Page 1: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

0

Leroy San Miguel

ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS

Henry Acosta

EXECUTIVE DIRECTOR OF CONSTRUCTION & ENGINEERING

Richard De La Cruz, P.E.

DIRECTOR OF ENGINEERING

Engineering Services

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

April 2018

Page 2: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

1

PROJECTS IN CONSTRUCTION

Page 3: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

2

Track & Field Upgrades at Jay HS

ATHLETICS UPGRADES

Engineering Firm – Cude Engineers, LLC

NISD Project Manager – Richard De La Cruz, P.E.

Contract Amount – $1,895,356

Contractor – Field Turf USA, Inc.

Construction Period – April 2017- TBD

Construction Status – 80%

Project Scope – Full replacement of track and football field with synthetic turf and synthetic track surfacing. (2007/2014 Bond Funds).

Page 4: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

3

Tennis Court Upgrades at Sul Ross MS & Stevens HS

Engineering Firm – Moy Tarin Ramirez Engineers, LLC

NISD Project Manager – Troy Spear Contract Amount – $103,875 Contractor – Premier Courts Limited Company Construction Period – September 2017 – April 2018

Construction Status – 100% for Sul Ross MS and 98% for Stevens HS

Project Scope – Tennis court resurfacing at both campuses.

Tennis Court Upgrades at Taft HS

Engineering Firm – Moy Tarin Ramirez Engineers, LLC

NISD Project Manager – Richard De La Cruz, P.E.

Contract Amount – $56,846

Contractor – Premier Courts Limited Company

Construction Period – May 2018 – August 2018

0% Construction

Project Scope – Tennis court resurfacing

Page 5: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

4

CHILLER REPLACEMENTS

Chiller Replacement, Electrical & Lighting Upgrades at Carlos Coon ES and PE/Athletics Dressing/Locker Room AC Installation at Stevens HS

Engineering Firm – Silber & Associates Consulting Engineers, Inc.

NISD Project Manager – Rob Ibarra Contract Amount – $947,228 Contractor – Flo-Aire Service, Inc. Construction Period – February 2018 – July 2018

15% Construction at Carlos Coon ES and 85% at Stevens HS

Project Scope – Carlos Coon ES – Replace chiller, main electrical panel and motor control

centers. Replace 32 watt lamps with 28 watt lamps throughout campus. Stevens HS - Install air conditioning and heating in boy’s and girl’s locker

rooms.

Carlos Coon ES – Steel reinforcement for concrete slab

in preparation of the chiller installment

Page 6: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

5

Chiller Replacement, PE/Athletics Dressing/Locker Room AC Installation, Energy Savings & Lighting Upgrades at Health Careers HS

Engineering Firm – Alderson & Associates, Inc.

NISD Project Manager – Rob Ibarra Contract Amount – $2,415,000 Contractor – R.E.C. Industries, Inc. Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Replace chiller, cooling tower, condenser and chilled water pumps. Install air conditioning and heating in boy’s and girl’s locker rooms. Replace existing lamps in Gym with LED lamps.

Engineering Firm – DBR Engineering Consultants, Inc.

NISD Project Manager – Rob Ibarra Contract Amount – $1,599,000 Contractor – R.E.C. Industries, Inc. Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Re-lamping of interior lighting, locker room AC installations, and

Building D mechanical renovations of the classrooms.

Electrical, Lighting, Mechanical Upgrades and PE Athletics Dressing/Locker Room AC Installation at Pease MS

Page 7: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

6

ENERGY CONTROLS

Energy Controls, Fire Alarm System & Lighting Upgrades at Burke ES

Engineering Firm – DBR Engineering Consultants, Inc.

NISD Project Manager – Ramiro Guerrero Contract Amount – $474,208 Contractor – HJD Capital Electric, Inc. Construction Period – June 2018 – August 2018

0% Construction

Project Scope –

Jay HS – Upgrade network cabling. Carson ES – Upgrade network cabling and install new Native programming

system.

Energy Controls at Helotes ES & Nichols ES

Engineering Firm – DBR Engineering Consultants, Inc.

NISD Project Manager – Ramiro Guerrero Contract Amount – $188,000 Contractor – Climatec, LLC Construction Period – June 2018 – August 2018

0% Construction Project Scope –

Helotes ES – Upgrade cabling and full HVAC control system. Nichols ES – Upgrade network cabling.

