ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal...

62
AD-A091 4bO D*APPOLONIA CONSULTING ENGINEERS INC PITTSBURGH PA F/G 13/13 NATIONAL DAM INSPECTION PROGRAM. DOVERSPIKE NUMBER 2 DAM (NOI I--ETC(U) 1980 L D ANDERSEN DACW31-80-C-0022 UNCLASSIFIED NL El..II]EEEIIIE IIIIIIIIIIIIIIfllfllfl IIIllfllfllflflfflfflf BIIIIIIIIIIIIhh IIIIEIhE

Transcript of ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal...

Page 1: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

AD-A091 4bO D*APPOLONIA CONSULTING ENGINEERS INC PITTSBURGH PA F/G 13/13NATIONAL DAM INSPECTION PROGRAM. DOVERSPIKE NUMBER 2 DAM (NOI I--ETC(U)1980 L D ANDERSEN DACW31-80-C-0022

UNCLASSIFIED NLEl..II]EEEIIIEIIIIIIIIIIIIIIfllfllflIIIllfllfllflflfflfflfBIIIIIIIIIIIIhh

IIIIEIhE

Page 2: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

L60 1-8 Q11111 1.0

11lU1 UI. UrnL

MICROtOPY RESOLUTION TEST CHARTNATIONAL 6UREAU OF STANDARDS-1963-A

Page 3: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

OHIO RIVER BASIN ICAYLOR RUN, JEFFERSON COUNTY

PENNSYLVANIA '

CND ID. PA(0

* PHASE IINSPECTION REPORT

T~N~lATNSPECTTGN VOGRAM

00

DEATMN OFTEAMBATMR DITIT0OPSO NIER

BATMRMRLN 10C. Bl

BAPLOEISTI COPSOFN ENGINEERS J

I 0rt'h1'al contain3 color' 10DUFF ROAD)- J p l t c A l l D I C r cp r d c t P I TTl S U R G H P ; % S 2 3 5v l be in biLck Laid

-. 1/26/ oll 0.9 1 3,3

Page 4: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

PREFACE

This report is prepared under guidance contained in the RecommendedGuidelines for Safety Inspection of Dams, for Phase I Investigations.Copies of these guidelines may be obtained from the Department of

the Army, Office of Chief of Engineers, Washington, D.C. 20314.

The purpose of a Phase I investigation is to identify expeditiouslythose dams which may pose hazards to human life or property. The

assessment of the general condition of the dam is based upon visualobservations and review of available data. Detailed investigations

and analyses involving topographic mapping, subsurface investigations,

material testing, and detailed computational evaluations are beyond

the scope of a Phase I investigation; however, the inspection isintended to identify any need for such studies which should beperformed by the owner.

In reviewing this report, it should be realized that the reported

condition of the dam is based on observations of field conditions at

the time of inspection along with data available to the inspectionteam. In cases where the reservoir was lowered or drained prior toinspection, such action, while improving the stability of the dam,

removes the normal load on the structure and may obscure certainconditions which might otherwise be detectable if inspected underthe normal operating environment of the structure.

It is important to note that the condition of the dam depends onnumerous and constantly changing internal and external factors which

are evolutionary in nature. It would be incorrect to assume that

the present condition of the dam will continue to represent the

condition of the dam at some point in the future. Only throughfrequent inspections can unsafe conditions be detected and only

through continued care and maintenance can these conditions be

prevented or corrected.

Phase I inspections are not intended to provide detailed hydrologic

and hydraulic analyses. In accordance with the established Guidelines,

the spillway design flood is based on the estimated "ProbableMaximum Flood" for the region (greatest reasonably possible stormrunoff), or fractions thereof. The spillway design flood provides a

measure of relative spillway capacity and serves as an aid in

determining the need for more detailed hydrologic and hydraulic For

studies, considering the size of the dam, its general condition and T

the downstream damage potential.

The assessment of the conditions and recommendations was made by

the consulting engineer in accordance with generally and currently

accepted engineering principles and practices.

tC 66r

Page 5: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

PHASE I REPORT

NATIONAL DAM INSPECTION PROGRAM

NAME OF DAM: Doverspike No. 2 Dam

STATE LOCATED: PennsylvaniaCOUNTY LOCATED: JeffersonSTREAM: Caylor Run, Tertiary Tributary of Mahoning CreekSIZE CLASSIFICATION: IntermediateHAZARD CLASSIFICATION: SignificantOWNER: J. C. EnterprisesDATE OF INSPECTION: April 24, 1980 and May 1, 1980

SSSESSMENT: Based on the evaluation of the existing conditions,Pe condition of Doverspike No. 2 Dam is considered to be good,except that the dam has no outlet works and no formally engineeredspillway facilities. A low spot on the crest of the dam located atthe junction of the embankment and the right abutment appears to bethe intended spillway overflow section. On the dates of inspection,the pool level was found to be approximately 5 feet below the lowspot on the crest of the dam, and as reported by the representativeof the owner, the pool is normally maintained at that level byseepage and evaporation losses from the reservoir.

According to the recommended criteria, intermediate size dams in thesignificant hazard category are required to pass from 50 percent ofthe probable maximum flood (PMF) to full PMF. In view of thedownstream damage potential, the lower limit of the recommendedrange is considered to be applicable to this dam. The flood dis-charge capacity was evaluated according to the recommended procedureand the dam was found to impound less than 20 percent of the PMFwithout overtopping the embankment. Therefore, the flood dischargecapacity of the dam is classified to be inadequate.

