Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets ›...
Transcript of Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets ›...
![Page 1: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),](https://reader036.fdocuments.net/reader036/viewer/2022081405/5f0beeba7e708231d432ee68/html5/thumbnails/1.jpg)
Engineering and Operations CommitteeItem 6aDecember 9, 2019
![Page 2: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),](https://reader036.fdocuments.net/reader036/viewer/2022081405/5f0beeba7e708231d432ee68/html5/thumbnails/2.jpg)
E&O Committee Item 6a, Slide 2 December 9, 2019
Demonstration Plant Activities
Grand Opening Operations and TestingSchedule
Panel and Regulatory ActivitiesProgram ActivitiesNext Steps
Demonstration Plant
![Page 3: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),](https://reader036.fdocuments.net/reader036/viewer/2022081405/5f0beeba7e708231d432ee68/html5/thumbnails/3.jpg)
E&O Committee Item 6a Slide 3 December 9, 2019
October 10, 2019 ‐Approximately 250 attendees
![Page 4: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),](https://reader036.fdocuments.net/reader036/viewer/2022081405/5f0beeba7e708231d432ee68/html5/thumbnails/4.jpg)
E&O Committee Item 6a, Slide 4 December 9, 2019
MBR –Membrane Modules
Reverse Osmosis
Chemical Feed Systems UV Light/Advanced Oxidation Process
MBR – Aerobic and Anoxic
Tanks
![Page 5: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),](https://reader036.fdocuments.net/reader036/viewer/2022081405/5f0beeba7e708231d432ee68/html5/thumbnails/5.jpg)
E&O Committee Item 6a Slide 5 December 9, 2019
Continued Weekly Coordination &Operational Meetings
MetropolitanLACSDProject Consultants
Monitoring & MaintenanceMicrobial MethodDevelopmentStart‐up Operations
Operations Partnering Kick‐off Meeting
![Page 6: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),](https://reader036.fdocuments.net/reader036/viewer/2022081405/5f0beeba7e708231d432ee68/html5/thumbnails/6.jpg)
E&O Committee Item 6a, Slide 6 December 9, 2019
Field SamplingAnalyzer Maintenance
Chemical Tote Handling
Sample Analyses
![Page 7: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),](https://reader036.fdocuments.net/reader036/viewer/2022081405/5f0beeba7e708231d432ee68/html5/thumbnails/7.jpg)
E&O Committee Item 6a, Slide 7 December 9, 2019
Sanitation Districts’ Brine Test Platform
Pathogen Analyses Training
Bench‐Scale TestingDenitrification Reactor Test Setup
![Page 8: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),](https://reader036.fdocuments.net/reader036/viewer/2022081405/5f0beeba7e708231d432ee68/html5/thumbnails/8.jpg)
E&O Committee Item 6a, Slide 8 December 9, 2019
Biological Acclimation
Bioreactor Sampling
Equipment Troubleshooting
![Page 9: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),](https://reader036.fdocuments.net/reader036/viewer/2022081405/5f0beeba7e708231d432ee68/html5/thumbnails/9.jpg)
E&O Committee Item 6a, Slide 9 December 9, 2019
Pre‐testing
Phase 1
Phase 2
Equipment Testing and Process Acclimation (3 months)
Baseline Performance Testing (4 months)
Challenge Testing and Evaluation (8 months)
![Page 10: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),](https://reader036.fdocuments.net/reader036/viewer/2022081405/5f0beeba7e708231d432ee68/html5/thumbnails/10.jpg)
E&O Committee Item 6a, Slide 10 December 9, 2019
Title 22 Regulations require independent panel of experts to review alternative approaches for meeting existing regulations (e.g., application of Membrane Bioreactor)
National Water Research Institute commissioned to secure panel for demonstration project
Panel will help guide demonstration project Testing and monitoring approachWater quality, operations data and reportingRegulatory engagement
![Page 11: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),](https://reader036.fdocuments.net/reader036/viewer/2022081405/5f0beeba7e708231d432ee68/html5/thumbnails/11.jpg)
E&O Committee Item 6a, Slide 11 December 9, 2019
Ed Means Adam OlivieriNancy Love
