![Page 1: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/1.jpg)
Balboa Reservoir Community Advisory CommitteeOctober 15, 2018
Environmental Analysis Update
![Page 2: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/2.jpg)
Balboa Reservoir CACOctober 15, 2018
CEQA = California Environmental Quality Act
EIR = Environmental Impact Report
NOP = Notice of Preparation of an EIR
DEIR = Draft EIR
COMMON TERMS IN ENVIRONMENTAL REVIEW
![Page 3: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/3.jpg)
Balboa Reservoir CACOctober 15, 2018
BALBOA RESERVOIR TIMELINE
![Page 4: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/4.jpg)
Balboa Reservoir CACOctober 15, 2018
To provide a public process in analyzing environmental consequences
To identify a range of potential environmental impacts
To identify measures or additional alternatives that reduce impacts
PURPOSE OF ENVIRONMENTAL REVIEW
![Page 5: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/5.jpg)
Balboa Reservoir CACOctober 15, 2018
CEQA TOPICS
Population and Housing
Cultural Resources
Transportation and Circulation
Noise
Air Quality Greenhouse Gas Emissions
Wind and Shadow
Recreation Utilities and Service Systems
PublicServices
Biological Resources
Geology, Soils, and Seismicity
Hydrology and Water Quality
Hazards and Hazardous Materials
Mineral and Energy
Resources
Agricultural and Forest
Resources
Land Use and Land Use
Planning
![Page 6: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/6.jpg)
Balboa Reservoir CACOctober 15, 2018
CEQA REVIEW DOES NOT
Approve a project
Evaluate the merits or benefits of the project
Analyze social, demographic, and economic impacts
![Page 7: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/7.jpg)
Balboa Reservoir CACOctober 15, 2018
WHAT IS BEING ANALYZED IN EIR?
5 scenarios (options + variants)
• Studied to understand the impacts before further decisions
• Smaller buildings/more townhomes along the western edge
• 4 acres of open space
• Better access to Sunnyside from North Street
• 50% affordable housing
Developer Proposed Option (previous draft at right)
• Submitted range of units, 800-1300
• EIR will analyze as 1100 units
• Includes public parking garage in addition to residential parking
![Page 8: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/8.jpg)
Balboa Reservoir CACOctober 15, 2018
DeveloperProposed Option
Residential Units
800 - 1,300 unitsEIR to analyze 1,100
Affordable Units
550
Vehicle Parking Spaces
1,300 550 residential + 750 public garage
Public SpaceApproximately 4 acres
Height 25 to 78 feet
Public garage and access
Underground garage (south); Off-site garage at CCSF
VARIANTS & OPTIONS TO BE ANALYZED IN THE EIR
![Page 9: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/9.jpg)
Balboa Reservoir CACOctober 15, 2018
DeveloperProposed Option
Residential Units
800 - 1,300 unitsEIR to analyze 1,100
Affordable Units
550
Vehicle Parking Spaces
1,300 550 residential + 750 public garage
Public SpaceApproximately 4 acres
Height 25 to 78 feet
Public garage and access
Underground garage (south); Off-site garage assumed at CCSF
Developer Proposed Option
DeveloperProposedVariant 1
Residential Units
800 - 1,300 unitsEIR to analyze 1,100
No changefrom base
Affordable Units
550 ----
Vehicle Parking Spaces
1,300 550 residential + 750 public garage
----
Public SpaceApproximately 4 acres
----
Height 25 to 78 feet ----
Public garage and access
Underground garage (south); Off-site garage at CCSF
Above-grade garage (south);
VARIANTS & OPTIONS TO BE ANALYZED IN THE EIR
![Page 10: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/10.jpg)
Balboa Reservoir CACOctober 15, 2018
DeveloperProposed Option
Residential Units
800 - 1,300 unitsEIR to analyze 1,100
Affordable Units
550
Vehicle Parking Spaces
1,300 550 residential + 750 public garage
Public SpaceApproximately 4 acres
Height 25 to 78 feet
Public garage and access
Underground garage (south); Off-site garage assumed at CCSF
Developer Proposed Option
DeveloperProposedVariant 1
Residential Units
