ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac...

141
.... MINISTRY OF INDUSTRY AND TRADE THE WORLD BANK RENEWABLE ENERGY DEVELOPMENT PROGRAM Credit code: IDA Cr.4564-VN ENVIRONMENTAL MANAGEMENT PLAN BAO LAM 1 SMALL HYDRO POWER PROJECT CAO BANG PROVINCE Cao Bang, September 2014 SFG2200 V8 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Transcript of ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac...

Page 1: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

....

MINISTRY OF INDUSTRY AND TRADE THE WORLD BANK

RENEWABLE ENERGY DEVELOPMENT PROGRAM

Credit code: IDA Cr.4564-VN

ENVIRONMENTAL MANAGEMENT PLAN

BAO LAM 1 SMALL HYDRO POWER PROJECT

CAO BANG PROVINCE

Cao Bang, September 2014

SFG2200 V8 P

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

ed

Page 2: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page i

TABLE OF CONTENTS

SCREENING OF SAFEGUAR POLICIES FOR SUBPROJECT UNDER REDP 1

1. INTRODUCTION 13

1.1. Project background 13

1.2. Project Donor and Participating Bank 13

1.3. Project objectives 13

1.4. Project management & EMP implementation 14

1.5. Legal documents of Vietnam Goverment on Environmental Imapct Assessment14

2. PROJECT DESCRIPTION 18

2.1. Location of project 18

2.2. Project description 19

2.3. Construction method 20

3. KEY ENVIRONMENTAL AND SOCIAL ISSUES 23

3.1. Environmental issues 23

3.2. Key Social Issues 39

4. MITIGATION MEASURES FOR NEGATIVE IMPACTS 41

5. ENVIRONMENTAL MONITORING PLAN 68

6. COMPLAINATION ON ENVIRONMENT AND PENALTY 86

7. ENVIRONMENTAL MANAGEMENT CAPACITY BUILDING PLAN 87

7.1. In the preparation phase 87

7.2. In the construction and operation phase 87

8. ENVIRONMENTAL MANAGEMENT COST ESTIMATION 88

9. PUBLIC CONSULTATION AND DISCLOSURE 89

9.1. Public consultation 89

9.2. Disclosure 93

Annex 1. List of EMP preparers 96

Annex 2. Responsibility of safe and environmental supervising officer 97

Annex 3. The approval documents on EIA of Bao Lam 1 HP 102

Annex 4. Minute of Public Consultation Meetings 109

Annex 5. Some pictures of consultation meetings 136

Page 3: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page ii

LIST OF TABLE

Table 2-1: Parameters of main components of Bao Lam 1 Hydro Power Project 19

Table 3-1 Environmental issues of project 23

Table 3-2 Land acquisition by main components in detail 38

Table 3-3 Permanent acquistion by land use in detail 39

Table 3-4 Key Social Issues 39

Table 4-1 Key Mitigation and Management Measures 42

Table 5-1 Parties involved in environmental monitoring 68

Table 5-2 Environmental monitoring plan 70

Table 5-3 Form of in-site environmental monitoring report 78

Table 5-4 Form of EMP implementation monitoring report 81

Table 5-5 Requirements on environmental management reporting system 84

Table 6-1 Cost estimation for environmental management capacity building 87

Table 7-1 Estimated cost for EMP implementation 88

LIST OF FIGURE

Figure 1: Location of Bao Lam 1 Hydro Power Plant in Cao Bang Province 18

Page 4: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page iii

ABBREVIATIONS

BIDV Bank for Investment and Development of Vietnam

MONRE Ministry of Natural Resource and Environment

DSP Dam Safety Panel

EIA Environmental Impact Assessment

EMP Environmental Management Plan

ESF Environmental Safeguard Framework

GDoE General Department of Energy

MOIT Ministry of Industrial and Trade

REDP Renewable Energy Development Project

SHP Small Hydropower Project

TCVN Vietnam Standard

PPC Provincial People’s Committee

PMU Project Management Unit

WB World Bank

Page 5: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 1

SCREENING OF SAFEGUAR POLICIES FOR SUBPROJECT UNDER REDP

TABLE A. BAO LAM 1 HYDRO POWER PROJECT SCOPING CHECKLIST

ISSUE RELEVANT? OUTCOME

Is the subproject located in or near a

national park or other government

designated protected area?

No

If a dam, is the subproject more than

15 m in height? Yes DSP has reviewed

If a dam, is the subproject more than

3 million cubic meters in capacity? Yes DSP has reviewed

Will the subproject result in change

of land use and resettlement of

affected people?

Yes

- Project acquired

agricultural and

residential land and

need to resettle people;

- Resettlement plan

has been made

Do ethnic minorities live or use the

area affected by the project? Yes

Ethnic plan has been

made.

Will the subproject affect physical

or cultural resources that may be

significant?

No

Is the subproject situated on or near

to an international waterway? Yes

The Bao Lam 1 small

hydropower plant

located on the Gam

river after intersection

of Gam river and Nho

Que river. Gam River

is an international river

originates from Yunnan

Province (China),

enters into Vietnam in

the province of Cao

Bang. Nho Que River

(up stream, called Pho

Mai River in China) is

a river originating from

mountainous Son

Nghiem (Yunnan,

Page 6: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 2

ISSUE RELEVANT? OUTCOME

China) 1,500 m high,

running from

northwest-southeast,

sawed through Dong

Van Plateau, through

the districts of Dong

Van, Meo Vac, Ha

Giang province to join

the Gam river at Na

Nat commune in Ly

Bon, Bao Lam district,

Cao Bang province.

Therefore, the policy of

international

watercourses have

applied for this project.

Has an EIA been completed?

Yes

EIA was approved by

Cao Bang PPC by

Decision No.

1100/QD-UBND dated

4th

August 2014.

Have all Approvals from Cao Bang

Province’s People’s Committee

been obtained?

Yes

Has public consultation of those

people potentially affected by the

subproject been undertaken?

Yes

Consultation meetings

were held by investor

with participants from

representatives of

affected households

and local authorities

Bao Toan commune,

Bao Lac district and

Vinh Quang, Ly Bon

communes, Bao Lam

district, Cao Bang

province.

Has an environmental management

plan been completed? Yes

Will the subproject affect

downstream flows, ecology and Yes Consideration was

taken during

Page 7: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 3

ISSUE RELEVANT? OUTCOME

those living downstream? preparation of EMP

Have construction impacts been

fully mitigated? Yes

Consideration was

taken during

preparation of EMP

Will the subproject result in

construction of new access roads

and how will access be managed?

Yes

Consideration was

taken during

preparation of EMP

Will the subproject result in

construction of a new transmission

line?

Yes

Consideration was

taken during

preparation of EMP

TABLE B: BAO LAM 1 HYDRO POWER PROJECT

PRESCREENING DOCUMENT CHECKLIST

DOCUMENT

INCLUDED?

Feasibility Study Yes

Approved EIA Yes

Environmental Management Plan Yes

Resettlement Plan Yes

Ethnic Minority Plan Yes

EIA Approvals from Cao Bang PPC Yes

Dam safety review by Dam Safety Panel Yes

Other approvals: if required

Page 8: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 4

TABLE C. SCREENING OF WB’S SAFEGUARD POLICIES

Environmental Assessment (OP/BP 4.01): potential environmental impacts of the

subproject includes those relevant to land acquisition and construction activities; those

relevant to conversing land to reservoir and changing flows in downstream

environment; impacts at downstream on water quality and aquatic bio-diversity; those

relevant to finding, collecting, transporting and storing biomass fuel; land using

contradict biomass production or reservoir construction; and those in operation phase

such as noise and waste management. These impacts can increase cumulative effects

of the rapid development such as upstream and downstream hydropower and

environmental flows. However, these impacts are mitigative.

ENVIRONMENTAL SAFEGUARD

SCREENING CRITERIA

APPLIES, YES

OR NO

(tick )

OP/BP 4.04: Natural Habitats

Natural habitats are defined as land and water areas where the ecosystems'

biological communities are formed largely by native plant and animal species,

and human activity has not essentially modified the area's primary ecological

functions

1. Is the subproject located within any National Biological

Conservation Areas, (NBCAs),

National/Provincial/District Protected Areas (NPAS,

PPAs, DPAs)? (If yes, subproject is excluded)

Yes

No

2. Will the subproject result in significant degradation or

conversion of habitats and/or forests in protected areas,

proposed protected areas or areas that are considered of

special ecological significance? If yes, what is the

consequence? (If yes, subproject is excluded)

Yes

□ No

3. Will the subproject aim to bring about changes to the

management, protection, or utilization of natural forests or

plantations, whether they are publicly, privately, or

communally owned? (If yes, subproject is excluded)

Yes

□ No

4. In the case of a biomass subproject, will the subproject

undertake commercial harvesting of forests (e.g., for fuel

for biomass plant)?

(If yes, subproject is excluded)

Yes

No

Page 9: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 5

* The Project does not withdraw land at sensitive area, the the project will not

enchroament any forested area.

ENVIRONMENTAL SAFEGUARD

SCREENING CRITERIA

APPLIES, YES OR

NO

(tick )

OP/BP 4.10: Ethnic Minorities (Indigenous People)

Are ethnic minority people present/reside in the

project area?*

YES

NO

* Result from the surveys shows that land from sensitive areas is not acquired for

project

5. Is the subproject located within the buffer zone of any

National Biological Conservation Areas, (NBCAs),

National/Provincial/District Protected Areas (NPAS,

PPAs, DPAs)? (if yes, subproject is eligible but requires

permit)

Yes

□ No

6. Will the subproject affect a forested area? (If yes,

subproject is eligible but requires permit of the owner or

of the district’s People’s Committee).

Yes

No

Based on the above screening, does OP/BP 4.04 apply? Yes

□ No

If the answer to any of Questions 1-4 is YES, OP/BP 4.04 will apply and the

subproject is NOT ELIGIBLE for refinancing.

ENVIRONMENTAL SAFEGUARD

SCREENING CRITERIA

APPLIES, YES

OR NO

(tick )

OP/BP 4.11: Physical Cultural Resources Physical cultural resources

include movable or immovable objects, sites, and structures, groups of

structures, natural features and landscapes that have archeological,

paleontological, historical, architectural, religious, aesthetic or other cultural

significance.

Will the subproject cause temporary or permanent

relocation or any other type of impact on physical

cultural resources known to be of local, regional or

YES

NO

Page 10: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 6

national significance based on national or Provincial lists,

proposed national or Provincial lists and/or identified

during public consultation with local affected groups?

Are any physical cultural resources considered especially

important or sensitive particularly to local groups (e.g.

tomb sites)?

YES

□ NO

Are chance find procedures in place? YES

NO

Based on the above screening, does the physical Cultural

Resources Apply?

NO

ENVIRONMENTAL SAFEGUARD

SCREENING CRITERIA

APPLIES,

YES OR NO

(tick )

OP/BP 4.12 Involuntary Resettlement

The Involuntary Resettlement safeguard will apply in those situations

involving involuntary taking of land and involuntary restrictions of access to

legally designated parks and protected areas. The policy aims to avoid

involuntary resettlement to the extent feasible, or to minimize and mitigate its

adverse social and economic impacts

1. Is any land used by people/organizations likely to be

acquired as a result of the subproject? Yes

No

2. Will any subproject activity involve restrictions of use

on adjoining land?

Yes

No

3. Is land ownership affected by the subproject? Yes

No

4. Will there be a loss of housing or assets or incomes of

local people/organizations? Yes

No

5. Will there be a loss of housing ? Yes

No

6. Will there be a loss of crops, trees, and other fixed assets?? Yes

No

7. Will there be a loss of incomes and livelihoods? Yes

No

Page 11: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 7

*There are 9 households have to resettlement, compensation plan was prepared.

ENVIRONEMENTAL SAFEGUARD

SCREENING CRITERIA

APPLIES, YES

OR NO (tick )

8. Will there be a loss of infrastructure, services and

resources? YES

□ NO

9. Will there be a loss of job or business? YES

NO

10. Will any social or economic activities be affected by land

use related changes? Yes

No

11. Will there be a loss of common land, grazing land, fishing

area of local community? YES

□ NO

12. Will there be a loss of medical stations, cemeteries,

pagodas, community center or local traffic roads? YES

□ NO

13. Will local people’s access to drinking water source, water

supply system, internal roads, power source and other energy

sources be affected?

YES

NO

14. Based on the above screening, does OP/BP 4.12

Apply and is a Resettlement Plan required?* Yes

No

OP/BP 4.37 Dame Safety Policy

1. Is the dam height is 15 meters or greater? Yes

No

2. Is dam storage 3 million cubic meter or more? Yes

No

3. The dam height is between 10 and 15 meters but the

dam presents special complexities (for example large

flood-handling requirement, location in a zone of high

seismicity, foundations that are complex and difficult to

prepare, or retention of toxic materials?

Yes No

4. Is the dam is expected to become a large dam during the

operation of the facility?

Yes

No

5. Based on the above screening is the REDP subproject

considered to be a large dam and will a Dam Safety

Assessment be required?

Yes

No

Page 12: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 8

ENVIRONMENTAL SAFEGUARD

SCREENING CRITERIA

APPLIES, YES

OR NO (tick )

* The Bao Lam 1 small hydropower plant located on the Gam river after

intersection of Gam river and Nho Que river. Gam River is an international river

originates from Yunnan Province (China), enters into Vietnam in the province of

Cao Bang. Nho Que River (up stream, called Pho Mai River in China) is a river

originating from mountainous Son Nghiem (Yunnan, China) 1,500 m high, running

from northwest-southeast, sawed through Dong Van Plateau, through the districts

of Dong Van, Meo Vac, Ha Giang province to join the Gam river at Na Nat

commune in Ly Bon, Bao Lam district, Cao Bang province. Therefore, the policy of

international watercourses have applied for this project.

OP/BP 7.50 Projects on International Waterways

The objective of OP/BP 7.50 is to ensure that World Bank-financed projects

affecting international waterways would not affect relations between the World

Bank and its Borrowers and between states and also not affect the efficient

utilization and protection of international waterways. It applies to projects that

involve the use and/or potential pollution of international waterways. OP/BP

7.50 does not apply to run of the river projects.

Is the subproject the first subproject downstream of a river

that flows from another country? YES

NO

Is the proposed subproject the last project on a river that

flows into another country? YES

NO

Will the subproject utilize water from or into a river or

river tributary that flows to or through or forms a border

with a neighboring country?

YES

NO

Will the subproject discharge water from or into a river or

river tributary that flows to or through or forms a border

with a neighboring country?

YES NO

If a biomass subproject, does the subproject utilize or

discharge water from, or into a river or river tributary that

flows to a neighboring country, or that forms a boundary

with a neighboring country.

YES NO

Page 13: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 9

Overall Safeguard Compliance

Does the subproject comply with the aforementioned

World Bank Safeguards?

YES

NO □

Based on the screening results above it could conclude that Bao Lam 1 Hydro Power

project is categorized B level of WB environmental safeguard policy.

Page 14: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 10

TABLE D: ENVIRONMENTAL CONCERNS AND EMP REQUIREMENTS

Issue or Environmental Concern

(Note: Social issues and concerns are dealt

elsewhere)

Is Issue or Concern

Addressed in EIA? Yes

or No

(tick )

Is Issue or Concern

Addressed in EMP?

Yes or No

(tick )

Required Action or

Follow-up

YES NO YES NO YES

Air quality impacts on local communities?

Noise?

Dust?

Is in a Seismically Active or Geotechnical

Unstable Area?

Affects Integrity of Protected Areas?

Impacts on Migratory, Rare, Threatened or

Endangered Species?

Impacts on Biodiversity?

Considers Downstream Impacts?

Affect Environmental Flows?

Affect Downstream Water Quality?

Page 15: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 11

Issue or Environmental Concern

(Note: Social issues and concerns are dealt

elsewhere)

Is Issue or Concern

Addressed in EIA? Yes

or No

(tick )

Is Issue or Concern

Addressed in EMP?

Yes or No

(tick )

Required Action or

Follow-up

YES NO YES NO YES

Affects Fish or Fisheries?

