Environment Management Plan “Sandor” Ameya Townhomes Pvt. Ltd.
Transcript of Environment Management Plan “Sandor” Ameya Townhomes Pvt. Ltd.
Environment Management Plan
For
“Sandor”
S.No. 230, H.No 1,2,3,4,5,6,7,8 S.No. 231, H.No 1,2,3,4,5,6,7,8,9 S.No. 235,
H.No 1/2,2,3,4,5,6,7,8,9,10,11/1,11/2 S.No. 236, H.No 1, 2, 3, 7, 8, 11, 12, 13,
14, 15, 17, 18,19,20,21,22,23,pt,24,25A,25B,27,28,29 at Village Sandor, Taluka
Vasai, Dist. Palghar, Maharashtra
Proposed by
Ameya Townhomes Pvt. Ltd.
CONSULTANT
Mahabal Enviro Engineers Pvt. Ltd. Plot F-7, Road 21, MIDC Wagle Estate, Thane-400604
Phone:+91-22-25823139/1663/0658 [email protected]
Environment Management Plan
Ansal Housing and Construction Ltd. Page 2
Contents
Introduction ............................................................................ 3
1.1 During construction phase ................................................... 3
1.2 During operation phase ....................................................... 4
1.3 Land Environment ............................................................... 5
1.3.1 Construction phase ........................................................ 5
1.3.2 Operation phase............................................................ 6
1.4 Air Environment ................................................................. 6
1.4.1 Construction phase ........................................................ 6
1.4.2 Operation phase............................................................ 7
1.5 Noise Environment .............................................................. 8
1.5.1 Construction phase ........................................................ 8
1.5.2 Operation phase............................................................ 8
1.6 Water Environment ............................................................. 9
1.6.1 Construction phase ........................................................ 9
1.6.2 Operation phase ......................................................... 9
Wastewater treatment scheme .............................................. 10
Storm water management .................................................... 11
Rain Water Harvesting - NA ..................................................... 11
1.7 Biological Environment ...................................................... 11
1.7.1 Construction phase ...................................................... 11
1.7.2 Operation phase.......................................................... 11
1.8 Environment Monitoring Cell .............................................. 15
Environmental Management Audits: ......................................... 15
1.9 Environmental Monitoring .................................................. 19
1.10 Budgetary provisions for Environmental Management Plan ... 21
1.11 Compliance schedule ....................................................... 21
Environment Management Plan
Ameya Townhomes Pvt. Ltd. Page 3
Environment Management Plan
Introduction
The Environmental Management Plan is a site-specific plan
developed in order to ensure that the project is implemented in an
environmentally sustainable manner; where all the contractors and
sub-contractors (including consultants) understand the potential
environmental risks arising from the proposed expansion project
and take appropriate actions.
EMP also ensures that the project implementation is carried out in
accordance with the design and by taking appropriate mitigation
actions to reduce adverse environmental impact during its life cycle.
The potential environmental impact that needs to be regulated is
mentioned below:
Air pollution due to the emission of Particulate Matter and
gaseous pollutants;
Noise pollution due to various noise generating equipment as
well as vehicular movement;
Wastewater generation from sanitary/domestic activities; and
Solid waste disposal
To ensure better environment in & around the project site as well as
for the neighbouring population, an effective EMP is developed
separately for construction and operational phases.
1.1 During construction phase
The proposed project will have certain construction activities.
Pollution control during construction is of considerable importance
and it is necessary to consider the potential of environmental
pollution during this phase.
The following measures will be adopted during construction
phase:
Environment Management Plan
Ameya Townhomes Pvt. Ltd. Page 4
Construction materials will be stored in covered go-down or
enclosed spaces to prevent the windblown fugitive emissions. Truck carrying soil, sand, stone dust, and stone will be duly
covered to avoid spilling and fugitive emissions. Regular water sprinkling at vulnerable areas of construction
sites will be done to control fugitive dust during material handling and hauling activities in dry seasons.