800 - 1,300 unitsEIR to analyze 1,100
No changefrom base
Affordable Units
550 ----
Vehicle Parking Spaces
1,300 550 residential + 750 public garage
----
Public SpaceApproximately 4 acres
----
Height 25 to 78 feet ----
Public garage and access
Underground garage (south); Off-site garage assumed at CCSF
Above-grade garage (south);
DeveloperProposed Option
Developer Proposed Variant 1
Developer Proposed Variant 2
Residential Units
800 - 1,300 unitsEIR to analyze 1,100
No changefrom base
No changefrom base
Affordable Units
550 ---- ----
Vehicle Parking Spaces
1,300 550 residential + 750 public garage
---- ----
Public SpaceApproximately 4 acres
---- ----
Height 25 to 78 feet ---- ----
Public garage and access
Underground garage (south); Off-site garage at CCSF
Above-grade garage (south);
Underground garage (north); South Street moved South
VARIANTS & OPTIONS TO BE ANALYZED IN THE EIR
![Page 11: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/11.jpg)
Balboa Reservoir CACOctober 15, 2018
DeveloperProposed Option
DeveloperProposedVariant 1
DeveloperProposedVariant 2
Developer Proposed Variant 3
Residential Units
800 - 1,300 unitsEIR to analyze 1,100
No changefrom base
No changefrom base
No changefrom base
Affordable Units
550 ---- ---- ----
Vehicle Parking Spaces
1,300 550 residential + 750 public garage
---- ---- ----
Public SpaceApproximately 4 acres
---- ---- ----
Height 25 to 78 feet ---- ---- ----
Public garage and access
Underground garage (south); Off-site garage assumed at CCSF
Above-grade garage (south);
Underground garage (north); Off-site garage assumed at CCSF;South Street moved South
Assumes no pedestrian or bike access from San Ramon Way
DeveloperProposed Option
Residential Units
800 - 1,300 unitsEIR to analyze 1,100
Affordable Units
550
Vehicle Parking Spaces
1,300 550 residential + 750 public garage
Public SpaceApproximately 4 acres
Height 25 to 78 feet
Public garage and access
Underground garage (south); Off-site garage assumed at CCSF
Developer Proposed Option
DeveloperProposedVariant 1
Residential Units
800 - 1,300 unitsEIR to analyze 1,100
No changefrom base
Affordable Units
550 ----
Vehicle Parking Spaces
1,300 550 residential + 750 public garage
----
Public SpaceApproximately 4 acres
----
Height 25 to 78 feet ----
Public garage and access
Underground garage (south); Off-site garage assumed at CCSF
Above-grade garage (south);
DeveloperProposed Option
Developer Proposed Variant 1
Developer Proposed Variant 2
Residential Units
800 - 1,300 unitsEIR to analyze 1,100
No changefrom base
No changefrom base
Affordable Units
550 ---- ----
Vehicle Parking Spaces
1,300 550 residential + 750 public garage
---- ----
Public SpaceApproximately 4 acres
---- ----
Height 25 to 78 feet ---- ----
Public garage and access
Underground garage (south); Off-site garage at CCSF
Above-grade garage (south);
Underground garage (north); South Street moved South
VARIANTS & OPTIONS TO BE ANALYZED IN THE EIR
![Page 12: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/12.jpg)
Balboa Reservoir CACOctober 15, 2018
DeveloperProposed Option
DeveloperProposedVariant 1
DeveloperProposedVariant 2
Developer Proposed Variant 3
Additional Housing Option
Residential Units
800 - 1,300 unitsEIR to analyze 1,100
No changefrom base
No changefrom base
No changefrom base 1,550
Affordable Units
550 ---- ---- ---- 775
Vehicle Parking Spaces
1,300 550 residential + 750 public garage
---- ---- ----650 residential only
Public SpaceApproximately 4 acres
---- ---- ---- ----
Height 25 to 78 feet ---- ---- ---- 25 to 88 feet
Public garage and access
Underground garage (south); Off-site garage at CCSF
Above-grade garage (south);
Underground garage (north); South Street moved South
Assumes no pedestrian or bike access from San Ramon Way
No public parking garage on site;Off-site garage at CCSF
VARIANTS & OPTIONS TO BE ANALYZED IN THE EIR
![Page 13: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/13.jpg)
Balboa Reservoir CACOctober 15, 2018
WHY ANALYZE AN ADDITIONAL HOUSING OPTION?