Considers Off-site Impacts (e.g. Borrow

Pits and Aggregates)?

Aesthetic and Visual Impacts?

Impacts Cultural Property or Resources?

Causes Increased Erosion and

Sedimentation During Construction?

Involves Construction of New Access

Roads?

Involves Construction of Worker

Camp(s)?

Has Chance Find Procedures In Place for

Physical and Cultural Resources?

Has Waste Management Plan (Solid and

Page 16: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 12

Issue or Environmental Concern

(Note: Social issues and concerns are dealt

elsewhere)

Is Issue or Concern

Addressed in EIA? Yes

or No

(tick )

Is Issue or Concern

Addressed in EMP?

Yes or No

(tick )

Required Action or

Follow-up

YES NO YES NO YES

Liquid Wastes) in Place?

Is there a Reclamation Plan In Place?

Have Subproject Contingency and

Notification Plan in case of Accident or

Event (e.g. Release)?

Has Included EMP and Environmental

Protection Measures as Part of Contract

Provisions?

Has EMP Monitoring and Supervision

Procedures in Place?

Includes Costs and Timeline for EMP?

Are there any other issues of concern

about the subproject that is listed in the

EIA over and above the aforementioned

issues that should be addressed?

Page 17: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 13

1. INTRODUCTION

1.1. Project background

Bao Lam 1 small hydropower project is invested by Hydropower Construction Joint

Stock Company 1. The project is located on Gam river which flows through

communes of Ly Bon, Vinh Quang communes, Bao Lam district and Bao Toan, Bao

Lac district, Cao Bang province

Gam river is the primary tributary of Lo river and the second tributaty of Red river. It

derives from the high mountain region at altitude over 1600 m of Van Nam, China.

Total basin area of Gam river is 17,200km2, the area located in China is 7,420km2

share of 43%, with total length is 297km, where about 217km located in Vietnam. Nho

Que 3 Hydropower plant is the upper-level of Bao Lam 1 hydropower plant.

Bao Lam 1 hydropower project utilize the water energy from Gam and Nho Que river.

The headwork of Bao Lam 1 hydro power located along Gam river and closed to

National highway No. 34 and No. 4C. The dam of Bao Lam 1 hydro power located

after intersection of Gam river and Nho Que river and around 500m far from Ly Bon

bridge in upstream in Ly Bon commune, Bao Lam district, Cao Bang province. The

reservoir of project is located in communes of Vinh Quang and Ly Bon, Bao Lam

district, and Bao Toan, Bao Lac district, Cao Bang province.

It is located at Northern latitude: 22o56’30’’ and Eastern longitude 105

o32’56’’.

The Bao Lam 1 small hydro power project with the capacity of 30 MW, annual

electricity production of 115,7 x 106 kWh, categorized open after dam with

impoundment, regulated by reservoir. The headwork consists of gravity concrete dam

with 28 m length, 24.5 m height, spillway located between main dam and regulated

valve with 107.5 m length. The left bank energy route includes intake, powerhouse,

discharge canal, and 110kV distribution station.

Bao Lam 1 hydropower was additional into master plan of small hydropower of Cao

Bang province and it was approved by Cao Bang Provincial People’s Committee to

allow Hydropower Construction Joint Stock Company No.1 preparing investment

report in Investment Letter No. 11121000149 dated 21/8/2013.

1.2. Project Donor and Participating Bank

Bao Lam 1 small hydropower plan project expects to be refinanced from REDP

funded by WB through the Bank of investment development Vietnam (BIDV), Hanoi

branch.

1.3. Project objectives

The main objective of subproject is to exploit effectively the water resource and

natural topographical features of the local area to produce electricity with its annual

average power generation up to 115.7 million kWh. It supports to increase power

generation of the national power system, it helps to meet local electrical power

demand and to improve the local budget.

Page 18: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 14

The project also brings great significance to improve infrastructure, life quality for the

local people in the remote area of Bao Lam and Bao Lac districts, Cao Bang province

that is facing many difficulties due to its poor infrastructure and backward customs.

1.4. Project management & EMP implementation

Investor: Power Construction Joint Stock Company No.1

Feasibility Study consultant: Power Engineering Consultant Company No 1 (PECC1)

The investor assigned for Project Management Unit under Power Construction Joint

Stock Company No.1 to manage and supervise the project implementation. An

environmental and social staff has been assigned by project management unit to

manage all projects’ environmental activities.

According to the WB regulations, investor is responsible for preparing and complying

to EMP. The environmental consultant supports investor to prepare EMP following

ESF under REDP which was approved by MOIT and no objection by WB.

According to the Vietnamese regulations, the reservoir’s gross storage corresponding

to the normal water level I 8,89 million m3 so the Environmental Impact Assessment

Report was prepared by investor and it was approved by Cao Bang PPC by the

decision No. 1100/QD-UBND dated 04/8/2014.

1.5. Legal documents of Vietnam Goverment on Environmental Imapct

Assessment

Government legal framework

The Law on Land approved by National Assembly of the Socialist Republic

of Vietnam dated 29/11/2013

Law on Water resources passed on June 21, 2012, by the 13th National

Assembly of the Socialist Republic of Vietnam at its 3rd session

The Law on Environmental Protection approved by the National Assembly of

the Socialist Republic of Vietnam dated 29th November, 2005.

The Law on Forest Protection and Development approved by the National

Assembly of the Socialist Republic of Vietnam dated 3/12/2004

The Electricity Law approved by the National Assembly of the Socialist

Republic of Vietnam dated 03/12/2004

Decree No: 44/2014/ND-CP date 15/05/2014 Regulation on Land Price.

Decree No. 47/2014/ND-CP providing compensation, support, resettlement

when land is recovered by the State

Decree No. 106/2005/ND-CP date 17/08/2005 regulation on detailing and

guiding the implementation of a number of articles of the electricity law on

protection of safety of high-voltage power grid works

Page 19: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 15

Decree No. 23/2006/ND-CP date 3/3/2004 on the implementation of the law

on forest protection and development

Decree No. 59/2007/NĐ-CP dated 9/4/2007 on solid waste management.

Decree No. /2007/NĐ-CP dated 7/5/2007 on Dam safety management

Decree No. 112/2008/NĐ-CP dated 20/10/2008 on management, protection

and integrated exploitation of resources and environment of hydropower and

irrigation reservoirs.

Decree No. 81/2009/NĐ-CP dated 12/10/2009 on Amending or supplementing

a number of Articles of the Government's Decree No. 106/ 2005NĐ-CP dated

August 17, 2005, which details and guides a number of articles of the electricity

law regarding the safe protection of high-voltage power grid works

Decree No.29/20 II/ND-CP dated 18th April, 20 II of the Government on

strategic environmental assessment, environmental impact assessment and

environmental protection commitment.

Decree No. 67/2012/NĐ-CP dated 10/9/2012 on Amending or supplementing

a number of Articles of the Government's Decree No. 143/2003/NĐ-CP dated

28/11/2003 on Detailing the implementation of a number of articles of the

ordinance on exploitation and protection of irrigation works.

Decree No. 201/2013/NĐ-CP dated 27/11/2013 of the Government on details

regulation of some articles of Water Resource Law.

Circular No24/2013/TT-BNNPTNT date 06/5/2013 of MARD on provisions

on replacement afforestation upon conversion of forest use purpose to other

purposes.

Circular No.26/20111TT-BTNMT dated 18th July, 2011 of the Ministry of

Natural Resources and Environment, detailing a number of articles of the

Government's Decree No. 29/2011lND-CP dated 18th April, 2011 on strategic

environmental assessment, environmental impact assessment and environmental

protection commitment.

Circular No. 12/2011lTT-BTNMT dated April 14th , 2011 of the Ministry Of

Natural Resources and Environment stipulating hazardous waste management.

Decision No. 186/2006/QĐ-TTg dated14/8/2006 pf Prime Minister on

promulgating the regulation on forest management

Decision No. 2704/2008/QD-BCT dated 02/08/2008 of MoIT to approve the

Master plan of cascade Hydro powerplant on Gam River.

Page 20: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 16

Decision No. 12/2008/QĐ-BCT dated 17/ 6/2008 of MoIT to promulgate the

national technical regulation on electrical safety

Decision No. 2154/QĐ-BCT dated 07/4/2008 MoIT on Approving the

Adjusment of Small hydropower development plan .

Decision No. 16/2008/QĐ-BTNMT dated 31/12/2009 of MARD on

Promulgation of national technical regulation on environment.

Circular No. 28/2011/TT-BTNMT dated 01/8/2011 of the Ministry of Natural

Resources and Environment on regulating monitoring technique procedure on

ambient air quality and noise;

Circular No. 29/2011/TT-BTNMT dated 01/8/2011 of the Ministry of Natural

Resources and Environment on regulating monitoring technique procedure on

inland surface water quality;

Circular No. 30/2011/TT-BTNMT dated 01/8/2011 of the Ministry of Natural

Resources and Environment on regulating monitoring technique procedure on

underground water quality

Decision No. 3221/2009/QĐ-UBND dated 28/12/2009 of Cao Bang PC on

Assigning the environmental and natural resources management responsibility in

Cao Bang Province.

Decision No. 878/QĐ-TCMT dated 01/7/2011of National Environmental

Protection Agency on technical guidance on air quality index evaluation.

Decision No. 1208/QĐ-TTg dated 21/7/2011 on Approving the National

master plan for Power development in the 2011-2020 period, with considerations

to 2030.

The master plan for Power development in Northern Mountain areas in the

2011-2020 period, with considerations to 2025 which prepared by Energy Institute

10/2011.

Decision No. 6620/QD-BCT dated 19/12/2011 of MoIT to approve the

adjusment of master plan of cascade hydro powerplant on Gam River.

Decision No. 2011/QĐ-UBND dated 19/12/2012 of Cao Bang PC on approval

the Master plan on exploying and protection the water resources within Cao Bang

provice to 2020;

Decision No. 2324/QĐ-UBND dated 23/12/2013 of Cao Bang PC on approval

the Master plan on Provincial Solid waste management to 2025

Decision No. 259/QĐ-UBND dated 17/03/2014 of Cao Bang PC on

Promulgation of the list of natural resource and environmental databases.

Technical standards

Page 21: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 17

QCVN 05:2013/BTNMT - National technical regulation for ambient air quality.

QCVN 40:2011/BTNMT - National technical regulation on industrial

wastewater quality

QCVN 26:2010/BTNMT - National technical regulation on noise

QCVN 27:2010/BTNMT - National technical regulation on vibration

QCVN 19: 2009/BTNMT - National Technical Regulation on Industrial

Emission of Inorganic Substances and Dusts.

QCVN 02 : 2009/BYT- National technical regulation on domestic water

quality.

QCVN 03:2008/BTNMT - National technical regulation on the allowable limits

of heavy metals in the soils.

QCVN 08:2008/BTNMT - National technical regulation on surface water

quality.

QCVN 09:2008/BTNMT - National technical regulation on underground water

quality.

QCVN 14:2008/BTNMT - National technical regulation on domestic

wastewater quality.

QCVN 02:2008/BCT - National technical regulation on safety in the storage,

transportation, use and disposal of industrial explosive materials

TCXDVN 33:2006 Water supply - Distribution System and Facilities Design

Standard

Page 22: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 18

2. PROJECT DESCRIPTION

2.1. Location of project

Bao Lam 1 hydropower project utilize the water energy from Gam and Nho Que river.

The headwork of Bao Lam 1 hydro power located along Gam river and closed to

National highway No. 34 and No. 4C. The dam of Bao Lam 1 hydro power located

after intersection of Gam river and Nho Que river and around 500m far from Ly Bon

bridge in upstream in Ly Bon commune, Bao Lam district, Cao Bang province. The

reservoir of project is located in communes of Vinh Quang and Ly Bon, Bao Lam

district, and Bao Toan, Bao Lac district, Cao Bang province.

The location of Hydropower is in the right bank energy route - Figure 1.

It is located at Northern latitude: 22o56’30’’ and Eastern longitude 105

o32’56’’.

The main project components including headwork and energy route. The headwork

consists of concrete dam, spillway, flooding discharge drain and sand discharge drain.

The energy route includes intake, power house and switchyard. The whole project

components are located in Ly Bon commune, Bao Lam, Cao Bang province.

A 100m transmission line will be constructed to national grid by 110 kV transmission

line and 110 kV transmission station which will be located about 100 m from Bao Lam

1 hydropower plan. The transmission line is within Ly Bon commune, which also

located in the vacant or cultivation areas, there are no households in this area.

Figure 1: Location of Bao Lam 1 Hydro Power Plant in Cao Bang Province

Bao Lam 1 Hydro

power project

Page 23: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 19

2.2. Project description

Table 2-1: Parameters of main components of Bao Lam 1 Hydro Power Project

No. Parameter Unit Value

1 2 3 4

I Catchment

1 Catchment area Km2 10,356

2 Main river length Km 123

3 Annual average rainfall mm 1,624

4 Annual average flow rate (Q0) m3/s 193

5 Gross storage 106

m3 6,090

6 Maximize flooding

P = 0,2% (and NQ3) m3/s 9,346

P = 1% m3/s 6,508

P = 5% m3/s 4,611

P = 10% m3/s 3,860

II Reservoir

1 Normal water level (MNDBT) m 163.00

2 Death water level (MNC) m 160.00

3 Water level corresponding to P=0,2% m 168.01

4 Water level corresponding to P=1% m 163.75

5 Total reservoir capacity (Wtb) 106

m3 8.89

6 Useful capacity (Whi) 106

m3 3.41

7 Death capacity (Wc) 106

m3 5.48

8 Surface area corresponding to normal water

level Km

2 1.19

III Water flow through powerhouse

1 Maximize water flow Qmax m3/s 365

IV Water volume

1 Max height of water level (Hmax) m 13.1

2 Min height of water level (Hmin) m 7.3/4.3

Page 24: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 20

No. Parameter Unit Value

3 Average height of water level (Htb) m 10.0

4 Designed height of water level (Htt) m 9.20

V Water level in down stream

1 Max height of water level corresponding to

P=0,2% m 163.7

2 Max height of water level corresponding to

P=1% m 161.2

2 Max height of water level corresponding Qmax

2 (two generator operation) m 152.01

3 Max height of water level corresponding Qmax

1 (one generator operation) m 151.04

VI Capacity

1 Installed capacity (Nlm) MW 30

2 Capacity with Operation 90% MW 3.0

VII Electricity production

1 Annual electricity production Eo 106

kWh 115.7

2 Operation with installed capacity Hours 3,857

Source: Feasibility study report of Bao Lam 1 Hydropower subproject

2.3. Construction method

Material, equipments: Total rock demand for project construction is 70.103

m3. This

amound of material will be exploited in the near by mine which located on national

highway No. 43. The total sand demand is 45.103 m

3 which will be produced in rocks

mine and transported to the project site. The Investor has been submited the documents

for license of stone exploition at Khuoi Choong quarry located at the pac Ra village,

Ly Bon commune, Bao Lam district. The intend exploited vollume is around 30,000

m3 and exploited area is 0.5ha, the exploited duration is until 31/12/2015 . The

documents have been submited to Cao Bang DONRE for approval, thus the types and

copce of impacts from sand exploition activities will be updated since the permission

license has been issued.

Other material such as concrete, steel, fuel, lubricant etc is bought from Ha Giang city

with around 102km far from the site or from Cao Bang city with 153 km far from the

project site.

For the imported equipment will be transported by sea ships to Haiphong Port then

carried by trucks thourgh NH 2 and 34 to the site, with total lengh of these route is

500km.

Page 25: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 21

Other domestic equipment will be transported by railway or inland waterway/seaway

to Hanoi city then arried by trucks to the project site via NH 2 and 24 with total lengh

is 380 km.

Transportation:

Access road: is the main road being to use in the operation phase and also used during

construction phase.

Temporary road for construction activites: is the main road being to use only in the

whole construction phase .

Temporary road several construction activites: is the road that use for only several

certain construction activites and will be closed since these activties completed. Totol

length of this type of road is 0.8 km.