During construction activity, labour may be employed from outside. We will be providing drinking water facility, mobile
toilets & Mobile STP of 20 m3/day capacity for the workers. Noise control measures will be adopted at appropriate stages,
the most effective being control at the source itself. The onsite workers will be using high noise equipment and
those working in the noisy area will adopt noise protection devices like ear plugs/ muffs.
We will be using fly ash based materials for walling as well as
plasters. Separate parking area will be provided for unloading material
vehicles within the site premises so as to avoid waiting of other vehicles
Monitoring of air and water quality at regular intervals will be conducted during construction phase.
Barricading of the site with 3m high GI sheet will be provided between the activities and the receptors.
Working hours and construction activities are aligned and work will be prohibited during night time.
Geo membrane fabric will be used around the scaffolding to minimize dust dispersion during construction activity.
1.2 During operation phase
Environment monitoring cell will be developed for environmental
monitoring, analysis and control of all possible sources due to the
proposed project. The responsibility of the cell will be to follow the
pollution control measures stringently at proposed project site
through a regular monitoring of various environmental parameters
and environment management plan will be effectively implemented.
Environment Management Plan
Ameya Townhomes Pvt. Ltd. Page 5
1.3 Land Environment
1.3.1 Construction phase
Waste generated from construction activity includes construction
debris, biomass from land clearing activities; waste from the Labour
camp, etc.
The following section discusses management for each type of waste.
Besides, management of topsoil is an important area for which
management measures are required.
Construction debris:
Construction debris is bulky and heavy and re-utilization and
recycling is an important strategy for management of such waste.
Recycled aggregate will be used for filler application, and as a
sub-base for road construction. The mixed debris with high gypsum
will be given to the recyclers, as they are highly susceptible to
contamination so plaster cannot be used for filling.
The construction contractors will remove metal scrap from structural
steel, piping, concrete reinforcement and sheet metal work from the
site. A significant portion of wood scrap can be reused on site. The
recyclable wastes such as plastics, glass fibber insulation, roofing
etc. will be sold to recyclers.
Waste from Labour camp:
The waste generated from labour camps will mainly comprise of
household domestic waste that will be collected and composted on
project site. The non-compostable and non-recyclable portion of the
waste will be collect & segregated. We have made agreement with
SWATCH for collection & disposal of Non-biodegradable waste.
Topsoil management:
To minimize disruption of soil and for conservation of topsoil, the
contractor will take out the topsoil separately and stockpile it. After
the construction activity is over, topsoil will be utilized for
Environment Management Plan
Ameya Townhomes Pvt. Ltd. Page 6
landscaping activity. Other measures, which would be followed to
prevent soil erosion and contamination will include:
Maximize the use of organic fertilizer for landscaping and
green belt development
Removal of as little vegetation as possible during the
development, and re-vegetation of bare areas after the
project
Working in a small area at a time (phase wise construction)
1.3.2 Operation phase
Solid waste management will be to encourage the four ways of
waste i.e. Waste Reduction, Reuse, Recycling, and Recovery
(materials & energy). This will result lesser quantity will be land fill.
The Environmental Management Plan for solid waste focuses on
three major components of the waste management system i.e.
collection & transportation, treatment or disposal and closure & post
closure care of treatment/disposal facility.
Collection & transportation:
During the collection stage, the biodegradable and non-
recyclable/inert waste will be stored and collected separately.
Treatment & disposal:
The segregated biodegradable waste will be composted by using
OWC machine, i.e. the compost will be used as manure for
landscaping.
The non-compostable and non-recyclable portion of the waste will
be collected by Municipal Corporation.
1.4 Air Environment
1.4.1 Construction phase
There will be daily sprinkling of water on road will reduce the
fugitive dust emission. PUC will be compulsory for all the vehicles
Environment Management Plan
Ameya Townhomes Pvt. Ltd. Page 7
that will be parked at the project site. The construction machinery
will be kept in secured place and the use of low sulphur fuel will
help in reducing the adverse impact.
Following measures will be carried out for further
environmental improvements:
Environment management cell will be developed for the
regular check-up and efficient maintenance of all the pollution
control arrangements.