Page 8: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

7

FENCING UPGRADES

Engineering Firm – CDS Muery Engineers

NISD Project Manager – Troy Spear Contract Amount – $87,335 Contractor – Clearfield Construction Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Improve exterior perimeter fencing at three campuses.

Fencing Upgrades at NW Crossing ES, Westwood Terrace ES & Marshall HS

Energy Controls at Jay HS & Carson ES

Engineering Firm – Wallis Engineering Group, Inc.

NISD Project Manager – Ramiro Guerrero Contract Amount – $423,900 Contractor – Central Electric Contractors Construction Period – June 2018 – August 2018

33% Construction Project Scope – Upgrade network cabling and install new Native programming

system; replace fire alarm system. Replace 32 watt lamps with 28 watt lamps throughout campus. Replace existing lamps in Gym with LED lamps.

Page 9: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

8

Fire Alarm System Upgrades at Stevenson MS & Mary Hull ES

FIRE ALARM SYSTEM UPGRADES

Engineering Firm – DBR Engineering Consultants, Inc.

NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor – Central Electric Contractors Ent. & Co. Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Replace fire alarm systems.

Fire Alarm System Upgrades at Maintenance

Purchasing Warehouse

Engineering Firm – KCI Technologies, Inc.

NISD Project Manager – Carlos Rodriguez Contract Amount – $118,700 Contractor – Central Electric Contractors Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Upgrade the fire alarm system entirely, and upgrade the lighting

including new ballast and disconnects.

Page 10: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

9

Fire Alarm System Upgrades at Howsman ES, Transportation North & Transportation South

Engineering Firm – MS2 Inc. Consulting Engineers

NISD Project Manager – Carlos Rodriguez Contract Amount – $155,000 Contractor – CRI Electric, Inc. Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Replace fire alarm systems.

Fire Alarm System Upgrade at Holmes HS

Engineering Firm – Wallis Engineering Group, Inc.

NISD Project Manager – Ramiro Guerrero Contract Amount – $189,400 Contractor – Central Electric Contractors Ent. & Co. Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Replacement of the FCI 7300 series F/A panels to the FCI S3 series panel in the following buildings: B, C, D, E, F, G, H, and I.

Page 11: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

10

HVAC RENOVATION

LIGHTING UPGRADES

Lighting Upgrades at Jay HS & Police Station and Energy Controls at Neff MS

Engineering Firm – Silber & Associates Consulting Engineers, Inc.

NISD Project Manager – Ramiro Guerrero Contract Amount – $180,000 Contractor – CRI Electric, Inc. Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Jay HS –Replace existing lamps in Gym with LED lamps. Police Station – Replace ballasts and 32 watt lamps with 28 watt lamps

throughout campus. Neff MS – Upgrade network cabling.

Engineering Firm – Wallis Engineering Group, Inc.

NISD Project Manager – Richard De La Cruz, P.E., Rob Ibarra

Contract Amount - $16,200,000

Contractor – Bartlett-Cocke General Contractors

Construction Period – June 2016 – June 2018

Construction Status – 80% Construction Phase VIII (Last Phase to Complete)

Project Scope – Replace HVAC system including boiler and piping; install air

conditioning and heating in boy’s and girl’s locker rooms.

HVAC Renovation/Boiler Replacement/PE/Athletics Dressing/Locker Room AC Installation

at Clark HS

Page 12: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

11

Lighting Upgrades at Locke Hill ES

Lighting Upgrades at Howsman ES, Transportation Rhodes & Transportation South

Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $85,173 Contractor – HJD Capital Electric, Inc. Construction Period – April 2018 – August 2018

60% Construction

Project Scope – Replace 32 watt lamps with 28 watt lamps throughout campus. Replace existing lamps in Gym with LED lamps.

Engineering Firm – MS2 Inc. Consulting Engineers

NISD Project Manager – Ramiro Guerrero Contract Amount – $83,242 Contractor – HJD Capital Electric, Inc. Construction Period – June 2018 – August 2018

0% Construction Project Scope – Howsman ES –Replace existing lamps with LED lamps throughout

campus. Transportation Rhodes & South – Replace ballasts and 32 watt lamps with 28 watt lamps throughout campuses. Replace existing lamps in Bus areas with LED lamps.

Page 13: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

12

MECHANICAL UPGRADES

Engineering Firm – DBR Engineering Consultants, Inc.

