Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE...

83
Electric Power Engineering REFERENCES

Transcript of Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE...

Page 1: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

Hamdije Ćemerlića 2, 71000 Sarajevo, Bosnia and HerzegovinaPhone: (++) 387 33 277 111; 277 120

Fax: (++) 387 33 658 328E-mail: [email protected]

www.energoinvest.com

Electric PowerEngineering

Publ

ishe

r:En

ergo

inve

std.

d.–

Mar

ketin

g,Sa

raje

vo,J

uly

2008

. REFERENCES

Page 2: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

1

E L E C T R I C P O W E R E N G I N E E R I N G

1 - design, 2 - equipment supply, 3 - construction, U/C - under construction

COUNTRY SUBSTATIONLOCATION OWNER VOLTAGE (KV) TRANSFORMER

RATING (MVA) COMPLETION SCOPE

Dubai UAE Najma DEC 132 - 1988 1,2,3Garhoud DEC 132 2x63 1992 2Ghusais DEC 132 2x63 1992 2Mankhooul DEC 132 2x63 1992 2Future Need DEC 132 2x63 1992 2

Egypt Beni Suef EEA 132 - 1985 1,2,3

Iraq Ramadi East Ministry of Industry - SOE 132/33/11 3x63 1990 1,2,3Tel Abu Tahir Ministry of Industry - SOE 132/33/11 3x63 1989 1,2,3New Akashat Ministry of Industry - SOE 132/33/11 3x63 1990 1,2,3New Um Qasir Ministry of Industry - SOE 132/33/11 3x63 1989 1,2,3New Suleimanlya Ministry of Industry - SOE 132/33/11 3x63 1990 1,2,3Amara Ministry of Industry - SOE 132/33/11 3x63 1990 1,2,3Hammam Al-Alil GEGT 132/33/11 3x63 1990 1,2,3

Libya Benjawad SOE 66/11 2x10 1989 1,2,3Homs SOE 220/33/11 3x63 1997 1,2,3Rapta SOE 220/33/11 3x63 1988 1,2,3

Syria Damascus PEE 66/20 3x30 1987 1,2Aleppo PEE 66/20 3x30 1987 1,2Latakia PEE 66/20 1987 1,2

Ex-Yugoslavia Kakanj - 5 Elektroprivreda BiH 400 270 1988 1,2,3HPP Višegrad Elektroprivreda BiH 220 - 1989 1,2,3Otoka Elektroprivreda BiH 110/10 2x31,5 1975 1,2,3Cement factory Elektroprivreda BiH 110/6,3 3x31,5 1978 1,2,3Prahovo 1 RTB - Bor 110/10 31¸,5 1978 1,2,3Koševo GIK Hidrogradnja 110/10 2x31,5 1979 1,2,3Prahovo 2 RTB - Bor 110/10 31,5 1985 1,2,3Priština Elektrokosovo 110/10 31,5 1985 1,2,3Šupkovac RMHK-Trep~a 110/35/6,3 2x31,5 1985 1,2,3

3x63HPP Mostar Elektroprivreda BiH 110/35/10 3x30 1988 1,2,3Bu}a Potok Elektroprivreda BiH 110 2x31,5 1984 1,2,3

Qatar Old Airport MEW 132 2x92 1990 2Old Airport MEW 66 2x36 1990 2Race Cource MEW 66 2x36 1990 2Gharata North MEW 66 2x36 1990 2

Czechoslovakia Ziarnadhronom ZSEC 110 - 1990 2

Bosnia &Herzegovina

Skenderija Elektroprivreda BiH 123/12 2x31,5 2000 1,2Otoka Elektroprivreda BiH 123/12 2x31,5 2000 1,2Koševo Elektroprivreda BiH 123/12 2x31,5 2000 1,2

SUBSTATIONS WITH GAS INSULATED SWITCHGEARS

Serbia &Montenegro Šupkovac RMHK-Trepča 110 2005 1,2,3

Libya Rabta GECOL 220/33/11 2007 1,2,3

Page 3: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

2

E L E C T R I C P O W E R E N G I N E E R I N G

1 - design, 2 - equipment supply, 3 - construction, U/C - under construction

COUNTRY SUBSTATIONLOCATION OWNER VOLTAGE (KV) TRANSFORMER

RATING (MVA) COMPLETION SCOPE

Ex-Yugoslavia Bor ZEPS 400/110 300 1971 1,2,3Tuzla Elektroprivreda BiH 400/220/110 400;150 1977 1,2Mostar Elektroprivreda BiH 400/220/110 400;150 1977 1,2Reljevo Elektroprivreda BiH 400/200/110 400 1979 2,3Banja Luka Elektroprivreda BiH 400/110 2x300 1980 2,3Titograd Elektroprivreda CG 400/110 2x300 1981 2,3

Thermal Power Plant - 400 kV Switchgears

Ex-Yugoslavia Gacko Elektroprivreda BiH 400/110/35 300 1982 1,2,3Ugljevik Elektroprivreda BiH 400/110/35 300 1985 1,2,3

275 kV Substations

COUNTRY SUBSTATIONLOCATION OWNER VOLTAGE (KV) TRANSFORMER

RATING (MVA) COMPLETION SCOPE

Substations and Switching Stations

Malaysia Melaka TNB 275/132/11 - 1993 1,2Pasir Gudang P/S TNB 275/132 - 1993 1,2Permas Jaya TNB 275/132 - 2000 1,2Port KluangUpgrading TNB 275 - U/C 1,2,3

Bukit Tambun(Ext.) TNB 275/132/33 - U/C 1,2,3

Sungai Mati(Ext.) TNB 275/132 240 U/C 1,2,3

Conventional Substations 400 kV Substations

Page 4: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

3

E L E C T R I C P O W E R E N G I N E E R I N G

1 - design, 2 - equipment supply, 3 - construction, U/C - under construction

COUNTRY SUBSTATIONLOCATION OWNER VOLTAGE (KV) TRANSFORMER

RATING (MVA) COMPLETION SCOPE

Substations and Switching Stations

Ex-Yugoslavia Mostar 3 Elektroprivreda, BiH 220 - 1965 1,2,3Kakanj Elektroprivreda, BiH 220 - 1965 1,2,3Cirkovci ZEPS 220/110 150 1968 2Podlog ZEPS 220/110 150 1969 2Kakanj Elektroprivreda, BiH 220/110 150 1970 1,2,3Zenica 2 Elektroprivreda, BiH 220/110 150 1971 1,2,3Prijedor 2 Elektroprivreda, BiH 220/110 150 1971 1,2,3Mostar Elektroprivreda, BiH 220/42 60;70 1972 1,2,3Jajce 2 Elektroprivreda, BiH 220/110/35 63;150 1977 1,2,3

Albania Contract024/TR90/79 Makinaimport 220/115/38,5 90 1979 2

Contract074/EEM/84 Makinaimport 220 - 1988 2

Contract074/DHF/85 Makinaimport 220 - 1988 2

Contract074/NS-1-6/87B Makinaimport 220 - 1988 2

Tanzania Singida Town Tanesco 220/33/11 2x20 1988 1,2,3Shinyanga Tanesco 220/132/33 2x60 1988 1,2,3Mwanza Tanesco 220/132/33 2x60 1988 1,2,3

Iran Olimpik Area Esfahan R.E.C. 220/63/20 - 1999 1,2Foolad Shahr Esfahan R.E.C. 220/63/20 - 1999 1,2Shahreza Esfahan R.E.C. 220/63/20 - 1999 1,2Ardestan Esfahan R.E.C. 220/63/20 - 1999 1,2Mobarakeh ext. Esfahan R.E.C. 220/63 - 1992 1,2

Thermal Power Plant 220 kV Switchgears

Ex-Yugoslavia Tuzla 3 Elektroprivreda, BiH 220 250 1967 2Tuzla 4 Elektroprivreda, BiH 220 250 1968 2Tuzla 5 Elektroprivreda, BiH 220 250 1978 1,2,3Kosovo 2,3,4,5 ZEPS 220,100 - 1965-74 2

Bosnia &Herzegovina Tuzla 4 Elektroprivreda, BiH 220 2003 1,2,3

Hydro Power Plant 220 kV Switchgears

Ex-Yugoslavia Dubrovnik Elektroprivreda Hrvatske 220 120 1965 1,2Gran~arevo Elektroprivreda, BiH 220 60 1968 2Rama Elektroprivreda, BiH 220 90 1968 2^apljina Elektroprivreda, BiH 220 2x40 1979 2Salakovac Elektroprivreda, BiH 220 3x75 1981 2,3Grabovica Elektroprivreda, BiH 220 2x64 1981 2,3

220 kV Substations

Page 5: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

4

E L E C T R I C P O W E R E N G I N E E R I N G

1 - design, 2 - equipment supply, 3 - construction, U/C - under construction

COUNTRY SUBSTATIONLOCATION OWNER VOLTAGE (KV) TRANSFORMER

RATING (MVA) COMPLETION SCOPE

Albania Contract024/TR30/79 Makinaimport 170/115 30 1979 2

Ghana Volta VRA 161 - 1981 1,2,3Achimota VRA 161 - 1981 1,2,3Dunkwa VRA 161 - 1981 1,2,3Asawinso VRA 161/33 30 1982 1,2,3

Indonesia Belawan PLN 150/20 30 1979 1,2Payapasir PLN 150 - 1979 1,2Medan Timur PLN 150/20 30 1979 1,2Titikuning PLN 150 - 1979 1,2Medan/TPP PLN 150/6 2x82 1984 1,2Gilimanuk PLN 150/20 10 1987 1,2,3Kapal PLN 150/20 15 1987 1,2,3Pemaron PLN 150/20 10 1987 1,2,3Glanyar PLN 150/20 15 1988 1,2,3Nusa Dua PLN 150/20 10 1988 1,2,3Negara PLN 150/20 1x10 1988 1,2,3Pesanggaran Ext. PLN 150/20 - 1988 1,2,3Amplapura Ext. PLN 150/20 - 1990 1,2,3Sanur Ext. PLN 150/20 - 1990 1,2,3Bakaru PLN 150 - 1990 1,2,3Tonasa PLN 150 - 1990 1,2,3Pare Pare PLN 150 - 1990 1,2,3Pinrang PLN 150 - 1990 1,2,3Barru PLN 150 - 1990 1,2,3Bangkalan PLN 150/66 - 1994 1,2Sampang PLN 150/66 - 1994 1,2Pamekasan PLN 150/66 - 1994 1,2Sumenep PLN 150/66 - 1994 1,2Kraksaan PLN 150/66 - 1994 1,2Paiton PLN 150/66 - 1994 1,2Babadan PLN 150/66 - 1994 1,2Tuban PLN 150/66 - 1994 1,2Ngawi PLN 150/66 - 1994 1,2Segoromadu PLN 150/66 - 1994 1,2Sekarputih PLN 150/66 - 1994 1,2Banaran PLN 150/66 - 1994 1,2Rungkut PLN 150/66 - 1994 1,2Probolinggo PLN 150/66 - 1994 1,2

170 kV, 161 kV, 150 kV Substations

Page 6: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

5

E L E C T R I C P O W E R E N G I N E E R I N G

COUNTRY SUBSTATIONLOCATION OWNER VOLTAGE (KV) TRANSFORMER

RATING (MVA) COMPLETION SCOPE

Indonesia Manisrejo PLN 150/66 - 1994 1,2Sukolilo PLN 150/66 - 1994 1,2Kenjeran PLN 150/66 - 1994 1,2Surabaya Barat PLN 150/66 - 1994 1,2Babat PLN 150/66 - 1994 1,2Gili Timur PLN 150/66 - 1994 1,2Turen PLN 150/66 - 1994 1,2Kertosono PLN 150/66 - 1994 1,2Magetan PLN 150/66 - 1994 1,2Maospatih PLN 150/66 - 1994 1,2Tulungagung PLN 150/66 - 1994 1,2Jeber PLN 150/66 - 1994 1,2Lawang PLN 150/66 - 1994 1,2Consumer PLN 150/66 - 1994 1,2Mobile Substation PLN 150/66 - 1994 1,2Wlingi PLN 150/66 - 1994 1,2Kisaran Ext. PLN 150/20 - 1996 1,2,3R.Prapat PLN 150/20 - 1996 1,2,3Sibolga PLN 150/20 - 1996 1,2,3Binjai PLN 150/20 - 1996 1,2,3P.Brandan PLN 150/20 - 1996 1,2,3Langsa PLN 150/20 - 1996 1,2,3Sidikalang PLN 150/20 - 1996 1,2,3Tarutung PLN 150/20 - 1996 1,2,3K.Tanjung Ext. PLN 150/20 - 1996 1,2,3T.Tinggi Ext. PLN 150/20 - 1996 1,2,3P.Siantar Ext. PLN 150/20 - 1996 1,2,3Porsea Ext. PLN 150/20 - 1996 1,2,3P.Geli Ext. PLN 150/20 - 1996 1,2,3Brastagi Ext. PLN 150/20 - 1996 1,2,3P.Sidempuan PLN 150/20 - 1996 1,2,3

Turkey Tokat TEAS 154/33 - 2001 1,2Beysehir TEAS 154/33 - 2001 1,2Sinop Ext TEAS 154/33 - 2000 1,2Kayabasi Ext TEAS 154/34,5 - 2000 1,2Giresun Ext TEAS 154/31,5 - 2000 1,2Senderemeke Ext TEAS 154/34,5 - 2000 1,2Kayseri III Ext TEAS 154/33 - 2000 1,2Erzincan Ext TEAS 154/34,5 - 2001 1,2Misliova Ext TEAS 154/33 - 2000 1,2Derinkuju TEAS 154/33 - 2001 1,2

1 - design, 2 - equipment supply, 3 - construction, U/C - under construction

Page 7: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

6

E L E C T R I C P O W E R E N G I N E E R I N G

1 - design, 2 - equipment supply, 3 - construction, U/C - under construction

COUNTRY SUBSTATIONLOCATION OWNER VOLTAGE (KV) TRANSFORMER

RATING (MVA) COMPLETION SCOPE

Bangladesh Saidpur BPDB 132/33 10 1977 1,2Rangpur BPDB 132/33 10 1977 1,2Palashbari BPDB 132/33 10 1977 1,2Bogra BPDB 132/33 10 1977 1,2Kishorganj BPDB 132/33 10 1977 1,2Mymensingh BPDB 132/33 10 1977 1,2Jamalpur BPDB 132/33 10 1977 1,2Madanhat (Ext.) BPDB 132/33 - 1977 1,2Tangail BPDB 132/33/11 10 1982 1,2

Eqypt Edfu GARE 132/33 10 1963 1,2,3Esna (Ext.) GARE 132/33 10 1963 1,2,3Comombo GARE 132/33 10 1963 1,2,3Qena GARE 132/33 10 1963 2,3Comombo Ext. EEA 132/33 - 1985 1,2,3High Dam Ext. EEA 132 - 1985 1,2,3Qena (Ext.) EEA 132/33 - 1985 1,2,3Esna (Ext.) EEA 132/33 - 1985 1,2,3

Ethiopia Wallayita Soso EELPA 132/66/15 6 1985 1,2,3Malka Walkana EELPA 132/66/15 2x6 1985 1,2,3Shashemane (Ext.) EELPA 132/66/15 - 1985 1,2,3Shakisho EELPA 132/11 2x6 1987 1,2,3Yirgalem EELPA 132 - 1987 1,2,3Guder EELPA 132/11 2x15 1989 1,2,3

India Kalakot/TPP 6,6/132 3x7,5 1965 1,2,3Kampur/TPP 11/132 2x40 1965 1,2,3

Iran Rasht Ministy of Energy - Tavanir 132/63/20 15; 20 1970 1,2,3Shafa Ministy of Energy - Tavanir 132/63/20 - 1987 2

Iraq Fao Ministy of Energy - SOE 132/11 2x15 1975 1,2,3Rumaila Ministy of Energy - SOE 132/6,6 2x15 1974 1,2,3Abul Flus (Ext.) Ministy of Energy - SOE 132 - 1974 1,2,3Falluja Ministy of Energy - SOE 132/33/11 2x25 1975 1,2,3Hammam al Alil Ministy of Energy - SOE 132/33/11 2x25 1975 1,2,3Najaf Ministy of Energy - SOE 132/33/11 2x50 1975 1,2,3Shamiya (Ext.) Ministy of Energy - SOE 132 - 1975 1,2,3Babil Ministy of Energy - SOE 132/33/11 2x25 1975 1,2,3Heet Ministy of Energy - SOE 132/33/11 2x50 1983 1,2,3Upper EufratCement Ministy of Energy - SOE 132/33 2x63 1983 1,2,3

Qara Qosh Ministy of Energy - SOE 132/33 2x50 1983 1,2,3Kirkuk Cement Ministy of Energy - SOE 132/33 2x63 1983 1,2,3Farabi (Ext.) Ministy of Energy - SOE 132/33/11 2x50 1985 1,2,3

132 kV Substations

Page 8: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

7

E L E C T R I C P O W E R E N G I N E E R I N G

1 - design, 2 - equipment supply, 3 - construction, U/C - under construction

COUNTRY SUBSTATIONLOCATION OWNER VOLTAGE (KV) TRANSFORMER

RATING (MVA) COMPLETION SCOPE

Iraq Jamila (Ext.) Ministy of Energy - SOE 132 - 1984 1,2,3New Baghdad(Ext.) Ministy of Energy - SOE 132 - 1982 1,2,3

Shuaiba Ministy of Energy - SOE 132/33/11 2x50 1984 1,2,3Muthana Ministy of Energy - SOE 132/33/11 2x63 1984 1,2,3Rashidiya Ministy of Energy - SOE 132/33/11 2x63 1983 1,2,3Tikrit (Ext.) Ministy of Energy - SOE 132/33/11 2x50 1984 1,2,3Shatra Ministy of Energy - SOE 132/33/11 2x63 1984 1,2,3Babil (Ext.) Ministy of Energy - SOE 132/33/11 2x50 1984 1,2,3Najaf (Ext.) Ministy of Energy - SOE 132/33/11 2x50 1983 1,2,3Hilla South Ministy of Energy - SOE 132/33/11 2x50 1984 1,2,3Rutba Ministy of Energy - SOE 132/33/11 2x50 1986 1,2,3Al-Qaim (Ext) Ministy of Energy - SOE 132 - 1990 1,2,3Haditha GEGT 132/33/11 3x63 1990 1,2Khalis GEGT 132/33/11 3x63 1990 1,2Hiten GEGT 132/11 3x63 1990 1,2Rumaitha GEGT 132/33/11 3x63 1990 1,2Kalar GEGT 132/33 3x63 1990 1,2Baiji North GEGT 132 3x63 1990 1,2Meqdadiya GEGT 132/33/11 3x63 1990 1,2Baquba GEGT 132/33/11 3x63 1990 1,2Tuz Khormato GEGT 132/33/11 2x63 1990 1,2Rashidiya Ext. GEGT 132 - 1990 1,2Khir Housing GEGT 132/33/11 3x63 1990 1,2New Latifiya GEGT 132/33 3x63 1990 1,2New Iskenderiya GEGT 132/11 4x63 1990 1,2

Jordan Broadcasting JEA 132/33 - 1988 1,2Sahab JEA 132 - 1988 1,2

Kuwait Al Jabrieh MEW 132/33/11 3x40 1971 1,2,3Hawallie (Ext.) MEW 132/33 3x15 1971 1,2,3Selmeh (Ext.) MEW 132 3x40 1971 1,2,3

IraqSoran UNDP 132/33/11 63 2004 1,2,3W. Dohuk. ext. UNDP 132/33/11 - 2004 1,2,3

Page 9: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

8

E L E C T R I C P O W E R E N G I N E E R I N G

1 - design, 2 - equipment supply, 3 - construction, U/C - under construction

COUNTRY SUBSTATIONLOCATION OWNER VOLTAGE (KV) TRANSFORMER

RATING (MVA) COMPLETION SCOPE

Malaysia Gopeng Road NEB 132/11 2x30 1985 1,2Dungun NEB 132/11 2x15 1985 1,2Rasah NEB 132/11 2x30 1986 1,2Kulai NEB 132/11 2x30 1986 1,2Sabah Alam North NEB 132/11 2x30 1986 1,2Papan (Ext.) NEB 132/11 - 1986 1,2Kulim NEB 132/11 2x45 1986 1,2Renggam NEB 132/11 2x15 1986 1,2Mantin NEB 132/11 2x7,5 1986 1,2Bahau NEB 132/11 2x7,5 1986 1,2Beaufort SEB 132/11 2x15 1989 1,2,3Papar SEB 132/11 2x15 1989 1,2,3Kuala Pilah TNB 132/11 - 1993 1,2Simoang Pertang TNB 132/11 - 1993 1,2Bahan TNB 132/11 - 1993 1,2Pasir Besar TNB 132/11 - 1993 1,2Gemas TNB 132/11 - 1993 1,2Bakri TNB 132/11 - 1993 1,2Sungai Mati Ext. TNB 132/11 - 1993 1,2Parit Raja TNB 132/11 - 1993 1,2Pontian TNB 132/11 - 1993 1,2Rengit TNB 132/11 - 1993 1,2Kluang TNB 132/11 - 1993 1,2Kota Tinggi TNB 132/11 - 1993 1,2Petronas TNB 132/11 - 1993 1,2Pasir Gudang Ind. TNB 132/22 - 1993 1,2Option TNB 132/11 - 1993 1,2Penampang Ext. SEB 132/66 2x24 1994 1,2,3Chaah TNB 132/11 2x15 1998 1,2,3Gelang Patah TNB 132/22 2x60 1998 1,2,3Kukup TNB 132/11 2x15 1998 1,2,3Bukit Kepong TNB 132/11 2x15 1997 1,2,3Pajam TNB 132/11 - 2004 1,2Kinta Valley Resort TNB 132/11 - 2004 1,2Kuala Kangsar(Ext) TNB 132/11 - 2004 1,2

