Enviro Engineering

download Enviro Engineering

of 28

  • date post

    18-Jul-2016
  • Category

    Documents

  • view

    4
  • download

    0

Embed Size (px)

description

enviro

Transcript of Enviro Engineering

  • Telecom., Control Systems & Environmental engineering

  • 2Kenya: HPPs automation and remote systems

    CORE Palermo

    CORE Glasgow

    USA: CORE Portland

    Tunisia: Distribution delegate dispatch

    Spain: META projects

    SpainMETA ProjectSTAR ProjectCORE ToledoPRODITEL

    SCADA Kenia

    Smart Grids Qatar

    CORE Spain, USA, UK, Italy - Renewables

    Iberdrola WF Telecommunications: Spain,

    Europe, Mexico, USA, UK

    STAR project (IBD Spain) & Smart Grids Qatar

    Algeria: BCC Constantine

    BCC Constantin

    SCADA Distribution -Arequipa

    SCADA Distribution SEAL- Peru

    Iberdrola: Fiber Optics and Telecom Solutions

    Telecommunications, Control Systems & Environmental engineering

    Environmental engineering:Spain, UK, Peru and more

  • 3Control & RegulationTelecontrolTelecommunications and Smart grid

    Telecommunication solutions for operation of

    electrical installations Definition &

    implementation of pilot projects

    Feasibility studies: technical analysis

    and CBA (cost-benefit analysis)

    Renewable energy control center

    Control & protection systems of

    hydropower plants

    Dam emergency plans

    Telecommunications network deployment

    Generation delegate dispatch

    SCADA Systems

    Hardware/Software Development

    Solutions

    Types of projects:Engineering studies, EPC, EPCM

    High technical knowledge and capabilities required to fully develop the projects. Continuous training and innovation.

    Telecom. & Control Systems: Capacities

    Telecom Solutions for other industries: Transportation, etc.

    Electrical market access systems

    Speed and voltage regulators

    Ability to work with major manufacturers of PLCs, regulators, relays system, etc.

    Definition & implementation of roll-out projects

    I+D+I projects

  • 4Telecom. & Control Systems: ReferencesProject Country Customer Description Scope Start-up

    Qatar Smart Grid Qatar Kahramaa Smart grids Feasibility study & CBA 2015

    Control & Telecom. Centre Algeria Sonelgaz

    Upgrading of the electrical grid in the region of Constantine EPC 2013

    CORE UK UK Scottish Power Renewables Renewable energy control center EPCM 2011High Speed Train Vigo-La Corua Spain ADIF

    Energy remote control and telecommunication EPC Since 2010

    CORE USA USA Iberdrola Renewables Renewable Energy Control Centre EPCM 2010SCADA systemHPPs Kenya Kengen

    Upgrading of the control system of the main HPs EPC 2010

    STAR Project Spain Iberdrola Distribution Smart grids EPCM Since 2010Metro lines: L1, L5 y L11 Spain MINTRA Madrid Metro telecommunications EPC 2007

    Delegate Dispatch Spain Iberelica Wind farm delegate dispatch EPC 2008

    AVR Aguayo HPP Spain EON Voltage regulators replacement EPC 2009National Distribution Centre Tunisia STEG

    Upgrading of the National Distribution Grid EPC 2005

    Voltage & speed regulators Spain

    Iberdrola Generation

    Replacing voltage and speed regulators EPC Since 2003

    CORE Toledo - SCADA system Spain

    Iberdrola Renewables Renewable Energy Control Centre EPCM 2003

    Meta Project Spain Iberdrola GenerationAutomation and Control of

    58 HPs EPCM 2002

    Telecommunications Spain Iberdrola Development of Iberdrola Spain's communications network EPC/EPCM Since 1995

    EPC = Engineering Procurement and ConstructionEPCM = Engineering Procurement and Construction ManagementSCADA = Supervisory Control And Data Acquisition

    HPs = Hydroelectric plantsCMDS = Monitoring, diagnosis and simulation centreCBA = cost-benefit analysis

  • 5CORE Control centre for renewable energies The largest SCADA application in the World (of renewable energies)

    BASIC DATA

    Location: Toledo (Spain)Client: Iberdrola

    Start Date: 2002

    Commercial Operation 2003

    MAIN TECHNICAL CHARACTERISTICSOn-line system designed to gather, monitor and archive all wind-farm information and hasspecific features for operation, analysis and maintenance of Wind Farms.Functions: Centralized operation and control in real time Control applications for energy management Centralized communication Remote control services for third parties

    It was developed by Iberdrola Engineering and Construction in 2003 and is now installed in more than 150 wind farms with real-time supervision of more than 1,200,000 data

    5

  • 6NCC National Control Center IberdrolaThe largest integrated SCADA application in USA (of renewable energies)

