Laboratory Project of Quality Safety Inspecting and
Testing Monitoring Center of Agricultural Products
of Songyuan City
Environment Management Plan
Environmental Science Institute of Jilin Province
June 25, 2009
E2217v10
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
-
Contents
I. Establishing Background and Purpose of Environment
Management Plan (EMP) ......................................................................... 1
1.1 Project Background ............................................................................ 1
1.2 Purpose of Environment Management Plan (EMP) ................................................................ 3 1.3 Preparation Basis and Executing Standards ............................................................................ 4
1.3. 1 Preparation Basis ............................................................................................................. 4 1.3.2 Technical Specifications and Guidelines ................................................................... 5 1.3.3 Executing Standards ......................................................................................................... 6
1. 4. Classification Basis of Laboratory ...................................................................................... 11
II. Main Environment Impacts and Mitigation Measures .................. 13
2.1 Discharging of Existing Pollutant and Analysis of Pollution Prevention and Control Measures ......................................................................................................................................... 13
2.2 Environment Impact Analysis ............................................................................................... 14 2.2.1 Environment Impact Analysis during Construction Period ............................................ 14 2.2.2 Environment Impact Analysis during Operating Period ................................................ 16
2.3 Environment Impact and Mitigation Measures ..................................................................... 19 2.3.1 Environment Impact and Mitigation Measures during Planning and Designing Phase . 20 2.3.2 Environment Impact and Mitigation Measures during Construction Period .................. 22 2.3.3 Environment Impact and Mitigation Measures during Operation Period ...................... 22 The environment impact and mitigation measures during the operating period operating period are seen in Table 2.3-2. ................................................................................................ 22 2.3.3. Environment Impact and Mitigation Measures during Operating Period ..................... 24
III. Actualizing Organization .............................................................. 36
3.1.2. Responsibility of Environment Management Organization .......................................... 38
IV Environmental Monitoring Plan ..................................... 48
4.1 Environmental Monitoring Purpose ...................................................................................... 48 Management/ Mitigation Measures ......................................................................................... 50 Management/ Mitigation Measures ......................................................................................... 54 Management/ Mitigation Measures ......................................................................................... 57
VI.Report ................................................................................................. 62
7.2. Investigation Scope of Public Participation ......................................................................... 64
-
Environment Management Plan
-1-
I. Establishing Background and Purpose of Environment
Management Plan (EMP)
1.1 Project Background
It is the construction purpose of the World Bank Loans Project for the quality and safety of the
agricultural product project of Jilin Province that the advanced safety controlling technologies like
the “good agricultural practices" (GAP), "Good Manufacturing Practice" (GMP), Harm Analysis and
Critical Control Point (HACCP) and the others are used to produce and process the agricultural
products to increase the standardization demonstration zones (bases) of the coverage areas in order
to get the majority of the agricultural production and processing enterprises in our province to
enter the standardization production track gradually.
The project is designed according to enclosing the security system of the quality and safety of the
agricultural products, promoting the standardization demonstration sample popularization in the
whole process, the quality control in the whole process, the product quality inspection and testing,
the quality retroact, the propaganda and advocacy training and the quality safety of the agricultural
products as well as the related research project. The design is divided into the 5 sub-projects,
including: (1) the project of the criterion promotion of the quality safety of the good agricultural
products, (2) the project of the public monitor of the quality and safety of the agricultural products,
(3) the project of the practicability research of the quality and safety of the agricultural products,
(4)the project of the personnel training and propaganda and (5) the project of the project
management. This project is the 2nd subproject of the laboratory project of the quality safety
inspecting and testing monitoring center of the agricultural products of Songyuan City in the project
of the quality safety monitoring system construction of the agricultural products of the quality safety
of the public monitoring and testing of the agricultural products.
The sites of the project are located in No 791, on Songyuan Road, in Ningjiang District,
Songyuan City. The project is rebuilt on the basis of the previous laboratory of the
quality supervising inspecting station of the agricultural products of Songyuan City. the
quality safety inspecting and testing monitoring center of the agricultural products takes the
-
Environment Management Plan
-2-
quality safety of monitoring and inspecting the agricultural products as the core task. the
quality safety inspecting and testing monitoring center of the agricultural products shall have the
capability of monitoring and inspecting the look-back devoted materials and the
environment of the original production area and take on the jurisdiction of the quality
safety evaluation within the scopes of the agricultural products, the agricultural input
materials, the agricultural-ecological environment. the quality safety inspecting and testing
monitoring center of the agricultural products performs the quality and safety of the inspection
work and the monitoring work for the market access of the agricultural products. the
quality safety inspecting and testing monitoring center of the agricultural products takes on the
reconnaissance of the quality safety of the agricultural products from the whole Jilin
Province and the whole country and the routine monitoring work as well as the other
work. The quality safety inspecting and testing monitoring center of the agricultural products takes
on the risk analysis and assessment work of the quality safety of the agricultural
products. the quality safety inspecting and testing monitoring center of the agricultural products
organs the major incidents of the quality safety of the agricultural products like the
investigation of the disputes, the identification and evaluation. The quality safety inspecting
and testing monitoring center of the agricultural products is responsible for testing the quality
of the imported agricultural products and the agricultural products to be exported. The
quality safety inspecting and testing monitoring center of the agricultural products carries out the
quality safety certification testing and accept, the arbitration testing accept and the other
tasks entrusted to inspection, the supervision as well as the inspection of the quality
safety of the agricultural products that the quality inspection agencies at the county
stage. The monitoring testing center is responsible for the quality safety of the
agricultural products on the professional technical advice and technical services. The
monitoring and testing center provides the inspecting and monitoring center of Class IV
with the professional technical guidance, the services and the personnel training. The
laboratory of the main building is divided into the two layers. The total construction
area is 398.96 square meters. The two layers are divided into the office region, the
inspection and testing supporting region and inspection and testing region. The office
region includes the office for the director, the office for the deputy director, the office
-
Environment Management Plan
-3-
for the inspecting and testing personnel, the office for the financial personnel and the
room for the archives. The inspection and testing region includes the sample
pre-treatment room, the organic and inorganic pre-treatment room, the washing room,
the standard solution preparation room, the sample room, the balance room, the small
instrument room, the electrical digestion room, the microbial room, the gas
chromatography mass spectrum room, the liquid chromatography spectrum room, the
atomic absorption spectrometry room, the atomic fluorescence spectrometry room.
The total investment of the project is for RMB19,126,800.00 YUAN. Among them, the
investment of purchasing the laboratory instruments is for RMB17,268,200.00 YUAN,
the project investment of rebuilding the main building of the laboratory work and the
project of the tools and apparatus is for RMB1,858,600.00 YUAN.
1.2 Purpose of Environment Management Plan (EMP)
The environmental impact assessment of the project shows that the environmental
impact of the project is mainly produced during the construction period and operation
period. The environmental management plan (EMP) will provide the detailed
instructions on the environmental mitigation measures, the environmental management,
the environmental supervision, the environmental monitoring and the other contents.
The environmental management plan (EMP) will be the t guiding document during the
implementation of these activities. Its roles are described as the follows:
(1) To provide the environmental guidance documents. After the environmental
management plan (EMP) book has been reviewed by the World Bank, the book will be
served as the provision text of the environmental protection that will be provided to the
construction supervision unit and the environmental monitoring units and other related
units during the construction period and operation period of the project.
(2)To definitude the responsibilities and functions of the relevant units. The
responsibilities and functions of the relevant functional departments and management
institutions have been described in environmental management plan (EMP) book and
the communication channels and the manners between or among the various
departments have been put forward. .
-
Environment Management Plan
-4-
(3)The environmental mitigation measures and the environmental monitoring plan
during the construction period and operation period have been put forward.