To prevent fugitive emissions at solid handling areas
conveyors, elevators, silos etc. All other transfer points,
proper care will be taken to minimise the exit of particulates
We will use covered vehicles used for the loading & unloading
material which will reduced the fugitive dust emission
Cleaning and sweeping of floors will be a regular feature of
normal plant operations.
A green belt around the project site and plantation within the
plant premises especially around the possible sources of
fugitive emissions is recommended to further reduce the dust
emissions to maintain a clean and healthy environment.
Water sprinkling will be carried out to prevent dust pollution.
Site will be provided with entry & exit points and driveways
for easy movement of vehicles.
The sign boards at driveways and at parking areas will be
installed.
1.4.2 Operation phase
To mitigate the impact of pollutants from vehicular traffic during the
operational phase of the site, the following measures are
recommended for implementation:
Vehicle emission controls
Adequate informatory signage’s/speed control devices will be put up
within premises near entry/exit gates to regulate and control the
speed of outgoing/incoming traffic. Regular maintenance of the
vehicles will be mandatory. PUC will be compulsory for all the
vehicles being parked in the building premises. The security persons
Environment Management Plan
Ameya Townhomes Pvt. Ltd. Page 8
at entry and exit point will be present to ensure the smooth traffic
movement.
Landscape development
Increasing vegetation in the form of landscape is one of the
preferred methods to mitigate air pollution. Plants generate oxygen,
it serves as a sink for pollutants, and they reduce the flow of dust
and noise pollution.
1.5 Noise Environment
1.5.1 Construction phase
To mitigate the impact of noise from construction equipment,
the following measures will be proposed:
Noise prone activities will be restricted to the extent possible
during night.
Screening or fencing of the construction site will be done with
proper height of fence to prevent nuisance to neighbouring
habitation.
Workers employed in high noise areas will be rotated.
50 no. of earplug/Ear mug will be provided to the workers &
other hearing protective wear will be provided to those
working very close to the noise generating machinery.
65 no. of trees will be planted on roadside which will act as
noise barrier.
1.5.2 Operation phase
At the time of power failure, DG sets will be providing. Acoustic
enclosures will be provided on the DG sets, which will reduce the
noise during operational phase.
Landscaping
Total of 4,203.18 m2 areas will be provided for the development of
green belt in the premises. Trees we will be planted on site. Tree
plantation area act as noise barriers in the premises.
Environment Management Plan
Ameya Townhomes Pvt. Ltd. Page 9
1.6 Water Environment
1.6.1 Construction phase
Following measures will be carried out for further
environmental improvements
We will not doing excavation during monsoon
Necessary care will be taken to avoid soil erosion
We will be providing 20 m3/day capacity of mobile STP for
sewage treatment during construction phase. Treated water
will used for curing purpose.
To prevent surface and ground water contamination by
oil/grease, leak proof containers will be used for storage and
transportation of oil/grease. The floors of oil/grease handling
area will be kept effectively impervious. Any wash off from the
oil/grease handling area or workshop shall be drained through
impervious drains
Construction activities generate disturbed soil, concrete fines,
oils and other wastes. On-site collection and settling of storm
water, prohibition of equipment wash downs, and prevention
of soil loss and toxic releases from the construction site are
necessary to minimize water pollution.
1.6.2 Operation phase
Water conservation measures have been taken including all possible
potential for reuse and recycling of water. These could be in the
form of the following:
Minimizing water Consumption
Water consumption will be minimized by a combination of water
saving devices and other domestic water conservation measures.
Furthermore, to ensure ongoing water conservation, an awareness
programme will be introduced.
Environment Management Plan
Ameya Townhomes Pvt. Ltd. Page 10
Usage:
We will use of water efficient plumbing fixtures (ultra flow
toilets and urinals, low flow sinks). The water efficient
plumbing fixtures use less water with no marked reduction in
quality and service
Promoting reuse of water after treatment & development of
closed loop systems
To promote reuse and development of closed loop system for
water, segregation of two schemes namely;
Wastewater treatment scheme
Storm water management schemes have been suggested
Wastewater treatment scheme
The sewage generated from the proposed project will be
672 m3/day. The sewage generated will be first treated in STP. We
will be providing 1 no. of Sewage treatment plant for the project.
