Environmental Impact Assessment Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) Plot No. DP-2 (part), Saykha Ind. Estate, Saykha, Tehsil: Vagra, Dist.: Bharuch, Gujarat. for Proposed Manufacturing of Dye Intermediates Project Activity: 5(f), Category: B (TOR No. SEIAA/GUJ/TOR/5(f)/1330/2017) Prepared by San Envirotech Pvt. Ltd. (NABET Accreditation No. NABET/EIA/1619/RA0084; Valid till 23.12.2019) 424, Medicine Market, Paldi Cross Road, Ahmedabad-380006, Gujarat Email: [email protected] (February, 2018)

Transcript of Environmental Impact Assessment Report Associated...

  • Environmental Impact Assessment

    Report

    of

    Associated Dyestuff Pvt. Ltd. (Unit-IV)

    Plot No. DP-2 (part), Saykha Ind. Estate, Saykha,

    Tehsil: Vagra, Dist.: Bharuch, Gujarat.

    for

    Proposed Manufacturing of Dye Intermediates

    Project Activity: 5(f), Category: B

    (TOR No. SEIAA/GUJ/TOR/5(f)/1330/2017)

    Prepared by

    San Envirotech Pvt. Ltd.

    (NABET Accreditation No. NABET/EIA/1619/RA0084; Valid till 23.12.2019)

    424, Medicine Market, Paldi Cross Road,

    Ahmedabad-380006, Gujarat

    Email: [email protected]

    (February, 2018)

    mailto:[email protected]

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) I

    Contents Particulars Page No.

    Index I

    List of Tables IX

    List of Figures XII

    List of Annexures XIV

    Index Chapter 1 Introduction Page No.

