Engineering, System Design Global Procurement Construction ...

12

Transcript of Engineering, System Design Global Procurement Construction ...

Engineering, System Design

Construction Management

Global Procurement

Maintenance

HIRONOBU WADARepresentative

20003rd President

Masafusa Sekizawa(2000-2005)

Fujidenki Engineering Co.,Ltd. Established

Tom Yum Kung Financial Crisis

19971st PresidentTadashi Ando

(1997-1998)

19992nd PresidentToshihiro Fujii

(1999)

1998Navanakorn Office

Established

Thailand’sPolitical Change

20064th PresidentMorito Endo(2006-2016)

2008Moved Navanakorn Office

1969‘80

‘902000

‘10‘20

2011Thailand floods

2014Thai coup d'état

20175th President

Yoshiyuki Kido(2017-2019)

20206th President

Hironobu Wada (2020~)

1993Moved Head Office toCharn Issara Tower II

1995Laem Chabang Branch

Established

2019Fuji Furukawa E&C (Thailand) Co.,Ltd.

50 Years Anniversary

1972Plating Line

Construction

1981Gas Separation Plant

Construction

SUBSTATIONWORKS

ELECTRICALWORKS

MECHANICALWORKS

INSTRUMENTWORKS

PHOTOVOLTAIC POWERWORKS

Fuji Furukawa E&C (Thailand)“More Optimal, More Comfortable”

CIVILWORKS

MAINTENANCE & IMPROVEMENT

WORKS

SUBSTATION WORKS

ELECTRICAL WORKS

INSTRUMENT WORKS

PHOTOVOLTAIC POWER WORKS

CIVIL WORKS

Japan (support)

Cambodia Malaysia

philippines

Vietnam

Indonesia

Myanmar

Thailand

Fuji Furukawa E&C (Thailand) Co., Ltd.