Moving bed Bioreactor reactor process will be used for the sewage
treatment. The treated sewage will be used for flushing tanks,
gardening & vehicle washing.
Environment Management Plan
Ameya Townhomes Pvt. Ltd. Page 11
Storm water management
The storm water generates from the proposed project will be
1.01 m3/sec. We will provide 750 mm × 750 mm size of storm
water drain channel.
Rain Water Harvesting - NA
We will be proposing recharge pits. To prevent leaves and debris from entering the system, mesh filters will be provided at the
mouth of the drainpipe.
For rainwater collected from ground surface following actions are
usually taken:
• Cleaning of surface of vegetation, organic and loose materials
• Smoothening the surface by mechanical compaction or surface
binding treatment
• Checking that the surface is free from all such chemical and
organic material, which may cause chemical/bacterial
contamination of harvested water
1.7 Biological Environment
1.7.1 Construction phase
The construction activities will be carried out only during the day
time by minimizing the magnitude of the impact. Also water
sprinkling will be carried out on the construction site.
After completion of major construction work, the landscape will be
developed as there will be no or less disturbance in these areas.
1.7.2 Operation phase
The project is mainly residential in nature and will not have any
emissions. Hence, the impact envisaged is negligible. Extensive
plantation and landscaping is proposed to mitigate any impact
during this phase.
Environment Management Plan
Ameya Townhomes Pvt. Ltd. Page 12
Plantation & Landscaping
Selection of the plant species has been done on the basis of their
adaptability to the existing geographical conditions and the
vegetation composition of the region. During the development of
the green belt within the project area, emphasis has been given to
selection of plant species like nitrogen fixing species, species of
ornamental values, species of very fast growth with good canopy
cover etc.
Landscape development plan
In the proposed project, the area allotted for landscaping is
4,203.18 m2. Various types of trees are proposed for plantation.
Trees will be planted in the proposed project. The trees will be
planted along the compound wall and along the road with adequate
space between them so that their growth is not hampered.
Plantation has to be taken up randomly and landscaping aspects
could be taken into consideration.
Environment Management Plan
Ameya Townhomes Pvt. Ltd. Page 13
Table 1: Environmental Management Plan during
construction phase
Air & Noise
Environment
Use of Ready Mixed Concrete for
building construction
Water sprinkling will be adopted for
dust suppression.
10 no. Tanker
/month
Vehicle wheels will be cleaned prior
to departure from the site to prevent
the loss of soil from construction site
Every day
Dust covers will be provided on
trucks used for transportation of
materials prone to fugitive dust
emissions
Barricades provided along the
periphery of the site
Ear plugs provided for construction
workers 50 no.
PUC checking, no noise polluting
work in night shifts Every day
DG set will be provided for power
back up
1500KVA x 2 NOS.
+ 500KVA x 1 NOS.
Water
Environment
Provision of temporary toilets on
project site
8 no. of toilets
for Ladies and Gents
workers each
Drinking water facility for the
workers
Water storage tank workers &
construction activity 10 m3 tank
Drinking water & ground water
regularly check from MoEF
recognized laboratory
Monthly
Environment Management Plan
Ameya Townhomes Pvt. Ltd. Page 14
Table 2: Environmental Management Plan during operational
phase
Air & Noise
Environment
HSD fuel shall be used for
DG sets.
Acoustical Enclosure
provided for DG sets
Trees act as a Noise barrier We will be providing trees
which act as a noise barrier.
Water
Environment
Rain water harvesting tank &
Recharge pits provided for
rainwater harvesting
Recharge pits will be
provided
Sewage Treatment Plant will
be provided 7,00 m3/day
Recycled water used for
flushing, gardening &
washing purpose
312 m3/day
Strom water drainage will be
properly maintained. Monthly monitoring
Land
Environment
The waste generated will be
properly collected,
segregated both wet & dry
waste.