The following recommendations should be implemented as soon aspossible or on a continuing basis.

1. The owner should retain a professional

engineer experienced in the design andconstruction of dams to conduct additionaldetailed hydrologic and hydraulic studies tomore accurately ascertain the requiredspillway capacity and the nature and extentof improvements required to provide struc-

turally and hydrologically adequate spillwayfacilities.

S l III1 [[

Page 6: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

2. Around-the-clock surveillance should beprovided during unusually heavy runoff and a

formal warning system should be developed toalert the downstream residents in the eventof emergencies. The owner should also developa plan to draw down the reservoir in the eventof an emergency.

3. The dom and appurtenant structures should beinspected regularly and a formal maintenancemanual should be developed for the futuremaintenance of the dam.

Lawrence D. Andersen, P.E.Vice President

' \ '.'".i=, _ zJuly 30 1980,,. , Date

Approved by:

JAMES W. PECKi Colonel, Corps of EngineersDistrict Engineer

Date 2 l -

ili

IrL

Page 7: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

rr C

Page 8: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

TABLE OF CONTENTS

PAGE

SECTION 1 -PROJECT INFORMATION 1

1.1 General I1.2 Description of Project I1.3 Pertinent Data 2

SECTION 2 - DESIGN DATA 5

2.1 Design 52.2 Construction 62.3 Operation 62.4 Other Investigations 62.5 Evaluation 6

SECTION 3 - VISUAL INSPECTION 7

3.1 Findings 73.2 Evaluation 8

SECTION 4 - OPERATIONAL FEATURES 9

4.1 Procedure 94.2 Maintenance of the Dam 94.3 Maintenance of Operating Facilities 94.4 Warning System 94.5 Evaluation 9

SECTION 5 - HYDRAULICS AND HYDROLOGY 10

5.1 Evaluation of Features 10

SECTION 6 - STRUCTURAL STABILITY 12

6.1 Evaluation of Structural Stability 12

SECTION 7 - ASSESSMENT AND RECOMMENDATIONS/PROPOSEDREMEDIAL MEASURES 13

7.1 Dam Assessment 137.2 Recommendations/Remedial Measures 13

v

0 --7

Page 9: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

TABLE OF CONTENTS1% A (Continued)

APPENDIX A - CHECKLIST, VISUAL INSPECTION, PHASE IAPPENDIX B - CHECKLIST, ENGINEERING DATA, DESIGN, CONSTRUCTION,

OPERATION, AND HYDROLOGIC AND HYDRAULIC, PHASE IAPPENDIX C - PHOTOGRAPHSAPPENDIX D - HYDROLOGY AND HYDRAULICS ANALYSESAPPENDIX E - PLATESAPPENDIX F - REGIONAL GEOLOGY

Vv

8V

L ___....__

Page 10: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

r

PHASE I REPORT INATIONAL DAM INSPECTION PROGRAM

DOVERSPIKE NO. 2. DAMNDI I.D. PA-810DER I.D. 33-57

SECTION IPROJECT INFORMATION

1.1 General

a. Authority. The inspection was performed pursuant to theauthority granted by The National Dam Inspection Act, Public Law92-367, to the Secretary of the Army, through the Corps of Engineers,

to conduct inspections of dams throughout the United States.

b. Purpose. The purpose of this inspection is to determine ifthe dam constitutes a hazard to human life or property.

1.2 Description of Project

a. Dam and Appurtenances. Doverspike No. 2 Dam consists of anearth embankment approximately 650 feet long. The available informa-tion indicates the maximum height of the embankment to be 50 feetfrom the downstream toe. The downstream slope, which is approxi-mately on a 91 to IV, gradually merges with the downstream valleyand the toe of the dam cannot be readily identified. The crest ofthe dam is 40 feet wide and the slope of the upstream face abovenormal pool level is 3H to IV.

The reservoir has neither a low-level outlet facility nor an over-flow facility to control the normal pool level. As reported by theowner's representative, the pool is normally maintained approxi-mately 5 to 6 feet below the low point on the crest of the dam byreservoir seepage and evaporation losses.

A low spot on the crest of the dam at the junction of the embankmentand right abutment appears to be the intended spillway for thereservoir. This low area on the crest of the dam is approximatelytriangular in cross section with a top width of about 60 feet at thedam crest level and a depth of 2 to 2-1/2 feet from the mean damcrest elevation. No defined discharge channel exists below this lowspot on the crest of the dam.

b. Location. Doverspike No. 2 Dam is located on CaylorRun approximately one mile upstream from its confluence with Pine

JI

Page 11: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

Run, which is a secondary tributary of Mahoning Creek, about onemile north of the community of Dora in Ringgold Township, JeffersonCounty, Pennsylvafiia. Plate I illustrates the location of thedam.

c. Size Classification. Intermediate (based on 50-foot heightand 332 acre-feet maximum storage capacity).

