![Page 1: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/1.jpg)
ENGINEERING FOR A BETTER FUTURE
![Page 2: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/2.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 2 of 41
EXPERIENCE63 Years of construction experience worldwide
RELIABILITY538 projects in 46 countries have beencompleted or under construction withhistorical value of USD 50 Billion
DIVERSIFICATIONWith a solid background of 63 years ENKA operates in 4 main segments:
Engineering & ConstructionEnergyReal EstateTrade
SYNERGYGroup of companies composed of morethan 50 subsidiaries operating in 7 majorgeographical areas:
CIS, Asia, Middle East, Europe, America, Africa & Turkey
EVALUATIONTraded publicly onBorsa Istanbul (BIST)with a market cap ofUSD 5,0 Billion (@ 30.06.2020)
Introduction
![Page 3: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/3.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 3 of 41
Milestones [1957-1976]
Founded Focused on The Partnership
First International First Power Plant
as a limited liability partnership as Şarık Tara &Sadi Gülçelik Enka Limited Şirketi
design, engineering and construction activities of industrial plants, buildings and infrastructure
was transformed into a joint stock company asENKA İnşaat ve Sanayi A.Ş.
Contract Benghazi Cement Factory and then 4 more cement factory projects in Libya
150 MW Tunçbilek Thermal Power Plant in Turkey
Diversification of activities and specialized subsidiary companies
![Page 4: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/4.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 4 of 41
Foundation First Natural Gas Outstanding
Real Estate Oil Fields
ENKA Sports, education and culture foundation and Sadi Gülçelik sports center establishments
combined cycle power plant in Turkey 600 MW Trakya CCCP
achievements with fast-track projects in Libya, Russia and Former Soviet Union Countries as well as in Turkey as a general contractor
Establishment of development companies in Moscow, Russia
Primary oil services contracts in Kazakhstan oil fields
Milestones [1977-1996]
![Page 5: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/5.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 5 of 41
Retail Business Power Generation Certified
Turkey BOO US Embassies
Development of shopping malls and retail business in Moscow, Russia
Power Generationas Independent Power Producer (IPP)
by BSI for ISO 9001 Quality Management System & ISO 14001 Environmental Management System & OHSAS 18001 Occupational Health and Safety Management System
Projects have been accomplished by the ENKA BECHTEL JOINT VENTURE
New US Embassy projects started in West African countries: Cameroon, Guinea, Mali and Sierra Leone
Milestones [1997-2020]
![Page 6: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/6.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 6 of 41
Gas Fired CCPP EPC in Russia Airport
World Record Continent America
790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands
ENKA as a main contractor has been awarded 400 MW YajvaState District Power Plant EPC Project in Russia
Completion of Sheremetyevo Airport Terminal 3 in Moscow, Russia
ENKA set a new world record for power plant availability (with 99.8% which is 7% over the industry average) over the 12-month period with GE 9 FA gas turbines
First contract awarded in Continent America – new US Embassy Compound in Santa Domingo, Dominican Republic
Milestones [1997-2020]
![Page 7: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/7.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 7 of 41
Iraq Re-Entry Northern Iraq Oil & Gas
Izmit Bay Crossing Combined Cycle
ENKA’s re-entry into Iraq oil & gas market by winning the contract for mechanical, electrical and instrumentation works of early production facility in Majnoon Oil Field
First contract awarded in Northern Iraq after two decades
Erbil Combined Cycle Power Plant Conversion Project
Al-Najybia 500 MW gas turbine power plant and Rumaila Crude Oil Pumping Station Projects have been awarded
Steel Works Contract of IzmitBay Crossing Suspension Bridge Project has been awarded
Sulaymaniyah and Duhokcombined cycle plant conversion projects have been awarded
Milestones [1997-2020]
![Page 8: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/8.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 8 of 41
Caucasus Pipeline Kosovo Power Plants
Global Partners Hydroelectric
A contract related to South Caucasus Pipeline Expansion (SCPX) has been awarded to Bechtel-ENKA JV
After successfully completing the Route 7 Motorway Project, the new phase; Route 6 has also been awarded to Bechtel-ENKA JV in Kosovo
EPC contracts awarded;Simple Cycle Power Plant Project at Bazyan, Sulaymaniyah 1,500 MW Combined Cycle Power Plant Project at Besmaya
ENKA with its partner General Electric, will design and build the Samawa and Dhi Qar Combined Cycle Power Plants, which will add 750 MW each to Iraq
ENKA together with Clean Energy Group of Norway won the bid for the Namakhvani Project in Georgia, a Hydroelectric Power Plant with a total capacity of 433 MW under build-own-operate model
Milestones [1997-2020]
![Page 9: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/9.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 9 of 41
Our Missionto design, build and deliver safe, high-quality and cost-effective constructionprojects on schedule for our customerswhile providing quality employmentand career growth opportunities forENKA employees.