Swichtyard and transmission line: Electricity supply for main activties on the site

such as equipment operation, worker camps, management house ...with total demand

for consutruction sites is 2MW via 5 transformer stations. Electricity for construction

is suplied from 35kV national transmission line at Ly Bon about 500m far from the

site. The 35/0.4 kV transformers are provided at construction/auxility facilities areas.

Moreover, diesel electric generators with total capacity of 500 KVA will be provided

on the management houses for the case of electricity shutdown from 35kV line.

Electricity grid for construction activities combine transformal and distribution

stations (35/0,4kV), and sublines (0,4kV). 0,4 kV lines will be provided from

35/0,4kV transformers to households. The 0,4 kV lines will only use in the

consutruction phase with simple structures and removablility, foundation by

prefabricated concrete, steel colume 130 mm and 0.5m in height.

Construction organization: Bao Lam 1 hydropower project may take 2 years to

complete the construction phase. The fist year (10/2014 - 9/2015) will focus on

resetlement activities, auxility facilities area preparation, excavation/backfilling and

placing concrete at spillway, dam foundation excavation on right banks. The second

year will focus on dam foundation excavation on right banks, placing concrete at

spillway.

Water supply: Water for construction is taken from Gam river. Total demand of

consutruction water is 700 m3/day.night. Water for fire prevention is 30 l/s. A water

treamant station will be provided at the left hand site of main dam, the water will be

taken from Gam river (at the section before confluence with Nho Que river). The

water after treating will be disbuted to construction site, D = 200mm line will be used

to take water from river to treatment station and D = 50mm line will be used to

distribute water to construction site.

Domestic water supply: Domestic water is taken from slots in the higher regions and

wells then filtered by man-made. Total domestic water volume is estimated around 12

m3/day. night.

Campsites and auxility facilities: Total are of construction site is 8.6 ha, where 7.1 ha

of auxility facilities, 0.4 ha of public areas, 0.5 ha of worker camps and management

Page 26: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 22

area. The auxility facilities ussualy will be used in very short time, which constructed

by the temporary structures and material which could be easy for assemble.

Page 27: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 23

3. KEY ENVIRONMENTAL AND SOCIAL ISSUES

3.1. Environmental issues

Table 3-1 Environmental issues of project

No. Impacts Impact description

PREPARATION AND CONSTRUCTION PHASE

1 Land acquisition Total area of acquired land for project is 103.91

ha

Permanent acquired land is 103.91 ha of which:

- 24.09 ha of agricultural land (4.05ha of one

harvest time rice land ), 0.93 ha of residential

land , 12.95 ha of forest product trees and 65.94

ha of other land;

- The whole of acquired land is located in Ly Bon,

Vinh Quang and Bao Toan communes.

Temporary acquired land: to build up worker

camps, disposal sites, and materials field.

(Refer Table 3.2 for more details).

Impact assement: Moderate Negative, but a Rap

will be prerared to ensure safeguard pollicies

application for APs

2 Landslide, erosion and

sedimentation

Cause of landslide/erosion:

- Implementation of excavation/backfilling of

rock/soil at the main components of headwork

such as dam, intake, and powerhouse during

construction phase leading to risk of

landslide/erosion.

- Construction of dam and storage water in

reservoir will impulse landslide especially at

unstable ground. Moreover, in case of long,

heavy rain, water level rises; the new land is

submerged leading to locally landslide.

Geological features of project site:

- Bao Lam 1 hydropower located within the Song

Hien terrigenous formation. Petrographic

compositon includes shale, quartz, lime clay,

pale or ashy adhesive clay, average to shaply

Page 28: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 24

No. Impacts Impact description

faults.

- There are several faults level III cuting through

gristone and sandstone and the stone are

wrinkled and schit. However, these faults is old,

undiscovers new activity signs and no relative to

land movement. These faults have not gone

through limestone formation and fullfill by the

secondary material which ensure that ther will be

not water loss along these faults.

- As in the map scale 1/200.000, Bao Lac (F-48-

X), no high economic value mine have been

discovered in the project areas, there are only

several normal construction material mines.

- The main faulting systems in the region namely

NorthEast-SouthWest, NorthWest-SouthEast,

sub latitude and meridian.

Impacts of landslide/erosion:

- Sedimentation of Gam and Nho Que river and

reservoir.

- Reduce surface water quality.

- Changing of water flow in downstream.

Features of project:

- Project site is located on long narrow valley,

nearby confluence of Gam river and Nho Que

river.

- Suitable geological condition, so the risk of

landslide at large scale to reform reservoir bank

is limitation.

- Reservoir, with small scale, is mainly formed

base on riverbed

- Topography include two sharp slopes from 350

to 400 and faulted. There are not high cascade

and waterfal, low segment vertical in the

riverbed.

- Process of landslide as well as reformation of

reservoir bank is small scale. Process of

sedimentation is estimated at low speed.

- Foundations cut through rock layers leading to

Page 29: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 25

No. Impacts Impact description

easy erosion of foundations.

- Discharging water through spillway may cause

localized flood and erosion in this area (behind

the spillway).

Impact assement: Moderate Negative

3 Impacts on surface

water quality

The main seasons cause to water surface

pollution in the construction phase:

- Domestic waste water from 300 workers in

project site (at peak time).

- This type of waste water contains BOD5, residue,

TSS, and organic substance....

- In average, each worker uses 40 water litters per

day. Total domestic waste water discharge from

300 workers is 12 m3 per day.

- Constructed waste water from auxiliary facilities

such as machine repaired workshop, concrete

mixed stations, rock washed grounds etc. This

waste water contains mainly TSS, oil and grease,

organic substances, metals etc.

- Run-off water from the whole of project site

sweeps out impurities especially scattered oil,

grease, dust which come from concrete mixed

workshops, fuel storages,

machines/equipment/vehicles loading etc.

- Scattered fuel: as estimated, the average volume

of fuel which is extracted from stored tanks to

machines/vehicles is 1,500 liters per day. The

loss of fuel is around 7.5 litters/day (lost norm of

0.5%).

- Domestic and constructed solid waste: in case of

not control well, this waste impacts remarkable

to surface water when solid waste is discharged

directly into rivers, reservoir...

- Organic waste is decomposed from dead bodies

of animal and vegetation in the reservoir.

Impacts of surface water pollution:

- Increasing of turbidity, reducing of water quality

of Gam and Nho Que river water.

Page 30: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 26

No. Impacts Impact description

- Affecting to life of aquatic species.

Project features:

- The results from site survey shows that due to

sloping terrain and low density of population

that there are not any activities of small industry,

aquaculture or agriculture in project site. And the

river water in downstream have not used for

domestic or agricultural irrigation purpose.

Impact assement: Moderate Negative in case the

proposed mitigation measure will not be

compliance

4 Impact on air quality Causes of air pollution:

- Blasting for construction of internal road,

digging of foundations, quarrying, due to need

to small realignment (100m) of road from Ly

Bon bridge to Lung Cu, Ha Giang.

- Rock/soil excavation and backfilling.

- Material transportation, loading and unloading.

- Operation of rock grinded/screened stations;

concrete mixed workshops; vehicles;

constructed machines/equipment.

For above items, estimated quantity of main

works are:

- Excavation/backfilling of soil and rock: 926.62 x

103 m

3

- Concrete works: 76.87 x 103 m

3

- Steels of any kind: 3,500 tons

Estimated dust quantity is emitted from

excavation and backfill activities:

- Total quantity of excavation and backfilling:

926.62 x 103 m

3 x 2 tons/m

3 = 1,853.24 x 10

3

tons

- Total dust quantity is generated: 926.62 x 103

tons x 0,4 kg/ton = 370,65 x 103

kg

Dust is also strongly generated from quarry and

road construction parallel with activities of

Page 31: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 27

No. Impacts Impact description

rock/soil excavation and backfilling;

material/rock/soil transportation; blasting for

digging foundations.

In comparing with standard of QCVN 05:

2013/BTNMT, the dust concentration which

emits in project site may be exceeded the

permission.

Beside, the operation of constructed machines,

trucks will emit toxic gas such as CO2, CO, SO2,

NOx, and dust.

As estimated, materials/equipments/machines

that serve for project construction are transported

in sequence along Province road No 4C, internal

district, communal roads to project site.

All main project components located very close

with district roads, but keep distance to commune

roads. The project location is only 200 far from

Ly Bon market, which present public facilities

and irrigation system.

The rock and sand supply for project activities

will be taken from rock mine located on the

national road 43, about 7km far from the project

site. This quarry is separated to the surrounding

areas by hills/mountains that are covered by tree

so that the impact of dust will be mitigated.

Dust and toxic gas pollution which emit in the

construction phase only affect to narrow, partly

areas and in short term depending to the

construction time.

Air pollution not only affects directly to workers

who are working in constructed sites but also

affected to surrounded communities of Ly Bon

commune, if without appropriate mitigation

measures.

Dust and toxic gas generated during

transportation of materials/equipments may

affect to local people who live along two sides of

roads.

Impact assement: Moderate Negative and in the

short time in case the proposed mitigation measure

Page 32: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 28

No. Impacts Impact description

will not be stricly compliance

5 Noise Main causes of noise pollution:

- Construction equipment.

- Materials/equipments transported vehicles.

- Operation of concrete mixed stations, rock

grinded/screened workshops.

- Blasting, using drilling machines.

According to statistic data: 8-12 tons loaded

trucks, excavator, air pressed driller have the

noise level of 91-98 dBA, 90-96 dBA, and 94

dBA; respectively.

As calculation, the average noise level of

machines is around 72-80 dBA within the

distance of 120-200 m. This noise level exceeds

the permission following the standards of QCVN

26:2010/BTNMT so it may affect to workers

who are working in the constructed site.

Noise pollution may cause seriously negative

impacts to workers who hand directly with

blasting, using driller if they are not quipped by

labor safe equipments. The noise level is not only

generated by blasting, driller but it is increased

strongly by phenomenon of reverberation in

narrow mountainous terrain.

Due to main project components are located

quite close to residential areas of Ly Bon

commune thus the generated noise may create

negative impact on local people and affect

directly to the workers on the sites during

construction and local people who live along 2

sides of roads during transportation.

Impact assement: Moderate Negative and in the

short time but the impact could be managed with an

appropriate management plan

6 Pollution cause by

solid waste

Sources of solid waste:

- Scattering rock/soil from quarries, material

transportation and discarded rock/soil from

excavation, drilling, blasting etc.

Page 33: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 29

No. Impacts Impact description

- Scattering concrete: from concrete mixed

stations, constructed sites, concrete scattering in

transportation process.

- Scattering steel: from constructed sites and

productive workshops.

- Wood, bamboo: from constructed sites, reservoir.

- Domestic solid waste: from campsites,

constructed sites.

During construction phase, discarded rock/soil

will be discharged from excavation of topsoil,

reservoir vegetation clearance, quarries and

constructed waste containing cement, steel,

wood etc. Disposal of constructed waste without

controlling may lead to trespass forest/cultivated

land and water pollution.

Domestic solid waste: 0.3 kg/person/day x 300

persons = 90 kg/day (at peak time)

Domestic solid waste contains different types of

waste such as food waste, paper, cover of

canned food. It may cause unpleasant odor

incase of not well controlling.

In case if clearance of reservoir does not well

leading to disintegrate animals/vegetable bodies

that causes surface water polution.

The vegetation cover that collected after

clearance may cause risks of forest fire if it is not

well controlled..

Impact assement: Moderate Negative and in the

short time but the impact could be minimized with

an appropriate management plan

7 Loss of partly

vegetation cover

Total permanent acquisition land for project is

around 103.91 ha.

Since the terrain feature of project site is mainly

mountain and hill with high slope so the

vegetation here is poor. Almost the lost

vegetation for project construction is mixed

forest such as brush, trees and agricultural trees

such as paddy, maize, cassava etc.

The loss of temporary vegetation cover for

Page 34: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 30

No. Impacts Impact description

disposals, borrowed pits etc will be restored after

construction phase...

Impact assement: Minor Negative due to poor

vegetable cover and low valua ecosystem arround

the project area.

8 Impacts of mining

(sand, stone quarry

etc) for construction

The total volume of sand needed for

construction is about 45.103 m

3. Due to no

natural sand quarry, the needed sand will be

grinded from stone quarry then transported to

the project site.

Stone is exploited from Khuoi Choong quarry,

Pac Ra village, Ly Bon commune, Bao Lam

District. The developer is submitting request to

Cao Bang DONRE for exploiting stone at Khuoi

Choong quarry. The intend exploited vollume is

around 30,000 m3 and exploited area is 0.5ha,

the exploited duration is until 31/12/2015.

Embankment soil is mainly for small dyke and

transport roads. All the embankment soil will be

salvaged from the foundation works.

Quarry by blasting on the surface of mine must

to use the explosive. It may cause accident at

work due to mine collapse leading to

death/wounded of workers, residents or asset

losses in case if contractors do not comply with

safe regulations.

Blasting for quarry and process of transportation

of rock, sand from the borrow pits to project site

may cause air pollution by dust, toxic gases,

noise, vibration.

Due to sloping terrain, difficult transportation

and almost none of resident live nearby mines

and project site so these impacts only effect to

workers who work directly in project site and

local people who transports nearby and they

could be mitigated.

Impact assement: Moderate Negative and in the

short time but the impact could be managed with an

appropriate management plan

Page 35: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 31

No. Impacts Impact description

9 Impacts due to

construction of

transmission line and

access road

The investor has to do following items during

construction phase:

- Building newly 0.8 km length of internal

roads, include one access road in left bank

and 2 access roads in right bank.

- A 110 kV transmission station will be

constructed on the left bank and connecting

to national grid by 110 kV transmission line.

The 110 kV transmission station intend to

locate about 100m far from Bao Lam 1

hydropower.

Construction of access/internal roads and

transmission line may cause the following

impacts:

- Due to high slope so the vegetation cover of

project area does not diversify, mainly

treeless hill with brush, trees and partly

agricultural trees such as paddy, maize,

cassava etc.

- Acquisition land for road and transmission

line is not much. The transmission line is

designed compling with regulations of

transmission line corridor safety. There are

almost none local residents living nearby so

the effect is negligible comparing to other

hydropower projects.

- The terrain of project area is mainly

hill/mountain so it is exposed to landslide

leading to risks of health and life for workers

during excavation of pole foundation if the

safe measures are not complied. Because of

almost none of resident living nearby along

the transmission line so landslide does not

effect to houses however, landslide or

soil/rock that are swept away to farm will

effect to cultivation.

- Construction activities of access/internal

roads, 110 kV transmission line will lead air

pollution those causes by dust during

excavation/backfilling of soil/rock, toxic

exhaust from operation of vehicles/machines,

Page 36: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 32

No. Impacts Impact description

noise by blasting, digging foundation and

effect to transportation safety. These impacts

are not remarkable since the almost none of

local communities nearby project site.

- The transmission line does not cross the army

areas and effect to the historical/cultural

monuments of Cao Bang province.

Terrain of project area is mainly sloping

mountain/hill so it may expose to risks of

damaging to health or life of workers/local

residents if the safe measures are not complied

during construction.

Impact assement: Minor Negative and could be

controlled with an appropriate management plan

10 Effect to terrestrial

ecosystem

During construction phase, the below activities

will cause affects to terrestrial ecosystem:

- Gathering of workers with high density in

project site

- Access road system is constructed by

investor that facilitates for accessing to

project surrounded areas

- Operation of heavy trucks with high

frequency

- Blasting

The wild animals rarely appear in the project site.

There are only birds, small animals, fox, reptile

etc. The above activities will make the terrestrial

fauna trending to move far away from project site

during construction phase.

Impact assement: Minor Negative

11 Impacts on fish and aquatic life

The aquatic ecosystem will lose temporary living

environment due to water resource is

contaminated by high turbidity, run-off water

contained cement, fuel, oil and grease rock, soil,

etc.

However, these impacts are not remarkable; only

occur in the short term because the civil

constructed works are almost done in the dry

Page 37: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 33

No. Impacts Impact description

seasons.