Decision makers and Planning Commission asked staff to identify more housing opportunities
With ongoing housing crisis, have to keep the door open to additional housing
Comparable sites around SF are analyzing taller and denser options
Unique opportunity near transit & City College
Smaller projects are “covered” and still possible when a larger project is analyzed
![Page 14: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/14.jpg)
Balboa Reservoir CACOctober 15, 2018
PUBLIC INPUT ON EIR SCOPE
Comments should focus on the scope of environmental review:
Methods used for environmental analysis
Measures that would avoid or lessen an environmental impact
Information that would help inform environmental impact analysis
Suggestions for alternatives to be evaluated in the Draft EIR
Public scoping period: October 10 – November 12
![Page 15: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/15.jpg)
Balboa Reservoir CACOctober 15, 2018
OPPORTUNITIES TO COMMENT ON EIR SCOPE
PUBLIC SCOPING MEETINGTuesday, October 30, 2018, 6-8 pm Lick Wilmerding High School - Cafeteria/Ann Maisel Café 755 Ocean Avenue
EMAIL BY NOVEMBER 12, [email protected]
MAIL BY NOVEMBER 12, 2018Jeanie Poling San Francisco Planning Department 1650 Mission Street, Suite 400 San Francisco CA 94103
Public scoping period: October 10 – November 12
![Page 16: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/16.jpg)
AvalonBay Communities + BRIDGE Housing
Environmental Studies and Draft Master Plan Update
Balboa Reservoir CAC Meeting10/15/18
Mission Housing | Habitat for Humanity | Pacific Union Development Corporation
![Page 17: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/17.jpg)
Tonight’s Agenda
Balboa Reservoir CAC Presentation | 10/15/18
• Environmental Analysis Update
• Draft Master Plan and Building Massing Update
![Page 18: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/18.jpg)
Balboa Reservoir Community Advisory CommitteeOctober 15, 2018
Environmental Analysis Update
![Page 19: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/19.jpg)
Balboa Reservoir CACOctober 15, 2018
CEQA = California Environmental Quality Act
EIR = Environmental Impact Report
NOP = Notice of Preparation of an EIR
DEIR = Draft EIR
COMMON TERMS IN ENVIRONMENTAL REVIEW
![Page 20: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/20.jpg)
Balboa Reservoir CACOctober 15, 2018
BALBOA RESERVOIR TIMELINE
![Page 21: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/21.jpg)
Balboa Reservoir CACOctober 15, 2018
To provide a public process in analyzing environmental consequences
To identify a range of potential environmental impacts
To identify measures or additional alternatives that reduce impacts
PURPOSE OF ENVIRONMENTAL REVIEW
![Page 22: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/22.jpg)
Balboa Reservoir CACOctober 15, 2018
CEQA TOPICS
Population and Housing
Cultural Resources Transportation and Circulation
Noise
Air Quality Greenhouse Gas Emissions
Wind and Shadow Recreation Utilities and Service Systems
PublicServices
Biological Resources
Geology, Soils, and Seismicity
Hydrology and Water Quality
Hazards and Hazardous Materials
Mineral and Energy Resources
Agricultural and Forest Resources
Land Use and Land Use
Planning
![Page 23: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/23.jpg)
Balboa Reservoir CACOctober 15, 2018
CEQA REVIEW DOES NOT
Approve a project
Evaluate the merits or benefits of the project
Analyze social, demographic, and economic impacts
![Page 24: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/24.jpg)
Balboa Reservoir CACOctober 15, 2018
WHAT IS BEING ANALYZED IN EIR?5 scenarios (options + variants)• Studied to understand the impacts before further decisions
• Smaller buildings/more townhomes along the western edge
• 4 acres of open space
• Better access to Sunnyside from North Street
• 50% affordable housing
Developer Proposed Option (previous draft at right)
• Submitted range of units, 800-1300
• EIR will analyze as 1100 units
• Includes public parking garage in addition to residential parking
![Page 25: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/25.jpg)
Balboa Reservoir CACOctober 15, 2018
DeveloperProposed Option
DeveloperProposedVariant 1
DeveloperProposedVariant 2
Developer Proposed Variant 3
Additional Housing Option
Residential Units
800 - 1,300 unitsEIR to analyze 1,100
No changefrom base
