Engineering & Construction Services...ENGINEERING & CONSTRUCTION SERVICES MICHAEL D'ANDREA, P. ENG....
Transcript of Engineering & Construction Services...ENGINEERING & CONSTRUCTION SERVICES MICHAEL D'ANDREA, P. ENG....
ENGINEERING & CONSTRUCTION SERVICES
CHIEF ENGINEER AND EXECUTIVE DIRECTOR, MICHAEL D'ANDREA, P. ENG. -
S:\2017\17M-02182-00\CONTRACT 1\f\projects\STRUCTURES_EXPRESSWAYS\CULVERTS\GENERAL DRAWINGS FOR 267,274,661,668\MASTER\267-S491-2.dgnFILE:
ISSUED FOR TENDER
Engineering & Construction Services
ISLIN
GT
ON A
VE
HUMBER RIVER
LAKELAND DR
LIGHTWOOD DR
ALBION RD
RE
NFO
RTH D
R
ISLIN
GT
ON A
VE
ELMHURST DR
GOLFDOWN DR
RE
DW
ATE
R D
R
SH
EN
DALE D
R
DEESIDE C
T
TOLEDO RD
ARBROATH CRES
SEALC
OVE D
R
THIC
KET R
D
TAYSHAM CRES
CULVERT NO 661
CULVERT NO 274
CULVERT NO 668
CULVERT NO 267
RIC
EK
OO
RB
RA
ELC
DR DOOWELKCIRC
RD
NO
TL
OB
RO
T
SERC YLEVA
TS
SERC
A
WA
TA
B
RD K
O
OR
B
DD
OT
DATE:
DRAWING INDEXN
DRAWING NUMBER:
N
N
SEE NEXT SHEET
REHABILITATION OF CULVERTS AT VARIOUS LOCATIONS
CONTRACT No. 19ECS-TI-12BE
267-S491-2
CO
NT
RA
CT N
o. 19E
CS-TI-12B
E IS
SU
ED F
OR T
EN
DE
R
REHABILITATION OF CULVERT No. 661 AND CULVERT No. 668
REPLACEMENT OF CULVERT No. 267 AND CULVERT No. 274,
MARCH 2019
ENGINEERING & CONSTRUCTION SERVICES
CHIEF ENGINEER AND EXECUTIVE DIRECTOR, MICHAEL D'ANDREA, P. ENG. -
ISSUED FOR TENDER
S:\2017\17M-02182-00\CONTRACT 1\f\projects\STRUCTURES_EXPRESSWAYS\CULVERTS\GENERAL DRAWINGS FOR 267,274,661,668\MASTER\267-S491-3.dgnFILE:
Engineering & Construction Services
DATE:
DRAWING INDEX
DRAWING NUMBER:
REHABILITATION OF CULVERTS AT VARIOUS LOCATIONS
267-S491-3
CO
NT
RA
CT N
o. 19E
CS-TI-12B
E IS
SU
ED F
OR T
EN
DE
R
CONTRACT No. 19ECS-TI-12BE
REHABILITATION OF CULVERT No. 661 AND CULVERT No. 668
REPLACEMENT OF CULVERT No. 267 AND CULVERT No. 274,
MARCH 2019
LANDSCAPE RESTORATION PLANPLAN661-S3010-8
NOTES
TREE PRESERVATION CHARTS AND DETAIL661-S3010-7
TREE PRESERVATION PLAN PLAN661-S3010-6
ROADWAY RESURFACINGPLAN661-S3010-5
STRUCTURAL REPAIRSDETAIL661-S3010-4
TEMPORARY FLOW PASSAGE SYSTEM PLAN661-S3010-3
GENERAL ARRANGEMENTPLAN661-S3010-2
LANDSCAPE RESTORATION PLANPLAN274-S637-19
NOTES
TREE PRESERVATION CHARTS AND DETAIL274-S637-18
TREE PRESERVATION PLANPLAN274-S637-17
MISCELLANEOUS DETAILSDETAIL274-S637-16
FINAL LANE MARKINGPLAN274-S637-15
TRAFFIC CONTROL IIPLAN274-S637-14
TRAFFIC CONTROL IPLAN274-S637-13
ROADWAY RECONSTRUCTIONPLAN274-S637-12
RETAINING WALL DETAILSDETAIL274-S637-11
CAST-IN-PLACE CULVERT DETAILSDETAIL274-S637-10
LIMITS
FOOTING REINFORCEMENT AND PAYMENT DETAIL274-S637-9
DETAILS
FOUNDATION LAYOUT AND FOOTING DETAIL274-S637-8
AND REMOVALS
TEMPORARY FLOW PASSAGE SYSTEM PLAN274-S637-7
CONSTRUCTION STAGINGDETAIL274-S637-6
GENERAL ARRANGEMENTPLAN274-S637-5
STREETLIGHTING LAYOUT - ULTIMATEPLAN SL-08
STREETLIGHTING LAYOUT - ULTIMATEPLAN SL-07
CIVIL LAYOUT - ULTIMATE PLAN SL-06
PHOTOMETRICS - TEMPPLAN SL-05
STREETLIGHTING LAYOUT - TEMPPLAN SL-04
CIVIL LAYOUT - TEMPPLANSL-03
DETAILS 2DETAILSL-02
TITLE PAGESL-01
LANDSCAPE RESTORATION PLANPLAN267-S491-18
TREE PRESERVATION NOTES AND CHARTSDETAIL267-S491-17
