Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016...
Transcript of Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016...
![Page 1: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/1.jpg)
2016 Annual ReportEnid Public Schools 2016 Bond
February 2017
![Page 2: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/2.jpg)
Goal:We will provide and maintain exemplary facilities that are clean, safe, and secure for all students. These facilities will enhance learning opportunities in every curricular and extracurricular activity.
End of Year Projections for 2016:Design firms selected, design phase begun
Evidence of Completion:Bond election passed, design work begun
Action Steps:Construct new and renovate existing facilities
The initial goals of the Enid Public Schools Strategic Action Plan have been met, and we are well on our way to completing the Action Steps.
Enid Public Schools Strategic Action Plan
![Page 3: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/3.jpg)
Design Projects55%
Construction
Projects
45%
Funds
Encumbered
8%
In 2016 we encumbered 8% of the bond funds designated for facilities in the 2016 Bond. The funds are being used for “shovel ready” construction projects and for architects to design our major building projects.
Enid Public Schools 2016 Bond
![Page 4: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/4.jpg)
Design Projects15
Construction
Complete
53Construction
Underway
8
Enid Public Schools 2016 Bond
76Total Projects
In 2016 we started 76 projects. That equates to about 1 new project every 5 days. The average cost of those projects was around $55,000.
![Page 5: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/5.jpg)
Design Projects Progress
![Page 6: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/6.jpg)
15 Design Projects
Complete46%
Design Projects Progress
About one third of the time it takes to build a building is used by the architects to design the building. We have had teams of architects working every day to make sure we have quality buildings. Many of our design projects are ahead of schedule.
![Page 7: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/7.jpg)
Enid High School
Adams ES
NWOSU
Longfellow MS
Garfield ES
Waller MS
Taft ES
0 20 40 60 80 100%
Design Projects Progress
![Page 8: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/8.jpg)
Architects Selection Process
![Page 9: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/9.jpg)
Architects Selection Process
The architect selection process created by the Construction Management Department attracted architects from multiple states and internationally. We attracted architects of famous structures like Skydance Bridge and the Oklahoma City Bombing Memorial. We narrowed the list of architects down to five for interviews. The Selection Committee then visited projects that represented the firm’s work. We visited projects in Stillwater, Sand Springs, Bartlesville, Tulsa, Tahlequah, Yukon, and Mustang. After the interviews the architects were selected for each project.
Request Qualifications
Select Architects to interview
Visit Architects projects
Interview Architects
![Page 10: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/10.jpg)
MA+ Architecture
Corbin and Merz Architects
Corbin and Merz Architects
The Stacy Group, Inc.
The Stacy Group, Inc.
Easley Associates Architects
Easley Associates Architects
KKT Architects
Enid High School Competition Gym & PAC
Waller Middle School Additions & Renovations
Taft Elementary School Additions
Garfield Elementary School Additions
Longfellow Middle School Additions & Renovations
The Cooperative Preschool at Northwestern
Adams Elementary School Additions & Renovations
District On-Call Projects
Architects Selected
![Page 11: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/11.jpg)
Design Projects Updates
![Page 12: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/12.jpg)
Adams Elementary SchoolArchitect: Easley Associates Architects
Update: We have completed preliminary floorplans andhave decided to look at some issues with utilitylines that bisected our property. The utilities linesmake expanding to the north difficult. We havehad very positive meetings with the City of Enidand several utility companies and now havesolutions that will allow us to expand Adams in avery positive way. We have taken this time tolook at how we currently use the spaces in ourschool and to find the best use for them. Wehave clarified what we need and are working onincluding those findings as we move forward withthe design.
![Page 13: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/13.jpg)
Taft Elementary SchoolArchitect: Corbin and Merz Architects
Update: The design work on Taft has been complete. The construction documents and specifications are currently available for contractors who are interested in bidding on the project. Construction should start in late March.
![Page 14: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/14.jpg)
Taft Elementary School
Taft Elementary
![Page 15: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/15.jpg)
Taft Elementary School
Taft ElementaryAerial View
![Page 16: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/16.jpg)
Taft Elementary School
Taft ElementarySecurity Vestibule
![Page 17: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/17.jpg)
Garfield Elementary SchoolArchitect: The Stacy Group, Inc.
Update: The Stacy Group has created a very simple and efficient design that blends seamlessly with the original school. We have approved the design, and the Stacy Group has started the construction documents. We plan to be finished with the design work by the end of March.
Southeast Addition
![Page 18: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/18.jpg)
Garfield Elementary School
Garfield
Elementary
Floorplans
![Page 19: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/19.jpg)
Garfield Elementary School
Southwest Addition
![Page 20: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/20.jpg)
Longfellow Middle SchoolArchitect: The Stacy Group, Inc.