    1.1 Preface 1

    1.2 Purpose of the Report 1

    1.3 Identification of Project & Project Proponent 2

    1.4 Brief description of project 3

    1.5 Applicable Environmental Regulatory framework 4

    1.6 Scope of the study 5

    1.7 Compliance to Terms of Reference 6

    1.8 Objective of EIA 19

    1.9 Methodology for EIA 19

    1.10 Structure of EIA Report 20

    Chapter 2 Project Description

    2.1 Type of project 22

    2.2 Need for the project 22

    2.3 Proposed schedule for approval and

    implementation

    23

    2.4 Location of the project 23

    2.5 Size or magnitude of operation 26

    2.5.1 Land breakup & project site layout 26

    2.5.2 Project Magnitude 28

    2.6 Description of manufacturing process 28

    2.7 Project Components 51

    2.8 Input Requirements 52

    2.9 Generation of pollutants 56

    2.9.1 Wastewater Generation 56

    2.9.2 Air Pollution 56

    2.9.3 Hazardous/solid waste generation 58

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) II

    2.9.4 Noise Generation 59

    2.10 Pollution control strategy 59

    2.10.1 Effluent Management 59

    2.10.2 Generation & consumption of Liquid Waste

    Streams

    63

    2.10.3 Air Pollution Control measures 64

    2.10.4 Hazardous/ solid waste management 64

    2.10.4.1 Fly Ash Management 65

    2.10.4.2 Methodology of decontamination of discarded Containers

    65

    2.10.5 Noise Pollution Control 65

    2.11 Rain water harvesting 65

    2.12 Green Belt Development 65

    2.13 Occupational Health & Safety 66

    Chapter 3 Description of the Environment

    3.1 General 68

    3.2 Study area 68

    3.3 Study Period 69

    3.4 Source of environmental data generation 69

    3.5 Methodology 69

    3.6 Land Environment 70

    3.6.1 Land use pattern of the Study Area 70

    3.6.2 Objective of Land Use Studies 70

    3.6.3 Topography 72

    3.6.4 Seismicity of the area 72

    3.7 Meteorology 72

    3.7.1 Site specific micro-meteorological data 72

    3.7.2 Wind Rose 73

    3.8 Ambient air quality 74

    3.8.1 Introduction 74

    3.8.2 Design of Network for Ambient Air Quality

    Monitoring Stations

    74

    3.8.3 Reconnaissance 74

    3.8.4 Parameters, Frequency and monitoring

    Methodology

    74

    3.8.5 Interpretation of result 75

    3.9 Water Environment 76

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) III

    3.9.1 Hydro-Geology of the Study Area 76

    3.10 Water quality 80

    3.10.1 Introduction 80

    3.10.2 Sampling Frequency, Techniques & Methodology 80

    3.10.3 Surface Water Quality (Primary data) 81

    3.10.4 Ground Water Quality 81

    3.10.5 Interpretation 81

    3.10.6 Conclusion 82

    3.11 Noise Environment 82

    3.11.1 Instrument used for Sampling and Monitoring 83

    3.11.2 Noise Quality Monitoring Locations 83

    3.11.3 Ambient Noise Standards 83

    3.11.4 Results 83

    3.11.5 Conclusion 84

    3.12 Soil Environment 84

    3.12.1 Soil sampling locations 84

    3.12.2 Methodology 85

    3.12.3 Corollaries 85

    3.12.4 Conclusion 86

    3.13 Biological Environment 87

    3.13.1 Period of the study 87

    3.13.2 Study methodology 87

    3.13.3 Floral species in the study area 88

    3.13.4 Fauna in the study area 88

    3.14 Socio Economic Environment 88

    3.14.1 Objective of the study 88

    3.14.2 Land use pattern and infrastructure 89

    3.14.3 Demographic and Socio-Economic Environment 89

    3.14.4 Living Standard and Infrastructure 90

    Chapter 4 Anticipated Environmental Impacts &

    Mitigation Measures

    4.1 General 121

    4.2 Identification of Impact 122

    4.2.1 Identification of Impacting Activities 122

    4.2.2 Identification of Environment Attributes 123

    4.3 Impact on Topography 123

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) IV

    4.4 Impact on Air Environment 123

    4.4.1 Air Pollution Dispersion modeling of stack 124

    4.4.2 Micrometeorology 126

    4.4.3 Input data 126

    4.4.4 Receptor Network 127

    4.4.5 Output of Model (24-hourly GLCs) 127

    4.4.6 Incremental & cumulative concentration of

    pollutants

    127

    4.4.7 Conclusions 127

    4.5 Impact on Water Environment 128

    4.6 Impact on Noise Environment 128

    4.7 Impact on Land Environment 130

    4.8 Impact on Biological Environment 131

    4.9 Impact on Socio-Economic Environment 132

    4.10 Impact on Occupational Health & Safety 133

    Chapter 5 Analysis of Alternatives

    5.1 Prologue 147

    5.2 Site Alternative 147

    5.3 Technology Alternative 147

    Chapter 6 Environmental Monitoring Program

    6.1 Prelude 149

    6.2 Environment Monitoring Program 149

    6.3 Objective of Monitoring Plan 149

    6.4 Schedule for Environment Monitoring 150

    6.5 Ambient Air Quality Monitoring 150

    6.6 Water Environment Monitoring 151

    6.7 Noise Environment Monitoring 151

    Chapter 7 Additional Studies

    7.1 Risk Assessment 154

    7.1.1 Introduction 154

    7.1.2 Objectives 154

    7.1.3 Scope of Study 154

    7.1.4 The study Approach 155

    7.2 Hazardous Identification 155

    7.3 Hazardous Material Storage 157

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) V

    7.4 Risk Screening Approach 157

    7.5 QRA Approach 160

    7.6 Thermal Hazards 161

    7.7 Damage due to explosion 163

    7.8 Toxic release 163

    7.9 Likely Failure Scenarios 164

    7.10 Quantitative Risk Assessment & Consequence

    Analysis

    165

    7.11 Incidents Impacts 166

    7.12 Consequential Impacts 171

    7.12.1 Toxic Hazards 171

    7.12.2 Other Hazards 171

    7.12.3 Other Toxic Hazards 171

    7.13 Occupational Health 171

    7.14 Other Safety Precautions & Recommendations 172

    7.14.1 Safety/control measures during storage,

    transportation & unloading of materials

    172

    7.14.2 Fire Control Plan 175

    7.14.3 Leak Detection and repair program 176

    7.14.4 Dos & Donts 176

    7.14.5 Antidotes Details 178

    7.15 Ways to minimize the manual handling of the

    hazardous chemicals

    178

    7.16 Occupational health & safety programme 178

    7.16.1 Hospital facilities/factory medical officer & OHC 178

    7.16.2 Personnel Protective Equipment 179

    7.16.3 Plan for periodic medical check-up 180

    7.16.4 Safety Trainings 180

    7.16.5 Mock drills 180

    7.17 On-site Emergency Plan 181

    7.17.1 General 181

    7.17.2 Statutory requirement 181

    7.17.3 Preparedness of OnSite Emergency Plan 182

    7.17.4 Emergency Time Activities 182

    7.17.5 Sequential actions during emergency 183

    7.17.5.1 Incident 183

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) VI

    7.17.5.2 Responding actions 183

    7.17.5.3 Site Crisis 184

    7.17.5.4 Messages 184

    7.17.5.5 Discipline 184

    7.17.5.6 Emergency Actions 185

    7.17.6 Shut down procedure 185

    7.17.7 Post Emergency Activities 186

    7.17.8 Training, Rehearsals & Records 186

    7.17.8.1 Need of training & Rehearsal 186

    7.18 Off-site Emergency Plan 188

    7.18.1 Role of the Factory Management 190

    7.18.2 Role of the Emergency Co-ordination Office (ECO) 190

    7.18.3 Role of the local authority 191

    7.18.4 Role of Fire Authorities 191

    7.18.5 Role of the police & Evacuation Authorities 192

    7.18.6 Role of the health authorities 193

    7.18.7 Role of the Mutual Aid Agencies 193

    7.18.8 Role of the factory Inspectorate 193

    Chapter 8 Project Benefits

    8.1 Introduction 195

    8.2 Improvements in Physical Infrastructure 195

    8.3 Improvement in Social Infrastructure 195

    8.4 Employment Potential 196

    8.5 Other Tangible Benefits 196

    Chapter 9 Environmental Cost Benefit Analysis 197

    Chapter 10 Environment Management Plan

    10.1 Introduction 198

    10.2 Environmental Management During Construction

    Phase

    199

    10.2.1 Air & Noise Environment 199

    10.2.2 Water Environment 199

    10.2.3 Socio-Economic Environment 199

    10.2.4 Safety & Health 199

    10.3 Environmental Management during the Operational

    Phase

    200

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) VII

    10.3.1 Air Pollution Management 200

    10.3.1.1 Source of Air Pollution & Control Measures 200

    10.3.1.2 Measures for Solvent Recovery 201

    10.3.1.3 Odour Control Plan 201

    10.3.2 Water Environment Management 201

    10.3.2.1 Spillages/Leakages Control Measures 202

    10.3.2.2 Economical & Technical viability of the effluent

    treatment system to achieve zero liquid discharge

    202

    10.3.3 Hazardous/Solid waste management 203

    10.3.4 Noise Control 204

    10.3.5 Green Belt Development 205

    10.3.6 Occupational Health & Safety Plan 207

    10.4 Post Project Environmental Monitoring 210

    10.4.1 Work Place Air Quality Monitoring Plan 211

    10.5 Environment Management Budget Allocation 211

    10.6 Environmental Management Cell 212

    10.6.1 Hierarchical Structure of Environmental

    Management Cell

    212

    10.6.2 Reporting System of Non-Compliances/Violations

    of Environmental Norms

    213

    10.7 Resource Conservation and Cleaner Production 214

    10.8 Socio Economic Activities 215

    Chapter 11 Summary & Conclusion

    11.1 Project Description 217

    11.1.1 General Introduction 217

    11.1.2 Brief project description 217

    11.1.3 Investment of the Project 218

    11.1.4 List of Products 218

    11.2 Description of Environment 219

    11.2.1 Baseline Environmental Study 219

    11.2.2 Air Environment 219

    11.2.3 Water Environment 220

    11.2.4 Noise Environment 221

    11.2.5 Soil Quality 221

    11.2.6 Biological Environment 222

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) VIII

    11.2.7 Socio-Economic Environment 222

    11.3 Anticipated Environmental Impacts and Mitigation

    Measures

    222

    11.3.1 Summary of Impacts on Air Environment 222

    11.3.2 Summary of Impacts on Water Environment 223

    11.3.3 Impacts on Noise quality & Mitigation measures 223

    11.3.4 Summary on Impacts on Land Environment 224

    11.3.5 Summary of Impacts on Socio Economy 224

    11.3.6 Summary on Impact on Ecology 225

    11.4 Environment Monitoring Programme 225

    11.5 Additional Studies 226

    11.5.1 Risk Assessment 226

    11.6 Project Benefits 226

    11.7 Environmental Management Plan 226

    11.8 Conclusion 228

    Chapter-12 Disclosure of Consultant engaged

    12.1 Preface 229

    12.2 Details of EIA Consultant Organization 229

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) IX

    List of Tables

    Table

    No.

    Name Page No.

    1.1 Salient features of the project 3

    1.2 List of products 4

    2.1 Land breakup of the area 26

    2.2 List of products 28

    2.3 List of raw materials 52

    2.4 Break up of water consumption & wastewater generation 54

    2.5 Details of the utilities and quantity of fuel required 56

    2.6 Details of air pollution 57

    2.7 Details of hazardous/solid waste 58

    2.8 Design parameters ETP-1 60

    2.8 (a) Design parameters ETP-2 60

    2.9 Design parameters of MEE & RO 61

    2.9 (a) Technical Details of MEE-1 61

    2.9 (b) Technical details of MEE-2 61

    2.10 Technical Details of RO-1 62

    2.10 (a) Technical Details of RO-2 62

    2.11 Summary of generation & consumption of liquid waste 63

    2.12 Characteristics of treated & untreated effluent process

    W/w

    67

    2.12(a) Characteristic of Recycle water recovered at different

    stage of effluent treatment

    67

    3.1 Environmental setting of the study area 69

    3.2 Land use statistics work out based on satellite imaginary 71

    3.3 Monitoring Methodology of Meteorological Data 73

    3.4 Meteorological Data for the Monitoring Period 73

    3.5 Methodology of Ambient Air Monitoring 75

    3.6 Monitored Parameters and Frequency of Sampling 75

    3.7 Groundwater availability, utilization and stage of

    development of Vagra Taluka and Bharuch District (2011)

    78

    3.8 Sampling locations with source & date of sampling 81

    3.9 Monitoring Methodology of Noise 83

    3.10 Location of soil sampling 84

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) X

    3.11 Methodology of Soil Sample analysis 85

    3.12 Ambient Air Quality Monitoring Locations 92

    3.13 Ambient Air Quality Status 93

    3.14 Ambient Air Quality Status (PM10) 94

    3.15 Ambient Air Quality Status (PM2.5) 95

    3.16 Ambient Air Quality Status (SO2) 96

    3.17 Ambient Air Quality Status (NOx) 97

    3.18 Ambient Air Quality Status (VOCs) 98

    3.19 National Ambient Air Quality Standards 99

    3.20 Results of Ground water Quality in the Study Area 100

    3.21 Results of Surface water Quality in the Study Area 101

    3.22 Indian Standard Specification for Drinking Water 102

    3.23 Ambient Noise Levels in the Study Area 103

    3.24 Ambient Air Quality Standards with respect to Noise 103

    3.25 Soil Analysis of Study area 104

    3.26 Floral Diversity 105

    3.27 Faunal Diversity 107

    3.28 Land Use Pattern 109

    3.29 Summary of Socio-Economic Status (Demography) 110

    3.30 Basic amenities in the study area 112

    4.1 Input data for air quality modeling 135

    4.2 Cumulative Concentrations at various locations 136

    4.3 The 24-hourly average GLC Concentration Values for SPM 137

    4.4 The 24-hourly average GLC Concentration Values for SO2 138

    4.5 The 24-hourly average GLC Concentration Values for NOx 139

    4.6 The 24-hourly average GLC Concentration Values for HCl 140

    4.7 The 24-hourly average GLC Concentration Values for NH3 141

    6.1 Environment Monitoring Plan 152

    6.2 Budget for implementation of Environmental Monitoring

    Plan

    153

    7.1 Bulk Hazardous Materials storage 157

    7.2(a) Hazardous Characteristics of Raw materials 158

    7.2(b) Hazard analysis-raw materials 159

    7.3 Risk Classification 161

    7.4 Effects due to Incident Radiation intensity 162

    7.5 Thermal Radiation Impact to human 162

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) XI

    7.6 Tolerable Intensities for various objects 162

    7.7 Damage due to overpressure 163

    7.8 Different failure scenarios 164

    7.9 Hazards scenario impact 166

    7.10 Antidotes details 178

    10.1 Greenbelt Development Programme 206

    10.2 Environment Monitoring Plan 210

    10.3 Budget Allocation for Environment Management 211

    10.4 Budgetary provisions for the social upliftment 216

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) XII

    List of Figures

    Figure No.

    Name Page No.

    2.1 Location of the project 24

    2.2 Google map of 10 km radius 25

    2.3 Co-ordinates and boundary of the site 25

    2.4 Project site layout 27

    2.5 Water Balance Diagram 55

    3.1 Land use map 71

    3.2 Hydrogeological map of Bharuch district 79

    3.3 Pre- & Post- monsoon water level for year 2012 in

    Bharuch district

    79

    3.4 Graphical representation of Ambient Air Quality 93

    3.5 Graphical representation for PM10 94

    3.6 Graphical representation for PM2.5 95

    3.7 Graphical representations for SO2 96

    3.8 Graphical representations for NOx 97

    3.9 Location of AAQM station 115

    3.10 Wind Rose Diagram 116

    3.11 Water sampling Locations 117

    3.12 Noise monitoring Locations 118

    3.13 Soil Sampling Locations 119

    3.14 Topo sheet of location with site location map of 10 km radius (1:50,000 scale)

    120

    4.1 Isopleths for Ground Level Concentration for SPM 142

    4.2 Isopleths for Ground Level Concentration for SO2 143

    4.3 Isopleths for Ground Level Concentration for NOx 144

    4.4 Isopleths for Ground Level Concentration for HCl 145

    4.5 Isopleths for Ground Level Concentration for NH3 146

    7.1 Oleum spillage-SO3 release 167

    7.2 Sulphuric acid spillage and evaporating toxic pool 167

    7.3 Liquid Ammonia Spillage & EvaporationToxic Impact Zone (Stability Class-D)

    168

    7.4 Liquid Ammonia Spillage & EvaporationToxic Impact Zone (Stability Class-F)

    168

    7.5 Nitric Acid (Anhydrous) Spillage and Evaporating Toxic

    Pool

    169

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) XIII

    7.6 Chloro Sulphonic Acid Spillage and Evaporating Toxic Pool 169

    7.7 Ethylene Oxide Jet Fire 170

    7.8 Thionyl Chloride Spillage and Pool Fire 170

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) XIV

    List of Annexures

    Annexure No. Annexure Name Page No.

