphide Lack of standard
Note: As the river sediment is no uniform standards currently, the environment impact
assessment of the project is carried out by means of the "Environmental Quality
Standards for Soil" (GB15618-1995).
“Integrated Draining Standard of Sewage” (Gb8978-1996)
Appendix 1-6
No. Item name Unit Maximum allowable
concentration
Grade
1 pH value 6.0-9.0
2 Suspended matter mg/L 70
3 BOD5 mg/L 30 Primary standard
4 CODcr mg/L 100
5 Ammonia nitrogen mg/L 15
"Atmospheric Pollution Material Integrated Emission Standard" (GB16297-1996)
Appendix 1-7
Item name Unit Controlled concentration limit Grade
Particle mg/m3 The highest concentration of outer
concentration is 1.0
Fugitive emission
“Noise Limits for Construction Site” (GB12523-90)
Appendix 1-8
Construction
period Main noise source
Noise limit (dB)
Daytime Nighttime
Soil and stone Bulldozers, loader and excavator and etc. 75 55
Piling Various hammers and etc. 85 Prohibit
construction
Structure Concrete mixer, vibrating rod and electric saw
and etc.
70 55
Fitment Crane and lift and etc. 65 55
“Sanitary Standard for Drinking Water” (GB5749-2006)
Appendix 1-9
Index Unit Limit value
1. Microbiological index Total coliform MPN/100 ml Negative
Thermotolerant
coliform
MPN/100 ml Negative
2. Toxicological index Arsenic mg/L 0.01
Cadmium mg/L 0.005
Chromium
(hexavalent)
mg/L 0.05
Lead mg/L 0.01
Mercury mg/L 0.001
3. Sensory properties and general
chemical index
Chromaticity Platinum cobalt
chromaticity
15
Turbidity NTU 1
Smell and taste PH Without abnormal odor and
peculiar smell
PH Not less than 6.5 and not
more than 8.5
Aluminium mg/L 0.2
zinc mg/L 1.0
4. Radioactive indexes Total alpha activity Bq/L 0.5
Total beta activity Bq/L 1
Note: the radioactive indexes are guide values
Appendix 2 Detailed Project Environmental Management Standards of Contractor
In construction period, environmental protection is the responsibility of the contractor. The
article 19.1 of the soil mold engineering evaluation Contract of the International
Federation of Consulting Engineers (FIDIC) states that ―in the whole process of
construction, completion and repair other defects, the contractor should take all
reasonable steps to protect the site and its vicinity environment, so as to avoid the
pollution, noise or other results caused by construction and prevent the injury or prejudice
on human and property and other aspects.‖
1. Control measures of air environmental pollution
① Implement civilized construction during the construction period, develop the measures
for preventing dust pollution according to the construction plan, for example, adding
baffles, watering and timely removing earthwork, wherein the transport vehicles should be
covered with a canvas before leaving from the site to the road, meanwhile the material
should be prevented from loading/unloading in wind as much as possible.
② For powdery materials, they are piled up intensively and provided with covering and
sheltering measures to reduce the production of dust.
③ Regularly inspection the working site, subject the sensitive point to TSP monitoring,
and reform the overweight phenomenon in a given time.
④ For the construction which is in violation to the provisions or the problem did not be
reformed in time, administrative and financial penalties should be taken.
2. Control measures of water environmental pollution
① Production and living wastewater is strictly prohibited from discharging without treating,
the construction site should be provided with a wastewater collecting and depositing tank,
and the wastewater is used for watering to reduce the dust or used for concrete mixing
and the like after treating simply.
② The management of the construction site should be strengthened to prevent earthwork
and construction materials and the like from entering into the water close to the piling
place.
3. Control measures of noise environmental pollution
① Replace behind high-noise construction process with advanced low-noise construction
process.
② The speed of the bulldozers, excavators, loading and unloading vehicles should be
limited will accessing the site, and the maintenance of the mechanical equipment and
transport vehicles should be strengthened.
③ Reasonably arrange the schedule and construction time, and avoid the continuing
impact of strong-noise operating machinery on the surrounding residents.
④ Operate the equipment according to the provision, and minimize the impact noise.
⑤ When the construction site through schools, residential and other sensitive points, the
temporary noise barriers (walls) should be set, if necessary.
⑥ Regularly monitor the noise level of the sensitive point, and provide control measures
to the excessive points.