After construction phase, the presence of

reservoir facilitates for animals to return and live

surrounding the reservoir because of its good

living conditions.

And the project could be impacted on fishs which

move up or down stream during reproductive

period. For these fishes, the impacts could be on

2-5km before and after dam.

12 Effect to traffic Project needs to realignment about 100 m of road

on left bank which goes from Ly Bon bridge to

Lung Cu, Ha Gang, the realignment activites

could be created impact on the traffic movement

on this road, although the traffic volume is low,

but the PMU also need to develop and apply

appropriate measure to ensure traffic flow and

traffic safety.

Rock and sand material is exploited from mines

and transported via national road 43, about 7km

far from construction site. Other construction

material is boutgh from shops in Ha Giang city

which are 102 km far form project site and rock

is also reused from foundation excavation.

Transportation of mterials/machines/equipments

in general do not affect to traffic of local people

due to low density of population and travelling of

communities is not much.

Increase the worker population on the site also

create high risk of traffic conflicts between

workers and local poeple, if safety traffic

education are not provided for workers.

Impact assement: Minor Negative due to the

recover capacity of ecosystem since the project turn

in to operation phase;

13 Effect on cultural/

historical properties

The Cao Bang Department of Cultural and Sport

had been certificated that there is not any ranked

cultural/historical properties which are managed

by the district/provincial/national authorities in

the project areas. There are also not any cultural

and non-cultural properties that relate to the

Page 38: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 34

No. Impacts Impact description

ethnic minority people in the project area has

been identified during public consultation

meetings

As servey result shows that there is not

concentrated tomb in the project area, but still

there are two graves located in the high places,

over 162m.

The investor will prepare action plan in case if

cultural/historical properties are discovered in the

construction phase.

Impact assement: Moderate Negative in the short

time

14 Effects to natural

preservation area/

national park

The project site is located quite far from the

natural preservative areas. The project activities

do not impact to natural preservation parks areas

of Cao Bang province.

Impact assement: Minor Negative

15 Risks of mine and

underground works

It may expose risks of mine/bomb during

construction/operation phase that may be left

after the war incase do not detect carefully.

During construction process, the internal roads;

110 kV transmission line, etc must be built

newly.

It is forced to blasting for construction such kind

of works because two sides of streams are

mountainous with high sloping terrain.

Process of constructing underground works,

blasting may cause health, life damaged risks to

workers and local people in case safe measures

are not complied.

Impact assement: Moderate Negative and in the

short time in case the proposed mitigation measure

will not be stricly compliance

OPERATION PHASE

16 Environmental flow in

downstream

Bao Lam 1 small hydro power plant is under

Gam river cascade. Thus the regulation regime of

Bao Lam 1 power plant depends on the ones of

other plants in the same cascade.

Page 39: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 35

No. Impacts Impact description

After construction phase has been completed,

will form areservoir with the capacity of 8.9

million m3. Formation of reservoir and regulation

regime of Bao Lam 1 hydro power plant will

change the flow in downstream of Gam and Nho

Que rivers on the section behind the dam.

The project is categorized impoundment

hydropower plant. The water which is used to

generate electricity will be discharged back into

the main river behind the dam so it is not affected

by flow change or breaking off.

The flow is always maintained at least of 37.1

m3/s through turbines in the low peak hours in

dry season. Moreover, Bao Lam 1 hydropower is

under Gam and Nho Que river basin which has a

munber of stream branches with small flow

adding water to the river.

Impact assement: Moderate Negative due to dail

water monderated operation and the water flow

after dam will be maintained;

17 Impairment on water

quality

In case if the waste such as domestic solid waste,

domestic waste water, lubricant contained waste

water from maintaining machines/vehicles is not

well control, it will lead to pollution of Gam and

Nho Que river. However, this impact is not

remarkable and could be mitigated.

When blocking water, if the reservoir is not

cleared, biomass (tree roots, regenerated grass,

organism death...) and other substance (humus,

mineral salt) which are immerged in the reservoir

will be decomposed leading to water pollution

due to reduce DO and increase BOD5. Water

pollution will cause negative to aquatic life. This

impact is negligible and may mitigate if investor

follows fully plan of reservoir clearance.

In case if the amount of phosphoric that

discharges into reservoir is higher 8.15 tons/year,

eutrophication phenomenom may occured

leading to reduction of water quality and affect

to aquatic life.

Page 40: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 36

No. Impacts Impact description

Impact assement: Moderate Negative

18 Impacts on flora After formation of reservoir, climate in the

project area becomes cooler with higher humidity

that facilitates for development of vegetation

cover.

Impact assement: Moderate Negative due to the

ecosystem will be seft recover and high adative

capacity with the change of living enviroment.

19 Impacts on fauna After formation of reservoir, small animals (dog,

fox, mouse...), birds, reptiles, frog etc will

comeback to live in the reservoir surrounded

area.

Impact assement: Insignificant

20 Impacts on fish and

aquatic species

Increasing to turbidity of water river when

construction project will impact to aquatic

species that leave in the section from project site

to downstream of project.

In the operation phase, the dam has negative

impacts to aquatic species and fishs that has

emigration habit. This impact do not prevent

when constructing and operating the hydropower

plants.

Impact assement: Minor Negative

21 Noise The operation of two units with installed

capacity of 15 MW/unit and other machines such

as lubricant pumped equipment will cause noise.

As experience from other small hydro power

plants, Bao Lam 1 power plant is categorized

impoundment power plant but not type of high

water column so the noise is not very high (only

around 80 dB at distance of 1 m). This value of

noise meets the National standard QCVN

26:2010/BTNMT on noise.

Impact assement: Moderate Negative need

preparing an appropriate opration plan to minize

the impacts on local people.

Page 41: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 37

No. Impacts Impact description

22 EMF Operation of electrical equipment such as

electrical generator, transfomer will arise the

EMF. The EMF only affects to workers who

operate the electrical equipments mentioned

above if they do not comply strictly to

regulations on operation of electrical equipments.

The EMF does not affect to surrounding

communities since there is not any residents

living nearby and this impact could mitigate.

- In case the transmission line does not comply

with regulation on transmission line safe

corridor, the EMF will affect to person who

work or living under in the unsafe distance.

The statistic data shows that the intensity of

EMF within safe distance is less than 5kV/m that

meet to WHO standard on EMF.

Impact assement: Minor Negative due to the project

and transmission line (100m) located in the remove

area.

23 Emergency case Emmergency case in the power house: the

electrical accidents such as electrical leakage,

short circuit, fire etc may occur if do not comply

to safe regulations on powerhouse or electrical

equipment operation. These accidents may lead

to damage the power plant.

Emmergency case in the switchyard/transformer

station: fire accident due to short circuit/electrical

leakage may occur easily if do not follow strictly

technological design and regulations during

construction and operation. Compliance to

procedures on transmission line safety is

extreamly important task. It requires workers

have to obey strictly, fully all technological and

safe reguations during operation transmission

line.

Emmergency case in broken of dam, reservoir:

these disasters may orccur in case of

extraordinary weather such as sweep flood or

geological altering (earthquake, crack, depression

etc). These disasters cause serious cosequences

Page 42: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 38

No. Impacts Impact description

leading damage to health and life as well as

assets especially in downstream area. The main

impacts include: high risk of broken of dam in

the downstream hydropower plants, flooding

cause for downstream communities, block

transport routes, negative impacts on activities

and incomes of downstream communities, high

risks of diseases dispersion and insanitation

enviromnement condition;

Impact assement: Minor Negative due to seldom

frequency. However, the responding plan need

caryfully prepare annualy.

Table 3-2 Land acquisition by main components in detail

No. Item Acquired land Unit

A Permanent acquisition 103.91 ha

B Temporary acquisition

Supported facility 9.0 ha

Total A + B 112.91 ha

Source: Feasibility study report of Bao Lam 1 Hydropower subproject

Page 43: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 39

Table 3-3 Permanent acquistion by land use in detail

No. Type of Land ha

1 Agricultural land 24.09

2 Residential land 0.93

3 Forestry land 12.95

4 - Others (alluvial deposit along

rivers, streaams) 65.94

Total 103.91

Source: Feasibility study report of Bao Lam 1 Hydropower subproject

3.2. Key Social Issues

Table 3-4 Key Social Issues

No. Social issues Information

PREPARATION AND CONSTRUCTION PHASES

1 Impacts to communities There are 09 relocated households (36 people).

The most local people there are Tay and Nung

ethnic minorities who still keep their

backward customs thus, the project may

impacts their daily life. However, this disorder

only affects within construction time of

project.

The transportation of materials and equipments

does not affect much to the local people.

Most of local people expect that development

of project will faciliate to improve their

production and living standards.

2 Labor influx due to

construction workers and

conflict between workers

and communities

According to fesibility study, there are around

300 staffs/workers who are mobilized for

project construction at the project site in the

peak time.

Complementary areas are located at both sides

of the river, but mostly on the left side of the

dam. At the upstream of the dam, there is a

Page 44: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 40

No. Social issues Information

concrete mixing plant. The crushing plant is

located at the stone quarry, 7 km away from

the site along the national road 43.

The relationship between the investor and

local people who are living in affected area is

quite good. The investor has experience in

management of workers and security in the

local area when building the former projects.

The security of Ly Bon and Vinh Quang

communes, Bao Lam District and Bao Toan

commune in Bao Lac District is quite good.

The social evils such as drugs, theft and fight

are seldom therefore conflicts between

workers and local people will be low.

The results from site survey show that there is

an primary school located about 500m away

from left hand site of the dam which will be

not seriously impacted by project. There are

also 2 schools (secondary and highschool)

which located on other site of Nho Que river,

thus the project will create impacts on the

access road to schools of the pupils since the

iron bridge will be removed, therefore, the

replacement access road need to be provided

to ensure all pupil will be safety on the way to

schools.

3 Increase income sources for

the local people

At the beggining of construction phase,

project will gather large amount of

staffs/workers thus, it could provide jobs and

stable income for a part of local residents in

project site.

Demand in foodstuff and a series of services

facilitate for development of production and

trading of the local people.

OPERATION PHASE

4 Positive impacts on the local

socio-economic

development

When finishing, project will supply stable

power with high quality for the local people. It

will support to development of industrial,

handicraft and traditional sectors in the

locality …

Page 45: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 41

No. Social issues Information

During construction and operation phases,

project creates jobs for local people.

Income from tax of water resource usage

which is provided from project will be added

to provincial budget.

The reservoir will allow to development of

aquaculture in the future which benefit for

local people in term of getting jobs and

improving their income.

4. MITIGATION MEASURES FOR NEGATIVE IMPACTS

During construction phase, the contracts will be signed between investor and

contractors who construct internal roads, switchyard and transmission line, main

components such as dam, powerhouse etc. These contractors will sign the subcontracts

with the sub-contractors who provide material/equipment. The responsibilities of

developer/contractors/subcontractors who must comply with mitigation measures are

presented in Table 4.1.

The mitigation measures must be put into the bid documents/contractors by

investor/contractors as requested conditions to the material provided/constructed

contractors. Power Construction Joint Stock Company No. 1 has responsible to

integrate the EMP into the detail design and bidding contracts. Power Construction

JSC No. 1 assigned one staff who is in charged in environmental management for Bao

Lam 1 Hydropower plant. This staff presides and coordinates to the relevant agencies

to: (i) Monitoring the implementation of mitigation measures following EMP and EIA;

(ii) Supervising, suggesting measures to deal with negative impacts on environment (if

any); (iii) Making report on environmental management implementation and submit to

the district’s Department of Natural resource and Environment and leaders of Power

Construction Joint Stock Company No. 1, BIDV Hanoi; (iv) Participating courses on

environmental management which are held by GdoE PMB and WB.

Page 46: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 42

Table 4-1 Key Mitigation and Management Measures

Issues/Responsibilities Mitigation and Management Measures

PREPARATION PHASE (Power Construction Joint Stock Company No. 1 is responsible for implementation of mitigation measures)

1. Selection of project location Dam route location is chosen at Ly Bon commune (includes 4 villages: Na Khang, Na

Mat, Na Pong and Tong Ac). The dam site is located at the section of high slope river

banks, narrow riverbed the width of 30-40m. This location facilitates for arrangement of

dam route.

Selection of project site as presented above may mitigate the negative impacts to

environment due to minimized land acqusition, limitation of loss of vegetation cover,

forest, convenience for construction arrangement etc. It also limits to social impacts of

local communities since the agricultural land acquisition is reduced as well as dam site

is quite far from local residents.

Supported facilities of project is chosen based on the criteria such as far from surface

water resource at least 100 m, explosive storage is arranged far from communities with

minimum radius of 500 m.

Transmission line and switchyard are chosen following the regulations and standards

presented in Decision No 34/2006/QD-BCN on safety of low voltage works.

2. Affected people Consulting with authorities of communes Ly Bon, Vinh Quang, Bao Lam District, Bao

Toan commune, Bao Lac District and affected households to propose the appropriate

compensation plan which should meet expectation of affected people;

Compensation plan and its implementation must be monitored by local authorities;

Consulting with representative authorities and households of Ly Bon, Vinh Quang

communes on the location of two disposals to prevent the negative impacts to public

Page 47: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 43

Issues/Responsibilities Mitigation and Management Measures

health;

To minimize the acquisition of cultivated land and roads when arrangement of

campsites, material temporary loading or during construction of transmission line;

(See reports of Resettlement plan and Ethnic plan for more details).

3. Risk of bombs and mines Hiring Cao Bang Military Steering Committee to detect bombs and mines at the

following sites:

- Area of all project component sites such as: powerhouse, dam, internal road...;

- Reservoir area corresponding to normal water level;

- Transmission line;

- Auxiliary facilities (campsites, borrow pits, quarries, construction sites etc);

- Compensation land areas.

CONSTRUCTION PHASE (Investor/contractors/material, equippment provided sub-contractors are responsible for implementation of

mitigation measures)

4. Risks of mine Investor Coordinating with constructed contractors to arrangement of appropriate blasting plan;

Responsible for informing of blasting plan to local authorities and residents that aims to

avoid transportation and animal grazing at blasting areas;

Coordinating with constructed contractors to assigning the guard, using the warning

alarm and traffic arrangement when blasting;

Monitoring safe measures relating to management and using explosives which are done

Page 48: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 44

Issues/Responsibilities Mitigation and Management Measures

by contractors.

Contractors To discuss and inform to investor on blasting plan so thatInvestorcan inform to local

authorities and communities on time;

To comply strictly with current regulations on explosive safety;

Workers using explosives must be trained and certificated by the relevant authorities;

To prohibit strictly person who do not have certification handing with the explosives;

To disseminate frequently to workers on safe regulations in handing with explosives;

Blasting should be conducted at fix time to create watchful habit for local people. The

time of blasting should be arranged at low density of traffic so that it can mitigate

impacts to local transportation. The best is lunch time (from 11 am to 1 pm);

To coordinate withInvestorfor assigning the guard, using the warning alarm and traffic

arrangement when blasting.

5. Mining of

quarries

Investor Coordinating with contractors to inform local authorities on plan of mining (sand, quarry

etc)

Supervising safety of contractors in mining

Supervising environmental rehabilitation by contractors after closing the mine

Contractors To establish the plan of mining that provides in detail technologies and machines as well

as do procedures to getting the permission by written from local authorities.

To deposit environmental fund before exploiting.

Page 49: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 45

Issues/Responsibilities Mitigation and Management Measures

To comply strictly rules and regulations on technology and safety as well as

environmental standards during mining.