NISD Project Manager – Carlos Rodriguez Contract Amount – $338,120 Contractor – Central Electric Enterprises & Co. Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Westwood Terrace ES: Meter loop for portables needs to be upgraded due to age. Light fixture upgrades. Mary Hull ES: Light fixture upgrades and new ballast and

disconnects.

Lighting Upgrades at Grissom CIT & Purchasing Warehouse

Purchasing Warehouse Engineering Firm – KCI Technologies

NISD Project Manager – Ramiro Guerrero Contract Amount – $82,200 Contractor – Central Electric Construction Period – June 2018 – August 2018

90% Construction

Project Scope – Grissom CIT – Replace 32 watt lamps with 28 watt lamps throughout

campus. Replace existing lamps in Bus area with LED lamps. Purchasing Warehouse – Replace 32 watt lamps with 28 watt lamps

throughout campus. Replace existing lamps in Warehouse with LED lamps.

Mechanical & Lighting Upgrades at Mary Hull ES and Electrical & Lighting Upgrades at Westwood Terrace ES

Page 14: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

13

Mechanical Upgrades at Jordan MS

Engineering Firm – Wallis Engineering Group, Inc.

NISD Project Manager – Rob Ibarra Contract Amount – $7,465,000 Contractor – D.L. Bandy Constructors, Inc.

Construction Period – June 2018 – August 2020

0% Construction

Project Scope – Install new VAV system throughout campus, replace chiller.

Engineering Firm – DBR Engineering Consultants, Inc.

NISD Project Manager – Ramiro Guerrero

Contract Amount - $2,345,820

Contractor – Comfort-Air Engineering, Inc.

Construction Period – June 2017 – August 2018

Construction Status – 65% Construction Phase III of IV in Progress

Project Scope – Replace unit ventilators throughout the campus with VAV

systems, replace two chillers and HVAC controls throughout the campus.

Mechanical Upgrades & Energy Controls Upgrade at Elrod ES

Page 15: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

14

Mechanical Upgrades at Linton ES

Engineering Firm – Cleary Zimmermann Engineers

NISD Project Manager – Rob Ibarra Contract Amount – $1,078,690 Contractor – Comfort-Air Engineering, Inc. Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Replace air handling unit and install VAV system for Library,

Cafeteria, Admin, Auditorium and Stage.

Engineering Firm – Cleary Zimmermann Engineers

NISD Project Manager – Rob Ibarra

Contract Amount – $2,950,000 Contractor – Baron-Long Construction, LTD. Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Replace unit ventilators with VAV system in classrooms.

Mechanical Upgrades at Brauchle ES

Page 16: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

13

Paving Upgrades at Human Resources

Engineering Firm – Moy Tarin Ramirez Engineers, LLC NISD Project Manager – Richard De La Cruz, P.E.

Contract Amount – $143,360

Contractor – SBM General Contractors, LLC Construction Period – February 2018 – August 2018

10% Construction

Project Scope – Replace paving for staff parking.

PAVING UPGRADES

Engineering Firm – Wallis Engineering Group, Inc.

NISD Project Manager – Rob Ibarra Contract Amount – $2,426,000 Contractor – Baron-Long Construction, LTD Construction Period – April 2018 – July 2018

0% Construction

Project Scope – Taft HS Boy's and Girl's Locker Room: Add 4 AHU's and ductwork, add roof relief hoods, replace exhaust fans and remove unit heaters and ventilation fans. Taft HS Building B Voc: Replace Corridor Unit Ventilator with AHU and ductwork. Stinson MS Boy's and Girl's Locker Room: Add 2 roof AHU's and ductwork, add roof relief hoods, and replace exhaust fans. Remove unit heaters and ventilation fans. Rayburn MS Girl's Locker Room and Weight Room: Add DX rooftop units and ductwork, add roof relief hoods and replace exhaust fans. Remove unit heaters and ventilation fans.

Mechanical Upgrades at Taft HS and PE/Athletics Dressing/Locker Room AC Installation

at Rayburn MS, Stinson MS & Taft HS

Page 17: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

14

Paving & Drainage Upgrades at Northside Children Center & Rawlinson MS

Engineering Firm – CDS Muery Engineers

NISD Project Manager – Richard De La Cruz, P.E.

Contract Amount – $274,000

Contractor – R.L. Rohde General Contractors Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Rawlinson MS – Improve drainage system. Northside Children’s Center – Replace paving for staff parking and bus

loop.

Engineering Firm – CDS Muery Engineers

NISD Project Manager – Troy Spear

Contractor Amount – $129,950

Contractor – ADCO Master Builders Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Replace paving for staff parking and bus loop.