No changefrom base
No changefrom base 1,550
Affordable Units 550 ---- ---- ---- 775
Vehicle Parking Spaces
1,300 550 residential + 750 public garage
---- ---- ----650 residential only
Public Space Approximately 4 acres
---- ---- ---- ----
Height 25 to 78 feet ---- ---- ---- 25 to 88 feet
Public garage and access
Underground garage (south); Off-site garage at CCSF
Above-grade garage (south);
Underground garage (north); South Street moved South
Assumes no pedestrian or bike access from San Ramon Way
No public parking garage on site; Off-site garage at CCSF
DeveloperProposed Option
DeveloperProposedVariant 1
DeveloperProposedVariant 2
Developer Proposed Variant 3
Residential Units
800 - 1,300 unitsEIR to analyze 1,100
No changefrom base
No changefrom base
No changefrom base
Affordable Units 550 ---- ---- ----
Vehicle Parking Spaces
1,300 550 residential + 750 public garage
---- ---- ----
Public Space Approximately 4 acres
---- ---- ----
Height 25 to 78 feet ---- ---- ----
Public garage and access
Underground garage (south); Off-site garage at CCSF
Above-grade garage (south);
Underground garage (north); South Street moved South
Assumes no pedestrian or bike access from San Ramon Way
DeveloperProposed Option
Developer Proposed Variant 1
Developer Proposed Variant 2
Residential Units
800 - 1,300 unitsEIR to analyze 1,100
No changefrom base
No changefrom base
Affordable Units 550 ---- ----
Vehicle Parking Spaces
1,300 550 residential + 750 public garage
---- ----
Public Space Approximately 4 acres
---- ----
Height 25 to 78 feet ---- ----
Public garage and access
Underground garage (south); Off-site garage at CCSF
Above-grade garage (south);
Underground garage (north); South Street moved South
Developer Proposed Option
DeveloperProposedVariant 1
Residential Units
800 - 1,300 unitsEIR to analyze 1,100
No changefrom base
Affordable Units 550 ----
Vehicle Parking Spaces
1,300 550 residential + 750 public garage
----
Public Space Approximately 4 acres
----
Height 25 to 78 feet ----
Public garage and access
Underground garage (south); Off-site garage at CCSF
Above-grade garage (south);
VARIANTS & OPTIONS TO BE ANALYZED IN THE EIRDeveloper
Proposed Option
Residential Units
800 - 1,300 unitsEIR to analyze 1,100
Affordable Units 550
Vehicle Parking Spaces
1,300 550 residential + 750 public garage
Public Space Approximately 4 acres
Height 25 to 78 feet
Public garage and access
Underground garage (south); Off-site garage at CCSF
![Page 26: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/26.jpg)
Balboa Reservoir CACOctober 15, 2018
WHY ANALYZE AN ADDITIONAL HOUSING OPTION?
Decision makers and Planning Commission asked staff to identify more housing opportunities
With ongoing housing crisis, have to keep the door open to additional housing
Comparable sites around SF are analyzing taller and denser options
Unique opportunity near transit & City College
Smaller projects are “covered” and still possible when a larger project is analyzed
![Page 27: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/27.jpg)
Balboa Reservoir CACOctober 15, 2018
PUBLIC INPUT ON EIR SCOPE
Comments should focus on the scope of environmental
review:
Methods used for environmental analysis
Measures that would avoid or lessen an environmental impact
Information that would help inform environmental impact analysis
Suggestions for alternatives to be evaluated in the Draft EIR
Public scoping period: October 10 – November 12
![Page 28: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/28.jpg)
Balboa Reservoir CACOctober 15, 2018
OPPORTUNITIES TO COMMENT ON EIR SCOPE
PUBLIC SCOPING MEETINGTuesday, October 30, 2018, 6-8 pm Lick Wilmerding High School - Cafeteria/Ann Maisel Café 755 Ocean Avenue
EMAIL BY NOVEMBER 12, [email protected]
MAIL BY NOVEMBER 12, 2018Jeanie Poling San Francisco Planning Department 1650 Mission Street, Suite 400 San Francisco CA 94103
Public scoping period: October 10 – November 12
![Page 29: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/29.jpg)
19Balboa Reservoir CAC Presentation | 10/15/18
QUESTIONS & COMMENTS
![Page 30: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/30.jpg)
20Balboa Reservoir CAC Presentation | 10/15/18
DRAFT MASTER PLAN
UPDATES
![Page 31: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/31.jpg)
(4/9/18 AT CITY COLLEGE MUB)Balboa Reservoir CAC Presentation | 10/15/18