Kluang (Ext) TNB 132/11 - 2004 1,2Taman Universits TNB 132/11 - 2003 1,2

Page 10: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

9

E L E C T R I C P O W E R E N G I N E E R I N G

1 - design, 2 - equipment supply, 3 - construction, U/C - under construction

COUNTRY SUBSTATIONLOCATION OWNER VOLTAGE (KV) TRANSFORMER

RATING (MVA) COMPLETION SCOPE

Pakistan Bucheke WAPDA 132/66/11 30; 10 1969 1,2,3Mahra Khas WAPDA 132/11 10 1969 1,2,3Damhar Wala WAPDA 132/11 10 1969 1,2,3Khairpur Sadat WAPDA 132/11 10 1969 1,2,3Muzaffargarh WAPDA 132 - 1969 1,2,3Jatoi-Janubi WAPDA 132/11 10 1969 1,2,3Shadara WAPDA 132/11 10 1972 1,2,3Kaka Shah Kaku WAPDA 132/11 20 1972 1,2,3Narang WAPDA 132/11 10 1973 1,2,3Narowal WAPDA 132/66 30 1973 1,2,3Muzaffargarh (Ext.) WAPDA 132/11 10 1973 1,2,3Kot Adu WAPDA 132 - 1973 1,2,3Chaubara WAPDA 132/66/11 30; 10 1974 1,2,3Rohri (Ext.) WAPDA 132/66 30 1975 1,2,3Khairpur Sadat WAPDA 132/11 10 1975 1,2,3Gambat WAPDA 132/11 10 1975 1,2,3Kandiaro WAPDA 132/11 10 1975 1,2,3Nowshero Feroz WAPDA 132/11 10 1975 1,2,3Haripur WAPDA 132/11 10 1977 1,2Aboatabad WAPDA 132/66/11 30; 10 1977 1,2Jamrud WAPDA 132/11 10 1977 1,2Lahore Fort WAPDA 132/11 20 1977 1,2Ravi (Ext.) WAPDA 132/11 - 1977 1,2Kot Adu (Ext.) WAPDA 132/66/11 - 1977 1,2Rohri WAPDA 132/66/11 10 1977 1,2Shikarpur WAPDA 132/66/11 30; 10 1977 1,2Kand Kot WAPDA 132/11 10 1977 1,2Nowshero Feroz(Ext.) WAPDA 132/66/11 30 1978 1,2

Sudan Rabak Ministry of Electricity 132/33/11 12,5 1964 1,2,3

Zair HPP Mobal SNEL 132/66 2x15 1987 1,2,3Residence SNEL 132/30/6,6 1x15 1988 1,2,3

Page 11: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

10

E L E C T R I C P O W E R E N G I N E E R I N G

1 - design, 2 - equipment supply, 3 - construction, U/C - under construction

COUNTRY SUBSTATIONLOCATION OWNER VOLTAGE (KV) TRANSFORMER

RATING (MVA) COMPLETION SCOPE

Central AfricanRepublic HPP Boali 2 ENERCA 5,5/110 (t0) 11 1976 1,3

Cuba Santiago deCuba Energoimport 110/13,8 - 1977 2

Cerro Energoimport 110/13,8 25 1987 2Victoria de Giron Energoimport 110/13,8 2x25 1987 2Plaza Energoimport 110/13,8 25 1987 2

Guinea Grandes Chutes MINEK 110/63 12,5 1969 2,3Donkea/HPP MINEK 110/20 2x15 1969 2,3Matoto MINEK 110/15 2x8,5 1969 2,3

Sudan Sennar/HPP (Ext.) Ministry of Electricity 110/33 - 1964 1,2,3Rabak Ministry of Electricity 110/33/11 2x12,5 1964 1,2,3Khartoum North Ministry of Electricity 110/33 3x30 1972 1,2,3

Ex-Yugoslavia Mostar 1 Elektroprivreda BiH 110/35 2x31,5 1958 1,2,3Sarajevo 1 Elektroprivreda BiH 110/35 2x20 1958 1,2,3Kakanj Elektroprivreda BiH 110/35 31,5 1958 1,2,3Bile}a Elektroprivreda BiH 110/35 2x20 1959 1,2,3Gora`de Elektroprivreda BiH 110/35 2x20 1959 1,2,3Br~ko Elektroprivreda BiH 110/35 20 1960 1,2,3Doboj Elektroprivreda BiH 110/35 20 1960 1,2,3Jajce 1 Elektroprivreda BiH 110/35 40 1960 1,2,3Lukovac Elektroprivreda BiH 110/35 2x40 1960 1,2,3Ilijaš Elektroprivreda BiH 110/20/6 2x40 1960 1,2,3Banlozi Elektroprivreda BiH 110/35 2x20 1960 1,2,3Prijedor 1 Elektroprivreda BiH 110/35 2x31,5 1960 1,2,3Banja Luka 1 Elektroprivreda BiH 110/35 40 1960 1,2,3Bitola Elektrostopanstvo 110/35 20 1961 1,2^apljina Elektroprivreda BiH 110/35 40 1962 1,2,3Split - Su}idar Elektroprivreda Hrvatske 110/35 20 1963 2,3@eljezara-Jasenice Elektrogospodarstvo 110/35 40 1964 1,2,3Pljevlja Elektroprivreda CG 110/35 10 1965 1,2Sarajevo 2 Elektroprivreda BiH 110/35 63 1965 1,2,3Srebrenica Elektroprivreda BiH 110/35 40 1965 1,2,3Bosanski Šamac Elektroprivreda BiH 110/35 20 1965 1,2,3Biha} Elektroprivreda BiH 110/35 2x20 1965 1,2,3Banja Luka 2 Elektroprivreda BiH 110/35/20 2x20 1965 1,2,3Ljubljana-Centar Elektrogospodarstvo 110/10 2x20 1965 2,3Toplana Ljubljana Elektrogospodarstvo 110/6 20 1965 2,3Bijeljina Elektroprivreda BiH 110/35 20 1965 1,2,3Tivat Elektroprivreda CG 110/35 10 1966 2,3Bijeljina Elektroprivreda BiH 110 20 1968 1,2Travnik Elektroprivreda BiH 110/35 40 1968 1,2,3Trebinje Elektroprivreda BiH 110/35 20 1968 1,2Jajce 2 Elektroprivreda BiH 110/35 2x40 1969 1,2,3

110 kV Substations

Page 12: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

11

E L E C T R I C P O W E R E N G I N E E R I N G

1 - design, 2 - equipment supply, 3 - construction, U/C - under construction

COUNTRY SUBSTATION LOCATION OWNER VOLTAGE (KV) TRANSFORMERRATING (MVA) COMPLETION SCOPE

Ex-Yugoslavia Beograd 6 ZEPS 110/35 63 1969 2,3Priština 1 Elektrokosovo 110/35 31,5 1969 2,3Mladenovac ZEPS 110/35 20 1969 2,3Tesli} Elektroprivreda BiH 110/35 40 1969 2,3Bor-3 RTB - Bor 110/5,25 3x40 1969 1,2,3Šupkovac RMHK - Trep~a 110/35/6 4x20 1969 1,2,3Jug-Zenica RMK - Zenica 110/35/6 2x31,5 1973 1,2,3Titov Drvar Elektroprivreda BiH 110/20 20 1974 1,2,3Pan~evo-3 ZEPS 110/35/20/110 2x20 1975 2,3Kanji`a Elektrovojvodina 110/35/20 2x20 1975 2,3

Beograd 13 (Vo`dovac) ZEPS 110/10 2x31,5 1976 1,2,3

Apatin Elektrovojvodina 110/20/35 2x31,5 1976 2,3Crvenka Elektrovojvodina 110/20/35 2x31,5 1976 2,3Zvornik-Bira~ Elektroprivreda BiH 110/10 2x20 1976 1,2,3Zvornik Elektroprivreda BiH 110/35 2x31,5 1976 1,2,3Sjever - Zenica RMK Zenica 110/35/6,3 4x31,5 1977 1,2,3TE Kakanj Elektroprivreda BiH 110/35/6 31,5 1977 1,2,3Tuzla Centar Elektroprivreda BiH 110/35/10 3x40 1977 1,2,3Šupkovac 3 RMHK-Trep~a 110/35/6,3 2x40 1977 1HE Bo~ac Elektroprivreda BiH 110/35 31,5 1978 2Radakovo Elektroprivreda BiH 110/20/10 20 1979 1,2,3Omarska Elektroprivreda BiH 110/6 2x31,5 1980 1Rafinerija Sisak Elektroprivreda Hrvatske 110/35 2x40 1981 1,2,3Herceg Novi Elektroprivreda CG 110/35 31,5 1981 1,2,3Debelja~a Elektrovojvodina 110/20 2x16 1983 2,3Bijelo Polje EP Crne Gore 110/35 2x20 1983 2,3Stenjevac ZEPS 110/35/10 2x31,5 1983 2Vršac Elektrovojvodina 110/20/10 2x20 1983 2,3Subotica 4 Elektrovojvodina 110/20 2x31,5 1984 1,2,3PK Dubrave Titovi rudnici Tuzla 110/35/6 2x31,5 1988 1,2,3Vitina Elektrokosovo 110/35/10 2x31,5 1986 1,2,3Podujevo Elektrokosovo 110/20/ (10) 2x31,5 1989 1,2,3Prizren Elektrokosovo 110/20/(10) 2x31,5 1988 1,2,3Titograd 4 Elektroprivreda CG 110/10 2x31,5 1989 2,3Sarajevo - B (Azi}i) Elektroprivreda BiH 110/35/10 2x31,5 1988 2,3Lipljan Elektrokosovo 110/20/ (10) 2x31,5 1988 1,2,3

Zair Katana SNEL 110 1984 1,2,3Goma SNEL 110/15 2x10 1985 1,2,3

Albania Contract 074/NS-1- 6/87B"SH" Makinaimport 110 2x20 1988 1,2Contract 074/NS-1- 6/87B"GJ" Makinaimport 110 2x7,5 1988 1,2Contract 074/NS-1- 6/87B"U" Makinaimport 110 2x7,5 1988 1,2

Contract 074/NS-1- 6/87B"P+Mt" Makinaimport 110 2x7,5 1988 1,2

Contract 074/NS-1- 6/87B"L" Makinaimport 110 2x7,5 1988 1,2

Page 13: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

12

E L E C T R I C P O W E R E N G I N E E R I N G

1 - design, 2 - equipment supply, 3 - construction, U/C - under construction

COUNTRY SUBSTATIONLOCATION OWNER VOLTAGE (KV) TRANSFORMER

RATING (MVA) COMPLETION SCOPE

Zambia Kapiri Mposhi ZESCO 99 1986 1,2,3Mpongwe West ZESCO 88/11 10 1986 1,2,3Mpongwe East ZESCO 88/11 5 1986 1,2,3Mankumpu ZESCO 88/11 5 1986 1,2,3

Indonesia Palembangllir Barat PLN 70/11 2x5 1972 1,2,3

Palembang llir PLN 70/11 2x5 1972 1,2,3Palembangllir Timur PLN 70/11 2x5 1972 1,2,3

Palembang Ulu PLN 70/11 2x5 1972 1,2,3TPP Palembang PLN 70/11 2x16 1975 1,2,3Panorogo PLN 70/20 10 1979 1,2,3Pacitan PLN 70/20 10 1979 1,2,3Delopo PLN 70/20 1979 1,2,3New Madiun PLN 70/20 1979 1,2,3Trengalek PLN 70/20 1979 1,2,3

88 kV, 70 kV Substation

COUNTRY SUBSTATIONLOCATION OWNER VOLTAGE (KV) TRANSFORMER

RATING (MVA) COMPLETION SCOPE

Bosnia &Herzegovina

TE Kakanj Elektroprivreda, BiH 110 2006 1Zenica - Sjever BH STEEL, Željezara Zenica 110/35/6 2004 1

Page 14: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

13

E L E C T R I C P O W E R E N G I N E E R I N G

1 - design, 2 - equipment supply, 3 - construction, U/C - under construction

COUNTRY SUBSTATIONLOCATION OWNER VOLTAGE (KV) TRANSFORMER

RATING (MVA) COMPLETION SCOPE

Zambia Chinsali ZESCO 66/11 1x5 1983 1,2,3Mpika Ext. ZESCO 66 - 1983 1,2,3Isoka ZESCO 66/11 1x5 1983 1,2,3Nakonde ZESCO 66/11 1x5 1983 1,2,3

Central AfricanRepublic

HPP Boali 1 (Ext.) ENERCA 5,5/60 11 1976 1,3Bangui B ENERCA 60/15,5 10 1976 1,3

Egypt Bahteem GARE 66/11 4x10 1968 1,2,3Mostorod GARE 66/11 4x10 1968 1,2,3South Tahrir GARE 66/11 3x10 1968 1,2,3Kaha GARE 66/11 2x10 1968 1,2,3Suez I GARE 66/11 4x10 1973 1,2,3Fayed GARE 66/11 2x10 1973 1,2,3Belkas GARE 66 - 1973 1,2,3Fayoum GARE 66 - 1973 1,2,3Mansoura GARE 66/11 4x10 1973 1,2,3Manzalla GARE 66/11 2x10 1973 1,2,3Abou Ghanima GARE 66/11 2x10 1973 1,2,3Kanater GARE 66 - 1973 1,2,3Nour Baria GARE 66 - 1973 1,2,3Mulaq GARE 66/11 - 1973 1,2,3Zavya GARE 66/11 - 1973 1,2,3Damanhure GARE 66/11 - 1973 1,2,3

Ethiopia Bahir Dar EELPA 45/66 1x6 1983 1,2,3Wereta EELPA 66/15 1x3 1983 1,2,3Gondar EELPA 66/15 2x3 1983 1,2,3Dabat EELPA 66/15 3 1983 1,2,3Dangla EELPA 66/15 3 1983 1,2,3Arba Minch EELPA 66/15 3 1985 1,2,3Robi EELPA 66/15 3 1985 1,2,3

Iran Ramsar Ministry of Energy 63/20 5 1970 1,2,3Astara Ministry of Energy 63/20 5 1970 1,2,3Lachtenecha Ministry of Energy 63/20 5 1970 1,2,3Lahljan Ministry of Energy 63/20 2x5 1970 1,2,3Roudsar Ministry of Energy 63/20 2x5 1970 1,2,3Somech Sara Ministry of Energy 63/20 2x5 1970 1,2,3Hastpar Ministry of Energy 63/20 2x5 1970 1,2,3Dacht Ministry of Energy 63/20 5 1972 1,2,3Dindarloo Ministry of Energy 63/20 5 1972 1,2,3Gas Turbine Ministry of Energy 63/20 12,5 1972 1,2,3Naqsh-e-Rostam Ministry of Energy 63/20 5 1972 1,2,3Takht-e-Jamshid Ministry of Energy 63/20 - 1972 1,2,3

66 kV, 63 kV, 60 kV Substations

Page 15: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

14

E L E C T R I C P O W E R E N G I N E E R I N G

1 - design, 2 - equipment supply, 3 - construction, U/C - under construction

COUNTRY SUBSTATIONLOCATION OWNER VOLTAGE (KV) TRANSFORMER

RATING (MVA) COMPLETION SCOPE

Iran Zarghan Ministry of Energy 63/20 5 1972 1,2,3Nowshahr Ministry of Energy 63/20 - 1976 1,2,3Namakabroud Ministry of Energy 63/20 10 1976 1,2,3Mahmud Abad Ministry of Energy 63/20 10 1976 1,2,3Kordkoy Ministry of Energy 63/20 5 1976 1,2,3Voshmgir Ministry of Energy 63/20 10 1976 1,2,3Zirab Ministry of Energy 63/20 5 1976 1,2,3Nashtaroud Ministry of Energy 63/20 5 1976 1,2,3Ghaemshahr Ministry of Energy 63/20 - 1976 1,2,3

Libya Babolsar Ministry of Energy 66/11 - 1976 1,2,3Ali Abad Ministry of Energy 66/11 - 1976 1,2,3Tiji SOE 66/11 2x10 1980 1,2,3Nalut SOE 66/11 2x10 1980 1,2,3Gosh SOE 66/11 2x10 1980 1,2,3Shakshuk SOE 66/11 2x10 1980 1,2,3Az Zintan SOE 66/11 2x10 1980 1,2,3Romia SOE 66/11 2x10 1980 1,2,3Kiklah SOE 66/11 2x10 1980 1,2,3Garyan SOE 66/11 2x10 1980 1,2,3Tarhuna SOE 66/11 - 1980 1,2,3Misdah SOE 66/11 2x10 1980 1,2,3Wadi Mardun SOE 66/11 2x10 1980 1,2,3Bani Walid SOE 66/11 2x10 1980 1,2,3Egdama SOE 66/11 2x10 1980 1,2,3Suf al Jin SOE 66/11 2x10 1980 1,2,3Jado SOE 66/11 2x10 1986 1,2,3Tamimi SOE 66/11 - 1981 1,2,3Marawa SOE 66/11 - 1987 1,2,3Brega SOE 66/11 2x10 1987 1,2,3Sarir North I SOE 66/11 2x10 1981 1,2,3Sarir North II SOE 66/11 2x10 1981 1,2,3Sarir North III SOE 66/11 2x5 1981 1,2,3Derj SOE 66/11 2x5 1982 1,2,3Senawun SOE 66/11 2x5 1982 1,2,3Ghadames SOE 66/11 2x5 1982 1,2,3GhadamesNew Airport SOE 66/11 2x10 1982 1,2,3

Steel Factory SOE 66/11 2x10 1982 1,2,350 km from Sert SOE 66/11 2x10 1982 1,2,3107 km from Sert SOE 66/11 2x10 1982 1,2,3Bay al Kabir SOE 66/11 2x10 1982 1,2,3Bunjem SOE 66/11 2x10 1982 1,2,3

Page 16: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

15

E L E C T R I C P O W E R E N G I N E E R I N G

1 - design, 2 - equipment supply, 3 - construction, U/C - under construction

COUNTRY SUBSTATIONLOCATION OWNER VOLTAGE (KV) TRANSFORMER

RATING (MVA) COMPLETION SCOPE

Libya Shweref SOE 66/11 2x10 1982 1,2,3Tinenia SOE 66/11 2x10 1982 1,2,3Wadan SOE 66/11 2x10 1982 1,2,3Zallah SOE 66/11 2x10 1982 1,2,3Sert SOE 66/11 2x10 1982 1,2,3Nalut SOE 66/11 2x10 1982 1,2,3Ghadahlya SOE 66/11 2x10 1982 1,2,3Bani WalidFactory SOE 66/11 2x10 1982 1,2,3

Al Qara SOE 66/11 2x10 1984 1,2,3Kambot SOE 66/11 2x10 1984 1,2,3Bir al Ashab SOE 66/11 2x10 1984 1,2,3Qasr al Jadi SOE 66/11 2x10 1984 1,2,3Bardiyah SOE 66/11 2x10 1984 1,2,3Jaghboub SOE 66/11 2x10 1984 1,2,3Wadi Shahbe SOE 66/11 2x10 1984 1,2,3Hunewah SOE 66/11 2x10 1984 1,2,3Tamit SOE 66/11 2x10 1984 1,2,3Abu Hady SOE 66/11 2x10 1984 1,2,3Gardba SOE 66/11 2x10 1984 1,2,3Krumhel SOE 66/11 2x10 1984 1,2,3Aziyad SOE 66/11 2x10 1984 1,2,3Makaili SOE 66/11 2x10 1984 1,2,3Wishtata SOE 66/11 2x10 1984 1,2,3Fissano SOE 66/11 2x10 1987 1,2,3Qaryat West SOE 66/11 2x10 1987 1,2,3Tobhga SOE 66/11 2x10 1988 1,2,3Nesma SOE 66/11 2x10 1988 1,2,3Rajma SOE 66/11 2x10 1990 1,2,3Qaryat East SOE 66/11 2x10 1987 1,2,3Hun SOE 66/11 2x10 1987 1,2,3Hara SOE 66/11 2x10 1991 1,2,3ABW Housing SOE 66/11 2x10 1990 1,2,3Agriculture I SOE 66/11 2x10 1992 1,2,3Agriculture II SOE 66/11 2x10 1992 1,2,3Nina Agriculture SOE 66/11 2x10 1991 1,2,3Nina Army Camp SOE 66/11 2x10 1990 1,2,3Martuba SOE 66/11 2x10 1993 1,2,3Al Ardam SOE 66/11 2x10 1991 1,2,3MMB SOE 66/11 2x10 1996 1,2,3Beida East SOE 66/11 2x10 1993 1,2,3Beida University SOE 66/11 2x10 1993 1,2,3Namo Airport SOE 66/11 2x10 1991 1,2,3Sdad Quori SOE 66/11 2x10 1989 1,2,3