d. Hazard Classification. The dam is classified to be in thesignificant hazard category. Below the dam, the valley is approxi-mately 400 to 500 feet' wide with gentle side slopes. A small streamoriginates approximately 500 to 600 feet downstream from the dam.The stream flows under a railroad embankment approximately one miledownstream from the dam and then joins Pine Run, a secondary tribu-tary of Mahoning Creek. Rural residential areas are located down-stream of the railroad embankment underpass. It is estimated thatfailure of the dam may cause loss of a few lives andproperty damage in the farms in the vicinity of the confluence ofCaylor Run and Pine Run.

e. Ownership. J. C. Enterprises (address: Mr. Mike Mc~eans,Box 90, Ringgold, Pennsylvania 15770).

f. Purpose of Dam. Recreation.

g. Design and Construction History. The dam was designed byDelta Associates from Timlen, Pennsylvania, and constructed by theoriginal owner, Doverspike Brothers, Inc., with completion in 1975.

h. Normal Operating Procedure. As it presently exists, thedam has no overflow facilities to maintain the pool at a givenelevation. As reported by the owner's representative, the pool ismaintained at a level about 5 to 6 feet below the low spot on thecrest of the dam by evaporation and seepage losses from the reservoir.

1.3 Pertinent Data. Elevations referred to in this and subsequentsections of the report were calculated based on field measurementsassuming the pool level on the dates of inspection to be at Eleva-tion 1400 (USGS Datum), the elevation which is shown to be thenormal pool elevation on the USGS 7.5-minute Dayton quadrangle.

a. Drainage Area 0.9 square mile

b. Discharge at Dam Site (cfs)

Maximum known flood at dam site UnknownOutlet conduit at maximum pool Not applicable( 1 )

("The dam has no outlet facilities.

2

Page 12: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

Gated spillway capacity at maximum pool Not applicable

Ungated spillway capacity at maximum pool(l) 0

Total spillway capacity at maximum pool(1) 0

c. Elevation (USGS Datum) (feet)

Top of Dam 1404.7 (lowspot on crest);Design crestelevation unknown

Maximum pool 1404.7Normal pool 1400+

Upstream invert outlet works Not applicable

Downstream invert outlet works Not applicable

Maximum tailwater Unknown

Toe of Dam 1355+

d. Reservoir Length (feet)

Normal pool level 3000

Maximum pool level 3100+

e. Storage (acre-feet)

Normal pool level 500+

Maximum pool level 700+

f. Reservoir Surface (acres)

Normal pool level 29

Maximum pool level 35

g. Dam

Type Earth

Length 650 feetHeight 50 feet

Top width 40 feetSide slopes Downstream:

9H: IVUpstream:3H: IV

Zoning UnknownImpervious core Unknown

Cutoff Unknown

Grout curtain Unknown

(1"The dam has no formal spillway.

3

-. - .-

Page 13: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

W,1-E mmm M

h. Regulating Outlet. The dam has no regulating facilities.

i. Spillway. The dam has no formal spillway.

Page 14: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

SECTION 2DESIGN DATA

2.1 Design

a. Data Available. The available data consist of filesprovided by the Commonwealth of Pennsylvania, Department of Environ-mental Resources (PennDER), which contain correspondence and afoundation investigation report.

(I) Hydrology and Hydraulics. The available information

includes no data relative to the hydrology and hydraulics.

(2) Embankment. The available information includes a reportentitled, Foundation Investigation for Proposed Earth Dam, Dora,Pennsylvania, prepared by Pittsburgh Testing Laboratories, dated

April 6, 1973.

(3) Appurtenant Structures. The available informationconsists of a description of a proposed spillway for the dam includedin a Commonwealth report.

b. Design Features

(1) Embankment. As described in the Pittsburgh TestingLaboratories report, the dam was designed to be a homogeneous earthembankment with a 2H to IV downstream slope and a 1.5H to lV upstreamslope and a crest width of 20 feet. Apparently during the construc-tion of the dam, material available from a nearby coal strippingoperation was placed on the downstream face of the dam, increasingthe crest of the dam to about 40 feet and reducing the downstreamslope to the present 9H to IV slope. The design provided a cutofftrench at the center line of the embankment to be excavated to topof rock and backfilled with compacted material.

(2) Appurtenant Structures. The proposed spillway structuresfor the dam were supposed to consist of a 40-foot-wide, concrete-paved, open channel located at the right abutment-embankment inter-face, discharging into a channel. Field observations indicated

that these spillway structures have not been constructed.

c. Desi.n Data

(1) Hydrology and Hydraulics. No design data are available.

(2) Embankment. As described in the Pittsburgh Testing

Laboratories report, the design of the proposed dam (which was

5

LS

Page 15: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

ii

significantly modified during construction) consisted of subsurfaceinvestigation, laboratory and materials testing, and engineeringanalyses, including slope stability and seepage analyses. Theconfiguration of the embankment used for a seepage and stabilityanalysis is shown in Plate 2. The factor of safety against slopestability failure is reported to be in the range of 1.4 to 1.5.

2.2 Construction. Available records indicate that the dam wasconstructed by the original owner, Doverspike Brothers, Inc. Noinformation was found to indicate the manner in which the dam wasconstructed.

2.3 Operation. There are no formal operating records maintainedfor the dam.

2.4 Other Investigations. None reported.

2.5 Evaluation

a. Availability. The available information was provided byPennDER.

b. Adequacy

(1) Hydrology and Hydraulics. No design information isavailable. The dam has no outlet facilities nor a formal spillway.

