“Enhanced Housekeeping Requirements in Egress Paths in Buildings with Polystyrene” ES&H Tier 1 Working Group Meeting Presentation MICHAEL KRETSCHMANN PE FIRE PROTECTION ENGINEERING February 8, 2011

Transcript of “Enhanced Housekeeping Requirements in Egress Paths in Buildings with Polystyrene” ES&H Tier 1...

“Enhanced Housekeeping Requirements in Egress Paths in Buildings with Polystyrene”

ES&H Tier 1 Working Group Meeting Presentation

MICHAEL KRETSCHMANN PEFIRE PROTECTION ENGINEERING

February 8, 2011

JULY 2010 REPORT: ASSESSMENT OF BROOKHAVEN NATIONAL LABORATORY’S

FIRE PROTECTION PROGRAM

Finding 201 O-FP-L 1-1: Egress paths in buildings with elevated fire risks (facilities that lack automatic sprinkler protection or have exposed polystyrene foam insulation* on the HVAC ducts) are not being maintained to assure access to exits are clear, unobstructed, and unencumbered (not to hinder or impede the action or performance of).

Polystyrene

Polystyrene produces a highly intense fire and a thick black smoke. The intensity of a polystyrene fire has been proven to be

able to outrun sprinkler protection in tests.

BLDG Building Description0197 NNSD/Graphic Arts/NNDC

0459 Information Technology Division

0463 Biology

0477 Research Library

0480* Materials Science

0488 Berkner Hall

0490 Medical Research Center

0510 Physics

0515 Information Technology Division

0526 Energy Efficiency & Conservation

0535 Instrumentation Division

0555** Chemistry

0815 EENS Multiprogram Laboratory

0830 Environmental Waste Technical Center

0901 Radioisotope and Radiotracer C

0902 Magnet Division

0911 Collider Accelerator Department

0930 200 Mev Linac

NOTES

* Bldg 480 should have the Polystyrene removed with the completion of RSL I project.

** Chemistry should have the poly removed and sprinkler installed with the end of RSl II project.

Buildings with Polystyrene

Once seven foot wide, now 5 foot. What happens when doors are open and materials

are being loaded into the cabinets?

“Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

Is less better?

“Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

When three floors of people come down the stairs, does their safety have to rely on

the bicycles staying under the stairs?

“Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

Problems are not always visible from the inside.

“Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

A temporary blockage can occur during a temporary fire leading to a temporary life loss.

“Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

Okay?

“Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

Clear?

“Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

Is this not acceptable?

“Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

Starting to get narrower

“Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

Still not bad?

“Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

Is this worse?

“Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

Is this worse?

(door can only swing 90 degree due to the tanks)

“Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

Narrower

“Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

Next Steps

“Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

Questions?