Page 17: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

16

E L E C T R I C P O W E R E N G I N E E R I N G

1 - design, 2 - equipment supply, 3 - construction, U/C - under construction

COUNTRY SUBSTATIONLOCATION OWNER VOLTAGE (KV) TRANSFORMER

RATING (MVA) COMPLETION SCOPE

Malaysia Bukit Kepong NEB 66/11 2x15 1986 1,2

Pakistan Barana WAPDA 66/11 2,5 1967 1,2,3Lalian WAPDA 66/11 2;2,5 1967 1,2,3Malaqpur WAPDA 66/11 5 1969 1,2,3Ali Jaj WAPDA 66/11 5 1969 1,2,3Alipur WAPDA 66/11 5 1970 1,2,3Sharakpur WAPDA 66/11 10 1972 1,2,3Badomalli WAPDA 66/11 10 1973 1,2,3Garh-Naharaja WAPDA 66/11 10 1974 1,2,3Ahmadpur Sial WAPDA 66/11 10 1974 1,2,3Atharan Hazari WAPDA 66/11 10 1974 1,2,3Mankera WAPDA 66/11 - 1974 1,2,3Swabi WAPDA 66/11 10 1977 1,2,3Shabqadar WAPDA 66/11 10 1977 1,2,3Tall WAPDA 66/11 10 1977 1,2,3Raiwind WAPDA 66/11 10 1977 1,2,3Laliani WAPDA 66/11 10 1977 1,2,3Uch Iharif WAPDA 66/11 10 1977 1,2,3Khipro WAPDA 66/11 10 1978 1,2,3Dign WAPDA 66/11 10 1978 1,2,3

Alger Ain Sefra SONELGAZ 60/30 2X40 2007/2008 1,2,3Labiodh SidiCheikh SONELGAZ 60/30 2X40 2007/2008 1,2,3

Ghrib SONELGAZ 60/30 2X40 2007/2008 1,2,3

Ouled Mimound SONELGAZ 60/30 2X40 2007/2008 1,2,3

Sidi Ali SONELGAZ 60/30 2X40 2007/2008 1,2,3Mostaganem(Ext.) SONELGAZ 60/30 2X40 2007/2008 1,2,3

Page 18: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

17

E L E C T R I C P O W E R E N G I N E E R I N G

1 - design, 2 - equipment supply, 3 - construction, U/C - under construction

COUNTRY SUBSTATIONLOCATION OWNER VOLTAGE (KV) TRANSFORMER

RATING (MVA) COMPLETION SCOPE

Afganistan 65 14/04 0,16; 0,63 1972-74 1,2,3

Bangladesh 54 BPDB 33/11 2,5; 5; 10 1974-80 1,2,35 BPDB 33 - 1975-80 1,2,37 BPDB 33/0,4 0,250 1977 1,2

28 BPDB 11/0,4 1977 2

Dubai UAE 6 DEC 33 - 1987 1,27 DEC 33 - 1988 1,2

Egypt 1 REA 33/11 10 1963 1,2,31 REA 33 - 1968 1,2,32 REA 11/0,4 0,3; 0,5 1973 1,2

Ghana 30 ECG 33/11 0,3; 2,5;10,20 1975/80 1,2,3

Indonesia 12 PLN 36/11 2x(2x10) 1969/71 1,2,3500 PLN 11/0,4 0,25 1970/72 1,2,3

3 PLN 20/0,4 50 1969/72 1,2,32 PLN 20 - 1988 1,2,3

Iran 2 Ministry of Energy 20/0,4 2;5;8 1996 1,21 NIOC 20 - 1975 1,2,31 NIOC 33/11 - 1996 1,2

Iraq 3 Ministry of Industry - SOE 33/11 1 1973 1,2,31 Ministry of Industry - SOE 30/6 20 1980 1,2,3

36 Ministry of Industry - SOE 6/0,4 0,63 1980 1,2,337 GEDTE 33 1990 1,2

Libya 110 SOE 30/11 2,5; 5; 20 1971-96 1,2,3262 SOE 11/0,4 1; 0,5 1971-84 1,2,3

3 SOE 33/11 2x20 1991 1,2,3

Pakistan 2.560 WAPDA 11/0,4 0,5; 0,07;0,10 1967-75 1,2,3

Ex-Yugoslavia 176 Elektroprivreda 35/10 2,5; 4;5;8 1968-82 1,2,329 Elektroprivreda 35/6 10; 20 1968-82 1,2,3

2.843 Elektroprivreda 10/0,4 1,6;2;0,25;0,63;1 1959-84 1,2,3

Zair 10 SNEL 15/0,4 0,63 1986 1,2,34 SNEL 30/6,6 2x12,75 1987 1,2,32 SNEL 33/11 5 1988 1,2,3

Malaysia 1 SEB 33/11 10 1988 1,2,311 NEB 33/11 15-Oct 1989 1,2,3

35 kV; 33 kV; 30 kV; 20 kV; 10 kV Substations

Page 19: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

18

E L E C T R I C P O W E R E N G I N E E R I N G

1 - design, 2 - equipment supply, 3 - construction, U/C - under construction

COUNTRY SUBSTATIONLOCATION OWNER VOLTAGE (KV) TRANSFORMER

RATING (MVA) COMPLETION SCOPE

Cathodic Protection

COUNTRY OWNER PROJECT COMPLETION SCOPE

Bosnia &Herzegovina PTT BiH TT Network 2000 1

Libya AGOCO 138 oil wells 2001 1,2,3

Libya GMRA

203 km ofPCCP

conveyancesystem

2004 1,2,3

Libya GMRA 37 km of PCCP U/C 1,2,3

Libya GMRA 160 km ofPCCP U/C 1,2,3

Iraq Shaqlawa UNDP 33/11 12x16 2003 1,2,3

Harir UNDP 33/11 12x16 2003 1,2,3

Hospital Rizgary UNDP 33/11 12x31,5 2004 1,2,3

Sailo UNDP 33/11 12x31,5 2004 1,2,3

Zanayan UNDP 33/11 12x31,5 2004 1,2,3

Amadiya UNDP 33/11 2x10 2003 1,2,3

Kanimasi UNDP 33/11 2x5 2004 1,2,3

Sarsenk UNDP 33/11 2x10 2004 1,2,3

Batel UNDP 33/11 2x10 2004 1,2,3

Aqra UNDP 33/11 2x16 2004 1,2,3

Bardaresh UNDP 33/11 2x16 2004 1,2,3

Libya 4 Agoco 34,5 10 2003 1,2,3

Iraq Ifraz Kurdistan Region Government 33/3,3 10 2007 1,2,3

Maroda Kurdistan Region Government 33/3,3 10 2007 1,2,3

Page 20: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

19

E L E C T R I C P O W E R E N G I N E E R I N G

N O T E S

Page 21: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

20

E L E C T R I C P O W E R E N G I N E E R I N G

N O T E S

Page 22: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

Hamdije Ćemerlića 2, 71000 Sarajevo, Bosnia and HerzegovinaPhone: (++) 387 33 277 111; 277 120

Fax: (++) 387 33 658 328E-mail: [email protected]

www.energoinvest.com

Electric PowerEngineering

Publ

ishe

r:En

ergo

inve

std.

d.–

Mar

ketin

g,Sa

raje

vo,J

uly

2008

. REFERENCES

Page 23: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

400 kV T.L. in Bosnia and Herzegovina.

Hamdije Ćemerlića 2, 71000 Sarajevo, Bosnia and HerzegovinaPhone: (++) 387 33 703 606; 703 624

Fax: (++) 387 33 657 672E-mail: [email protected]

www.energoinvest.com

Power TransmissionLines Engineering

REFERENCES

Publ

ishe

r:En

ergo

inve

std.

d.–

Mar

ketin

g,Sa

raje

vo,J

uly

2008

.

Page 24: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

1

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor

[per phase]

Tower structure[tons] Note

UN I TED STATES OF AMER ICA

Navajo - Mccullough s.c. ACSR Blue Bird 2 15.667 2

Bonavile project s.c. ACSR Blue Bird 2 1.284 2

500 kV TRANSMISSION LINES

LEGEND: s.c. SINGLE CIRCUIT CONSTRUCTION(1) DESIGNING(2) SUPPLY OF TOWERS

400 kV TRANSMISSION LINES

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor [per

phase]

Tower structure[tons] Note

ALGER IA

Hadjerat Ennous-El Affroun 60 s.c. AAAC 570 sqmm 2 2000 1,2,3

Oued Athmania – Salah Bey 120 s.c. AAAC 570 sqmm 2 4000 1,2,3

Naama - Beshar 52 s.c. AAAC 570 sqmm 2 1750 1,2,3

BOSN IA AND HERZEGOV INA

Mostar - Posušje 45 s.c. ACSR 490/65 2 1,2,3

Buk Bijela - Kijevo 50 s.c. ACSR 490/65 2 1,2,3

Reljevo - Kraljeva Sutjeska 30 s.c. ACSR 490/65 2 1,2,3

Kijevo - Reljevo 25 s.c. ACSR 490/65 2 1,2,3

Tuzla - Sava 90 s.c. ACSR 490/65 2 1,2,3

Mostar - Gacko 70 s.c. ACSR 490/65 2 1,2,3

Kraljeva Sutjeska - Tuzla 60 s.c. ACSR 490/65 2 1,2,3

Mostar – Reljevo (Sarajevo10) 95 s.c. ACSR 490/65 2 1,2,3

Trebinje - Dolovi 25 s.c. ACSR 490/65 2 1,2,3

Gacko - Trebinje 60 s.c. ACSR 490/65 2 1,2

Tuzla - Banja Luka 140 s.c. ACSR 490/65 2 1,2,3

Bileća - Gacko 8 s.c. ACSR 490/65 2 1,2,3

Ugljevik - Ernestinovo 47 s.c. ACSR 490/65 2 1,2,3

Ugljevik - Connection s.c. ACSR 490/65 2 272 1,2,3

Lukavica - Connection s.c. ACSR 490/65 2 622 1,2,3

TPS Kakanj - Connections 10 s.c. ACSR 490/65 2 1,2,3

HPS Visegrad - Visegrad 4 s.c. ACSR 490/65 2 1,2,3

Višegrad - Zvornik - Tuzla 123 s.c. ACSR 490/65 2 1,2,3

Lukavica SIS - Connections 19 s.c. ACSR 490/65 2 1,2,3

Page 25: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

2

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor [per

phase]

Tower structure[tons] Note

CROAT IA

Ernestinovo - Kamensko 75 s.c. ACSR 490/65 2 1.501 1,2,3

Sid - Ernestinovo 44 s.c. ACSR 490/65 2 878 1,2,3

Sava - Ernestinovo 43 s.c. ACSR 490/65 2 868 1,2,3

Kamensko - Zagreb 58 s.c. ACSR 490/65 2 1.161 1,2,3

I RAQ

Khor Al Zubair – Hartha East 55 s.c. AAAC 551,4 sqmm 2 1,2,3

Khor Al Zubair – Hartha West 55 s.c. AAAC 551,4 sqmm 2 1,2,3

Khor Al Zubair – Nassiriya 205 s.c. AAAC 551,4 sqmm 2 1,2,3

Nassiriya - Wasit 200 s.c. AAAC 551,4 sqmm 2 1,2,3

Wasit – Baghdad West 185 s.c. AAAC 551,4 sqmm 2 1,2,3

Baghdad East – Al Taaameen 225 s.c. AAAC 551,4 sqmm 2 1,2,3

Baghdad East – Baquba 35 s.c. AAAC 551,4 sqmm 2 1,2,3

Baghdad West - Baiji 230 s.c. AAAC 551,4 sqmm 2 1,2,3

Bajiji P.S. – Al Kaddisiya Dam P.S. 160 s.c. ACSR 490/65 2 1,2,3

Zkho – National Border 12 s.c. ACSR 490/65 2 1,2,3

Baghdad Connections 20 s.c. ACSR 490/65 2 1,2,3

MACEDON IA

Skopje - Negotino s.c. ACSR 490/65 2 1.760 1,2

Negotino - Greak border s.c. ACSR 490/65 2 1.240 1,2

MONTENEGRO

Pljevlja - Ribarevica 60 s.c. ACSR 490/65 2 1.336 1,2,3

Titograd - Ribarevica 116 s.c. ACSR 490/65 2 2.324 1,2,3

Titograd - Dolovi 80 s.c. ACSR 490/65 2 1.618 1,2,3

Ribarevica - Serbian border 60 s.c. ACSR 490/65 2 1.203 1,2,3

NORWAY

Hol – Usta I s.c. 2 300 1,2

Aurland - Hol s.c. 2 2.600 1,2

Page 26: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

3

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

LEGEND: s.c. SINGLE CIRCUIT CONSTRUCTION(1) DESIGNING(2) SUPPLY OF TOWERS(3) ERECTION

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor [per

phase]

Tower structure[tons] Note

SERB IA

Subotica - Novi Sad 12 s.c. ACSR 490/65 2 250 1,2,3

SLOVEN IA

Mihovci - Krsko 52 s.c. ACSR 490/65 2 1.059 1,2,3

Mihovci - Podlog 54 s.c. ACSR 490/65 2 1.096 1,2,3

Ljubljana - Podlog 50 s.c. ACSR 490/65 2 946 1,2,3

Ljubljana - Divaca 60 s.c. ACSR 490/65 2 1.229 1,2,3

Krsko - Croatian border 88 s.c. ACSR 490/65 2 1.769 1,2,3

Konjsko - Mekina 32 s.c. ACSR 490/65 2 632 1,2,3

Savske elektrane - Bericevo okroglo 82 s.c. ACSR 490/65 2 1.644 1,2,3

Page 27: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

4

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor [per

phase]

Tower structure[tons] Note

ZAMB IA

Kafue Gorge - Leopard's Hill 90 s.c. ACSR Bison 2 1,2,3

Kabwe - Serenje 300 s.c. ACSR Bison 2 1,2,3

N IGER IA

Alaoji - Calabar 150 d.c. AAAC 55 sqmm 2 8600 1, 2

330 kV TRANSMISSION LINES

LEGEND: s.c. SINGLE CIRCUIT CONSTRUCTIONd.c.DOUBLE CIRCUIT CONSTRUCTION(1) DESIGNING(2) SUPPLY OF TOWERS(3) ERECTION

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor

[per phase]

Tower structure[tons] Note

MALAYS IA

Chenderiang - Rawang 120 d.c. ACSR Zebra 2 1.059 1,2,3

Kuala Lumpur - Port Kelang I 42 d.c. ACSR Zebra 2 1.096 1,2,3

Kuala Lumpur - Port Kelang II 42 d.c. ACSR Zebra 2 946 1,2,3

Paka P/S - Telok Kalong S/S 41 d.c. ACSR Batang 2 1.769 1,2,3

Melaka - Young Peng 113 d.c. ACSR Zebra 2 632 1,2,3

Young Peng- kuda I 100 d.c. ACSR Zebra 2 1.644 1,2,3

Majidee - Pasir Gudang 19 d.c. ACSR Zebra 2 1,2,3

Contract LLN 450/88 d.c. ACSR Batang 2 800 1,2

Contact 72/87 28 d.c./q.c. ACSR Batang 2

275 kV TRANSMISSION LINES

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor

[per phase]

Tower structure[tons] Note

MALASYA

Skudai - Majidee 14 d.c./q.c. ACSR Zebra 2 1,2,3

Co: Kuala Lumpur City q.c. ACSR Zebra/Batang 2 6.500 1,2

275 kV/132 kV TRANSMISSION LINES

LEGEND: s.c. SINGLE CIRCUIT CONSTRUCTION (1) DESIGNINGd.c. DOUBLE CIRCUIT CONSTRUCTION (2) SUPPLY OF TOWERSq.c. QUADRUPLE CIRCUIT CONSTRUCTION (3) ERECTION

Page 28: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

5

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

230 kV TRANSMISSION LINES

LEGEND: s.c. SINGLE CIRCUIT CONSTRUCTIONd.c. DOUBLE CIRCUIT CONSTRUCTIONq.c. QUADRUPLE CIRCUIT CONSTRUCTIONu/c UNDER CONSTRUCTION(1) DESIGNING(2) SUPPLY OF TOWERS(3) ERECTION

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor

[per phase]

Tower structure[tons] Note

ETH IOP IA

Frincha - Gafarsa 200 d.c. AAAC 469,8 sqmm 2 1,2,3

Koka - Dire Dawa 337 s.c. ACSR Mallard 1 1,2,3

Gilgel Gibe - Ghedo 131 s.c. ACSR Mallard 1 1,2,3

Bahidar - Gonder 136,97 d.c. AAAC “Ash” 2 1,2,3

Gafarsa - Sabatha - Kaliti 26 ACSR Mallard 1 1,2,3

Gilgel Gibe - Sabatha 210 AAAC “Ash” 1 1,2,3

Gondar - Metema 122 d.c. AAAC “Ash” 2 2100 1,2,3

I RAN

Teheran - Manjil 220 d.c. ACSR Cardinal 1 1,2,3

Esfahan 2 - Najaf Abad 20 d.c. ACSR Rail 1 1,2,3

Najaf Abad - Esfahan Great 40 d.c. ACSR Rail 1 1,2,3

N.D. Industry - Mobarekeh 30 d.c. ACSR Rail 1 1,2,3

Esfahan Great - Khorasgan 50 d.c. ACSR Rail 1 1,2,3

Dez Line - Saven 15 d.c. ACSR Rail 1 1,2,3

Dez Line - Ghom 55 d.c. ACSR Rail 1 1,2,3

Ghom - Kashar 95 s.c. ACSR Rail 1 1,2,3

Ray - Ray North 38 d.c. ACSR Rail 1 1,2

Shiraz Ring 100 d.c. ACSR Rail 1 1,2,3

THA I LAND

The Thako - Khon Kaen 3 300 d.c. ACSR Scissortail 1 1,2,3

The Thako- Thalen 3 140 d.c. ACSR Scissortail 2 1,2,3

Page 29: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

6

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

220 kV TRANSMISSION LINES

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor [per

phase]

Tower structure[tons] Note

ABU DHAB IZakher - El Wagon d.c. 1 3.000 2

ALGER IAJijel - Ain M'lila 105 s.c. AAAC 411 sqmm 2 1,2,3Jijel - Bellara 30 d.c. AAAC 411 sqmm 2 1,2,3Bellara - Skikda 80 s.c. AAAC 411 sqmm 2 1,2,3Jijel - Mansouriah 50 d.c. AAAC 411 sqmm 2 1,2,3Mansouriah - El Kseur 65 s.c. AAAC 411 sqmm 2 1,2,3M’sila - El Hassi a Salah Bey 44 s.c. ACSR “Crocus” 411sqmm 1 1143 1,2,3M’sila - Biskra 11 s.c. Alu/Acier 411 sqmm 1 190 1,2,3Ahmal El Alain I – El Affraun 122 d.c. AAAC 570 sqmm 2 450 1,2,3Ahmal El Alain II – El Affraun 15 d.c. AAAC 570 sqmm 2 450 1,2,3Ahmar Connection 10 s.c. AAAC 570 sqmm 2 300 1,2,3Mascara Sidi Ali Boussidi 110 s.c AAAC 570 sqmm 2 1500 1,2,3Tlemzen-Sidi Bel Abess 4 s.c ACSR 411 sqmm 2 92 1,2,3Saida –Sidi Bel Abess 40 s.c ACSR 411 sqmm 2 920 1,23

BOSN IA AND HERZEGOV INAJajce - Zagreb I 70 d.c. ACSR 240/40 1 1,2,3Kakanj - Jajce I 85 d.c. ACSR 240/40 1 1,2,3Mostar - Kakanj I 100 s.c. ACSR 360/57 1 1,2,3Mostar - Split 80 s.c. ACSR 360/57 1 1,2,3Mostar - Trebinje I 70 s.c. ACSR 360/57 1 1,2,3Kakanj - Tuzla 80 s.c. ACSR 360/57 1 1,2,3Trebinje - Titograd 80 s.c. ACSR 360/57 1 1,2,3Jajce - Zagreb II 128 s.c. ACSR 360/57 1 1.560 1,2,3Tuzla - Djakovo 65 s.c. ACSR 360/57 1 1,2,3Una - Zagreb s.c. ACSR 360/57 1 1.230 1,2Mostar - Trebinje II 70 s.c. ACSR 360/57 1 1,2,3Mostar - Kakanj II 110 s.c. ACSR 360/57 1 1,2,3Rama - Jablanica 25 s.c. ACSR 360/57 1 1,2,3Jablanica - Jajce 95 s.c. ACSR 360/57 1 1,2,3Jajce - Prijedor 90 d.c. ACSR 360/57 1 1,2,3Kakanj-Zenica-Tuzla 95 s.c. ACSR 360/57 1 1,2,3Jajce - Mrcalin 72 s.c. ACSR 360/57 1 1,2,3Kakanj - Zenica 95 s.c. ACSR 360/57 1 1,2,3Tuzla - Djakovo 65 s.c. ACSR 360/57 1 1,2,3Čapljina - Mostar 70 d.c. ACSR 360/57 1 1,2,3Prijedor II - Bihać 70 s.c. ACSR 360/57 1 1,2,3EAL Mostar-Cule 7 s.c. ACSR 360/57 1 1,2,3Tuzla - Gradačac 65 s.c. ACSR 360/57 1 1,2,3H.P.SGrabovica-Jablanica 10 s.c. ACSR 360/57 1 1,2,3H.P.S. Salakovac - D 11 s.c. ACSR 360/57 1 1,2,3