1.3 Preparation Basis and Executing Standards
1.3. 1 Preparation Basis
1.3.1.1 China's Environmental Protection Laws and Related Regulations
(1) 《Environmental Protection Law of People's Republic of China》December 26,
1989;
(2)《Fume Pollution Control Act of People's Republic of China》 April 29, 2000;
(3)《Water Pollution Control Act of People's Republic of China》 February 28, 2008;
(4)《Water Pollution Control Act Regulations of People's Republic of China》Decree No. 284 of
the State Council;
(5)《Solid Waste Pollution Prevention Law of People's Republic of China》April, 2005;
(6)《Environmental Noise Pollution Control Act of People's Republic of China》 March 1st,1997;
(7)《Cleaner Production Promotion Law of People's Republic of China》 January 1st,2003;
(8)《Environmental Impact Assessment Law of People's Republic of China》October 28,2002;
(9)《Energy Conservation Law of People's Republic of China》 January 1st ,1998;
(10)《Cleaner Production Promotion Law of People's Republic of China》(2002);
(11)《Construction Project Environmental Protection Management Regulations》 Decree No. 253
of State Council [1998] November 29,1998;
(12)《Construction Project Environmental Protection Classification Management Directory》State
Environmental Protection Administration issued on January 1st , 2003;
(13)《Environmental Management on Construction Projects of a number of views on issues》State
Environmental Protection Administration issued on March 21, 1988;
(14)《Notice of Strengthening the Urban Water Supply and Water Pollution Prevention and
Treatment of Water-Saving Work of State Council》 No. 36 Document in 2000;
(15)《Notice in Loans from International Financial Organizations to Strengthen the
Project Management of Environmental Impact Assessment 》 (No. 324
Environment Monitoring Document [1993]);
(16) 《Public Participation in Environmental Impact Assessment and Interim
-
Environment Management Plan
-5-
Measures》issued by State Environmental Protection Administration(2006);
(17) 《Work on the Strengthening of Industrial Water-saving Advice》issued by State
Economic and Trade Resources Committee No. 1015 Document(2000);
(18)Open approach to environmental information (for trial implementation) April 21,(2007);
(19)Guiding Directory Structure of investigation of Industry Structure (2005)
1.3.1.2 Requirements of World Bank
The requirements of World Bank include the 10 items of the major security policies,
they are, the operational policies, the World Bank procedures, the operational guidelines,
etc., they are described as the follows:
(1)Environmental assessment(OP/BP/GP4.01)
(2)Forestry practice(OP /GP4.36)
(3)Natural habitat(OP/BP4.04)
(4)Dam Safety(OP/BP4.37)
(5)Worming-disposing medicament management(OP4.09)
(6)Involuntary immigrant resettlement(OP4.30)
(7)Minority (OP4.20)
(8)Historical relic(OP4.11)
(9)Project disputed areas (OP/BP/GP7.60)
(10)Projects of international watercourses(OP/BP/GP7.50)
1.3.2 Technical Specifications and Guidelines
(1)《Environmental Impact Assessment Technology Guidelines •
·General Program》(HJ/T2.1-93);
(2)《Environmental Impact Assessment Technology Guidelines· Air
Environment》(HJ/T2.2-2008);
(3)《Environmental Impact Assessment Technology Guidelines· Surface water
environment》(HJ/T2.3-93);
(4)《Environmental Impact Assessment Technology Guidelines· Acoustic
environment》(HJ/T2.4-1995);
(5)《Environmental Impact Assessment Technology Guidelines· Non-pollution
-
Environment Management Plan
-6-
ecological impact》(HJ/T19-1997);
(6)《Technical Guidelines of Environmental Risk Assessment of Construction
Project》(HJ/T169-2004);
(7)《Function area standards of surface water in Jilin Province》DB22/388-
2004;
(8)《Technical Methods of Constituting the Local Fume Pollutant Discharging
Standards》(GB/T13201-91)。
1.3.3 Executing Standards
The project implements the following standards according to the environmental
function zoning of Songyuan City.
1.3.3.1 Environment Quality Standards
(1)Environment Air
The environment air where the project is established is theⅡ type area. The
environmental air of the evaluation region executes the 2nd class of the standard in
《Environment Air Quality Standards》(GB3095-1996). The details are seen in Table
1.3-1.
Table 1.3-1 Environment Air Quality Standards Unit:mg/m3
No. Pollutant Executing Standard Daily
Average
Hour
Average
Evaluated
Object
1 SO2 《 Environment Air
Quality Standards》
GB3095-1996 2nd
Class
0.15 0.5 The
environment
air where the
project is
established.
2 TSP 0.3
3 PM10 0.15
4 NO2 0.12 0.24
(2)Surface Water
The wastewater which is discharged from the project is ultimately discharged into
Songhua River after the wastewater has been treated in the Sewage Treatment Works of
Songyuan City. The surface water quality adopts the III Class Standard and the IV Class
-
Environment Management Plan
-7-
Standard according to 《 Surface Water Function Region in Jilin Province 》
(DB22/388-2004). The details are seen in Table 1.3-2.
Table 1.3-2 Environment Quality Standard of Surface Water
Evaluation
factor Unit Ⅲ Class Ⅳ Class
Standard Source
pH - 6-9 6-9 GB3838-2002 , *
refers to 《Environ-
mental Quality
Standard of Water
System of Songhua
River》
CODcr mg/L ≤20 ≤30
BOD5 mg/L ≤4 ≤6
NH3 mg/L ≤1.0 ≤1.5
SS* mg/L <25* <40*
Petroleum
Class mg/L ≤0.05 ≤0.5
(3)Acoustic Environment
The acoustic environment quality of the project region executes the Standard of
Class I in《Acoustic Environment Quality Standard 》GB3096-2008. The details
are seen in Table 1.3-3.
Table 1.3-3 Acoustic Environment Quality Standard
Evaluation
factor Unit Time Segment
Standard
limited
Values
Standard Source
Equivalent
Acoustic Class dB(A)
Daytime 55 Factory Region to
be built
GB3096-2008 “ 1
Class ”
Nighttime 45
1.3.3.2 Discharging Control Standard of Pollutant
(1)Fume Pollutant
The discharging control of the waste fume pollutant from the laboratory executes
The Class Standard in 《 Integrated Discharging Standard of Fume Pollutant》
-
Environment Management Plan
-8-
(GB16297-1996). The fumes from the eatery executes 《Cooking Fume Discharging
standards》(GB18483-2001). The details are seen in Table 1.3-4 and Table 1.3-5.
Table 1.3-4 Integrated Discharging Standard of Fume Pollutant(GB16297-1996)
Pollutant
Highest
Permitted
Discharging
Concentration
mg/m3
Highest Permitted
Discharging Speed,
kg/h
Unorganized Discharging
Concentration Monitoring
Limited Values
Height of
Fume
Discharging
Pipe m
II
Class Control Point
Concentration
mg/m3
Particulate
Matter 120
15 3.5 Highest Point of
Concentration
around the
Outside Area
The naked
eye is not
visible. 20 5.9
Sulfuric
Acid Mist 45
15 1.5 Highest Point of
Concentration
around the
Outside Area
1.2 20 2.6
Mercury
and its
Compounds
0.7
15 0.0015 Highest Point of
Concentration
around the
Outside Area
0.0012 20 0.0026
Phenol
Sorts 100
15 0.10 Highest Point of
Concentration
around the
Outside Area
0.080 20 0.17
-
Environment Management Plan
-9-
Table 1.3-5 Highest Permitted Discharging Concentration of Fume and Lowest
Removal Efficiency of Air Purification Facilities of Catering Units
Specifications Mini-type Middle-type Big-type
Benchmark Kitchen
Number ≥1,<3 ≥3,<6 ≥6
Highest Permitted
Discharging Concentration
of Fume(mg/m3)
2.0
Lowest Removal Efficiency
of Air Purification Facilities
(%)
60 75 85
(2)Water Pollutant Discharging Standards
The project emissions from treated, the of conventional pollutants discharged waste
water discharges from the of the implementation of
After the discharged wastewater of this project has been
The treated wastewater is discharged into the urban drainage network. The discharging
concentration implementation of the conventional pollutants executes the III Class
Standard in 《Integrated Wastewater Discharge Standard》GB8978-1996. The discharging
concentration implementation of the heavy metal executes the highest permitted
discharging standard of the I Class of the pollutants in《 Integrated Wastewater
Discharge Standard》GB8978-1996. The details are seen in Table 1.3-6.