Paving Upgrades at McDermott ES

Page 18: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

15

Engineering Firm – DBR Engineering Consultants, Inc.

NISD Project Manager – Carlos Rodriguez Contract Amount – $507,030 Contractor – Comfort-Air Engineering, Inc.

Construction Period – March 2018 – July 2018

0% Construction

Project Scope – Install air conditioning and heating in boy’s and girl’s locker

rooms.

PE/Athletics Dressing/Locker Room AC Installation at Brandeis HS

P.E. / ATHLETICS DRESSING / LOCKER RM AC INSTALLATION

Engineering Firm – CDS Muery Engineers

NISD Project Manager – Richard De La Cruz, P.E.

Contract Amount – $468,850

Contractor – CGC General Contractors, Inc. Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Replace paving for staff parking and bus loop at both campuses.

Paving & Drainage Upgrades at Alternative HS & Burke ES

Page 19: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

16

Engineering Firm – KCA Engineers, Inc.

NISD Project Manager – Carlos Rodriguez Contract Amount – $190,000 Contractor – Flo-Aire Service, Inc.

Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Install air conditioning and heating in boy’s and girl’s locker

rooms.

Engineering Firm – Cleary Zimmermann Engineers

NISD Project Manager – Carlos Rodriguez Contract Amount – $94,680 Contractor – R.E.C. Industries, Inc.

Construction Period – April 2018 – July 2018

0% Construction

Project Scope – Install air conditioning and heating in boy’s and girl’s locker

rooms.

PE/Athletics Dressing/Locker Room AC Installation at Brennan HS

PE/Athletics Dressing/Locker Room AC Installation at Garcia MS

Page 20: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

17

Engineering Firm – DBR Engineering Consultants, Inc.

NISD Project Manager – Rob Ibarra Contract Amount – $652,065 Contractor – Comfort-Air Engineering, Inc.

Construction Period – March 2018 – July 2018

0% Construction

Project Scope – Install air conditioning and heating in boy’s and girl’s locker

rooms.

Engineering Firm – CNG Engineering, PLLC

NISD Project Manager – Carlos Rodriguez Contract Amount – $652,065 Contractor – International Mechanical Services

Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Install air conditioning and heating in boy’s and girl’s locker

rooms.

PE/Athletics Dressing/Locker Room AC Installation at Warren HS

PE/Athletics Dressing/Locker Room AC Installation at Jordan MS

Page 21: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

18

Engineering Firm – CDS Muery Engineers

NISD Project Manager – Troy Spear

Contract Amount – $162,500

Contractor – Pronto Sandblasting & Coating & Oil Field Services Co.

Construction Period – April 2018 – June 2018

100% Construction for All Campuses

Project Scope – Geodesic dome replacement with playscape equipment at five

campuses.

Playground Upgrades at Allen ES, Cable ES, Carnahan ES, Nichols ES & NW Crossing ES

Playground Upgrades at Boone ES, Brauchle ES, Burke ES, Carson ES & Scobee ES

Engineering Firm – CDS Muery Engineers

NISD Project Manager – Troy Spear

Contract Amount – $163,775

Contractor – SBM General Contractors, LLC

Construction Period – April 2018 – June 2018

0% Construction for Boone ES and 100% Construction for Brauchle ES, Burke ES,

Carson ES, and Scobee ES

Project Scope – Geodesic dome replacement with playscape equipment at five

campuses.

PLAYGROUND UPGRADES

Page 22: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

19

Playground Upgrades at Cody ES, Meadow Village ES, Powell ES & Westwood Terrace ES

Engineering Firm – CDS Muery Engineers

NISD Project Manager – Troy Spear

Contract Amount – $121,400

Contractor – Pronto Sandblasting & Coating & Oil Field Services Co.

Construction Period – April 2018 – June 2018

100% Construction at Cody ES, 100% at Powell ES, 90% at Westwood Terrace ES, and

100% at Meadow Village ES

Project Scope – Geodesic dome replacement with playscape equipment at four campuses.

Playground Upgrades at Behlau ES, Glenoaks ES, Murnin ES, Valley Hi ES & Villarreal ES

Engineering Firm – Moy Tarin Ramirez Engineers, LLC

NISD Project Manager – Troy Spear

Contract Amount – $165,500

Contractor – Pronto Sandblasting & Coating & Oil Field Service, Co. Inc.