Page 30: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

7

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor [per

phase]

Tower structure[tons] Note

BOSN IA AND HERZEGOV INAJablanica - Salakovac 12 s.c. ACSR 360/57 1 1,2,3Jablanica - Salakovac 12 s.c. ACSR 360/57 1 1,2,3Jajce - Prijedor - Mraclin 132.1 s.c. ACSR 360/57 1 126.6 1,2,3Kakanj - Prijedor 173.94 s.c. ACSR 240/40 2 106 1,2,3Prijedor - Medjuric - Sisak 30 s.c. ACSR 360/57 1 1,2,3Trebinje - Dubrovnik 12.3 s.c. ACSR 360/57 1 1,2,3

CH I LEPehvenche Project d.c. 1 1.000 2

CROAT IA

Sinj - Vinodol 63 s.c. ACSR 360/57 1 980 1,2,3Split -[ibenik 57 s.c. ACSR 360/57 1 910 1,2,3Vinodol - Matulje 29 s.c. ACSR 360/57 1 465 1,2,3Split - Zagreb 258 s.c. ACSR 360/57 1 4.130 1,2,3Marclin - Kidrićevo 68 s.c. ACSR 360/57 1 1.080 1,2,3

EGYPTEl Ahram - El Fayoum 95 d.c. ACSR 380/50 2 1,2,3El Fayoum - Bani Suef 35 d.c. ACSR 380/50 1 1,2,3Katamia - Cairo East 30 d.c. ACSR 380/50 2 1,2,3Mahmudia - Tanta 75 d.c. ACSR 380/50 2 1,2,3Ataka - Katamia 120 d.c. ACSR 380/50 2 1,2,3

L IBYAContract: 1/78 A 102 d.c. AAAC 413sqmm 2 1,2,4Misurata - Geddahia 131 d.c. AAAC 413sqmm 2 1,2,4Geddahia - Sirt 17 d.c. AAAC 413sqmm 2 1,2,4Tripoli East- Al Fatah 9 d.c. AAAC 413sqmm 2 1,2,4Al Fatah-Hadba Khadra 19 d.c. AAAC 413sqmm 2 1,2,4Hadba Khadra - Industrial Zone 14 d.c. AAAC 413sqmmv 2 1,2,4Industrial Zone - Tripoli West 6 d.c. AAAC 413sqmm 2 1,2,4Geddahia - Bungem 95 d.c. AAAC 413sqmm 2 1,2,4Bungem - Hun 199 d.c. AAAC 413sqmm 2 1,2,4Sirt - Sultan 116 d.c. AAAC 413sqmm 2 1,2,4Sultan - Ras Lanuf 112 d.c. AAAC 413sqmm 2 1,2,4Tripoli West - Zawia 35 d.c. AAAC 413sqmm 2 1,2,4Zawia - Mellita 50 d.c. AAAC 413sqmm 2 1,2,4Mellita-Abu Kammash 50 d.c. AAAC 413sqmm 2 1,2,4Homs - Garabulli 51 d.c. AAAC 413sqmm 2 1,2,4

Page 31: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

8

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor [per

phase]

Tower structure[tons] Note

L IBYA

Garabulli - Tripoli East 41 d.c. AAAC 413sqmm 2 1,2,4

Ageddabia - Jallo 260 d.c. AAAC 413sqmm 2 1,2,4

Jallo - Sarir West 166 d.c. AAAC 413sqmm 2 1,2,4

Sarir West-Sarir South 92 d.c. AAAC 413sqmm 2 1,2,4

Geddahia & Tamimi 10 d.c. AAAC 413sqmm 2 1,2,4

Hun - Wadi Arial 203 d.c. AAAC 413sqmm 2 1,2,4

Wadi Arial - Semno 67 d.c. AAAC 413sqmm 2 1,2,4

Semno - Sebha 70 d.c. AAAC 413sqmm 2 1,2,4

Bir Ghanem - Mellita 75 d.c. AAAC 413sqmm 2 1,2,4

Sarir South-Tazerbo I 186 s.c. AAAC 413sqmm 2 1,2,3

Sarir South-Tazerbo II 186 s.c. AAAC 413sqmm 2 1,2,3

Sarir South - Kufra I 387 s.c. AAAC 413sqmm 2 1,2,3

Sarir South - Kufra II 387 s.c. AAAC 413sqmm 2 1,2,3

Sebha - Traghan I 110 s.c. AAAC 413sqmm 2 1,2,3

Sebha - Traghan II 110 s.c. AAAC 413sqmm 2 1,2,3

Sebha - Fejej I 116 s.c. AAAC 413sqmm 2 1,2,3

Sebha - Fejej II 116 s.c. AAAC 413sqmm 2 1,2,3

Fejej - Ubari 60 s.c. AAAC 413sqmm 2 1,2,3

Rabata - Bir Ghanem 31 d.c. ACSR Redwing 2 1,2,3

Tee off 25 d.c. ACSR Redwing 1 1,2,3

Ubari Al Awajnat 243 s.c. AAAC 413,5 sqmm 2 5100 1,2Ruweys – Shak Shouk – BirGhanem 170 d.c. 5000 1,2

MONTENEGRO

Titograd - Bijelo Polje 85 s.c. ACSR 360/57 1 1,2,3

Pljevlja - Ribarevina s.c. ACSR 360/57 1 1.541 1,2

Pljevlja - Prijepolje 28 s.c. ACSR 360/57 1 1,2,3

Titograd-Albanian border 50 d.c. ACSR 360/57 1 1,2,3

SERB IA

Kosovo - Skopje s.c. ACSR 360/57 1 1.105 1,2

Kosovo B - Prizren 2 72 s.c. ACSR 360/57 1 1,2,3

Pri{tina - Glogovac 21 s.c. ACSR 360/57 1 1,2,3

Prizren - Caf Morina 46 s.c. ACSR 360/57 1 1,2,3

Kosovo B - Priština 37 s.c. ACSR 490/65 1 1,2,3

Page 32: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

9

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor

[per phase]

Tower structure[tons] Note

SLOVEN IA

Klece - Sostanj s.c. ACSR 360/57 1 1.235 1,2

Podlog - Homec s.c. ACSR 360/57 1 520 1,2

Klece - Pehlin s.c. ACSR 360/57 1 1.560 1,2

Pehlin - Plomin d.c. ACSR 360/57 1 620 1,2

Pehlin - Plomin d.c. ACSR 360/57 1 975 1,2

TANZAN IA

Kidatu - Iringa 162 s.c. ACSR "BISON" 1 1,2,3

Iringa - Mufindi 125 s.c. ACSR "BISON" 1 1,2,3

Dodoma - Singida 215 s.c. ACSR "BISON" 1 1,2,3

Singida - Shinyanga 220 s.c. ACSR "BISON" 1 1,2,3

Shinyanga - Mwanza 140 s.c. ACSR "BISON" 1 1,2,3

LEGEND: s.c. SINGLE CIRCUIT CONSTRUCTIONd.c. DOUBLE CIRCUIT CONSTRUCTIONu/c UNDER CONSTRUCTION(1) DESIGNING(2) SUPPLY OF TOWERS(3) ERECTION(4) ERECTION THROUGH JOINT VENTURE COMPANY "ELPCO"

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor

[per phase]

Tower structure[tons] Note

GHANA

Volta - Achimota 25 d.c. ACSR Lilac 1 1,2,3Dunkwa - Asawinso 60 s.c. ACSR Linnet 1 1,2,3

Contract No. 8.031 s.c. 7.450

161 kV TRANSMISSION LINES

LEGEND: s.c. SINGLE CIRCUIT CONSTRUCTIONd.c. DOUBLE CIRCUIT CONSTRUCTION(1) DESIGNING(2) SUPPLY OF TOWERS(3) ERECTION

Page 33: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

10

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

150 kV TRANSMISSION LINES

LEGEND: s.c. SINGLE CIRCUIT CONSTRUCTIONd.c. DOUBLE CIRCUIT CONSTRUCTIONq.c. QUADRUPLE CIRCUIT CONSTRUCTION(1) DESIGNING(2) SUPPLY OF TOWERS(3) ERECTION

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor

[per phase]

Tower structure[tons] Note

I NDONES IA

Contract II - 64/PST/77 d.c. ACSR Duck 1 3.000 1,2

Contract IV 032/PST/78 d.c. AXSR Duck 1 350 1,2

Medan Timur - Kuala Tanjung 91 d.c. ACSR 240/40 1 1,2,3

Kuala Tanjug - Kisaran 55 d.c. ACSR 240/40 1 1,2

Tebing Tingi - Pematang Siantar 50 d.c. ACSR 240/40 1 1,2

Titi Kung - Brastagi 55 d.c. ACSR 240/40 1 1,2

Ball, Section A, B and C d.c. ACSR 240/40 1 3.200 2

Power XV Project - Category II d.c. 5.000 1,2

Power XV Project - Category II A d.c./q.c. 700 1,2

East Java Project d.c. 5.000 1,2

Page 34: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

11

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor

[per phase]

Tower structure[tons] Note

BANGLADESH

Sirajugani - Saidpur s.c. ACSR Grosbeak 1 3.570 1,2

Asuganj - Jamalpur d.c. ACSR Grosbeak 1 2.890 1,2

Sadipur - Ishurdi d.c. ACSR Hawk 1 4.250 1,2

Bangladesh p.d.p. Dacca 1 d.c. ACSR Grosbeak 1 2.250 1,2

Tungi - Tangail d.c. ACSR Grosbeak 1 1.070 1,2

BURMA

Electric power corporation Rangoon s.c. 4.957 1,2Contract: No 5603(Ministry of Mines) s.c. ACSR 1 2.750 1,2

CYPRUS

Nicosia - Perstronaty 130 d.c. ACSR Perakeet 1 1,2,3

ETH IOP IA

Kaliti - Gafarsa 25 s.c. ACSR 151/15 1 1,2,3

Malcassa - Assele 50 s.c. ACSR 151/15 1 1,2,3

Assele - Admitula 50 s.c. ACSR 151/15 1 1,2,3

Admitula - Shashamane 75 s.c. ACSR 151/15 1 1,2,3

Shashamane - Yirgalem 55 s.c. ACSR 151/15 1 1,2,3

Shashamane - Malkawakana 120 s.c. ACSR 150/25 1 1,2,3

Shashamane - Wolaita Sodo 125 s.c. ACSR 150/25 1 1,2,3

Malakawana - Estention 5 s.c. ACSR 150/25 1 1,2,3

Yirga Alem - Shakiso 133 s.c. ACSR 150/25 1 1,2,3

Ghedo - Guder 34 s.c. ACSR 150/25 1 1,2,3

Contract: No 27.41/53

(Koka - Dire Dawa) 4 s.c. ACSR 166/16.75 1 1,2,3

Contract: No 27.41/53

(Koka - Dire Dawa) 3.5 d.c. ACSR 166/16.75 1 1,2,3

Gilgel Gibe I - Gilgel Gibe II 2.6 s.c. AAAC “Ash” 1 1,2,3

Gimbi – Mendi - Asosa 201 s.c. AAAC “ASH” 2 2700 1,2,3

Mieso – Asebe - Teferi 20 d.c. AAAC “ASH” 1 350 1,2,3

Jimma- Aba 52 s.c. AAAC ASH 1 520 1,2,3

Akaki- Yesu 4 d.c. ACSR Qual 1 70 1,2,3

132 kV TRANSMISSION LINES

Page 35: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

12

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

Line location Line length[km]

Type ofconstruction Conductor

Number ofconducto

[per phase]

Tower structure[tons] Note

I RAQ

Kut - Amara - Hartha 330 s.c. ACSR Oriole 1 1,2,3

Mandali - Hamrin 65 s.c. ACSR Partidge 1 1,2,3

Abul Flus - Fao 70 d.c. ACSR 240 sqmm 1 1,2,3

Dokan - Kirkuk 85 d.c. ACSR Lark 2 1,2,3

Arbil - Dokan 90 d.c. ACSR Lark 2 1,2,3

Dokan - Sulaimaniya 65 s.c. ACSR Teal 1 1,2,3

Najaf - Shamiah 35 d.c. ACSR Lark 1 1,2,3

Baghdad West - Hurriya 25 d.c. AAAC 551.4 sqmm 2 1,2,3

Baghdad West - Maari 30 d.c. AAAC 551.4 sqmm 2 1,2,3

Al Taameen - Kirkuk North 30 d.c. ACSR Teal 2 1,2,3

Al Taameen - Derbendikhan 80 d.c. ACSR Lark 1 1,2,3

Al Taameen - C. Factory 15 d.c. ACSR Lark 1 1,2,3

C. Factory - Derbendikhan 65 d.c. ACSR Lark 1 1,2,3

Al Taameen - Kirkuk South 15 d.c. ACSR Teal 2 1,2,3

Al Taameen - Mullah Abdulah 20 d.c. ACSR Teal 1 1,2,3

Mullah Abdulah - Samara 15 d.c. ACSR Teal 1 1,2,3

Amara - Amara South 10 d.c. ACSR Teal 2 1,2,3

Wasit - Kut South 20 d.c. ACSR Teal 2 1,2,3

Kalar - Kirkuk 147 d.c. ACSR Lark 1 1,2,3

Klara - Tuz 87 d.c. ACSR Lark 1 1,2,3

Saddam Dam - Zakhto 58 d.c. ACSR Teal 1 1,2,3

Hashimiya - Connection 5 d.c. ACSR Teal 1 1,2,3

Musayeb - Connection 12 d.c. ACSR Teal 1 1,2,3

Contract: S.G. TL-4.5.

(Baghdad Ring) 220 d.c. ACSR Teal 1 1,2,3

MALAYS IA

Port Kelang - Bukit Raja 26 d.c. ACSR Batang 2 1,2,3

Port Kelang - Kuala Selangor 34 d.c. ACSR Batang 1 1,2,3

Shah Alam - Banting 41 d.c. ACSR Batang 1 1,2,3

TO Bahan - Mantin 13 d.c. ACSR Batang 1 1,2,3

Bukit - Kepong 10 d.c. ACSRWolf 1 1,2,3

Skuda I - Majidee 14 d.c. ACSR Batang 2 1,2,3

In & Out of Young Peng 23 d.c. ACSR Batang 2 1,2,3

Page 36: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

13

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor

[per phase]

Tower structure[tons] Note

MALAYS IA

Keluang - Mersing 90 d.c. ACSR Batang 1 1,2,3

Kota Tinngi - Telok Ramunia 73 d.c. ACSR Batang 1 1,2,3

Majidee - Stulang Darat 8 d.c. ACSR Batang 2 1,2,3

Contract LLN 283/90 d.c. ACSR Batang 2 900 1,2

Contract LLN 437/89 d.c. ACSR Batang 2 2.950 1,2

Contract LLN 442/89 d.c. ACSR Batang 2 1.500 1,2

N IGER IA

Contract: MC 4173 d.c. ACSR 1 1.300 1,2

PAK ISTAN

Alipur project 100 s.c. ACSR Tiger 1 1,2,3

Muridke project 100 d.c. ACSR Lynx 1 1,2,3

Rangpur project 125 d.c. ACSR Lynx 1 1,2,3

Rohri North project 130 d.c. ACSR Lynx 1 1,2,3

Naushara Feroz - Hyderabad 190 d.c. ACSR Lynx 1 1,2,3

156 miles t.l. s.c. ACSR Lynx 1 2.300 1,2

LEGEND: s.c. SINGLE CIRCUIT CONSTRUCTIONd.c. DOUBLE CIRCUIT CONSTRUCTIONu/c UNDER CONSTRUCTION(1) DESIGNING(2) SUPPLY OF TOWERS(3) ERECTION

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor

[per phase]

Tower structure[tons] Note

THA I LAND

Nam Phong 1 - Udon Thani 100 d.c. ACSR Hawk 1 1,2,3

115 kV TRANSMISSION LINES

LEGEND: s.c. SINGLE CIRCUIT CONSTRUCTIONd.c. DOUBLE CIRCUIT CONSTRUCTIONu/c UNDER CONSTRUCTION(1) DESIGNING(2) SUPPLY OF TOWERS(3) ERECTION

Page 37: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

14

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor[per hase]

Tower structure[tons] Note

SUDAN

Sennar - Rabak 110 s.c. ACSR 95/15 1 1,2,3

El Rahad project 150 s.c ACSR 95/15 1 1,2,3

Contract NCEP 1/" ACSR 240/40 2 1.500 1,2

ZA IRE

Katana - Goma 103 s.c. ACSR Partrige 1 1,2,3

BOSN IA AND HERZEGOV INA

Bosanska Krupa 10 s.c. ACSR 240/40 1 1,2,3

Visoko - Vare{ 20 s.c. ACSR 240/40 1 1,2,3

Cazin 1 s.c. ACSR 240/40 1 1,2,3

Neum 5 s.c. ACSR 240/40 1 1,2,3

Trebinje - Pop. Polje 34 s.c. ACSR 240/40 1 1,2,3

Reljevo S/S - Connections 5 s.c. ACSR 240/40 1 1,2,3

Plo~e - Radakovo 5 s.c. ACSR 240/40 1 1,2,3

Mrkonji} - Grad 16 s.c. ACSR 240/40 1 1,2,3

Sarajevo - Kiseljak 21 s.c. ACSR 240/40 1 1,2,3

HAK - Tuzla 6 s.c. ACSR 240/40 1 1,2,3

Reljevo- Bu}a potok 7 d.c. ACSR 240/40 1 1,2,3

Biha} 1 - Biha} 2 5 d.c. ACSR 240/40 1 1,2,3

Stolac 1 s.c. ACSR 240/40 1 1,2,3

Rasplet Banja Luka 15 s.c. ACSR 240/40 1 1,2,3

Grada~ac - Modri~a 12 s.c. ACSR 240/40 1 1,2,3

Banja Luka-Omarska 24 s.c. ACSR 240/40 1 1,2,3

Zenica - Kakanj 20 s.c. ACSR 240/40 1 1,2,3

Bocar 10 s.c. ACSR 240/40 1 1,2,3

Lukavica - Bogati}i 10 s.c. ACSR 240/40 1 1,2,3

Lakta{i s.c. ACSR 240/40 1 20 1,2,3

Tuzla - Banovi}i s.c. ACSR 240/40 1 300 1,2,3

Banja Luka ACSR 240/40 1 41 1,2,3

Bogati}i - Trnovo - Dobro Polje s.c. ACSR 240/40 1 372 1,2,3

Kladanj - Vlasenica s.c. ACSR 240/40 1 330 1,2,3

Vi{egrad - Rudo s.c. ACSR 240/40 1 295 1,2,3

Banja Luka - Nova Topola - Srbac s.c. ACSR 240/40 1 157 1,2

Jablanica - Prozor s.c. ACSR 240/40 1 358 1,2,3

110 kV TRANSMISSION LINES

Page 38: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

15

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor[per hase]

Tower structure[tons] Note

BOSN IA AND HERZEGOV INA

Gornji Zalik - Preta~e 3,65 s.c. ACSR 240/40 1 1,2,3

Srebrenik - Br~ko 1 2,9 s.c. ACSR 240/40 1 1,2,3

Grada~ac - Kerep 10,6 s.c. ACSR 240/40 1 1,2,3

Bosanska Krupa - Bu`im 22,18 s.c. ACSR 240/40 1 1,2,3

Bu`im - Vrnograc 11,25 s.c. ACSR 240/40 1 1,2,3

Grada~ac - Derventa 45 s.c. ACSR 240/40 1 1,2,3

Tuzla - Banovi}i 26 s.c. ACSR 240/40 1 1,2,3

Gra~anica- Derventa s.c. ACSR 240/40 1 440 1,2,3

Cazin 1 - Cazin 2 s.c. ACSR 240/40 1 118 1,2,3

Azi}i - Reljevo s.c. ACSR 240/40 1 137 1,2,3

Bugojno - G. Vakuf s.c. ACSR 240/40 1 285 1,2,3

Bugojno - Kupres s.c. ACSR 240/40 1 148 1,2,3

Drvar - Li~ko Polje 14 s.c. ACSR 240/40 1 1,2,3

Connection 20 s.c. ACSR 240/40 1 1,2,3

Kakanj - Zenica 8 s.c. ACSR 240/40 1 1,2,3

Bos. Grahovo-Strmica 9 s.c. ACSR 240/40 1 1,2,3

Vi{egrad - Gora`de 33 s.c. ACSR 240/40 1 1,2,3

Klju~ - G. Sanica 14 s.c. ACSR 240/40 1 1,2,3

Page 39: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

16

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor[per hase]