3,118 kg/day
Wet waste we convert into
compost by using organic
waste converter Technology
(OWC)
1,871 kg/day waste
OWC machine will be
provided
Dry waste we will sold to the
authorized recycler. 1,029 kg/day
Biological
Environment
Landscaping & tree
plantation at periphery
Various trees will be
planted on site.
Plant species selected based
on adaptability to geographic
conditions and keeping in
view the local species and
their benefits to site
Environment Management Plan
Ameya Townhomes Pvt. Ltd. Page 15
1.8 Environment Monitoring Cell
Ameya Townhomes Pvt. Ltd. will form the environmental
management cell which will be headed by an Environment Manager.
He will be supported by adequate number of personnel having
sufficient educational and professional qualification and experience
to discharge number of personnel having sufficient educational and
professional qualification and experience to discharge
responsibilities related to environmental management including;
statutory compliance, pollution prevention, environmental
monitoring, preventive maintenance of pollution control equipment
and green belt development. The head of the cell will directly report
to the top management. This cell will be a nodal agency to co-
ordinate and provide necessary services on environmental issues
during construction and operation of the project. This department
will interact with MPCB, MoEFCC, CPCB and Other environment
regulatory agencies. The cell will be effective until handing over of
the project to society.
Environmental Management cell will implement and review the
compliance of the stipulated conditions specified in Environmental
Clearance and Consent for Establish. Environmental cell will submit
six monthly compliance report regarding status of implementation
of each stipulated conditions to MoEF. The cell will be responsible to
obtain consent of operate under water Act and Air from MPCB. On
getting Consent to operate, the project will be handed over to
society. The project proponent will provide technical knowhow, legal
and technical training to society personnel for continuing the EMP.
Environmental Management Audits:
The management audits are to determine whether the activities are
conforming to the environmental management systems and
effective in implanting the environmental policy. They may be
internal or external, but carried out impartially and effectively by a
person properly trained for it. A broad knowledge of the
environmental process and expertise in relevant disciplines is also
Environment Management Plan
Ameya Townhomes Pvt. Ltd. Page 16
required. An appropriate audit programs and protocols will be
established.
Table 3: Organization & Environment Management Cell
Sr
. Level Designation Purpose
1 Honorary Director / Managing Committee Policy
2 Manager Environmental Scientist /Chemist Job (*)
3 Executive Supervisor, contractor, Engineers Implement
4 Third
Party
Environmental sampling, analysis will
be done through external agency
approved by MoEFCC / MPCB
Monitoring,
Testing,
Table 4: Responsibilities of Environment monitoring cell
Attribute Construction phase Operation phase
Water
Regime
Install water meters, take
readings routinely, and
record in the register.
Install necessary modular
STP for construction
workers and staff etc. to
look after its operational &
maintenance, take
periodical sample to assess
the quality.
Keep a daily watch on
sanitation/ drains, & good
housekeeping.
Examine proper
management of
channelization of water to
avoid water logging at site
Oil spill prevention
measures to be taken to
avoid pollution of water
body.
Material storage areas to be
Install water meters and take
readings routinely,
Monitoring of pH, COD, BOD
and TSS of the units to ensure
good treatment of waste
water into Sewage Treatment
Ensure the network of
connection to rain water
harvesting units; maintain its
sanitation and documentation.
Storm water drainage system
for any abnormality as to its
siltation, dropping leaves,
hampering of carrying
capacities: and if found
quickly arrange the
rectification.
Monitoring of water from
recharge pits for specified
parameters
Environment Management Plan
Ameya Townhomes Pvt. Ltd. Page 17
Attribute Construction phase Operation phase
kept far away from water
body
Air
Monitoring of Air quality
through MoEF approved
Laboratory.
Ensure water sprinkling for
dust suppression.
Ensure the use of covering
sheets, on the material
being transported incoming
or outgoing or stored.
Use as backup power DG
sets to be procured from
renowned suppliers with
acoustic enclosures.
Examine proper traffic
arrangement for the
construction vehicles
including instance of their
PUC.
Prohibition of open burning
of solid waste.
Provision of mask and other
personnel gazettes to
workers with regular health
check-up programme.