To ensure saving resources

Rehabilitation of environment after closing the mines (leveling and ramming the ground,

plant trees in the surface of mines)

6. Management

of construction

& solid waste

Investor To arrange 03 solid waste disposal sites with the total area of 5.3 ha. They must meet

criteria such as at least 100 m far from surface water resources, do not effect to surface

water flow, cultivated land, do not locate in the areas which are exposed dangers of

landslide/erosion, should located in the hollow grounds to prevent run-off water;

These 02 solid waste disposal sites have the agrrement with local authorities;

Prohibit workers to discharge the domestic and construction solid waste into non-

permitted places especially where it can easily sweep out in to surface water flows;

Disinfected waste is treated by septic tank at worker camps and inhabited areas. When

the Project finishes, the contractors have responsibility to fill up and septic tanks

treatment as prescribed hygiene;

Solid waste is collected and gathered to dumping sites. The dumping sites are arranged

according to regulations, located in unflood area and no impacts of inundation. The

investor has responsibility to coordinate with Department of Environment of Cao Bang

Province and Bao Lam District about the dumping sites. The average volumn of each

dumping site is 20 m3 with estimated dimention per each pit of 5m x 2m x 2m (5m

depth). Each dumping site is lined by anti-penetrative material called HDPE with 1.5

mm thick. Spraying EM bio-product on the surface of waste, covering on the waste

surface by the 3-5 cm thick soil layer with frequency of 2-3 days to avoid odor and

Page 50: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 46

Issues/Responsibilities Mitigation and Management Measures

insects. Isolation of dumping sites by gutter, cover is arranged to prevent run-off water

when raining. Ramming, filling up the soil, planting the tree on the top when finishing;

In case there are local Urban environment Companies, the investor or contractors can

sign a contract to collect, transport and treat solid waste;

Monitoring the solid waste management of contractors which is presented in article No.

5 below;

Prohibiting to burn solid waste to precause risk of fire the vegetable cover.

Contractors Top soil layer which is generated in process of excavation, road/transmission line

construction is kept in rock/soil storage sites and reused for planting trees after

construction phase;

Soil/rock which is generated from excavation, blasting, penstock construction etc is kept

in rock/soil storage sites and reused to backfilling the foundation of main components as

well as borrowed pits (material loadings, concrete mixed stations, campsites etc);

The discarded soil/rock at disposal sites is leveled, rammed closely. The proposed

dumping sites are located along Nho Que Bank, thus there should be permanent

embankment to avoid soil/rocks run into the riverbed, to prevent blocking the existing

flow in the area, to plant tree around to capture soil, etc. To avoid washout, it should

plant trees at areas which finishing the disposal and revert to the orginal state when

complete the construction phase;

Distribute waste bins on sites to ensure the collection of solid waste and transported to

landfills everyday;

Prohibiting workers to discharge the domestic and constructed solid waste into non-

Page 51: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 47

Issues/Responsibilities Mitigation and Management Measures

permitted places especially where it can easily sweep out into surface water;

Prohibiting to burn solid waste to precause risk of fire.

7. Vegetation

clearance of the

reservoirs and

construction sites

Investor Before flooding, the reservoir is cleared carefully to mitigate eutrophication and

reduction of water quality;

The landmarks which determine boundary of reservoir area for vegetation clearance will

be marked;

Prohibiting to cut off trees in the areas that are outside of the reservoir boundary;

To harvest agricultural products before flooding reservoir;

Big trees must be cut off at the foot and used for making formwork. Brushwood is

cleared and pulled out with the remaining part less than 20 cm;

If safe condition is ensured (without construction activities, transportation of vehicle,

blasting, water flooding and not in flood season etc), it is allowed to local people

collecting trees, products for their usage;

Investor is responsible for coordinating with local authorities and residents in the

process of vegetation removal in the reservoir and also checking safe conditions prior to

permit people collecting trees;

Burning of disposal biomass must be followed the plan preparing byInvestorand ensured

compliance with regulations on forest fire prevention. Site of burning points must be far

away each other at least 500 m. Do not burn trees in strong wind conditions to avoid the

spread to surrounding areas.

Page 52: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 48

Issues/Responsibilities Mitigation and Management Measures

8. Erosion and

sedimentation

Investor After construction phase, quarries, disposal sites... are backfilled by soil then rammed,

pressed and planted trees on the top to avoid erosion;

Planting trees and managing well vegetation cover at surrounded areas of reservoir

especially at semi-flooding areas to stabilize the foundation of the reservoir bank, main

components and the new sedimentation areas;

To coordinate closely with local authorities to manage well upstream watershed forest to

prevent swept-flood that cause landslide leading to reservoir sedimentation;

To dredge reservoir bed every 1-2 years/time;

To prohibit exploiting of rock/soil or cultivation in the semi-flood areas within reservoir;

Monitoring compliance of landslide/erosion mitigation measures of contractors.

Contractors It is necessary to describe foundations, monitoring blocks of rock which are exposed to

risk of landslide so that could provide warning and suggest the dealing measures during

excavation of foundation;

It should not drill, blast with large amount of rock. The excavation should blast oriently

to create border of excavation;

Should have the measures to prevent landslide/erosion of rock which may be rolled from

the top to constructing foundation. The gutters that discharge water from the top should

be digged to prevent water run into the foundation. The gutters which could discharge

water rapidly in the foundation area should be created;

It must consolidate the embankments at the sites that are exposed to high risk of

landslide/erosion at the beginning of construction of new roads;

Page 53: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 49

Issues/Responsibilities Mitigation and Management Measures

The isolated gutters are built at material temporary loadings, concrete mixed stations,

rock grinded/screened workshops etc to prevent run-off water which can sweep out

rock/soil into stream;

After construction phase, the borrowed pits are backfilled by soil then rammed, pressed

and planted trees on the top to avoid erosion;

Activities of construction/excavation/backfilling are priority done in dry seasons.

9. Traffic and

transportation

Investor Monitoring implementation of mitigated measures which are done by contractors;

Coordinating to contractors for repairing the damaged road in case the road is damaged

because of overload transportation;

Propagandize to improve awareness of compliance with traffic safe regulations for

drivers.

Construction/ma

terials,

equipment

supplied

contractors

Develop traffic management plan and ensure traffic safety during construction phase,

submit the plan to the investor for approval and monitoring the implementation;

To ensure all vehicles that use for transportation in project site have to meet standards of

technical safety and emission which are applied for vehicles;

Provide Project Site Signs at area near roads on both sides of the river;

Uphold red light on the project site during night time;

Appropriate regulation of vehicles during construction phase to avoid traffic obstacles

for local people;

Due to sloping terrain with quite a lot of bends so contractors should consider carefully

Page 54: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 50

Issues/Responsibilities Mitigation and Management Measures

in case sending vehicles in the night time to ensure safety for drivers and local people;

To ensure all vehicles meeting loaded permission so that it could mitigate the damage of

road. Responsible for repairing the damaged road in case the road is damaged by

contractors because of overload transportation;

Propagandize to improve awareness of compliance with traffic safe regulations for

drivers.

10. Construction

of access road

and transmission

line

Contractors The roads which will be newly built must meet the designed standards of road presented

in TCVN 4054-2005 (width of surface/foundation, slope, radius, visibility, angle of

rotation, gutter etc).

Transmission line and switchyard are complied with the regulations and standards

presented in Decision No 34/2006/QD-BCN on safety of low voltage works.

Location of electricity poles is chosen to avoid sloping points (the slope should be less

than 300). It should limit excavation/backfilling in case of sloping sites.

To arrange the appropriate distance of poles to ensure the distance of transmission lines

at the intersection is larger than 3m-5m depending on each intersection. The fixing wire

board is used for insulator in the whole transmission line.

In the intersection between transmission line and the National/Provincial roads, the

distance from transmission line to the surface of road is larger than 7m to ensure

meeting the safe standard.

The contractors are responsible for repairing the existing medium and low voltage

transmission lines or telecom lines if they are damaged by contractors during

construction and drawing the cable.

Page 55: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 51

Issues/Responsibilities Mitigation and Management Measures

During drawing the cable, the warning signals must be arranged at the intersection

between transmission line and the roads as well as the person to guiding transportation

must be assigned.

To comply strictly regulations on safe corridor of transmission line (level of height, sag) to

meet EMF standards during operation phase.

Application of safe constructed measures and prevention of traffic obstacles to local

people.

Priority to reuse topsoil from excavation process to backfilling the foundation, do not

use new soil for that work;

Topsoil must be kept and stored in the right of way then reused to recover vegetation;

To backfill the borrowed pits, creation of the embankments, planting trees on the surface

to prevent erosion/landslide and landscape after construction phase.

11. Management

of hazardous

materials (fuels,

lubricants,

explosives etc.)

Contractors Ensuring of safely hazardous materials storing was agreed by the Employer and was

approved/liciensed by Department of Natural Resources and Environment and by Local

Government;

01 fuel/lubricant storehouse is arranged at the left side, downstream of dam. It is ensured

at least 300 m far from surface water and residential areas;

Storehouse floor must be lined by anti-seepage materials (thick nylon) or 5 cm thick

concrete layer to avoid contamination of oil and grease into ground and underground

water;

Gutter to collect oil/grease is designed surrounding storage in case of oil spilling;

Page 56: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 52

Issues/Responsibilities Mitigation and Management Measures

To prepare the extinguishers and oil suction apparatus in case of happening incidents;

Hazardous chemicals (gasoline, diesel…) must be stored in the tanks with their volume

must be 110% of volume as required, in good conditions with labels;

To comply strictly with regulations of storage, transportation and usage of hazardous

chemicals and explosives as regulated in Vietnamese Standard 5507:2002 Hazardous

Chemicals - Safety Regulations in production, business, usage, storage and

transportation;

Labors who work directly with fuel, explosives must be trained on safety technique

relating to chemical, explosive, fire precaution, oil spilling etc;

To minimize storage of explosives at most on the construction site. In case of explosives

are used and stored in the short term, explosive storage must be located more than 100 m

far from surface water sources and 500 m from residential area;

Disseminating safety procedure to labors who hand directly with hazardous chemicals.

To mark warning notices and regulations of safety on site when handling with hazardous

chemicals;

It is compulsory for workers to use the labor safe equipments when handling with

hazardous chemicals;

Refueling operation and construction equipment maintenance must be conducted in the

area which was approved in case of oil and material spilling;

Collection, transportation and disposal must be carried by the company who was

licensed in dealing with hazardous waste as regulated in Circular 12/2011/TT-BTNMT

dated April 14 2011 of MONRE.

Page 57: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 53

Issues/Responsibilities Mitigation and Management Measures

12. Noise Investor Monitoring implementation of mitigated measures which are done by contractors;

Propagandizing to improve drivers’ awareness to avoid impact of noise to local people;

Investor must coordinate to contractors for consulting Ly Bon commune authorities and

local people in case of necessary to blasting or construction in night time.

Constructed/materi

al supplied

contractors

Noise control planning in construction stage should be built and submitted to investor

for approval and management;

Requesting to check regularly on technical status of machines and equipments to ensure

they meet the noise standards which are presented in QCVN 26:2010/BTNMT to

mitigate impacts to workers;

The appropriate working time should be arranged, avoiding to blasting and construction

in night time;

Must coordinate to investor for permission of Ly Bon commune authorities and related

local people in case of necessary to blasting or construction in night time;

Vehicles that transport the materials, machines have to use the horn with noise level

meeting the standards of noise for transportation;

Propagandizing to improve drivers’ awareness so that they do not make impact of noise

to local people;

To avoid sending vehicles during night time to mitigate noise that affects to local people

living along roads.

Page 58: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 54

Issues/Responsibilities Mitigation and Management Measures

13. Dust Investor Monitoring in order to ensure that mitigate measures be fully carried out by the

Contractors;

Personel and budget resources for conducting and monitoring EMP of project must be

allocated sufficiently.

Contractors Machines and equipment in compliance with the national standards of emission as

regulated in 249/2005/QD-TTg issued by Prime Minister of Emission Regulations for

transportation vehicles;

Humidifier should be applied in dry season to ensure the site hygiene as well as

workers’ health;

Material should be mobilized reasonably in order to mitigate stagnant in the site causing

traffic congestion and dust;

Transported trucks must be covered by tarpaulin to avoid scattering and dust. All

transported trucks’sizes must be matched and not over loaded in transportation;

Trucks’ Wheels must be washed before leaving the site at car washing stations supplied

at the site’s entrances in order to mitigate dust in transportation roads;

Roads should be clean up immediately if there are any scattering.

Material Supply

Contractors

Material transported trucks must be covered by tarpaulin to avoid scattering and dust.

During transportation along the roads or through the residential areas, drivers should

give up way for local people to prevent dust for them.

Page 59: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 55

Issues/Responsibilities Mitigation and Management Measures

14. Domestic

waste water

management

Investor Each worker camp is arranged septic tanks to collect and treat domestic waste water of

workers. The waste water must meet the permission standards before discharging into

the environment.

Contractor Propagandizing to improve workers’ awareness on environmental hygiene;

To prohibit workers discharging waste into streams which lead to contaminate domestic

water of the local people;

Punishing workers who do not comply with the above regulations.

15. Constructed

waste water

Constructed

Contractor

To collect grease and oil generated from car parking and equipments/machines

maintenance stations then sell to companies who is allowed to treat the hazardous waste

as regulated in Circular 12/2011/TT-BTNMT dated April 14 2011 issued by Ministry of

Natural Resources and Environment;

To build the pits which collect mud/sand in the following sites before discharging waste

water in to environment:

- Rock grinded stations

- Concrete mixed stations

- Cement waste water contained grounds etc

16. Exploitation

of Natural

Resources

Investor To recommend to Cao Bang Department of Natural Resources and Environment not

allow constructed agencies to exploit natural resources in riverbed (sand, gravel) but in

fact gold mining.

Page 60: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 56

Issues/Responsibilities Mitigation and Management Measures

Contractors Exploitation natural resources in riverbed serving to construction should be prohibited.

Materials must be exploited at the licensed material quarries with commitment of

environmental protection.

17. Chance find

of cultural

artifacts, and

areas/structures

of local cultural

value

Investor To prepare the procedure in case of finding historical/cultural/archeological artifacts and

request constructed contractors must to comply during construction phase;

If main components (transmission line, internal road, etc) go through or locate in the

areas that have tombs, the investor must cooperate closely with consultant to adjust

design;

Beside, the investor consults authorities and local people to find suitable solutions to

move ashes following the local customs.

Contractor In case of any historical/cultural/archeological artifacts that may be encountered during

excavation: excavation works must be stopped and the Investor, Ly Bon and Vinh

Quang Commune People Committees, Bao Lam District, and Cao Bang Department of

Culture, Sport and Tourism must be immediately informed; the locale must be guarded

to solve by local authorities;

Prohibiting workers to remove any historical/cultural/archaeological artifacts. This is

supposed to be illegal actions;

Construction work will only be continued after being permitted with notice in writing

from the authorities;

Coordinate with local authorities and local people to compensate, remove in accordance

with customary in case of finding graves in the bed of lake.

Page 61: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 57

Issues/Responsibilities Mitigation and Management Measures

18. Water Supply

for workers

Contractror To arrange pipelines which take water from higher mountain/hill parallel with digging

wells for domestic water usage;

To build man-made tanks which use to filter for domestic usage of workers.

19.Safety issues

in the

construction

process

Investor Coordinating with constructed contractors to establish labor safe regulations which force

workers to comply;

Assigning 01 staff to supervise labor safe issues of contractors;

Coordinating with contractors to solve on time the risks/accidents which happen during

construction.

Contractors The contractors are responsible for ensuring work safety for the whole engineers and workers

on the construction site as in details:

It is mandatory for workers to attend training courses on labor safety before they are

recruited to work for the project;

Supervise periodly on compliance to labour safe measures of workers at project sites;

Training courses on labor safety for workers are held periodically to improve their

knowledge and awareness in term of compliance with safety measures;

To provide necessary safety facilities for workers;

A person will be assigned to work as safety staff. He/she is responsible for supervising

and speeding up the compliance with regulations of labor safety of workers;

Page 62: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 58

Issues/Responsibilities Mitigation and Management Measures

To have timely measures in the event of happening accidents;

Do suspend all work absolutely during heavy rains or emergencies of any kind in

anticipation of landslide, accidents caused by open circuit that may lead damage for

worker’s health and lives.

To equip fully fire extinguishers in the worker camps and the construction sites.

20. Management

of sanitary and

safety and

prevention of

disease infection

in campsites.