Our Visionto be one of the best and innovative engineering & construction companies serving globally.
Our Valuesdefine how we do work at ENKA. Wewill not undertake or execute aproject which comprises any of thesevalues. We believe that when wecommit to work within ENKA’s values,we achieve superior work in ourindustry.
ValuesVisionMission
Mission, Vision and Values
![Page 10: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/10.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 10 of 41
Tara Family51,04%
Gülçelik Family31,41%
ENKA Treasury Stock1,98%Shareholder Structure
As of 27 March 2020
ENKA Foundation5,87%
Free Float9,70%
![Page 11: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/11.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 11 of 41
TOTAL ASSETS
TOTAL EQUITY
CASH & MARKETABLE SECURITIES
REVENUE
EBITDA
EBITDA MARGIN
NET PROFIT
NET MARGIN
8.318
6.568
3.960
1.893
436
23,1%
686
36,2%
2019
7.796
6.103
3.252
2.881
757
26,3%
328
11,4%
2018
8.031
6.207
3.479
2.900
745
25,7%
705
24,3%
2017
7.587
5.667
3.194
3.506
732
20,9%
589
16,8%
2016
All figures given above are in Million US Dollars
Consolidated Financial Highlights
8.149
6.410
4.053
858
228
26,6%
260
30,3%
2Q 2020
![Page 12: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/12.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 12 of 41
CONSTRUCTION
POWER GENERATION
REAL ESTATE
TRADE
ELIMINATION
TOTAL
2017
USD %
(185) (6,4)
1.195 41,2
1.337 46,1
319 11,0
234 8,1
USD %
(98) (3,4)
1.011 35,1
1.474 51,2
329 11,4
165 5,7
2016
USD %
(94) (2,7)
1.453 41,5
1.582 45,1
319 9,1
246 7,0
2.900 1002.881 100 3.506 100
2018
All figures given above are in Million US Dollars
Revenues by Business Lines
USD %
(43) (2,3)
1.147 60,6
324 17,1
346 18,3
119 6,3
1.893 100
2019
USD %
(15) (1,7)
673 78,4
0 0,0
147 17,1
53 6,2
858 100
2Q 2020
![Page 13: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/13.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 13 of 41
CONSTRUCTION
POWER GENERATION
REAL ESTATE
TRADE
ELIMINATION
2018
TOTAL
USD % MRG
1 0
757 100
209 28 21
326 43 22
204 27 62
17 2 10
2017
USD % MRG
0 0
745 100
212 28 18
312 42 23
193 26 61
28 4 12
All figures given above are in Million US Dollars
EBITDA by Business Lines
2019
USD % MRG
3 1
436 100
142 33 12
68 16 21
213 49 62
10 2 8
2Q 2020
USD % MRG
0 0
228 100
138 60 20
(12) (5) -
98 43 67
4 2 7
![Page 14: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/14.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 14 of 41
All Figures given above are in Million Turkish Liras
Share Capital Increases (Shares Dividend-Bonus Issue)
DATE PREVIOUS SHARE CAPITAL INCREASE INCREASE (%) INCREASED SHARE
CAPITAL
25.05.2012 2.500 300 12,00 2.800
12.06.2013 2.800 400 14,29 3.200
21.05.2014 3.200 400 12,50 3.600
06.05.2015 3.600 400 11,11 4.000
23.05.2016 4.000 200 5,00 4.200
27.04.2017 4.200 400 9,52 4.600
24.05.2018 4.600 400 8,70 5.000
27.05.2020 5.000 600 12,00 5.600
![Page 15: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/15.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 15 of 41
Dividend Payments
YEAR DATE GROSS RATECASH DIVIDEND D.P.F.S.*
TL USDNET RATE
TL USD
28.09.201614.12.201619.04.2017
3,33%3,33%
12,00%
2,83%2,83%10,81%
140 47,1140 40,3504 136,8
0 00 0
29,4 7,97
2016
784 224,2 29,4 7,972016 TOTAL
27.09.201713.12.201717.04.2018
3,59%4,00%12,00%
3,05%3,40%10,91%
165 46,2184 48,0552 134,8
0 00 0
32,3 7,89901 229,0 32,3 7,892017 TOTAL
2017
* Dividend paid to Founder Shares
12.12.201817.04.2019
4,00%15,00%
3,40%13,67%
200 37,3750 129,6
0 034,2 5,89
2018
950 166,9 34,2 5,892018 TOTAL
2016
2019 TOTAL
13.11.201914.04.2020
14,00%18,00%
11,90%16,41%
700 121,4900 133,1
