Environmental Construction Inspector January 2018
Hazardous Materials 3-1
HazMat for Inspectors
Shawn RappODOT State HazMat Program Lead
What is HazMat?
Underground tanks
Contaminated media
Asbestos
Lead-based paint
Solid/Haz Waste
Fueling/oils
Spills
Standard Specifications: 290.20 (Waste/Haz Subs), 290.29 (H&S), 290.30 (Poll. Control), 290.80-.90 (M&P)
Specials: 293 (USTs), 294 (Media), 295 (Asb.), 296 (Paint), 297 (PCB/Hg), 299/A (UICs and Septic)
00290.20: Waste, Hazardous Waste, and Hazardous Substances
“Comply with all applicable federal, State, and local Laws as they pertain to the storage, handling, management, transportation, disposal, and documentation of waste, hazardous waste, and hazardous substances.”
(a) – Haz Comm
(b) – Fuel Storage (“SPCC Plan”)
(c) – Waste Management
(d) – Hazardous Waste Management
(e) – Hazardous Substance Transportation
(f) – Unexpected Contamination
(g) – Spills and Releases
Environmental Construction Inspector January 2018
Hazardous Materials 3-2
00290.20(g): Spills and Releases
Response Agreement required with “professional” on-call spill response team – identified in Pollution Control Plan, with training per 29 CFR 1910.120 (“HazWOPER”)
In the event of a spill:
Refer to PCP, cleanup to background, notify On-Call ER
Notify Engineer of release
Lists contractor reporting requirements
Report to engineer – w/in 10 days after cleanup but no more than 30 days after initiation
Fuel – storage and spills 290.20(b) & 290.30(g)
Hazards: Toxic vapors, explosion, fire, spills
Documentation:
– Pollution Control Plan
– Spill Prevention Control and Countermeasures(SPCC) Plan (>1,320 gallonsin 55-gal or more containers,near water) (290.20(b))
Spills
Environmental Construction Inspector January 2018
Hazardous Materials 3-3
Spills #1 – SAFETY
*IR HazMat Training and Booklet*
Contractor to notify Engineer
Contractor to notify OERS
Cleanup to “background”
Key references:
– 290.20(g) – Spills and Releases
– 290.30(a) – Pollution Control Measures
– 290.30(b) – Pollution Control Plan
– Regional HazMat Coordinators
00290.29: Health and SafetyComply with all applicable health and safety Laws as they pertain to hazardous substances and wastes used, stored, and generated on-site. If any of these requirements are in conflict, the more stringent requirements apply.
00290.30: Pollution ControlPrevent, control, and abate pollution of the environment. Comply with new or amended environmental pollution Laws, not contemplated at the time of bid preparation, according to 00140.50 (“Environmental Pollution Changes”) and ORS 279C.525 (“Provisions concerning environmental and natural resources laws”).
(a) – Pollution Control Measures
(b) – Pollution Control Plan
(c) – Air Pollution Control Measures
Concrete Washouts (290.30(a)(4))
Environmental Construction Inspector January 2018
Hazardous Materials 3-4
HazMat material and spill containment kits290.30(a)(6) – “Maintain hazardous material containment kits and spill containment kits on-site to facilitate the cleanup of hazardous material spills on dry land and/or waters of the State and the U.S.”
4 Considerations:
Size, materials, PPE, Portability/location
00290.30(6)(b): Pollution Control Plan
Environmental Construction Inspector January 2018
Hazardous Materials 3-5
Environmental Construction Inspector January 2018
Hazardous Materials 3-6
Environmental Construction Inspector January 2018
Hazardous Materials 3-7
HazMat Special Provisions
293 – USTs
294 – Contaminated Media
295 – Asbestos Materials
296 – Paint and Painted Materials
297 – PCB and Mercury Containing Equipment
299 – Decommission Underground Injection Control Systems
299A – Decommission Septic Systems
.00 Scope – Project Data, Report reference, definitions, submittals
.30 Labor/Quals – Training, qualifications (RG, PE, CHMM)
.40 Construction – Permitting, reg. fees, handling requirements, reg. & Spec references, disposal
.80/.90 M&P – Lump sum (reports and docs), sampling & analysis, disposal measures and payments
Underground Storage Tanks – SP 293
Environmental Construction Inspector January 2018
Hazardous Materials 3-8
Underground Storage Tanks – SP 293
Hazards: Vapors, explosion, excavation, heavy equipment
Restrictions: Do not enter the work zone
Documentation:
– Contractor qualifications(DEQ Licenses, HazWoper, etc.)
– Health and safety plan
– DEQ reports30-day notice of intent (before)30-day checklist and report (after)
Contaminated Media – SP 294
Contaminated Media – SP 294
Hazards: chemicals, locations, and concentrations summarized
Restrictions: Do not enter the work zone, stay upwind
Documentation:
– HazMat Report(s)
– Contractor qualifications(HazWoper & Supervisor)
– Health & Safety Plan
– Lab results
– Disposal receipts
Environmental Construction Inspector January 2018
Hazardous Materials 3-9
Asbestos – SP 295
R. Grieshaber, University of Wisconsin-MilwaukeeDept. Environmental Health, Safety and Risk Management
Asbestos – SP 295
Hazards: Inhalation of asbestos fibers - “friable”
Restrictions: Do not enter containment or work area
Documentation:
– HazMat Report
– Contractor Qualifications (Asbestos worker & supervisor)
– DEQ forms (DEQ notification)
• ASN-1/6 –Waste shipment report
• ASN-4 – Air clearance report
• ASN-5 – Disposal receipts
Paint and Painted Materials – SP 296
Environmental Construction Inspector January 2018
Hazardous Materials 3-10
Paint and Painted Materials – SP 296
Hazards: Toxic dust (Lead, Cadmium, Chromium)
Restrictions: Lead Awareness and respirator training (ODOT); wear respiratory protection; wash hands.
Documentation:
– Worker qualifications(lead awareness training, etc.)
– Lead work safety plan
– Containment plan (blasting)
– Waste characterization and lab results (HazMat report)
– Disposal receipts and shipping papers, waste determination
– Hazardous waste Gen. ID# and Contingency Plan (if applicable)
Paint and Painted Materials – SP 296
Paint and Painted Materials – SP 296
Hazards: Toxic vapors and mists
Restrictions: Respirator training and fit test; Wear respiratory protection
Documentation: Pollution Control Plan, Containment Plan, disposal receipts (for used solvents and filters), disposal receipts and shipping papers, hazardous waste ID# (if applicable)
Environmental Construction Inspector January 2018
Hazardous Materials 3-11
Other Hazardous Construction Materials (Hazardous Substances 290.20)
Examples: Paint, solvents, spray cans, oils, pesticides and herbicides, etc.
Documentation: Pollution Control Plan
Other Construction Wastes
Treated/Coated Timbers (290.20 (c)(3)(c) or SP 296 if lead paint coated)
Mercury vapor lamps (SP 297)
PCB in electrical equipment(SP 297)
Abandoned HazMat
Labeled sealed containers
Unidentifiable containers
Drug lab wastes
Trash
Environmental Construction Inspector January 2018
Hazardous Materials 3-12
ODOT HazMat Coordinators
Region 2Bart Bretherton503-986-2647
Region 1Charles Schwarz 503-731-8290
Region 3Kenny Camp541-957-3594
Region 4Russ Frost541-388-6186
StatewideShawn Rapp 503-667-7442
Region 5Carolyn Cooper541-963-1590