    Annexure-I NABET/QCI Certificate 233

    Annexure-II Land Documents 235

    Annexure-III Material Safety Data Sheet 241

    Annexure-IV Copy of Terms of Reference (TOR) 408

    Annexure-V Undertaking by Consultant 419

    Annexure-VI Undertaking by Project Proponent 421

    Annexure-VII Adequacy of proposed EMS 423

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 1

    Chapter-1

    Introduction 1.1 PREFACE

    An Environmental Impact Assessment (EIA) is an assessment of the

    possible impacts that a proposed project may have on the environment -

    consisting of the environmental, social and economic aspects. It is an

    assessment and management tool that evaluates the possible impacts,

    positive or negative, that a proposed project may have on the

    environment. EIA systematically examines both beneficial and adverse

    consequences of the project and ensures that these effects are taken into

    account during project design. The purpose of the assessment is to

    ensure that decision makers consider the ensuing environmental impacts

    when deciding to proceed with a project. In India, Ministry of

    Environment and Forests has defined elaborated Environmental

    Clearance (EC) framework along with requirements for preparing

    Environmental Impact Assessment (EIA) under the Environmental

    (Protection) Act, 1986 (Environmental Impact Assessment Notification,

    2006) for establishing/expanding and industry/development projects.

    1.2 PURPOSE OF THE REPORT

    Industrialization and infrastructure development have increased economic

    growth and improved living standards of people in India. However,

    development has led to rapid consumption of natural resources and

    increased emissions of waste. To control the pollutions from industrial

    activity, government has framed regulations which are governed by

    Ministry of Environment, Forest & Climate Change in India. Environment

    Impact analysis is mandatory as per the Environment Impact Assessment

    (EIA) Notification issued by Ministry of Environment, Forest & Climate

    Change (MoEF&CC), New Delhi dated 14th September, 2006 and its

    subsequent amendment; for setting up a new projects or activities, or

    expansion or modernization of existing projects or activities based on

    their potential environmental impacts as indicated in the Schedule to the

    notification, being undertaken in any part of India, unless prior

    environmental clearance has been accorded.

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 2

    Proposed establishment of Associated Dyestuff Pvt. Ltd. (Unit-IV)falls

    under 5(f) schedule of EIA Notification, 2006 Synthetic Organic

    Chemical Industries and is of B Category. Therefore, unit requires

    prior Environmental Clearance before commencement of activity at site.

    Online application was submitted on 14/09/2017 along with Form-I to

    SEIAA. The SEAC, Gujarat vide their letter dated 19/12/2017 had

    recommended to the SEIAA, Gujarat, to grant the Terms of Reference for

    the project based on its meeting held on 11/10/2017. The proposal was

    considered by SEIAA, Gujarat in its meeting held on 20/12/2017 at

    Gandhinagar. The present report is based on the Terms of Reference

    (TOR) No. SEIAA/GUJ/TOR/5(f)/1330/2017 issued on 28/12/2017

    by the SEIAA under the provisions of EIA Notification dated 14th

    September, 2006.

    EIA Consultant

    In view of the above, legal aspect and monitoring work has been carried

    out for all the environmental attributes by M/s. San Envirotech

    Pvt.Ltd., Ahmedabad.

    1.3 IDENTIFICATION OF PROJECT PROPONENT &PROJECT

    ASSOCIATED DYESTUFF PVT. LTD. (ADPL) was founded in 1977 as a

    manufacturer of reactive dyes and dye-intermediates. In the last 4

    decades, the company has transformed itself from a small manufacturing

    company to one of the most reputed quality oriented supplier of

    specialized products in the field of selected reactive dyes and dye-

    intermediates. ADPL is a Govt. of India recognized export house since

    1993. ADPL is strong in reactive turquoise blue series products and is

    regularly supplying to major multinational dyestuff companies & to the

    companies of Europe and Far East. ADPL being an R & D oriented

    company and having experienced technicians including PhDs & chemical

    engineers of dyes and dye-intermediates fields, continuously strives to

    develop new and improved processes for existing products as well as new

    products. Considering the growing global demand and expertise in

    manufacturing, ADPL proposes to increase its production capacity by

    proposing manufacturing of 1725 MTPM Dye intermediates at M/s.

    Associated Dyestuff Pvt. Ltd. (Unit-IV).

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 3

    The proposed unit is at Plot No. DP-2 (part), Saykha Ind. Estate, Saykha,

    Tehsil: Vagra, Dist.: Bharuch. The unit is situated within the designated

    notified area promoted by GIDC. Hence, the land use pattern will not be

    changed due to the proposed project. Nearest city Baruch is about 17 km

    away from the site, which is having connectivity with other parts of the

    country by road and rail.

    1.4 BRIEF DESCRIPTION OF PROJECT

    Salient features of the project and list of products are given in Table

    1.1and Table 1.2, respectively.

    Table 1.1 Salient Features of the Project

    Name of the Project Associated Dyestuff Pvt. Ltd. (Unit-IV)

    Proposed production

    capacity

    1725 MTPM of Dye intermediates

    Project cost Rs. 70 Crores

    Capital cost for EMS Rs. 12.25 Crores

    Recurring cost Rs. 18.90 Crores per annum towards

    environmental protection measures

    Manpower requirement About 150 persons

    Location

    Plot/ Survey No. DP-2 (part), Saykha Ind. Estate,

    Saykha

    Tehsil Vagra

    District Bharuch

    State Gujarat

    Total plot area 51406 m2

    Area utilize for this project 40000 m2

    Coordinates Latitude: 2147'33.27"N

    Longitude: 7249'29.00"E

    Nearest

    Railway Station Bharuch Railway Station, about 20 km

    Air Port Vadodara/Surat Airport, about 75 km

    Town, City, District

    Headquarter

    Bharuch, about 18 km

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 4

    Table 1.2 List of Products

    Sr.

    No.

    Product Capacity

    (MT/month)

    1 K Acid 100

    2 Gamma Acid 50

    3 Dyes Intermediates like 500

    H Acid

    FC Acid

    MUA

    Sulfo Tobias Acid

    Sulfo J Acid

    4 VS and Its derivatives 1000

    Vinyl Sulphone (PBVS)

    OAVS

    Sulpho VS

    Sulpho OAVS

    MPDSA

    DASA

    5 PCVS 50

    6 DMAVS 25

    Total 1725

    1.5 APPLICABLE ENVIRONMENTAL REGULATORY FRAMEWORK

    The proposed project will abide and function under the purview of the

    following Rules, Acts & Regulations which are formulated by the Govt. of

    India to protect the environment and development in a sustainable way.

    The Water (Prevention & Control of Pollution) Act, 1974

    The Air (Prevention & Control of Pollution) Act, 1981

    The Environmental (Protection) Act, 1986

    Environmental Impact Assessment Notification dated 14th September

    2006 and subsequent amendments

    The Hazardous & Other Waste (Management and Transboundary

    Movement) Rules, 2016

    Noise Pollution (Regulation and Control) Rules, 2000 and its

    amendments

    The Public Liability Insurance Act, 1991

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 5

    1.6 SCOPE OF THE STUDY

    The scope of the EIA study is based on the guideline provided by

    MoEF&CC, Government of India for structure of Environmental Impact

    Assessment document. The scope of the study broadly includes:

    Field sampling of environmental attributes at various representative

    locations in the study area to establish the baseline status,

    Collection & compilation of secondary data including socio-economic

    data,

    Identification, assessment and evaluation of the beneficial and adverse

    impacts on surrounding environment due to proposed project activities

    considering the existing baseline status along with compilation of other

    information,

    Analysis of project proposal and data analysis,

    Assessment of pollution potential due to proposed project,

    Prediction of the incremental levels of pollutants in the study area,

    Evaluation of the predicted impacts on various environmental

    attributes by using scientifically developed and widely accepted

    models,

    Identification and assessment of risks associated with the proposed

    project and their appropriate management through proper Risk

    Assessment (RA) and Disaster Management Plan (DMP),and

    Environmental Management Plan (EMP), and

    Identification of critical environmental attributes required to be

    monitored during the project execution and post project.

    The scope also includes all the conditions outlined in the TOR issued by

    SEIAA and the compliance to the TOR is given below.

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 6

    1.7 COMPLIANCE TO TERMS OF REFERENCE

    The present report is based on TOR No.

    SEIAA/GUJ/TOR/5(f)/1330/2017 issued on dtd. 28/12/2017 by the

    SEIAA under the provisions of EIA Notification dated 14th September,

    2006.

    Sr.

    No. TOR STATUS

    A. Additional TOR

    1. Qualitative and qualitative analysis of

    hazardous waste streams H2SO4, Acetic Acid,

    SBB and spent HCl generation from the

    manufacturing process (Product wise) and its

    feasibility report for reuse within premises.

    Worst case scenario shall be considered for

    generation of wastes streams. Explore the

    possibilities to complete reuse of above

    mentioned hazardous wastes streams within

    premises.

    Possibilities of complete reuse of

    mentioned waste stream within

    premises is mentioned in Chapter

    2, Section 2.10.2, Page no. 63.

    2. Undertaking regarding no use of lignite for

    Boiler, TFH & HAG.

    Attached as Annexure VI, Page

    no. 421.

    3. Provision of adequate APCM for flue gas and

    process gaseous emission as per the prevailing

    guidelines.

    List of APCM for flue gas and

    process gaseous emission provided

    is mentioned in Table 2.6, Page no.

    57. Adequacy certificate is attached

    as Annexure VII, Page no. 423.

    4. Compliance of GPCB circular vide dated

    04/05/2017 regarding dirty products.

