OUR REF: () in Pt.2 of EP 2/N7/A/78 Environmental Protection Department YOUR REF: Branch Office TEL. NO.: 2835 1107 28th Floor, Southern Centre, FAX NO : 2591 0558 130 Hennessy Road , E-MAIL: Wan Chai, Hong Kong. :t.Lt HOMEPAGE: http:// W'WW.epd.gov.hk 23 February 2018 Hsin Chong Tsun Yip Joint Venture Environmental Impact Assessment (EIA} Ordinance, Cap.499 Application for Further Environmental Permit Project Title: Site Formation and Associated Infrastructural Works for Development of Columbarium at Sandy Ridge Cemetery (Application No. FEP-180/2018) I refer to your above application received on 26 January 20 18 for ftnther enviromnent al pennit under Section 12(1) of the EIA Ordinance. Pursuant to Section 12(3) of the EIA Ordinance, I now issue the attached Further Enviromnental Pennit (No. FEP-01/534/20 17) for your use . Under Section 15 of the EIA Ordinance, the Fmther Environmental Permit will be placed on the EIA Ordinance Register. It wi ll also be placed on the EIA Ordinance website (http: // www.epd.gov.hk/eia/). Please note that if you are aggrieved by any of the conditions imposed in this Pennit , you may appeal under Section 17 of the EIA Ordinance within 30 days of receipt of this Permit. Should you have any queries on the above application, please contact me at 2835 1142. Yours sincerely, (Steve T.S. LI) Acting Principal Environmental Protection Officer for Director of Environmental Protection

Transcript of Environmental Impact Assessment (EIA} Ordinance, Cap.499 … · 2018. 2. 26. · Environmental...

  • *~*'~~ !ii~HiH~iHr~OUR REF: () in Pt.2 of EP 2/N7/A/78 Environmental Protection Department 3Ri]*~~ ili;t!~HYOUR REF: Branch Office ~IE~~m ~ ~iS -s=-t-~TEL. NO.: 2835 1107 28th Floor, Southern Centre,

    l~~~ c:p ~e.~ttJ\t~lll:XR!J~ FAX NO : 2591 0558 130 Hennessy Road , ~7-!ll!Wt: E-MAIL: Wan Chai , Hong Kong.

    ~ :t.Lt HOMEPAGE: http://W'WW.epd.gov.hk

    23 February 2018

    Hsin Chong Tsun Yip Joint Venture

    Environmental Impact Assessment (EIA} Ordinance, Cap.499

    Application for Further Environmental Permit

    Project Title: Site Formation and Associated Infrastructural Works for Development of

    Columbarium at Sandy Ridge Cemetery

    (Application No. FEP-180/2018)

    I refer to your above application received on 26 January 2018 for ftnther enviromnental pennit under Section 12(1) of the EIA Ordinance.

    Pursuant to Section 12(3) of the EIA Ordinance, I now issue the attached Further Enviromnental Pennit (No. FEP-01/534/20 17) for your use.

    Under Section 15 of the EIA Ordinance, the Fmther Environmental Permit will be placed on the EIA Ordinance Register. It will also be placed on the EIA Ordinance website (http://www.epd.gov.hk/eia/).

    Please note that if you are aggrieved by any of the conditions imposed in this Pennit, you may appeal under Section 17 of the EIA Ordinance within 30 days of receipt of this Permit.

    Should you have any queries on the above application, please contact me at 2835 1142.

    Yours sincerely,

    (Steve T.S. LI)

    Acting Principal Environmental Protection Officer

    for Director of Environmental Protection

    http://www.epd.gov.hk/eia

  • Environmental Permit No. FEP-01/534/2017 Jl:f:l~PJliJ!~~: FEP-01/534/2017

    ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE

    (CHAPTER 499)

    Sections 10 and 12

    Jl~~#lf~f9!J

    (~ 499 Ji[)

    ~ 10 f~& 12 f~

    FURTHER ENVIRONMENTAL PERMIT TO CONSTRUCT

    A DESIGNATED PROJECT

    ~~m~I~~§~~~J~~~~m

    PART A (MAIN PERMIT) A ffl5 c~ra:rm.±.~ffl57t)

    Pursuant to Section 10 and 12 of the Environmental Impact Assessment Ordinance (EIAO), the Director of Environmental Protection (the Director) grants this fmiher envirorunental pennit to Hsin Chong Tsun Yip Joint Venture (hereinafter refened to as the "Permit Holder") to construct the designated project described in Part B subject to the conditions specified in Part C. The issue of this further environmental pennit is based on the documents, approvals or pennissions described below:

    riU~ {£!t§E~~~tfiiJ{J~19U } (£!~t11~19U) ~ 1o {1~& 12 {1~8'9~JUE , £!t§EfiiUI~~-&C~-&) W~J*~JT8'9£!t§E~i=OJ~~Htt-T~~~~ll~ Cfr~"§tOJ~~¥-J~.A")t)Jt~ ~pff§~BJl8'9tl3 5Eil~J~ El , f§ ~~~~ C t5B?ff:9U BA8'9{1~1t o *;fJT8'9£!:tJ[§LfPJ~~~f;&f~T':9Ux1t, ftt>l~ ~tOJiffi~-g~ :

    Application No. Ef3~ ~$.i51JE: Document in the Register: ~§C.-ffiLt8'9X:1CJ: :

    FEP-180/2018

    (1) Site Fonnation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery (Register No. AEIAR-198/2016) -Envirorunental Impact Assessment Report [Hereinafter referred to as the "EIA Repo11"] -EIA Executive Summary [Hereinafter referred to as the "EIA Executive Summary"] -Envirorunental Monitoring and Audit Manual [Hereinafter referred to as the "EM&A Manual"]

    ~-~~-~~~- , *~~&~H~~~I~~~

    ,&;f§i9~¥~If¥

    (~gcffitt~5nt : AEIAR- 198/201 6)

