Engineering Issues Related to Mined...

106
1 1 Society of Myanmar Civil Engineers (Singapore) Engineering Issues Related to Mined Tunnels Dr. Oskar SIGL Geoconsult Asia Singapore Singapore; 16 October 2016

Transcript of Engineering Issues Related to Mined...

Page 1: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

1 1

Society of Myanmar Civil Engineers (Singapore)

Engineering Issues Related to Mined

Tunnels

Dr. Oskar SIGL – Geoconsult Asia Singapore

Singapore; 16 October 2016

Page 2: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

2 2

Mined Tunnels – SCL/NATM/SEM

Content

Latest Developments on mined tunneling supporting

method

Controlling soft ground

Page 3: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

3 3

Mined Tunnels – SCL/NATM/SEM

Terminology

SCL – Sprayed Concrete Lining

NATM – New Austrian Tunneling Method

SEM – Sequential Excavation Method

Observational Approach

Shotcrete Sprayed Concrete

Page 4: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

4 4

Example: Mined Station; Seattle

SoundTransit

Beacon Hill Station

Page 5: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

5 5

Example: Mined Station; London

LUL Jubilee Line Extension

Contract 102 Waterloo Station

Page 6: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

6 6

Example: DTSS Advance Tunnel; Singapore

North East Line

Contract C705

Page 7: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

7 7

Example: Overrun Tunnels; Singapore Orchard Road

Circle Line 1 – Overrun Tunnels

Contract C825 Dhoby Ghaut Station

Page 8: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

8 8

Example: NS3 Cable Tunnel; Singapore

Tunnels for TBM operation and cable

enlargements

Page 9: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

9 9

Example: EW1 Cable Tunnel; Singapore

Mined tunnel

Page 10: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

10 10

Key Issues

Are not rocket science

Understand the general sequence of tunneling and

the staging of excavation & support application

Pay attention to deformation control and ground

confinement

Recognize the importance of design adjustments

during construction

Maintain stability of the excavation face at all times

Understand why people call it “high risk”

Mined Tunnels

Page 11: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

11 11

Characteristics of Work Processes

Linear development of the work zone with limited

space and accessibility

Repetition of working steps (work cycles)

Transient intermediate stages (sections with

incomplete liner)

Mined Tunnels

Page 12: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

12 12

Mined Tunnel - Construction

Sequencing of Excavation & Support

Constitutes major part of the design

Page 13: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

13 13

Sequencing/staging DETAILING

Staged Excavation

Lattice girder, full round in soft ground

Shotcrete & wire mesh

Mined Tunnel - Construction

Page 14: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

14 14

Top Heading

Bench

Invert Bench

Typical sequencing/staging

Mined Tunnel - Construction

Page 15: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

15 15

Mined Tunnel - Construction

Page 16: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

16 16

Typical sequencing/staging

Page 17: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

17 17

Typical sequencing/staging

Page 18: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

18 18

Steel Rib / Arch

Not embedded in shotcrete

Function Load distribution

Support of “green” shotcrete

Profile control

Support for forepoling

Traditional Types H-beams

Channels with sliding connection

Lattice girder

Page 19: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

19

Channel with sliding connection

Page 20: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

20 20

Layout Options:

“Standard”

“Optional”

Lattice girder – For embedment in shotcrete

Page 21: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

21 21

Face Stability

Advance support of excavation face

Forepoling / pipe umbrella / spiling

Page 22: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

22 22

Advance support ahead of excavation face

Provide support for exposed round

Needs support (soil and lattice girder)

Ground Support

Forepoling DETAILING

Page 23: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

23 23

Special Equipment – Tunnel Excavator

Page 24: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

24 24

Special Equipment – Tunnel Excavator

Page 25: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

25 25

Pipe Umbrella / Pipe Roof

Same concept as forepoling

but stronger & heavier & longer

Advance Support Ahead of Excavation Face

Page 26: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

26 26

Pipe Umbrella / Pipe Roof

Advance Support Ahead of Excavation Face

Page 27: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

27 27

Pipe Roof

Page 28: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

28 28

Casagrande Rig

Pipe Roof

Page 29: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

29 29

Jumbo

Pipe Roof

Page 30: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

30

Pipe Roof

Page 31: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

31 31

Forepoling – Soft ground

Support soil in front of the “next” face

Reduce soil loading for the soil wedge defining face

stability

Spacing typically 150-300mm c/c

T25 rebars, mostly grouted

Length > advance length (typically 1.5 x)