0 040,5 5,99
2019
1,600 254,5 40,5 5,99
![Page 16: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/16.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 16 of 41
Share Buy BackDecision Taken Share Amount to be
Bought Number of Total Shares Percentage
July 2016 8,4 million 4,2 billion 0,20%July 2017 4,6 million 4,6 billion 0,10%August 2017 4,6 million 4,6 billion 0,10%January 2018 4,6 million 4,6 billion 0,10%May 2018 4,6 million 4,6 billion 0,10%June 2018 5 million 5 billion 0,10%July 2018 5 million 5 billion 0,10%August 2018 10 million 5 billion 0,20%January 2019 10 million 5 billion 0,20%September 2019 10 million 5 billion 0,20%October 2019 20 million 5 billion 0,40%February 2020 10 million 5 billion 0,20%
TOTAL COMPLETED 2,00%
New Decision Taken Share Amount to be Bought Number of Total Shares Percentage
August 2020 28 million 5,6 billion 0,50%
![Page 17: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/17.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 17 of 41
Work Force
ENKA Abroad
ENKA TURKEY
SUBSIDIARIES TURKEY
SUBSIDIARIES ABROAD
ENKA ABROADTechnical : 711Administrative : 368Workers : 15.148Total : 16.227
Technical : 26Administrative : 10Workers : 555Total : 591
Technical : 847Administrative : 453Workers : 1.727Total : 3.011
Technical : 387Administrative : 99Workers : 86Total : 572
Grand Total : 20.401
![Page 18: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/18.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 18 of 41
Awards & Achievements
POWER
INSURANCE
KOSOVOENKA’s Kosovo Motorway EPC Project(sections 1, 2, 3 & 4a) has beenawarded “The Best Project in theRoads/Highways Category” in 2013Global Best Projects Competition ofENR (Engineering News-Record)
KUNTSEVO
ADMIRED COMPANYENKA’s 411 MW CCPP Yajva StateDistrict Power Plant EPC Project hasbeen awarded “the Best Project in thePower/Industrial Category” in 2013Global Best Projects Competition ofNR (Engineering News-Record)
YAJVA
ENKA’s cityscape awards for emergingmarkets - 2012 category : RetailProject" award to ENKA TC for itsKuntsevo Multifunctional Trade andBusiness Center in Moscow
"Most Admired ConstructionCompany of Turkey awards" for theyears 2005 - 2012 by CAPITAL, abusiness and economics magazine
In 2011, ENKA’s Adapazarı PowerPlant has been selected as thePower Plant of the Year with anavailability of 99.8% by the POWERMAGAZINE
In 2011, ENKA’s insurer FactoryMutual Global (FM), awarded allthree ENKA power plants thestatus of highly protected risk inrecognition of ENKA’s commitmentto the reduction of potential lossesthrough a stringent programme ofrisk mitigation and prevention.
![Page 19: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/19.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 19 of 41
Awards & Achievements
GLOBAL
INNOVATIONThe most prestigious and innovativeleisure, shopping, business andresidential complex of Moscow, washonored with the Best ShoppingCenter 2015 award given by RussianCouncil of Shopping Centers (RCSC)to Kuntsevo Plaza.
Turkish Power Company ENKA POWERhas world class risk managementarticle which praises ENKA'scommitments and achievements inprotecting the power plant assetspublished in UTILITY WEEK MAGAZINEon 28 January 2011 edition.
RISK MANAGEMENT
ENKA’s EPC Project, Sulaymaniyah1.500 MW Combined Cycle PowerPlant Project was selected as the“Global Project of the Year 2017”,as well as the “Best Global Projectin Power/Industrial Category”, byENR.
DEVELOPMENTKuntsevo Plaza, has been awarded inthree categories of the prestigiousawards in 2016: Best RetailArchitecture Russia, Best RetailDevelopment (5 Stars) Russia and BestRetail Development Europe.