    F-~~~~~& [T~rF~~& ]- ~ J%}J'vl5- 5Til:::J 'fl)( o 1· 1f':t ~oT'fl)( o J

    -£!:t_l~~~tfiiJ ¥&1S-fjifx:fjilij~ [T'ffi{ I!~ffjfx: fjilij~ J] -£!:t_l~~.&~H~.f-$ [T'r~ r I!~.f-ffit J J

  • Environmental Permit No. FEP-01/534/2017 fliJ!~'fOJmli~: FEP-0 1/534/2017

    8 August 2016 (Reference: ( 46) in EP2/N7 IA/78 Pt.2)

    ~-&n~ 2o16 if 8 fj 8 a~~t±Htt>tr!~f¥&"*s~f§ftt= cm ~*i5£1: : (46) in EP2/N7/A/78 Pt.2)

    (3) Application for environmental pennit submitted by the Permit Holder on 13 March 2017 (Application No. AEP-534/2017)

    §"Lf"6J~1H~:jf.An~ 2o17 if 3 fj 13 am:x:s~r!±Jt8t"6J§~ $§~ ($§~~~i5ffi: :AEP- 534/2017)

    (4) Enviromnental pennit issued on 7 April 2017 (Environmental pennit No. EP-534/201 7)

    n~ 2017 if 4 fj 7 B~~~ 8~ f! ±JHt DJ§~ (~i 5u~ EP-534/2017)

    (5) Application for further environmental pennit submitted on 26 January 2018 (Application No. FEP-180/2018)

    n~ 20 t8 if 1 fj 26 a m:xs~~JT8~f!±J[8t"6J§~ Ef! §~ cEf! §y!f~~i5JJC : FEP-180/20 18)

    23 February 201 8

    Date Bf!Jj

    2

    http:Lf"6J~1H~:jf.An

  • Environmental Permit No. FEP-011534/2017 !_ft:flgtfPJm~~: FEP-01/534/2017

    PART B (DESCRIPTION OF DESIGNATED PROJECT) B $ (:t§)EI.fi~ § ®~13Jj)

    Hereunder is the description of the designated project mentioned 111 Part A of this environmental permit (hereinafter referred to as the "Permit" ):

    Title of Designated Project Site Fonnation and Associated lnfrastructural Works for mn~~ El erg~fM Development of Columbarium at Sandy Ridge Cemetery

    [This designated project is hereinafter referred to as "the Project"]

    ~-~~R~~~-~I.~~-&ffiU~~Im [:;$::f§kilEJWi § Tffi} r I tEJWi § J 1

    Nature of Designated Project 1. A drainage channel which discharges into an area which t§~I~~ El e'g'ti~ is less than 300 m from the nearest boundary of an

    existing conservation area

    I. t1~J15cA-{~:t~~~E~fH5FfoHI~§ f!H~~~:®iliW~~Yn~ 300*8~t1~7_klli o

    Location of Designated Sandy Ridge Cemetery, New TetTitories. Project The location of the Project is shown in Figure 1 of this Pem1it. t§~I~~§e'g~l!i

    ~JTJF.).YW~t~ I lEJWi § 8~:t~~~:;$:8LfoH~!II I o

    Scale and Scope of Designated Project t§~I~~ El e'gJiJM}tWiB!II

    The Project mainly comprises:

    1. Site fonnation works for a formed platform of about1.8 hectares and associated drainage, sewerage and landscape works for development of Columbarium at the Sandy Ridge Cemetery;

    2. Construction of the pick-up/drop-off point at Man Kam To Road .;

    3. Widening of about 900m of the existing Sha Ling Road; and

    4 . Improvement works to the existing barging point at Siu Lam

    3

    http:t�)EI.fi

  • Environmental Permit No. FEP-011534/2017 !f:t_l~foJmf®51Jf: FE P-0 11534/2017

    4

  • Environmental Permit No. FEP-011534/2017 ill:f:lm=CJfM~~: FEP-01/534/2017

    PART C (PERMIT CONDITIONS) cw c~OJmf~f!f) 1. GENERAL CONDITIONS

    -JN: f~{lf

    1.1 The Permit Holder and any person working on the Project shall comply with all conditions set out in this Permit . Any non-compliance by any person may constitute a contra vention of the Environmental Impact Assessment Ordinance (EIAO) (Cap. 499) and may become the subject of appropriate action being taken under the EIAO.

    ~~m~~A&ff~~~I~~§~A±~~~~~~*~~m·~~~~~~ · ff fDJ A ±M~::ff:-'f~*~lf~mttJ'~)x , DJ~s~& c~ 499 ~) s1 m~ ~ ~~~~m•~~~~~-fl~ ·

    1.2 The Permit Holder shall ensure full compliance with a ll legislation from time to time in force including, without limitation to, the Air Pollution Control Ordinance (Cap. 3 11 ), Waste Disposal Ordinance (Cap. 354), Water Pollution Control Ordinance (Cap. 358) and No ise Control Ordinance (Cap. 400). This Permit does not of itself constitute any ground of defence against any proceedings instituted under any legislation or imply any approval under any legislation.

