ENTRY OF NTPC IN HYDRO-POWER SECTOR
Government of India formulated hydro policy in 1998which encourages more public & private participation
POWER SECTOR
which encourages more public & private participation.
NTPC, the leading thermal power giant of Asia hasresponded to the need of nation.p
NTPC entered in the field of hydro power in 1998.
The agreement of Koldam hydro electric power projecte ag ee e o o da yd o e ec c po e p ojecwith H.P. Govt. Was made in Feb.2000.
Subsequently Implementation agreement has beenSubsequently Implementation agreement has beensigned for
-Loharinag Pala HPP (600MW)2
-Loharinag Pala HPP (600MW)-Tapovan Vishnugad HPP (520 MW)-Rupsiabagar Khasiyabara HPP (261 MW)
ENTRY OF NTPC IN HYDRO-POWER SECTORPOWER SECTOR
A wholly owned subsidiary company, NTPCHydro Ltd (NHL) was formed for developingHydro Ltd (NHL) was formed for developingprojects having capacity upto 250 MW.
PROJECTS TAKEN UP BY NHL :
o LATA TAPOVAN UTTARAKHAND 171 MWo RAMMAM STAGE-III WEST BENGAL 120 MW
3
CURRENT HYDRO PROJECTSUNDER IMPLEMENTATION :
KOL DAM HIMACHAL PRADESH 800 MWTAPOVAN VISHNUGAD UTTARAKHAND 520 MWTAPOVAN VISHNUGAD UTTARAKHAND 520 MWLOHARI NAG PALA UTTARAKHAND 600 MWLATA TAPOVAN (NHL) UTTARAKHAND 171 MWRAMMAM Stage-III (NHL) WEST BENGAL 120 MW
Total 2211MWUNDER INVESTIGATION :
RUPSIBAGAR-KHASIYABARA UTTARAKHAND 261 MWRUPSIBAGAR KHASIYABARA UTTARAKHAND 261 MWTotal 261 MW
MoU SIGNED FOR DPR:
ETALIN ARUNACHAL 4000 MWATTUNLI ARUNACHAL 500 MW
Total 4500 MW
4GRAND TOTAL 8742MW
NTPC PLANS TO SETUP 9000MW BY 2017.
STRENGTH OF NTPC
P M t bilit t i l t j t
STRENGTH OF NTPC
Proven Management capability to implement projects ahead of scheduleEffective Project Cost Control systemj yNo constraints in arranging of Funds due to Financial soundnessDetailed and thorough Geological investigations toDetailed and thorough Geological investigations to minimize Geological risksBest practices of Quality, Safety, Environment & R&RP ti f d t ti t h iPromotion of modern construction techniques.Has a strong team of Engineering, Contracts, Construction, Erection, Commissioning, O&M.
5
g
6
Detailed investigation for DPR
Detailed investigations are carried out for DPR hi h i l d• Geological mapping
D illi
DPR which includes :
• Drilling• Drift• Geophysical studyGeophysical study• Geotechnical Investigation
-In Situ tests-Laboratory tests
• Geothermal investigation
7This will minimize Geological surprises.
Engineeringg g
• In house Engineering capability forti f DPR & d t il d d ipreparation of DPR & detailed design
• Latest design software are used for analysis& design& design.
• At construction stage, quick modifications tosuit site conditions.
• NTPC explores latest modern techniques,suitable for construction and adopts thesame.
• To avoid any delay construction drawing issubmitted one month in advance to
8
submitted one month in advance tocontractor.
Objective SpecificationsObjective Specifications
• FIDIC specifications are followed for civilFIDIC specifications are followed for civil works.
• For different geology encountered during• For different geology encountered during construction stage specifications have provision for resolution of variations andprovision for resolution of variations and extra item.T id d l l d f i f t t• To avoid delay land for infrastructurefacility for contractor are identified.
9
Award of contracts
Following steps are taken for selection ofFollowing steps are taken for selection of proper contractors / vendors:
• Formulation of proper QRs• Pre bid conferences• Pre-bid conferences• Post bid discussions
10
Monitoringg
• Corporate Monitoring group monitorsprogress of work using latest software likePRIMAVERAPRIMAVERA.
• Alternate contingency measures to make updelaysdelays.
• Monthly review meetings..
11
InfrastructureInfrastructure• Telecommunication and other amenities are
i t ll d b f d f i kinstalled before award of main package.• Main approach roads, bridges etc suitable for
transporting heavy construction material &transporting heavy construction material &equipments is developed by NTPC during initialstages.
• To meet peak construction demandarrangements for construction power are donebefore award of main packagebefore award of main package
12
Environmental MeasuresEnvironmental Measures
• Project specific R&R scheme are implementedj p pin consultation with state government & projectaffected persons (PAPs).All l i E i• All statutory clearances viz., Environment,Forest etc. are obtained prior to award of mainworksworks.