Investor Assign 01 staff responsible for health care of workers in the project site;

Coordinating with constructed contractors to make plan of workers’ health care during

construction phase;

Coordinating with contractors to establish the precautionary program of sexual

transmitted diseases, especially HIV/AIDS precautionary program, among labors;

Supervising the implementation of mitigation measures in term of food safety,

environmental sanitation, disease transmitted precaution which must be done by

contractors.

Contractors 01 staff who is responsible for health care of workers in the project site will be assigned

by contractors;

A first aid kit will be provided at each construction site to ensure patients can receive

first aid timely before transporting them to the medical station/hospital;

Monitoring regularly to keep sanitary in campsite, construction sites in order to

precaution of pathogenesis/disease transmission relating to digestive and respiratory

system. To require workers using mosquito nets to prevent petechial/marsh fever;

To propagandize food safety and hygiene for workers;

Page 63: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 59

Issues/Responsibilities Mitigation and Management Measures

To build toilets in campsite which must meet environmental standards. To prohibit

discharging of domestic solid waste directly in to the environment. Domestic solid waste

must be hygienically collected, stored, transported and treated;

Carrying out the precautionary program of sexual transmitted diseases, especially

HIV/AIDS precautionary program, among labors;

Coordinating with Investor to make and implement plan of workers’ health care during

construction phase;

Provide communication/entertainment facilities for workers.

21.Worker

Regulation

Investor Coordinating with contractors to establish worker regulation and manage them during

construction phase;

If constructed contractors recruiting workers who come from the other regions, they

must be informed investor to register temporary residence with the Ly Bon, Vinh Quang

commune authorities;

Investor is responsible with the Ly Bon, Vinh Quang commune authorities for all issues

relating to worker management during they stay in locality for project construction.

Constructed

Contractors

Coordinating with investor to set up worker regulation;

Responsible for worker management during construction phase;

Informing to investor in case the workers coming from other regions to register

temporary residence with the Ly Bon, Vinh Quang commune authorities;

The following activities are prohibited on and near project site:

Page 64: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 60

Issues/Responsibilities Mitigation and Management Measures

- Cutting of trees for any reason outside the approved construction area;

- Hunting, fishing, wildlife capture, or plant harvest;

- Disturbance to anything with architectural or historical value;

- Building fires outside camp areas;

- Use of firearms (except authorized security guards);

- Use of alcohol by workers during working hours;

- Use of drugs and stimulants which are prohibited;

- Washing car, motorbikes or machinery in streams or creeks.

- Doing maintenance (change of oils and filters) of cars and equipment outside

authorized areas.

- Disposing trash in unauthorized places;

- Driving in an unsafe manner in local roads;

- Having caged wild animals (especially birds) in camps;

- Working without relevant safety equipment (including boots and helmets);

- Creating nuisances and disturbances in or near communities;

- Disrespecting local customs and traditions.

22.

Rehabilitation of

all Project sites

Investor Recover vegetation in all project components to prevent erosion in rainy season;

After construction phase, planting trees/grass in the surface of all borrow pits (disposal

sites, campsite, material temporary loadings etc);

Page 65: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 61

Issues/Responsibilities Mitigation and Management Measures

after construction

phase.

Planting in combination of 3 types of trees including long term trees, grass, and shrub

with priority of indigenous plants especially in re-vegetation areas;

Landscaping at project site after construction phase.

23. Affected

people

Investor Upgrading/Reparing water supply pipeline for affected households or irigation system

to ensure supplying fully water for agricultural activities of local communities incase if

is damaged by project;

Coordinating with local authorities to provide documents on compensation of land and

property on land, EMP to affected households within project area;

Upholding downstream’s flow to ensure development of aquatic life and do not affect to

fishing based on natural condition.

To ensure the pulpil could be safety to go to school, other replacement access road

(600m) which connect the schools and National highway No. 34 will be provided;

Preparing and implementing the awareness raising program in traffic safety for relevant

stakeholders to minimize the risks of traffic accidents.

OPERATION PHASE (Power Construction Joint Stock Company No. 1 is responsible to implement mitigation measures of

environmental affects in operation phase)

24. Noise (from the hydropower

plant)

Turbines and/or associated rotating equipment should be designed to meet international

standards of noise (85~90 db at 1 meter) comply with QCVN 26:2010/BTNMT;

Design and procurement of equipments should specify requirements to meet standards

of noise;

Monitoring periodically the noise level outside the fence of hydropower plant. To

Page 66: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 62

Issues/Responsibilities Mitigation and Management Measures

implement the measures of noise reduction in case it exceeds the standards.

25. Labor safety issues and worker

regulations

To arrange fire-extinguishers at necessary places;

To set up the procedures of safe operation;

To arrange the first aid cabinet so that it can carry out the first aid measures on site;

To assign a staff in each shift who is responsible for labor safety;

Labor regulation is defined similar to the construction phase.

26. Change in downstream flows For the reservoir: the flow is controlled strictly by developer following the regulations

on reservoir operation, discharging water. Developer is responsible for informing in

time on plan of water discharging to local authorities to prevent damage of health, life

or assets of downstream communities.

Investor is responsible for informing widely to local residents, organizations and

authorities on water level fluctuation of Bao Lam 1 flow in downstream to ensure safety

for health and asset as well as production and agricultural activities in the downstream

area.

Investor is responsible for compensating in case of damaging to asset of communities

due to discharging flood.

For the downstream distance after the power plant: developer commits to comply strictly

the approved operation procedures of reservoir. During operation phase, developer will

regularly coordinate to local authorities in monitoring water level and erosion to provide

suitable mitigation measures.

Page 67: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 63

Issues/Responsibilities Mitigation and Management Measures

27. Impairment of water quality To clear vegetation cover before flooding reservoir to prevent pollution of water;

Embankments are build at locations which are exposed to danger of landslide;

To built separated systems of domestic and industrial waste collection and treatment

which meet permitted standards prior to discharge into the environment;

Domestic solid waste is hygienically managed then transported to the dumpsite for

treatment;

Recovering vegetation at construction sites to mitigate erosion and water resource

protection.

28. Plant plankton residing in the

reservoir

In case of increasing too much planktons which leads to water pollution so it is

necessary to remove vegetation from the reservoir;

Pesticide is prohibited to use for planktons treatment.

29. Reservoir sedimentation Prohibition of cultivated activities in the semi flood area.

To coordinate to local authorities in supervising of prohibition of destroy forest in

reservoir surrounding area especially the semi flood area.

To monitor erosion of reservoir bank two times per year. To take the initiative in

implementing mitigation measures such as planting trees, building breakwaters at points

that expose to serious erosion.

Planting trees on the project component sites after construction phase to mitigate erosion

and sedimentation of reservoir;

Discharging sediment through bottom culvert and dredging the reservoir if necessary.

Page 68: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 64

Issues/Responsibilities Mitigation and Management Measures

To mitigate erosion of the river banks behind power house, the energy eliminated hole is

designed to reduce flow rate after discharging canal of power plant so that the flow

returning to original flow of river.

To monitor erosion of river banks in downstream and provide the appropriate mitigation

measures such as building breakwater, dealing to breakdowns that occur by erosion.

30. Monitoring and maintaining the

replanted vegetation cover

Monitoring and maintaining annually vegetation cover which is replanted after

construction phase

31. Management of hazardous

substances ( fuel, lubricant, etc)

The same to the measures presented in item No 11.

32. EMF To provide facilities of EMF protection and request staffs/workers who work directly in

the EMF arised areas comply strictly rules on labor safety.

As statistic data, in the safe distance of transmission line, the intensity of EMF is less

than 5kV/m that meets to WHO standards on EMF. The local resident who is living or

working in the safe distance of transmission line will not be affected by EMF.

To supervise periodly transmission line (lowest sag) to ensure meeting the standards on

EMF safety.

33.Emergency cases Storage of water and reservoir operation procedures must be complied to regulation of

reservoir.

Annualy, before flooding season, the director of Bao Lam 1 power plant make report

and organize the meeting with representatives from flood control sterring committes of

districts of Bao Lam, Bao Lac and Cao Bang province to approve the detail plan of flood

Page 69: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 65

Issues/Responsibilities Mitigation and Management Measures

control. The minute of meeting must be sent to each members of flood control sterring

committes of Bao Lam, Bao Lac districts for cordination in implementation. The detail

plan of flood control will be submitted to flood control sterring committes of Cao Bang

province for supervision.

Prepare the risk responding plans and strictly comply with regulations on dam safet and

safety operation, which include: i) Building up the communicate system with local

authorities and people to timely inform when risks occurs; ii) Compliance with design

standards on the dam stable monitoring equipment system; iii) Rapidly informing to

local authorities since the risks occur for appropriated responding action plans;

Dam breakdown risk responding plan:

An appropariate Dam breakdown risk responding plan need to be prepared and

updated every years to ensure rapidly responding actions;

Cooperating with local authorities to supervise when implementing the updrating and

maintain the dam;

Loss compensation for affected peoples and areas when the breakdown risk

occurring;

Training the detail responding activites and assistance to relocate and remove the

affected people and areas

Annualy before the rainy period, the director of Bao Lam 1 Power Plan need to

prepare the plan and work with Flooding Preventation and Responding Steering

Committees of Bao Lam, Bao Lac districts and Cao Bang province to approve the the

detail responding action plan.

Page 70: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 66

Issues/Responsibilities Mitigation and Management Measures

Annualy, from June, Bao Lam 1 power plant must check the whole equipments,

machines, hydrolic works such as generators, communication facilities, equipments to

monitoring water level, practising and checking of technology and procedures of flood

discharging.

To comply strictly rules on operation, maintaining, reparing of electrical equipment,

regulations of power plant, transmisison line and switchyard.

To train periodly on electrical safety, prevention of fire for staffs

To dissiminate electrical safe regulations at work places for staffs.

To monitor and provide regularly fire-extinguishers at neccesary places and provide

emergency aid for staffs in case of fire

Page 71: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 67

Chance finds procedures

If the Contractor discovers archeological/historical sites, monuments and objects,

including graveyards and / or individual graves unearthed during construction, the

contractor will be responsible for:

To stop the construction activities in the chance find area.

To delineate the location or found area.

To protect the area to prevent the object from being damage and lost. For

artifacts or remains, the night guard will be allocated directly until the local

government has the responsibility or the Department of Culture and Information

takeover.

Inform the Investor to notify for the local government or the nations

undertaking the cultural heritage of Viet Nam (within 24 hours)

Relevant local/central authorities will be responsible for the area protection and

conservation before providing the decision on the later appropriate procedures. Then

they will implement the preliminary evaluation on the excavated findings. The

significance and importance of these findings should be evaluated according to various

criteria relevant to cultural heritage, including aesthetic value, historical or scientific

research, economic and social values

The decision of findings treatment will be made by the responsible agency. This

decision covers the layout (such as in case of detecting the rest of the cultural or

archeological importance cannot be moved) conservation, preservation, restoration and

salvage.

If the cultural area and/or heritage evaluated by the experts and the Cultural Relics

Management agency’s regulation are valuable and should be preserved, the developer

have to change the design in accordance with the required conservation of the area

The decisions of findings management will be notified in writing by the related

agency.

Page 72: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 68

5. ENVIRONMENTAL MONITORING PLAN

Table 5-1 Parties involved in environmental monitoring

No. Agency Main Responsibility Content and form of

report

Frequency

1 Contractor To carry out the proposed mitigation

measures in EMP

To report to investor the implementation of

mitigation measures.

Refer to the table

5.3

Submitting report

to Investor

monthly

2 The Participate

Bank - BIDV - The PB review the EMP and ensure

that EMP commitments form part of the loan

agreement.

During subproject implementation, each PB will

supervise subproject implementation to ensure

that the responsibilities and protocols specified

in the EMP are being properly followed and

document their findings as part of their overall

reporting of subproject supervision.

PB will submit quarterly progress reports on

ESF compliance of REDP developers to the

Administrative Unit (AU).

Every 6 months,

submit report to

AU

3 Investor To join EMP into detail technology design

and construction bidding contractors.

Refer to the table

5.3

Submitting

quarterly reports

to BIDV

Page 73: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 69

To carry out the proposed mitigation

measures in EMP

To monitor construction activities and

ensure that the contractors comply to

environmental requirements in the

contracts and EMP (Terms of reference for

environmental staff in monitoring EMP is

presented in the Annex 2).

To report to BIDV Hanoi/GDoE PMB the

implementation of mitigation measures.

Hanoi/GDoE

PMB

4 Independent

Monitoring

Consultant

To monitor (by observation) and assess

environmental quality based on parameters

suggested by this EMP report.

To conduct public consultation to received

comment, assessment of local people on

environmental management of the Project.

Refer to the table

5.4

Submitting bi-

annual reports to

BIDV

Hanoi/GDoE

PMB

Page 74: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 70

Table 5-2 Environmental monitoring plan

Parameters Monitoring Measure Monitoring location

1. CONSTRUCTION PHASE

Selecting of campsites

and supplementary

areas

Visual observation the following issues:

Location of campsites:

How far from them to surface water and residential areas?

How investor arrange water supply?

Does investor build tanks to filter water?

Camp sites

Water supply

resources

Location of supplementary areas:

How far from them to surface water and residential areas?

Location of disposals/dumpsites:

How far from them to surface water/worker’s camps?

Concrete mixed

stations

Vehicles, machines

parking

Material yards

Equipment/machine

repaired workshops

Page 75: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 71

Parameters Monitoring Measure Monitoring location

Vegetation clearance

and topsoil stripping

Check and visual observation the following issues: The flora gathering

area after its cut-off;

Topsoil temporary

stored site

Work with investor

Vegetation clearance plan

Measures of vegetation clearance

Topsoil stored areas (disposal sites) are applied measures of protection

from erosion/run-off water?

Does project build holes/gutters/embankments?

Does project has landscape rehabilitation plan/Does it implement? Work with investor

Detect bombs and

mines

Checking bomb and mines disarming document proposed in the project Work with investor

Domestic and

constructed solid waste

management

Visual observation the following issues:

Does project generate discarded rock/soil?

Do discarded rock/soil affect on water quality or flow of water?

How to collect domestic solid waste?

How to treat domestic solid waste?

How to manage dump sites?

Disposal sites

Dump sites

Topsoil storage sites

Camp sites

Removal of discarded

vegetation out of

reservoir area

Visual observation the following issues:

Checking the plan of vegetation clearance

Work with investor

Check the reservoir bed.

Page 76: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 72

Parameters Monitoring Measure Monitoring location

Is it correct to cut off trees in the required areas?

Does collection of valuable wood out of the reservoir implement?

Is burning the remaining tree leaves/wood well done?

Erosion and

sedimentation

Visual observation the following issues: The construction sites

Do construction activities carry out in dry season?

Are measures to mitigate erosion/landslide applied at construction sites?

Are holes/ditchs/embankments built at danger sites of landslide in

construction areas?

The sites expose risk of

high erosion/landslide

Transportation and

traffic management

The following issues should be checked:

Certification of vehicles that serve for project meet

technological/emission standards

Attested document of vehicles/machine periodic maintenance

Do transportation cause traffic jam or damage the road?

Contracts signed with contractors supplying materials/equipments

Dam area

Powerhouse

Working with investor

Management of

hazardous substances

The following issues should be checked and assessed:

Hazardous substance storage:

Is it lined by anti-seeped ground?

Is it protected with protected roof?

Work with investor

Check the storage

Page 77: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 73

Parameters Monitoring Measure Monitoring location

Is it locked and isolated with surrounding area?

Check permission of Cao Bang Province’s Department of Industry

and Trade if explosives is stored;

Check dissemination and material supply about toxicity, safe manual

with hazardous substance;

Noise The following issues should be checked and assessed:

Does noise level at the construction sites impact on the nearest

residential area?

Interview local people and leaders living in the nearest area whether

the project makes noise in rest time, evening time?

Interview local people whether investor asks their permission to work

in evening time?

If there is any claim about the noise, request investor to measure the

noise level and give appropriate measures to mitigate its impact

Contracts signed with material supplied contractors.

Project area,

The nearest

residential area

Interview the local

people and

authorities

Working with

investor

Dust The following issues should be checked and assessed:

Is water sprayed fully in dry season at sensitive sites?