Tied into lattice girder of previous round

Advance Support Ahead of Excavation Face

Page 32: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

32 32

Face Stability

Effects of Advance Support

Wedge 1 & Wedge 2

Page 33: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

33 33

Face Stability – Design of Advance Support

Wedge 1 situation

Support of free

advance length

Page 34: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

34 34

Face Stability – Design of Advance Support

Wedge 2 situation

Supporting load

on top of wedge

Page 35: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

35 35

Spiling – Rock

Same concept as forepoling but in rock

Rock bolting inclined forwards in order to avoid

overbreak in the next blasting round

Spacing typically >500mm c/c

Length ≈ advance length

“Does not need a lattice girder”

Advance Support Ahead of Excavation Face

Page 36: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

36 36

Spiling to reduce overbreaks

Page 37: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

37 37

EXAMPLE: Face stability in Praxis

Page 38: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

38 38

Page 39: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

39 39

Loose Gravel

Dense Gravel

Silt Stone

Dense Gravel

Tunnel

EXAMPLE: Face stability in Praxis

Page 40: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

40 40

Face stability in Praxis

Subdivide excavation face

Increase immediate support by reduction of

excavation area

Start where it is worst, use the better area for

support

FACE

SUPPORTING

BODY

Page 41: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

41 41

Example – Face Stability Recover, small faces

Page 42: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

42 42

Recover, small faces

Page 43: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

43 43

Recover, small faces

Page 44: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

44 44

Drainage

Forepoling

Face bolts

Face

Dumpling

Page 45: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

45 45

103.03m

101.48

Existing 1.2m Water Pipe

PIPE

800mmx11mm thk

Ground Level 109.43 (approx.)

Supporting Steel Frame

~ 94.00m

Change of shallow cover pipe pile box

tunnel to a mined tunnel with shotcrete

Application to Complicated Problems

SUBWAY STRUCTURE

Page 46: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

46 46

Pipe Roof Cross Section – Pipe Pile Box

Page 47: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

47 47

Existing 1.2m Water Pipe

Application to Complicated Problems

SUBWAY STRUCTURE

One tunnel too shallow

Page 48: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

48 48

SCL Cross Section - Sequencing

Page 49: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

49 49

SCL Cross Section - Sequencing

Page 50: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

50 50

SCL Cross Section - Sequencing

Half of permanent

structure

Temp. props

Page 51: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

51 51

SCL Cross Section - Sequencing

Page 52: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

52 52

SCL Cross Section - Sequencing

Page 53: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

53 53

SCL Cross Section - Sequencing

Page 54: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

54 54

Longitudinal Section & Ground Condition

Pipe Roof Sections

Water Pipe

FILL & Peaty clay

Silty Clay

Cemented silty sand

Page 55: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

55 55

Sequential Excavation with Pipe Roof

Install Pipe roof Sections overlap more pipe layers

Top heading

Temporary invert

Page 56: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

56 56

Construction

Pipe Roof

Page 57: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

57 57

Ground Treatment

Details of face grouting arrangement

Design of drilling / grouting pattern

Page 58: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

58 58

2D Analysis

Mined Tunnel 2 (Staged Top Heading &

Bench/Invert excavation)

Face & pipe roof grouting

Temporary Prop

“Fill concrete”

Permanent Structure

Connection DETAIL

Tunnel 2

Horizontal face grouting + Pipe Roof

installation and grouting

Staged excavation of Top Heading &

Bench/Invert (short ring closure)