Update: Longfellow Middle School is the second largestschool in our District. It has been built on to 7different times. The current design has foundways to simplify the existing layout and how totake advantage of spaces that have long beenunused. The design will also make it easier toget around the building and give us a beautifulnew entry. The design is about 25% complete.We expect to be approving the design soon andstarting construction documents.
![Page 21: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/21.jpg)
Longfellow Middle School
PreliminaryEntry Design
![Page 22: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/22.jpg)
Longfellow Middle School
Preliminary DesignShaded Seating
![Page 23: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/23.jpg)
Longfellow Middle School
Preliminary Design
![Page 24: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/24.jpg)
Waller Middle SchoolArchitect: Corbin and Merz Architects
Update: Corbin and Merz Architects are complete with the design and 60% complete with the construction documents. We are coordinating the work in the cafeteria expansion with the kitchen consultants and our Child Nutrition Department. We plan to bid the project at the end of March.
![Page 25: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/25.jpg)
Waller Middle School
Preliminary DesignWest Elevation
![Page 26: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/26.jpg)
Waller Middle School
Preliminary DesignAuditorium Entry
![Page 27: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/27.jpg)
Enid High SchoolArchitect: MA+ Architecture
Update: We have meet with the music and drama teachers, coaches and athletic directors, and the various other groups involved with the new Competition Gymnasium and Performing Arts Center. We have determine the types of spaces needed and have looked at several ways to arrange the building. MA+ architects has been working on preliminary designs and renderings.
![Page 28: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/28.jpg)
Enid High School
Enid High Gym & PACPreliminary Rendering
![Page 29: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/29.jpg)
Enid High School
Enid High Gym & PACPreliminary Renderinig
![Page 30: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/30.jpg)
Enid High School
Enid High Gym & PACPreliminary Site Plan
![Page 31: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/31.jpg)
Enid High School
Enid High Gym & PACPreliminary Floor Plan
![Page 32: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/32.jpg)
Cooperative PreschoolArchitect: Easley Associates Architects
Update: We have looked at several options for the plan to make it work as both a high quality preschool and a teaching preschool for NWOSU. The design is about 25% complete. We are currently coordinating the design with our Child Nutrition Department.
![Page 33: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/33.jpg)
Cooperative Preschool
Preliminary Planand Site Plan
![Page 34: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/34.jpg)
Cooperative Preschool
PreliminaryEntry Design
![Page 35: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/35.jpg)
Hayes Elementary SchoolArchitect: KKT Architects
Update: The awning at Hayes had been damaged and needs to be repaired. KKT’s design for the new awning gives the school a beautiful new entry and provides a place for students to gather. KKT is working on the construction documents.
![Page 36: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/36.jpg)
Hayes Elementary School
PreliminaryAwning Design
![Page 37: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/37.jpg)
Hoover Elementary SchoolArchitect: KKT Architects
Update: KKT architects is working on finalizing the construction documents for the hall flooring and we are working finalizing the selection of materials.
New Flooring Plan
![Page 38: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/38.jpg)
Hoover Elementary School
New Flooring
Interesting Fact:
The floor pattern doesn’t just look pretty. The architects designed the pattern to help teachers. Like on a road, the center line helps teacher line students up, and the lines across the hall align with doors where they want them stop.
![Page 39: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/39.jpg)
Prairie View Elementary SchoolArchitect: KKT Architects
Update: The construction documents are being completed for the parking lot expansion. We plan to bid the project soon and complete the construction over the summer.
![Page 40: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/40.jpg)
Prairie View Elementary School
Parking Lot Expansion
![Page 41: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/41.jpg)
Construction Projects
![Page 42: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/42.jpg)
Playgrounds
![Page 43: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/43.jpg)
Playground installation is complete at Eisenhower, Glenwood, Hoover, McKinley, and Prairie View Elementary Schools. The installation continues at Monroe Elementary.
Taft Elementary will have its playground installed after its major addition is completed.
Playgrounds
Underway1
Completed5
To Go1
![Page 44: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/44.jpg)
Interesting Fact:
The play equipment selected was specifically designed to improve cognitive alertness and social inclusiveness.
Interesting Fact:
The students VOTED for their favorite playgrounds as part of a civics lessons during the presidential election.
Playgrounds
![Page 45: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/45.jpg)
We are expanding our existing Avigilon security camera system. Half of the schools have had security cameras installed. We will be installing the remaining cameras in conjunction with the construction of security vestibules.
Security Cameras
Complete50%
![Page 46: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/46.jpg)
Several schools throughout the district have had their auditorium and gymnasium sound systems upgraded. This has improved many morning assemblies, PE classes, and activities.