(2) Embankment. The available design information was foundto include subsurface investigation, laboratory testing, and engi-neering analysis. However, no information was found to assess theadequacy of the construction of the dam.

(3) Appurtenant Structures. No information is available onthe design of the appurtenant structures.

6

& - _ I

Page 16: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

SECTION 3VISUAL INSPECTION

3.1 Findings

a. General. The on-site inspection of Doverspike No. 2 Damconsisted of:

1. Visual inspection of the embankment, abutments,

and embankment toe.

2. Evaluation of downstream area hazard potential.

The specific observations are illustrated in Plate 3.

b. Embankment. The general inspection of the embankmentconsisted of searching for indications of structural distress, suchas cracks, subsidence, bulging, wet areas, seeps and boils, andobserving general maintenance conditions, vegetative cover, erosion,and other surficial features.

In general, the condition of the embankment is considered to begood. The downstream face of the dam is covered with grass and isused as pasture. The upstream face of the dam is also covered withgrass and was found to be in good condition with no signs of signifi-cant shoreline erosion.

The crest of the dam was surveyed relative to the pool elevation onthe date of inspection, and the crest profile is illustrated in Plate4. A low area found on the crest of the dam near the right abutmentappears to be the intended spillway overflow section for the reser-voir. The downstream and upstream slopes of the dam were surveyedand found to be approximately 9H to IV and 3H to IV, respectively.

c. Appurtenant Structures. The dam has no outlet works nor aformal spillway.

d. Reservoir Area. A map review and visual observationsindicate that the watershed is predominantly covered by reclaimedstrip-mined areas. No signs of landslide activity in the vicinityof the reservoir were found. A review of the regional geology isincluded in Appendix F.

e. Downstream Channel. Because there is no discharge fromthe dam, there is no perennial streambed below the dam for approxi-mately 500 to 600 feet. At that point, a small stream originatesand flows south. Approximately one mile downstream from the dam,

7

Page 17: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

this stream flows under a railroad embankment, then shortly there-after joins Pine Run, a secondary tributary of 1ahoning Creek.A further description of the downstream conditions is included inSection 1.2d.

3.2 Evaluation. The overall condition of the embankment is con-sidered to be good. Installation of an overflow spillway withadequate discharge capacity, erosion protection and dischargechannel is considered to be required.

8

Page 18: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

SECTION 4OPERATIONAL FEATURES

4.1 Procedure. There are no formal operating procedures for thedam. As it presently exists, the reservoir is maintained at a levelapproximately 5 to 6 feet below the low spot on the crest of the dam(assumed spillway section) with flow balance apparently maintainedby seepage and evaporation losses from the reservoir.

4.2 Maintenance of the Dam. The downstream face of the dam is

covered with grass and currently is a pasture. There are no featuresof the dam that at this time would require maintenance.

4.3 Maintenance of Operating Facilities. The dam has no operablefacilities.

4.4 Warning System. No formal warning system exists for the dam.Telephone communication facilities are available via residencesapproximately one mile downstream from the dam.

4.5 Evaluation. The dam has no operable facilities and no featuresthat would require maintenance at this time. As mentioned previously,it is required that the dam be equipped with structurally andhydrologically adequate spillway facilities.

9

£

* .**P

Page 19: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

SECTION 5HYDRAULICS AND HYDROLOGY

5.1 Evaluation of Features

a. Design Data. Doverspike No. 2 Dam has a watershed of0.9 square mile and impounds a reservoir with a surface area of 29acres at normal pool level. As previously mentioned, the dam is notequipped with a discharge facility that would maintain a givennormal pool elevatioq. Apparently, the normal pool is maintained byreservoir seepage and evaporation losses balancing the inflow. Thedam has no formal spillway facilities. A low spot on the crest ofthe dam near the right abutment appears to be the location of theintended overflow spillway.

b. Experience Data. As previously stated, Doverspike No. 2Dam is classified as an intermediate ,iz( dam in the significant h1:zardcategory. Under the recommended criteria for evatoating emergencyspillway discharge capacity, such impoundments are required to passfrom 50 percent PMF to full PMF. In view of the downstream hazardpotential, the lower limit of the recommended range is considered tobe applicable to this dam.

The PMF inflow hydrograph for the reservoir was determined utilizingthe Dam Safety Version of the HEC-l computer program developed bythe Hydrologic Engineering Center of the U.S. Army, Corps of Engi-neers. The data used for the computer analysis are presented inAppendix D. The one-half PMF inflow hydrograph was found to have apeak flow of 945 cfs. Computer input and summary of computer outputfor the PMF analysis are included in Appendix D.

c. Visual Observations. Although the low spot on the crestof the dam is not equipped with any erosion protection measures,flow through this section is not considered to pose a significantbreach potential due to the wide dam crest and shallow downstreamslope.

d. Overtopping Potential. Various percentages of the PMFinflow hydrograph were routed through the reservuir, and it wasfound that the dam can impound less than 20 percent of the PMFwithout overtopping the low spot on the crest (Elevation 1404.7).For 40 percent of the PMF, it was found that only the low spot onthe crest of the dam near the right abutment would be overtopped,and for 50 percent of the PMF, most of the crest would be overtoppedfor a duration of 4.8 hours with a maximum depth of about 0.5 foot.