-
Environment Management Plan
-10-
Table 1.3-6 Discharging Standard of Water Pollutants
Pollutant
Source
Sorts
Pollutant Factor Unit
Control Standard
Standard Source
A
pH - 6~9
III Class Standard in
《 Integrated
Wastewater
Discharge
Standard
GB8978-1996》
COD mg/L 500
BOD5 mg/L 300
SS mg/L 400
Ammonia Nitrogen mg/L -
Aniline Sorts mg/L 5.0
Animal and Vegetable
Oils mg/L
100
Nitrobenzene Sorts mg/L 5.0
Linear Alkylbenzene
Sulfonates (LAS) mg/L
20
Organophosphorus
Pesticide (counted
according to P)
mg/L
0.5
Total mercury mg/L 0.05 Highest Permitted
Discharging
Standard of the 1st
Sort of the
Pollutants in
Integrated
Wastewater
Discharge
Standard
Total arsenic mg/L 0.5
Total lead mg/L 1.0
Total chromium mg/L
1.5
(3)Environmental Noise Discharging Standards around Factory Boundary
The environmental noise discharging standards around factory boundary during the
-
Environment Management Plan
-11-
operating period executes I Class Standard in《Environmental Noise Discharging
Standards around Factory Boundary of Industry Enterprises》GB12348-2008. The
environmental noise discharging standards around the construction site
during the construction period executes(DB22/272-2001)《Construction Noise
Limited Values around Construction Site》.
Table 1.3-7 Noise Discharging Standard
Pollutant
Source Sort
Pollutant
Factor
Daytime
Limited
Values
dB(A)
Nighttime
Limited
Values dB
(A)
Related
Regulations Standard Source
Construction
Period
( Factory
Boundary)
Equivalent
Sound level
75 55
Earth Stone
Material
Period
《 Environmental
Noise Discharging
Standards around
Factory Boundary
of Construction
Site 》
DB22/272-2001
70 55 Structure
Period
65 55 Fitment
Period
Operating
Period
( Factory
Boundary)
Equivalent
Sound level 55 45
1st Sort Region
Standard in
GB12348-2008
1. 4. Classification Basis of Laboratory
The classification sort and the classification criterion of the laboratory are
carried out according to 《Security Common Criteria of Microbiology and
Biomedical Laboratories (WS 233-2002)of Health Industry Standard of People's
Republic of China》 as the following Table 1.3. 4-1.
-
Environment Management Plan
-12-
Table 1.3.4-1 Classification Sorts and Classification Criterion of Laboratory
Following Table
CLASSIFICATION
SORTS
CODE
NO. CRITERIONS
Laboratory of
Class I
Microbiology
Security
Protection
BSL—1
The structure and facilities, the security operating
regulations and the safety equipment of the laboratory
are suitable for the adult healthy known to the
functions of the non-pathogenic micro-organisms, such
as the general microbiology laboratory for the
teachings.
Laboratory of Class
II Microbiology
Security
Protection
BSL—2
The structure and facilities, the security operating
regulations and the safety equipment of the laboratory
are suitable for the adult healthy known to the
functions of the middle-latency-harm pathogenic
micro-organisms microbiology of the people or the
environment.
Laboratory of Class
III Microbiology
Security
Protection
BSL—3
The structure and facilities, the security operating
regulations and the safety equipment of the laboratory
are suited to get the people to be contaminated by the
serious or indeed the fatal diseases, the pathogenic
micro-organisms and the toxins through the
main channels of the respiratory infection but
there is usually the vaccine for preventing the
spread. The HIV research work (except for the
serological test) should be done in Class III
biological safety laboratory. in prevention.
Laboratory of Class
IV Microbiology
Security
BSL—4
The structure and facilities, the security operating
regulations and the safety equipment of the laboratory
are applicable to the human body with a high degree
-
Environment Management Plan
-13-
Protection of the risk that is transmitted through the unknown
aerosol route of the transmission but there is no
effective vaccine now or no treatment of the pathogenic
microorganisms and the toxins. The research work of
the similar situation with the unknown
micro-organisms must also be done in the bio-security
laboratory of Class IV. After the sufficient data have
been obtained, it can be decided that the
experiment of this kind of the microbiology or
the toxin should be done in the bio-security
laboratory of Class IV or in the .lower-level processing
laboratory.
According to the engineering analysis, the experiments of the pesticide, the fertilizer the
residue, the producing environmental monitoring, the detection, such as the irrigation
water for the agricultural products (the grain, the vegetables, the fruits, etc.) should be
done in the microbiological laboratory. The experiment that is done in the
micro-organism laboratory is also the common micro-organism experiment so that the
micro-organism is known to have non-pathogenic function to the health of the healthy
adults under the normal circumstances. Therefore, the physical and chemical laboratory
in the project is the common laboratory. The common micro-organism laboratory is the
biological BSL 1 security laboratory of Class I.
II. Main Environment Impacts and Mitigation Measures
2.1 Discharging of Existing Pollutant and Analysis of Pollution
Prevention and Control Measures
(1)Exhaust Fume
-
Environment Management Plan
-14-
The laboratory of the quality safety inspecting and testing center of the agricultural
products of Songyuan City is used as the existing laboratory to be rebuilt where there
are no ventilation equipment.
(2)Wastewater
The laboratory basically does not use the water currently when the laboratory performs
the speed measurement of the seeds, the soils and the agricultural products. The
experimental wastewater and the domestic sewage are discharged directly into the
municipal water distribution network. There is no single measurement of the wastewater,
no separate treatment measures and the facilities. The discharging quantity of the
existing wastewater is about 1.28m3 / d, in which the discharging quantity of the living
sewage is 0.6 m3 / d and the discharging quantity of the experimental wastewater is
0.68 m3 / d.
Although the discharging quantity of the wastewater from the laboratory is relatively
small, the quality of the wastewater is complex which is involved in the organic
chemistry and the inorganic chemistry so that the excessive discharging quantity is
harmful. In the rebuilding process of the laboratory, it must be done that the production
wastewater is separated from the domestic living sewage. The experimental wastewater
can be discharged after the experimental wastewater has been treated to arrive at the
standard.
(3)Noise
The basic noise-free equipment during the experiment are equipped in the laboratory so
that there is no impact on the surrounding acoustic environment. There is no large-scale
of the fixed noise source around the project region so that sound environment quality
can be better.
2.2 Environment Impact Analysis
2.2.1 Environment Impact Analysis during Construction Period
(1)Environment Fume Impact Analysis
The project is the technological rebuilding project. It is the main construction content
that the indoor operation, the installation of the purchased equipment so that the
-
Environment Management Plan
-15-
environment impact during the construction period is relatively small. In the period of
the interior decoration, the load and unload of the bulk powder (particle) materials like
the material handling, the material processing, the material mixing operation and
construction material transportation by the vehicles, if the vehicle overloads the
construction materials with or without protective measures, the materials may be
scattered in the transportation, some dust would be flied upwards. The engineering
transportation and the construction machinery in some areas may get the quality of the
atmospheric environment to have been affected. However, when the construction period
is ended, these impacts disappear then.
(2)Environment Impact Analysis of Surface Water
The local construction team is selected for the of the project construction. The
construction camps are not set up. The construction team uses the existing toilet of the
inspecting and monitoring testing center of the quality and safety of the agricultural
products. The municipal living sewage is discharged into the drainage network so that
the water will not significantly affect the water environment.
(3)Construction Noise
The project is the technological rebuilding project. When the electric drill, the electric
saw and the other machinery are used during the interior decoration construction would
inevitably have the impact of the construction noise. However, the operations are all the
indoor workplaces, as long as a reasonable operating time is arranged and the
construction and operation of closing a window can reduce the impact to the external
environment. These impacts will be ended then when the construction period comes to
an end.