Construction Period – April 2018 – June 2018

100% Construction at Murnin ES and 0% Construction at Behlau ES,

Glenoaks ES, Valley Hi, and Villarreal ES

Project Scope – Geodesic dome replacement with playscape equipment at

five campuses.

Page 23: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

20

San Antonio Sports School Park at Burke ES and Colonies North ES

Engineering Firm – Moy Tarin Ramirez Engineers, LLC

NISD Project Manager – Richard De La Cruz, P.E.

Contract Amount – $104,324

Contractor – R.L. Rhode General Contracting, Inc.

Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Community fitness park on school grounds to include fitness

equipment and walking paths.

Engineering Firm – Moy Tarin Ramirez Engineers, LLC

NISD Project Manager – Richard De La Cruz, P.E. Contract Amount – $68,000 Contractor – EZ Bel Construction, LLC

Construction Period – May 2018 – June 2018

0% Construction

Project Scope – Installation of flashing beacons and associated signage.

School Flashers at Linda G. Mora ES

SAN ANTONIO SPORTS SCHOOL PARK

SCHOOL FLASHERS

Page 24: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

21

PROJECTS IN DESIGN/PLANNING

Page 25: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

22

PAVING / DRAINAGE UPGRADES

Paving Upgrades at Transportation South

Engineering Firm – Cude Engineers

NISD Project Manager – Richard De La Cruz, P.E.

Budget Amount – $1,200,000

Contractor – TBD Construction Period – June 2018 – August 2018

60% Design

Project Scope – Reconstruction of existing pavement around the entire transportation station, especially for bus parking.

Lighting Upgrades at Carson ES and Lewis ES

Purchasing Warehouse Engineering Firm – CNG Engineering, PLLC

NISD Project Manager – Carlos Rodriguez Budget Amount – $140,000 Contractor – TBD Construction Period – June 2018 – August 2018

100% Design

Project Scope – Carson ES: Light Fixtures are the shoe box type fixture and will be the T5 High Bay for the Gym and the Campus Lamps are 32 Watt that will go to 28 Watt with new ballast and disconnects. Lewis ES: Light Fixture Technology Requires Upgrade, Light Fixtures are the shoe box type fixture and will be the T5 High Bay for the Gym and the Campus Lamps are 32 Watt that will go to 28 Watt with new ballast and disconnects.

LIGHTING UPGRADES

Page 26: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

23

PA Intercom Systems at Mead ES and Murnin ES

Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Carlos Rodriguez

Budget Amount – $80,000

Contractor – TBD Construction Period – June 2018 – August 2018

100% Design

Project Scope – PA systems are in need of an upgrade with two- way communication between the classrooms and front office.

Drainage Upgrades at Warren HS

Engineering Firm – CDS Muery NISD Project Manager – Richard De La Cruz, P.E.

Budget Amount – $200,000

Contractor – TBD Construction Period – June 2018 – August 2018

0% Design

Project Scope – Drainage upgrades adjacent to the existing track due to runoff

from the adjacent parking.

PA INTERCOM SYSTEMS

Page 27: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

24

PA Intercom Systems at Carson ES, Ott ES, and Wanke ES

Engineering Firm – DBR Engineering, Inc.

NISD Project Manager – Carlos Rodriguez

Budget Amount – $120,000

Contractor – TBD Construction Period – June 2018 – August 2018

100% Design

Project Scope – PA systems are in need of an upgrade with two- way communication between the classrooms and front office.

PA Intercom Systems at Blattman ES and Hatchett ES

Engineering Firm – DBR Engineering Consultants, Inc.

NISD Project Manager – Carlos Rodriguez

Budget Amount – $80,000

Contractor – TBD Construction Period – June 2018 – August 2018

100% Design

Project Scope – PA systems are in need of an upgrade with two- way communication between the classrooms and front office.

Page 28: Engineering ServicesFIRE ALARM SYSTEM UPGRADES Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor

25

PLAYGROUND UPGRADES

Engineering Firm – Moy Tarin Ramirez Engineers, LLC

NISD Project Manager – Troy Spear

Budget Amount – $345,000

Contractor – TBD

Construction Period – June 2018 – August 2018

100% Design

Project Scope – Geodesic dome replacement with playscape equipment at ten

campuses.

Playground Upgrades at Aue ES, Carlos Coon ES, Colonies North ES, Esparza ES, Forester ES, Krueger ES, Lieck ES, Los Reyes ES, Mead ES, Mireles ES