    The proposed new project is

    situated at Saykha Industrial

    Estate, which Falls in PCPIR. All the

    conditions of the circular will be

    compiled.

    Annexure I TOR

    1. A tabular chart with index for point-wise

    compliance of below mentioned TORs.

    Prepared as here.

    2. Executive summary of the project giving a

    prime facie idea of the objectives of the

    proposal, use of resources, justification, etc. In

    addition, it should provide a compilation of EIA

    report, including EMP and the post-project

    monitoring plan in brief.

    Executive summary of the project

    including all the mentioned details

    is included as Chapter-11 (Page no.

    217-228).

    3. Justification for selecting the proposed product

    and unit size.

    Justification is provided in Chapter

    2, Section 2.2, Page no. 22.

    4. Land requirement for the project including its

    break up for various purposes, its availability

    and optimization.

    Land requirement for the project

    including its break up for various

    purposes is provided in Chapter 2,

    Section 2.5, Page no. 27 and Table

    2.1, Page no. 26.

    5. Land possession documents. Copy of NA order

    showing permission to use the project-land for

    industrial purpose. If located in GIDC, copy of

    plot holding certificate obtained from GIDC

    Attached as AnnexureII, Page no.

    235.

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 7

    Authority.

    6. Location of the project site and nearest

    habitats with distances from the project site to

    be demarcated on a toposheet (1:50000

    scale).

    Toposheet of location with site

    location map of 10 km radius

    provided in Chapter 3, Figure 3.14,

    Page no. 120.

    7. Topography details of the project area. Topography details of the project

    area are provided in Chapter 3,

    Section 3.6.3, Page no. 72 & Figure

    3.14, Page no. 120.

    8. Geological features and geo-hydrological status

    of the study area.

    Geological features and geo-

    hydrological status of the study

    area is provided in Chapter 3,

    Section 3.9.1, Page no. 76.

    9. In case of project located outside notified area:

    Legal Undertaking stating that unit is

    complying the tree condition [i.e. water

    consumption less than 25 M3/day; Fuel

    consumption less than 25 TDP; and not

    covered in the category of MAH unit as per the

    Management, Storage, Import of Hazardous

    Chemical Rules (MSHIC Rules), 1989] as per

    the amendment to EIA Notification, 2006 vide

    SO 1599 (E) dated 25/06/2014.

    Not applicable

    10. Present land use pattern of the study area shall

    be given based on satellite imagery.

    Present land use pattern of the

    study area is provided in Chapter 3,

    Section 3.6.1, Figure 3.1 & Table

    3.2, Page no. 71.

    11. Layout plan of the factory premises clearly

    demarcating various units within the plant.

    Provision of separate entry& exit and adequate

    margin all-round the periphery for

    unobstructed easy movement of the

    emergency vehicle / fire tenders without

    reversing back. Mark the same in the plant

    layout.

    Layout plan of the factory premises

    is provided in Chapter 2, Section

    2.5, Figure 2.4, Page no. 27.

    12. Technical details of the plant/s along with

    details on best available technologies (BAT),

    proposed technology and reasons for selecting

    the same.

    Technical details of the plant/s

    along with details on best available

    technologies (BAT), proposed

    technology and reasons for

    selecting the same is provided in

    Section 5.3, Page no. 147.

    13. Product spectrum (Proposed products along

    with production Capacity) and processes.

    Proposed products along with

    production Capacity is provided in

    Chapter 2, Section 2.5.2, Table 2.2

    (Page no. 28).

    Manufacturing processes are

    provided in Section 2.6 (Page no.

    28).

    14. Chemical name of each proposed product to be

    manufactured. Details on end use of each

    product. (Provide CAS number of all products &

    raw materials. In case of Dyes, CI number).

    Chemical name, details on end use,

    and CAS number provided are in

    Chapter 2, Section 2.5.2 (Page no.

    28) and 2.8 (Page no. 52).

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 8

    15. Details on raw materials, source and storage

    within the premises.

    Details on raw material are

    provided in Chapter 2, Section 2.8

    (Page no. 52).

    16. Details of complete manufacturing process/

    operations of each product along with chemical

    reactions, process flow diagram describing

    each unit processes and unit operations along

    with material balance, consumption of raw

    materials etc.

    All mentioned details are provided

    in Chapter 2, Section 2.6 (Page no.

    28).

    17. Details on strategy for the implementation of

    cleaner production activities.

    Strategy for the implementation of

    cleaner production activities is

    provided in Chapter 10, Section

    10.7 (Page no. 214).

    18. Assessment of source of the water supply with

    adequacy of the same to meet with the

    requirements for the project. Permission

    obtained from the concern authority for supply

    of raw water.

    The proposed will get water from

    Saykha Industrial Estate, GIDC.

    Plot allotment and permission for

    supply of raw water is Attached as

    AnnexureII (Page no. 235).

    19. Undertaking stating that no bore well shall be

    dug within the premises (If project is located

    within the industrial estate).

    Attached as AnnexureVI (Page no.

    421).

    20. Details on water balance including quantity of

    effluent generated, recycled & reused. Details

    of methods to be adopted for the water

    conservation.

    Water balance is provided in

    Chapter 2, Section 2.9, Figure 2.5

    (Page no. 55).

    Effluent management leading to

    water conservation is explained in

    Section 2.10.1 (Page no. 59).

    21. Efforts to minimize effluent discharge and to

    maintain quality of receiving water body.

    Not applicable, as unit will perform

    ZLD.

    22. Explore the possibilities for zero Liquid

    Discharge (ZLD) option for the proposed

    project.

    Unit will perform ZLD. Effluent

    management is explained in Section

    2.10.1 (Page no. 59).

    23. Segregation of waste streams, characterization

    and quality with specific treatment and

    disposal of each stream including action plan

    for maximum recycle of treated waste water

    and minimum discharge for effluent.

    Unit will segregate waste streams

    with specific treatment. Entire

    quantity of process effluent will be

    taken in ETP-1 having primary and

    tertiary treatment followed by RO

    and MEE to achieve zero discharge.

    Effluent from Washing and utility

    will be taken into ETP-2 having

    primary, tertiary treatment unit

    followed by RO & MEE to achieve

    zero discharge. This approach will

    maximum recycle of treated waste

    water. Effluent management is

    explained in Section 2.10.1 (Page

    no. 59).

    24. Capacity of ETP in KL/day. Details of ETP

    including dimensions of each unit along with

    schematic flow diagram. lnlet, transitional and

    treated effluent qualities with specific efficiency

    of each treatment unit in reduction in respect

    Capacity and details of ETP

    including dimensions of each unit is

    provided in Section 2.10.1 (Page

    no. 59). Effluent qualities are

    shown in Table 2.12, Page no. 67.

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 9

    of all concerned/regulated environmental

    parameters. lnlet effluent quality should be

    based on worst case scenario considering

    production of most polluting products that can

    be manufactured in the plant concurrently.

    25. In case of discharge into GIDC drainage / Pipeline:

    Not discharging into GIDC drainage / Pipeline

    i. Copy of permission letter with quantity (KL/day)

    from the concern authority of drainage network /

    pipeline with confirmation for spare capacity

    available to take additional effluent.

    Not applicable

    ii. Provision for Continuous Monitoring System for

    waste water discharge.

    Not applicable

    26. In case of waste water sent to Common Facilities (CF) like CETP, MEE, Spray Dryer

    etc.

    Not sending Wastewater to Common Facilities

    a. Details of Common facilities including (1) Total

    capacity of the CF (2) Copy of CC&A of the CF. (3)

    Actual load at present (Qualitative and Quantitative

    KL per day) (4) Booked quantity & Spare capacity

    of CF (5) Copies of XGN generated Inspection

    reports with analysis reports of the

    water/Air/Hazardous samples collected by GPCB

    (Last 2 year). Copies of instructions issued by GPCB

    in last 2 year and point wise compliance thereof. (6)

    Copies of show- cause notices, closure notices etc.

    served by the GPCB and its compliance (6)

    Recommendations and suggestions of the last two

    Environment Audit reports of CETP and its

    compliance report. (7) Common Facility Up

    gradation scheme. If any.

    Not applicable

    b. Status of compliance to the 18(1) direction issued

    by the CPCB with respect to CETP compliance &

    CEPI area action plan along with relative supportive

    document.

    Not applicable

    c. Give status of compliance of Environmental norms of

    existing common infrastructure i.e. CEPT, MEE &

    Spray Dryer (Whichever is applicable) in which you

    are a member.

    Not applicable

    d. Submit adequacy of Common infrastructure i.e.

    CETP, MEE & Spray Dryer for additional load

    (Whichever is applicable) along with written

    confirmation/membership certificate mentioning the

    same (Total consented quantity, total quantity

    booked so far, quantity booked for the unit, spare

    quantity available.)

    Not applicable

    27. In Case of Zero Liquid Discharge (ZLD):

    i. Action plan for Zero discharge of effluent shall

    be included. Notarized undertaking for assuring

    that underground drainage connection will not

    be taken in the unit and shall be no effluent

    discharge outside the plant premises.

    Action plan for ZLD is included in

    Chapter 2, Section 2.10.1 (Page no.

    59). Notarized undertaking for

    assuring that underground drainage

    connection will not be taken in the

    unit and shall be no effluent

    discharge outside the plant

    premises is attached as Annexure

    VI (Page no. 421).

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 10

    ii. Economical and technical viability of the

    effluent treatment system to achieve Zero

    Liquid Discharge (ZLD).

    Unit has allocated 12.25 Crores for

    development of EMS as capital

    investment and has provision of Rs.