    BASIC DATA

    Location: Portland y Phoenix (USA)Client: Iberdrola Renewables

    Start Date: 2009

    Commercial Operation 2010

    MAIN TECHNICAL CHARACTERISTICSOn-line system designed to gather, monitor and archive all wind-farm information and hasspecific features for operation, analysis and maintenance of wind farms, photovoltaic plantsand substations associated to Iberdrola Renewables in USAFunctions: Centralized operation and control in real time Control applications for energy management Centralized communication Remote control services for third parties

    It was developed by Iberdrola Engineering and Construction in 2010 and is now installed in more than 50 wind farms and photovoltaic plants with real-time supervision of more than 5,000,000 data,

    controlling more than 5.5 GW6

  • 7CORE UK Scottish Power Control Center

    BASIC DATA

    Location: Whitelee, y Cathcart (Scotland)

    Client: Scottish PowerRenewables

    Start Date: 2010Commercial Operation 2011

    MAIN TECHNICAL CHARACTERISTICSOn-line system designed to gather, monitor and archive all wind-farm information and hasspecific features for operation, analysis and maintenance of wind farms, and substationsFunctions: Centralized operation and control in real time Control applications for energy management Centralized communication

    It was developed by Iberdrola Engineering and Construction in 2010 and is now installed in more than 20 wind farms with real-time supervision of more than 250,000 data, controlling 0.8 GW

    The largest SCADA application in UK (of renewable energies)

    7

  • 8CORE Italy SER Control Center

    BASIC DATA

    Location: Palermo (Italy)Client: SER (Societa Energie

    Rinnovabili)Start Date: 2011

    Commercial Operation 2013

    MAIN TECHNICAL CHARACTERISTICSOn-line system designed to gather, monitor and archive all wind-farm information and hasspecific features for operation, analysis and maintenance of wind farms, and substationsFunctions: Centralized operation and control in real time Control applications for energy management Centralized communication Remote control services for third parties

    It was developed by Iberdrola Engineering and Construction in 2011 and is now installed in more than 20 wind farms with real-time supervision of more than 70,000 data, controlling 0.4 GW

    The largest SCADA application in Italy (of renewable energies)

    8

  • 9SCADA System Kenya

    BASIC DATA

    Location: Kenya

    Client: KenGen

    Start Date: 2007

    Commercial operation: 2009

    MAIN TECHNICAL CHARACTERISTICS

    Modernization of Control Systems of 6 Hydro Plants in Kenya, communication links and full functionalityControl Center.Features: Modernization of instrumentation and local controls. Complete telecommunication system (VSAT links, radio and fiber-optics) Supply of 6 local SCADA systems Supply of a full-functionality Control Center, complete with historical systems, video-wall, etc. Supply of software tools for water reserve management integrated in the Control Centre.

    Complex project in remote location. Iberdrola Engineering applied its wide experience in diverse fields (hydro plants upgrade, communications and control).

    9

  • 10

    Modernization of distribution network - Peru

    BASIC DATA

    Location: Arequipa (Peru)Client: Southern Western

    Electricity (SEAL)Start Date: 2004

    Commercial Operation: 2005

    MAIN TECHNICAL CHARACTERISTICSModernization of the electric distribution network of SEAL in the region of Arequipa, Peru, includingautomation of the network and telecommunications.Features: Adaptation of 11 Substations, with instalation of local RTUs. Communications of the 11 STs with the control center through radio UHF links. Telecontrol SCADA system and complete Control Center

    A project with actions in many sites accomplished in consortium with locals companies.

    10

  • 11

    Automatic Generation Control ApplicationsAGC (Automatic Generation Control) and Economic Office

    BASIC DATA

    Location: Cartagena (Spain),Bizkaia (Spain)Client: CC GDF CartagenaCC Bizkaia Energia

    Start Date: 2005, 2009

    Commercial operation 2005, 2009

    MAIN TECHNICAL CHARACTERISTICSAutomatic Generation Control System for CCGT plants.Features: AGC, IS (Interchange Scheduling) Direct Communication with the Spanish System Operator (REE)

    Highly dependable systems for Automatic Generation Control.

    11

  • 12

    Wind Control Center Acciona - CESA

    BASIC DATA

    Location: Santiago de Compostela (Spain)Client: CESA-Acciona

    Start Date: 2005Commercial operation: 2007

    MAIN TECHNICAL CHARACTERISTICSControl Center supervising 19 Wind Farms with their substations,Features: Adaptation of substations to remote control Deployment of satellite communications network between Control Center and plants Deployment of local communications gateways (UCCs) Full Control Center with SCADA systems, video wall and historical systems (ORACLE, PI)

    Complete turn-key project including adaptation of substations to remote control, communication equipment and all HW and SW of the Contr