Introduction to Metra’s Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer

Transcript of Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview...

Page 1: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

Introduction to Metra’s

Engineering Department

and Overview of 2018 Capital Program

Bruce M. Marcheschi

Chief Engineering Officer

Page 2: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

METRA OVERVIEW

• 11 rail lines

• 487 route miles

• 1,155 track miles

• 686 weekday trains

• 433 weekend trains

• Total weekday trains: 1,119

• 290,000 daily riders

• 78.8 million passenger trips a year

Page 3: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

METRA OVERVIEW

• 822 Bridges

• 571 Grade Crossings

• 237 Outlying Stations

• 5 Downtown Stations

• 24 Yard Facilities

• 150 locomotives, 840 railcars and

186 Highliners (EMU)

Page 4: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

STATE OF GOOD REPAIR NEEDS

$12.1 Billion investment needed

Less than one-fourth of that expected

Metra has:

• One of the oldest fleets

• Best on-time record

• Lowest fares

• Most complex system

Page 5: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

PROPOSED 2018 CAPITAL PROGRAM

Description In Dollars

Rolling Stock $ 71,782,500

Track & Structure $ 39,615,000

Signal, Electrical, and Communications $ 39,702,500

Facilities and Equipment $ 24,360,000

Stations and Parking $ 5,500,000

Support Activities $ 15,909,429

Grand Total $ 196,869,429

Page 6: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

ENGINEERING DEPARTMENT

• Bridges and Structures

• Electrical and Electrical propulsion

• Track

• Signal

• Telecommunications

• Yard Facilities and Maintenance

• Stations and Parking Lots

• Line Extensions and Expansions

• Positive Train Control

Page 7: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

Career Opportunities

• Civil Engineers

• Structural Engineers

• Electrical Engineers

• Construction Engineers

• Mechanical Engineers

• Computer Science

• Architects

• Project/Program Managers

Page 8: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

2018 Capital Program

Stations

Page 9: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

59th / 60th Street Station

Project Scope

Project Budget

Project Schedule

• Design - 2Q 2018

• Procurement - 4Q 2018

• Construction - 2019

• $ 14.3 Million

• 1 year project for complete station replacement of 59th Street entrance

• Re-open 60th Street entrance

• Coordination with City and University concerning Obama Library

District

• Metra Electric

Page 10: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

Prairie Crossing / Libertyville

Project Scope

Project Budget

Project Schedule

• Design - Complete

• Procurement - 1Q 2018

• Construction – 3Q 2018

• $ 500,000

• Construction of 440 sq foot Warming Shelter

• Removal of Existing Double wide Shelter

District

• Milwaukee North

Page 11: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

West Chicago Station Rehab

Project Scope

Project Budget

Project Schedule

• Design - 2Q 2018

• Procurement - 4Q 2018

• Construction - 2019

• $ 3.0 Million

• 16 Month rehabilitation project including new platforms, stairwells, and restoration of

depot

District

• Union Pacific West

Page 12: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

Hubbard Woods Rehab

Project Scope

Project Budget

Project Schedule

• Design - 2Q 2018

• Procurement - 4Q 2018

• Construction - 2019

• $ 7.0 Million

• 1 Year construction

• New ADA Compliant Elevator

• New Warming Shelter and Canopy

• Platform replacement

District

• Union Pacific North

Page 13: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

Cary Station

Project Scope

Project Budget

Project Schedule

• Design - Complete

• Procurement – Bids Received

• Construction - 3Q 2018

• $3.4 Million

• New Inbound Platform Construction

• New Inbound Depot / Shelter

• Demolition of existing Outbound Depot

District

• Union Pacific Northwest

Page 14: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

Blue Island Vermont Street Station Rehab

Project Scope

Project Budget

Project Schedule

• Design - 2Q 2018

• Procurement - 3Q 2018

• Construction - 2019

• $ 3.0 Million

• Historical Rebuild of Depot

District

• Rock Island

Page 15: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

Van Buren Street Station Rehab

Project Scope

Project Budget

Project Schedule

• Design - 2017 - 2018

• Procurement - 2Q 2019

• Construction - 4Q 2019

• $ 40 Million Projected

• Multi-year Phase Funded project

• Complete Rebuild of Canopy and Platforms

• Historical restoration of Ticket Office and waiting area

• Total rebuild of Pedestrian Tunnel system

District

• Metra electric

Page 16: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

111th/Pullman - MED

16

Page 17: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

111th/Pullman - MED

17

Page 18: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

111th/Pullman - MED

18

Page 19: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

111th/Pullman - MED

19

Page 20: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

2018 Capital Program

Yards and Facilities

Page 21: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

49th Street Yard Expansion / Training Facility

Project Scope

Project Budget

Project Schedule

• Design - Complete

• Procurement - Bids Received

• Construction - 2Q 2018

• $ 32.0 Million

• Phase Funded Project – 2 year Build

• New Training Center Building

• Parking Lot / Retention

• Two Building Additions to existing Structures

• New Storage Barn

District

• Rock Island

Page 22: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

California Avenue Train Washer / Sand Tower

Replacement

Project Scope

Project Budget

Project Schedule

• Design - Complete

• Procurement - 2Q 2018

• Construction - 4Q 2018

• $ 2.0 Million

• Design Study Currently underway.

