Libro de practicas reactores nucleares-centrales nucleares español.pdf
ENSA successful works in components of European … · This document contains information...
-
Upload
truonghuong -
Category
Documents
-
view
216 -
download
0
Transcript of ENSA successful works in components of European … · This document contains information...
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
ENSA successful works in components
of European Pressure Reactor
Olkiluoto 3 NPP
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
• Limonite Ring
• Pressure Equalization Ceiling
• Fixed Points with pipe penetrations (Fixed Points)
• Substructures in four LAR-WATERPOOLS (Hangers for inspection cages)
• KPL, KTA, Steel Wall andPlummet shieldings
• Fuel Transfer Tube shielding
ENSA successful works in components of
EPR Olkiluoto3NPP
Main Contracts Index
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
General Requirements Compliance
• Regulation: Finnish YVL Guides
• Building code: RakMk for steel structures, NationalBuilding Code of Finland (B7)
• Quality procedures: QR Doc 50 FIN005 (AREVA)
• Coating works: QR-FAB 03 FIN005 (AREVA)
• Materials compliance: Different Material Test Sheets(AREVA)
• Ancillary tools: EuroCode-3
• Safety Culture
• Compliance with RCC-M code requirements
• Compliance with ASME III code requirements
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
Limonite Ring for Olkiluoto 3 NPP
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
Limonite Ring for Olkiluoto 3 NPP
The Limonite Ring (LR) is a steel structure, located in the reactor pit between the wall openings of the reactor coolant lines (RCL) and the pool liner support.
Approx. ø9000 mm
Limonite Ringreinforced concrete
2nd phase concrete
RPV
RCL
reactor pit1st phase concrete
RPV insulation
ISI device
cavity seal ring
RPV closure head Limonite Ringlost formwork pool liner
Limonite Ring cross section
+7,44 m
+7,12 m
+6,44 m
Ø6080 mm
insulation (matresses)
L-shape profile
Ø6000 mm
Limonite Ring
Pool liner
RPV
Materials: Carbon Steel S355J2
Weight: 9Tm
Construction Code: EN
Safety Class EYT
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
•Beginning erection of works: September 2010
•End of works: April 2011
Limonite Ring for Olkiluoto 3 NPP
For this project ENSA is the designer and manufacturer of the following devices to ensure the quality of the component:
Welding Device:
Used for welding the 4 slices on site.
Stiffener:
To avoid deformations during introduction into the reactor pit.
Lifting Device:
Used to support the loads during pouring operations.
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
Pressure Equalization Ceiling for OL3 NPP
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
Pressure Equalization Ceiling for OL3 NPP
Location
(upper part of steam generator)
The pressure equalization ceiling consist of two steel structures.
During normal plant operation is ensuring the separation of ventilation between accessible and inaccessible part of containment.
Description
Materials: Carbon Steel S355J2Weight: 24 TmConstruction Code: ENSafety class 3
Beginning of erection works: Nov 2011
Forecasted end of works: Feb 2012
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
Pressure Equalization Ceiling for OL3 NPP
ENSA will perform the installation starting from pre-assembly pieces of the component, being adjusted on site, to achieve the requirement of the designer.
ENSA already has the necessary qualifications for these welding works on site according to European standards.
Manufacturing Installation
Transport
ENSA manufacturing process consist of all needed steps to guarantee the operation of the equipment including:
EngineeringPurchasingTestingQualificationsManufacturingInstallationMaintenance works
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
Fixed Points with Pipe Penetration for OL3
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
Steel Boxes (2) with Pipe Penetration for OL3
The function of SPEP is to serve as wall elements containing penetration sleeves formain piping branches on Safeguard Buildings
Main piping branches:oMain Steam Lines (MSL)oMain Feed Water Line (MFWL)
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
Materials: Carbon Steel S355J2Weight: 70 TmConstruction Code: ENSafety Class 2
Beginning of erection works: September 2009End of works: March 2010
Steel Boxes (2) with Pipe Penetration for OL3
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
Substructures in four LAR-Waterpools for
OL3 NPP
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
Substructures in four LAR-Waterpools for
OL3 NPP
Provision and erection of the substructures in four LAR Waterpoolsfor use in the Olkiluoto 3 NPP
Engineering, drawings and documentation
Material procurement
Manufacturing
Welders Qualification
NDT (Non Destructive Tests)
Load Test
Delivery and Transport
Installation
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
Substructures in four LAR-Waterpools for
OL3 NPPMaterials: Stainless Steel material 1.4571Weight: approx.1 TmConstruction Code: ENSafety Class EYT
Beginning of erection works: September 2010End of works: December 2010
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
KPL, KTA, Steel Wall and Plummet
Shieldings for OL3 NPP
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
KPL, KTA, Steel Wall and Plummet
Shieldings for OL3 NPP
Provision and erection of shieldings for use in the Olkiluoto3 NPP.
Engineering, drawings and documentation
Material procurement
Manufacturing
Welders Qualification
NDT (Non Destructive Tests)
Delivery and Transport
Installation
Works involving the use, manipulation,
machining and coupling of Lead components
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
Materials: Carbon Steel S235J2, LeadConstruction Code: ENBeginning of erection works: December 2011Forecasted end of works: April 2012
KPL, KTA, Steel Wall and Plummet
Shieldings for OL3 NPP
KPL KTA Steel Wall Plummet
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
Fuel Transfer Tube Shielding for OL3
NPP
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
Engineering, drawings and documentation
Material procurement
Manufacturing
Welders Qualification
NDT (Non Destructive Tests)
Delivery and Transport
Erection
Fuel Transfer Tube Shielding for OL3 NPP
Works involving the use, manipulation, machining and coupling of lead components
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
Materials: Stainless Steel 316Ti, leadConstruction Code: ENBeginning of works: November 2011Forecasted end of works: February 2012
Erection sequence
Fuel Transfer Tube Shielding for OL3 NPP
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
Projects Localization in OL3
Reactor Building/Fuel BuildingFuel Transfer Tube Shielding
Reactor BuildingSteel Wall Shieldings
Nuclear Auxiliary BuildingPlummet Shielding
Reactor BuildingKTA Shieldings
Fuel BuildingKPL Shieldings
Safeguard BuildingsSubstructures in four LAR-WATERPOOLS
Safeguard BuildingsFixed Points with pipe penetrations
Reactor BuildingPressure Equalization Ceiling
Reactor BuildingLimonite Ring
BuildingComponent
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
Projects Localization in OL3
ShieldingsFuel Transfer Tube Shielding
Limonite RingPressureEq.Ceiling
Substructures in 4 WAR waterpools
Fixed PointFixed Point
1. Reactor Building
2. Fuel Building
3. Safeguard Building
4. Diesel Building
5. Nuclear Aux. Building
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
ERECTION WORKS – FIXED POINTS
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
ERECTION WORKS – FIXED POINTS
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
ERECTION WORKS – LIMONITE RING
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
ERECTION WORKS – LIMONITE RING
This document contains information proprietary to Equipos Nucleares, S.A. (Ensa) and shall not be disclosed or reproduced without written authorization of Ensa.
ERECTION WORKS IN OL3 NPP
EQUIPOS NUCLEARES S.A.
Oficina Central / Head Office:
José Ortega y Gasset 20-5º
28006 Madrid, Spain
Phone: +34 91 555 36 17
Fax: +34 91 556 31 49
Instalaciones / Facility:
Avda. Juan Carlos I, 8
39600 Maliaño, Cantabria, Spain
Phone: +34 942 20 01 01
Fax: +34 942 20 01 48
www.ensa.es