    ~~m~~Am§m~~~~~~~fl~~~m~ ~ ~~m::f~~

  • Environmental Permit No. FEP-011534/2017 :EJ~gtfiiJ~t;l~: FEP-011534/2017

    §lfi:i}g~:j:~~,AJ&1±Ifj_J~ § Iti:ti3':JpJT~*~~:iit8 D~-J$l/J{~ttt~~, ~~HtUi:t~if;;$:§t

    ~m~m::4s:·~~0~1±ffW~M~MH o ~~mM~A~~~1±~®~~~~g~ *~~mc~gaw~~n~~~m)~-~~~o~~mM~A~~~~~m~~ ~~~$ · ~mre~~x~~~~~•·:tt~~~~~~m~~~ffi~~~~~ o • ~~fflM · ~&~~~~~~m~m~I~~§I~~T·~~~~ o

    1.6 The Permit Holder shall construct the Project in accordance with the project description in Part B of this Permit.

    I . 7 The Permit Holder shall ensure that the Project is designed and constructed in accordance with the information and recommendations described in the approved EIA Report (Register No. AEIAR-1 98/2016), the appli cation document for Environmental Permit (Application No. AEP-534/20 1 7), other relevant documents in the Register, the information and mitigation measures described in this Permit, mitigation measures to be recommended in submissions that shall be deposited with or approved by the Director as a result of permit conditions contained in this Permit, and mitigation measures to be recommended under on-going surveillance and monitoring activities during all stages of the Project. Where recommendations referred to in the documents of the Register are not expressly referred to in this Permit , such recommendations are nevertheless to be implemented unless expressly excluded or amended in this Permit.

    ~~mM~Am~~I~~§~~~&~~ ·~~T~ft~&m~m~ : ~*~~~ 15- (~*cfRHi5et: AEIAR-198/20 16 ) pfT§~ry:jS'J]~*4&~r~~§i · I!m§t~§~$t5~X:14 ( ~3§~-~i5JJt AEP-534/2017 ) ; ~§c fffi i*JB':J~{iM§~~ X:{tj:: ; ;$:§t~mJ5JT§~B,Jj8':J~*4 &•mm~ ; m•*~~m~-~~~m~~~~~~~~~m*~mxx:~M~• ~--m~;~&1±I~~§~~W:iiff~Mm§.&§~I~ffi~-~~Mm~ o ~§cfffiX:14J5JT~~-:tlD~9. ~1±*§Lf~§~ryjui~~ , ~ U1JJ~~f:f1iffii§®~~ji, ~~~F:~I*§t ~§~BJJuiW~~~{I~§J o

    1.8 All deposited submissions, as required under thi s Permit, shall be rectified and resub mitted in accordance with the comments, if any, made by the Director within one month of the receipt ofthe Director's comments or otherwise as specifi ed by the Director.

    ffi~~*~~mm~mx&~~~x:~·m:ttm~¥~~-~c~~~)~ I OO~ ~ ( ~~~F:¥-&~1=Jf§~) , t~M¥~8':]~~1JOt){I~IE&miFJTm~ o

    I .9 All submissions approved by the Director, all submissions deposited without comments by the Director, or all submiss ions rectified in accordance with comments by the Director under thi s Permit shall be construed as part of the permit conditions described in Part C of thi s Permit. Any variation of the submissions shall be approved by the Director in writing or as prescribed in the relevant permit conditions . Any non-compliance with the submiss ions may constitute a contravention of the Environmental Impact Assessment Ordinance (Cap. 499). All submiss ions or any variation of the submissions shall be certified by the Environmental Team (ET) Leader and verifi ed by the Independent Environmenta l Checker (IEC) referred to in Conditions 2.1 and 2.6 below, before submitting to the Director under this Permit.

  • Environmental Permit No. FEP-011534/2017 !lm~PJm€!1~: FEP-01/534/2017

    ~:WJ~~!JZ1611~'d9U> cm 499 ~) 0 r!T::fo§mX:X:14~J~X:x14s~1:E1DJ fi~H/.$: . t~~~rn"T x1~14m 2.1 "& 2.6 J~pJTiili8'JE~:tJVJ \~Ji~Ji-& t*m&1!m :fi. f~:tJHH*A.t:i

  • Environmental Permit No. FEP-011534/2017 !J!Jt~PJli!f€/.i5Jff: FEP-0 11534/2017

    2 SPECIFIC CONDITIONS Ff~{&j§ftf:

    Employment ofEnvironmental Team (ET) ~ff}!JJI!Jl/j1Uf

    2.1 An ET shall be established by the Permit Holder no later than one month before the commencement of construction of the Project. The ET shall not be in any way an associated body of the Contractor or the IEC for the Project. The Permit Holder shall provide a site office/suitable work accomm odation on site to the ET for use. The ET shall be headed by an ET Leader and supported by relevant specialists including qualified ecologist(s) and Registered Landscape Architect. The ET Leader shall be a person who has at least 7 years of experience in environmental monitoring and auditing (EM&A) or environmental management. The minimum on-site time for the ET Leader and ET, and the qualifications of the specialists in the ET shall be proposed with justifications for the approval of the Director.

    :f±IfE_r~ El 8'J~i§IfE~IfflJW , glJ=OJ§fH~*IA~1l~Ym!£f. I @B IJX:fr-@J~:t3VJ\~Jl o J! :l:Jt;J \ ~Jl /F1~~IfEr~ El 8'J7¥c ~JJ¥~~1W:lzJ~ :l:JF11f t~A*I{f1DJ ~~r, ~ o!~~~J \ ~Jl ~~El3-;g J~~~J \ ~JlHl.-&m~~ oglf OJmf~*IA~~m! 1~~I!ii3~}JHJ~.~/i® -El 8'JI 1'1= !ii3~r5-T !~~~J \ ~il.f~ m0 ~m/J\~J3.5~ El3 - ;gr~~~J \~Jl~Jl-&m~~ , w~~1itEI 19~s'J :w* §f3~~~*R.a fffi ~ ~@ffi 5zJ-l oJ~~~J \ ~ii.~Jl-& ~~1±r~ ij\Hi:H\~R.:riti< C r r~~ J ) ~r~~~!J.)Jiii~Y *I 7 if:~![.~~ o~lJ=oH~f~*IA~~l!';tl~~~J \~ii.~Jl-&R.J!~ ;J\~Jl8'J:® 0-"UI!ii3B~Fs,t)&J~~~J\~Ji ~~:W*~~~~~-&m:~~-R.~El3,~mm* o