    18.90 Crores as recurring cost per

    annum. Action plan for ZLD is

    included in Section 2.10.1 (Page

    no. 59). Budget allocation for

    effluent treatment system as well

    as EMS is provided in Chapter 10,

    Section 10.5 (Page no. 211).

    iii. Certification of adequacy of proposed ZLD

    scheme through credible institutes of National

    repute.

    We will obtain adequacy of

    proposed ZLD scheme through

    credible institutes of National

    repute. Currently we have higher

    size of equipment to achieve ZLD.

    iv. To estimate & monitoring ground water quality

    & its contamination status, piezometer wells,

    one on up gradient of the groundwater flow

    and other three on the down gradient side of

    the ground water flow of the proposed project

    at different depth based on available ground

    water depth shall be established and all the

    parameters mentioned in IS 10:500 for potable

    water standard shall be monitored.

    The unit will fulfill raw water

    demand from GIDC and will not be

    discharging effluent outside the

    premises by achieving ZLD.

    Groundwater monitoring results are

    shown in Chapter 3, Table 3.20

    (Page no. 100).

    28. In case of in-house MEE/Spray dryer for waste

    water treatment: Capacity of MEE/Spray dryer

    in KL/hr. Technical details of MEE including

    evaporation capacity, steam required for

    evaporation, adequacy of the proposed boiler

    to supply steam for evaporation in addition to

    the steam required for the process etc.

    Techno-economical viability of the evaporation

    system. Control measures proposed for the

    evaporation system in order to avoid/reduce

    gaseous emission/VOC from evaporation of

    industrial effluent containing solvents & other

    chemicals.

    Technical details of MEE including

    evaporation capacity, steam

    required for evaporation, adequacy

    of the proposed boiler to supply

    steam for evaporation in addition to

    the steam required for the process

    is provided in Section 2.10.1 (Page

    no. 61).

    Economical viability of the

    evaporation system is shown in

    Chapter 10, Section 10.3.2.2 (Page

    no. 202).

    29. Technical details of ATFD/Crystallizer/ spray

    Dryer, RO/NF system etc. (if any).

    Technical details of RO system is

    provided in Chapter 2, Table 2.10

    (Page no. 62).

    30. Undertaking stating that a separate electric

    meter will be provided for the waste water

    treatment system viz. ETP, RO, MEE, Spray

    dryer etc. (Whichever is applicable)

    Attached as AnnexureVI (Page no.

    421).

    31. Economical and technical viability of the

    effluent treatment system.

    Unit has allocated 12.25 Crores for

    development of EMS as capital

    investment and has provision of Rs.

    18.90 Crores as recurring cost per

    annum. Action plan for ZLD is

    included in Chapter 2, Section

    2.10.1 (Page no. 59). Budget

    allocation for effluent treatment

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 11

    system as well as EMS is provided

    in Chapter 10, Section 10.5 (Page

    no. 211).

    32. Plans for management, collection and disposal

    of waste streams to be generated from

    spillage, leakages, vessel washing, used

    container washing etc. Measures proposed for

    preventing effluent discharge during

    unforeseen circumstances.

    Whatsoever effluent generated

    from spillage, leakages, vessel

    washing, used container washing

    will be collected in collection tank of

    ETP. We have excess quantity of

    collection tank to meet any

    unforeseen circumstances.

    33. Action plan for reuse of liquid waste streams

    like Spent acids, Poly Aluminium Chloride etc.

    within premises to convert into valuable

    products instead of sending outside to actual

    end-users.

    Possibilities of complete reuse of

    mentioned waste stream within

    premises is explored. It is

    mentioned in Chapter 2, Section

    2.10.2 (Page no. 63).

    34. Adequacy of the proposed EMS with respect to

    the pollution load envisaged in team of Air,

    Water and hazardous waste.

    Attached as Annexure VII (Page

    no. 423).

    35. One season Site-specific micro-meteorological

    data using temperature, relative humidity

    hourly wide speed and direction and rainfall

    should be incorporated.

    One season Site-specific micro-

    meteorological data are provided in

    Chapter 3, Section 3.7.1 (Page no.

    72).

    36. Anticipated environmental impacts due to the

    proposed project/production may be evaluated

    for significance and based on corresponding

    likely impacts VECs (Valued Environmental

    Components) may VECs and likely impacts will

    have to be assessed for their magnitude in

    order to identify mitigation measures.

    Anticipated environmental impacts

    due to the proposed project on

    Topography, Air Environment,

    Water Environment, Noise

    Environment, Land Environment,

    Biological Environment, Socio-

    Economic Environment, and

    Occupational Health & Safety is

    briefly covered in Chapter 4 (Page

    no. 121-146).

    Unit will perform ZLD, and Entire

    quantity of hazardous waste will be

    handled and disposed as per

    Hazardous and other Wastes

    (Management & Trans boundary

    Movement) Rules, 2016

    Impact on air environment is

    covered in Section 4.4 (Page no.

    123); Conclusion provided in

    Section 4.4.7 (Page no. 127).

    The maximum 50 (24-hr) average

    concentration values for SPM, SO2,

    NOx, HCl & NH3 are given in Table

    4.3 to 4.7 (Page no. 137-141).

    Corresponding Isopleths for 24-

    hourly predicted value is shown in

    Figure 4.1 to 4.5 (Page no. 142-

    146).

    37. One complete season base line ambient air

    quality data (except monsoon season) to be

    One complete season base line

    ambient air quality data is provided

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 12

    given along with the dates of monitoring. The

    parameters to be covered shall be in

    accordance with the revised National Ambient

    Air Quality Standards (NAAQS) as well as

    project specific parameters like NH3, HCl, Cl2,

    HBr, VOC etc. Location of the monitoring

    station should be so decide so as to take into

    consideration the pre-dominant downwind

    direction, pollution zone and sensitive

    receptors. There should be at least one

    monitoring station in the upwind direction,

    There should be at least one monitoring station

    in the pre dominant downwind at a location

    where maximum ground level concentration is

    likely to occur.

    in Chapter 3.

    The existing baseline levels with

    respect to PM10, PM2.5, SO2, NOX,

    VOC, CO, NH3, & HCl are tabulated

    in Tables 3.13 to 3.18 & chart is

    given as Figure 3.4 to 3.8 (Page no.

    93-98).

    The monitoring locations (with

    relative directions and distances

    from the unit) are given in Table

    3.12 (Page no. 92) & shown in

    Figure 3.9 (Page no. 115).

    38. Modeling indicating the likely impact on

    ambient air quality due to proposed activities.

    The details of model used and input

    parameters used for modeling should be

    provided. The air quality contours may be

    shown on location map clearly indicating the

    location of sensitive receptors, if any, and the

    habitation, The wind rose showing pre-

    dominate wind direction should also be

    indicated on the map. Impact due to vehicular

    movement shall also be included into the

    prediction using suitable model. Results of Air

    dispersion modeling should be superimposed

    on satellite Image/geographical area map.

    The modeling is briefly covered in

    Chapter 4, Section 4.4.1 (Page no.

    125-127).

    Input parameters used for modeling

    are provided in Table 4.1 (Page no.

    135), additional input - maximum

    50 (24-hr) average concentration

    values for SPM, SO2, NOx, HCl &

    NH3 are given in Table 4.3 to 4.7

    (Page no. 137-141).

    The wind rose is shown in Figure

    3.10 (Page no. 116).

    Results of Air quality modeling

    superimposed on geographical area

    map is shown in Figure 4.1 to 4.5

    (Page no. 142-146).

    39. Base line status of the noise environment,

    impact of noise on present environment due to

    the project and proposed measures for noise

    reduction including engineering controls.

    Base line status of the noise

    environment are provided in Table

    3.23 (Page no. 103).

    40. Specific details of

    a. Process gas emission from each unit process

    with its quantification.

    Process gas emission from each

    unit process is mentioned in

    Chapter 2, Section 2.10.2, Table

    2.6 (Page no. 61).

    b. Air pollution Control Measures (APCM) for

    proposed for process gas emission. Adequacy

    of the air pollution control measures (APCM)

    for process gas emission measures to achieve

    the GPCB norms.

    Proposed APCM to achieve the

    GPCB norms for process gas

    emission are Two stage water

    scrubber and Alkali scrubber, Two

    stage Alkali Scrubber, Two stage

    water Scrubber, Inbuilt Cyclone and

    bag filter. It is mentioned in

    Chapter 2, Section 2.10.3 (Page no.

    64), Table 2.6 (Page no. 57).

    c. Details of the utilities required. Mentioned in Chapter 2, Section

    2.6, Table 2.5 (Page no. 56).

    d. Type and quantity (MT/hr & MT/Day) of fuel to

    be used for each utility.

    Mentioned in Chapter 2, Section

    2.9(c), Table 2.5 (Page no. 56).

    e. Flue gas emission rate emission from each Mentioned in Chapter 2, Table 2.6

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 13

    utility. (Page no. 57).

    f. Air Pollution Control Measures (APCM)

    proposed to each of the utility along with its

    adequacy

    It is mentioned in Chapter 2,

    Section 2.11.2, Table 2.6 (Page no.

    57).

    g. List the project specific sources of fugitive

    emission along with its quantification and

    proposed measures to control it.

    Project specific sources of fugitive

    emission are provided in Section

    2.9.2 (Page no. 57); and proposed

    measures to control it are provided

    in Section 2.10.3 (Page no. 64).

    h. Details on tail gas treatment. (If any) Not applicable

    41. Provision of CEMS (Continuous Emission

    Monitoring system).

