ENGINEERING & STORMWATER DEPARTMENT REDUNDANT STREETLIGHTING

6
ENGINEERING & STORMWATER DEPARTMENT REDUNDANT STREETLIGHTING

description

ENGINEERING & STORMWATER DEPARTMENT REDUNDANT STREETLIGHTING. GIS INTERACTIVE STREETLIGHT LAYER 2008 Present. STREETLIGHT INVENTORY ANALYSIS. How many streetlights? Answer: 2876 City streetlights A redundant streetlight: - PowerPoint PPT Presentation

Transcript of ENGINEERING & STORMWATER DEPARTMENT REDUNDANT STREETLIGHTING

Page 1: ENGINEERING & STORMWATER DEPARTMENT REDUNDANT STREETLIGHTING

ENGINEERING & STORMWATER DEPARTMENT

REDUNDANT STREETLIGHTING

Page 2: ENGINEERING & STORMWATER DEPARTMENT REDUNDANT STREETLIGHTING

GIS INTERACTIVE STREETLIGHT LAYER2008 Present

Page 3: ENGINEERING & STORMWATER DEPARTMENT REDUNDANT STREETLIGHTING

STREETLIGHT INVENTORY ANALYSISHow many streetlights? Answer: 2876 City streetlights

A redundant streetlight:An existing light remaining after a new

continuous lighting string is installed.10 redundant lights have already been

removed under separate projects.41 lights to be removed in 4 phases.The total cost of the project will be

$15,444.00.The City will see a $381.00/month or

$4,572.00/year savings.The Return on Investment will be 3.38

years.

Page 4: ENGINEERING & STORMWATER DEPARTMENT REDUNDANT STREETLIGHTING

REDUNDANT STREETLIGHT REMOVAL

Palm Coast Parkway (East bound) @ Brushwood Dr.

Redundan

t

Redundan

t

Continuou

s

Cont

inuo

us

Cont

inuo

us

Page 5: ENGINEERING & STORMWATER DEPARTMENT REDUNDANT STREETLIGHTING

REDUNDANT LIGHTS TO BE REMOVED

Page 6: ENGINEERING & STORMWATER DEPARTMENT REDUNDANT STREETLIGHTING

PROJECT PHASESPhase Description Cost

Savings# 1 10 Fixtures & Poles $6,290$121/month# 2 11 Fixtures $4,780$83/month# 3 14 Fixtures $2,828

$123/month# 4 6 Fixtures $1,546

$54/monthTotal 41 Fixtures $15,444$381/month

Return On Investment = 3.38 years