4. Control measures of ecological environmental pollution
① For the land and forest and the like must be occupied in the construction process, the
land acquisition must be completed before starting the project and must be in line with
relevant domestic regulations and the security policy OP4.12 of the World Bank and the
requirements of 4.20.
② For the temporary land occupation of construction, the mellow soil of cultivating in the
original land surface should be stacked aside and leveled when the construction is
completed, so as to restore the land surface.
③ Strengthen the education of the construction worker, promote civil construction, and
protect the wildlife in the construction area.
5. Control measures of solid waste pollution
① The construction waste and residues should be uniformly treated according to the
provisions of the relevant local department, the household waste will be subjected to
landfill in the designated landfill of the sanitation department.
② The solid waste and waste oil and the like generated in the construction site should be
intensively stacked in the designated place. When the construction is completed, the solid
wastes are sent to a refuse landfill to subject to landfill, and for the waste oil, the leaked oil
of construction machinery and the like will be collected by means of onsite leakage
collection method.
③ The construction waste and abandoned soil should be promptly disposed so as to
reduce the time for piling in the construction site.
6. Social environment safeguard measures
① According to the policies of land acquisition and resettlement and the compensation
methods of Chinese government and the region, the villagers involved in land acquired
will be provided with a reasonable compensation, and the suggestion of the villagers will
be listened carefully.
② Implement staged construction of the pipeline, so as to complete the excavation and
backfill work as soon as possible.
7. Environmental monitoring measures
Compliance with environmental monitoring plan of the project, and commission the
environmental monitoring station of Cheng County and the qualified soil and water
conservation monitoring unit to monitor the major environmental impacts, the conditions of
surrounding environmental quality and the soil and water conservation situation in the
construction period according to the frequency and point distribution requirements of the
monitoring plan.
Detailedly record the results for the implementation of environmental monitoring and
monitoring report, and involve that into monthly and quarterly reports, timely submit the
reports to the local project office, and copy the records to the local Environmental
Protection Agency.
8. Environmental supervision and water conservation supervision measures
The environmental supervision and water conservation supervision work should run
through the entire process of construction, so as to ensure the smooth development of
environmental protection work in the construction period of the project and ensure the
effective implementation of environmental protection measures and soil and water
conservation measures. In order to ensure that the environmental protection measures
and the soil and water conservation measures are completed according to the plan, and
the quality of the environmental project is ensured, the supervisor should be entrusted by
the owner and should have environmental project supervision qualification and water and
soil conservation supervision qualification; due to the stage and period implementation
characteristics of the project, three full-time supervisors and water conservation
supervisors are primarily considered, the establishment of other environmental
management personnel can be the staff of other departments in part-time according to the
requirements, and the number of the worker is determined according to the requirements.
8.1 Working method of environmental supervisor and water conservation supervisor
① Environmental supervision and water conservation supervision are involved in the
range of project supervision and are uniformly managed by the supervision management
department of the construction headquarters. The environmental supervisor and water
conservation supervisor will participate in monthly meeting of engineering director, and
submit weekly and monthly and the like contents to the chief inspector office.
② Regularly convene environmental supervision and water conservation supervision
conferences, solve the existing problems by combining with the recent environmental
supervision and water conservation supervision work, and provide the working plan of the
next stage.
③ The sub-departments of environmental supervision and water conservation
supervision will regularly convene environment supervision meetings monthly.
④ Form a complete onsite environmental protection management system, establish an
environmental protection lead group in each participation project department, wherein the
group is responsible for the environmental protection and lead work of the project
department, the organization is extended to the construction team and group, the
responsibility area is divided, and the person in charge is determined.
8.2 Content of environmental supervision and water conservation supervision work
① Environmental supervision of project preparation period:
Review the environmental protection articles in the "Construction Organization Plan"
compiled by the construction unit, inspect whether the environmental protection system
established by the construction unit is reasonable, participate, approve and submit the
application of ―Unit Project Start Report‖, and implement project supervision for the
construction of pollutant treatment project, and supervise the implementation.