    The unit has provision of Work zone

    fugitive monitoring for RPM, VOCs,

    Acid mist; Ambient Air Quality

    Monitoring; and Stack Monitoring in

    its Environment Monitoring Program

    as mentioned in Chapter 6, Table

    6.2 (Page no. 153). Continuous

    Emission Monitoring system will be

    installed, if demanded by CPCB.

    42. Action plan for odour control to be submitted. Action plan for odour control is

    included in Chapter 10, Section

    10.3.1.3 (Page no. 201).

    43. Management plan for hazardous/Solid waste

    including storage, handling, utilization and safe

    disposal as per the Hazardous and Other

    Wastes (Management and Transboundary

    Movement) Rules 2016. CPCB guidelines in

    respect of specific treatment, such as solar

    evaporation, incineration, etc., need to be

    followed.

    Management plan for

    hazardous/Solid waste as per the

    Hazardous and Other Wastes Rules

    2016 is provided in Chapter 2,

    Section 2.10.4 (Page no. 64), Table

    2.7 (Page no. 58).

    44. How the manual handling of the hazardous

    wastes will be minimized? Methodology of de-

    contamination and disposal of discarded

    containers and its record keeping.

    Methodology of de-contamination

    and disposal of discarded

    containers is provided in Chapter 2,

    Section 2.10.4.2 (Page no. 65).

    Other safety precautions &

    recommendations are provided in

    Chapter 7, Section 7.14 (Page no.

    172). Ways to minimize the manual

    handling of the hazardous

    chemicals are provided in Section

    7.15 (Page no. 178).

    45. Management of by-products which fall under

    the purview of the Hazardous and Other

    wastes (Management and Transboundry

    Movement) Rules 2016 as per the said rules

    and necessary permission from the concern

    authority.

    Unit will obtain necessary

    permission for sell of all the by-

    product/waste which are covered

    under Rule-9 of Haz rule, 2016

    from concerned authority.

    46. Membership of Common Environmental

    infrastructure like TSDF, Common Incineration

    Facility (CHWIF), MEE, Spray dryer etc.

    Membership of TSDF will be taken

    after getting EC.

    47. Name and quantity of each type of solvents to

    be used for proposed production. Details of in-

    All details are covered in Chapter-

    10, Section 10.3.1.2 (Page no.

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 14

    house solvent recovery system including mass

    balance, solvent loss, recovery efficiency (%

    recovery), feasibility of reusing the recovered

    solvents etc. for each type of solvent.

    201).

    48. Appropriate monitoring network has to be

    designed and proposed, to assess the possible

    residual impacts on VECs.

    The unit has provision of Stack

    Monitoring of each stack and

    Ambient Air Quality Monitoring in

    its Environment Monitoring Program

    to assess the possible residual

    impacts on VECs. It is mentioned in

    Chapter 6, Table 6.2 (Page no.

    153).

    49. A detailed EMP including the protection and

    mitigation measures for impact on human

    health and environment as well as detailed

    monitoring plan and environmental

    management cell proposed for implementation

    and monitoring of EMP. The EMP should also

    include the concept of waste-minimization,

    recycle/reuse/recover techniques, energy

    conservation, and natural resource

    conservation. Total capital cost and recurring

    cost/annum earmarked for environment

    pollution control measures.

    Unit will set up a separate

    Environment Management Cell

    (EMC) to implement Environmental

    Management Plan among other

    tasks regarding environmental

    protection. Detailed duties &

    responsibilities of EMC are

    mentioned in Chapter 10, Section

    10.6 (Page no. 212).

    Occupational Health & Safety Plan

    is covered in Section 10.3.6 (Page

    no. 207).

    Environment Monitoring Plan and

    budget allocation towards

    environment pollution control

    measures is mentioned in Table

    10.2 (Page no. 210) and Table 10.3

    (Page no. 211), respectively.

    Concept of resource & energy

    conservation and cleaner

    production is covered in Section

    10.7 (Page no. 214).

    Total capital cost and recurring

    cost/annum earmarked for

    environment pollution control

    measures is mentioned in Table

    Table 10.3 (Page no. 211).

    50. Details of in- house monitoring capabilities and

    the recognized agencies if proposed for

    conducting monitoring.

    Monitoring will be performed by

    outside agencies authorized by

    GPCB at regular frequencies.

    51. Permission from PESO, Nagpur for storage of

    solvents, other toxic chemical, if any.

    Unit will obtain necessary

    permission from PESO.

    52. Occupational health impacts on the workers

    and mitigation measures proposed to avoid the

    human health hazards along with the personal

    protective equipment to be provided. Provision

    of industrial hygienist and monitoring of the

    occupational injury to workers as well impacts

    on the workers. Plan for periodic medical

    checkup of the workers exposed. Details of

    All details are mentioned in Chapter

    10. Occupational Health & Safety

    Plan is covered in Section 10.3.6

    (Page no. 207). Environment

    Monitoring Plan and budget

    allocation is mentioned in Table

    10.2 (Page no. 210) and Table 10.3

    (Page no. 211), respectively.

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 15

    work place ambient air quality monitoring plan

    as per Gujarat Factories Rules.

    53. Details on volatile organic compounds (VOCs)

    from the plant operations and occupational

    safety and health protection measures.

    Proposal for Leak Detection and Repair (LDAR)

    program as per the CPCB guidelines.

    VOCs generation from the plant

    operations will be minimal due to

    closed material handling and

    manufacturing. The unit has

    provision of Work zone fugitive

    monitoring for RPM, VOCs, Acid

    mist in its Environment Monitoring

    Program as mentioned in Chapter

    6, Table 6.2 (Page no. 153).

    LDAR is provided in Chapter 7,

    Section 7.14.3 (Page no. 176).

    54. Risk assessment including prediction of the

    work-case scenario and maximum credible

    accident scenarios should be carried out. The

    worst-case scenario should take into account

    the maximum inventory of storage at site at

    any point of time. The risk contours should be

    plotted on the plant layout map clearly

    showing which of the facilities would be

    affected in case of an accident taking place.

    Based on the same, process safeguard

    measures including On-Site / Off Site

    Emergency Plan should be provided.

    Risk assessment is carried out in

    Chapter 7. See Section 7.4 (Page

    no. 157) for hazard analysis of

    materials coming under hazardous

    category as specified by MSIHC

    Rules, 1989;

    Section 7.10 for Quantitative Risk

    Assessment & Consequence

    Analysis (Page no. 165);

    Section 7.17 for On-Site Emergency

    Plan (Page no. 181); and

    Section 7.18 for Off-Site Emergency

    Plan (Page no. 188).

    55. MSDS of all the products and raw materials. Attached as AnnexureIII (Page no.

    241).

    56. Details of hazardous characteristics and

    toxicity of raw materials and products to be

    handled and the control measures proposed to

    ensure safety and avoid the human health

    impacts. This shall include the details of

    Antidotes also.

    Details of hazardous characteristics

    and toxicity is provided in Table

    7.2a (Page no. 158). Acute

    Exposure Guideline Levels (AEGLs)

    and Emergency Response Planning

    Guidelines (ERPGs) are provided in

    Table 7.2b (Page no. 159). Antidote

    details are provided in Section

    7.14.5 (Page no. 178).

    57. Details of quantity of each hazardous chemical

    (including solvents) to be stored, Material of

    Construction (MoC) of major hazardous

    chemical storage tanks, dyke details, threshold

    storage quantity as per schedules of the

    Manufacture, Storage & Import of Hazardous

    Chemicals Rules of major hazardous chemicals,

    size of the biggest storage tank to be provided

    for each raw material & product etc. How the

    manual handing of the hazardous chemical will

    be minimized?

    Details of quantity of each

    hazardous chemical (including

    solvents) to be stored, Material of

    Construction (MoC) of major

    hazardous chemical storage tanks

    are mentioned in Section 7.3, Table

    7.1 (Page no. 157).

    Threshold storage quantity as per

    schedules of the Manufacture,

    Storage & Import of Hazardous

    Chemicals Rules of major

    hazardous chemicals is provided in

    Table 7.2(a) (Page no. 158).

    Ways to minimize manual handing

    of the hazardous chemical is

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 16

    provided in Section 7.15 (Page no.

    178).

    58. Details of the separate isolated storage area

    for flammable chemicals. Details of flame proof

    electrical fittings, DCP extinguishers and other

    safety measures proposed. Fire control plan for

    flammable substances and processes showing

    hydrant pipeline network, of DF Sets, fire

    pumps, jockey pump, toxic gas detectors etc.

    Mentioned information is briefly

    included in Chapter 7,

    Section 7.6 - Thermal Hazards

    (Page no. 161);

    Section 7.7 - Damage Due to

    Explosion (Page no. 163);

    Section 7.14.1 - Safety/control

    measures during storage,

    transportation & unloading of

    materials (Page no. 172);

    Section 7.14.2 - Fire control plan

    (Page no. 175); and

    Section 7.18.4 - Role of the Fire

    Authorities (Page no. 191).

    59. Submit checklist in the form of Dos & Donts of

    preventive maintenance strengthening of HSE,

    manufacturing utility staff for safety related

    measures.

    Dos & Donts list is provided in

    Chapter 7, Section 7.14.4 (Page no.

    176).

    60. Specify safety precautions to be taken for

    Chemical storage process handling &

    transportation hazard.

    Safety precautions to be taken for

    Chemical storage, process, handling

    & transportation hazard are

    included in Chapter 7, Section 7.14

    (Page no. 172).

    61. Details on Workers training before engaging

    work, periodical, in-house outside etc.