• Replacement of Train Washer at the California Ave Facility

• Replacement of Sand Tower.

District

• Union Pacific

Page 23: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

2018 Capital Program

Bridges

Page 24: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

Bridges

1 4

89

205

164

88

49

25 28 3214 24

44 35

20

50

100

150

200

250

Nu

mb

er

of

Bri

dg

es

pre

1880

1880

1890

1900

1910

1920

1930

1940

1950

1960

1970

1980

1990

2000

2010

Decade

Original Construction Dates of Bridges Metra Operates Across

Page 25: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

Morgan Street Bridge Rehab RID

Project Scope

Project Budget

Project Schedule

• Design - Complete

• Procurement - 2Q 2018

• Construction – 4Q 2018

• $ 7.0 Million

• Total Replacement

• New Abutments

• Lower Roadway

District

• District

Page 26: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

Bridge A-32

Project Scope

Project Budget

Project Schedule

• Design - 2Q 2018

• Procurement - 3Q 2018

• Construction - 2019

• $ 12.0 Million

• New Replacement

• New Abutments

• Lower Roadway

District

• Milwaukee North

Page 27: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

Bridge #275 Rehab ( 96th Ave)

Project Scope

Project Budget

Project Schedule

• Design - 2Q 2018

• Procurement - 3Q 2018

• Construction - 2019

• $ 4.0 Million

• Complete Rebab of steel, Abutments

• Lower Roadway

District

• Rock Island

Page 28: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

86th & Vincennes Bridge Rehab

Project Scope

Project Budget

Project Schedule

• Design - Complete

• Procurement – 1Q 2018

• Construction – 3Q 2018

• $ 1.6 Million

• Rehab of Bridge

• Concrete Repair

District

• Rock Island

Page 29: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

UP 3rd MAIN, WEST SEGMENT

Project Scope

Project Budget

Project Schedule

• Design - Complete

• Procurement - 3Q 2018

• Construction – 2019 Start

• $ 95.0 Million

• 6.1 Miles Kress to Peck

• New Fox River Bridge

• New Route 31 Bridge

• Parking At Geneva

District

• Union Pacific

Page 30: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

2018 Capital Program

Electrical

Page 31: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

Homewood / 95th Street / Riverdale Substations

Project Scope

Project Budget

Project Schedule

• Design - 2Q 2018

• Procurement - 3Q 2018

• Construction – 2018/ 2019

• $ 21Million

• Installation of New Substations to accommodate additional Required Power

• Each Site will have Independent Contract

District

• Metra Electric

Page 32: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

47th Street Yard Power Distribution Upgrade

Project Scope

Project Budget

Project Schedule

• Design - 60% Complete

• Procurement - 2Q 2018

• Construction - 4Q 2018

• $ 2.5 Million

• Upgrade Existing High Voltage Pole-Line

District

• District

Page 33: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

4KV AC Switch Replacement (MED)

Project Scope

Project Budget

Project Schedule

• Design - Complete

• Procurement - 2Q 2018

• Construction - 4Q 2018

• $ 300 K

• Installation of an Automatic Transfer Switch at the KYD Facility

District

• District

Page 34: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

Millennium Depot Emergency Exits

Project Scope

Project Budget

Project Schedule

• Design - 2Q 2018

• Procurement - 3Q 2018

• Construction – 4Q 2018

• $ 800k

• Installation of Two (2) Emergency Evacuation Routes for Passengers

• Includes Platforms, Stairways, Lighting

District

• Metra Electric

Page 35: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

2018 Capital Program

Signal

Page 36: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

16th Street Interlocker

Project Scope

Project Budget

Project Schedule

• Design - Complete

• Procurement - 3Q 2018

• Construction - 2019

• $ 9.0 Million

• Currently Revising Bid Package to Accommodate Property Development

• Tracks to be Rerouted Through Property

• Complete Interlocker to be Replaced

District

• Rock Island

Page 37: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

Rondout Interlocker Replacement

Project Scope

Project Budget

Project Schedule

• Design - Complete

• Procurement - 3Q 2018

• Construction - 2019

• $ 14.0 Million

• Upgrade Complete Plant

• Including New Track Layout

• Designed for Future Expansion

District

• Milwaukee North

Page 38: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

2018 Capital Program

Telecommunications

Page 39: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

Radio Dispatching System Upgrade

Project Scope

Project Budget

Project Schedule

• Design - Complete

• Procurement - 2Q 2018

• Construction - 3Q 2018

• $ 1.3 Million

• Complete replacement of Existing Analog Radio Dispatching System

• New System Shall be VoIP based

District

• CCF

Page 40: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

POSITIVE TRAIN CONTROL (PTC)

• PTC is a GPS-based

operational safety system

• Integrates new technology with

existing train control and

operating systems to enhance

operations and provide an

added level of safety

• An unfunded federal mandate that will cost Metra:

$350 million to $400 million to install

$15 million to $20 million a year to operate

Page 41: Engineering Department and Overview of 2018 Capital Program · Engineering Department and Overview of 2018 Capital Program Bruce M. Marcheschi Chief Engineering Officer. METRA OVERVIEW

Questions???