10

I t

_________________________________

Page 20: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

e. Spillway Adequacy. The dam was found to impound less than20 percent of the PHF without overtopping the embankment, which isless than the required spillway capacity of 50 percent PHF relativeto size and hazard classification of the dam. Therefore, the floodimpoundment/discharge capacity is classified to be inadequate.

---- ..

Page 21: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

SECTION 6STRUCTURAL STABILITY

6.1 Evaluation of Structural Stability

a. Visual Observations

(1) Embankment. As discussed in Section 3, the overallcondition of the embankment was considered to be good. No conditionswere observed that would raise concern relative to the overallstability of the dam at this time.

(2) Appurtenant Structures. The dam has no appurtenantstructures.

b. Design and Construction Data

(1) Embankment. The visual observations indicate that thetypical cross section of the embankment had been significantlymodified during construction. The proposed dam, as shown in Plate2, consisted of a homogeneous embankment with a 2H to IV downstreamslope, a 1.5H to IV upstream slope, and a crest width of 20 feet.Presently, the downstream slope is approximately 9H to IV and thecrest is about 40 feet wide. The design of the proposed embankmentconsisted of subsurface investigation, laboratory and materialstesting, and engineering analysis. The slope stability factor ofsafety of the proposed dam was reported to be in the range of 1.4 to1.5. Based on visual observations, the static stability of theexisting embankment is considered to be adequate.

(2) Appurtenant Structures. The dam has no structuralappurtenant facilities.

c. Operating Records. No operating records are maintained.

d. Post-Construction Changes. None reported.

e. Seismic Stability. The dam is located in Seismic Zone 1,and based on visual observations, the static stability of thedam appears to be adequate. Therefore, based on the recommendedcriteria for the evaluation of seismic stability of dam, thestructure is presumed to present no hazard as a result of earthquakes.

12

Page 22: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

SECTION 7ASSESSMENT AND RECOMMENDATIONS/REMEDIAL MEASURES

7.1 Dam Assessment

a. Assessment. The visual observations indicate thatDoverspike No. 2 Dam is in good condition. The dam has neither anoverflow facility to maintain a prescribed normal pool elevation nora low-level outlet facility for emergency drawdown purposes. Asreported by the owner's representative, the normal pool level ismaintained by reservoir seepage and evaporation losses. It wasfound that a low area exists on the crest at the right abutment-embankment junction. However, this section is not equipped witherosion protection and downstream discharge channel to properlyfunction .as an emergency spillway section.

In view of the above conditions, it is recommended that hydrologicand hydraulic features of the dam be evaluated by an experiencedprofessional engineer to prepare plans to provide adequate spillwayfacilities to maintain a prescribed normal pool elevation and tohave adequate flood discharge capacity.

The flood impoundment/discharge capacity of the dam was found to beless than 20 percent of the PMF without overtopping the embankment.Because this capacity is less than the recommended flood impoundmentor discharge capacity of 50 percent of the PMF, the flood impound-ment/discharge capacity of the dam is classified as inadequate.

b. Adequacy of Information. Available information, in conjunc-tion with visual observations, is considered to be sufficient to makethe following recommendations.

c. Urgency. The following recommendations should be implementedimmediately or on a continuing basis.

d. Necessity for Additional Data. In view of the conditionsdescribed above, the owner should retain an experienced professionalengineer to prepare and implement plans to provide adcquate spillwayfacilities.

7.2 Recommendations/Remedial Measures. It is recommended that thefollowing recommendations be implemented immediately or on acontinuing basis:

1. The owner should retain a professionalengineer experienced in the design andconstruction of dams to conduct additional

13

Page 23: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

detailed hydrologic and hydraulic studies tomore accurately ascertain the requiredspillway capacity and the nature and extentof improvements required to provide structur-ally and hydrologically adequate spillwayfacilit ies.

2. Around-the-clock surveillance should beprovided during unusually heavy runoff and aformal warning system should be developed toalert the downstream residents in the eventof emergencies. The owner should alsodevelop a plan to draw down the reservoir inthe event of an emergency.

3. The dam and appurtenant structures should beinspected regularly and a formal maintenancemanual should be developed for the futuremaintenance of the dam.

144. I

Page 24: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

APPENDIX A

CHECKLISTVISUAL INSPECTION

PHASE I

Page 25: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

in cnI

44k

0Ia0

-HH444

'-r-0

z

00

0 U 0 O9 to- 0

0-4 0 .I b

W z

1.

0 -

-I

0z

-40) w

4T

494fn

Page 26: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

.. ,

II

De Id

.44

u 0 41 w41E 0

4144 E S

Od

~a4J 1.4 6

Z .4.4 UFAo ... 04uw

Page 27: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

C

I-4 0

g,~ CUS.

USSb.4~S

'.4

0S0U-I* S

Co e I3 3 3

UU Id4 3a. CU C

UU U

S

IlIst Ii I _____

Page 28: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

i'i

0

0

IOIL CL ILLn

0 al aOe

4 -4 z r

4. W.

118-4u

0d

Page 29: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

.C

dw 4

41

06 w

..

