Enterprise Architecture 2013 ITAG and EA Update ITLC – Oct. 23.

13
E n t e r p r i s e A r c h i t e c t u r e 2 0 1 3 ITAG and EA Update ITLC – Oct. 23

Transcript of Enterprise Architecture 2013 ITAG and EA Update ITLC – Oct. 23.

Page 1: Enterprise Architecture 2013 ITAG and EA Update ITLC – Oct. 23.

En

terp

rise A

rch

itectu

re

2013

ITAG and EA Update

ITLC – Oct. 23

Page 2: Enterprise Architecture 2013 ITAG and EA Update ITLC – Oct. 23.

En

terp

rise A

rch

itectu

re

2013

2

Goal Alignment Foundation for Collaboration on Technology Enabled UC Solutions Pillar II: Establish the enterprise architecture and

technology infrastructure necessary to promote and support interoperability and sharing of IT solutions among and between campuses

Page 3: Enterprise Architecture 2013 ITAG and EA Update ITLC – Oct. 23.

En

terp

rise A

rch

itectu

re

2013

3

Accomplishments ITAG Wiki

• Provides visibility on the progress of our deliverables

Enterprise Architecture Artifact Repository• Sharepoint site is accessible to all UC• Contains the Body of Knowledge (EA BoK)

• Principles and Standards, Reference Architectures

Framework for Adoption• Submission• ITAG Review (includes local SME review)• Refinement• Publication• Local Adoption and communication

Page 4: Enterprise Architecture 2013 ITAG and EA Update ITLC – Oct. 23.

En

terp

rise A

rch

itectu

re

2013

4

Accomplishments – ITAG Wiki

Provides visibility into deliverables and progress

Page 5: Enterprise Architecture 2013 ITAG and EA Update ITLC – Oct. 23.

En

terp

rise A

rch

itectu

re

2013

5

ITAG Wiki – Requests

Should any requests be prioritized to the Roadmap?

Page 6: Enterprise Architecture 2013 ITAG and EA Update ITLC – Oct. 23.

En

terp

rise A

rch

itectu

re

2013

6

ITAG Wiki– Roadmap

Are these the correct priorities?Has your ITAG representative begun discussions with you about these deliverables?

Page 7: Enterprise Architecture 2013 ITAG and EA Update ITLC – Oct. 23.

En

terp

rise A

rch

itectu

re

2013

7

Enterprise Architecture Asset Repository

A

B

C

Page 8: Enterprise Architecture 2013 ITAG and EA Update ITLC – Oct. 23.

En

terp

rise A

rch

itectu

re

2013

8

EAA Metadata1

2

3

4

5

Page 9: Enterprise Architecture 2013 ITAG and EA Update ITLC – Oct. 23.

En

terp

rise A

rch

itectu

re

2013

9

ITAG Membership

Page 10: Enterprise Architecture 2013 ITAG and EA Update ITLC – Oct. 23.

En

terp

rise A

rch

itectu

re

2013

10

Summary• Roles and resources in place to progress “Pillar

II” objectives

• ITAG wiki records the work in progress, in queue– 22 work items on Roadmap (6 high priority)– 9 Intake Requests pending evaluation

• EAAF– 13 Assets submitted ready for review-to-adoption

process• 3 Guidelines• 2 Principles• 8 Standards (+1 anti-pattern)

– ITAG has begun to execute the EAAF• Improvements to framework made as necessary

Page 12: Enterprise Architecture 2013 ITAG and EA Update ITLC – Oct. 23.

En

terp

rise A

rch

itectu

re

2013

12

Backup Slides

Page 13: Enterprise Architecture 2013 ITAG and EA Update ITLC – Oct. 23.

En

terp

rise A

rch

itectu

re

2013

13

Enterprise Architecture Assets