![Page 20: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/20.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 20 of 41
![Page 21: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/21.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 21 of 41
Engineering & Construction
ENKA’s global solutions spanthe entire project life cycle:
Engineering,
Fabrication,
Procurement,
Construction,
Commissioning and start-up,
Operation and management.
The fields of Engineering & Construction activities are;
• Oil & Gas Facilities, Pipelines
• Petrochemical Plants
• Power Plants
• Industrial Plants
• Airports, Harbors, and Offshore Works
• Motorways, Bridges, and Tunnels
• New Towns and Housing Complexes
![Page 22: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/22.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 22 of 41
Backlog as of June 30th, 2020
Special Projects
Serbia
Kazakhstan
Russia
Iraq
Turkey
Bahamas
Others
Country
Total
Backlog
2.535
All figures given above are in Million US Dollars
21,4
20,5
15,9
15,4
8,3
7,8
4,3
6,4
%
100
541
519
404
390
210
199
108
164
![Page 23: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/23.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 23 of 41
Selected Projects Under Construction
Samawa and Dhi Qar Combined Cycle Power Plant Projects
Job Owner : Ministry of Electricity
Location : Samawa (293 Km Northwest of Basra)Nasiriyah (230 Km Northwest of Basra)
ENKA Share : USD 505 Million (1st Phases)
ENKA, with its partner General Electric, will design and build the Samawa and Dhi QarCombined Cycle Power Plants, which will add 750 MW each to the Iraqi Grid.
ENKA’s scope: Engineering, procurement of balance of plant (BOP), construction, erection,commissioning and start-up of the power plant, whereas GE will provide the power islandequipment (i.e. steam turbine generator (STG), heat recovery steam generator (HRSG), aircooled condenser (ACC), and main transformers), distributed control system (DCS) andswitchyard, will also be responsible for the plant performance tests.
The financing of the projects is arranged by UK Export Finance (UKEF).
![Page 24: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/24.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 24 of 41
Selected Projects Under Construction
PJSC Nizhnekamskneftekhim 495 MW CCGT-TPP
Job Owner : PJSC Nizhnekamskneftekhim, a member of TAIF Group
Location : Nizhnekamsk, Republic of Tatarstan - Russia
Siemens signed a contract for building 495 MW natural gas fired combined cyclepower plant on a turnkey basis in Tatarstan.
The contract amount is EUR 350 million and under the cooperation agreement withSiemens, ENKA’s share as the EPC contractor is about EUR 245 million.
The power plant is expected to be operative in May 2021.
![Page 25: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/25.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 25 of 41
Selected Projects Under Construction
FGP 3GP Mechanical, Electrical & Instrumentation Installation Works Tengiz, Kazakhstan
Job owner : TengizchevroilContractor : Senimdi Kurylys
(Bechtel – ENKA Joint Venture with equal shares)
Senimdi Kurylys LLP has been awarded a contract for mechanical, electrical and instrumentation installation works in Tengiz, Kazakhstan.
The Client is Tengizchevroil (TCO), which operates and develops Tengiz oil field, a joint venture (JV) with shares owned by Chevron (50%), ExxonMobil (25%), KazMunayGas (20%) and LukArco (5%).
Contract commenced in May 2018 with a project duration of 45 months.
The project will increase the Tengiz oil field’s annual oil production capacity by an additional 12 million tons.
![Page 26: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/26.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 26 of 41
Selected Projects Under Construction
Kazan 250 MW Combined Cycle Power Plant Kazan, Tatarstan, Russian Federation
Job owner : PJSC Kazanorgsintez (Member of the TAIF Group)
In October 2019, Siemens signed a contract with PJSC Kazanorgsintez, a member of theTAIF Group, for the delivery, installation, and commissioning of one SGT5-2000E gasturbine, one SST-600 steam turbine, one heat recovery steam generator and all associatedsystems for a 250 MW Combined Cycle Power Plant in Kazan (KOS Project) in Tatarstan inthe Russian Federation. ENKA has a “Cooperation Agreement” with Siemens regarding theconstruction of the plant.
Within the framework of this “Cooperation Agreement” ENKA is to perform the engineering,procurement and construction (EPC) works. ENKA will also be responsible forcommissioning. Siemens will supply the gas and steam turbines.
It is anticipated that the basic design documentation package will receive RussianFederation state expertise approval in November 2020 and that construction work willcommence in December 2020. The plant is due to start operating in March 2023.