I.In

Page 30: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

la-

ItIC

a. ow- 0mm ml

Page 31: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

IIS3

Page 32: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

04Ila

-42014

a o

5 16

z~~z*

Page 33: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

411a

44

dii

C I

In 1

*VA

A IA

Page 34: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

I

APPENDIX B

CHECKLISTENGINEERING DATA

DESIGN, CONSTRUCTION, OPERATIONAND HYDROLOGIC AND HYDRAULIC

PHASE I

p'

L&

Page 35: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

pt 0

.44

M 31

1d. ..

Page 36: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

CL I-.

0. 04

a a

E a41

0. C be

40A t...0

.441 A

r£ rMu .~ a A

* . .

Page 37: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

In

40I-4.

am

w.5U&8 ± .y U

S.. B.o 0 I.0. 0. 0U C U U

2 1. UU a - U..

a .M IK m 0U

aB.0

IIp. II

1 1

3r

L ________

Page 38: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

in

la lo.

00.

40 00

6 0

lAl00.

$C

Id bb

0gg

.0 .0 -e p

Page 39: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

CHECKLISTENGINEERING DATA

HYDROLOGIC AND HYDRAULIC

DRAINAGE AREA CHARACTERISTICS: 0.9 square mile (reclaimed strip-mined area)

ELEVATION, TOP OF NORMAL POOL AND STORAGE CAPACITY: 1400 (500 acre-feet)

ELEVATION, TOP OF FLOOD CONTROL POOL AND STORAGE CAPACITY: 140 4 .7 (700± acre-feet)

ELEVATION, MAXIMUM DESIGN POOL: 1404.7

ELEVATION, TOP OF DAM: 1407.5 (measured low spot); design elevation unknown

SPILLWAY:

a. Elevation 1404.7

b. Type Earth open channel

c. Width (approximately triangular in cross section)

d. Length 60 feet

Ohe. Location Spillover Adjacent to spillway

f. Number and Type of Gates None

OUTLET WORKS:

a. Type (The dam has no outlet works)

b. Location Not applicable

c. Entrance Inverts Not applicable

d. Exit Inverts Not applicable

e. Emergency Drawdown Facilities None

YDROMETEOROLOGICAL GAGES:

a. Type None

b. Location None

c. Records -None

MAXIMUM NONDAMAGING DISCHARGE: cfs (flow over the low section on thecrest of the dam)

Page B5 of 5

4,

4Db

Page 40: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

APPENDIX C

PHOTOGRAPHS

Page 41: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

LIST OF PHOTOGRAPHSDOVERSPIKE NO. 2 DAM

NDI I.D. PA-810DER I.D. 33-57APRIL 24, 1980

PHOTOGRAPH NO. DESCRIPTION

1 Upstream face (looking south).

2 Crest (looking southeast). Foreground:low area on crest, possible emergencyspillway.

3 A culvert under railroad embankment(approximately one mile downstream).

4 Farms immediately downstream fromrailroad embankment.

k _ _ _ _

Page 42: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

H 50'

~9 1SLOPE

BARBED WIREFE NCE

LEGEND:

I NDICATES DIRECTION INL7 WHICH PHOTOG3RAPH WAS

[7 TAKEN DOVERSPIKE NO-2 DAMKEY PLAN OF PHOTOGRAPHS

FIELD INSPECTION DATE: APR. 24.19 80

Page 43: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

Photograph No.I

( mferientrv 'I

Page 44: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

P1 ,c ,graph No.

o ir~ c ndc'r rai I rnrc bn1,nkment (appro" xiac )v

onC .1 1 ii I dwn t relm

Photo(griph No.

Page 45: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

APPENDIX D

HYDROLOGY AND HYDRAULICS ANALYSES

Page 46: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

STODrLGY AND UWDRAMLIC *3ULTeSDATA MASK

MW OF Lin: Doverepike no. 2 D3m (NDI I.D. PA410)

FROBABLE NAnIN PRECIPITATION (Mr) - 23.5 M]CMsf24 MOS

STATION 1 2 3 4 5

Station Description Lake DOW

Drainage Area (square miles) 0.9 -

Cumulative Drainage Area(square miles) 0.9 0.9

Adjustment of PH Zjy7

Drainage Area ( (ZON 7)

6 Hours 102 -

12 Hours 120 -

24 Hours 130 -

48 Hours 140 -

72 Hours - -

Snyder Hydrograph

Parameters

Zone(3 ) 24 -

Cp/Ct14 )

0.45/1.6

L (miles) (5 )

1.8L c. (miles)

( - 0.8-

L. 0.3. Ct (L-Lc) (hours) 1.8

Spillvay Data

Crest Length (ft) - See Spillvay

Freeboard (ft) dischargerating

Discharge Coefficient calculation

Exponent

(l) fydrometeoroloxical Report 33 (Figure 1). U.S. Amy, Corps of Engineers. 1956.

(2)Hydrometeorological Report 33 (Figure 2). U.S. Army, Corps of ngineers. 1956.

(3)Hydrological zone defined by Corps of nineers, Baltimore District. for determining Snyder's

Coefficients (Cp and C

)Snyder' s Coefficients.

(5)L - Length of longest water curse from outlet to begin divide.Lca - Length of water course from outlet to point opposite the ceatroid of draimage area.

TOAG9 VS. ILSATION

ELEVATION an. MT AM WOL (2) TQW(ACM)(ACM-RIT)(ACOolUT)

1400.0 20 43.2 1033.1 0

1420.0 60.6 1033.1

(Pleoimstered from OM emps.