(4)Solid waste
A small amount of the construction solid wastes will be produced during the
construction period in the interior decoration process of the project. And the living of
the construction team will also have a certain amount of the solid wastes, if the solid
wastes are not treated immediately, the mosquitoes will breed and the stench will
impact on the surrounding environment.
In order to avoid the solid waste to impact on the environment, the construction wastes
-
Environment Management Plan
-16-
produced during the construction period should timely be removed and transported to
the location designated by the municipal department where the dumps or the
construction materials are piled up for the materials of the roads to be built. The unified
collection of the living garbage bins should be dedicated in the construction site. The
living garbage should regularly be transported to the municipal solid waste landfill site
so that it is avoided for the solid waste not to be discarded anywhere.
If it is properly handled, the solid waste will be immediately removed and the adverse
impact will not be produced to the external environment.
2.2.2 Environment Impact Analysis during Operating Period
(1)Exhaust Fume
The exhaust fume from this project is mainly a small number of the acid mists and the
exhaust fume that is discharged by NO2 and the organic solvent that are produced when
the inspecting and testing experiments are done. The exhaust fume will be discharged
after it has been treated to arrive at the standard.
The ventilation cabinets are installed in some laboratories where the exhaust fumes are
easily produced in the rebuilding process. After the negative pressure that is produced
during the experiment has been collected and has been pure-filter-treated as well as has
arrived at the discharging standard by the high efficiency filter through the filter purity
treatment, the negative pressure has the less impact to the surrounding environment
fume in the normal circumstances.
The heat-providing resource of the heating period of the project comes from the
self-collecting heat providing. The project has no own boiler room, no chimney and no
flue gas discharging of the boiler fume. The small type employee canteen will be built
for 16 staff to have the meals so that the employee canteen will produce the exhaust
fume of the oil fume. By analogy, the initial concentration of the oil fume is generally
4-6mg/m3 and is more than 2 mg/m3 in the GB18483-2001 of the fume discharging
standard so that it is recommended to install the purification equipment whose
purification efficiency is more than 75% in order to get its discharging concentration
-
Environment Management Plan
-17-
of the equipment to meet the requirement of the corresponding discharging
concentration standard.
(2)Wastewater
The external discharging wastewater of the project is mainly wastewater that is
discharged from the laboratory and the living wastewater that is produced from the
workers. After the project has been completed, the total discharged amount of the
wastewater is for 4.9m3 / d among which the discharging amount of the wastewater
from the experiment and the inspecting and testing operation is for 4.3m3 / d and the
discharging amount of the living waste water is for 0.6m3 / d.
The discharging concentration of the various kinds of the pollutants in the domestic
living sewage wastewater is COD250mg / L, BOD200mg / L and SS200mg / L. The
water quality can meet the requirement of the standard of Class III in 《Integrated
Wastewater Discharge Standard》GB8978-1996 and the wastewater can directly be
discharged into the urban drainage network, after the domestic living sewage
wastewater has been treated in the wastewater treatment factory of Songyuan City
before it is discharged. The pollutants in the experiment wastewaters that are produced
from the laboratory tests, the inspection of the experimental processes of the laboratory
building are mainly the acid and lead, the heavy metals and the various chemical
reagents as well as the various additives. Although the discharging amount of the
laboratory wastewater is small, the elements in them are very complicated. By analogy
investigation, the discharging concentration in the experimental pollutants in the
discharged wastewater is about COD600mg / L, BOD5400mg / L, SS210mg / L, and
the heavy metals of the varying degrees are contained inside the wastewater. If we do
not treat the wastewater and directly discharge it, the wastewater must produce the
negative impact to the surface water bodies so that the wastewater can be discharged
into the urban drainage network only after the wastewater has to be treated and be got it to
arrive at the discharging standard. In the rebuilding process of the project, the
production wastewater must be separated from the domestic sewage wastewater. After
the wastewater has been treated by the use of the wastewater treatment facilities and has
arrived at the standard, the wastewater can be discharged into the urban wastewater
-
Environment Management Plan
-18-
drainage network. The wastewater discharge through Sewage Treatment Works of
Songyuan City has the small impact to the water environment.
(3)Noise
The noise generated by the project mainly comes from the noises of the multi-laboratory
oscillator, the air-conditioning, the ventilation devices in the laboratory such as the fan
noise. The noise source strength is about 75-90dB in between, the measures of which
the sound insulation room should be built and the sound insulation window should be
installed inside the laboratory. When the equipment and devices are installed, the
measures of the damping pad should be increased so that the noise within the factory
boundary district is got to meet the requirement of the standard of Class I.
Therefore, after the this project has been completed, the impact to the surrounding noise
environment quality is less..
(4)Solid Pollutants
After the this project has been completed,the main solid pollutants are the living
garbage and the solid pollutants from the laboratory.
① Waste Samples of Agricultural(Domestic Animal and Aquatic)Products
This part of the solid pollutants include the post-experimental agricultural products,
mainly including the vegetables, the fruits, the grains, the livestock products, the aquatic
products, such as the testing samples. Their generated amount is about 1.7t / a. These
pollutants can be sent to the trash collection site and are sent to the waste disposal
plants.
②Laboratory Equipment Apparatus (one-time), Experimental-generated Liquid
Waste
The Experiment drugs and the reagents that are generally used to buy the basic
end-of-life samples are not expired. After the completion of this project, the equipment,
the apparatus, the consumables (paper, etc.) and the damage apparatus (glass) products
that are used in the experimental laboratory are the one-time ones, whose produced
amount is about 15.4kg / a. The experiment generated waste liquid is about 7.4kg / a.
Those wastes are the hazardous wastes (HW49 other wastes). They should be sent to
Nantian Hazardous Waste Company Limited of Changchun City to be uniform-treated.
-
Environment Management Plan
-19-
③Waste Materials by High-performance Replacement Air Filter from or Spent
Activated Carbon
In order to ensure the efficient air filtration efficiency of the high efficient filters, the filters are
generally needed to be replaced per 6 months. The generated amount of the waste filtered materials
or the spent filter media or the waste activated carbon panels are about 0.4t / a. The replaced waste
filtered materials or the spent activated carbon filter or the board should be sent to Nantian
Hazardous Waste Company Limited of Changchun City to be uniform-treated or fired.
④Sewage Sludge Produced in Wastewater Treatment
The amount of the sewage sludge produced in the wastewater treatment is about
0.1t/a. The produced sewage sludge that contains the heavy metal hazardous waste should be
appropriately stored and should be sent to Nantian Hazardous Waste Company Limited
of Changchun City to be uniform-treated.
⑤Living Rubbish
If the living rubbish is counted according to 0.5kg/d per person, the produced amount
of the living rubbish is 8kg/d,2t/a.
According to the regulations of "State Table of Hazardous Wastes" (2008), the solid
waste generated by the project has the general solid waste and also the hazardous solid
waste. If they are not properly treated, they have the harmful impact on the surrounding
environment so that each of them should adopt the different approach according to their
different properties. The general solid waste and the hazardous waste may not be mixed
and treated. As long as the reasonable treatment approach is adopted, it can be
effectively avoided to prevent the improper treatment of hazardous waste from
generating the secondary pollution.
2.3 Environment Impact and Mitigation Measures
This project construction will implement the Decree No. 253 of the State Council
People's Republic of China (1998)《Construction Project Environmental Protection
Management Regulations》so as to ensure that the project environmental protection
facilities and the main project are designed at the same time, the construction is
constructed at the same time and the project is operated at the same time.
-
Environment Management Plan
-20-
2.3.1 Environment Impact and Mitigation Measures during Planning
and Designing Phase
In the project selection and design stage, a comprehensive analysis of the potential
impact of the various factors should be made and the farthest environmental impact
mitigation measures should be taken into the account in the project design. The
environment impact mitigation measures are adopted in the engineering design phase
and the specific implementation of the mitigation measures has been summarized in
Table 2.3-1.