Tower structure[tons] Note

CROAT IA

Meterize - Sucidar 2,5 d.c. ACSR 240/40 1 24 1,2,3

Mline - Mavrinci 34 d.c. ACSR 240/40 1 340 1,2,3

Gra~ac- Donji Lapac 5 s.c. ACSR 240/40 1 53 1,2,3

Meline - Rijeka 0,5 s.c. ACSR 240/40 1 7 1,2,3

Valpovo 7 s.c. ACSR 240/40 1 76 1,2,3

Daruvar - Virovitica 10 s.c. ACSR 240/40 1 107 1,2,3

Meduric-N.Gradi{ka 45 s.c. ACSR 240/40 1 451 1,2,3

Konjsko - Kastela 30 d.c. ACSR 240/40 1 303 1,2,3

Li~ki Osik - Gra~ac 21 s.c. ACSR 240/40 1 220 1,2,3

Zadar - Nin 15 s.c. ACSR 240/40 1 146 1,2,3

Vojnic - Slunj 22 d.c. ACSR 240/40 1 240 1,2,3

Ston - Orebi} 56 d.c. ACSR 240/40 1 530 1,2,3

Sinj - Li~ki Osik 5 s.c. ACSR 240/40 1 66 1,2,3

Crkvice-Rog. Slatina 15 s.c. ACSR 240/40 1 182 1,2,3

Kastela - Bile}e 10 s.c. ACSR 240/40 1 110 1,2,3

Pore~ - Rovinj 29 s.c. ACSR 240/40 1 284 1,2,3

Zakucac - Meterize 44 d.c. ACSR 240/40 1 454 1,2,3

Rakitje - Jarun 8 s.c. ACSR 240/40 1 94 1,2,3

Opuzen - Podgora 31 s.c. ACSR 240/40 1 325 1,2,3

Obrovac 12 s.c. ACSR 240/40 1 133 1,2,3

Svraca - D. Stativ 20 d.c. ACSR 240/40 1 220 1,2,3

Daruvar 10 s.c. ACSR 240/40 1 119 1,2,3

Cres - Lo{inj 41 s.c. ACSR 240/40 1 439 1,2,3

HPS Gojak - Ostarije 18 s.c. ACSR 240/40 1 191 1,2,3

Karlovac 1 - Karlovac 2 3 d.c. ACSR 240/40 1 34 1,2,3

Rakitje - Jarun 16 d.c. ACSR 240/40 1 176 1,2,3

Li~ko Dugo Polje - Bosansko Grahovo 24 s.c. ACSR 240/40 1 1,2,3

Strumiva - Knin 19 s.c. ACSR 240/40 1 1,2,3

Koprivnica - Virje 20 s.c. ACSR 240/40 1 215 1,2,3

Ivanec - Straza 31 s.c. ACSR 240/40 1 323 1,2,3

Page 40: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

17

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor[per hase]

Tower structure[tons] Note

MACEDON IA

Dubrava - Negotino s.c. ACSR 240/40 1 21 1,2,3

Skopje s.c. ACSR 240/40 1 119 1,2,3

Tetovo s.c. ACSR 240/40 1 50 1,2,3

MONTENEGRO

Pljevlja s.c. ACSR 240/40 1 41 1,2,3

SERB IA

Vr{ac - Debeljaca s.c. ACSR 240/40 1 806 1,2,3

Resnik - Sjever s.c. ACSR 240/40 1 940 1,2,3

Vr{ac 2 - Bela Crkva s.c. ACSR 240/40 1 23 1,2,3

Resnik - Knja`evac s.c. ACSR 240/40 1 330 1,2,3

Resnik-Knja`evac-D. Selo s.c. ACSR 240/40 1 225 1,2,3

Temerin - Zabalj s.c. ACSR 240/40 1 106 1,2,3

Subotica 1, 2, 3, 4 s.c. ACSR 240/40 1 311 1,2,3

Senta 3, 4, 2 s.c. ACSR 240/40 1 220 1,2,3

TPS Kosovo s.c. ACSR 240/40 1 82 1,2,3

Zrenjanin 2 - Zrenjanin 4 s.c. ACSR 240/40 1 141 1,2,3

Zrenjanin 2 - TO s.c. ACSR 240/40 1 133 1,2,3

SLOVEN IA

Gorica - Divca s.c. ACSR 240/40 1 155 1,2,3

Ljubljana d.c. ACSR 240/40 1 38 1,2,3

N. Mesto - Trebnje s.c. ACSR 240/40 1 262 1,2,3

Solkan - N. Gorica d.c. ACSR 240/40 1 37 1,2,3

Pivka - Postojna d.c. ACSR 240/40 1 195 1,2,3

Trbovlje - Hrastnik d.c. ACSR 240/40 1 95 1,2,3

Klece - Domzale d.c. ACSR 240/40 1 60 1,2,3

Page 41: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

18

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor

[per phase]

Tower structure[tons] Note

I NDONES IA

Contract II 064/PST/77 s.c. ACRR Piper 1 1.700 1,2

Contract IV 032/PST/78 s.c ACRR Piper 1 1.950 1,2

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor[per hase]

Tower structure[tons] Note

ZAMB IA

Kapiri - Mpongwe 155 s.c. ACSR Wolf 1 1,2,3

88 kV TRANSMISSION LINES

70 kV TRANSMISSION LINES

LEGEND: s.c. SINGLE CIRCUIT CONSTRUCTION(1) DESIGNING(2) SUPPLY OF TOWERS(3) ERECTION

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor

[per phase]

Tower structure[tons] Note

L IBYA

Contract 18-07-2003 25 ACSR “Pernice” 1 1

69 kV TRANSMISSION LINES

Page 42: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

19

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor [per

phase]

Tower structure[tons] Note

ALGER IA

Oued Sly - Chlef 27 s.c. Alu/Acier 288 sqmm 1 273 1,2,3

Petit Lac - Oran Est 7 s.c. Almelec 366 sqmm 1 60 1,2,3

Oran Est - Hassi Ameur 10 s.c. Almelec 366 sqmm 1 86 1,2,3

Ain El Bya - Hassi Ameur 20 s.c. Alu/Acier 617 sqmm 1 172 1,2,3

Tlemcen - Zbair 33 s.c. Almelec 366 sqmm 1 284 1,2,3

Salah Bey - Ras El Oued 38 s.c. AAAC “Aster” 366 sqmm 1 413 1,2,3

Salah Bey - Ain Azel 17 s.c. AAAC “Aster” 366 sqmm 1 202 1,2,3

Salah Bey - Berhoum 38 s.c. AAAC “Aster” 366 sqmm 1 444 1,2,3

Salah Bey - Ain Oulmene 21 s.c. AAAC “Aster” 366 sqmm 1 291 1,2,3

El Hassi - Setif Nord 19 s.c. ACSR “Canna” 288 sqmm 1 244 1,2,3

Jijel - Jijel Ville 4 d.c. Alu/Acier 288 sqmm 1 80 1,2,3

Jijel - Taher 18 s.c. Almelec 366 sqmm 1 250 1,2,3

Connection to Alahmar - Alain 20 d.c. AAAC 366 sqmm 1 210 1,2,3

CYPRUS

Colemiolis - Paphos 15 s.c. ACSR Pigeon 1 1,2,3

EGYPT

Shoubra - Shouada 70 d.c. ACRR 240/40 1 1,2,3

Shoubra - Embaba 15 d.c. ACRR 240/40 1 1,2,3

ETH IOP IA

Bahirdar - Wereta 50 s.c. ACSR 70/12 1 1,2,3

Wereta - Gondar 85 s.c. ACSR 70/12 1 1,2,3

Gondar - Dabat 60 s.c. ACSR 70/12 1 1,2,3

Bahidar - Dangla 75 s.c. ACSR 70/12 1 1,2,3

Asmara (Belesa) Ginda 35 s.c. ACSR 70/12 1 1,2,3

Wolaita - Sodo - Abra Minch 110 s.c. ACSR 70/12 1 1,2,3

Malakawakana - Robe 70 s.c. ACSR 70/12 1 1,2,3

Avanas - Nuraera 60 s.c. QNAIL 2 450 1,2,3

I NDONES IA

Makassar - Palembang 85 d.c. ACSR Dog 1 1,2,3

66 kV TRANSMISSION LINES

Page 43: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

20

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor [per

phase]

Tower structure[tons] Note

L IBYA

Benghazi - New Barche 90 d.c. ACSR Bear 1 1,2,4

Tobruk - Al Qara 25 d.c. ACSR Bear 1 1,2,4

Al Qara - Kamboot 32 d.c. ACSR Bear 1 1,2,4

Kamboot - Bir Al Ashab 19 d.c. ACSR Bear 1 1,2,4

Bir Al Ashab - Gasr Al Jadi 13 d.c. ACSR Bear 1 1,2,4

Gasr Al Jadi-Bardijah 25 d.c. ACSR Bear 1 1,2,4

Nalut - Sinawan 101 d.c. ACSR Bear 1 1,2,4

Sinawan - Darag 107 d.c. ACSR Bear 1 1,2,4

Darag - Ghadames 100 d.c. ACSR Bear 1 1,2,4

Nalut - Ruways 24 d.c. ACSR Bear 1 1,2,4

Sirt1-Steel Factory 1 3 d.c. ACSR Bear 1 1,2,4

Sirt2-Steel Factory 2 3 d.c. ACSR Bear 1 1,2,4

Steel Factory-S/S 50km 54 d.c. ACSR Bear 1 1,2,4

S/S 50 km-S/S 107 km 58 d.c. ACSR Bear 1 1,2,4

S/S 107 km - S/S Benjevat 48 d.c. ACSR Bear 1 1,2,4

S/S Benjevat - S/S Ras Lanuf 51 d.c. ACSR Bear 1 1,2,4

Vool F. I - II - Tinina 61 d.c. ACSR Bear 1 1,2,4

Hun - Waddan 31 d.c. ACSR Bear 1 1,2,4

Waddan - Zella + Extension 160 d.c. ACSR Bear 1 1,2,4

Bungem - Shwerif 135 d.c. ACSR Bear 1 1,2,4

Bay Al Kabir - Bungem 34 d.c. ACSR Bear 1 1,2,4

Mizda - Tinina 86 d.c. ACSR Bear 1 1,2,4

Steel F.- Abu Hady 27 d.c. ACSR Bear 1 1,2,4

Aby Hady - Hunayawah 28 d.c. ACSR Bear 1 1,2,4

Hunayawah - Harawah 34 d.c. ACSR Bear 1 1,2,4

Harawah - 107 km 37 d.c. ACSR Bear 1 1,2,4

Giaref - Sirt 14 d.c. ACSR Bear 1 1,2,4

Zukayr - Giaref 35 d.c. ACSR Bear 1 1,2,4

Wiskah - Zukayr 41 d.c. ACSR Bear 1 1,2,4

Page 44: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

21

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

Dafnia 3 Agr. - Suo Talata Zliten 18 d.c. ACSR Bear 1 1,2,4

Suo Talata - Zliten S/S 220/66 kV 8 d.c. ACSR Bear 1 1,2,4

Mamura- Medical Store 9 d.c. ACSR Bear 1 1,2,4

Mamura - Zanzur Housing 15 d.c. ACSR Bear 1 1,2,4

Contract: Hun 13 d.c. ACSR Bear 1 1,2,4

Wadi Kaam - Army Project 16 d.c. ACSR Bear 1 1,2,4

Abu Arqub - Wadi Mejejin 28 d.c. ACSR Bear 1 1,2,4

Wadi El Hera Silos - Wadi Mejejin 15 d.c. ACSR Bear 1 1,2,4

Awgillah - Agr. Farms "A" 37 d.c. ACSR Bear 1 1,2,4

Awgillah - Tee Off Farms "A" 7 d.c. ACSR Bear 1 1,2,4

Kufra Housing - Hara 4 d.c. ACSR Bear 1 1,2,4

Kufra Gas Power St. - Housing 6 d.c. ACSR Bear 1 1,2,4

S/S Kpp1 - S/S Kpp2 12 d.c. ACSR Bear 1 1,2,4

S/S Kpp2 - S/S Kpp3 12 d.c. ACSR Bear 1 1,2,4

Ageddabia - Ageddabia South 23 d.c. ACSR Bear 1 1,2,4

Sarir North1 - Sarir Town 46 d.c. ACSR Bear 1 1,2,4

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor

[per phase]

Tower structure[tons] Note

L IBYA

Geddahia - Wiskah 44 d.c. ACSR Bear 1 1,2,4

Bungem - Nina 70 d.c. ACSR Bear 1 1,2,4

Mizda - Fissano 24 d.c. ACSR Bear 1 1,2,4

Fissano - Tabagah 119 d.c. ACSR Bear 1 1,2,4

Tabagah- Qaryat West 17 d.c. ACSR Bear 1 1,2,4

Qaryat West-Qaryat East 19 d.c. ACSR Bear 1 1,2,4

Garabulli - Nuclear Centre 34 d.c. ACSR Bear 1 1,2,4

Sirt-50 km Deviation 4 d.c. ACSR Bear 1 1,2,4

Misurata Sw. - Essikt 17 d.c. ACSR Bear 1 1,2,4

Chicken F. - Sadia 10 d.c. ACSR Bear 1 1,2,4

Nina - Wadi Nina 30 d.c. ACSR Bear 1 1,2,4

Homs Town - Homs Switching 6 d.c. ACSR Bear 1 1,2,4

Entry Arrangament Hun 8 d.c. ACSR Bear 1 1,2,4

Suf Al Jin- Stada Quore 36 d.c. ACSR Bear 1 1,2,4

Misurata Sw. - Misurata Port 17 d.c. ACSR Bear 1 1,2,4

Tripoli South - Zanzur 9 d.c. ACSR Bear 1 1,2,4

Essikt - Dafnia 3 Agriculture 19 d.c. ACSR Bear 1 1,2,4

Page 45: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

22

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor

[per phase]

Tower structure[tons] Note

L IBYA

Sarir West - Sarir Town 35 d.c. ACSR Bear 1 1,2,4

Suq Al Ahad 2 - Suq Al Ahad 2 "A" 3 d.c. ACSR Bear 1 1,2,4

Suq Al Ahad 2 "A" - Garabulli 37 d.c. ACSR Bear 1 1,2,4

Suq Al Ahad 2 "A" - Suq Al Giuma 24 d.c. ACSR Bear 1 1,2,4

Suq Al Giuma - Marada 17 d.c. ACSR Bear 1 1,2,4

Martuba1 - Martuba 2 7 d.c. ACSR Bear 1 1,2,4

Martuba 2- Al Ardam 23 d.c. ACSR Bear 1 1,2,4

Wadi Kaam - C. Plant Zliten 10 d.c. ACSR Bear 1 1,2,4

Wadi Kaam-Suq Al Khamis 9 d.c. ACSR Bear 1 1,2,4

Ageddabia - Reservoir 43 d.c. ACSR Bear 1 1,2,4

Wadi Arial - Al Fooha 103 d.c. ACSR Bear 1 1,2,3

Wadi Arial - Al Awayanat 198 d.c. ACSR Bear 1 1,2,3

Qatrun - Tajeri 82 d.c. ACSR Bear 1 1,2,3

Tajeri - Al Weigh 31 d.c. ACSR Bear 1 1,2,3

Al Sharq 250 d.c. ACSR Bear 1 1

Messla - Sarir 42 s.c. ACSR Penguin 1 1,2,3

GECOL - Purchase Order 500 d.c 8702 1,2

Medelec s.c. 5000 1,2

PAK ISTAN

Lalian - Barana 40 s.c. ACSR Dog 1 1,2,3Rangour and Rohri project 1.440 s.c. ACSR Dog 1 1,2,3Rangour project 95 s.c. ACSR Dog 1 1,2,3

Page 46: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

23

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor[perphase]

Tower structure[tons] Note

I RAN

Gulian project I 220 s.c. ACSR Lynx 1 1,2,3Gulian project II 45 s.c. ACSR Lynx 1 1,2,3Mazandavan project 65 s.c. Almelec 228 sqmm 1 1,2,3Dourud - Lowshan 40 s.c. ACSR Lynx 1 1,2,3Asad Abad project 80 s.c. ACSR Lynx 1 1,2,3

63 kV TRANSMISSION LINES

LEGEND: s.c. SINGLE CIRCUIT CONSTRUCTION(1) DESIGNING(2) SUPPLY OF TOWERS(3) ERECTION

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor

[per phase]

Tower structure[tons] Note

ZAMB IA

Lusiwasi - Mpika 250 s.c. ACSR Wolf 1 1,2,3Lusiwasi - Msoro 100 s.c. ACSR Wolf 1 1,2,3Msoro - Chipata 100 s.c. ACSR Wolf 1 1,2,3Mosoro - Katete 80 s.c. ACSR Wolf 1 1,2,3Mosoro - Kakumbi 100 s.c. ACSR Wolf 1 1,2,3Mansa - Mprkoso 700 s.c. ACSR Wolf 1 1,2,3Luwiwasi - Serenje 145 s.c. ACSR Wolf 1 1,2,3Luwinga - Kasama 150 s.c. ACSR Wolf 1 1,2,3Kasama - Mpika 180 s.c. ACSR Wolf 1 1,2,3Kasama - Mbala 140 s.c. ACSR Wolf 1 1,2,3Serenje - Kanona 44 d.c. ACSR Wolf 1 1,2,3Mongo - Kalabo 65 s.c. ACSR Wolf 1 1,2,3Mpika - Nakonde 380 s.c. ACSR Wolf 1 1,2,3

I RAN

Shiraz project 250 d.c. ACSR Hyena 1 1,2,3Dez project 100 s.c. ACSR Lynx 1 1,2,3Rasht - Rudsar 100 d.c. ACSR Lynx 1 1,2,3Shiraz - Kavar 80 d.c. ACSR Hyena 1 1,2,3

LEGEND: s.c. SINGLE CIRCUIT CONSTRUCTIONd.c. DOUBLE CIRCUIT CONSTRUCTIONu/c UNDER CONSTRUCTION(1) DESIGNING

(2) SUPPLY OF TOWERS(3) ERECTION(4) ERECTION THROUGH JOINT VENTURE COMPANY "ELPCO"

Page 47: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

24

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor[per hase]

Tower structure[tons] Note

AFGHAN ISTAN

s.c. 1 63 1,2

BANGLADESH

s.c./d.c. ACSR diff. sizes 1 11.180 1,2

BURMA

s.c. 1 478 1,2

ETH IOP IA

40 s.c. ACSR 58 sqmm 1 300 1,2,3

GHANA

Order No 8.031 s.c. 312 2

I RAN

Co: Kala Naft s.c. ACSR diff. sizes 1 310 1,2

I RAQ

Different contracts 1600 s.c./d.c. ACSR, Copper 1 1,2,3

Contract 5/5/15/R2/81 861 s.c. ACSR 210 & 120 mm2 1 1,2,3

Contract 5/3/820R s.c. ACSR diff.sizes 1 7.678 1,2

Contract TS 2/2005 24 d.c. AAC “ASH” 1 350 1,2,3

L IBYA

2135 s.c./d.c. ACSR diff.sizes 1 19.000 1,2,3

Co: Arabian Gulf Oil Company

Mesla - Majed 75 s.c. ACSR 150/25 1 1,2,3

Order: O.T.D.S. s.c. 1 500 1,2

N IGER IA

Co: MC 4173 d.c. ACSR diff. sizes 1 480 2

PAK ISTAN

2320 s.c. ACSR diff. sizes 1 1,2,3

ZA IRE ( 5 0 kV / 1 5 kV )

Co: Marche II 12 s.c. ACSR 50 sqmm 1 50 1,2,3

1 500 1,2

11; 15; 30; 33; 34,5; 35; 45; kV TRANSMISSION LINES

Page 48: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

25

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

Location Name Type of Cable Voltage (kV) Leng (km) Note

L IBYA

Bengazy Mesla Sarir OPGW 65 42,5Tripoli Zawia Harsha OPGW 220 48

ETH IOP IA

OPGW CABLE

Line location Line length[km]

Type ofconstruction Conductor

Number ofconductor[perphase]

Tower structure[tons] Note

SR I LANKA

s.c./d.c. ACSR diff. sizes 300 1,2s.c./d.c. ACSR diff. sizes 8.500 1,2

BOSN IA AND HERZEGOV INA

4400 s.c.. ACSR diff. sizes 1 1,2,3

LEGEND: s.c. SINGLE CIRCUIT CONSTRUCTIONd.c. DOUBLE CIRCUIT CONSTRUCTION(1) DESIGNING(2) SUPPLY OF TOWERS(3) ERECTION

Addis Abeba Gambi – Mendi - Asosa OPGW 132 201 1,2,3Addis Abeba Avash – Mieso Asabeteferi OPGW 132 18 1,2,3Addis Abeba Mieso – Asebe - Teferi OPGW 132 20 1,2,3Addis Abeba Gondar - Metema OPGW 230 122 1,2,3