S(2) AVolume - AN/3 (A1 + A2 + -12).

IPA= Dl OF 6

t:

Page 47: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

A

Z 0.

U,

a r- irQr

z a .O'

z 1 1% 0.

a 4L -r%0aa

w~~~ .EC ^AIs -t e

kaO a a t5 a'

aL : - a-uac- e (r P )

LA0 0 O0 M U f

at b :

C.9 ~ 09V W 3 . o ~

a.. .r a a

o-O Z- ty N.oua

Page 48: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

'80.

Ct

bV~E

cPj t P4

0 ghVI I

%"40

.j 0-V r .4L k4 0

IL V

A. , V% al

z V,

B0- CI V

4 *a *i-QC

I

r 44J ir

ILC ow

Ca IA AV% SA

Page 49: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

*mo 000000000

M. A

W to f nP. .u . . N a .ein 0 ftm~mtJA.

40 v ft2

z 4m. fn

4P

ma

o zag

a. oan IA .-0 -S -V

WWdg..~~

Page 50: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

CONSULTING ENGINEERS. INC.

By km.. Dat &Ai Wo*Sbjct 3AK&' AlS 2 MM Sho qo fChkd. SVJA2 a24Lt 4ftfi" Pmi. od.

~.'! 3poLLWAaj 1uc4LO&Ar W"A&A

-- S~End

0

a. 3

eor rap wsbro ,s )E4J.44*~~

s I

'~la e~CN404, kwrs , of s

PA Ct 5 oFb

Page 51: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

* DAiPOILONIACONSULTING ENGINEERS, INC.

By WlS.....Date 7/f110 Stbjec UMM6A& A 2 UMASeNo..~

chkd. syft/Doe leo~ Prol. too. 7r-38

LAWL L.gL ouaiIn#PJ 6- 1404-7 .4.

dc. T- a Vj AII G&'*MO4

0 to - - - 4..0.5 of 7 244 3.5 02. 0.7 #40s41.0 a& of 26-a 4.7 Os us3 14

854& 35 M g-S 5.4 05S 20 #44.72.0 42 52 '6293 6.3 0.6 1&. #4*7.32.S So I15 521.2. 44 0-8 33. f4c8a.0 SIR 102 17474 . O 3j 413.s 64 133 fell-+ II 1 4.S 04.9*2

6.0 10(v 6*9 578.0 10-3 1 (P 7-& 1412-3to 1341 sit. 6 5V If. i 2.1 lO51 10#1t

.1.1 20.6 I1AVS 11474-4 #+.3 32,L IS.I r 1.0

PAGE D& OF (p

Page 52: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

APPENDIX E

PLATES

Page 53: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

p-

41

ERRIE AT

MOMON ANEL R OVERPILDLI

w OHIOsik No.2 DA S o V0 50 OWLE

................................. E / Y*1VA N

RII - ' -MI

VIGI I /-. I~ I

8. -k

IL "V"I ,

L. (L -. It ~

PINE

o) ',7 Ktj ,t

Page 54: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

Ld

o ' ()9 '

DA EAPI

Bs I

/OESPK N' 2'DA

,2',SCALEPiiO.A 1ii /OK"N0/' 100 26 360 400/00

Page 55: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

IDe

CD

IL

C - 2C5

'0

c==0

.. I

C=

II----

I '=32. 0 ~-I0200

1 70. 00= 4-P*

Page 56: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

- 2080

//

1~'

- - - - I----- I

- - -

I %~. ,

I *-..~

I -

I -

- - - - - -

I I

-jj

-4 IPLATE 2 1

D~PPOLONIA j

Page 57: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

03

Wa.L

Ln H: 50'

SLOPE

TEDAM HAS NO PRIMARY SPILLWAY]INO OUTLET WORKSI

PROTECTION

NOTES: PLATE 3DOVERSPIKE N02 DAM1. POOL LEVEL DATE OF INSPECTION: GENERAL PLAN=5 FT BELOW LOW SPOT ON CREST. FIELD INSPECTION NOTES

FIELD INSPECTION DATE: APR. 24,19 80

Page 58: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

IAJ

w w

- 1 8L CL c

,w w

'U>

'Eu) U

cN -Q 0> 0

0 cr0W (L 4 0 4 lx 9

o 1-

z a 0

IIDOESIEN.0A

*fIj DA0 RSTSRE

AMPCRSTWSRVE

Page 59: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

APPENDIX F

REGIONAL GEOLOGY

imwo

Page 60: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

APPENDIX F

REGIONAL GEOLOGYDOVERSPIKE NO. 2 DAM

Doverspike No. 2 Dam is located in the central section of theAppalachian Plateau Province which is characterized by broad, nearlylevel ridges and deep steep valleys. The dam lies near the contactof the Allegheny and Conemaugh groups of Pennsylvanian Age. Stratahave been gently folded and form a broad shallow basin known as theLeechburg syncline which trends to the northeast.

The Allegheny Group is composed of shales and sandstones and severalminable coals. The Upper Freeport Coal lies at the top of theAllegheny, thus delineating the Allegheny from the overlying ConemaughGroup. The Conemaugh Group is characterized by variegated shalesand thick sequences of coarse-grained sandstones. The lower half ofthe Conemaugh, below the Ames Limestone, contains numerous claystonesthat are prone to landslides.