    Details on Workers training is

    provided in Chapter 7, Section

    7.14.4 (Page no. 176) and 7.17.8

    (Page no. 186).

    62. Details on various SOP to be prepared. SOPs for sulphuric acid handling

    (Section 7.8, Page no. 163), for

    preventive maintenance (Section

    7.14.4, Page no. 176), and for

    manual handling of the hazardous

    chemicals (Section 7.15, Page no.

    178) will be prepared.

    63. Details on safety audit to be carried out and

    their compliance status.

    This is a new unit, having no prior

    safety audit carried out. Detailed

    Occupational Health & Safety

    Programme is provided in Chapter

    7, Section 7.16 (Page no. 178).

    64. Specific safety measures to be taken for

    general public living in the vicinity.

    It is briefly mentioned in Chapter 7,

    Section 7.18 (Page no. 188).

    65. Details on hazard identification i.e. HAZOP,

    HAZAN, Fault tree analysis, Event tree

    analysis, Checklist, Audit etc. to be adopted for

    the safety operation of the plant.

    Three-tier approach was adopted

    for Hazard identification (Chapter 7,

    Section 7.2, Page no. 155). For the

    raw materials coming under

    hazardous category as specified by

    MSIHC Rules 1989, Acute Exposure

    Guideline Levels and Emergency

    Response Planning Guidelines were

    mentioned in the report in Chapter

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 17

    7, Section 7.4 (Page no. 157).

    66. Detection and monitoring of VOCs / gases. The unit has provision of Work zone

    fugitive monitoring for RPM, VOCs,

    Acid mist; Ambient Air Quality

    Monitoring; and Stack Monitoring in

    its Environment Monitoring Program

    as mentioned in Chapter 6, Table

    6.2 (Page no. 153).

    67. Detailed five year greenbelt development

    program including annual budget, planning

    schedule, species, width of plantations,

    number of trees to be planted, under green

    belt development [with map]. Budgetary outlay

    etc. along with commitment of the

    management to carry out the tree plantation

    activities outside the premises at appropriate

    places in the nearby areas and elsewhere.

    Action plan for the greenbelt

    development is provided in Chapter

    10, Section 10.3.5 (Page no. 205).

    Greenbelt is shown in plant layout

    map in Chapter 2, Figure 2.4 (Page

    no. 27). Budget allocation for

    greenbelt development is provided

    in Chapter 10, Section 10.5 (Page

    no. 211).

    68. Action plan for the greenbelt development

    species, width of plantations, planning

    schedule etc. in accordance to CPCB published

    guidelines.

    Action plan for the greenbelt

    development species, width of

    plantations, planning schedule are

    provided in Chapter 10, Section

    10.3.5 (Page no. 205).

    69. Detailed socio-economic development

    measures including community welfare

    program most useful in the project area for the

    overall improvement of the environment.

    Submit a detailed plan for social corporate

    responsibilities, with appropriate budgetary

    provisions for the next five years and activities

    proposed to be carried out specific to the

    current demographic status of the area.

    Detailed socio-economic

    development measures are

    provided in Chapter 10, Section

    10.8 (Page no. 215).

    70. (a) Does the company have a well laid down

    Environment Policy approved by its Board of

    Directors? If process / procedures to bring into

    focus any infringement / deviation / violation

    of the environment or forest norms /

    Conditions? If so. It may be detailed in the

    EIA.

    Unit will set up a separate

    Environment Management Cell

    (EMC) to implement Environmental

    Management Plan among other

    tasks regarding environmental

    protection. Detailed duties &

    responsibilities of EMC are

    mentioned in Chapter 10, Section

    10.6 (Page no. 212).

    71. What is the hierarchical system or

    administrative order of the company to with

    the environmental issues and for ensuring

    compliance with the EC conditions? Details of

    this system may be given.

    It is mentioned in Chapter 10,

    Section 10.6.1 (Page no. 212).

    72. Does the company have a system of reporting

    of non-compliances / violations of environment

    norms to the Board of Directors of the

    company and / or shareholders or stakeholders

    at large? This reporting mechanism should be

    detailed in the EIA Report.

    It is mentioned in Chapter 10,

    Section 10.7.2 (Page no. 213).

    73. Phase wise project implementation schedule Phase wise project implementation

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 18

    with bar chart and time frame, in terms of site

    development infrastructure provision, EMS

    implementation etc.

    schedule with bar chart and time

    frame is provided in Chapter 2,

    Section 2.3 (Page no. 23).

    74. Certificate of accreditation issued by the

    NABET, QCI to the environmental consultant

    should be incorporated in the EIA Report.

    Certificate of accreditation issued

    by the NABET, QCI to the

    environmental consultant is

    enclosed as AnnexureI (Page no.

    233).

    75. An undertaking by the Project Proponent on

    the ownership of the EIA report as per the

    MoEF&CC OM dated 05/10/2011 and an

    undertaking by the Consultant regarding the

    prescribed TORs have been complied with and

    the data submitted is factually correct as per

    the MoEF&CC OM dated 04/08/2009.

    Both undertakings are enclosed as

    Annexure V & VI (Page no. 419).

    76. All documents to be properly referenced with

    index and continuous page numbering.

    It is done in the report.

    77. Where data are presented in the Report

    especially in Tables, the period in which the

    data were collected and the source should be

    indicated.

    It is mentioned in the report.

    78. Project Proponent shall enclose all the

    analysis/testing report of water, air, Soil, noise

    etc. Using the MoEF&CC /NABL accredited

    laboratories. All the original analysis/testing

    reports should be available during appraisal of

    the Project.

    The analysis was performed in the

    MoEF&CC approved laboratory of

    San Envirotech Pvt. Ltd.,

    Ahmedabad The results are

    included in the EIA report.

    79. In case of Expansion of the project:

    This is not an expansion project.

    a. Need for the proposed expansion should be justified in

    detail.

    Not applicable

    b. Adequacy of existing EMS (Environmental Management

    system).

    Not applicable

    c. Explore the possibility to achieve Zero Liquid Discharge

    (ZLD) for existing as well as proposed activity.

    Not applicable

    d. Records of any legal breach of Environmental laws i.e.

    details of show-cause notices, closure notices etc. served

    by the GPCB to the existing unit in last five years and

    action taken then after for prevention of pollution.

    Not applicable

    e. Copies of Environment Clearances obtained for the existing

    plant, its point wise compliance report.

    Not applicable

    f. Environment audit report for last 3 years and compliance

    of its recommendations/Suggestions. (Including latest

    audit report and its compliance.)

    Not applicable

    g. Copy of Consent to Operate (CC&A) obtained along with

    point wise compliance status of all the conditions stipulated

    therein.

    Not applicable

    h. Compliance of MoEFCC circulars vide No: J-

    11011/618/2010-lAll (l) dated 30/05/2012 and J-

    11013/41/2006-lA-ll (l) dated 20/10/2009.

    Not applicable

    i. Copies of XGN generated Inspection reports with analysis

    reports of the water/Air/Hazardous samples collected by

    GPCB (Last 2 year). Copies of instructions issued by GPCB

    in last 2 year and point wise compliance thereof.

    Not applicable

    80. In case of project is located in Ankleshwar- panoli, Vatva- Narol&Vapi GIDC:

    Project is not located in Ankleshwar-Panoli, Vatva-Narol&Vapi GIDC

    (A) Compliance of MOEFCCs OM no. J -11013/5/2010-lA.ll (l) Not applicable

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 19

    dated 25/11/2016 regarding lifting of moratorium on the

    consideration of projects for environmental clearance.

    (B) Compliance on the direction under section 18 (1) (b) of the

    Water (Prevention and Control Pollution) act, 1974 issued

    by CPCB dated 31/03/2016 regarding compliance of CETP.

    Not applicable

    a) Action initiated by GPCB, if any, against proposed unit

    regarding non-compliance of prescribed standards under

    the various environment laws.

    Not applicable

    b) Performance of CETP with respect to current hydraulic load

    & prescribed standers with No. Objection Certificate of

    CETP regarding incorporation of the proposal unit for

    acceptance of waste water.

    Not applicable

    c) Performance of TSDF site with respect to current load &

    prescribed standers with No. Objection Certificate of TSDF

    site regarding incorporation of the proposed unit for

    acceptance of hazardous waste to the common

    infrastructure.

    Not applicable

    d) Copies of quarterly action report taken for the above points

    submitted to the CPCB.

    Not applicable

    e) Report of GPCB which have conducted monitoring as per

    the said direction by CPCB dated 31/03/2016.

    Not applicable

    i. Action plan for rainwater harvesting measures at plant site shall be submitted to harvest rainwater

    from the roof tops and storm water drains to

    recharge the ground water and also to use for the

    various activities at the project site to conserve

    fresh water and reduce the water requirement from

    other sources.

    Not applicable

    ii. Total capital cost and recurring cost/annum for environmental pollution control measures shall be

    included.

    Not applicable

    iii. Action plan for post-project environmental monitoring shall be submitted.

    Not applicable

    iv. Onsite and Offsite Disaster (natural and Man-made) Preparedness and Emergency Management Plan

    including Risk Assessment and damage control.

    Disaster management plan should be linked with

    District Disaster Management Plan.

    Not applicable

    1.8 OBJECTIVE OF EIA

    The objectives of the present EIA Study are to identify potential source of

    pollution, assess the impacts on various environmental components due

    to the proposed project activity, and recommend appropriate

    environmental management system and environment management plan

    for the unit to ensure that the adverse impacts, if any, will be minimized.