ALGERIA

Algeria Hadjerat Ennous-El Affroun OPGW 400 60 1,2,3Algeria Oued Athmania – Salah Bey OPGW 400 120 1,2,3Algeria Naama- Beshar OPGW 400 52 1,2,3Algeria Alahmar – Alalain I OPGW 220 122 1,2,3Algeria Alahmar – Alalain II OPGW 220 15 1,2,3Algeria Alahmar Connection OPGW 220 10 1,2,3Algeria Mascara Sidi Ali Boussidi OPGW 220 110 1,2,3Algeria Tlemzen-Sidi Bel Abess OPGW 220 4 1,2,3Algeria Saida –Sidi Bel Abess OPGW 220 40 1,2,3

Page 49: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

26

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

Location Name Type of Cable Voltage (kV) Leng (km) Note

BOSN IA AND HERZEGOV INA

Biha} 1 Biha} 1 OPGW 35 1,6 1,2,3SS Grabovica SS Salakovac OPGW 35 21,5 1,2,3Sarajevo TE Kakanj OPGW 110 50 1,2,3Zenica Zenica OPGW 110 40 1,2,3Biha} B. Krupa OPGW 110 70 1,2,3Biha} B. Krupa OPGW 110 70 1,2,3Zenica 1 Zenica 4 OPGW 110 7,5 1Kakanj Cementara OPGW 110 5,5 1Mostar 4 ^itluk OPGW 110 12 2^itluk Ljubu{ki OPGW 110 13,5 2^apljina Ljubu{ki OPGW 110 19 2Mostar 1 Mostar 4 OPGW 110 12 2Vitez Busova~a OPGW 110 11 2Mostar 4 ^apljina OPGW 220 6 2Jablanica Grabovica OPGW 220 10 2Sarajevo SG Kakanj - Jablanica OPGW 220 65 1,2,3Tuzla TPP Tuzla - Grada~ac OPGW 220 55 1,2,3Zenica RP Kakanj OPGW 220 40 1,2,3Sarajevo Kakanj OPGW 400 8 1,2,3Ugljevik Ra~a OPGW 400 42,5 2

I RAQ

Contract TS 2/2005 OPGW 33 24 1,2,3

LEGEND: (1) DESIGNING(2) SUPPLY OF TOWERS(3) ERECTION

Page 50: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

27

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

Location Name TypeL H V Q

(m) (m) (m/s) (sk/h)

BOSN IA AND HERZEGOV INA

Jahorina Rajska dolina E 16 792 219 3,62 1000

Bjela{nica Bjela{nica X E 15 609 154 3,54 900

Bjela{nica Bjela{nica Y E 17 1300 454 3,54 900

Bjela{nica Bjela{nica Z E 16 565 223 3,54 900

Bjela{nica Kotlovi E 16 620 244 3,54 900

Jahorina Poljice E 15 527 126 3,54 900

^vrsnica Risovac E 15 500 102 3,54 900

Kalinovik Lelija E 17 990 244 3,54 900

Smetovi Smet E 15 490 120 3,54 900

Vlasenica Igri{te E 16 881 331 3,54 900

Mostar Ruji{te E 15 468 107 3,54 900

^ajni~e Strazica E 16 618 205 3,54 900

Bosanski Petrovac O{trelj E 15 414 161 3,54 900

Zavidovi}i Tajan E 16 680 146 3,54 900

Sokolac Puhovac E 17 847 104 3,54 900

Kupres Cajusa E 17 968 226 3,54 900

Kladanj Karaula E 17 1074 232 3,54 900

Bosansko Grahovo Borovaca E 13 363 77 3,54 900

Bjela{nica Kolijevka E 16 648 125 3,54 900

Bjela{nica Heliodrom E 16 690 275 3,54 900

Trebevi} Dovli}i E 06 182 47 3,55 750

Vla{i} Baby E 06 221 26 3,55 750

Kozara Mrakovica E 15 485 121 3,50 900

SERB IA

Kopaonik Gobelja relej E 15 662 178 3,40 840

Kopaonik Karaman E 15 817 140 3,40 710

Kopaonik Gobelja greben E 15 562 156 3,40 840

Kopaonik Jezerce E 13 431 75 3,00 800

Kopaonik Mali Karaman E 17 1033 191 3,62 1000

Kopaonik Jaram E 06 570 67 2,55 650

Kopaonik Knezovske bare E 16 774 150 3,50 900

Ni{ Sokolov kamen E 17 772 361 3,65 900

SKILIFTS

Page 51: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

28

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

Location Name TypeL H V Q

(m) (m) (m/s) (sk/h)

SERB IA

Brezovica Grcke livade E 06 396 113 2,55 750

Brezovica Trsenje E 15 521 167 3,50 900

Kopaonik Masinac E 11 277 32 2,50 450

Brezovica Saldare E 06 413 90 2,55 450

CROAT IA

Bjelolasica Livade E 12 320 51 2,60 720

Bjelolasica Hajducica E 12 189 67 2,60 600

Bjelolasica Valinska draga E 13 320 103 3,40 840

Platak Tesnja E 15 624 140 3,50 900

Osijek Slalomica E 13 425 122 3,50 900

MONTENEGRO

Zabljak Razana glavica E 13 411 103 3,54 900

Pljevlja Kosanica E 15 515 117 3,50 900

Zabljak Pitomine E 06 251 55 3,55 750

Bjelasica Jezerine E 11 277 45 3,50 450

SLOVEN IA

Kranjska Gora Zelenci E 13 364 121 3,50 900

Kranjska Gora Rutec E 16 727 246 3,50 900

Skofja Loka Valentin E 16 893 274 3,50 900

MACEDON IA

Pelister Cuka E 15 680 122 3,50 900

Pelister Sapuncica E 15 848 268 3,00 600

KAZAKHSTAN

Alma Ata Cimbulak No 1 E 17 1071 304 3,50 780

Alma Ata Cimbulak No 2 E 17 1004 304 3,50 780

Alma Ata Cimbulak No 3 E 17 789 314 3,50 830

Page 52: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

29

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

Location Name TypeL H V Q

(m) (m) (m/s) (sk/h)

BOSN IA AND HERZEGOV INA

Zenica Smet I - TC6 CAB 6 3386 707 5,00 2000

Zenica Smet II - TC6 CAB 6 2315 707 5,00 2000

SERB IA

Brezovica Brezovica - TC6 CAB 6 2869 615 5,00 1500

RUSSIA

Kaukas Dombas - Jig back CAB 45 2053 900 10,00 450

GONDOLAS

Page 53: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

N O T E S

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

30

Page 54: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

31

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

N O T E S

Page 55: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

32

P O W E R T R A N S M I S S I O N L I N E S E N G I N E E R I N G

N O T E S

Page 56: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

400 kV T.L. in Bosnia and Herzegovina.

Hamdije Ćemerlića 2, 71000 Sarajevo, Bosnia and HerzegovinaPhone: (++) 387 33 703 606; 703 624

Fax: (++) 387 33 657 672E-mail: [email protected]

www.energoinvest.com

Power TransmissionLines Engineering

REFERENCESPu

blis

her:

Ener

goin

vest

d.d.

–M

arke

ting,

Sara

jevo

,Jul

y20

08.

Page 57: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

Hamdije Ćemerlića 2, 71000 Sarajevo, Bosnia and HerzegovinaPhone: (++) 387 33 703 610

Fax: (++) 387 33 715 770E-mail: [email protected]

www.energoinvest.com

Publ

ishe

r:En

ergo

inve

std.

d.–

Mar

ketin

g,Sa

raje

vo,J

uly

2008

.

ENERGOENGINEERINGAutomation

Automation equipment in part of engine room TPP Tuzla 3

REFERENCES

Page 58: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

1

E N E R G O E N G I N E E R I N G - A U T O M A T I O N

COUNTRY LOCATIONPOWER (MW) OWNER ACTIVITY COMPLETION SCOPE

B&H Kakanj 6, 110 Elektroprivreda BiH Circuits of measurement andregulation 1996 4 (A)

Kakanj 5, 110 - Analyses and measurement flow 1996 1,2 (A)

Kakanj 5, 110 - Reconstruction 1 of circuits ofmeasurement and regulation 1997 1,3,4 (A)

Kakanj 6, 110 - Reconstruction 2 of circuits ofmeasurement and regulation 1997 1,2,4 (A)

Kakanj 5, 110 - Plant and equipment of reheatingsteam 1997 3,4 (A)

Kakanj 6, 110 - Partially reconstruction 1997 2,3 (A)

Kakanj 6, 110 - H2 cooling system of generator 1997 1 (A)

Kakanj 5, 110 -Replacement of existing circuits ofmeasurement and signalling on

feed water pumps1997 1 (A)

Kakanj 5, 110 - Adaptation of electric actuators 1997 2,3,4 (D)

Kakanj 7, 230 - Circuits of measurement and regulation 1998 1,4 (A)

Kakanj 6, 110 - Equipment of electrofilters for 0,4kv distribution and control 1999 2,3 (B)

Kakanj 6, 110 - EHS actuators 2000 3,4 (A)

Kakanj - Equipment for measurement 2001 2 (A)

Kakanj 7, 230 - Instrumentation and controldevices 2002-2003 1,3,4 (AB)

Tuzla 3, 4, 110 - Circuits of measurement andregulation 1997 1 (A)

Tuzla - Regulation's valves with actuatorsfor oil 1997 2 (A)

Tuzla 3,4 110 - Electrical actuators ofmeasurement and regulation 1997 2 (A)

Tuzla 3, 110 - Reconstruction of automation,0,4 kv distribution 2001 1,2,3,4 (A,B)

Tuzla 4, 110 - Reconstruction of automation,0,4 kv distribution 2001-2002 1,2,3,4 (A,B)

Serbia Kosovo B, 300 KEK Kosovo External hydraulic transport ofbottom and fly ash 2004 - 2005 1,2,3,4 (A,B,C,D)

B&HKakanj 7,230 Elektroprivreda BiH Instrumentation and control design

(reconstruction) 2004 1,4 (B)

Kakanj 7,230 Elektroprivreda BiH Reconstruction of automation(dismounting and mounting) 2004 3 (A,B)

IndonesiaPalembang Electric power

enterprise IndonesiaDelivery of parts of automation

equipment 2004 2 (A)

Makasar Electric powerenterprise Indonesia

Delivery of parts of automationequipment 2004 2 (A)

Thermoelectric power plantREFERENCE LIST 1995-2007

B&H

Tuzla 5; 215 Siemens d.o.o.Sarajevo

Design of mounting, dismountingand testing equipment and

devices of automatic and MCC2006 1,3,4

(D)

Tuzla 5; 215 Elektroprivreda BiH

Design, delivery equipment andcommissioning of electrical part

and automation of internalpneumatic disposal ach and

bottom ach

2006-2007 1,2,3,4(A,B)

Page 59: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

2

E N E R G O E N G I N E E R I N G - A U T O M A T I O N

COUNTRY LOCATION OWNER PROJECT NAME COMPLETION SCOPE

B&H Mostar EU Hotel Bristol 1996 1,4 (B, C)

Mostar EU Administrative building 1996 1 (C)

Sarajevo BiH The supreme court of BiH 1996 1 (C)

Sarajevo EU University clinic center 1996 2,4 (D)

Sarajevo Holiday Inn Hotel Holiday Inn 1997 1 (C)

Sarajevo Kanton Sarajevo Clinic center 1998 1,4 (B, C)

Sarajevo Zavod zaizgradnju grada Secondary technics school 1998 1 (B, C)

Sarajevo PTT Public enterprise PTT 1999 4 (B, C)

Sarajevo PTT Main post - Office 2002 4 (B, C)

Sarajevo BH Telecom BH Telecom 2002 1 (B, C)

Biha} BH Telecom Telephone network 2003 1 (B)

Sarajevo BiH Academy ofSciences Reconstruction 2003 1 (C)

Sarajevo BiH Telecom Reconstruction 2003 1 (C)

Sarajevo BiH Academy ofSciences Reconstruction 2003 1 (C)

Sarajevo BiH Academy ofSciences

Design of telecommunicationsystems 2003 1 (C)

Sarajevo BH Telecom Remote monitoring and signalling 2004 1 (A, C)

Sarajevo Elektroprenos Fiber optical cables, plastic tubesand optical dividers 2004 2 (C)

Sarajevo Elektroprivreda BiH Main design of layingunderground fiber optical cable 2004 1,2 (C, D)

Grand media center(Holiday Inn)

Sarajevo

Alfa baudManagement

Austria

Nostrification of electrical part,building technology, gas and

water2006 5

COUNTRY LOCATION OWNER PROJECT NAME COMPLETION SCOPE

R Croatia Adriatic oil pipeline R Croatia Deilivery of parts of automotionequipment 2004 2 (A)

Buildings

Petrochemistry

COUNTRY LOCATION OWNER ACTIVITY COMPLETION SCOPE

B&H Jablanica Elektroprivreda BiH Reconstructon of agregate 1995 1,2,4 (A,B)Mostar - Reconstruction of agregate 1996 1,3 (A,B)

Una-Biha} - Fire detection system 2000 1 (C)

Hydroelectric Power Plant

Page 60: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

3

E N E R G O E N G I N E E R I N G - A U T O M A T I O N

COUNTRY LOCATION OWNER PROJECT NAME COMPLETION SCOPE

B&H Sarajevo Sarajevska pivara Brewery 1996 1,4 (B)

Biha} Biha}ka pivovara Brewery 1997 2 (A)

Biha} Biha}ka pivovara Brewery 1998 1,3,4 (A)

Miso~a Sarajevoputevi Rock screening plant 1997 1 (B)

Turkey Seydisehir Turkey Factory of etizeolite 1997 1 (B, C)

B&H Sarajevo Energoinvest dd Factory of armatures 1996 4 (A, D)

Sarajevo-Stup Elop Factory of high volt. equipm. 1996 1 (A, B, C)

Sarajevo FDS Tobacco factory Sarajevo 1997 2,3 (B)

Sarajevo-Stup Elop Electric equipment factory 1997 1 (A, B, C)

Sarajevo-Stup Elop Electric equipment factory 1998 1,4 (A, B, C)

Sarajevo FDS Tobacco factory Sarajevo 2000 3 (B)

Sarajevo Bosnalijek Pharmaceutical company 2001 1 (C)

Kladanj Sarajevogas “Metering unit - Kladanj” 1998 1 (A, C)

Bla`uj Energopetrol -Sarajevo TTT Bla`uj 1999 1,2,3,4 (B)

Libya Libya Water injection system 1999 1,2 (B)

B&H Sarajevo JKP GRAS Gras 1999 1 (C)

BiH Sarajevo FDS

Protection of perimeter, videosupervision, evidence of workingtime, control of access and

computerised building monitoringsystem

2005 1 (C)

Process industry

Page 61: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

4

E N E R G O E N G I N E E R I N G - A U T O M A T I O N

COUNTRY LOCATION OWNER PROJECT NAME RATING COMPLETION SCOPE

BiH Stup-Doglodi Zavod za izgradnjuKantona Sarajevo

Substation Eurobeton 312610-20/0,4 kV 630 kVA 2002 1 (B)

Sarajevo Zavod za izgradnjuKantona Sarajevo

Substation Dobojska 3,3128 10-20/0,4 kV 630 kVA 2002 1 (B)

Sarajevo Zavod za izgradnjuKantona Sarajevo

Substation Obala 110-20/0,4 kV 630 kVA 2003 1 (B)

COUNTRY LOCATION OWNER PROJECT NAME COMPLETION SCOPE

B&H @ivinice Kanton Lukavac District heating of@ivinice and Lukavac 2002 1 (B)

Lukavac Kanton Tuzla Hot water pipeline Tuzla 2002 1 (A, B, C)

Heating

Transformer stations

COUNTRY LOCATION OWNER PROJECT NAME COMPLETION SCOPE

B&H Sarajevo Kanton Sarajevo Flood-Gate Bentba{a 1997 1,2,3,4 (A, B)

Sarajevo Kanton Sarajevo Sport and recreation centerBentba{a 1997 1 (B)

Biha} - N. Naselje BH Telecom Access network 2003 1 (C)

Sanski Most - West BH Telecom Access network 2003 1 (C)

Sanski Most - ZdenaII BH Telecom Access network 2003 1 (C)

Sanski Most -Mahala BH Telecom Access network 2003 1 (C)

Gata - Biha} BH Telecom Access network 2003 1 (C)

Other objects

Note:1 Design;2 Equipment delivery (supply);3 Mounting (construction);4 Commissioning5 Nostrification;A Automation;B MCC and LV distribution;C Telecommunication;D Mechanical part

AlgeriaAlgeria, Sonelgaz

Transfer de lelectricite

Sonelgaz

Design, delivery equipment,mounting, supervision of

fire and burglary protection(IC sensor and cable),video supervision andbuilding management

2006-2007 1,2,3,4( C )

B&H Brčko District Government ofBrčko district

Delivery of equipment forhydrological automatic station 2006 2,3,4

(A)

France Paris Petrolinvest Design 2007 1(A)

Page 62: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

5

E N E R G O E N G I N E E R I N G - A U T O M A T I O N

REFERENCE LISTFOR PERIOD BEFORE 1995

I. THERMOELECTRIC POWER PLANTS

� Tuzla 1: 2x32 MW 1963� Rtanj: 12,5 MW 1963� Tuzla 2: 100 MW 1966� Candla: 2x5 MW India 1967� Callacot 3x7,5 MW India 1968� Campur: 2x32 MW India 1968� Trbovlje 125 MW 1968� Kakanj 3: 110 MW 1969� Plomin 125 MW 1969� Morava 125 MW 1969� Kosovo 3: 220 MW 1970� Makassar 2x12,5 MW Indonesia 1970� Palembang: 2x12 MW Indonesia 1970� Kakanj 4: 110 MW 1976� Kosovo 4: 215 MW 1976� Kosovo 5: 215 MW 1976� Kolubara 4: 110 MW 1977� Obrenovac 2x220 MW 1977� Tuzla 5: 215 MW 1978� Gacko 300 MW 1983� Tuzla 3: 110 MW reconstruction 1983� Medan 2x65 MW Indonesia 1984� Ugljevik 300 MW 1984� Drmno 348,5 MW 1986� Kakanj 5: 230 MW 1986� Kuba: Modernization of 3 blocks of 100 MW each 1988� Kosovo 2: Reconstruction 1989

It is necessary to mention that plants Kakanj 4, Tuzla 5, Gacko,Ugljevik, Kakanj 5 and Medan were realised according to "turn-key" system including all activites on designing of measurement,regulation, control, signalization, o,4 kV switch gear and motorcontrol center, DC distribution and telecommunication, finallyengineering and puting into operation.

Remaining structures were not realized up to this scope, so wewould not engage in detailing of all activties which were realizedon mentioned structures.