Contract price (ENKA’s share): EUR 182 Million
![Page 27: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/27.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 27 of 41
Selected Projects Under Construction
Morava Corridor Motorway Project Pojate – Preljina, Serbia
Job owner : Government of the Republic of Serbia Ministry of Construction,Transport and Infrastructure
ENKA and its joint venture partner Bechtel have been selected by the Government of theRepublic of Serbia to design and build the 112 km Morava Corridor Motorway Project whichwill connect central Serbia with Pan-European Corridors 10 and 11.
The construction of the motorway will start in early 2020. Under the contract terms andconditions, each individual section of the motorway will be completed within less than 2.5years during the course of a total construction period of four years.
The scope of works includes 78 bridges, 24 overpasses, 12 underpasses, over 20 million m3
of excavations, over 17 million m3 of earth filling, 490,000 m3 of concrete, 1.7 million m3 ofsubbase, 1.1 million tons of asphalt and 460 km of guardrail installation.
Contract price: EUR 745 Million + Indirect Costs
![Page 28: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/28.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 28 of 41
Selected Projects Under Construction
St. Petersburg High-Technological Multifunctional Medical Complex (HMMC)Russian Federation
Job owner : LLC MMC SOGAZ Medical Technologies / Limited Liability Company“Constructiv”
ENKA commenced work in 2019 on design and construction of a High-TechnologyMultifunctional Medical Complex (HMMC) Project in St. Petersburg in Russia.
The first phase comprises the construction of temporary site facilities and utilities, top soilremoval and excavation works, the construction of perimeter walls (piling, concrete andpanel works), the sublayers of the foundations and drainage works. For the remainingworks, a contract is due to be signed in April 2020.
The medical complex, which is scheduled to start operating in 2022, will not only be one ofthe most advanced of its kind in Russia, but will also be one of the three best equipped andmost multifunctional medical institutions in the world.
![Page 29: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/29.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 29 of 41
Selected Projects Under Construction
Marine Works in Prince George Wharf, Nassau, the Bahamas
Job owner : Nassau Cruise Port Limited (NCPL)Contractor : ENKA Construction and Development B.V.
NCPL proposes to reinvigorate the current tourism infrastructure in Nassau by boosting thecruise ship arrivals and drawing visitors from the vessels into Nassau. The current cruiseterminal functions as an official port of entry and is located near the western entrance ofNassau Harbor (the Harbor), a naturally formed harbor between New Providence andParadise Island.
The project site is located in Nassau Harbor on the northeastern face of the island of NewProvidence of the Bahamas, north of Nassau’s downtown area. The harbor and its navigationchannel are used by many ships for shelter and storage and is most notably visited on aregular basis by numerous cruise ships. The project include all existing berths, wharves,connecting structures, dolphins, surrounding waters for land reclamation, and dredging.
Contract price: USD 108 Million
![Page 30: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/30.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 30 of 41
![Page 31: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/31.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 31 of 41
Real Estate Portfolio
Class A Office AreaRetail Area *5 Star Hotel
TYPE
370.000 m2360.000 m2235 Rooms
SIZE (NLA)
90%96%
**
OCCUPANCY
USD 570/m2/yearUSD 230/m2/year
**
RATE
All assets are located in Moscow, except 1 shopping center which is located in St.Petersburg.
* During Apr and May 2020 all stores, except hypermarkets, pharmacies, mobile operators andpet shops were closed due to Covid-19. In Moscow malls opened in the beginning of June butentertainment areas, cinemas and fitness areas were not opened in the second quarter.