• Disaster management plan are developed foreventualities like land slide, flash floods etc. inadvance and regular mock drill is carried out.
13
14
15
Power H
Koldam Project LayoutKoldam Project Layout
HousePenstocks Inlet
Diversion Tunnels
16PROJECT
VIEW POINT
Switchyard
Project Components –A model view of Koldam HEPA model view of Koldam HEP
DecantingDam
PowerU/S
S ill
Power IntakePower House
Spillway
Diversion Tunnel Outlet
Plunge Pool
17River Satluj
D/S
SALIENT FEATURESDIVERSION TUNNELS
NUMBER/LENGTH : 2 No. ( 901 m & 933 m)FINISHED DIAMETER : 14 m (Horse shoe shaped)
DAMTYPE : ROCK & GRAVEL FILL WITH
CLAY COREHEIGHT : 163 m
PENSTOCKSNUMBER / TYPE : 04 nos.NUMBER / TYPE : 04 nos. SIZE : 6.45 m DIA
POWER HOUSETYPE OF POWER HOUSE SURFACETYPE OF POWER HOUSE : SURFACE TYPE OF TURBINE : 04 NOS. FRANCIS
SWITCH YARD
18TYPE OF SW YARD : SURFACE / CONVENTIONALTRANSMISSION : 400 kV
19An aerial view of Dam under construction
Main Dam
TYPE : ROCK & GRAVELFILL
WITH CLAY CORE
HEIGHT : 163 Mtrs.
CREST WIDTH : 14 Mtrs.
MAX. RES. LEVEL : EL 646 Mtrs
FULL RES. LEVEL : EL 642 Mtrs.CREST LEVEL : EL 648 Mtrs.
CREST LENGTH : 500 Mtrs. MIN. D/DOWN LEVEL: EL 636 Mtrs.
El. 648 M
El. 500 M
El. 558 M
Up stream Coffer Dam
D/s Coffer Dam
M A I N D A M
El. 500 M p
CLAY QUARTZITE GRAVEL ROCK FILL RIP RAP
All quantities in Lac M3
2020.62 7.89 32.61 59.02 1.84
DIVERSION TUNNELDIVERSION TUNNEL
River Satluj Gurgling in
INLETINLET OUTLETOUTLETRiver Satluj streaming
21
River Satluj Gurgling in to the Asia’s biggest dia. Twin Diversion
Tunnels
River Satluj streaming out from Twin Diversion Tunnels “Luv & Kush”
Asia’s Largest Twin diameter Diversion Tunnel constructed in record time
Power House- under i ( / )construction(u/c)
K ld22
Koldam
Decanting Chamber u/c
K ld23
Koldam
Spillway u/c
Koldam
24
Koldam
TownshipTownship
K ld25
Koldam
MAJOR ACHIEVEMENTS
•EXCAVATION 10,33,000 Cu.m IN A MONTH
•DAM FILLING 16m IN 2 MONTHS (5 Lac Cu.m)
•ERECTION ERECTED TWO DT-GATES EACH OF 350 MT IN 21
DAYS
GALLERY 181 LINEAL METER ON ONE•GALLERY 181 LINEAL METER ON ONE FACE IN A MONTH (3.5m
DIA)
•CONCRETING 1700 Cu.m. IN A DAY
•TUNNEL 206 m ON SINGLE FACE IN A
26
TUNNEL 206 m ON SINGLE FACE IN A MONTH (14 m DIA)
27
Gangotri Shrine
28Loharinag Pala Hydro Power Project Layout
LOHARINAG-PALA (600MW)Salient Features
River : BhagirathiType : RoR ypBarrage : 67.5 m long. HRT : 13 85 km long 6 m diaHRT : 13.85 km long , 6 m dia.Surge shaft : 192 m high, 13 m dia.Penstock : 4 nos 2 84 m diaPenstock : 4 nos ,2.84 m dia.Power house : Underground ,125 m X 22 mTRT 510 L 6 diTRT : 510 m Long,6 m dia.Gen. Eqpt. : Pelton
29Gross head : 481.67mDischarge : 152.6 Cumecs
Adit to Gate operating chamber under construction (u/c)under construction (u/c)
LNP HEP30
LNP HEP
Adit to HRT u/c
LNP HEP31
LNP HEP
Adit to Desilting Chamber
LNP HEP32
LNP HEP
Diversion channel u/cDiversion channel u/c