II. PROCESSING INDUSTRY

� Chemical industry "Miloje Zaki}" - Kruševacmeasuring and regulation 1965

� Wood industrial plant "Magli}" - Fo~ahot water preparation; regulation 1966

� Gasworks - "Voplin"- Rijekacity gasworks; cracking 1966

� Iron ore mines - Ljubijatelephony, motor control center 1966

� Gasworks - Mariborcity gasworks; cracking 1967

� Ironworks - Zenicameasuring and regulation 1968

� Energoinvest - ITENmeasuring and regulation 1968

� Mining and iron steel processing complex - Zenicasequential signal equipment 1968

� Gasworks - Zagrebcity gasworks; cracking 1968

� Lead and zinc mines - Srebrenicaflotation, filtration and crusher;control, motor control center 1969

� New salt - works - Tuzlameasuring, regulation, motor control centerpropulsion and thelephony 1970

� Salt - works- Ulcinjsalt water; measuring and regulation 1970

� "Soko" - Mostar, "Kombiteks" - Biha}"Ðuro Salaj" - Mostar, "Viteks" - Visoko"Igman" - Konjic, "Lignosper" - Bosanski Novi,"IPK" - Sarajevo, Coal mines "Tito" - Banovi}iwaste water discharge; measuring 1970

� Asbestos - cement corrugated sheet factoryAnhovo measuring and regulation 1971

� Coal mines - BrezaCoal excavation and transport;measuring and regulation 1971

� Coal mines "Kreka"preliminary design; measuring and regulation 1971

� Grainmill "Silos" - Beogradtransport regulation; measuring and regulation 1972

Page 63: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

6

E N E R G O E N G I N E E R I N G - A U T O M A T I O N

� Five Vojvodina sugar - refineriesmeasuring, regulation and signalling 1973

� Coal mines "Breza"measuring, regulation, motor control centerand telephony 1974

� Sugar - refinery - Zrenjaninmeasuring and regulation 1975

� Alumina factory - Mostarmeasuring, regulation, motor control centerand telecommunication 1975

� Yugoslav electric power supplyDispatcher centre 1975

� Salt - works - Tuzlasalt water; measuring and regulation 1976

� Chemical industry "OHIS" - Skopljechemical preparation of water;measuring and regulation 1976

� Coke - Chemical complex "Boris Kidri}"- Lukavacmotor control center and logical control 1976

� Brewery Most Sedlec - Czechoslovakialogical control 1976

� Sugar - refinery - Senta - Lime kilnmeasuring, regulation and control 1977

� Alumina factory - "Bira~" - Zvornikmeasuring, regulation, motor control center,telecommunication and computer system 1977

� Coach factory - Kraljevo - Lime kilnmeasuring and control 1978

� Lead and zinc mines - RTB - Bormeasuring, regulation and control 1978

� Sugar - refinery - Bijeljinameasuring, regulation and control 1983

� Sugar - refinery - ]uprija - Lime kilnmeasuring, regulation, motor control center 1985

� "Slavko Rodi}" - Bugojnomeasuring, regulation, motor control centerand control 1986

� Oil factory "BI-MA" - Zrenjaninmeasuring, regulation, motor control centerand control 1990

� Brewery - Chinameasuring, regulation, motor control centerand control 1990

� Brewery - Biha}measuring, regulation, motor control centerand control 1991

� Cellulose and paper industry - Banja Lukameasuring, regulation, motor control centerand control 1991

� Homogenization - Zenicameasuring, regulation, signalling and control 1991

� Oil refinery - Bosanski Brodmeasuring, regulation and control 1991

III. HEATING PLANTS

� Institute "Crvena Zastava" - Kragujevacdecarbonization 100 m3/h 1961

� Mining smelting basin - Bor - CHWTthermal substation 1961

� Heating plant - Zagreb - CHWTchemical water treatment; decarbonization 110 m3/hdeminerilization 3x55 m3/hthermal water treatment 140 m3/h 1962

� Cellulose factory "Bosanka" - Bla`uj25/30 t/h, 16 atp+1,5 MW 1964

� Heating plant - Osijek - TWTthermal water treatment 1964

� Automobile tires factory "Tigar" - Pirot12/14 t/h, 16 atp 1966

� Iron plant - Zenica2x230 t/h 1967

� Iron plant - Zenica25/32 t/h, 40 atp 1967

� Automobile factory "TAM"- Maribor12 t/h, 16 atp 1967

� Mining smelting basin - Bor40/50 t/h, 40 atp 1968

� Iron plant - Zenica40/50 t/h, 40 atp 1968

� Iron plant - "Ravne"12/14 t/h, 37 atp 1968

� Cardboard factory "Umka"25 t/h, 37 atp 1968

� Wood industrial plant "SIP Kopaonik"-Kuršumlija 16 t/h, 16 atp 1968

Page 64: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

7

E N E R G O E N G I N E E R I N G - A U T O M A T I O N

� Heating plant - Ljubljana145/32/36 t/h 1968

� Oil refinery - Bosanski Brod60/80 t/h, 40 atp 1968

� Chemical products factory - Hrastnik12/14 t/h, 37 atp 1968

� Iron plant - Jesenice32 t/h, 37 atp 1968

� Leather factory "KONUS" - Slov. Konjice12/14 t/h, 37 atp 1969

� Alumina plant -Mostar4x50 t/h 1971

� Sodium factory - Lukavac20/25 t/h, 33 atp 1975

� Iron plant - Splitmeasuring, regulation and control 1987

� Heating plant - Gora`dereplacement of pump station 1991

IV. HYDROELECTRIC POWER PLANTS

� HE Jablanica (Neretva) 6x25 MWremote control and telecommunication,220 kV switchboard 1968

� HE Salakovac (Neretva) 3x70 MW 1980

� HE Grabovica (Neretva) 2x60 MWcontrol, signalling, measuring, protection,temperature monitoring, information computersystem, start - stop automation 1980

� HE Višegrad (Drina) 3x115 MWcontol,signalling,measuring, protection,information computer system, telephony, intercomsystem, timing,fire alarm, HF connections 1990

� HE Jablanica (Neretva) block 3reconstruction; contol, signalling,measuring, protection, temperaturemonitoring, information computer system 1991

� HE Jablanica (Neretva) block 3reconstruction and modernisation;testing, adjustment and start up 1995

V. TRANSFORMER STATIONS

� Banja Luka20/10 kV 1974

� Otoka - Sarajevo20/10 kV 1976

� Koševo - Sarajevo110/10 kV 1976

� Thermal power plant - Kakanj220/110 kV 1976

� Cazin110/35/10 kV 1976

� Velika Kladuša110/35/10 kV 1976

� Bosanska Krupa110/35/10 kV 1976

� Zavidovi}i110/35/10 kV 1976

� Pale110/35/10 kV 1977

� Neum110/35/10 kV 1977

� Thermal power plant - Gacko110/35 kV 1982

� Iraq - Baghdad13 transformer stations 33/11 kV 1982

VI. WATER POWER ACTIVITES

� Water supply system - Prištinaautomatic control 1975

� Alumina plant - Mostarautomatic control 1975

� Mining and iron plant - ZenicaPump station 52automatic control 1978

Page 65: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

8

E N E R G O E N G I N E E R I N G - A U T O M A T I O N

VII. TRAFFIC

a) Railway track ( signal - safety equipment)� Novska - Zagreb 106 km 1969� Zagreb - Rijeka 229 km 1969� Ljubljana - Dobova 129 km 1969� Dobova - Zagreb 29 km 1969� Novska - Tovarnik 184 km 1969� Sarajevo - Plo~e 228 km 1969� Sarajevo - Vrpolje 257 km 1970

b) Marshalling yards ( signal - safety equipment)� Velika Gorica 1969� Zagreb , Zalog (Ljubljana) 1969� Doboj 1974

c) Railway station (signal - safety equipment)� Vreoci 1967� Alumina plant - Mostar (Ba~evi}i) 1971

d) Overroad crossing� Ravne, Railroad junction - Bosanska Poljana

1968� Sarajevo - Vogoš}a - Semizovac 1970

e) Coaxial cable system� Zenica; section Sarajevo - Dobrinja 1970

VIII. BURGLARY AND FIRE PROTECTION

� PTT - Sarajevo 1970

� "Novi Dom" - Beograd 1970

� "Makedonka" -Štip 1970

� "Rade Kon~ar" - ERC Zagreb 1971

� "Pionir" - Beograd 1971

� SUP Vrnja~ka Banja 1971

� Exhibition "Art on the Yugoslav Teritory fromPrehistory till today " - Sarajevo 1971

� Yugoslav Bank for Foreign TradeSarajevo Branch 1972

� Iron plant - Zenica, power supply system;intercom system, timing, loudspeaker systemand telephone installations 1972

� Plo~e harbourIntercom system, timing, loudspeaker systemand telephone installations 1989

� Institute for Automation and ComputerSciences - Stup - Sarajevo 1989

IX. PETROCHEMISTRY

� YU - Oil pipelines(terminals, pump and metering stations)measuring, regulation, control, computersystem and 0.4 kV distribution 1985

X. OTHER OBJECTS

� "HEPOK - Hercegovina" -Mostar green houses remote hydraulic system 1975

� Bar harbourtelecommunication,acoustic and light signalling. 1975

� Br~ko river portcrane hydraulic system. 1976

� Electric power supply plants - Bardispatching centre. 1976

� Faculty of Metallurgy - Zenicatelecommunication installations. 1977

� Electric power supply plants - Vara`dindispatching centre. 1977

� Chemical water treatment - Bosanski Brodmeasuring, regulation and control. 1980

� Iron plant - Skoplje - chemical water treatment;measuring, regulation and control. 1980

� Office building Energoinvesttelephony, loudspeaker system, fire protection,working hours registration systemand simultaneous translation. 1981

Page 66: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

Hamdije Ćemerlića 2, 71000 Sarajevo, Bosnia and HerzegovinaPhone: (++) 387 33 703 610

Fax: (++) 387 33 715 770E-mail: [email protected]

www.energoinvest.com

Publ

ishe

r:En

ergo

inve

std.

d.–

Mar

ketin

g,Sa

raje

vo,J

uly

2008

.

ENERGOENGINEERINGAutomation

Automation equipment in part of engine room TPP Tuzla 3

REFERENCES

Page 67: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

Software Development Process

Hamdije Ćemerlića 2, 71000 Sarajevo, Bosnia and HerzegovinaPhone: (++) 387 33 703 601; 703 604

Fax: (++) 387 33 657 458E-mail: [email protected]

www.energoinvest.com

Publ

ishe

r:En

ergo

inve

std.

d.–

Mar

ketin

g,Sa

raje

vo,J

uly

2008

.

CommunicationsEngineering

REFERENCES

Page 68: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

1

C O M M U N I C A T I O N S E N G I N E E R I N G

EWSD Public Digital Exchanges

LOCATION CUSTOMER CAPACITY(PORTS / TRUNKS) EXCHANGE T YPE YEAR OF

REALIZ ATION NOTE

Mostar, Travnik, Bihać,B&H JP PTT BiH 34238/6870 Transit/Local 1997. 1&2

Zenica, Kakanj, TrainingExchange, Mostar,

Zenica, Bugojno, B&HJP PTT BiH 17950/5110 Transit/Local 1998. 1&2

Sarajevo, Bihać, Mostar,Konjic, B&H JP PTT BiH 22052/8220 International and

Transit/Local 1999. 1&2

Eight exchanges, B&H JP BH Telecom 70828/21310 International, Transit andLocal 1999. 3

Sarajevo, B&H JP BH Telecom 11672/11640 MnC 2000. 5

Tuzla, Zenica, KakanjTravnik, Bugojno, Mostra,

Konjic, Bihać, B&HJP BH Telecom 43170/2250 Transit/Local 2000. 1&2

Contract Upgrade EWSDV11 to V14

Ten exchanges, B&HJP BH Telecom 148492/33040 International, Transit and

Local 2001. 4

Priština, Kosovo PTK 38872/10560 Local 2001. 5

Sarajevo, Tuzla, Zenica,Kakanj Travnik, Bugojno,

Mostra, Konjic, Bihać,B&H

JP BH Telecom 47562/8040 International, Transit andLocal 2001. 1&2

Sarajevo, Tuzla, Zenica,Kakanj Travnik, Bugojno,

Mostra, Konjic, Bihać,B&H

JP BH Telecom 45128/6840 International, Transit andLocal 2003. 1&2

Sarajevo, Tuzla, Zenica,Kakanj Travnik, Bugojno,

Mostra, Konjic, Bihać,B&H

BH Telecom d.d.Sarajevo 83850/0 Transit and Local 2004. 1&2

Sarajevo, Tuzla, Zenica,Kakanj Travnik, Bugojno,

Mostra, Konjic, Bihać,B&H

BH Telecom d.d.Sarajevo 37824/0 Transit and Local 2005. 1&2

Sarajevo, Tuzla, Zenica,Kakanj Travnik, Bugojno,

Mostra, Konjic, Bihać,B&H

BH Telecom d.d.Sarajevo 30336/960 Transit and Local 2006 1&2

Kakanj, Konjic, B&H BH Telecom d.d.Sarajevo

Relocation of remotelocations Remote locations 2007 2

Note: 1 - Design 4 - Hardware and Software Upgrade V.11 - V.12 - Installation and Commisioning 5 - Installation3 - Hardware and Software Upgrade V.7 and V.9 - V.11

Page 69: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

2

C O M M U N I C A T I O N S E N G I N E E R I N G

Software Development Projects

PROJECT CUSTOMER TECHNOLOGIES YEAR OF REALIZATION NOTE

TalkGemclient development of web application IskraTel, Slovenia javascript 2004. 2

EWSDSwitch Based IN Services IskraTel, Slovenia C# 2004. 2

Media Streaming and Download systemDownload and Live Streaming of Videoon Demand Clips

IskraTel, SloveniaSiemens

C, Oracle, Solaris, Apache,Red Hat 2004. 2

OmniBox (Video Surveillance Center)Connect smart home appliances to aService Gateway (SG), which is throughthe IP network connected to aManagement Center (MC), as well as to aSurveillance Center which administers theapplication installed on theSG.Energoinvest developed VideoSurveillance Centre Application formonitoring video signal from cameras(working with video, streaming and codec)

IskraTel, SloveniaLinux, C#, java, ASP .NET,

PostgreSQL, SuSE 9.1,OSGi FW

2004. – 2006. 1,2

Hotel BillingDriver for Modem Communication IskraTel, Slovenia C#, java, MSSQL 2005. – 2007. 2

Tele VotingApplication for collecting of customercalls, connected to EWSD exchange

IskraTel, Slovenia C#, Visual Basic 2005. 2

System for controlling, configuring,setting up Network elements

IskraTel, SloveniaSiemens NSN

Solaris, C++, java, Flexigen,ClearCase, Mobile NE 2006. – 2007. 2

Advanced Speech Call ItemTesting form MSC on PC-simulator

IskraTel, SloveniaSiemens Assembler, Chill 2006. – 2007. 2

Number Portability Applicationresponsible for writing/removingported telephone numbers IskraTel, Slovenia C#, CORBA 2006. – 2007. 2

Web Phone Services Application toaccess common Phone/PBXfunctionalities from PC

IskraTel, Slovenia C# 2006. – 2007. 2

Test AdapterNGN interoperability testing (TTCN-3based) system

IskraTel, Slovenia java 2007. 2

IP-TV Set of applications, services, ...designed for TelCo operators.Participation in development ofMiddleware segment and User portal. Itcontains Conditional Access, webinterface to subscribers.

IskraTel, Slovenia Linux, C#, java, ASP .NET,JavaScript, MSSQL 2007. – 2008. 2

web-portal InformationSystem with web portal for Europeanorganization for development NCP FP7subsidiary B&H. System is designed forcustomers’ employees for online distantaccess to information system.

SUS – Foundation forhigh education (World

University Service)B&H

ASP.NET 2005, JavaScript,HTML, XML, MS Access

Database2008. 1,2,3

Note: 1 - Design2 - Installation and Commisioning3 - Supply of Equipment

Page 70: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

3

C O M M U N I C A T I O N S E N G I N E E R I N G

PROJECT CUSTOMER TECHNOLOGIES YEAR OF REALIZATION NOTEIMS ApplicationsBased on IMS platform, over ISCinterface. Technologies: Java, JainSlee,C, XML, VoXML. Testing applications inFraunhofer environment (FraunhoferInstitute, Berlin, Germany), especiallyequipped for testing IMS applications. Wedeveloped test applications, the aim wasto investigate the possibility of IMSplatform and make some test service.

Telekom Slovenije Java, JainSlee, C, XML,VoXML. 2008.-2009. 2

HP Open CallTest Application based on HP OCMPplatform for fixed network.

Telekom Slovenije Java, JainSlee, C, XML,VoXML. 2008.-2009. 2

In-House HR Survey applicationWeb based user application and WPFdesktop administrator application.Communication using WCF services.Data access layer implemented usingEntity Framework.

Energoinvest, d.d.Sarajevo

ASP.NET, WPF, SQL Server05/08, WCF services, Entity

Framework, Custom reporting2009. 1,2,3

WEPISBusiness Information SystemSystem is modular and includes thefollowing modules: Human Resource Management Accounting (Main accounting andfinancial operations) Fixed assets Payroll calculations Commodity-finance business Books of incoming and outgoinginvoices

Energoinvest, d.d.Sarajevo

.NET Framework 2.0,WinForms, SQL Server 05,Business Objects Crystal

Reports

Aug 2007 –April 2009 1,2,3

“ TAPSOL - implementation support forBH Telecom roaming solution”Solution development for handlingroaming data for BH Telecom togetherwith Allround partner company.Processing of roaming data is done forboth ways, incoming and out comingroaming data. Our responsibilities wereintegration of solution into BH Telecombusiness environment and supportingwork for whole life cycle.

BH Telecom d.d. Java,Oracle 10g 2008.-2009, 2012 2,3

“ NRTRDE- implementation support forBH Telecom roaming solution”Near Real Time Roaming Data Exchange(NRTRDE) provides a new method formonitoring the customers' activities in theVPMN (Visited Public Mobile Network)networks, and enables the HPMN (HomePublic Mobile Network) to detectunauthorized network usage and otherfraud issues near real time.

BH Telecom d.d. Java, Oracle 10g 2010.-2012. 2,3

“Call me”SMS mobile service which allow to user tosend free charge messages to ask otheruser to call him, in case that he has nocredit even for a message. Service isdeveloped in Java, developingenvironment is Eclipse, it is used EricssonParlay X API. The service has two parts,one for core functionalities (checking thecredit of user, sending SMS, checking thekind of users) the other is foradministration of service, and web part forgenerating dynamic report.

BH Telecom d.d. Java, JSF, PalayX API,mySQL, HTML, XML 2009.-2010. 1,2,3

Page 71: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

4

C O M M U N I C A T I O N S E N G I N E E R I N G

PROJECT CUSTOMER TECHNOLOGIES YEAR OF REALIZATION NOTETreasury businessInformation system that supports the workof administrative bodies in compliancewith the treasury operations. The systemis modular and includes modules: Budget Planning Order management Human Resource Management Accounting (Main accounting and

financial operations) Fixed assets Payroll calculations Commodity-finance business Books of incoming and outgoing

invoices Reporting;

Energoinvest, d.d.Sarajevo

.NET Framework 2.0,WinForms, SQL Server 05,Business Objects Crystal

Reports

2009. –2010. 1,2,3

“Weather Info”Represents web module for IPTV solutionend users. It gives them a graphicalpresentation of weather details such astemperature (low and high), wind,pressure etc. for every city.

BEESMART,Ljubljana JEE, EJB, Oracle database 2010 1,2,3

„Anevia VoD“Represents implementation andintegration of Anevia Video On Demandfunctionalities in IPTV frameworkmiddleware. Due to unified VoD interface,implementation for Anevia VoD serverobeyed and instantiated this particularinterface.

BEESMART,Ljubljana JEE, EJB, Oracle database 2010 1,2,3

“ TV Commerce ”Represents new platform that is added inIPTV framework that will be used fordifferent TV Shop services.This implementation of TV Commercealso included integration of currently mostimportant payment service in the worldPayPal. PayPal implementation isdeveloped as Enterprise Java Bean andalso as web service for use by 3rd partyapplications.

BEESMART, Ljubljana JEE, EJB, Oracle database 2010 1,2,3

“ERViP”-Access Control and Time &Attendance information systemERViP is web and windows applicationset for complete access control andbusiness timekeeping solution for anymodern organization. Its flexible andscalable personal identificationinfrastructure provides robust physicalsecurity platform. Once implemented, itcan be combined with comprehensivescheduling, tracking of working hours anddetailed attendance calculations requiredby Payroll and other Human Resourcesapplications.

Energoinvest d.d.,Sarajevo C #. NET, MS SQL 2005 2009/2010 1,2,3

Telemedicine SMS service developed forBH Mobile operator. It serves formonitoring and recording of vitalparameters.

BH Telecom d.d. Java 2011 1,2,3

WEB-based application for monitoringtransport of weapons on territory of B&H.App records every piece of weapon, withits history, status, place, and otherdetailed infomations.

UNDP ASP .NET, SQL 2008 2011 1,2,3

112Participation in instalation and integrationin Project Communication Center 112

Minnistry of SecurityBiH 2011 2

Page 72: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

5

C O M M U N I C A T I O N S E N G I N E E R I N G

NGN Projects

NAME OD THEPROJECT CUSTOMER DESCRIPTION OF THE PROJECT: YEAR OF

REALIZ ATION NOTE

WiFi Feasibility Study BH Telecom d.d.Sarajevo

The aim of this project was to estimate the possibility tointroduce WiFi network on the territory of Bosnia andHerzegovina. This study also analyses costs of theintroduction, as well as current operation costs. The studyspecify characteristics and functionalities of the networkequipment and advises BH Telecom on the choosing theadequat system, equipment and software.The project was realized together with Yankee Group.

2005. 1

HW and SW platformfor supervision and

maintenance FeasibilityStudy

BH Telecom d.d.Sarajevo

The aim of this project was to define the structure of HW andSW platform for supervision and maintenance of BHTelecom network, as well as procedures and steps ofimplementation.Based on the current situation and gap analysis, targetarhitecture and future mode of operation wererecommended using advanced OSS IntroductionMethodology

The project was realized together with partner companiesLucent Technologies and Kate-Kom d.o.o Zagreb.

2006. 1

TAP3 Application BH Telecom d.d.Sarajevo

This solution enables services that are specified byTAP3/RAP standards of GSM Association, includingintroduction of GPRS services in roaming regime.

TAP3 project was realized together with Allround, Hungary.

2006. 2

School SMS Application Self-financed project

This project is introduction of School SMS application intoelementary and secondary schools for improvement ofcommunication between parents/students and school. Usingthis modern Internet application and SMS technology,notification messages about homework, grades andabsences are being created and sent to the parents and/orstudents.