Prepare a schedule and
implement proper
maintenance of DG sets for
use as backup power DG sets
to be procured from renowned
suppliers with acoustic
enclosures and specification
as per CPCB norms for its
stack height
Trees will be planted with
special care for controlling
dust and noise and placing
them very near to the sources
of nuisance from air & noise
point of view.
Monitoring of Air quality
through MoEF approved
Laboratory.
DG set stack monitoring
through MoEF approved
Laboratory.
Solid waste
Provide training to
subcontractor & workers for
good sanitation & collecting
their individual waste
separate it as dry & wet in
respective colour coded
dust bins provided.
Isolated storage of
construction raw material
such as paint varnishes etc.
Segregated garbage will be
handed over to authorized
agency.
Ensure collection of solid
waste every day & keeping
the record of this qty, &
documents.
Segregation of garbage into
degradable & non
biodegradable waste in a shed
earmarked inside the
premises.
For treatment of
biodegradable garbage sent it
to the dedicated OWC,
carefully without spillage.
The separated non
biodegradable & inert waste
will be sent to authorized
agency.
The empty drums of paints,
pesticides & tubes,
Environment Management Plan
Ameya Townhomes Pvt. Ltd. Page 18
Attribute Construction phase Operation phase
E-waste, biomedical waste ,
spent batteries, rubber tires
so be collect, end sent to
respected site. Soil &
Greening
Provision of separate place
for storage of top soil to be
used in due course for
plantation.
Avoiding excavation during
high windy day & heavy
monsoon day.
Excess excavation will be
used within the premises.
Ensuring that no trees
cutting
Plant trees along the
boundary of project area.
Proper landscaping is
designed by the landscape
architect that are of native
species, having good canopy
capable of barricading noise,
wind borne dust.
Ensure maintenance of lawn &
Tree plantation
Provision of work force, tools
& watering arrangement.
The trimming to be conducted
routinely & especially at the
advent of monsoon
Dropping leaves to be
collected & used for mulching
& not to burn openly.
To keep a watch on storm
water drainage especially on
adequacy of capacity. Noise To prepare & get approved
a regular Noise monitoring
schedule & stations
Provision of ear plugs for
construction labour and
staff & insist its use.
There will be no noisy work
in night shifts.
Ensure the provision of
barricades along periphery
of the site
To obtain guidance from the
suppliers & maintain
acoustic enclosure for DG
sets
To prepare & get approved a
regular Noise monitoring
schedule
To obtain guidance from the
suppliers & maintain acoustic
enclosure for DG sets
To ensure smooth flow make
provision of proper parking
arrangement, traffic
management.
Socio
economic
Providing labour camps with
drinking water and
sanitation facility.
pre and post employment
opportunities for local
people
First aid and medical
Job opportunities will be
generated for skilled and
unskilled such as cleaners,
drivers and security guard,
etc.
Increased business
opportunities viz. market,
Environment Management Plan
Ameya Townhomes Pvt. Ltd. Page 19
Attribute Construction phase Operation phase
facilities
Proper safety precaution to
prevent any accident.
trade and commerce
Adhere to the high standard
of maintenance and services
for consistency of the
economic development
1.9 Environmental Monitoring
We will be doing environmental monitoring during Construction &
operation phase from MoEFCC recognized laboratory. Period of
monitoring is mentioned in the below table.
Table 5 Environment monitoring programme during
construction phase
Sr. Item Parameters Frequency Location
1 Ambient air
quality
PM2.5 & PM10, SO2,
NOX, O3, Pb, CO, NH3,
C6H6, BaP, As, Ni
Monthly At major construction
area.
2 Noise level Equivalent noise level
dB(A) Weekly
At major construction
area & during major
construction,
excavation, slab
filling
3 Water
analysis
Colour and odour,
Suspended solids, pH,
turbidity, total
dissolved solid,
Calcium, Chloride,
Fluoride, Residual free
chlorine, Iron,
magnesium, nitrate,
sulphate,
Phenolphthalein
Alkalinity, Total
hardness, total
coliform, E-coli
Monthly Tankers / Municipal
supply and bore well
4
Waste
water
analysis
Color ,pH, BOD, COD,
TSS, TDS,
O &G , Iron, Silica,
Total hardness,
Nitrates, Fluoride,
Manganese, Bio assay
test, Arsenic, Mercury,
Lead, Copper, zinc,
Selenium, Nickel,
Cadmium, hexavalent
Daily Before & after
treatment from STP.