② Environmental supervision and water conservation supervision of construction period:
Design and compile "Environmental Protection Focus" according to the construction
organization of each section, and propagandize environmental protection work to the
construction unit, point out environmental pollution sensitive point for the construction unit,
provide special environmental protection measures according to the main pollutant in the
construction process, check the ―Environmental Protection Plan of Project Construction‖
provided by the construction unit, inspect whether the operation of environmental
protection system of the construction unit is normal, and inspect the implementation
condition of the environmental protection measures and etc., and supervise the
construction of water and soil conservation measures. Supervise the implementation of
environmental monitoring plan, and supervise the monitoring result.
③ Environment supervision and water conservation supervision of project operation
period:
Review the ―Summary Report of Environmental Protection Work of Project Construction‖
developed and reported by the construction unit, file environmental protection completed
document and environmental protection acceptance inspection of the project item, and
compile ―Environmental Supervision Summary Report" and ―Summary Report of Water
Conservation Supervision Work‖ and etc.
8.3 Responsibilities of environmental supervision and water conservation supervision
① Supervisors should strictly carry out supervisory responsibilities, effectively play the
role of the supervision and management, so as to effectively implement the environmental
protection measures and soil and water conservation measures to be taken on the site,
and ensure the effective implementation of environmental protection work.
② Implement the propagandizing and implementation work of environmental protection
and soil and water conservation laws and regulations, improve the environmental
protection consciousness of the whole personnel participating in the construction to
consciously participate in and implement the environmental protection work well.
③ Develop staged environmental supervision and water conservation supervision plan,
subject the completion of unit project to environmental supervision and water conservation
supervision acceptance, and ensure the complete process of environmental protection
and complete data when the project is completed.
④ Sign environmental protection contract in the agreement in relation to the construction
project without bidding, review the content of environmental protection in the construction
organization design, add environmental protection sections with detailed contents in the
construction organization design.
⑤ Detailedly record the implementation of EMP of the project, compile weekly and
monthly reports, and timely submit the reports to the local project office and the
environmental protection agency.
Appendix 3 Detailed Project Environmental Management Standards of Project
Operation Department
The environmental management of operation period mainly comprises the following
aspects:
I. Management measures of operation technology
① Establish an operation management and operation responsibility system of treatment
facilities;
② Train the management personnel and the operator, establish technical assessment
files, and prohibit unqualified staff;
③ Hire an experienced professional and technical personnel who is responsible for
technical management;
④ Strengthen the maintenance and management of equipment and facilities, wherein the
key equipment should be provided with a standby machine;
⑤ Regularly visit the residents nearby the project, listen the suggestions, inform the
relevant environmental information, and coordinate the relationship with nearby residents
II. Environmental monitoring measures
Comply with project environmental monitoring plan, and commission the environmental
monitoring station of Cheng County and the qualified soil and water conservation
monitoring unit to monitor the major environmental impacts, the conditions of surrounding
environmental quality and the soil and water conservation situation in the construction
period according to the frequency and point distribution requirements of the monitoring
plan.
Detailedly record the results for the implementation of environmental monitoring and
monitoring report, and involve that into monthly and quarterly reports, timely submit the
reports to the local project office, and copy the records to the local Environmental
Protection Agency.
Appendix 4 Summary of Project Environmental Management Plan and
Environmental Action Plan of Construction Period
List for Environmental Management Plan of Construction Period
Table 4-1
Task Schedule Imple
menta
tion
organi
zation
Super
vision
organi
zation
Capita
l
source
Item Content of
environmental
management
Mitigation measures taken by
the project
Water
quality
protecti
on
Aggregate
washing
wastewater
management
Treat the wastewater with
sedimentation tanks
Completed ahead
of schedule while
using aggregate
system
Constr
uction
unit
In the
constr
uction
period
, the
enviro
nment
al
mana
geme
nt plan
is
superv
ised
by the
Enviro
nment
al
Protec
tion
Agenc
y and
the
Water
In the
constr
uction
period,
the
capital
requir
ed by
the
enviro
nment
al
manag
ement
plan is
obtain
ed
from
the
invest
ment
of the
main
project
Oily wastewater
management
Treat the wastewater with oil
separation tanks
Completed while
arranging the
construction site
Constr
uction
unit
Domestic
wastewater
Set pail latrine in the
construction camp to
implement centralized
wastewater collection and
treatment
Completed
before the
approach of the
construction
workers
Constr
uction
unit
Acousti
c
environ
mental
quality
control
Noise
generated by
construction
mechanical
equipment and
traffic
transportation
Control the operation time of
high-noise equipment and
transportation, reduce the
impact of the noise on the
residential area, and
strengthen personal labor
protection of the construction
workers
Simultaneous
with the
equipment while
putting into
operation
Constr
uction
unit
Environ
mental
air
quality
control
Dust and tail
gas of fuel
machinery
Select sealed sand producing
equipment to produce sand,
use wet method operation
while implementing
excavation and blasting
operations, provide a dust
collector for the concrete
mixing system, transport
Simultaneous
with the
equipment while
putting into
operation
Constr
uction
unit
concrete with a sealed
container, and implement
sealed raw material and
production transmission of
port to port
Author
ity of
Cheng
Count
y Solid
waste
disposa
l
Collection,
transportation
and treatment of
household
waste
Set garbage can and other
household waste collection
devices in the construction
living area
Completed
before entering
the construction
worker into the
camp
Constr
uction
unit
People
health
protecti
on
Health of
construction
workers body
Regularly check the body of
the construction workers and
disinfect the construction area
so prevent infectious
diseases
Completed
before entering
the construction
worker into the
camp, and
regularly
implemented in
the construction
period
Constr
uction
unit
Soil
and
water
conserv
ation
Water loss and
soil erosion
Timely restore construction
slash, and take
corresponding protection
measures in the construction
process.