    2.2 The ET and the ET Leader shall be responsible for:

    (i) implementing the EM&A programme in accordance wi th the EM&A requirements as contained in the EM&A Manual of the Project as mentioned in Condition 3. 1 below;

    t~TX:11* 14:§g 3. 1 r~pJT }lttifEJ~ El 8/;J!!~~fffi~]!.l8/;J !~~;i;Jt5E , ~Af'J!~~H iU ;

    (ii ) certifying the environmental acceptability of permanent and temporary works, relevant plans and submissions required in th e EM&A Manual and under this Permit;

    ti

  • Environmental Permit No. FEP-011534/2017 !J:fjt~fEJMftii~: FEP-011534/2017

    compliance with the recommendations of the approved EIA Rep ort (Register No. AEIAR-198/20 16) and this Permit; and

    tH}~PJ~5~*~~~Hif! !J~iJZ¥&"* ( 1t§cffiH~ 5J}t : AEIAR-198/20 16 ) E!':nt~& *~'TPJ~~ E!'9{';-f~·~~5LEI1a*JJ1t~: - att·~)5L~a=~·~~5L~1t.f:tt 1 @I 110 7:.1*J ~ w~:roJ~~"t-i

  • Environmental Permit No. FEP-011534/2017 :E.ft:tJULfPJifftf®~: FEP-011534/2017

    AEIAR-1 98/2016) and to certify submissions for the Project as required under Conditions 2.20 to 2.2 1. The qualification and experience of the Registered Landscape Architect shall be certified by the ET Leader and verified by the IEC.

    tE~rffli;f~J~ § 8'g~mit~mi~Y 1 @ A ~ffl-ijUffit~~gffi &J3. /JXI!JrJVJ\~J3. · tJiif:S: W~W~OO~U~I~· ~M@~~~-~-Mffi~· U~~N~~~W~C~~ffit ~JfiHdt : AEIAR-1 98/2016 ) !jtt}ill8'9~~i · tJ&t~m't31:1'*1tt~ 2.20 ~ 2.21 J~pJT1JUE:~~~~I f~ J~ § tfl!.x_8'gX:ftt: ot tfffi ~~@ffi8'g~if~l?

  • Environmental Permit No. FEP-011534/2017 J~m~rcrm~~= FEP-011534/2017

    ~D1DJ~J!a=.X·~55t~1t , W~&:t~~$1~Uif§~~8'9~~;${'i= Cf~U~DWit~.r& El if§ ~~ 8'9 ~F)tdif~) ~/f'}I1'J C§r3·~~/f'}I1'J8'9'~55t) t*AUI~~¥1H~ C~gcfHHi 5dt : AEIAR-198/2016 ) 8'9~m ( 19U~D:Iiffii:1J5~ , ~,i(Wll§':fjffi_&:fi~{~$) , li ~~$.&*~~m8'9•~·~~~-~~~-W~Im~EIM~~/f'~~~~ ~8'9~~~~ffiUI1'F ; tJ.&

    (iii) how to keep proper records in order to respond to questions and enquiries from the Director on the EM&A programme and duties di scharged by the IEC.

    ~~~~~-~-~@~~~~~~~~~m.&m~~~~~AM~fi•a B'9Fo~~,& ~§li] a

    2.8 The IEC shall be responsible for duties defined in the EM&A Manual and this Permit, including but not limited to the following:

    (i) to audit the overall EM&A performance, including the implementation of all environmental mitigation measures and monitoring activities on site;

    (ii) to verify the environmental acceptability of permanent and temporary works, relevant plans and submissions required in the EM&A Manual and under this Permit;

    t* '!EUk ?-. .&~~8~It~1:Efi~_t 13'9~tft~t~N , if§~~ i3'91E! ~Uf-D ti:HI~~~~$ .& *~Lf~§~;J:JUE:mxs'9xft~= ;

    (iii) to verify the log-book(s) mentioned in Condition 2.2 (v);

    (iv) to notify the Director by fax or email , within one working day of receipt of notification from the ET Leader, or identification by the IEC and his I her team, of each and every change of circumstances and emergency events mentioned in Condition 2.7(ii) ;

    :t:EI±\fJI1,~ft~=% 2.7(ii)J&.PJT}Ztts'9a=.x·~5x~1t.&~~;$ft~=s~ . {~:ffHgil~~~J\~Ji ~Ji*im%1~1lili~~~~t*A.&~~m:~J \~Ji1i1iLx£·~55t13t 1 @I1'F:l(f:kJt)1$Jl~ ~j~:1J"rt}m9;{]~~ ;

    (v) to liaise closely with the Director;

    (vi) to accompany the Director in carrying out site inspections and attending meetings when requ ested;

    (vii)

  • Environmental Permit No. FEP-01/534/2017 !I~~PJ~Ui~: FEP-01/534/2017

    EM&A programme and duties discharged by the IEC, with the support of relevant information , documents and records as appropriate; and

    ~~*~~~~mm*~•&••~~· ~mm~~~ffi~•~ · ~#~~ •~~~~~mlli~~~~~~w~~~~~~Affi~B~a~~a&~ §tg; t)&

    (viii ) to allocate adequate resources, including any necessary speciali st support, for discharging the duties required in th is Permit and the EM&A Manual.

    ~~~s~~~~~m~~-•~m · ~~B$~~m&~~~oom~~% J~~:Jf 0

    2.9 If the Director considers the IEC fa ils to discharge the duties of the IEC as defined in the EM&A Manu al or in this Permit, the D irector may require by notice in writing to replace the IEC. Failure to replace the IEC as directed or further fa ilure of the IEC to discharge his duties despite employment of a new IEC may render the Pe rmit liable to suspens ion, cancell at ion or variation .