Environment Management Plan
Ameya Townhomes Pvt. Ltd. Page 20
Sr. Item Parameters Frequency Location Chromium, Chromium,
cyanide, Vanadium,
Nitrate Nitrogen, Total
Kjeldahl Nitrogen,
Sulphide
5
Exhaust
from DG
set
PM2.5 & PM10, SO2, NOx Six Monthly Stack of DG sets.
Table 6: Environment monitoring programme during
operational phase
Sr
. Item Parameters Frequency Location
1 Ambient
air Quality
PM2.5 & PM10, SO2, NOX, O3,
Pb, CO, NH3, C6H6, BaP, As, Ni Monthly
Periphery of
the site.
2 Noise level Equivalent noise Level
Monthly
(Especially
during
festival
period)
Near DG sets,
Near STP,
Near parking
area.
3
Exhaust
from DG
set
PM2.5 & PM10, SO2, NOx Monthly Stack of DG
sets.
4 Water
analysis
Colour and odour, Suspended
solids, pH, turbidity, total
dissolved solid, Calcium,
Chloride, Fluoride, Residual
free chlorine, Iron,
magnesium, nitrate, sulphate,
Phenolphthalein Alkalinity,
Total hardness, total coliform,
E-coli
Monthly
during rainy
season
Harvested
water stored
in tank.
5
Waste
water
analysis
pH, BOD, COD, TSS, TDS,
O &G , Iron, Silica, Total
hardness, Nitrates, Fluoride,
Manganese, Bio assay test,
Arsenic, Mercury, Lead,
Copper, zinc, Selenium, Nickel,
Cadmium, hexavalent
Chromium, Chromium,
cyanide, Vanadium, Nitrate
Nitrogen, Total Kjeldahl
Nitrogen, Sulphide
Daily,
Monthly
and Six
monthly
Before & after
treatment
from STP.
Environment Management Plan
Ameya Townhomes Pvt. Ltd. Page 21
1.10 Budgetary provisions for Environmental Management Plan
Adequate budgetary provisions have been made for construction &
operational phase. For the initial five years, the management shall
keep regular budget provision for in-plant measures to reduce
pollution and construction of additional treatment units to facilitate
wastewater recycling/reuse and reduction in air pollution.
1.11 Compliance schedule
There will be three facets to design and follow the schedules viz:
(A) for compliance of responsibilities (B) for day to day operation
and management of STP & solid waste facility. (C) For routine
environmental monitoring to assess the impact and take timely
warning.
The Schedule:
(i) Daily Compliance:
Take meter reading – Initial & Final, for checking the water
consumption
Maintain the electricity consumption record for pollution control
facilities
(ii) Monthly Compliance:
Monitor ambient air, noise, DG set, water, waste water periodically
as per state pollution control board consent.
Monitoring the emissions sources through the competent authority
and submit the analysis reports to the board.
(iii) Quarterly compliance:
Review the water reuse performance.
Environment Management Plan
Ameya Townhomes Pvt. Ltd. Page 22
(IV) Half yearly Compliance:
Submit the post Environmental Clearance report to the regional
office Bhopal of MoEFCC & State pollution Control Board &
Environment Department as may be prescribed in the prior EC
every June & December.
(V) Yearly Compliance:
Carryout “Environment Audit” of various environmental aspects,
reviews the environmental policies with the help of experts and
makes the up gradation/ changes accordingly.
Submit the “Environment Statement” to the State Pollution Control
Board in Form V under Rule 14 of the second amendment rules
1992 of the Environment (Protection) Act, 1986.
Renew the Consent to Operate under the Water & Air Acts.
File the CESS returns to the State PCB under the water (Prevention
and control of Pollution) CESS Act, 1977.