-
Environment Management Plan
-21-
Table 2.3-1 Environment Impact and Mitigation Measures during Planning and
Design Phase
Impact Management / Mitigation Measures
Fees ( Ten Thousand Yuan)
1. Wastewater
1.1 The sewage of the water drainage system is cleaned up and flow separated in the planning and design. The independent pipelines for the living water and the production wastewater are designed and located. 1.2 An experimental wastewater treatment station is designed. After the laboratory wastewater has been treated , the discharging concentration of the conventional pollutants should meet the standard of Class III in 《 Integrated Wastewater Discharge Standard 》 GB8978-1996 . The discharging concentration of the heavy metal executes the highest permitted discharging standard of the 1st sort of the pollutant in 《Integrated Wastewater Discharge Standard》GB8978-1996.
26.5
2. Exhaust Fume
2.1 Exhaust Fume of Laboratory: The ventilation system is designed according to the relevant requirement in 《 Bio-safety Laboratory Construction Technical Specifications》GB50346-2004. After the exhaust fume in the laboratory has high efficiently been filtered and has been treated by the activated carbon filter, the discharged exhaust fume should meet the regulation in《Integrated Discharging Standard of Exhaust Fume Pollutants》 GB 16297-1996 . 2.2 The mechanical exhaust ventilation systems are designed and installed in the corridors, the stairways, the bathrooms and the other places. The mechanical exhaust ventilation systems are designed and installed in the part laboratories and the inspecting and testing rooms so that the grime air can be removed any time. The indoor ventilation problems in the conditions of which there is no experiment and no inspecting and testing operations can be solved. 2.2 The heat provision continues to rely on the central heating.
He
-
Environment Management Plan
-22-
3. Noise 3.1 The low-noise equipment is designed and selected. The vibration-decreasing measures of the equipment foundations have been treated. The high-noise fans, the pumps and the other devices are installed in a separate equipment room and closed. 3.2 The window is designed as the double layer sound insulating window. 3.3 The air supply and exhaust fan should be installed inside the rooms. If they are really needed to be installed in the roof, the simple sound insulating board room should be built so as to reduce the environmental noise impact on the surrounding sound.
3
Note: The environment protection investment should be included in the engineering
investment.
2.3.2 Environment Impact and Mitigation Measures during
Construction Period
The public bidding mode is used to select the construction. unit that has the certain
strength and capability. When the construction. unit and the contractor sign the
engineering construction contract, the environmental impact mitigation measures during
the construction period should be included in the project construction contract that is
promised and executed by the contractor. It is required that before the contractor and the
construction inspector and controller must accept the environmental protection and the
environmental management training. And the province project office and the city
project office shall dispatch the personnel or the environment experts are invited to the
construction site to regularly check and inspect the fulfilled condition of “Construction
of Implementation of Environmental Protection Requirements”. If the problem is found,
the problem should be corrected in time.
2.3.3 Environment Impact and Mitigation Measures during Operation
Period
The environment impact and mitigation measures during the operating period operating
period are seen in Table 2.3-2.
-
Environment Management Plan
-23-
Table 2.3-2 Construction of Implementation of Environmental Protection
Requirements
Sort Environment Impact Factor
Pollution Prevention and Cure Measures
Construction Period
Environment Air
( 1 ) The management is strengthened, the civilized construction is executed and the light construction materials are unloaded and loaded. The vehicles shall clean up the soil on the adhesion surface as much as possible before the vehicle is started. The vehicles that transport the lime, the aggregate, the cement and the ash dust and they are easily to produce the dust should be covered with the sheeting cloth. (2)The lime and the sand cannot be pile-placed in the other open-air as much as possible. If they cannot be placed in the Open dumps, they should be sprayed with the water so as to improve their surface moisture content, and also can play the effects of decreasing the dust. (3)When the wall body is removed, the watering should appropriately be performed so as to decrease the dust. (4)The soil to be thrown away should be transported to the low-lying disposal site designated by the municipal management department or should be transported to the reclaimed landfill site. When the soil is transported, the overloaded shipment is prohibited and the along loader can not sprinkle and down the soil from the vehicles. When the vehicle goes through the urban section of the city, the vehicle should go along the road that the specified traffic route designated by the municipal management department during the time section. (5)It is not allowed that the waste and garbage are fired at the construction site area at random. (6)The labor protection of the construction workers should well be done. The construction workers should put on the dust mask, etc.
Water Environment
The camp facilities are not arranged during the construction period. The workers use the existing indoor bathroom with the toilet. A small amount of the construction of wastewater is discharged into the sewer after the construction wastewater has been deposited.
Sound Environment
(1)Reasonable Arrangement of Construction Time The residential buildings are around the project area. And they are close to the residential areas. In order to
-
Environment Management Plan
-24-
reduce the construction noise of the impact of the sound environment on the residential areas, the scientific construction program should be developed. If it is avoided as much as possible to use a large number of the high-noise equipment at the same time, the construction time of the strong vibration equipment of the loud noise and the strong impact (such as the drilling impact, etc.) should be arranged during the day. And it is prohibited that the construction time of those equipment and devices are used in the night (22:00 - 6:00 the next day). ( 2 ) The requests on selecting the construction machinery and equipment whose noises should be very low should be put forward to the tender units. of the request for tender, options for equipment noise. (3)The publicity and education of the construction workers must be strengthened so as to reduce the man-made noise.
Solid Garbage
(1)The construction waste garbage should be classified and treated. The construction waste garbage that has the recycling value of the construction waste should be recycled by the special person in time. The construction waste garbage that has no recycling value of the construction waste should be transported and pile-placed to the designated locations that are designated by the municipal planning department according the requirement of the municipal planning department. (2)The living solid waste garbage that are produced by the construction should be collected and placed in the recycling garbage bins for collecting the garbage. The living garbage should be unify-sent to garbage landfill sanitary waste disposal site by the sanitation department of Songyuan City.
2.3.3. Environment Impact and Mitigation Measures during Operating
Period
2.3.3.1 Mitigation Measures of Environment Air Impact
The working property of the laboratory does not only have the indoor temperature
requirement nut also have the high humidity requirement as well as the different
requirement and the standards of the cleanliness. In order to ensure the experiment, the
inspection work has the requirement of the indoor temperature, the humidity and the air
-
Environment Management Plan
-25-
cleanliness. The rebuilding project will install the exhaust devices and the
high-efficiency filter according to the corresponding requirements in 《Construction Technical
Specifications of Bio-safety Laboratory》GB50346-2004.
(1)Optimal Operation Principle of Ventilation and Exhaust System
1)Because the gases and the particles that are harmful to the human body are produced in
the process of the chemical experiments are done in the laboratory, the gases and the
particles that are harmful to the human body must effectively removed in a timely
manner for the protection of health while the laboratory should be needed to ensure a
certain degree of the negative pressure.
2)The air flow is well organized in the laboratory. The air flow speed of the sending wind and
returning wind as well as the turbulence intensity can be controlled within the smaller
scope. The ventilation rate in the laboratory can effectively be controlled. The air in the
laboratory should fully be replaced so as to ensure the freshness of the air in the
laboratory.
(2)Laboratory Ventilation and Exhaust System
Powerful Exhaust System: It is required that the experiments that will directly
produce
the poisonous and harmful gases must be done in the ventilation cabinet in the
laboratory. The strengthen ventilation cabinet should be installed in the laboratory
and
inspecting and testing room where the experiments in which the poisonous and
harmful
gases are directly produced are done. The strong and negative pressure is collected
in
the experiment and the exhaust gas is produced in the inspecting process. The
exhaust
gas is discharged to the outdoor after the exhaust gas has been treated by the
high-performance air filter (activated carbon filters). The filter efficiency of the
high-performance air filter (HEPA) can not be less than B (the efficiency is not less
than
-
Environment Management Plan
-26-
99.97%).