Does trucks used for transport material covering by tarpaulin?

Contracts signed with material/machine supplied contractors

Interview with local people about dust pollution

The construction site

Material transported

trucks

Working with investor

Page 78: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 74

Parameters Monitoring Measure Monitoring location

Water quality

management

The following issues should be checked and assessed:

How does sewage collection and treatment system implement at

campsites? Are there septic tanks?

Does sewage discharge directly into environment without treatment?

Do the septic tanks in campsites keep sanitary?

Are oil and grease from vehicles/machines maintenance collected?

Are ditchs/pits/embankments built at supplementary areas to collect

sand/soil/cement before discharging into environment?

Is water quality measured periodically as presented in EMP/EIA?

Campsites;

Crushing and mixing

concrete area

Vehicle maintenance

area;

Working with investor

on document of water

quality measurement

Safety Visual observation (combine with information collection on health protection

plan and safety issues):

Is health and safety plan prepared?

Are safe tools & equipments provided to and being used by workers?

Are labors trained and disseminated information on safety?

Are there any warming notice and boards guiding safety handling to

hazardous chemicals?

Construction sites

Storage area

Working with investor

Page 79: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 75

Parameters Monitoring Measure Monitoring location

Worker health care

Are first-aid kits for workers equipped?

Do they clean up well the drainage? Is there mosquito net for sleeping?

Are workers trained about food safety and prevent sexually infected

diseases?

Is there any disease for workers and did they treat by local health care

centre?

Camps

Working with investor

Interview workers

Worker regulation To assess implementation of regulations for workers as specified in item 19

of Table 4.1.

Finding of cultural

artifacts, and

areas/structures of local

cultural value

Observation, information collection, assessment of the below-mentioned

issues:

Excavation area of

soil/rock

Interview workers

Along transmission line

Let check whether contractors/ investor/ related persons be informed

the relevant organizations if accidental find of articles of cultural

value?

Do contractors and related persons have followed procedures?

Are there findings on cultural property and historical heritage in the

soil/rock excavation?

How are chance find procedures in place when accidental find of

articles of cultural value?

Page 80: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 76

Parameters Monitoring Measure Monitoring location

Location of tombs or valuable structures to local people

OPERATION PHASE

Noise Observation at site, interview people to assess the following issues:

Do noise from the powerhouse affect the local people?

The area out of the

fence of powerhouse

If there is any claim about the noise, request the investor to measure noise

at site.

The nearest residential

area

Safety and regulations to

workers

The following issues should be checked and assessed:

Are fire extinguishers equipped at site?

Check complying regulations for people as item 19 in Table 4.1

Powerhouse area

Operation house and

workers’ camps (if any)

Management of water

quality in reservoir

The following issues should be checked and assessed:

Is there any erosion at reservoir side? Are reinforcing measures

applied?

Is domestic waste water collected and treated prior discharging into

the environment?

Is there phenomenon of eutrophication in reservoir? Does investor

remove floating vegetation from the reservoir?

In the reservoir bed

Operation house and

powerhouse

Management of hazardous

materials (fuels,

lubricants, explosives etc.)

The following issues should be checked and assessed:

Are hazardous materials stored in safe conditions?

Does the investor equip facilities, provide information and guide safe

In the plant and fuel,

material and chemical

Page 81: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 77

Parameters Monitoring Measure Monitoring location

process to hazardous materials? storage areas.

Page 82: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 78

Table 5-3 Form of in-site environmental monitoring report

(Apply for contractor/investor)

Project name: Project location:

Name of Contractor:

Commencement of Project report or monthly report:

Date of report:

No. Issues Mitigation measures implemented Remark

Construction Phase

1 Selecting of construction camps and supported facilities

2 Vegetation clearance and topsoil stripping

3 Detect bomb and mines

4 Domestic and constructed solid waste management

5 Removal of discarded vegetation out of reservoir area

6 Soil erosion and sedimentation

7 Transportation and traffic management

8 Management of hazardous substances

9 Noise

Page 83: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 79

No. Issues Mitigation measures implemented Remark

10 Dust

11 Water quality management

12 Safety

13 Worker Health Care

14 Worker Regulation

15 Chance find of cultural artifacts, and areas/structures of

local cultural value

16 Vegetation cover including reforestation

Operation Phase

1 Noise

2 Surface water quality

3 Waste water

4 Solid waste

5 Vegetation cover maintenance

Page 84: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 80

No. Issues Mitigation measures implemented Remark

6 Environmental flow

7 Management of hazardous materials

8 Safety

9 Labour Health Care

10 Working regulation

Name of person prepared this Report:

Title:

Address:

Telephone:

Page 85: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 81

Table 5-4 Form of EMP implementation monitoring report

(Applying for environmental monitoring report of independent environmental consultant)

Project name:

Project location:

Date of report:

No Impacts Assessment of Consultant/ community

complaints

Comments/Recommendations

Construction phase

1 Selecting of construction camps and supported facilities

2 Vegetation clearance and topsoil stripping

3 Detect bomb and mines

4 Domestic and constructed solid waste management

5 Removal of discarded vegetation out of reservoir area

6 Soil erosion and sedimentation

7 Transportation and traffic management

8 Management of hazardous substances

Page 86: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 82

No Impacts Assessment of Consultant/ community

complaints

Comments/Recommendations

9 Noise

10 Dust

11 Water quality management

12 Safety

13 Worker health care

14 Worker regulation

15 Chance find of cultural artifacts, and areas/structures of local

cultural value

16 Vegetation cover including reforestation

Operation phase

1 Noise

2 Surface water quality

3 Waste water

4 Solid waste

Page 87: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 83

No Impacts Assessment of Consultant/ community

complaints

Comments/Recommendations

5 Vegetation cover remaining

6 Environmental flow

7 Management of hazardous materials

8 Safety

9 Labour health care

10 Worker regulation

Report prepared by:

Address and contact information:

Page 88: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 84

Table 5-5 Requirements on environmental management reporting system

No. Contents 1st reporting level 2

nd reporting level

3nd

reporting level

(A copy sent to the district’s

Environment Management

Department )

CONSTRUCTION PHASE

1 Implementation of

mitigation measures

and on- site

environmental

management

By: Contractor

Frequency: Monthly

To: Investor

By: Investor

Frequency: Quaterly

To: BIDV Hanoi/GDoE

By: BIDV Hanoi

Frequency: Semi-annual

To: GDoE

No. Contents 1st reporting level

2nd

reporting level

(A copy sent to the district’s

Environment Management

Department )

CONSTRUCTION PHASE

1 Environmental

monitoring

By: Independent Consultant

Frequency: Semi-annual

To: Investor/BIDV Hanoi

By: Independent Consultant

Frequency: Semi-annual

To: GDoE/WB

Page 89: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 85

OPERATION PHASE

1 Labor safety and

environmental

monitoring

By: Investor

Frequency: Yearly for first two years

To: BIDV Hanoi

By: BIDV Hanoi

Frequency: Yearly for first two

years

To: WB/GDoE

Page 90: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 86

6. COMPLAINATION ON ENVIRONMENT AND PENALTY

While monitoring the scene if supervising/monitoring environmental officers discover

that there is non-compliance with regulations on the implementation of measures to

minimize environmental impacts mentioned in EMP then monitoring construction

staff/ environmental supervisor shall make the records and report the investor .The

investor will stop paying that month expense for the contractor until the contractor

performed adequate measures to minimize environmental effects. The contractor will

be extended one time (due to the construction supervision consultant / supervisor of

environmental regulate) to correct this violation. If the contractor performs the repairs

within the time extension he will not be penalized. However, if the contractor does not

conduct the repairs needed in the extension period, the contractor will have to pay for a

third party to repair the damage (this cost will be taken from retained). Investors must

make provisions for compliance and sanctions for environmental violations in the

contract with the contractor.

In case supervision staff / monitoring environmental officers find non-compliance with

the environmental regulations of the contractor, the contractor shall have to pay the

cost to repair the violation.

The investor is responsible for monitoring and implementing the EMP effectively. If

he does not fulfill the implementation of the EMP, the slow disbursement from the

project to the investors will happen

Environmental offices of the contractor will be the place to receive complaints from

citizens against environmental influences such as dust, noise, traffic safety,... The

Contractor’s Chief Engineer and Personnel Assistant with the safety and environment

officers will be responsible for carrying out or giving solutions to handle the above

issues. Officer safety and environmental construction supervision consultant (or team

management environment of the investor) will be provided with copies of the

complaints of the people and must confirm that the problems are properly resolved by

the contractor in a similar incidents were discovered when examining at site.

Page 91: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 87

7. ENVIRONMENTAL MANAGEMENT CAPACITY

BUILDING PLAN

7.1. In the preparation phase

Investor will send staffs who are assigned to manage environmental protection of

project to partipate the WB/GDoE training courses on preparation of EMP and public

consultation.

7.2. In the construction and operation phase

The assigned staffs shall participate the training courses on WB’s safeguard policies

under REDP. The investor will appoint 1-2 environmental staffs to attend the short-

term training courses on environment which are held by the local authorities.

Additionally, book, papers and documents will be bought byInvestorso that they

could update the environmental protection information.

Table 7-1 Cost estimation for environmental management capacity building

No Activites Costs (VND)

CONSTRUCTION PHASE

1 To appoint staffs to participate training courses held by

WB: 2 persons x 5,000,000 VND/person/training

course x 2 times

20,000,000

2 To appoint staffs to attend training courses held by the

local environmental authorities.

2 persons x 1,000,000 VND/person/time x 2 time

4,000,000

3 Purchase of books, documents, papers to update

information

10,000,000

TOTAL 34,000,000

OPERATION PHASE

4 Cost for annual training in the project running phase

(10,000,000 VND/year x 20 year)

200,000,000

TOTAL 234,000,000

Page 92: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 88

8. ENVIRONMENTAL MANAGEMENT COST

ESTIMATION

Table 8-1 Estimated cost for EMP implementation

No. Items Construction phase During operation phase

(20 years of life cycle)

1 Mitigation

measures

The cost is covered in

investment cost

The cost is covered in

operation cost

2

Recover vegetation

at project sites

after construction

phase

40,000,000 VND

(The cost is covered in

investment cost)

3

Detect mine 30,000,000 VND

(The cost is covered in

investment cost)

4

Monitoring costs

for the Project.

(By staff of

environmental

management team’s

company)

The cost is covered in

investment cost

The cost is covered in

operation cost

5

Environmental

quality monitoring

as required in

Environment

Accessement

Report

Construction Phase

25,000,000 VND

(Cost estimated)

Operation Phase

400,000,000 VND

(Cost estimated)

6

Monitoring costs

for independent

environmental

monitoring

consultant*

Lump-sum

(2 times/year x 2 years x

20,000.000/time) =

80,000,000 VND

Sub-total 175,000,000 VND 400,000,000 VND

This cost is covered in

production cost

Total 575,000,000 VND

Page 93: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 89

* This cost is paid by Project Management Board under GdoE

9. PUBLIC CONSULTATION AND DISCLOSURE

9.1. Public consultation

In the preparation phase, Power Construction No.1 JSC carried out the following tasks:

1 The feasibility study report and investment report of Bao Lam project were

submitted to the People Committees of Ly Bon, Vinh Quang and Bao Toan Commune.

Based on the comments from above local authorities on locations of the main

components, the investor can revise promptly project documents to get effective

investment and mitigate compensation of relocation and impacts on environment and

communities.

2 Social survey by interview directly representatives of local authorities and

affected households was done by investor. Results from these investigations show that

almost households and local authorities support to construction of project since it

provides benifits for local residents. Project also facilitates for local traffic from

internal roads.

3 Survey and statistic of environmental impacts as well as affected households

were done.

4 Preparing EMP report.

5 Consultation meetings on EMP report and other related issues were held at the

offices of Peope Committes of affected communes Ly Bon, Vinh Quang and Bao Toan

from 08-11 July, 2014. Participants consist of representatives from Power

Construction No.1 JSC, local authorities of communes of Ly Bon, Vinh Quang, Bao

Toan, environmental and social consultants, affected households (Minute of meetings

and list of participants are presented in the Annex 3). The main content of consultation

meetings as below:

Investor presented the main information of project:

Bao Lam 1 hydropower project has with the capacity of 30 MW is categorized

of impoundment, regulated by reservoir, annual electricity production of 115.7

x 106 kWh. The headwork consists of gravity concrete dam with n x b x h = 6 x

15 x 13.5m, spillway with BxH = 15 x 13.5m. Volume of reservoir is 8.9x106

m3. Designed flow: 365 m

3/s; minimum flow 37.1 m

3/s. Bao Lam 1 hydropower

project is under small hydropower master plan that was approved by Cao Bang

Provincial People Committee.

Construction of Bao Lam No.1 hydropower project as the same other ones will

cause some negative/positive impacts to environment and social and these

negative impacts are unavoidable. EMP is prepared following to the World

Bank safeguard policies and commites to compling to mitigation measures so

that the negative impacts could limit. Investor also develops CDM for Bao Lam

1 hydropower project and hope to have support from local authorities as well as

residents for project.

Page 94: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 90

Environmental consultant presented generally the environmental negative/positive

impacts and mitigation measures which will be applied by investor/contractors during

project implementation as below:

Positive impacts:

When finishing, project will supply stable power with high quality for the local

people. It will support to development of industrial, handicraft and traditional

sectors in the locality.

During construction and operation phases, project creates jobs for local people.

After formation of reservoir, climate in the project area becomes cooler with

higher humidity that facilitates for development of vegetation cover, trees and

reservoir aquatic species such as fish, snail, shrimp etc. The reservoir could

allow to develop aquaculture in the future which provides new jobs and income

for local residents.

Income from tax of water resource usage which is provided from project will be

added to provincial budget.

Project has installed capacity of 30 MW with annual electricity production of

115.7 million kWh. Project also applied CDM and as estimated the certification

emission reduction is received around 80,000 ton of CO2 per year.

Negative impacts:

Construction and operation of project must block river, storage water, build the main

components such as dam, powerhouse, swichtyard, transmission line etc that cause

some unavoidable impacts as below:

103.91 ha land will be appropriated permanently for buiding components of

headwork and some more land will be acquired temporary for supported

facilities.

Construction activities of components of headwork such as dam, spillway,

intake, powerhouse and swichyard have to excavation of soil/rock that cause

landslide/erosion at these sites.

Process of blocking river, constructing dam bringing about increasing turbidity

and reduction of water quality of Gam and Nho Que rivers.

Activities such as blasting, excavation of foundation, quarry, levelling soil and

rock, material transportation, rock grind, concrete mixing, operation of

constructed machines, construction etc will impact to environment causing air

pollution in case the mitigation measures are not applies.

In the construction phase, the operation of constructed/transported facilities,

concrete mixing, rock grind, blasting, using driller etc will create noise that

disturb to local residents.

Constructed and domestic solid waste that discharged from workers will cause

pollution of air and water river if it is not well controlled.

Page 95: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 91

In the construction phase, the aquatic species may lose temporary living

condition due to reduction of surface water quality that cause by random

spilling or rain sweeping away concrete, petrol, oil, gear, soil, rock etc.

However, this is only temporary and negligible impacts. They may be mitigated

because project has small scale and the construction time takes only 2 years.

Storage of water in the reservoir as well as operation of Bao Lam 1 hydropower

plant will cause changing of Gam and Nho Que river flows regime from behind

dam to downstream of powerhouse. In the project site, rive flow regime will

replace by reservoir hydrography regime that performs by fluctuation of water

level. In the operation phase, the reservoir has negative impacts to aquatic

species and fishs which have habit of emigration. This affect is unavoidable

when construction and operation of hydropower projects.

Some key main mitigation measures:

Environmental consultant presented briefly draft EMP which will be complied by

investor to mitigate negative impacts with some key measures as below:

The permanent and temporary acquired land due to project construction will be

compensated following compensation plan which is approved by local

authorities. During construction phase, cultivative and public transportation

acquired land for campsites, transmission line and supported facilities will be

limited by contractors.