    ~~~~~~n~~~~A*~~fi~~~oo~*~~mm~~~~n~~~~A~ H·~~~~-~~*••~n~~~~A - ~*~~m~••~n~~~~A · ~rr ~fflffJT1wnf~~~t*Ai'3i:fJJ*~Ew~o%~~rn~t~)5t ,~u~wr~¥~§t~m}li!fB~m~ft1 , ~)( >f-3~~~51: 0

    Submission ofManagement Organizations ~ft~J!l~IA

    2.10 No later than one month before the commencement of construction of the Project, the Director shall be info nned in wri ting of the fo llowing information whi ch shall include at least an organization cha11, names of responsible persons and their contact details:

    rr~~I~~§~~~I~M·mft&m~ I @~~~~~~C~&~M-ffimB~, ~-A~~~&·M-~ ) · ~W~im~~~ :

    (i) the management organizati on of the ma in construction companies and I or any form of j oint ventures associated with the construction of the Proj ect;

    ~~~~0~&/~~ff~~rtWI~~§~~I~ffi~~~-~-~W~~ tM ;

    ( ii) the management organi zation of the ET; and

    ( iii) the management organization of the IEC and the suppm1ing team.

    ' 12 ( \

  • Environmental Permit No. FEP-01/534/2017 :J;I:f;l~"PJiilf!Jij)t: FEP-01/534/2017

    2.11 The Permit Holder shall , no later than one month before the commencement of construction of the Project, deposit four hard copies and one electronic copy of a Works Plan with the Director . The plan shall include at least the following infom1ations/specifications:

    ~~mM~A~tr&~Im~§~~~Im~ft~ 1 00~~-~~~~I~m~4ffi~ •~& I ffi•~~~o~~m~~~T~~M/m~:

    (i) a detailed phasing programme of all construction works including site formation and roa d improvement works of the Project; and

    (ii) Location plan of all construction works in an appropriate scale as agreed by the Director.

    Submissions of Contamination Assessment Plan (CAP) for the south east eo m er ofthe site next to Man Kam To Road /Jl~{JLM';!(J$}/ff/Mf!.I:II!!J/{ffjj§tf.J/5~/ff{i!iffflff

    2.12 Land contam ination assessment to the potential ly contaminated site as shown in Figure 2 of this Permit shall be catTied out when access to this si te is available and before the commencement of construction of the relevant pat1 of the Project at thi s site. The Pennit Holder shall submit four hard copies and one electronic copy of the CAP to the Director for approval. No construction works at this site shall be commenced before the approval of the CAP by the Director. Al l recommendation(s) in the approved CAP shall be implemented.

    tr~~lli~I~~m~&tri~&~~~Im~§~ffi~$0~ , ~~*~~m~ 2 Mffi~~tr~~~~~~fl±~~~~~ o~~mM~A~m~ 4 ffi~·*& l ffiS ~~*~~~~~~~m•~•m o tr~~~~~m~~~~*~,~~~I~~fl 1:IfoJ~~Iiflf. o tt->tts1~*~~1i5HiUr*J11JBJ38/;J~lJ~~~HfljfE , ~~~¥AI'J o

    Submission ofGrassland Reinstatement Plan !Jl~¥/ffff5f!K!fff!tfif11!1

    2. 13 The Petmit Holder shall, no later than one month before the commencement of construction of the Project, submit four hard copies and one electronic copy of a Grassland Reinstatement Plan to the Director for approval. The Plan shall be prepared by a qualified ecologist/botanist and shall be certified by the ET Leader and verified by the IEC as confom1ing to the information and reconunendations contained in the approved EIA Report (Register No. AEIAR-198/2016). All recommended measures as set out in the approved Grassland Reinstatement Plan shall be fully and properly implemented.

    ~~mM~A~tr&~Im~§~B~Im~ft~ I OO~~¥~~~~AA~~~4ffi~ •*& l ffi•~~~m~~~m* o ~H~~~~~~~~~~~~~~•oo , ~~~ !.!ijt; J\~J3.~J3.~tt-*R2?dli!l.IT!fV:5l~tt-At~W , mEIA~H~tt->f£8'9!!~~¥&"* G~J2it!Hi5m : AEIAR-198/20 16) r*J~81~*4&~m o tt->tt8'9¥~'t;J(~~~;i\~iltUr*J1iJEIJ38/;J~J~~~tt§'

    0nfE , ~~~~JtE&£t~vA1'T

    Submissions of Vegetation Survey Report and Transplantation Proposal !Jl~IB#!i/11tf!Gi!i&!i$/BR&Nf!J ~

  • Environmental Permit No. FEP-011534/2017 !JI~gLfPJmi~~: FEP-011534/2017

    2.14 The Permit Holder shall, no later than one month before the commencement of construction of the Project, deposit with the Director four hard copies and one electronic copy of a Vegetation Survey Report. The survey shall repmi the presence, as well as update the conditions, number, locations and habitat types of any identified floral species of conservation importance within the works area. The survey shall also identify the number and locations of the individuals of fl oral species of conservation impotiance to be affected by the Project and evaluate suitability and/or practicability of transplantation.

    ~~WM~A~~~~Im~§~~~Im~&~ 1 @~~~~~~-~~~~~~ 4 ffi~~*& 1 ffi•~~* o ~~~~~~~~I~~~*•~~~~~~mm~£• 8'Jf~~5t , IOJ8~VJ\~Jf~ffff~~r.Pofl81~7\~5t , f&.ii , fll:ii&~rjU&J3U o ~~~~,3JE~~~t~M~~ ~Im~w~~~~~mm~£•~•~&m•,~&~~8S~®m~~~~tt& ~~~1'J'fi 0

    2.15 If the Vegetation Survey concluded that transplantation of the affected floral species of conservation importance is needed, the Pem1it Holder shall submit a Transp lantation Proposal no less than one month before commencement of transplantation to the Director for approval.

    frDt~¥?'.1~~~5~ffB~~~f~f1i:~::JJ~81~f~~{~flfl~o/.Jr.Pofi , §lf~§~t~~Ali!IH~~J&~ 8m~•~ 1 @~~8m~••m~~~m* o