Sound Systems
To Go1
Completed8
![Page 47: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/47.jpg)
Paving and Sidewalk Projects
Paving and sidewalk projects have been completed all over the District. Several of the projects are:
• EHS trackside parking
• Lincoln sidewalks
• Emerson parking
• Coolidge sidewalks
• McKinley sidewalks
• Hayes parking lot (resurfaced)
• And several others
![Page 48: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/48.jpg)
Construction Projects
![Page 49: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/49.jpg)
Adams Elementary School
COMPLETE
• Secured classroom doors
• Fenced playground area
• Installed window shades
ON-GOING
• Reviewing the needs of the school
• Designing cubbies for classrooms
![Page 50: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/50.jpg)
Coolidge Elementary School
COMPLETE
• New cafeteria HVAC & various classrooms
• Installed window shades
• Replaced sidewalk on East side
• Gym sound system
ON-GOING
• Designing cubbies for 4 classrooms
• Replacing old HVAC units as needed
![Page 51: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/51.jpg)
COMPLETE
• Kitchen Floor Remodel
• Gym Remodel
• Security Vestibule
• Security Cameras
• Playground
ON-GOING
• Access controls
Eisenhower Elementary School
Interesting Fact:
Eisenhower was one of the first projects completed. Because access to Vance Air force Base might become more difficult in the future, we decided to complete Eisenhower's projects first.
![Page 52: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/52.jpg)
Eisenhower Elementary School
Interesting Fact:
This is the first of the new security vestibules in the district. They will require visitors to check in through the office before entering the school.
SecurityVestibule
![Page 53: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/53.jpg)
Eisenhower Elementary School
PlaygroundCelebration
![Page 54: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/54.jpg)
Eisenhower Elementary School
BEFORE AFTER
GymnasiumRenovation
![Page 55: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/55.jpg)
COMPLETE
• Gym sound system
• Security cameras
• Window shades
• Playground
ON-GOING
• Preliminary design of computer room
Glenwood Elementary School
![Page 56: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/56.jpg)
Glenwood Elementary School
PlaygroundCelebration
![Page 57: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/57.jpg)
Glenwood Elementary School
![Page 58: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/58.jpg)
Glenwood Elementary School
Interesting Fact:
The Glenwood playground was themed with little red schoolhouses to pay homage to Glenwood's original 1895 Little Red Schoolhouse.
![Page 59: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/59.jpg)
Hayes Elementary School
COMPLETE
• Gym sound system
• Security cameras
• Sealed & striped the parking lot
• Concrete play area
ON-GOING
• Preliminary design of awning & cubbies in 4 rooms
![Page 60: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/60.jpg)
Hoover Elementary School
COMPLETE
• Gym sound system
• Security cameras
• Playground
• Restriped parking lot
• Handicap hardware
ON-GOING
• Preliminary design of hall flooring
![Page 61: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/61.jpg)
McKinley Elementary School
COMPLETE
• Gym sound system
• Gym flooring
• Improved drainage
• Playground
ON-GOING
• Card access
![Page 62: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/62.jpg)
McKinley Elementary School
Gym Flooring
Before:Damaged Floor Tile
![Page 63: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/63.jpg)
Monroe Elementary School
COMPLETE
• Secured playground fence
• Removed asphalt track
• Gym sound system
• New AC in server room
ON-GOING
• Playground installation
![Page 64: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/64.jpg)
Monroe Elementary School
Site Demolitionand Security Gates
![Page 65: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/65.jpg)
Monroe Elementary School
![Page 66: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/66.jpg)
Prairie View Elementary School
COMPLETE
• Security cameras
• Playground
ON-GOING
• Preliminary design of parking spaces & sidewalk extension
![Page 67: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/67.jpg)
Prairie View Elementary School
New PlaygroundEquipment
![Page 68: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/68.jpg)
Taft Elementary School
COMPLETE
• Security cameras
• Gym sound system
• Floor plans & elevations
ON-GOING
• Completing construction documents
![Page 69: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/69.jpg)
Emerson Middle School
COMPLETE
• Auditorium sound system
• Gym sound system
• Repaved parking lot
ON-GOING
• Reviewing science equipment needs
![Page 70: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/70.jpg)
Lincoln Academy
COMPLETE
• Sidewalk repairs
• Drainage improvements
ON-GOING
• Studying parking lighting
![Page 71: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/71.jpg)
Lincoln Academy
New Walks and drainage
![Page 72: Enid Public Schools 2016 Bond 2016 Annual Report · 2016 Annual Report Enid Public Schools 2016 Bond February 2017. Goal: ... In 2016 we encumbered 8% of the bond funds designated](https://reader034.fdocuments.net/reader034/viewer/2022050409/5f86782e26f6eb24da582fc4/html5/thumbnails/72.jpg)
Enid Public Schools 2016 Bond
Thank You ENID !!!!