Ventilation system: The mechanical exhaust fume ventilation systems are installed
in
the corridors, the stairways, the bathrooms and the other places so that the dirty
air can
effectively exhausted at any time. The mechanical exhaust fume ventilation systems
are
installed in some laboratories and the inspecting and testing rooms so that the
indoor
ventilation problems are solved in the conditions of which there are no
experiments and
no inspection operations.
(2)Height of Exhaust Pipe
The height of the exhaust pipe of each of the exhaust system should be 3m higher
than
the height of the roof.
(3)Risk prevention measures
If the air purification systems have the failures or the positive pressure happens in the
polluted region, the alarm will immediately start and the experimental work should be
stopped at the same time as well as the emergency accident program is started at the
same time.
The strict security responsibility system should be established in the laboratory..
2.3.3.2 Mitigation Measures of Water Environmental Impact
The pollution of the drainage system should be cleaned and the flow should be
separated. The independent domestic sewage and production wastewater pipelines
should separately be located. The discharging amount of the living wastewater is
smaller. The concentration COD in the wastewater is about 250mg / L, BOD5150mg / L
so that the discharging concentration can meet the requirement of the standard of Class
III in 《Integrated Wastewater Discharge Standard》GB8978-1996. Therefore, the living
wastewater cannot be treated and directly discharge into the drainage network.
-
Environment Management Plan
-27-
Although the wastewater produced in the laboratory is small, it is complicated. The
wastewater contains the acids, the alkali and the small amount of the organic matter in
particular, especially the heavy metals as well as the harmful. Only after the wastewater
has been treated and arrived at the standard of Class III in 《Integrated Wastewater
Discharge Standard》GB8978-1996 .
(1)Designed Wastewater Production Amount and Water Quality at Sewage
Treatment Station
The wastewater production amount of the inspecting experiment of the project is about 4.3m3/d. It is suggested that the wastewater treatment station whose designed and treatment capability of 5m3/d should be built. It is considered that the wastewater treatment station may arise the discharge incidents so that it is proposed to build an incident storage tank of 10m3. (2)Production Wastewater Treatment Program
According to the water quality of the wastewater and the flow quantity as well as the
discharging requirements, it is recommended according to the combined researchable
solution that the study of this environment evaluation performs the analysis of the
comparison of the technology economics and the operation efficiency in the following
kinds of the sewage treatment programs.
Scheme I: Biochemical Method (H / O)
The biochemical method is a widely used biological wastewater treatment method
which is suitable for treating the high concentrations of the organic wastewater. The
covering area of the project is small. The operation of the wastewater treatment is stable
and easy. The impact resistance capacity is strong.
Figure 2.3-1 Technologic flow Chart:
-
Environment Management Plan
-28-
Scheme II: Complete Integration Small-Scale Sewage Treatment Equipment
Laboratory
The discharging volume of the wastewater of the project is smaller. The contractor can
directly purchase the complete sets of the equipment to treat the wastewater. At present,
there are many wastewater treatment manufacturers produce "The Laboratory
Wastewater-treating machines of the family domestic sewage treatment". The series
machines have mainly adopted the technologies like the coagulation -sedimentation, the
activated carbon catalyst-ozone oxidation and the biological activated carbon adsorption.
These wastewater-treating machines have the properties like occupying the small area,
the high automation degree, the good treating effect and the lower operating costs as
well as can basically realize the operation no person on duty. The wastewater-treating
machines have got the Appraisal Certificate (Guangdong Kejianzi [2005] No. 287) of
Science and Technology Achievement issued by Guangdong Science and Technology
Department and have passed through the inspection testing authorities of the authority
organ, Guangzhou Chemical Research Institute of Chinese Academy of Sciences. The
treatment effect can fully meet the requirement of the corresponding discharging
standard of the state. These wastewater treatment machines have practically been
installed and used in Guangzhou University, Guangzhou Medical College, Chongqing
Sludge
Wastewater
Production
Wastewater
Grid
Adjusting
Tank
Primary
Sedimen
-tation
Tank
Filtered Cake
Out-transport
O Tank
Press
Filter
Water
Disinfec
tion Tank
Regulation
Pre-aeration
Tank
Sludge
Storage
Tank
Sludge
Thicken
ing Tank
H Tank
Secondary
Sedimentation Tank
Sludge
Return
Fig. 2.3-1 Biochemical Sewage Treatment Flow Chart 生化法污水处理流程图
-
Environment Management Plan
-29-
Environmental Monitoring Center, Chung Shan Institute for Drug Control, Yuexiu CDC
and other units and have achieved the good effect results.
1) Technologic Flow Chart and Operation Principles
All wastewaters first flow into the adjusting tank through the collection system to carry
out the regulation of the water quality and quantity. Then the wastewater is uniformed
by the water pump and is pumped into the wastewater constant treating reflection tank.
The wastewater is undergone the pH control in this machine. The accurate dosing
metering pump adds a certain volume of NaOH aqueous solution at the same time and
adjusts the pH value between 8 to 9 as well as adds coagulant flocculant PAC and PAM
at the same time.
In the alkaline conditions, the acid in the wastewater is neutralized. The heavy metal
ions like the iron, the cadmium, the copper, the manganese, the nickel and the lead
generate the chemical reaction with OH so as to generate the OH_ hydroxide
sedimentation. At the same time, in the effect of the cohesion and flocculation of PAC
and PAM, the sediment response generates the mutual condensation. The suspended
particles existed in the wastewater and some parts of the inorganic and organic
substances are adsorbed and form the alum floc formation of the large flowers. The wastewater flows into the sedimentation tank through the inclined pipe by its own. The alum floc is naturally subsided in the dependent on the gravity so that the purpose of removing the suspended solids in wastewater, the heavy metal ions and the part of the organic matter is achieved. The sludge in the sludge denounce should regularly be cleaned and sent to the by the relevant departments to do the burning, the landfill or the other treatment. The water from the sedimentation tank is pumped by the water pump into the pool of the activated carbon ozone. The wastewater is evenly arranged due to the resistance to the role of the filler from the slow down infiltration. At the same time, the air is used as the raw material, the ozone made by the ozone generator via the ozone cloth oxidation pond system is made of the penetration of the activated carbon filling materials from the penetration at the bottom up to the oxidation tank or is absorbed into the water via the Venturi Jet Device in the form of the negative pressure. In the process of which the gas-liquid two-phase full contact, the organic matters like the bacteria, the color, the smell and so on in the waste water are partly removed through the physical and chemical actions of the adsorption, the retention, the touch rush and the tape of the big pore canal structure and the activated carbon of the specific surface area. The other part of the wastewater is removed by the ozone that
-
Environment Management Plan
-30-
has the strong oxidation capability and the good bacterium sterilization capability, the
purity decolor and the capability of the degradation and organic compounds in the effect
of catalysis of the activated carbon.
Finally, the biological wastewater flows into the activated carbon filter tank. The thin
small suspended solids which have not been removed, the minim metals and a very
small amount of the organic matter and so on are removed by the ozone that has the
strong oxidation capability and the good bacterium sterilization capability, the purity
decolor and the capability of the degradation and organic compounds in the effect of
catalysis of the activated carbon. The other part of the wastewater is degraded and
removed by the ozone in the microbial membrane that is accreted on the activated
carbon, the good oxygen and the facultative bacteria and the activated carbon adsorption
retention. The wastewater is inter-luded, alternated and cycled in the process of the
biodegradation desorption. The wastewater can be discharged at present.
The entire wastewater treatment process is automatically programmed and controlled
through PLC programming. The float ball liquid level controller, the low liquid level
automatic stopping pump and the high liquid level automatic starter are installed in the
adjusting tank. The liquid level meter has been installed in the medicine adding box.
When the medicine is lacked, the box can automatically alarm and the operation is
stopped. The complete device can basically realize the operation no person on duty.