CAC Meeting: Master Plan Update
![Page 32: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/32.jpg)
Open Space Open HouseJune 23rd, 2018
Balboa Reservoir CAC Presentation | 10/15/18
![Page 33: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/33.jpg)
23Balboa Reservoir CAC Presentation | 10/15/18
Open Space Mock Up
![Page 34: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/34.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
Park DaySep 15th, 2018
![Page 35: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/35.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
Park Orientation
![Page 36: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/36.jpg)
Park Day Community Feedback
Balboa Reservoir CAC Presentation | 10/15/18
![Page 37: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/37.jpg)
City/Community Feedback
Balboa Reservoir CAC Presentation | 10/15/18
1. Improve Pedestrian Flow Between Sunnyside and Ocean Ave
2. Maximize Wind Protection and Solar Orientation3. Activate the Park with Ground Floor Uses4. Revise Block Configuration5. Refine Relationship to Westwood Park and City
College
![Page 38: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/38.jpg)
PEDESTRIAN CONNECTION GENERATES OPEN SPACE NETWORKBalboa Reservoir CAC Presentation | 10/15/18
Fundamental Master Plan Concept
![Page 39: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/39.jpg)
CITY COLLEGE MASTER PLAN EVOLUTION: PAEC LOCATIONBalboa Reservoir CAC Presentation | 10/15/18
Response to Neighborhood Context
![Page 40: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/40.jpg)
IMPROVE PEDESTRIAN CONNECTION TO SUNNYSIDE & OCEAN AVE
Balboa Reservoir CAC Presentation | 10/15/18
North/South Orientation
![Page 41: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/41.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
Sunnyside Playground Comparison
![Page 42: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/42.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
Sunnyside Playground
![Page 43: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/43.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
South Park Comparison
![Page 44: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/44.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
South Park
![Page 45: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/45.jpg)
OPEN SPACE DRIVES BUILDING FORMBalboa Reservoir CAC Presentation | 10/15/18
Bring It All Together
![Page 46: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/46.jpg)
High
Wind intensity legend:
Low
Balboa Reservoir CAC Presentation | 10/15/18
Current Plan: North South ParkFormer Plan: East West Park
Wind Studies
NEW ORIENTATION PROVIDES WIND PROTECTION
![Page 47: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/47.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
FORMER MASTER PLAN
Building Form & Solar Orientation
![Page 48: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/48.jpg)
UPDATED DRAFT MASTER PLANBalboa Reservoir CAC Presentation | 10/15/18
Building Form & Solar Orientation
![Page 49: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/49.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
Program Example
G
F E
DC
AB
![Page 50: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/50.jpg)
40Balboa Reservoir CAC Presentation | 10/15/18
![Page 51: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/51.jpg)
41Balboa Reservoir CAC Presentation | 10/15/18
BUILDING MASSING UPDATES
![Page 52: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/52.jpg)
UPDATED DRAFT MASTER PLAN DIAGRAMBalboa Reservoir CAC Presentation | 10/15/18
Draft Master Plan
![Page 53: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/53.jpg)
MASSING MODEL: Shows general height and size of buildings. Rough shapes/Block Diagrams to understand program, number of units etc.
ARCHITECTURAL MODEL: Shows actual building design. Breaks down the massing to create architectural effects, shows materials and architectural style.
MASSING = big and blockyARCHITECTURE = finished product
DESIGN PROCESS:1. Determine approximate massing: Ensure that building program (total size,
proper dimensions) fit within envelope.2. Add articulation: Breaks down the massing to create more defined shapes,
identify important features3. Concept Architecture: Starts to show a stylistic direction and consider
materials, details.