Chuck Haas (Chair)Vernon Snoeyink Paul WesterhoffRichard Bull Joe Cotruvo
Thomas Harder
FacilitationRegulations/PermittingWastewater Treatment
MicrobiologyPipeline Corrosion/Water ChemistryDrinking/Advanced Water Treatment
ToxicologyChemistry
Hydrogeology
![Page 12: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),](https://reader036.fdocuments.net/reader036/viewer/2022081405/5f0beeba7e708231d432ee68/html5/thumbnails/12.jpg)
E&O Committee Item 6a, Slide 12 December 9, 2019
Focus Areas covered on Dec. 4‐5, 2019
Process Technology• Testing Approach• Operational Criteria
Monitoring and Analysis• Microbial Sampling• Analytical Methodology
Raw Water Augmentation• Conceptual Approach• Technology Considerations
![Page 13: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),](https://reader036.fdocuments.net/reader036/viewer/2022081405/5f0beeba7e708231d432ee68/html5/thumbnails/13.jpg)
E&O Committee Item 6a, Slide 13 December 9, 2019
Final ISAP report available by early 2020
![Page 14: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),](https://reader036.fdocuments.net/reader036/viewer/2022081405/5f0beeba7e708231d432ee68/html5/thumbnails/14.jpg)
E&O Committee Item 6a, Slide 14 December 9, 2019
Joint support letter for RWA Expert Panel
Metropolitan, LADWP & Santa Clara Valley Water District
Research to support and inform regulation in progress
State Water Resources Control Board released a revised DPR Framework in August 2019
Staff provided verbal and written comments on framework
![Page 15: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),](https://reader036.fdocuments.net/reader036/viewer/2022081405/5f0beeba7e708231d432ee68/html5/thumbnails/15.jpg)
E&O Committee Item 6a Slide 15 December 9, 2019
ISAP/Regulator Engagement
2019 2020 2021 2022 2023
Raw Water Augmentation Development
Construction/Commissioning
Completion
MBR Regulatory TestingProcess Optimization & Design Criteria Testing
ISAP Meeting No. 2 (Dec. 4 and 5), Regulator Meeting No. 7 (Dec. 5)
![Page 16: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),](https://reader036.fdocuments.net/reader036/viewer/2022081405/5f0beeba7e708231d432ee68/html5/thumbnails/16.jpg)
E&O Committee Item 6a Slide 16 December 9, 2019
Full Tour Program Launched
Group ToursPublic Tours School Tours
![Page 17: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),](https://reader036.fdocuments.net/reader036/viewer/2022081405/5f0beeba7e708231d432ee68/html5/thumbnails/17.jpg)
E&O Committee Item 6a Slide 17 December 9, 2019
Workshop #1:Implementation and DPR Considerations
Workshop #1:Implementation and DPR Considerations
Workshop #2:Planning, Agreements
and Financial Considerations
Workshop #2:Planning, Agreements
and Financial Considerations
Board Action on Next Steps
Board Action on Next Steps
Mid 2020
Board Letter
Early 2020
Letters of Intent
2
July 23, 2019
White Papers
1
![Page 18: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),](https://reader036.fdocuments.net/reader036/viewer/2022081405/5f0beeba7e708231d432ee68/html5/thumbnails/18.jpg)
E&O Committee Item 6a Slide 18 December 9, 2019
Southern Nevada Water Authority Metropolitan and SNWA collaboration and partnership history
Colorado River water supplyWater quality, treatment technologies, and laboratory methods
SNWA assessing future long‐term supply needsExplore partnership opportunities in Program development
Letter of IntentCoordination on 2026 Colorado River Operating Guidelines
![Page 19: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),](https://reader036.fdocuments.net/reader036/viewer/2022081405/5f0beeba7e708231d432ee68/html5/thumbnails/19.jpg)
E&O Committee Item 6a Slide 19 December 9, 2019
www.mwdh2o.com/RRWP
![Page 20: Engineering Operations Committee Item 6a 9, 2019mwdh2o.com › DocSvcsPubs › rrwp › assets › boardupdate_dec2019.…Design Criteria Testing ISAP Meeting No. 2 (Dec. 4 and 5),](https://reader036.fdocuments.net/reader036/viewer/2022081405/5f0beeba7e708231d432ee68/html5/thumbnails/20.jpg)