Wastewater Treatment Technologic Flow Chart
2)Product Property:
-
Environment Management Plan
-31-
★ The treatment technologies like the coagulation-sedimentation, the chemical oxidation,
the membrane separation, the activated carbon catalyst-ozone oxidation, the
biological activated carbon adsorption treatment are adopted to treat the various
types of the wastewater pollutants
★ The real-time monitoring operation of the micro-computer program is used to control
the water quality change of the wastewater and the treatment flow chart so as to
achieve all-weather fully automated operation, no person on duty;
★ The PH meter, the ORP meter and the imported accurate metering pump are used to
control the medicine adding dosage and a liquid level control is designed. When the
medicine is lacked, the meters can automatically alarm and the sludge automatic
discharge devices have been installed.
★ The advanced jet Venturi Jet Device Oxygenator is used. The air-water contact is
full. The reaction is complete.
★ The operation is easy and stable. The operation service life is very long and the
operation and maintenance costs are very low.
★ The equipment and devices occupy the small foundation areas and they can be installed
placed in indoors or outdoors according to the different situations.
★The equipment and devices can be designed and made according to the different
requirements of the user.
3)Applicable Scope:
The equipment and devices are widely used in the tertiary institutions, the research
institutes, the inspecting testing agencies, the chemical experiment in the laboratory and
the integrated treatment of the wastewater.
4)Main Technical Specifications:
Table 2.3-3 Main Technical Specification Table
Items Technical Specifications
Flow Amount (m3/d) 5
Removing
Rate
Heavy Metal ( total lead, total
manganese, total zinc, total mercury, total ≥96
-
Environment Management Plan
-32-
(%) arsenic)
Chemical demand oxygen amount ≥93
Tri-chloromethane ≥93
Toluene ≥93
Phenol ≥93
Organophosphorus pesticide ≥90
Disinfection efficiency (%) ≥91
The number of the fecal coliform (mpn/L) ≤220
The total number of bacteria (cfu/L) ≤7500
Noise (dB) ≤65
Price RMB200,000.00 YUAN
According to the program selection, the evaluation considers that wastewater discharge
of the laboratory is the intermittent discharge. The water quality of the discharge
wastewater is different because of the different monitoring the content of the
wastewater. The biochemical method (Program I ) is not suitable for the treatment of the
wastewater. In the same conditions of the wastewater amount and the wastewater
quality, the treatment effect of the wastewater treatment of Program II is very stable,
The impact resistance capacity is better so that the second treatment program is widely
used to treat the wastewater in the wastewater treatment complete equipment in the
special laboratory. Program II is recommended. The total investment for the sewage
treatment facilities is for RMB200,000.00 YUAN (treatment capacity 5m3 / d) and the
operating costs are for RMB1;00 YUAN / ton of the wastewater.
2.3.3.3 Sound Environment Impact and Mitigation Measures
(1)When the project is designed, the low noise equipment is adopted.
(2)The equipment of the loud noise will be installed alone in the sound insulation room
and the acoustic insulation windows are installed.
(3)The foundations for installing the equipments should adopt the vibration reducing
treatment.
The noise that has been harnessed can achieve the standard of Class I in 《Industrial
-
Environment Management Plan
-33-
Enterprise Boundary Noise Standard》GB12348-2008
2.3.3.4. Solid Waste Environmental Impact Mitigation Measures
The solid waste generated by the project is divided into the general solid waste and the
hazardous waste. They should be treated according to their separate categories.
(1)Treatment of General Solid Waste
After the general solid waste that has been produced during doing the experiments of
the farming (livestock, poultry, aquatic) product samples and the other living garbage
have been collected together, the sanitation department will send them to the city
garbage treatment plant for the sanitary landfill garbage.
(2)Hazardous Waste Treatment
The laboratory equipment apparatus (one-time-use), the culture medium liquid, the trial expired drugs or the reagents, and the wastes and sludge that contain the heavy metals that are produced from the sewage treatment factory, the heavy metals, the activated carbon waste, the animal waste, the feed residues, the hazardous waste and the hazardous wastes and the spent activated carbon should be separated and collected. And they should be regularly sent to Nantian Hazardous Waste Treatment Center Company Limited of Changchun City to be treated. In the course of the transportation of the waste, the corresponding personnel should strictly follow the regulation of "the transfer of the hazardous wastes and the single management approach." The different treating method for the solid waste in different ways is seen in Table 2.3-4.
Table 2.3-4 Solid Waste Producing Amount and Treating Program
Name of solid waste
Waste type
Industry source and waste code
Packaging and storage
method Treatment plan
1 Agricultural produce etc. testing sample
General solid waste
Original package
Be sent to original unit or environment and health department recycle it and sent it to city garbage landfill for sanitary landfilling
2 One-time experiment facilities, consumables and damaged devices
HW49 dangerous
waste
Non-specific
industry
900-047-49
wastes
Sealed container
According to “List of Dangerous Wastes of China” (year 2008), the wastes produced in lab belong to dangerous waste, and after being
-
Environment Management Plan
-34-
3 Waste liquid, waste culture solution produced in experiment
produced in
chemical
and
biological
lab
Contained in 10kg glass bottle, be sent for every half year of one year
sealed and packed, send it to Changhcun Lantian Dangerous Waste Treatment Center Co., Ltd. for burning treatment
4 Waste filter material and active carbon replaced in high efficient filter
Replace filtering board for every 3-6 months
5 Dirt in waste water treatment station
After being filtered and sterilized, transport it through sealed tank car
6 Life garbage Genera
l solid waste
Stored at the designated dust bin
Environment and health department recycle it and sent it to city garbage landfill for sanitary landfilling
Nantian Hazardous Waste Treatment Center Co., Ltd. is located in Weizigou rura
village, Yingjun Countryside, Errdao District, Changchun City. This Waste Treatment
Center Co., Ltd. Is the special enterprise that has been authorized by Jilin Province
Development and Reform Commission and the Environmental Protection Agency
approval of Jilin Province. The Waste Treatment Center Co., Ltd. is the first specialized
fixed-point destruction enterprise in Jilin Province that has been built according to the
national relative standards and performs the operation of treating the hazardous wastes,
mainly engaged in the industrial solid waste (including the hazardous waste, the
chemical \ industrial waste \ abandoned hazardous chemicals \ fake and shoddy products
designated by the government expired food and drug disposition) the collection, the
transportation, the storage, the disposal and the comprehensive utilization of the
-
Environment Management Plan
-35-
business. The Waste Treatment Center Co., Ltd. can treat 6,000 tons of the hazardous
wastes per year. The enterprise has obtained the management qualification certificate of
the hazardous wastes and business qualifications that has been issued by Jilin Province
Environmental Protection Bureau. The construction unit has signed the agreement on
the treatment of the hazardous wastes with Nantian Hazardous Wastes and Treatment
Center Co., Ltd. and consigns Nantian Hazardous Wastes and Treatment Center Co.,
Ltd to treat the hazardous waste that is discharged by the project.
2.3.3.5. Risk Prevention Measures and Contingency Plans
The safety is the direct purpose for building the laboratory. All the designed
constructions that are not be propitious to safety and the security should be banned. All
the designed parameters that have the conflicts to the biological safety should be subject
to the security requirements. For example: the purification requirements should be
subject to the security. The ease use is subject to the safety. The saving is subject to the
human safety.
(1)Laboratory design and construction should meet the basic requirements of
BSL-1 laboratory
1)The hand-washing pool should be set up near the exit of each laboratory. The water
valve should be the automatic induction one, a long handle or pedal-style as well as the
disinfectant soap is prepared for so as to wash their hands.
2)The equipment and facilities for disinfecting the air and surfaces should be set up
inside the laboratory.
(2)The contingency plans for the environmental pollution should be developed in the
laboratory and should be reported to be recorded in the county-level people's
government administrative departments of the environmental protection. The
contingency plans for the environmental pollution should regularly trained.
(3)When the leak happens in the laboratory or causes the proliferation or causes the
serious environmental pollution, the emergency measures should immediately be taken.
The notification may be against the units and residents, and report to the local
environmental protection administrative departments of people's governments and the
relevant departments and finally the corresponding personnel should accept the
-
Environment Management Plan
-36-
investigation and handled.
