ENGINEERING, PROCUREMEMT, CONSTRUCTION/ … · 2017. 5. 4. · Management Professionals (IPMP) with...
Transcript of ENGINEERING, PROCUREMEMT, CONSTRUCTION/ … · 2017. 5. 4. · Management Professionals (IPMP) with...
ENGINEERING, PROCUREMEMT, CONSTRUCTION/ INSTALLATION &
COMMISSIONIING
Outstanding People Quality Methods Pride in Professionalism
Competence in Project Deliveryj y
With our technical, financial and organizationalcompetence, as evidenced by our being recognizedand awarded by the International ProjectManagement Professionals (IPMP) with HonoraryCorporate Membership for excellent delivery ofprojects, we assure our Clients and Partners of ourprojects, we assure our Clients and Partners of ourability to exceed expectations in delivering projectssatisfactorily.
Key Personnel Project Organization Chart
Project: Lease, Construction, Operation and Commissioning of 10,000 BOPD EPF
Client: Nigerian Petroleum Development Company Ltd. NPDC
Lease, Construction, Operation and Commissioning of 10,000 BOPD Early Production Facility
Obax civil works at the commencement stage of
Our Team of civil engineers at work at the commencementstage of
construction at the Oredo EPF at Ologbo.
commencement stage of the early production facility.
Marking out and excavation operations at the Oredo EPF.
A different view of civil works carried out at the EPF.
Lease, Construction, Operation and Commissioning of 10,000 BOPD Early Production Facility
Concrete work carried out by the Obax civil engineers at the
Geotextile material laid on foundation for crude oil storageengineers at the
Oredo early production facility.
Excavation operations carried
crude oil storage tank at the EPF.
More views of civil works for p
out in preparation of the base of crude oil storage tanks that were constructed at the Oredo EPF.
the crude oil surge tank foundation at the EPF.
Lease, Construction, Operation and Commissioning of 10,000 BOPD Early Production Facility
Aggregate Being poured on the geotextile
Pipe connections at the OredoEarly geotextile
material laid on foundation for crude oil storage tank at the EPF.
Early production facility by Obax mechanical team.
Construction of the Oredo EPF surge tank foundation.
Cutting of pipes using a beveling machine
Lease, Construction, Operation and Commissioning of 10,000 BOPD Early Production Facility
Mechanical Installation of the Oredoearly
More installation work by the mechanical early
production facility Equipment
mechanical team.
Installation works at the Oredo early production facility by Ob
Fastening of bolts on the Thermal theater for the OredoEPFObax
mechanical team.
EPF
Lease, Construction, Operation and Commissioning of 10,000 BOPD Early Production Facility
Tank Construction for the Oredo early
Tank for the Oredo early production facilityOredo early
production facility
facility.
Fabrication of stairs for the EPF tank Sand blasting
and priming of the tank for the OredoEPFEPF.
Lease, Construction, Operation and Commissioning of 10,000 BOPD Early Production Facility
Fitting and welding of flare pipe lines for both
Installation of the high pressure separator for lines for both
the high and low pressure gas line at the Oredoearly production
separator for the OredoEPF at Ologbo.
facility.
Some vessels at the OredoEPF.
Fabrication and Painting of Flare pipe line supports at OBAX temporary temporary Workshop Site
Lease, Construction, Operation and Commissioning of 10,000 BOPD Early Production Facility
Installation of the OredoEPF flare tip
Electrical and instrumentation work at the Oredo Early Oredo Early Production Facility.
A view of our Electrical and Instrumentation team, terminating earthingcables and installing an ultraviolet flame detector flame detector at the OredoEPF at Ologbo.
Lease, Construction, Operation and Commissioning of 10,000 BOPD Early Production Facility
A view of an ultraviolet Flame Detector
A view of the Oredo Early Production FacilityDetector
installed at the Oredoearly production facility.
Facility.
Inspection of the Oredo EPF Site by the
Our Team of Engineers installing the Instrument air
General Executive Director, Refining and Petrochemical, Nigerian National air
compressor at the EPF
National Petroleum Corporation
Lease, Construction, Operation and Commissioning of 10,000 BOPD Early Production Facility
Views of the Oredo early production facility at its final
Another view of the completed crude oil surge tank and firefacility at its final
phase of completion.
tank and fire water tank at the Oredo EPF
A view of A view of the completed crude oil surge tank at the Oredo early production facility.
termination work done by Obax E&I team at the control room of the Oredo EPF
Lease, Construction, Operation and Commissioning of 10,000 BOPD Early Production Facility
Cable Dressing and termination at the motor control center (MCC) of the Oredo earlythe Oredo early production facility by Obax E&I team.