LNP HEP33
LNP HEP
34
Badrinath Shrine
35Tapovan Hydro Power Project Layout
TAPOVAN –VISHNUGAD (520 MW) SALIENT FEATURES
River : DhauligangaType : RoRypBarrage : 70 m long HRT : 11 64 km long 5 4 m diaHRT : 11.64 km long, 5.4 m dia.Surge shaft : 13.5 m dia.Penstock : 3 6/2 6 m diaPenstock : 3.6/2.6 m dia.Power house : UndergroundTRT 513 l 5 4 H hTRT : 513 m long 5.4 m HorseshoeGen .Eqpt. : Pelton
36Design head : 525.67 mDischarge : 119.2 Cumecs
TV HEP -Desilting Basin u/cTV HEP Desilting Basin u/c
37
TV HEP-Work in Progress at Barrage siteBarrage site
38
RUPSIBAGAR-KHASIABARA (261MW)
(UTTARAKHAND)
39
RUPSIBAGAR-KHASIABARA (261MW)SALIENT FEATURESSALIENT FEATURES
River : GorigangaType : RoR Dam, 62 m highyp , gIntake : 2 nos. HRT : 7 580 km long 4 75 m diaHRT : 7.580 km long , 4.75 m dia.Surge shaft : 118.725 m high, 12.5 m dia.P t k 1 4 1 diPenstock : 1 no., 4.1 m dia.Power house : SurfaceTRT : 70 m lengthGen. Eqpt. : Pelton
40
qpDischarge : 41.478 Cumecs
41
Tangon DibangRiver
Dibang River
ETALIN HEP (4000MW)-INDIA’S SINGLE LARGEST
42HYDROPOWER PROJECT
An aerial view of Etalin & Attunli HEP- Site location
500MW
DIBANGTANGON
RIVERRIVER
4000 MW
43
ETALIN – 1500 MW on river TangonSALIENT FEATURES
RIVER Tangon
DIVERSION TUNNELSNUMBER/LENGTH : 1 No / 600 MNUMBER/LENGTH : 1 No. / 600 MFINISHED DIAMETER : 12 m (Horse shoe shaped)DESIGN CAPACITY : 1600 Cumecs
DAMTYPE : CONCRETEHEIGHT : 155 m
HEAD RACE TUNNELNUMBER / TYPE : 2 nos. HORSE SHOESIZE : 8 0 m DIASIZE : 8.0 m DIALENGTH : 12 & 12.5 KM
SURGE SHAFT2 NO., 15m DIA, 125m HIGH
PRESSURE SHAFT2 NO., 6.7mDIA, 361m DROP
POWER HOUSE
44
POWER HOUSETYPE OF POWER HOUSE : UNDERGROUNDTYPE OF TURBINE : 06 NOS. FRANCIS (VERTICAL ) 250MW EACH
ETALIN – 2500 MW on river DibangSALIENT FEATURES
RIVER Dibang
DIVERSION TUNNELSNUMBER/LENGTH : 2 No / 650 & 750 mNUMBER/LENGTH : 2 No. / 650 & 750 mFINISHED DIAMETER : 10.5m (Horse shoe shaped)DESIGN CAPACITY : 2300 Cumecs
DAMTYPE : CONCRETEHEIGHT : 90 m
HEAD RACE TUNNELNUMBER / TYPE : 2 nos. HORSE SHOESIZE : 10 5 m DIASIZE : 10.5 m DIALENGTH : 9.7 & 9.9 KM
SURGE SHAFT2 NO., 23m DIA, 125m HIGH
PRESSURE SHAFT4 NO., 5.5/6.7m DIA, 379m DROP
POWER HOUSE
45
POWER HOUSETYPE OF POWER HOUSE : UNDERGROUNDTYPE OF TURBINE : 10 NOS. FRANCIS (VERTICAL ) 250MW EACH
ATTUNLI HYDRO POWER PROJECTSALIENT FEATURES
RIVER : Tangon
DIVERSION TUNNELSNUMBER/LENGTH : 1 No / 700 mNUMBER/LENGTH : 1 No. / 700 mFINISHED DIAMETER : 11.5m (Horse shoe shaped)DESIGN CAPACITY : 1500 Cumecs
DAMTYPE : CONCRETEHEIGHT : 105 m
HEAD RACE TUNNELNUMBER / TYPE : 01 no.HORSE SHOESIZE : 8.0 m DIALENGTH : 7 50 KMLENGTH : 7.50 KM
SURGE SHAFT1 NO., 16m DIA, 105m HIGH
PRESSURE SHAFTPRESSURE SHAFT1 NO., 6.6m DIA, 237m DROP
POWER HOUSETYPE OF POWER HOUSE : UNDERGROUND
46
TYPE OF POWER HOUSE : UNDERGROUNDTYPE OF TURBINE : 04 NOS. FRANCIS (VERTICAL ) 125MW EACH
U/S OF ATTUNLI POWERHOUSE
47D/S OF ATTUNLI DAM
48