Casting of second half permanent

structure

Page 59: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

59 59

3D Analysis

Page 60: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

60 60

Pipe Roof Drilling

Page 61: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

61 61

Excavation

Page 62: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

62 62

SECTION 2 double pipe roof

SECTION 1 double pipe roof

Construction

Page 63: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

63 63

Excavation – Top Heading

Page 64: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

64 64

Pipe roof pipe

Construction

Page 65: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

65 65

Excavation – Top Heading

Face grouting pipes

Page 66: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

66 66

Face Support – Top Heading

Page 67: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

67 67

Face Grouting – Top Heading

Page 68: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

68 68

Drilling of Face Grouting – 1st Drift

Page 69: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

69 69

“Weak” support resistance of Lattice girder and temporary invert

Construction Issue

Page 70: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

70 70

Excavation – 2nd Drift

Page 71: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

71 71

2nd Drift Completed

Page 72: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

72 72

Application to much Larger Schemes

Page 73: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

73 73

Singapore Jurong Caverns

Page 74: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

74 74

Storage Schematics and Terminology

Inlet shaft Pump Shaft

Water Curtain Tunnel & dill holes

Access tunnel

Water Curtain Tunnel & drill holes

Access tunnel Storage cavern

20 x 30 x 650m

Page 75: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

75 75

Storage Schematics and Terminology

Page 76: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

76 76

Water Curtain System

Permanent pressure gradient towards the cavern

Oil floats on top of a water cushion

Thickness of water cushion is regulated by water

pumps in pump shaft

Page 77: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

77 77

Oil pump

Water pump

Water cushion

Crude Oil

Hot oil pipe

Storage of Crude Oil

Page 78: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

78 78

Storage Principle

Hot oil pipe

Page 79: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

79 79

Engineering

Engineering during construction

Geological Mapping

Geotechnical Documentation

Rock Support Classification

Rock support application

Geological prediction during construction

Page 80: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

80 80

Implementation During Construction

Geological

Mapping sheet

Page 81: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

81 81

Distribution of rock quality – Padur/A

Page 82: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

82 82

Data Management

Geological documentation

Page 83: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

83 83

Construction Sequencing

Gallery – Pilot and Slashings

Pilot Gallery Side Slashing - LEFT Side Slashing - RIGHT

Page 84: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

84 84

Construction Sequencing

Bench 1

Side Slashing

Pilot Bench

Bench 2

Page 85: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

85 85

Construction Sequencing

3 Benches

Gallery

Bench 1

Bench 2

Bench 3

Page 86: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

86 86

Gallery

Bench 1

Bench 2

Bench 3

Excavation Stages

Page 87: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

87 87

Pilot

Side slashing

Excavation Stages

Page 88: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

88 88

Pilot Side slashing

Bench 1

Excavation Stages

Page 89: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

89 89

Bench 2 Pilot Side slashing

Excavation Stages

Page 90: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

90 90

Bench 3

Excavation Stages

Page 91: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

91 91

21m

30m

12m

Excavation Stages

Pump sump

Page 92: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

92 92

Cavern

Construction

Page 93: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

93 93 Access tunnel portal

Construction

Page 94: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

94 94

Access tunnel junction

Page 95: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

95 95

Pump Shaft

Inlet Shaft

Page 96: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

96 96

Page 97: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

97 97

Inlet shaft

Vishakapatnam – Construction

Page 98: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

98 98

Inlet shaft

Page 99: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

99 99

Pump shaft

Page 100: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

100 100

Pump shaft

Page 101: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

101 101

Major Wedge Failure

Page 102: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

102 102

Major Wedge Failure

Page 103: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

103 103

Major Wedge Failure

Shear

Tension

Shear

Tension

Both

Sigma 1

MPa

0.00

1.80

3.60

5.40

7.20

9.00

10.80

12.60

14.40

16.20

18.00

0-1

0-2

0-3

0-4

0-5

0-6

0

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80

Page 104: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

104 104

Major Wedge Failure

Page 105: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

105 105

Major Wedge Failure

Page 106: Engineering Issues Related to Mined Tunnelssmces.org.sg/wp-content/uploads/2014/12/161016-SMCES-MinedTunnels...Engineering Issues Related to Mined Tunnels ... overbreak in the next

106 106

Thank You