The contractors are responsible for informing to local authorities and residents

on blasting time so that they do not travel or release cattle in the blasting areas.

Disposals have to meet criteria: far from surface water at least 100m, do not

affect to surface water, cultivative land, do not locate on the risk of erosion,

should locate on the hollow sites to mitigate sweep away by runoff water.

To establise the worker regulation at construction site containing regulations

such as prohibiting workers to discard domestic/construction waste into

surrounding areas, river, stream or places which may sweep away to surface

water.

Do not allow to burn solid waste to mitigate risks of forest fire.

After construction phase, the mine, borrow pits or disposals etc must be

restored by levelling ground then planting trees to prevent erosion.

Planting trees and controlling vegetation cover at reservoir surrounding area

especially in the places of semi-flooding, main components for more stability of

ground.

To arrange storehouses of petrol, fuels etc at minimum safe distances of 300 m

from surface water, local communities.

Investor commits to comply with EMP with the main issues presented above.

Questions and answers are summarized as below:

Ly Bon commune, Bao Lam district:

Page 96: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 92

Questions from representatives of local authorities and affected households

Chairman and vice chairman of People Committee represent Ly Bon commune

is one of the New Rural Planning Region’s affairs of province, due to Bao Lam

1 Hydropower Project construction activities of New Rural Planning Region

temporarily stop and affect to the local people’ life. Beside that, representatives

of local authority request investor to provide related documents of designs and

compensation to affected households. They suggest investor should has

harmonized compensation level and support stable livelihood for affected

households.

Vice chairman of Commune People Committee raised an issue of constructed

company taking advantage of the hydropower project construction to mining

lake (sand, gravel) which cause erosion and depletion of natural resources.

Beside that, there are some companies ask permission of sand mining on Gam

riverbed but the primary purpose of gold mining, therefore investor is required

to recommend to Department of Natural Resources and Environmen of Cao

Bang Province not to permit them to exploit.

Almost affected households consent to Bao Lam 1 hydropower project

construction but some of them wonder about compensation such as land areas

and price of compensation.

Answers of developers and environmental consultants

Compensation will resolve in the other working days with Resettlement

Committee and local authorities. Investor will provide documents relating to

compensation to coummne authorities. The method to culculate acquired land

as well as compensative expenses will be based on the current regulations

setting by the government and annual updated regulation of Cao Bang province.

Measures of livelihood stability for affected households will be considered by

investor.

Vinh Quang commune, Bao Lam district:

Questions from representatives from local authority and affected households

Chairman of communal people committee supports to Bao Lam 1 hydropower

project construction however he requires investor to deal with complaints from

affected persons on compensative procedures and expenses, count of property

on land.

Affected people complained on compensative land and expenses, livelihood

after acquired land for reservoir. They are worry about their livelihood after

powerplant is put into operation.

Some of affected residents raised issue of widening their land last year with

high price (because of buying and renting machine for grading) whether

investor compenses satisfactory in expenses as well as procedures.

Answers from investor and consultant:

Page 97: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 93

Compensation of land areas, expenses as well as procedures will be done by

current regulations. Investor will coordinate to local authority to harmonize the

compensative requirements from affected households.

Regarding to supporting livelihood and providing new jobs for affected

residents, investor will try to deal with at the best effort.

Bao Toan commune, Bao Lac district

Questions from representatives from communal people committee and affected

households:

Vice chairman of Bao Toan Commune People Committee support to

construction project. Bao Toan commune the affected one at least, however, it

is difficult for households lose their cultivate land to get new cultivate land

(because of almost cultivate land belong to owner). Construction will also affect

to vegetation, however, within 2 years in constructing, it will be recovered

afterward.

Cultivative land in the commune is reclaimation of residents from surrounding

areas so vice chairman requestsInvestorcoordinate to local authorities

supporting them on land ownership during compensative implementation.

Investor is required to issue worthy compensation and to support livehood for

affected resident.

Answers fromInvestorand consultant:

Investor will coordinate to local authorities and affected household preparing

compensative plan based on current regulations.

Issue of vegetation (environmental condition) will be regulated in EMP it is

committed to implement by investor.

6 To revise EMP following to comments from local authorities and affected

people in the consultation meetings as well as in surveys.

7 To provide EMP to communal people committee of Ly Bon, Bao Toan and

Vinh Quang to get comments from them.

8 To revise EMP again based on comments.

9.2. Disclosure

As policy of WB’s disclosure, investor will implement steps as below:

To provide EMP in Vietnamese version which is approved by WB to DONRE

of Bao Lam, Bao Lac and Ly Bon, Vinh Quang, Bao Toan Commune People

Committees.

Approved EMP Vietnamese version will be disclosure at project site during the

project implementation.

Announcement of EMP which is approved by WB to public during project

preparation and implementation in working time at Ly Bon, Vinh Quang, Bao

Toan Commune People Committees.

Page 98: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 94

To provide EMP in both English and Vietnamese versions to Information

Development Centre, 63 Ly Thai To street, Hanoi so that they are accessed by

NGOs and communities. EMP in English version is sent to WB Infoshop for

disclosure.

Page 99: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 95

List of reference documents

1 The compensation and relocation Plan of the project- Power Construction No.1

JSC

2 Investment Report of Bao Lam hydropower project - Power Construction No.1

JSC

3 The World Bank’s Safeguard policies;

4 Environmental Impact Assessment of Bao Lam No.1 hydropower project

5 Environmental safeguard framework for Vietnam Renewable Energy

Development Project- MOIT 2008, revised 2014.

6 Statistical yearbook- statistic publishing house

Page 100: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 96

Annex 1. List of EMP preparers

No. Name Agency

1 Mr. Trinh Van Tuan Director of Power Construction No.1

JSCo.,

2 Mr. Vu Anh Duong Head of Hydropower projects

management board

3 Mrs. Lai Thi Nhu Environmental staff

4 Mrs. Le Thi Thanh Nhan Environmental expert

Page 101: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 97

Annex 2. Responsibility of safe and environmental supervising officer

The Target

The safe and environmental supervising officer supports the EMP efficiently during

the Bao Lam 1 hydropower construction

To achieve the target of diminishing the environmental negative impacts of the project,

the contractor needs to comply with this management plan. Therefore, implementing

him environmental management plan will relate to the following units:

The safe and environmental officers of the contractor are responsible for supervising

the EMP and problems about safety and environment of the construction

The safe and environmental supervising officers of the developer are responsible for

the construction inspection and guarantee that the contractor will comply with the

requests in the contract and EMP

Tasks:

Overall responsibilities of the safe and environmental supervising officers including

supervision and inspection of construction activities to ensure that the mitigation

measures are implemented as appropriate in the plan so that environmental

management and the negative impact of the project on the environment is diminished.

The contractor is responsible for ensuring compliance with the environmental

management plan of the project and the contract conditions during construction under

the supervision of safety and the environment officer. Therefore, safety and the

environment officer is an independent supervisory personnel to ensure compliance

with the environmental management plan and ensure the full implementation of the

contractor for environmental issues

Personnel monitoring and environmental safety will examine monitor and implement

the environmental review for tenders and contracts for road construction. Supervisors

on safety and the environment have much knowledge and experience in monitoring

and verification of environmental issues and advise investors on implementation issues

of the project environment project. Personnel monitoring and environmental safety

should be familiar with the project work through the review of relevant reports,

including the report on environmental impact assessment (DTM) Bao Lam 1

hydropower project, environmental Management plan as well as the relevant technical

standards and contract documents.

Being a part of the construction examiner group, safety and environmental staff is

obliged to the following tasks

Phase 1: Preparation

The objective of Phase I is taking foundation for successful implementation of the

project. During this period, supervisors, safety and environment must: (i) consider the

DTM, environmental management plan, project design and technical standards to

assert not to miss these mitigation measures ; (ii) prepare guidelines for contractors in

the implementation of Environmental Management Plan; and (iv) develop and

implement training programs for activities related to construction.

Page 102: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 98

Main tasks for this phase are:

Desk study: supervisors on safety and the environment will review the DTM,

environmental management plan, project design and technical standards and certify in

writing expressly not to omit any mitigation measures. If problems arise, safety and

environment officers propose to the investor for additional updates in the

environmental management plan, project design and technical standards of this issue.

When the Investors, Board of Management and the World Bank project GDoE ratify,

personnel monitoring and environmental safety will conduct additional updates

environmental management plan

Enviromental supervision directory: The safety and environment officers need to

create an examination directory during the construction for supervising the

implementation of the contractor. This includes the core issue of the project, the

requested mitigation measures and implementation plan

Diary: safety and environment supervising staff of the Contractor shall keep diaries to

record events or changes possibly implicate the assessment of environmental impact

and non-compliance attached to the proposals. Diaries must be always ready to serve

when the supervisory staff support as mentioned in the environmental management

plan and contract suggest. Safety and environment staff of the investor will verify this

diary.

Environmental training : Environmental safety staff of the investors are obliged to

design and implement a comprehensive training program for the Supervision Engineer,

Owner, environmental safety officers of the contractor (and workers as part of training

for supervisors, safety and environment), the environmental requirements of the

project and methods for monitoring and evaluation, especially should pay attention to:

Environmental management plan: the requirements of the Environmental Management

Plan, approved check list in supervising environmental, environmental sample

monitoring and processing methods for non-compliance with the management plan

environment and all the issues will be mentioned. Special attention should be paid to

the specific terms of the contract emphasized on compliance with the environmental

management plan

Health and safety: Health and safety requirements of the project must be apparently

verified and coordinated to the contractors and the investor (included in the technical

standard environment for the contractors

At the end of training, the contractor will sign a confirmation through training grasp of

environmental regulations, the environmental management plan and compliance

framework, on the health and safety obligations. Construction supervisors must sign

the certification through training understand the oversight responsibilities.

Phase 2 Construction activities supervision

Safety and environment officer of the investors will represent the Owner and

monitoring Chief Engineer:

Examining and monitoring independently the implementation of the

Environmental management plan

Page 103: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 99

Performing random checks and review the profiles of environmental safety staff

of the Contractor

Proceeding the inspection frequently in the building section

Reviewing the implementation of the mitigation measures is not right with the

environmental management plan and contract documents

Reviewing the effectiveness of the mitigation measures and the implementation

of environmental problems;

Reviewing the terms acceptable environmental construction methodology

(including temporary works and permanent works), designs and related

submissions. If necessary, staff safety and the environment have to research and

propose solutions to the environmental impacts discussed with the designers,

contractors and Investors

Verifying survey cases of non-compliance of environmental quality and

effectiveness of the remedial measures;

Providing feedback to the Owner and Chief Engineer under the supervision of

the process of non-compliance with the Environmental Management Plan;

Organizing training programs, including team environmental safety staff of the

contractors, evaluating issues identified an improve environmental compliance

method;

To conduct the contractors to repairs within the prescribed time, conducting

additional monitoring, if required, in accordance with the provisions of the

contract and procedures in case of non-compliance and complaints

To conduct the contractor to take measures to minimize the impact and comply

with the environmental management process required in the case of non-

compliance and inconsistency

To conduct the contractor to stop the construction activities which can cause

negative effects, and / or if the contractor fails to perform the requirements of

the Environmental Management Plan / not conduct operations as directed the

supervisor of environmental safety.

Review of the plan at site: To ensure the consistency throughout the project, safety

and the environment staff must consider the entire plan could affect the environment.

These plans include, but are not limited to: plan pits and dumps. Supervisors on safety

and the environment will be considered and approved the environmental management

of the project and plans to restore the landscape of the contractor. What parts of the

plan does not comply with the environmental management plan, environmental impact

assessment, personnel and environmental safety of the investors will work with the

Chief Engineer and the Contractor to take appropriate measures.

Health and Safety: To ensure consistency throughout the project, the environmental

safety officer must consider all of the safety plan of the contractor, and on the basis of

this plan, with the data of the investor's input, to create a comprehensive plan for

safety projects. Comprehensive Plan about project safety must include processes such

Page 104: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 100

as blast management and safety in the construction process, preventing landslides / soil

erosion during the rainy season, ... These plans must be reviewed on an annual basis

and must be updated as necessary.

The supervisors on safety and the environment must ensure compliance with the

provisions of health and safety in the contract documents. This Compliance includes,

but is not limited to: (i) the construction activities; (ii) dissemination of education on

HIV / AIDS; (iii) comply with the labor law of Vietnam; and (iv) traffic safety. For the

prevention of HIV / AIDS, not only focusing on the construction site, but also pay

attention to the nearby communities.

In case of violation in the requirements of technical standards, or contractual

conditions or non-compliance with the environmental management plan, safety and the

environment monitor immediately notify to the Chief Engineer of the Contractor ,

Chief Engineer supervision and investor. Safety and the environment supervisors must

also report violations to the Investor as part of the monthly report.

Diary of safety and the environment staff must always be ready to provide, upon

request by the support team of project management

Safety and the environment supervisors have to regularly review records of the

Contractor to ensure that all records are updated in accordance with reality and meet

the requirements of the Environmental Management Plan (eg the records of complaints

about environmental issues).

The unintended effect: In case of the incident which was not anticipated in the

environmental management plan and DTM, safety and the environment monitors must

be closely coordinated with the investor, the contractor and the project manager to

confirm that the problem has been resolved. Safety and the environment supervisors

must update Environmental Management Plan and implement guidelines, based on

that training for contractor personnel

Monthly Payment: safety and the environment monitoring officer must certify the

monthly payment for activities related to the environment as proposed by the

Monitoring Officer safety and the environment to the investor.

Roadwork’s and landscaping restore: safety and the environment monitoring

officer must closely monitor the operation to restore the site and landscaping in areas

such as land mines, quarries, wash stations vehicles, to ensure that activities are carried

out according to acceptable standards. Safety and the environment supervisors must be

consistent with the contractor about the recovery plan which should be implemented

before the end of construction activities.

Human Resource for the Project: safety and environmental supervisors and building

monitors group is expected to be mobilized 1 month prior to construction

commencement. In January, the safety and environmental monitor will be familiar

with the project, project design, specifications, contract documents, environment

protection commitment, environment management plan and other reports and

documents related to the project. Based on the review, monitoring officer safety and

the environment will report a summary of the issues that may arise in the process of

implementing the environmental management plan and the conditions of the contract

Page 105: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 101

the recommend the Manager the best option to improve the process of implementing

the environmental management plan.

Supervisors and safety are expected to be mobilized in the early stages of the contract

to prepare the guidelines, documentation, training,

Report: environmental safety officers must make a minimum of the following

documents: ...

Weekly reports on issues of non-compliance;

Monthly report summarizes the main issues and findings during surveillance

activities;

Quarterly report from the contractor's monthly report

Reports and data must be provided as required by the project manager.

At the end of the project, safety and environment monitoring staff set up a final report

summarizing the main findings, the non-compliance, the solutions ... as well as

guidance on implementing orientation this mission later.

Page 106: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 102

Annex 3. The approval documents on EIA of Bao Lam 1 HP

Page 107: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 103

Page 108: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 104

Page 109: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 105

Page 110: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 106

Page 111: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 107

Page 112: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 108

Page 113: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 109

Annex 4. Minute of Public Consultation Meetings

Page 114: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 110

Page 115: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 111

Page 116: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 112

Page 117: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 113

Page 118: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 114

Page 119: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 115

Page 120: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 116

Page 121: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 117

Page 122: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 118

Page 123: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 119

Page 124: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 120

Page 125: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 121

Page 126: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 122

Page 127: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 123

Page 128: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 124

Page 129: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 125

Page 130: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 126

Page 131: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 127

Page 132: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 128

Page 133: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 129

Page 134: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 130

Page 135: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 131

Page 136: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 132

Page 137: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 133

Page 138: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 134

Page 139: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 135

Page 140: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 136

Annex 5. Some pictures of consultation meetings

Page 141: ENVIRONMENTAL MANAGEMENT PLANdocuments.worldbank.org/curated/en/... · Bao Toan commune, Bao Lac district and Vinh Quang, Ly Bon communes, Bao Lam district, Cao Bang province. Has

EMP - Bao Lam 1 Hydropower plant - Cao Bang Province

Page 137