2007. 2

Note: 1 - Study2 - Implementation and Support

Page 73: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

6

C O M M U N I C A T I O N S E N G I N E E R I N G

Access DSLAM/MSAN Systems

LOCATION CUSTOMER CAPACITY SYSTEM TYPE EQUIPMENT TYPE YEAR OFREALIZAT. NOTE

15 locations BH Telecom Cca.10000 DSLAM hiX 5635/5630 2008. 1&2

7 locations BH Telecom Cca.5260 POTS;648 ADSL MSAN hiX 5635/5630 2008. 1&2

17 locations BH TelecomCca.14600

POTS; 3600ADSL

MSAN hiX 5635/5630 2009. 1&2

113 locations BH Telecom Cca 11000 POTS DSLAM EDA 1200 2011 1&2

Note: 1 - Study2 - Implementation and Support

Page 74: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

7

C O M M U N I C A T I O N S E N G I N E E R I N G

ET Public Local Digital Exchanges

LOCATION CUSTOMER CAPA CITY(PORTS/TRUNK S) EXCHA NGE TYPE YEAR OF REALIZ

AT ION NOTE

Hutovo, B&H PTT 172/12 ET 10 1986. 1&2&3

Rakovica, B&H PTT 1114/72 ET 200 1987. 1&2&3

Ljuti Dolac, B&H PTT 482/32 ET 10 1987. 1&2&3

Opličići, B&H PTT 1230/80 ET 10 1988. 1&2&3

Zavidovići, B&H PTT 1490/90 ET 200 1988. 1&2&3

Rogatica, B&H PTT 3192/192 ET 200 1988. 1&2&3

Haljinići, B&H PTT 1862/62 ET 200 1988. 1&2&3

Mostar, B&H PTT 8100/700 ET 200 1988. 1&2&3

Kušiljevo, Serbia PTT 270/20 ET 10 1988. 1&2&3

Stog, B&H PTT 106/10 ET 10 1988. 1&2&3

Svinjašnica, B&H PTT 215/15 ET 10 1988. 1&2&3

Vozuća, B&H PTT 430/30 ET 10 1988. 1&2&3

Military of Defence, Serba - 250 ET 20/RSM 1989. 1&2&3

Svilajnac, Serbia PTT 3960/360 ET 200 1989. 1&2&3

Svilajnac, Serbia PTT 1800 ET 200/RSM 1989. 1&2&3

Čačak, Serbia PTT 2200 ET 200 1989. 1&2&3

Mostar Grude, B&H PTT 1072/72 ET 200 1989. 1&2&3

Ljubuški, B&H PTT 1072/72 ET 200 1989. 1&2&3

Gabela, B&H PTT 860/60 ET 200 1989. 1&2&3

Stolac, B&H PTT 860/60 ET 200 1989. 1&2&3

Paraćin, Serbia PTT 2300 ET 200 1989. 1&2&3

Sarajevo Medenica, B&H PTT 1090/90 ET 200 1990. 1&2&3

Novi Travnik, B&H PTT 3280/280 ET 200 1990. 1&2&3

Zavidovići, B&H PTT 2120/120 ET 200/RSM 1990. 1&2&3

Ljubuški, B&H PTT 250 ET 200/RSM 1990. 1&2&3

Dublje, Serbia PTT 328/28 ET 10 1990. 1&2&3

Goražde, B&H PTT 136/16 ET 10 1990. 1&2&3

Jablanica, B&H PTT 300 ET 200/RSM 1990. 1&2&3

Novi Travnik, B&H PTT 420 ET 200 1991. 1&2&3

Note: 1 - Design2 - Installation and Commisioning3 - Supply of Equipment

Page 75: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

8

C O M M U N I C A T I O N S E N G I N E E R I N G

Private Digital Exchanges PABX

LOCATION CUSTOMER CAPACITY (PORTS/TRUNKS)

EXCHANGETYPE

YEAR OF REALIZATION NOTE

Sarajevo, B&H Energoinvest Company 1401/120 TLC 10 1982. 1&2&3

Sarajevo, B&H Skenderija Culture& Sports Center 330/30 TLC 10 1983. 1&2&3

Sarajevo, B&H Holiday Inn Hotel 670/70 TLC 10 1983. 1&2&3

Bačka Palanka, Serbia Sintelon Company Headquarters 408/48 TLC 10 1986. 1&2&3

Zenica, B&H Steelworks 4400/400 ET 200 1986. 1&2&3

Sarajevo, B&H Unis Company Headquarters 2200/200 ET 200 1986. 1&2&3

Mostar, B&H Aluminium Company 2200/200 ET 200 1986. 1&2&3

Sarajevo, B&H Municipal Water DistributionCompany Headquarters 330/30 ET 10 1986. 1&2&3

Neum, B&H Hotel Neum 330/30 ET 10 1986. 1&2&3

Sarajevo, B&H Faculty of Mechanical Engineering 275/25 ET 10 1986. 1&2&3

Čačak, Serbia Factory 1st May 112/12 ET 10 1987. 1&2&3

Sarajevo, B&H Health Center Mojmilo 246/16 ET 10 1987. 1&2&3

Sarajevo, B&H Energopetrol Company 110/10 ET 10 1987. 1&2&3

Moscow, URSS Ministry of Energy 860/160 ET 200 1987. 1&2&3

Tešanj, B&H Unis Pobjeda Company 325/25 ET 10 1988. 1&2&3

Odessa, Ukraina Reni Port 660/160 ET 200 1988. 1&2&3

Moscow, Rusia Hotel Savoy 230/30 ET 200 1988 1&2&3

Prague, Czech Republic Krajski Projektovy Ustav (KPU) 440/40 ET 200 1990. 1&2&3

Kablo Decin, Czech Republic Ministry of Defence 4523/223 ET 200 1990. 1&2&3

Szcecin, Poland Donja Odva 272/22 ET 200 1990. 1&2&3

Zdziesowice, Poland Electrical Power Plant 2200/200 ET 200 Centrex 1990. 1&2&3

Wroclaw, Poland Institute of Automation 172/12 ET 10 1990. 1&2&3

Bidgosc, Poland Electrical Power Plant 1120/120 ET 200 Centrex 1990. 1&2&3

Gdinia, Poland Shipyard 2180/180 ET 200 Centrex 1990. 1&2&3

Warshow, Poland International Airport 4360/360 ET 200 1990. 1&2&3

Moscow, Rusia Business Club 72/16 ET 10C 1990. 1&2&3

Moscow, Rusia Fiodorov Clinic 324/ 4 ET 200 1990. 1&2&3

Sarajevo, B&H Electrical EnergyDistribution Company 204/24 ET 10 1990. 1&2&3

Page 76: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

9

C O M M U N I C A T I O N S E N G I N E E R I N G

LOCAT ION CUSTOMER CAPACITY(PORTS/TRUNKS)

EXCHANGETYPE

YEAR OFREALIZATION NOTE

Jajce, B&H Pljeva/Šipovo 360/60 ET 100 1990. 1&2&3

Čačak, Serbia Jugopetrol Company 132/12 ET 10 1990. 1&2&3

Szcecin, Poland Steelworks 220/20 ET 10C 1991. 1&2&3

Szcecin, Poland Thermal Heating Plant 266/10 ET 200 1991. 1&2&3

Vlasenica, B&H Aluminium Mines 2370/120 ET 200 1991. 1&2&3

Prilep, Macedonia 11th October Factory 68/8 ET 10 1991. 1&2&3

Sarajevo, B&H Energopetrol Company 104/8 ET 10 1991. 1&2&3

Note: 1 - Design2 - Installation and Commisioning3 - Supply of Equipment

Page 77: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

10

C O M M U N I C A T I O N S E N G I N E E R I N G

Radio Communications Systems

LOCATION CUSTOMER NUMBER OF RADIO STATIONS

EQUIPMENTTYPE

YEAR OF REALIZATION NOTE

Iraq Electrical Power Company 12 BBC 1982. 1

Sarajevo, B&H Gas line Zvornik - Sarajevo 110 Motorola 1984. 1&2&3

Ðurđevik, B&H Coal Mine 60 Motorola 1984. 1&2&3

Tuzla, B&H "Titovi rudnici uglja" Coal Mines 130 - 1984. 1

Šikulje, B&H Coal Mine 35 Motorola 1985. 1&2&3

Sarajevo, B&H Water Supply and Sewage 58 Motorola 1985. 1&2&3

Ugljevik, B&H Strip Mining, Bogutovo selo 84 Motorola 1985. 1&2&3

Tuzla, B&H Salt Mine Tetima 72 Motorola 1987. 1&2&3

Sarajevo, B&H "Energoinvest" Company 1900 - 1987. 1

Neum, B&H Regional Water Suplly andSewage 38 Motorola 1987. 1&2&3

Sarajevo, B&H Elektroprivreda BiH Company - - 1988. 1

Bosanski Brod, B&H Oil Rafinery 58 Motorola 1989. 1&2&3

Livno, B&H Elektrodistribucija Company 18 - 1989. 1

Tuzla, B&H Salt Mine Tetima 36 Motorola 1990. 1&2&3

Kakanj, B&H JP Grijanje 6 Motorola 1990. 1&2&3

Sarajevo, B&H Youth Center Skenderija 23 Motorola 1990. 1

Sarajevo, B&H Sport Center Skenderija 34 Motorola 1991. 1&2&3

Sarajevo, B&H Ministry of Internal Affairs BiH 146 Motorola 1991. 3

Sarajevo, B&H "Zora" Company 5 Motorola 1991. 1&2&3

Kakanj, B&H JP Grijanje Company 6 Motorola 1996. 3

Sarajevo, B&H Elektroprivreda BiH Company 340 Motorola 1997. 1

Alger Watter Sistem Saida 32 Motorola 1997. 1

Sanski Most, B&H Watter Sistem Sanski Most 16 Motorola 1999. 1&2&3

Sarajevo, B&H Energopetrol BiH Company 239 Motorola 1999. 1&2&3

Note: 1 - Design2 - Installation and Commisioning3 - Supply of Equipment

Page 78: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

11

C O M M U N I C A T I O N S E N G I N E E R I N G

Access and Industrial Telecommunications Networks

LO CATION CUSTOMER CAPACITY(PORTS) NETWORK TYPE YEAR OF R

EALIZAT ION NOTE

Višegrad, B&H Hydro-Electric Power Plant 240 Industrial Telecommunication Network 1984 1&2&3

Čapljina, B&H Power Plant 290 Industrial Telecommunication Network 1984. 1&2&3

Gacko, B&H Steam Power Plant 320 Industrial Telecommunication Network 1984. 1&2&3

Zenica, B&H RMK Steel Works 410 Industrial Telecommunication Network 1985. 1&2&3

Sarajevo, B&H Water Distribution Company 250 Industrial Telecommunication Network 1986. 1&2&3

Bulgaria Gas Line 160 Industrial Telecommunication Network 1986. 1&2&3

Mostar, B&H Aluminium Company 370 Industrial Telecommunication Network 1987. 1&2&3

Stolac, B&H PTT 440 Access Telecommunication Network 1989. 1&2&3

Bačka Palanka, Serbia PTT 1015 Access Telecommunication Network 1989. 1&2&3

Ostra, Croatia PTT 330 Access Telecommunication Network 1989. 1&2&3

Trepča, Serbia PTT 1100 Access Telecommunication Network 1989. 1&2&3

Bečanj, Serbia PTT 520 Access Telecommunication Network 1989. 1&2&3

Bresnica, Croatia PTT 470 Access Telecommunication Network 1990. 1&2&3

Donja Garevnica, PTT 710 Access Telecommunication Network 1990. 1&2&3

Vujetinci, Serbia PTT 490 Access Telecommunication Network 1990. 1&2&3

Orašje, B&H PTT 750 Access Telecommunication Network 1990. 1&2&3

Mrčajevci, Serbia PTT 730 Access Telecommunication Network 1991. 1&2&3

Pelagićevo, Serbia PTT 815 Access Telecommunication Network 1991. 1&2&3

Brčko, B&H PTT 635 Access Telecommunication Network 1991. 1&2&3

Tasovčiči, B&H PTT 530 Access Telecommunication Network 1991. 1&2&3

Dolina - Alići, B&H JP PTT BiH 600 Access Telecommunication Network 1999. 1

Budoželje, B&H JP PTT BiH 500 Access Telecommunication Network 1999. 1

Kakanj, B&H JP PTT BiH 1800 Access Telecommunication Network 1999. 1

Kakanj Bilješevo, B&H JP PTT BiH 2600 Access Telecommunication Network 1999. 1

Hadžići Pazarić, B&H JP PTT BiH 3300 Access Telecommunication Network 2000. 1

Butmir Donji Kotorac, B&H JP PTT BiH 6870 Access Telecommunication Network 2001. 1

Sokolović Kolonija, B&H JP PTT BiH 6390 Access Telecommunication Network 2001. 1

Gračanica - Džakule, B&H JP PTT BiH 2030 Access Telecommunication Network 2001. 1

Page 79: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

12

LOCAT ION CUSTOMER CAPA CITY(PORTS) NETWORK TYPE YEAR OF R

EALIZATION NOTE

Gračanica - Doborovci, B&H JP PTT BiH 1690 Access Telecommunication Network 2001. 1

Gračanica Soko, B&H JP PTT BiH 3460 Access Telecommunication Network 2001. 1

Sarajevo - Hrasnica, B&H JP BH Telecom 10400 Access Telecommunication Network 2002. 1

Sarajevo - Aneks, B&H JP BH Telecom 4670 Access Telecommunication Network 2002. 1

Sarajevo - Hrasno, B&H JP BH Telecom 5680 Access Telecommunication Network 2003. 1

Sarajevo- Pofalići, B&H JP BH Telecom 5650 Access Telecommunication Network 2003. 1

Sarajevo- Grbavica, B&H JP BH Telecom 8100 Access Telecommunication Network 2003. 1

Sarajevo - Obad, B&H JP BH Telecom 4440 Access Telecommunication Network 2003. 1

Bihać - Mali Lug, B&H JP BH Telecom 1360 Access Telecommunication Network 2003. 1

Bihać - Ozimice II, B&H JP BH Telecom 6520 Access Telecommunication Network 2003. 1

Bihać - Kamenica, B&H JP BH Telecom 1920 Access Telecommunication Network 2003. 1

Bihać - Klokot, B&H JP BH Telecom 800 Access Telecommunication Network 2003. 1

Bihać - Izačić, B&H JP BH Telecom 1480 Access Telecommunication Network 2003. 1

Bihać - Vikići, B&H JP BH Telecom 1260 Access Telecommunication Network 2003. 1

Bihać - Vinica, B&H JP BH Telecom 1230 Access Telecommunication Network 2003. 1

Bihać - Vrtoče, B&H JP BH Telecom 260 Access Telecommunication Network 2003. 1

Bihać – Radoč, B&H JP BH Telecom 600 Access Telecommunication Network 2003. 1

Travnik - Mudrike, B&H JP BH Telecom 450 Access Telecommunication Network 2003. 1

Travnik - Vitovlje, B&H JP BH Telecom 680 Access Telecommunication Network 2003. 1

Travnik - Babanovac, B&H JP BH Telecom 1320 Access Telecommunication Network 2003. 1

Travnik - PC 96 Vitez, B&H JP BH Telecom 1050 Access Telecommunication Network 2003. 1

Konjic - Studenčica, B&H DD BH Telecom 220 Access Telecommunication Network 2004. 1

Konjic - Čelina, B&H DD BH Telecom 200 Access Telecommunication Network 2004. 1

Konjic - Klek, B&H DD BH Telecom 270 Access Telecommunication Network 2004. 1

Mostar, B&H DD BH Telecom 500 Access Telecommunication Network 2004. 1

Jablanica, B&H DD BH Telecom 200 Access Telecommunication Network 2004. 1

Bihać - Žegar, B&H DD BH Telecom 1100 Access Telecommunication Network 2004. 1

Bihać - Lohovo, B&H DD BH Telecom 300 Access Telecommunication Network 2004. 1

C O M M U N I C A T I O N S E N G I N E E R I N G

Page 80: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

13

C O M M U N I C A T I O N S E N G I N E E R I N G

LOCATION CUSTOMER CAPACITY(PORTS) NETWORK TYPE YEAR OF R

EALIZATION NOTE

Bos. Krupa - Krčane, B&H DD BH Telecom 1200 Access Telecommunication Network 2004. 1

Cazin - Gnjilavac, B&H DD BH Telecom 1200 Access Telecommunication Network 2004. 1

Cazin - Polje, B&H DD BH Telecom 1300 Access Telecommunication Network 2004. 1

Velika Kladuša - Ponikve, B&H DD BH Telecom 600 Access Telecommunication Network 2004. 1

Sarajevo - Švrakino selo iMojmilo Brdo, B&H DD BH Telecom 6400 Access Telecommunication Network 2004. 1

Šehovina, Mostar, B&H DD BH Telecom 860 Access Telecommunication Network 2005. 1

Cerići, Konjic, B&H DD BH Telecom 1170 Access Telecommunication Network 2005. 1

Sarajevo – Koševsko brdo, B&H DD BH Telecom 10.400 Access Telecommunication Network 2007. 1

Sarajevo – Breka, B&H DD BH Telecom 2.100 Access Telecommunication Network 2007. 1

Sarajevo – Dobroševići iAhatovići, B&H

DD BH Telecom 3.000 Access Telecommunication Network 2007. 1

Note: 1 - Design2 - Installation and Commisioning3 - Supply of Equipment

Page 81: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

14

LOCATION CUSTOMER CAPACITY SYSTEM TYPE EQUIPMENT TYPE YEA R OF REALIZAT ION NOTE

Sarajevo,Tuzla,Zenica,Mostar,Brka, B&HKladanj,Zavidovići,Konjic,Kakanj

DD BHTelecom

252 x 2 Mbps96 x 155 Mbps4 regenerator

STM - 16

SDH(TransXpress)

STM - 16

SLD - 16 E (6)SMA - 16 (2)SLR - 16 (4)

2003. 1

Tuzla,Živinice, B&HG. DubraveKalesija

DD BHTelecom

903 x 2 Mbps3 x 34 Mbps

85 x 155 Mbps24 x 622 Mbps

SDH, SurpassSTM - 4

hiT7070SC2.0 (4)hiT7050FP1 (1)

SMA 1K V3.3 (1)2004. 1&2

TuzlaPasa bunarIlincicaMandici B&HKulaBig User 1Big User 2

DD BHTelecom

651 x 2 Mbps3 x 34 Mbps

64 x 155 Mbps8 x 622 Mbps24 x STM - 16

SDH, SurpassSTM - 16

hiT7070SC2.1 (3)hiT7050FP1 (4) 2005. 1&2

Mostar B&H DD BHTelecom

441 x 2 Mbps6 x 34 Mbps

32 x 155 Mbps4 x 622 Mbps8 x STM-16

SDH, SurpassSTM - 16 hiT7070DC 3.0 (1) 2005. 1&2

SarajevoB&H DD BH

Telecom16 x 155 Mbps

8 x STM-16SDH, Surpass

STM - 16 hiT7070 SC 3.0 (2) 2006. 1&2

Abu ArgoubRawiesGhadames LibyaTRCCNCC

GECOLLIBYA

126 x 2 Mbps4 x STM-45 x PDH

SDH, STM -4PDH

Family 1660ALCATEL,

Family DXC500AREVA

2007.2008. 1&2&3

Transmission SDH Systems

Bjelimići

Note: 1 - Design2 - Installation and Commisioning3 - Supply of Equipment

C O M M U N I C A T I O N S E N G I N E E R I N G

Page 82: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

15

C O M M U N I C A T I O N S E N G I N E E R I N G

Optical Cable Lines/Networks

LOCATION CUSTOMER CAPACITY (km/N 0f i bres)

LINE / NETWORKTYPE

YEA R OF REALIZATION NOTE

Region Bugojno, B&H JP PTT BiH 2,6 / 8 Optical Cable(underground) 1999 1

Region Gra~anica, B&H JP PTT BiH 32,2 / 24 Optical Cable(underground) 2002 1

Region Tuzla, B&H DD BH Telecom 17 / 24 Optical Cable(underground) 2004 1

Region Kalesija, B&H DD BH Telecom 1,7 / 24 Optical Cable(underground) 2004 1

Region Srebrenik , B&H DD BH Telecom 4 / 24 Optical Cable(underground) 2004 1

Region Br~ko, B&H DD BH Telecom 3,1 / 24 Optical Cable(underground) 2004 1

Region Lukavac, B&H DD BH Telecom 7,6 / 24 Optical Cable(underground) 2004 1

Region Gimbi-Mendi - Assosa, Ethiopia EPCO Ethiopia 208 / 48 Optical Cable

(OPGW) 2006 1&2

Region Gonder-Metema,Ethiopia EPCO Ethiopia 122 / 48 Optical Cable

(OPGW) 2007 1&2

Region Abu Argoub-Rawies-Ghadames, Libya GECOL Libya 759 / 24 Optical Cable

(OPGW) 2007* 1&2

* Contract has been signed and has been started. Contracted relations and works are currently under installation&commissioning

Note: 1 - Design2 - Installation and Commisioning3 - Supply of Equipment

Page 83: Engineering REFERENCES - Energoinvest · Libya Benjawad SOE 66/11 2x10 1989 1,2,3 Homs SOE 220/33/11 3x63 1997 1,2,3 Rapta SOE 220/33/11 3x63 1988 1,2,3 Syria Damascus PEE 66/20 3x30

Software Development Process

Hamdije Ćemerlića 2, 71000 Sarajevo, Bosnia and HerzegovinaPhone: (++) 387 33 703 601; 703 604

Fax: (++) 387 33 657 458E-mail: [email protected]

www.energoinvest.com

Publ

ishe

r:En

ergo

inve

std.

d.–

Mar

ketin

g,Sa

raje

vo,J

uly

2008

.

CommunicationsEngineering

REFERENCES