Gradually
implemented by
following the
construction
period
Constr
uction
unit
Terresti
ral
ecosyst
em
Terrestrial
vegetation and
animal
The construction process
should be avoided from the
local wildlife activities as
much as possible, strictly
prohibit capturing activities,
and prevent the damage to
the vegetation outside the
project area
Gradually
implemented by
following the
construction
period
Constr
uction
unit
Person
nel
training
Construction technology and
management requirements training
Befoore
construction
Constr
uction
unit
List for Environmental Management Plan of Operation Period
Table 4-2
Task
Schedule
Implementati
on
organization
Superv
ision
organiz
ation
Capital
source
Item Content of
environme
ntal
managem
ent
Mitigation measures taken by the
project
Geolog
ical
Geological
disaster
Implement slope protection and
foot protection of the section
Before
impoundi
Water
Authority of
In the
operati
In the
operati
environ
ment
protecti
on
which is easy in occurring
landslide of the reservoir bank,
and strengthen the seismic
monitoring of the region
ng Cheng
County
on
period,
the
environ
mental
manag
ement
plan is
supervi
sed by
the
Enviro
nmenta
l
Protect
ion
Agency
of
Cheng
County
on
period,
the
capital
require
d by the
environ
mental
manag
ement
plan is
the
income
of water
supply
in the
operati
on
period
Aquati
c life
protecti
on
Aquatic life
Maintain the discharge amount
under the suitable living
conditions of the aquatic life, and
reasonably introduce foreign
species on the basis of scientific
argumentation so as to increase
the value of fishery resources
Release
young fish
in April to
June in
the
operation
period of
each year
Water
Authority of
Cheng
County
Water
quality
protecti
on
Water
quality
change
Complete the cleaning work of
the reservoir, and supervise the
quality of water
Completio
n before
completio
n
acceptanc
e
Water
Authority of
Cheng
County
Solid
waste
dispos
al
Household
waste
Reasonably set garbage can in
the living area to collect garbage,
regularly transport the garbage to
the household waste landfill field
to implement centralized
treatment
Completio
n before
completio
n
acceptanc
e
Water
Authority of
Cheng
County
Person
nel
training
Environmental basic theories and monitoring
methods, compilation of monitoring reports,
and job training
Before
reservoir
operation
Water
Authority of
Cheng
County
List for Environmental Action of Construction Period
Table 4-3
No. Monitoring
worksite
Monitoring content Monitoring
time
Implement
ation
organizatio
n
Supervisio
n
organizati
on
1 Constructio
n camp
Determine the construction area; set
enclosing material around the
construction site, and set pail latrine in
the site, wherein each construction site
is provided with two garbage cans; the
Xiaozhuang-Gumugou construction site
is provided with a primary
sedimentation tank and flocculation
sedimentation tank, and the place close
Before
construction
Constructi
on unit
Environm
ental
Protection
Agency of
Cheng
County
and
Environm
ental
to the concrete mixing system is
equipped with two sedimentation tanks;
the Majiaya Qiaotou machinery parking
area of left bank, Bashang achinery
parking area of left bank, Gumugou
machinery parking area of right bank,
Machinery parking area of sand and
gravel mining area and the Bashang
achinery parking area of right bank are
respectively provided with an oil
separation tank; the Majiaya Qiaotou
construction site of the left bank, the
construction site upstream the dam of
left bank, the Xiaozhuang-Gumugou
construction site of right bank, the dam
construction site between the
cofferdams, the construction site
upstream the dam of right bank and
water pipeline construction site and
other sites are provided with 1 to 2
blocks of terrestrial vegetation and
wildlife protection warning signs; the
drainage ditches are provided; and the
grouted stone pitching wall and
reinforced stone cage facilities
Protection
Agency of
Longnan
City
In the process of high-noise