    2.16 The Vegetation Survey Repmi and the Transplantation Proposal shall be prepared by a qualified ecologist/botanist and shall be cetiified by the ET Leader and verified by the IEC as confonning to the infonnation and recommendations contained in the EIA Repmi (Register No. AEIAR- 198/20 16). All recommended measures as set out in the approved Transplantation Proposa l shall be fully and properly implemented.

    ti~~J~~¥&~&f~ti~·-~~E8~~t~~~"'&~~

  • Environmental Permit No. FEP-01/534/2017 !.ft:fjt~OJlilf~~: FEP-01/534/2017

    Submission ofMonitoring and Survey Plan for Golden-headed Cisticola

    !fl;f{:#zffA/ffifl,,.f§}J!l&ill!liflff

    2.18 The Permit Holder shall, no later than one month before the conunencement of construction of the Project, submit four hard copies and one electronjc copy of a Monitoring and Survey Plan for Golden-headed Cisticola to the Director for approval. The Monitoring and Survey Plan shall include an Action Plan in response to any inegularities identified. The Plan shall be prepared by a qualified ecologist/ornithologist and shall be certified by the ET Leader and verified by the IEC. Al l recommended measures as set out in the approved Monitoring and Survey Plan shall be fully and properly implemented .

    ~~mffl~Am~Im~§oo~w~2~~~m~ 1m~m~~~~~ft~~&~~ *~~ 4 ffi~m*& 1 ffi•~~* · ~m~~•m o ~~~~~~~&~~*~~~ :t3fri!JHIU, tJ~tN~l1U3UI:B8'~1:Ef5J1'&''~~5L oHfiU El31S-~;f~~~~*/.~~~~*~kfjij · .:tt~~El3J!~;J \~J3.HI.~tJ

  • Environmental Permit No. FEP-01/534/2017 fft:fjtiffCJ~:~Ui5df: FEP-01/534/2017

    implementation programme; maintenance and management schedules of the landscape and visual mitigation measures recommended in the EIA Report (Register No. AEIAR-198/2016). All drawings shall be in the scale of I: I000, or other appropriate scale as agreed by the Director.

    ~~EdJl~*~~~HIUR.f~1*f~~~HfiU~~-§:t3f*~~ , f*~R.~ti:EJFf~-s"JtM* · *fflfltitMR. •m~w · ~~~~§I~fi~~wm•~~~~WoH~~~~mllim•,R~ ,• £ /rs,Ji!E, tif0~1!t~ , g~H~ffi[!) , ~:Jjftt)J~;&f.~~f¥&"*

  • 3.2

    3.3

    3.4

    Environmental Permit No. FEP-0 11534/2017 !Jj;t~fOJmffii~: FEP-0 11534/2017

    §lfOJ§1H~~A~~fli:W~ffl~.:f-ffltpJT!Itt81t~J¥EHJUEJJt1'Jl~~HiU oHiU31D~HfDJ]!!2!Y: · ~~ ~ffl~~,~~~m~~-~~~~ffl~~~A.~W·m~~N~f!~.:f-ffltffi!ltt~~~& mJ£ · ?h1~::tt;lBz~-t~Jtt>rt 0

    The Pennit Holder shall take samples, measurements and necessary remedial actions m accordance with the requirements of the EM&A Manual by:

    ~OJm~~A.~fli:~ffl~.:f-ooMa~mJE: · m~~~~$~ft~•·~~&M~~M~ 1'J!JJ :

    (i) conducting baseline envirorunental monitoring, including the baseline survey and monitoring of Golden-headed Cisticola as mentioned in Condition 2. 18;

    (i i) conducting impact monitoring;

    (iii) carrying out remedial actions described in the Event/Action Plans of the EM&A Manual in accordance with the time frame set out in the Event/ Action Plans, or as agreed by the Director, in case where specified criteria in the EM&A Manual are exceeded; and

    31D~~:E!Hlli:.:f-00r*J:f§~8~f~~fj§ · ~IJfli:~.~:EI~.:f-iffir*J81~1!f/1'J!l!JJHmUr!T§J~81B~ ~~~~ffi~-~~~·~ft~~/fi%H~ffilli~~M~fi!JJ;~&

    (iv) Jogging and keeping records of the details of (i) to (iii) above for all parameters within 3 working days of the collection of data or completion of remedial action(s), for the purpose of preparing and submitting the monthly EM&A Reports and to make available the infom1ation for inspection on site.

    ;(± 4:li:*t2•:9X:jeiJXM3f~1'J% 3 @If!=~r*J · ~~*2~3R&f=tij:ffl:X:(i)~(iii)~~PJT~~ -~~•·m~•~&m~~~ffl~~*· ~·~~~-~~m;(:EI~~M o

    Four hard copies and one electronic copy of relevant Baseline Monitoring Reports shall be submitted to the Director at least I month before the commencement of construction of the Project. The submissions shall be certified by the ET Leader and verifi ed by the IEC as having complied with the requirements as set out in the EM&A Manual before submission to the Director. Additiona l copies of the Baseline Monitoring Reports shall be provided upon request by the Director.

    ;(:E~~I~~§~B~I~M · ft~ I @~~~~~m~~~¥-~~~*~ 4 fu~-2js:& 1 15H~:T-M&2!s: 0 mxx:1!f~~~:r~~~J ,~J3.~JI.~ftm&11fll~r~~~t~A.ttm:= · m~~r,.g:

    0~:r~~.:f-OOr1T~s1m~ · fh1k;1-mx~~ 31o~~~* · ~IJ~~m~¥~$~;~u¥&*s1?Sfl5~ 0fl/.'js:

    Four hard copies and one electronic copy of Monthly EM&A Reports for the construction stage of the Project shall be submitted to the Director, within 2 weeks after the end of the reporting month. The monthly EM&A Reports shall include an executive sunm1ary of all environmental audit results, together with actions taken in the event of non-compliance (exceedances) of the environmental quality perfonnance limits (Action and Limit Levels), complaints received and emergency events relating to violation of enviro1m1ental l egislatiOI~

    IAO \i 17 EPD ~

    ;,:.