    1.9 METHODOLOGY FOR EIA

    Considering the nature and magnitude of the proposed project,

    surrounding area and various guidelines available, an area of 10-km

    radius from the center of proposed plant site was considered for the

    purpose of environmental impact assessment study. The methodology is

    briefly reported below,

    Baseline Data Collection

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 20

    The baseline data for the impact zone have been generated for the

    following environmental parameters,

    Ambient Air Quality

    Micrometeorology

    Noise Level

    Surface & Ground Water Quality

    Soil Quality

    Ecology &Biodiversity

    Land Use Pattern

    Socio-Economics

    The baseline status of the above environmental parameters has been

    worked out based on the rapid monitoring/analysis carried out during the

    study period of October 2017 to December 2017, supplemented by

    data collected from various Government Departments, census

    publications, etc.

    Evaluation of Impact from Project Activities

    The Environmental Impact resulting from project activities have been

    identified, predicted and evaluated based on the study of manufacturing

    process and is correlated with existing baseline status.

    Preparation of Environmental Management Plan

    Environmental Management Plan has been prepared covering pollution

    prevention measures at source in terms of air and water pollution control

    measures, solid waste/hazardous waste management, safety

    management, greenbelt development, and environmental surveillance.

    1.10 STRUCTURE OF EIA REPORT

    The overall contents of the EIA report is in line with generic structure of

    EIA report as per the Appendix III of the EIA Notification, 2006. The

    report consists of twelve chapters and the content is briefly described

    below,

    Chapter 1: Introduction

    The chapter gives brief outline of the project and its proponent, brief description nature,

    size and location of the project, purpose of the EIA study including the scope of the

    study, TORs compliance etc. and work to be covered under each Environmental

    component.

    Chapter 2: Project Description

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 21

    This chapter includes project details and Infrastructure facilities including all industrial &

    environmental aspects of the unit as well as manufacturing process details. It also gives

    information about utilities, raw material, water & wastewater quantitative details, stack

    details, hazardous waste generation, storage & disposal facility.

    Chapter 3: Description of the Environment

    This chapter covers data of existing condition of Valued Environmental Components like

    air, water, noise, soil, biological environment and socio-economic aspects, basic

    amenities land use pattern. It also gives details of study area, period of study,

    component of environment & its methodology. Various sections of the chapter discuss

    the existing land use and drainage pattern, climate and meteorological parameters. Both

    primary and secondary data collected for the study are depicted in this chapter.

    Chapter 4: Anticipated Environmental Impacts and Mitigation Measures

    This chapter describes the overall impacts of the project activities on various

    environmental components. It predicts the overall impact of the project activities on

    different components of the environment viz. Air, Water, Land, Noise, Biological and

    Socio-Economic and its mitigation measures.

    Chapter 5: Analysis of Alternatives

    This chapter gives details of analysis of alternatives in terms of technology & site.

    Chapter 6: Environmental Monitoring Programme

    This chapter describes technical aspects of monitoring (including measurement

    methodologies, frequency, location and data analysis, reporting schedules, emergency

    procedures, detailed budget and procurement schedules.

    Chapter 7: Additional Studies

    This chapter describes Risk assessment, on-site and off-site emergency plan, and

    occupational health & safety programme.

    Chapter 8: Project Benefits

    This chapter focuses on benefits of project on improvement in physical infrastructure,

    social infrastructure & other tangible benefits.

    Chapter 9: Environmental Cost Benefit Analysis

    Chapter 10: Environmental Management Plan

    This chapter describes Environment Management Plan (EMP) to be adopted for

    mitigation of anticipated adverse impacts if any and to ensure acceptable impacts.

    Chapter 11: Summary & Conclusion

    It gives brief of the EIA Report and chapters there in. It also describes about overall

    justification for implementation of the project and explanation on various mitigation

    measures.

    Chapter 12: Disclosure of Consultants engaged

    This chapter describes the name of the consultant engaged with their brief nature of

    consultancy activities.

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 22

    Chapter-2

    Project Description

    2.1 TYPE OF PROJECT

    M/s. Associated Dyestuff Pvt. Ltd. (Unit-IV) proposes to manufacture

    Dye intermediates at Plot No. DP-2 (part), Saykha Ind. Estate, Saykha,

    Tehsil: Vagra, Dist.: Bharuch. As per the EIA Notification-2006, Industry

    falls under the Activity 5(f) Synthetic organic chemicals industry (dyes &

    dye intermediates; bulk drugs and intermediates excluding drug

    formulations; synthetic rubbers; basic organic chemicals, other synthetic

    organic chemicals and chemical intermediates), Category B.

    Total cost of proposed project is Rs. 70 Crores. Out of which, Rs.12.25

    Crores will be earmarked to development of EMS as capital investment

    and around Rs. 18.90 Crores will be recurring cost per annum.

    Based on the type of project, following are the expected aspects:

    Air Emissions,

    Waste water generation,

    Noise generation,

    Hazardous waste generation, and

    Occupational health, hazards & safety risk.

    2.2 NEED FOR THE PROJECT

    In the last 4 decades, Associated Dyestuff Pvt. Ltd. (ADPL) the company

    has transformed itself from a small manufacturing company to one of the

    most reputed quality oriented supplier of specialized products in the field

    of selected reactive dyes and dye-intermediates. ADPL being an R & D

    oriented company and having experienced technicians including PhDs &

    chemical engineers of dyes and dye-intermediates fields, continuously

    strives to develop new and improved processes for existing products as

    well as new products. With increasing market demand ADPL proposes to

    increase its production capacity by proposing M/s. Associated Dyestuff

    Pvt. Ltd. (Unit-IV) at Saykha to manufacture 1725 MTPM of Dye

    intermediates.

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 23

    2.3 PROPOSED SCHEDULE FOR APPROVAL AND IMPLEMENTATION

    Activity

    2017 2018 2019

    Jan

    Mar

    May

    Jul

    Sep

    No

    v

    Jan

    Mar

    May

    Jul

    Sep

    No

    v

    Jan

    Mar

    May

    Jul

    Sep

    No

    v

    EC Approval

    Land Development

    Site Construction

    Equipment/Utilities/ EMS Orders

    Equipment/Utilities/ EMS Delivery

    Installations & Commissioning

    CTO Approval

    Commercial Production

    2.4 LOCATION OF THE PROJECT

    M/s. Associated Dyestuff Pvt. Ltd. (Unit-IV) is located at Plot No. DP-2

    (part), Saykha Ind. Estate, Saykha, Tehsil: Vagra, Dist.: Bharuch. The

    project site is approachable by Road via Gujarat State Highway (SH) 161

    and National Highway (NH) 228. Nearest railway station of Bharuch and

    airport of Surat and Vadodara are at about 20 km and 75 km,

    respectively. Locations of the project, Google map of 10 km radius and

    coordinates and boundary of the site are shown in Figure 2.1, 2.2, and

    2.3, respectively.

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 24

    Figure 2.1 Location of the Project

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 25

    Figure 2.2 Google map of 10 km radius

    Figure 2.3 Coordinates and boundary of the site

    AssociatedDyestuffPvt.Ltd.(Unit-IV)2147'33.27"N,7249'29.00"E

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 26

    2.5 SIZE OR MAGNITUDE OF OPERATION

    2.5.1 Land Breakup & Project Site Layout

    Total area of the plot is 51406.34 m2, of which 40000 m2 will be utilized

    for this project. Detailed break up of land is given in Table 2.1 and

    Project site layout is given in Figure 2.4.

    Table 2.1 Land breakup of the area

    Sr. No. Particular Area (m2)

    1. H Acid Plant 1600

    2. VS Plant 1600

    3. Other intermediates plant 1600

    4. G. Salt recovery (MEE) 400

    5. RM storage area 2500

    6. Finished product storage area 900

    Utility

    7. Boiler 900

    8. HAG

    9. Coal yard 200

    10. Water Tank 225

    11. Work shop & engineering store 400

    Tank Farm

    12. EO tank 400

    13. Methanol tank 100

    14. Acid Storage yard 2500

    15. Spent acid storage 625

    16. Gypsum storage 900

    17. LSP storage 625

    18. ETP+MEE 900

    19. Haz. waste storage area 625

    20. Internal Road 4000

    21. Parking 1000

    22. Sec. Cabin 100

    23. Admin building & lab 400

    24. Greenbelt 13200

    25. Miscellaneous 1500

    26. Open area 2800

    27. Open area for future expansion 11406

    Total 51406

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 27

    Figure 2.4. Project site layout

  • San Envirotech Pvt. Ltd., Ahmedabad

    EIA Report of Associated Dyestuff Pvt. Ltd. (Unit-IV) 28

    2.5.2 PROJECT MAGNITUDE

    The design capacity of the plant will be 1725 MTPM of Dye

    intermediates. Complete list of products proposed to be manufactured is

    provided in Table 2.2.

    Table 2.2 List of Products

    Sr.

    No. Product CAS no.

    Capacity

    (MT/month) End-use

    1 K Acid 118-03-6 100

    Dye

    Intermediates

    2 Gamma Acid 90-51-7 50

    3 Dyes Intermediates like 500

    H Acid 90-20-0

    FC Acid 119-70-0

    MUA 59690-88-9

    Sulfo Tobias Acid 171570-11-9

    Sulfo J Acid 6535-70-2

    4 VS and Its derivatives 1000

    Vinyl Sulphone (PBVS) 2494-89-5

    OAVS 26672-22-0

    Sulpho VS 42986-22-1

    Sulpho OAVS 121-88-0

    MPDSA 88-63-1

    DASA 16803-97-7

    5 PCVS 21635-69-8 50

    6 DMAVS 26672-24-2 25

    Total 1725