construction, construction workers
should wear ear muffs and ear plugs; in
high-dust content construction process,
construction workers should wear
masks; water and dust are regularly
swept and removed; straw bag retaining
wall is set while implementing
temporary stacking, and the stacked
material will be covered
Construction
period
Implement backfill of the topsoil, land
remediation and vegetation restoration
After
construction
2 Constructio
n living area
Determine the living area; the living
area is provided with toilets and
garbage cans, drainage ditches,
grouted stone pitching wall and
reinforced stone cage facilities, wherein
when the topsoil is stripped, the
temporary stacking place should be
Before
construction
provided with straw bag retaining walls
and covered
Regularly watering to reduce dust,
implement cleaning and disinfection for
every three months
Construction
period
Implement backfill of the topsoil, land
remediation and vegetation restoration
After
construction
3 Water
pipeline
Set grouted stone pitching wall, set
straw bag retaining wall in the
temporary stacking place after stripping
the topsoil, and cover the stacking place
Construction
period
Implement backfill of the topsoil, land
remediation and vegetation restoration
After
construction
4 Road Grouted stone pitching wall and
reinforced stone cage facilities,
temporary stacking place should be
provided with straw bag retaining walls
and covered when the topsoil is
stripped, and the intercepting drain is
provided
Construction
period
Implement backfill of the topsoil, land
remediation and vegetation restoration
After
construction
5 Residues
place
Determine the range of the residues
place; provide reinforced stone cage
block; set surrounding intercepting
drain; set straw bag retaining walls in
temporary stacking place, and cover
Before
construction
Dry stone pitching; straw bag retaining
wall; and coverage of the slag after the
daily construction
Construction
period
Implement backfill of the topsoil, land
remediation and vegetation restoration;
and set slag top drainage ditch
After
construction
6
Quarry
Determine the mining area around
intercepting drain, set straw bag
retaining walls in the temporary
stacking place, and cover
Before
constructio
n
Spray mix bracing, bolting, slope
drainage holes;
Constructio
n period
Implement backfill of the topsoil, land
remediation and vegetation
restoration; and set slag top drainage
ditch
After
constructio
n
7
Main
project of
the dam
Scoping; dam dredging; surrounding
drainage ditches
Before
constructio
n
Grouted stone pitching wall, reinforced
stone cage facilities, slope bolting, and
surface concrete spray
Constructio
n period
Vertical green of excavated slope After
constructio
n
8 Flooded
area
Flooded area dredging Before
constructio
n
9 Diversion
tunnel
Spray mix bracing, bolting; scaffolding
support of inlet/outlet side walls and
roof arch. Framework composed of
combined templates
Constructio
n period
Lower gate blocking of the diversion
tunnel
Before
project
operation
10 Cofferdam Impermeable property of
high-pressure spray wall and
impermeable property of waistcoat
curtain grouting
Constructio
n period
Residues of cofferdam removal are
sent to the designated residue field
After
constructio
n
11 Ecological
measures
the Majiaya Qiaotou construction site
of the left bank, the construction site
upstream the dam of left bank, the
Xiaozhuang-Gumugou construction
site of right bank, the dam construction
site between the cofferdams, the
construction site upstream the dam of
right bank and water pipeline
construction site and other sites are
provided with 1 to 2 blocks of
terrestrial vegetation and wildlife
protection warning signs;
Before
constructio
n
Strengthen management, implement
regular inspection, prevent hunting
and fishing activities of the
construction workers
Constructio
n period
Renovate disturbed land, and restore
vegetation
After
constructio
n
Release young fish in April to June of
each year
Project