  • 0

    Environmental Permit No. FEP-01/534/2017 !ll:f:lm:crms~: FEP-ol/534/2017

    (such as illegal dumping and landfilling) . The submissions shall be certified by the ET Leader and verified by the IEC as having complied with the requirements as set out in the EM&A Manual before submission to the Director. Additional copies of the Monthly EM&A Reports shall be provided upon request by the Director.

    ~I~~§~~I~~ · ~moom~•~~~ffi~*~ 2 ®£M~ · m~~~mx@~ ~~-~~ 4 ffi~•*& l ffi•~~*og~~~•*m~~~~~m•~~*·~& ~B~~H~Cmlli)~~-~~mm~Cfi~&~~*~)~~~ffi~®~fi~·W 1~=%rnru3i&r~m5~19tl c19tl~D 3P5~~ifti&±ttl) e':rt.ft~IT&B~1'Elrnm~~;$f4e':rf'ri& 1ii!lJ~ mx El'g¥~~~f! i±!l~~~J\~Jl~Jift::ft:}l~ae'J § ~.,.1(~fl~X:f41fflrrilrl1JoA 0 ¥~~~~~~1§l~~fl~•:x=%1'Elrnru~if~· 8':JIE:X~ftllimX:2Js:}l~5 o~~~P~1j~~IOJ~, ¥~*~?JT=%1il1f~t~~f!J;J~~~ff:tf3W':J GIF • JPEG ~ PDF fe:r:tffitl~ 0 ¥&~e'gm:~ll&*pq~ , %,~flW~~*e1~~-~5z .O _A~.....

    18

  • Environmental Permit No. FEP-01/534/2017 !JI~~CJm~51Jf: FEP-01/534/2017

    4.2 At least 2weeks before the commencement of construction of the Project, a dedicated Intemet website shall be set up and the Director shalJ be notified in writing the Internet address where the environmental monjtoring data and project infom1ation is to be placed. All environmental monitoring data described in Condition 4.1 above shall be made available to the public via the abovementioned dedicated Internet website as mentioned in Condition 3.6. All finalized submissions and plans shall be made available to the public via the dedicated Intemet website in the shortest possible time and in any event no later than 2 weeks after the submissions and p lans are approved by or deposited with the Director, unless otherwise agreed with the Director. The dedicated website for public access of the environmental monitoring data and reports shall be maintained tlu·oughout the entire construction period and until 3 years after the last EM&A report is uploaded, or otherwise as agreed by the Director.

    ~Im~§~~~Im&~M,ma~m~ 2 M£M~n~~~M~~~~~~••& It¥r~§jr1f-4, :MztJ~iiiwM~-&1H~r.~~~~±.tl::rJT~ 0 ~ffi3F~1~~-&15J~, J:.X:11*14~ 4.1 ~lli~~m~~~§~•· , ~~•~m~J:.x:•~~ 3.6 ~lli~~~~~~~~Mm 0~M•,~a~mm~~~m~~~~-~~~-~~mv~~~ 2 M£M~J:.•~

    0~~~~~~)!~ r1T~mxx:1t&!Ml~IJ~t~ , ±~~~•t~m~~~~tE:~~ijr.~~~~trM!~0~M~ , ~ff1DJt~>R~~~1~,~~~re~mxx:1t&[M]~IH~~-&titt~rOJ~-&~n9J~a/;j 2 M£M , ~ffi3F~1~~-&15J~ o 1IIf¥J~§ ~@JftEIM~&f5i1~-{7Jf!~¥&'*J:.f$~/.$:~~M1~8/;j 3 ~~,~~-&15J~~~~MM,~~M~~~~M,m0~m•~~~~~--·&·

    4.3 The Internet website as described in Condition 4.2 above shall enable user-friendly public access to the environmental monitoring data and project infom1ation including the Project Profile and this Permit. The Internet website shall have features capable of:

    J:.x:•~~ 4.2 ~lli~~~~~~M , ~m~~m~~m , •0~~~m~~~§~B •&It¥r~§ft1f-4, ~cjJ'§f3If¥J~§r.f11!-&/.$:glf~~~ o ~ffi3F~1i~-&15J~, ~~~r.~~~~ M~~~fiti~ft , mf~~iffir}Jfclli :

    (i) providing access to all environmental monitoring data of thi s Project col lected since the commencement of construction;

    (ii) searching by date;

    (iii) searching by types of monitoring data; and

    (iv) hyperlinking to relevant monitoring data after searching;

    or otherwise as agreed by the Director.

    Notes: tt

    19

  • Environmental Permit No. FEP-011534/2017 !.ft~~OJ~HI.iilJE: FEP-0 11534/2017

    1. This Pennit consists of three parts, namely, Pm1 A (Main Permit), Part B (Description of Designated Project) and Part C (Pem1it Conditions). Any person relying on this pennit shall obtain independent legal advice on the legal implications under the EIAO, and the following notes are for general infonnation only.

    ::i~ 8':J5!1$-21~1lJ§i3J1~:fi5t1l~~ ,

    0"f}ill§l~lPR f;Jt-mt:~~m 2. If there is a breach of any condition of this Pem1it, the Director or his authorized officer may,

    with the consent of the Secretary for the Environment, order the cessation of associated work until the remedial action is taken in respect of the resultant env iromnental damage, and in that case the Permit Holder shall not carry out any associated works without the pennission of the Director or his authorized officer.