The Upper Freeport Coal has been stripped along the valley slopes inthe area. No deep mines are known to exist in the area. Localstripping of the Lower Freeport Coal may also have taken place.

It should be noted that borings drilled along the north and southabutments of the dam showed a lose of drilling water, indicatinghighly fractured rock. This could be a problem for excessiveseepage and piping. It is not known if grouting was done along thecenter line and abutments to control seepage.

i.

I. _ _ _ _ _ _ _

Page 61: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

S* .31

ps

10 Z

s .t I it

fF r

rv

ID In o.. ps

trattanv e4 T7

WeAth

ccrrp

orsics Ps'

jj'R

V) mrs41

Go

111 V Twn' ps b-

tun

WQt

V Vnno at-0.OU

0 ps

0PC 0

yr,

CLI a nt.42 t

'Y .- ARidge Ps 4

Doverspike No-1 DomNO

Kellersbu Doverspike Na2 DarnC

S C A L E DOVERSPIKE NO. I A NO NO. 2 DAMS

0 2 lomiles GEOLOGY MAP

REFERENCE:GEOLOGIC MAP OF PENNSYLVANIA PREPAREDBY COMMONWEALTH OF PENNADEPT OF INTERNAL 11PA12130KAON"AFFAIRS, DATED 1960, SCALE I'r-l 4 MILES

Page 62: ENGINEERS INC PITTSBURGH PA UNCLASSIFIED El..II]EEEIIIE ...inspected regularly and a formal maintenance manual should be developed for the future maintenance of the dam. Lawrence D.

Q __________________ __________________

I LEGEND:

Conemaugh Formation Marcellus FormationCoal e ..owne,vi of red 6.d omn. elte Jth,k. f,oa,/., , ... n W,, ah,fhend.it~~oe n'ith thin tgwnataen .ndl tAe,. . 46-ai~.'eVnAV /d.~-a. inakn,.'e %.del~. rednoom. -io '. .1-1 nV -d.....

44 .. IN Preu. at New.; A-ne Lineihtonaow:enent -ii. fewere plaretso awnm. O~hnondaga Formation-

Greoon thn Mao..~ pert, -1..e4-kago 1., '. .A u. -... etd4os nda-hIDn

de ."f more . en rrntrfl ."oflt.0~ pd

0 ottsville Group Shomt..e ',noe'eLnetien ed

1ZI ttery.Ikiol. soe--me t.menlon.- w.t hif.ng

Wills Creek FormationAllegheny Group Greis rwti bed... ai, Aide

F" (w/i.' A*m....re.. utdw .M. IV. contian. red shade and voitttwne in theh-.~. a~und -I us. wu~.-ron. ruwoteeu.t lower part.

ri/.1uw, ,,aV i'huu u Vswuut an-

*,.de rp-t. Kwa--V.giii. end

)a Bloomsburg FormationRed. in and thwmh bedded shne ad nili.wbnne with lwimil andt. of soedolte end

0Clinton Group ti ftnatietn;Oe. re hi

ZI,,a~r. lueddg tw. mnnot -fd 'McKenzie Formation4 t~~~,,al gry- tuW, /Vr~l liurb .i.' . , (.reeooh a-&, thin beded ohe/c enter-

the Ri.- Hi//ino bro-onb ii qwnrw, bedded wi~th erew, the. beddw-d. fooiti,(,,n,dn.-c IKurfiri i,hed,i tesperrd ines limmoinne'; 86-,at ofdn~n.tn the..'VV jtnk te-v sale OttAIuu'hr)e bow. anej.rnetonotd brm-ie in the

lowr port. Aboent in Hnrriobere endm-

Marine beds Kye omtoZ Gmraw1 t u/l brow,-. shot-. wrayn-k-he. KesrFomto

an wnuntiue. itilni tn,o- fid. Daerl grow, higl btvoilvfern. thick bdddV ad PInrte- be1. -anm/wit Iturke. gid. mrvotoeli", to noeduelrw,n

U ~~itrol/,e. ti rell. and Trivanter, Rtwik; Pawn- into Manius. R-nomt. and IleeherTw/tv Linmrotui,.e ase'. l'.aainon the rent.

P ocono Group Tmnloway FormationP-1 i/i...uii.ts, prat. An-il. Cray. highly lamineted. thin bedded.

b-04-1 /onql ,aa. tin 1 ....... ettlrenew iveo n... twyo Vtewe

At. I.. l" ,e ii iVt riia ....i t I va~.ut

[7Catskill FormationOA Chscfly red to, be-owen Mhote. end meid-

atn, wnt~e reyend a.,oreo1.t &an.4-Orskn Fomto n/me..'wo al P.11k M-unaine.

h alb h"' mwoHuntt'.huu/A~. nod Data'qr Nir-

theiiix,(uani. nteco

i.dd hit/ r, dmi witdal

Tuscarora FormationWl4'. 6Vi -. - -h- iin to 'huek t'dd,,Ane oraine. oqeiortmati -i-datue. cox.w/i--nreti. part,

GEOLOGY MAP LEGENDREFERENCE:GEOLOGIC MAP OF PENNSYLVANIA PREPAREDBY COMMONWEALTH OF PENNA. DEPT OF INTERNAL I~I~ ~ 1 ) IAFFAIRS ,OATEO 1960, SCALE I'14 MILES