Project: Construction of Two 20,000 Barrels Crude Storage Tanksj g
Client: Nigerian Petroleum Development Company Ltd. NPDC
Construction of Two 20,000 Barrels Crude Storage Tanksg
Civil works for the construction of two 20,000 Bbls crude oil storage tanks at thestorage tanks at the Oredo EPF
Construction of Two 20,000 Barrels Crude Storage Tanks
Various phases in the
t ti f
g
construction of two 20,000 Bbls crude oil storage tanks at the OredoEPF
Construction of Two 20,000 Barrels Crude Storage Tanks
Works on firefighting
t
g
system construction, installation and hook-up work on the two 20,000BOPD20,000BOPD oil storage tanks
Project: Electrical and Instrumentation Works for Ovade-Ogharefe Gas Plant
Client: Pan Ocean Oil Corporation
Electrical and Instrumentation Works for Ovade-Ogharefe Gas Plant
OBAX Electrical and Instrumentation Works for Pan
Termination of cables at the Motor Control Centre for Pan
g
Works for Pan Ocean Oil Corporation at Ovade in Ogharefe, Delta State
Centre for Pan Ocean by Obax E&I team
A view of E&I installation work undertaken by the Obax E&I team for Pan Ocean Oil
Obax E&I experts terminating cable connections for a generator atOcean Oil
Corporation at Ovade
a generator at Ovade.
Electrical and Instrumentation Works for Ovade-Ogharefe Gas Plant
Connection and termination of power cables and instrument
A view of an emergency shut down valve with complete
g
air tubing for control valves at Ovade.
complete electrical and instrumentation connections done by Obax E&I team at Ovade.
Installation of cable trays at Ovade.
Electrical works at Ovade.
Electrical and Instrumentation Works for Ovade-Ogharefe Gas Plant
OBAX Electrical and Instrumentation Works for Pan Ocean Oil Corporation at Ovade
g
Corporation at Ovadein Ogharefe, Delta State
Project: Dismantling and Reinstallation of 8” Flare Linej g
Client: Nigerian Petroleum development Company Ltd. (NPDC)
Dismantling and Reinstallation of 8” Flare Lineg
Flare Relocation work for NPDC by Obax at
Mechanical team dismantling the flare line
by Obax at NPDC flow station at Ologbo.
Dismantling and Reinstallation of 8” Flare Line
Views of the dismantled flare line.
g
Project: Relocation and Fabrication of 6” Firewater Pipelinej p
Client: Nigerian Petroleum development Company Ltd. (NPDC)
Relocation and Fabrication of 6” Firewater Pipeline
NPDC Firewater pipeline
Decommissioning of existing firewater line, cutting of the
relocation project carried out by Obax at NPDC’s flow station at Ologbo.
gline and evacuation of water in fill
Exposure of existing firewater line on NPDC’s flow station plot
Relocation and Fabrication of 6” Firewater Pipeline
Pipe preparation by Obaxexperienced
Stringing of pipe and fitting by welders and experienced
fitters and welders
fitters.
Pipe wrappingPipe wrapping during fitting
Relocation and Fabrication of 6” Firewater Pipeline
Marking out and excavation of proposed
Another view of pipe fitting
proposed relocation path.
A view of welding operations being carried
Excavation of proposed relocation path and pipe preparation
being carried out at the NPDC’s flow station at Ologbo
Relocation and Fabrication of 6” Firewater Pipeline
Views of back filled firewater pipe path
Welding operations being carried out on a pipe path.pipe for the firewater relocation project
A view of final fitted and wrapped weldedwrapped welded joint.
Project: EPC of 200MMSCF Cryogenic Gas Plantj y g
Client: Pan Ocean Oil Corporation
EPC of 200MMSCF Cryogenic Gas Plant
Hot oil surge tank and cooler under construction on
De-ethanizersurge tank and reboiler under
y g
construction on skid construction on
skid
Cold oil separator under construction on skid
Seal gas heater under construction on skid
EPC of 200MMSCF Cryogenic Gas Plant
Debutanizer reboiler and reflux accumulator
Dust filters in foreground with several process
y g
accumulator under construction on skid
skids at the background
An expander compressor on skid
Inlet scrubbers
EPC of 200MMSCF Cryogenic Gas Plant
Flare scrubber by structure of fuel gas skid
Side reboilerhooked-up for hydrotest
y g
Gas-gas heat exchanger Hydro test
inspection team setting up to test the side reboiler
EPC of 200MMSCF Cryogenic Gas Plant
Residue gas compressor in fabrication yard, ready for
Fuel Gas Skid under construction
y g
ready for testing
Pipe rackInspection team examining a residue gas compressor
Pipe rack structure under construction
EPC of 200MMSCF Cryogenic Gas Plant
Debutanizer/ depropanizerhot oil pump being set up for
Run test set-up for hot oil pump
y g
being set up for hydro-testing
Inspection team
Hydrotestequipment
Inspection team conducting the run test on the hot oil pump
EPC of 200MMSCF Cryogenic Gas Plant
Debutanizer/ depropanizerhot oil pump
Run test set-up for hot oil pump
y g
being set up for hydro-testing
Hydrotestequipment
Inspection team conducting the run test on the hot oil pump
q p