** Occupancy and rate of rooms of the hotel may vary daily.
![Page 32: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/32.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 32 of 41
1
3
2
46
7
5
9
13-14
1512
1 Leningradsky2 Kuntsevo Plaza3 Maryina Roshcha4 Kashirskaya5 Sevastopolsky6 Vernadskogo7 Belyaevo8 Podolsk9 Orekhovo-Zuyevo10 Sergiev Posad11 Pionerski (St. Petersburg)
Investments in RussiaRETAIL ( 360.000 m2 )
12 Naberezhnaya Tower13 Paveletskaya14 Moskva Krasnye Holmy15 MosENKA
OFFICE ( 370.000 m2 )
![Page 33: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/33.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 33 of 41
Real Estate Revenue & EBITDA
2Q 2020201920182017201620152014
YEAR
147346329319319382485
RENTAL REVENUE
98213204193223267337
EBITDA
66,7%61,6%62,0%60,5%69,9%69,9%69,6%
EBITDA MARGIN
All figures given above are in Million US dollars
![Page 34: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/34.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 34 of 41
Real Estate – Some Tenants
![Page 35: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/35.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 35 of 41
Real Estate New Investments
2 Kashirskaya PlazaMultifunctional Trade Center
Total Investment: USD 232 MillionTotal Area: 196.750 m2, Net Leasable Area: 70.000 m2
Completion: 2018
1 Kuntsevo Multifunctional Trade & Business Center
Total Investment: USD 484 MillionTotal Area: 245.000 m2, Net Leasable Area: 90.000 m2
29.000 m2 Office and 61.000 m2 Retail
Completion: 2015
Investment projects of ENKA TC (Fully owned by ENKA)
![Page 36: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/36.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 36 of 41
Real Estate Further InvestmentsInvestment projects of ENKA TC (Fully owned by ENKA)
1Existing shopping center is planned to be demolished.Total Investment: USD 335 MillionTotal Area: 245.000 m2, Net Leasable Area: 105.000 m2
3 Leningradsky PravaberejnayaOffice Center2 Vernadskogo
Office Center
A-Class offices including Multi-storey Car Park ProjectTotal Investment: USD 40 Million, will be started in 2020Total Area: 29.780 m2
Net Leasable Area: 20.600 m2 & car park
A-Class offices including Multi-storey Car Park ProjectTotal Investment: USD 80 Million, will be started in 2022Total Area: 64.800 m2
Net Leasable Area: 22.000 m2 & car park
Maryina RoshchaShopping Mall
![Page 37: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/37.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 37 of 41
![Page 38: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/38.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 38 of 41
Power Generation Overview3 gas-fired combined cycle power plants (total 3.854 MW)
Gebze 1.554 MWAdapazarı 777 MWIzmir 1.523 MW
Annual generation is 32 Billion Kwh net and the annual natural gas consumption isaround 6.5 Billion CBM,
Capability of meeting 11% of Turkey’s total demand, since Turkey’s consumption in 2018was 292 Billion Kwh and developed under the ‘BUILD-OWN-OPERATE’ programme,
Proximity to main electricity load centers, proven and environmentally friendlytechnology.
Will still be operative and owned by ENKA after 16 years from 2019 and the plants have35 – 40 years of economic life.
Following expiry of the Electricity Sale Agreements with EÜAŞ, Adapazarı and GebzeCombined Cycle Power Plants developed under the BO Scheme and owned by ENKAhave suspended their generation as of February 2019 and similarly Izmir CombinedCycle Power Plant has suspended its generation as of August 2019. A publicannouncement shall be made when the generation resumes.
![Page 39: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/39.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 39 of 41
Power Generation Debt Funding
Total Debt (75%)Total Equity (25%)Total Project Cost
COMMITTED AMOUNTS
1.530510
2.040
TOTAL
US EXIM, USAOPIC, USDHERMES, GERMANYOND, BELGIUMOTHER BANKS
PROJECT FINANCE TOTAL
86030018512560
TOTAL 1.530
All outstanding project finance loans have been fully paid back in 2013
![Page 40: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/40.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 40 of 41
Turkey’s Energy Consumption in 2019
CoalHydro Natural GasWindGeothermalOthersInternational (Net)Total Consumption
SOURCES
112,856 39.088,571 30.654,817 18.921,491 7.48,229 2.84,191 1.5(558) (0.2)
289,596 100
Million Kwh %
Source: Energy Exchange Istanbul (www.epias.com.tr)
![Page 41: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/41.jpg)
Phone : +90 (212) 376 10 00 (pbx) Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349 41 of 41
Turkey’s Energy Demand
128 127 133 141 150 161 175 190 198 194 210 230 242 246 255 264 275 290 292 290-4%
-2%
0%
2%
4%
6%
8%
10%
12%
75
125
175
225
275
BILLON KWH CHANGE
![Page 42: ENGINEERING FOR A BETTER FUTURE · 790 MW Rijnmond Natural Gas Fired CCPP has been completed in 22 months by the ENKA Bechtel Joint Venture in the Netherlands . ENKA as a main contractor](https://reader031.fdocuments.net/reader031/viewer/2022013023/6021d4f593ed6a39514baa0a/html5/thumbnails/42.jpg)
İNŞAAT VE SANAYİ A.Ş.Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349
Beşiktaş / İstanbul
Tel: +90 (212) 376 10 00 (pbx) Fax: +90 (212) 272 88 69