    ~~&::

  • Environmental Permit No. FEP-011534/2017 }.ft:ijt~LfOJm$i~: FEP-01/534/20 17

    (i) on a first conviction on indictment to a fine of $2 million and to impri sonment for 6 months;

    (ii) on a second or subsequent conviction on indictment to a fine of $5 million and to imprisonment for 2 years;

    (iii) on a first sununary conviction to a fine at level 6 and to imprisonment for 6 months;

    (iv) on a second or subsequent summary conviction to a fine of $ 1 million and to imprisonment for 1 year; and

    (v) in any case where the offence is of a continuing nature, the court or magistrate may impose a fine of$10,000 for each day on which he is satisfied the offence continued.

    :t:tfffDJ·rg~R-r31o ~~w17~1~~J!'fi~ , f=l!J ;t;; ll}tWt=lf< #!J g- DJi?x;ft:f;3~pg3~mHr~~j! sim~g~i!Jif,X 1o,ooo n °

    8. The Permit Holder may appeal against any condition of this Permit under Section 17 of the EIAO within 30 days of receipt of this Pennit.

    glfDJ~t~1:¥ .A DJ:t:Et~1!f:$:glfDJ8~1~ 30 ~pg, t~ti.~H!gffiJ~f:9~~ 17 fifif~,;t;zJs:glfDJ8~81H:fDJ f~ftfm!tl:Ltgff o

    9. The Notes are for general reference onl y and that the Pennit Holder should refer to the EIAO for details and seek independent legal advice.

    ~~ttmRm-~•~m· ~~~~~m·~orm~~.A~•~~~-~&•~~~ 05t1f~~

    21

  • .;:>!I ill. /•;i~

    )

    'r'-- ...-,~------'·-·i J~ •ii"'-'NI &\Aili!l•..,lll.*llll*t.!;

    Cr....,toriun. F...,...ol Porlouond Visitor- Service Centrec illi.III!!!=l'§I~Il!~~·il i.Hlllli;I(Jill~~~~~rqe -Proposed PIa !forms for Cohi!Oor iun !UiiD.:'!'I'§I.IiiiW.IIJill t.HIUiltl!t&a Propose

    ~ Oroo-off Point ~.J !Qll.tli 'Uii§l!:l

    D _ _-. L. - .

    ~==·

    Environmental Permit No.: FEP-01/534/201 7 Jl!!jlg.'fOJii.ff~itt: FEI'-01 /534/2017

    eD Legend ll{;J Project Bound;~ry 1n Environmental .- · ...., Perm1t No. EP-534/2017

    P."J:J.•;:r•·JrJ!Mt'l EP-534/2017 r•-·rmu 1-.r~

    Uti 1itios Construction

    lllil~mllle

    Pr()()O.Sed Access ROOd

    i\Uilll~ll!ll

    - Propose

    !-

    ~ Ji'

    ~- ' ·. "' ·~~:

    Co "11 s j.,ZQr;Qo)'

    \

    .. /l\P·

    -.::~

    l'roject Title: Site Formation and Associated lnfrastructural Works for Development of Colum barium at Sandy Ridge Cemetery

    I~~W : ~~~~~~A~I~~~&ffi~~~~

    Figure I : Location Plan Ill 1 : I~-(fzjf!il

    (This fig ure was prepared based on General Layou t Sheet I to 3 attached to FE I' application (Application No. FEP-180/2018))

    Pfi:lfllfi! f[H~IlliiPfi~':i'JTif-Jin!}'l.ffofilircf!?,?i lEf3f.i'f1.!HilJR: FEP-1 80/20 18) if-J~!Hl% I l9:~$ 3 Ji~;Jirf)

    Environmental Permit No.: FEP-01/534/2017 !.l:l:J!~OJli!Ui~ : FEP-011534/2017

    Prooose

  • Environmental Permit No.: FEP-01/534/20 17 lftJ:iil'fOJmti!M : FEP-01/534/20 17

    Legend i- · - · ~ Project Boundary [d Potentially Contaminated Site - ·- ·II{?IJ If¥_ljl~ll~ jf:(f~)~~itk&

    Project Title: Site Formation and Associated lnfrastructural Works for Development of Columbarium at Sandy Ridge Cemetery

    I@~W :~~"m~~-~~~~~H~mi@

    Figure 2: Location of Potentially Contaminated Site 112 : M:ff5't~~:ltkl!iUll (This figure was prepared based on Figure 2of the Environmental J>ermil No.: EJ>-53412017) P1>:lil:llH&11llll:lil'TOJmiiM El'-534/2017 • 1112 ii11i'Jl

    Environmental Permit No.: FEP-01/534/2017 J:Jmst'llJMflit'[ : FEP-01/534/2017

    结构书签FigureFigureFigureFigureFigureFigureFigureFigureFigureFigure(iv) ~~~Figure~ ~ E.\P..O ~ e.PO ~ FigureFigureFigureFigureFigure(vii) FigureFigureFigure7. 111 the Permit, and IS FigureFigure-~:. !:.~;-~ ~~~ ~ ~ . ·~ .,__.; L I L.-..~ L_____ ---·----s --!"'-' location of Existing Barging Point at Siu lam Jl~~~NIH·ii~~~~ ' !-~ Ji' ~-' ·. "' ·~~: Co "11 s j.,ZQr;Qo)' \ .. /l\P· -.::~ Project Title: Site Formation and Associated lnfrastructural Works for Development of Columbarium at Sandy Ridge Cemetery I@~W:~~"m~~-~~~~~H~mi@ Figure 2: Location of Potentially Contaminated Site 112 : M:ff5't~~:ltkl!iUll (This figure was prepared based on Figure 2of the Environmental J>ermil No.: EJ>-53412017) P1>:lil:llH&11llll:lil'TOJmiiM El'-534/2017 • 1112 ii11i'Jl Environmental Permit No.: FEP-01/534/2017 J:Jmst'llJMflit'[ : FEP-01/534/2017