(4)The accident prevention measures and the contingency plans should be developed
for the laboratories where the hazardous wastes may be generated according to the
regulations and the national requirements to the combat pollution of the environment.
The accident prevention measures and the contingency plans should be reported to the
local people's governments at or above the county administrative departments for the
environmental protection record.
This laboratory must not be engage in deliver the ill microorganism experiment
campaign of the high venereal disease.
III. Actualizing Organization
3.1 Environment Management Organization
3.1.1 Environmental Management Organization Structure
The constructional figures of the environmental administration during the construction
period and the operating period of the project are seen in Fig.3.1 1 and Fig.3.1 - 2.
-
Environment Management Plan
-37-
High Layer
Environmental
Supervisor Organ
OOrganorganization
Jilin Province
Environmental
Protection Bureau
Songyuan City Quality Safety Inspection Agricultural Products Synthesizes Center
Songyuan City Environment
Protection Bureau
World Bank Jilin
Province Project Office
World Bank
Environmental
Department
Environment
Affects
Appraisement Uni
Jilin Province Songyuan City Agricultural Committee
Environment Supervision Unit
Project Design Unit
Project
Supoerior unit
Local Environmental
Supervisor
Organization
Environmental
Protection
Responsibility
Unit during
Construction
Period
Project Contractor
Fig. 3.1-1 Environmental Management Organ Figure during Construction Period
-
Environment Management Plan
-38-
3.1.2. Responsibility of Environment Management Organization
According to the prokect property, the implement of the environmental protection does
not onlu accept the supervisory mangements of Jilin Province Environment Protection
Department and Songyuan City Environment Protection Bureau but also accepts the
supervisory mangement of the relative departments of World Bank. During the
construction perion, the environment supervisory personnel should be arranged to assist
the construction party to perform the site inspection. The responsibilties of the related
environmental administration are described as the followings::
World Bank environmental protrction department: According to the requirement of
the related environmental protection of world bank, the environmental protrction
department is responsible for the superintendency of the whole course project and puts
forward the requirement for the environmental protection of the project .
Jilin province environmental protection department: According to the requirement
EnvironmentManagement Contents during Operation Period
Local Environment
Supervisor
Organization
High Layer
Environmental
Supervisor Organ
Jilin Province
Environmental
Protection Bureau
Songyuan City Quality Safety Inspection Agricultural Products Synthesizes Center
Songyuan City Environment
Protection Bureau
World Bank Jilin Province Project Office
World Bank
Environmental
Department
Jilin Province Songyuan City Agricultural Committee
Environment Supervision Unit
Environmental
Protection
Responsibility
Unit during
Operation
Period Charging Environment Protection Director
Fig. 3.1-2 Environment Management Organ Figure during Operation Period
Part-time Job Environment Protection Person
Daily Environment Management
管理 Pollution Administer
facility operation
-
Environment Management Plan
-39-
of the domestic related legal regulations, Jilin province environmental protection
department takes the responsibility for the superintendency of the whole course of
the project , puts forward the requirement for the environmental protection of the
project. At the same time, Jilin province environmental protection department takes
the responsibility for the check and accept of the project complete during the period of
the "3 Same Time", inspects the implement of the environmental management plan,
looks through the environmental inspection plan and the environmental inspection and
testing report. .
Jilin Province World Bank Loan Project Leading Group Office ( Province Project
Office ): The Province Project Office assists the World Bnk environmental department
to perform the environment supervision of the project.
Songyuan City Environmental Protection Buerau: According to the requirements to
the project of the World Bank environmental protection department and the province
environmental protection department, Songyuan City Environmental Protection Buerau
performs the environment supervision of the whole course of the project, the supervise
inspection for the pollutive prevention and cure condition of the useless water, the waste
gas, the noise and the dangerous trash in the laboratory. When the illegal behavior is
found, Songyuan City Environmental Protection Buerau will order the corresponding
personnel to rectify and reform the illegal behavior within the limited time. The
inspection condition and the handling result should be recorded. After the inspection
person has signed the report, the report is filed and is fed back to the inspected unit.
Songyuan City Agricultural Committee: Songyuan City Agricultural Committee
performs the unify programming of the project, arranges the coordinative project
pre-construction and the project implement as well as the supervise management, the
construction period and the operation period, superintends the environment project, the
supervisor facility of the environmental protection of the project construction condition
at "3 Same Time " so as to guarantee the project to go on smoothly.
Songyuan City Quality Safety Inspection Agricultural Products Synthesizes Center:
Songyuan City Quality Safety Inspection Agricultural Products Synthesizes Center
ensures the environment management department to carry out the implement of the
-
Environment Management Plan
-40-
related environmental management measure of World Bank.At the same time, it will
assist the environmental management department to carry out daily superintendency.
Environmental Supervision Department: The environmental supervision department
assists the construction party to take the responsibility for the measures of the
environmental protection of the construction scene to implement the condition
supervision, at the same time, helps the environmental management department to carry
out the daily environment supervision.
The major responsibility of t he environmental supervision engineer is the following:
( 1) To ensure the permission and requirement of all the projects are permited and the
environmental management plan to get the implement before the project is executed.
( 2) To verify that the construction unit and all operation workers of the project
operation unit to agree to implement the measures of the environmental protection
according to contract.
( 3) To perform the intercommunication with construction personnel. The purpose is to
help the explaination of the environmental requirement on-the-spot; to remedy the
measures so as to offer the suggestions, to provide the project that is inconsistent with
project original intention with the remedy measures. The engineer should issue the
especially formal guide to the construction unit and the operation unit.according to the
requirement.
( 4) To execute the intercommunication with the construction unit, the operation unit
and the consulting person. The purpose is to enhance the intercommunication between
them so as to obtain some other viewpoints about the special problem. And the purpose
is to solve some problems that are met in the course so that the problems can be
responded fast to the building management engineer with this solution that is helpful for
problem; If the project has the sensitive goal and the latent infringement or the project
has some unforeseen problems.
( 5) To supervise the implement of the environment monitoring plan during the
construction period and supervise the project construction condition of the envirionment
facilities at the "3 Same Time" as well as to ensure the complete time limit off the
project eventually and to ensure that the environmental protection can smoothly pass
-
Environment Management Plan
-41-
through the check and accept .
Environmental Protection Person: The person implements and carries out the rules
and laws of the environmental protection and the standard, masteries the reference
environment condition of the inspecting and testing center; makes the statistics of
analysis of the contaminant diuscharging condition; organizes and prepares for the
annual plan and the program of the environmental protection of the whole project site as
well as organizes the enforcement of them. He takes the responsibility for the
environment management of the whole project site, the propagative educational of the
environment knowledge and the new technology of the knowledge of environmental
protection and the environmental management of the whole project site; inspects the
facility operation condition of the environmental protection regularly, discovers and
solves the problem in time; masteries the operation condition of the unit facility of
environmental protection; establishes the pollutive source files and the facility operation
files of the environmental protection; carries out the statistics of the environmental
protection; establishes and retains the experiment files, the experiment files should
record truthfully the experiment campaign and the facility, the equipment working state
condition, as well as the useless water that is produced during the experiment campaign ,
waste gas and dangerous trash and the harmless handling condition, centralizes the
disposal and the inspection; According to the requirement of the superviser department
of the environmental protection, he prepares the inspection plan of the environmental
protection and organizes the coordination in order to complete the inspection task. He
coordinates to treat the relevant contamination accident and the pollutive dispute,
supervises the alternation of the inspection and expandes recently the system conducted
condition of project at "3 Same Time" and participates in the complete check and
accept work of the project and the facility of the environmental protection.
3.2 Environmental Inspection Organization and Responsibility
According to the property of this project, the construction unit does not set up the
environmental inspection organization. Songyuan City environmental inspection
statiom can be entrusted to go on the environmental inspection work..
Songyuan City quality safety inspection and testing comprehensive center and the
-
Environment Management Plan
-42-
environmental supervision engineer of the agricultural products are responsible for the
construction scene work of th