Balboa Reservoir CAC Presentation | 10/15/18
Massing vs. Concept Architecture
![Page 54: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/54.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
Building MassingShows general height and size of buildings to understand what fits
Looks big and bulky at this point
Original Proposal
![Page 55: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/55.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
Add articulationStart to show building design, locations of important features
Building scale is broken down to a finer grain
Original Proposal
![Page 56: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/56.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
Concept ArchitectureShows how the building will look
Stylistic direction, materials, details
Original Proposal
![Page 57: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/57.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
Axonometric View – Building Massing
A
B
Townhouses
E
F
G
C
PAEC
D H4H
CCSF
Riordan High School
![Page 58: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/58.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
Heights – Existing buildings
1-2 stories
55’5 stories
55’3 stories
30’-45’2-3 stories
10’ 85’
City College
![Page 59: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/59.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
Heights – PAEC at City College
1-2 stories
City College 55’5 stories
55’3 stories
30’-45’2-3 stories
PAEC30’-85’
3 stories
10’ 85’
![Page 60: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/60.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
1-2 stories
CCSF
55’5 stories
55’3 stories
30’-45’2-3 stories
PAEC30’-85’
3 stories
2-3 stories
Heights – Balboa Reservoir (Draft Master Plan)
10’ 85’
![Page 61: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/61.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
1-2 stories
55’5 stories
55’3 stories
30’-45’2-3 stories
PAEC30’-85’
3 stories
2-3 stories
4-6 stories
Heights – Balboa Reservoir (Draft Master Plan)
10’ 85’
City College
![Page 62: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/62.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
Heights – Balboa Reservoir (Draft Master Plan)
1-2 stories
55’5 stories
55’3 stories
30’-45’2-3 stories
PAEC30’-85’
3 stories
2-3 stories
4-6 stories
6-7 stories
10’ 85’
City College
![Page 63: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/63.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
View from Cloud Hall
![Page 64: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/64.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
View from Cloud Hall - Existing
![Page 65: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/65.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
View from Cloud Hall – PAEC
PAEC
![Page 66: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/66.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
View from Cloud Hall – PAEC – with Reservoir
PAEC
G
AB
CD
F E
Tow
nhou
ses
![Page 67: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/67.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
View from Cloud Hall – Proposed
G
AB
CD
F E
Tow
nhou
ses
![Page 68: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/68.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
View from Unity Plaza
![Page 69: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/69.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
View from Unity Plaza - Existing
![Page 70: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/70.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
View from Unity Plaza - PAEC
PAEC
![Page 71: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/71.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
View from Unity Plaza – PAEC with Reservoir
G
AB
CD
F E
Tow
nhou
ses
PAEC
![Page 72: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/72.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
View from Lee Ave & Lakeview Ave
![Page 73: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/73.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
View from Lee Ave & Lakeview Ave - Existing
![Page 74: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/74.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
View from Lee Ave & Lakeview Ave - Proposed
G
AB
CD
F E
Tow
nhou
ses
PAEC
![Page 75: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/75.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
View from San Ramon
![Page 76: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/76.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
View from San Ramon - Existing
![Page 77: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/77.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
View from San Ramon - Proposed
G
AB
CD
F E
Tow
nhou
ses
![Page 78: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/78.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
View from Monterey Blvd & Colon Ave
![Page 79: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/79.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
View from Monterey Blvd & Colon Ave - Existing
![Page 80: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/80.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
View from Monterey Blvd & Colon Ave - Proposed
G
AB
CD
F E
Tow
nhou
ses
![Page 81: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/81.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
View from Gennessee St & Mangels Ave
![Page 82: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/82.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
View from Gennessee St & Mangels Ave - Existing
![Page 83: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/83.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
View from Gennessee St & Mangels Ave - Proposed
G
AB
CD
F E
Tow
nhou
ses
PAEC
![Page 84: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/84.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
Axonometric View – Building Massing
A
B
Townhouses
E
F
G
C
PAEC
D H4H
CCSF
Riordan High School
![Page 85: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/85.jpg)
1. Determine approximate massing: Ensure that building program (total size, proper dimensions) fit within envelope.
2. Add articulation: Break down the massing to create more defined shapes, identify important features
3. Concept Architecture: Start to show a stylistic direction and consider materials, details.
Balboa Reservoir CAC Presentation | 10/15/18
Design Process
![Page 86: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/86.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
Neighborhood Character
![Page 87: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/87.jpg)
Balboa Reservoir CAC Presentation | 10/15/18
Neighborhood Character
![Page 88: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/88.jpg)
78Balboa Reservoir CAC Presentation | 10/15/18
QUESTIONS & COMMENTS
![Page 89: Environmental Analysis Update - SF Planningdefault.sfplanning.org/plans-and-programs/planning...Balboa Reservoir CAC Presentation | 10/15/18 • Environmental Analysis Update • Draft](https://reader033.fdocuments.net/reader033/viewer/2022060600/6054248372542f2ea937ce73/html5/thumbnails/89.jpg)
79Balboa Reservoir CAC Presentation | 10/15/18
NEXT STEPS1. EIR “Public Scoping” Meeting
October 30, 6-8pm at Lick-Wilmerding High School
2. Architecture/Sustainability Update and End of Year Festivities December 5, 6-8pm at Ingleside Presbyterian Church
3. Email & Website [email protected]