TREE PRESERVATION PLANPLAN267-S491-16
FINAL LANE MARKINGPLAN267-S491-15
TRAFFIC CONTROL IIPLAN267-S491-14
TRAFFIC CONTROL IPLAN267-S491-13
ROADWAY RECONSTRUCTIONPLAN267-S491-12
ARMOUR STONE WALL DETAILSDETAIL267-S491-11
PRECAST UNIT DETAILSDETAIL267-S491-10
FOOTING DETAILSPLAN267-S491-9
REMOVALS
TEMPORARY FLOW PASSAGE SYSTEM AND PLAN267-S491-8
CONSTRUCTION STAGINGDETAIL267-S491-7
GENERAL ARRANGEMENTPLAN267-S491-6
AND DETAILS
ROAD RECONSTRUCTION GENERAL NOTES DETAIL267-S491-5
GENERAL NOTESDETAIL267-S491-4
DRAWING INDEX267-S491-3
TITLE PAGE267-S491-2
LANDSCAPE NOTES AND DETAILSDETAIL668-S3211-25
DETAILS
TREE PRESERVATION NOTES AND DETAIL668-S3211-24
MISCELLANEOUS DETAILSDETAIL668-S3211-23
ALUMINUM RAILINGDETAIL668-S3211-22
GRADE BEAM FOR RAILINGDETAIL668-S3211-21
CONCRETE REPAIR DETAILSDETAIL668-S3211-20
ELECTRICAL LAYOUT 2PLANSL-14
CIVIL LAYOUT 2PLANSL-13
ELECTRICAL LAYOUTPLAN SL-12
CIVIL LAYOUT 1PLAN SL-11
DETAILSDETAILSL-10
TITLE PAGE SL-09
LANDSCAPE RESTORATION PLANPLAN668-S3211-13
NOTES
TREE PRESERVATION CHARTS AND DETAIL668-S3211-12
TREE PRESERVATION PLANPLAN668-S3211-11
FINAL LANE MARKINGPLAN668-S3211-10
TRAFFIC CONTROLPLAN668-S3211-9
ROADWAY RECONSTRUCTIONPLAN668-S3211-8
STRUCTURAL REPAIRSDETAIL668-S3211-7
RETAINING WALL DETAILSDETAIL668-S3211-6
SYSTEM AND REMOVALS
TEMPORARY FLOW PASSAGE PLAN668-S3211-5
CONSTRUCTION STAGINGDETAIL668-S3211-4
GENERAL ARRANGEMENTPLAN668-S3211-3
CONSULTANTS
S:\2017\1
7M-0
2182-0
0\C
ON
TR
AC
T 1\f\projects\S
TR
UC
TU
RE
S_E
XP
RE
SS
WA
YS\C
UL
VE
RTS\2
67_
AL
BIO
N_
RD
_O
VE
R_
AL
BIO
N_
CR
EE
K\M
AS
TE
R\2
67-S
491-5.d
gn
JSSISSUED FOR TRCA APPROVAL03-04-20191
JSSISSUED FOR TENDER03-21-20192
CEN
VI
O
TA
NF O
NE
SD
EC
R
O
P
IL
R
ISAN
SR
PO
EF
EE
R
IO
N
E
L
N
I
G
100202018J. G. STONER
CEN
VI
O
TA
NF O
NE
SD
EC
R
O
P
IL
R
ISAN
SR
PO
EF
EE
R
IO
N
E
L
N
I
G
100127939J. SMITH
DATE INITIALREVISIONSNo. SIGNEDDIGITAL INFORMATION
Engineering & Construction Services
AS NOTED
STREAM FLOW DIVERSION / ISOLATION OF IN STREAM WORK AREAS:
CHANNEL BED AND BANK DISTURBANCE AND RESTORATION
PROTECT RESTORED BANKS BEFORE VEGETATION IS FULLY ESTABLISHED.
BLANKET DESIGNED TO WITHSTAND CHANNEL FLOWS SHALL BE INSTALLED TO TEMPORARILY
BANKS SHALL BE RESTORED TO CONDITIONS PRIOR TO THE DISTURBANCE. AN EROSION
STOCKPILED AND THEN REPLACED AS SOON AS POSSIBLE. DISTURBED VEGETATED CHANNEL
INSTALLATION OF PUMPS, COFFER DAMS), BED MATERIALS SHALL BE REMOVED AND
IN AREAS WHERE THE BED OF A WATERCOURSE WILL BE TEMPORARILY DISTURBED (E.G. 2.
RESTORED IN ACCORDANCE WITH DETAILS PROVIDED ON THE CONTRACT DRAWINGS.
WHERE APPLICABLE, ALL DISTURBED WATERCOURSE BED AND BANK AREAS ARE TO BE 1.
CONTINGENCY PLAN: FOR UNANTICIPATED STORM EVENTS
GENERAL NOTES:
X. ZHAOJ. STONER J. SMITH
CULVERT SITE NO. 267, 274, 661, 668
GENERAL NOTES
REINFORCING STEEL
CLASS OF CONCRETE
CLEAR COVER TO REINFORCING STEEL
CONSTRUCTION NOTES
ALBION RD OVER ALBION CREEK, ISLINGTON AVE OVER HUMBER RIVER TRIBUTARY,
TOLEDO RD OVER ELMCREST CREEK, REDWATER DR OVER HUMBER RIVER TRIBUTARY
TRAFFIC CONTROL NOTES:GENERAL NOTES:
REHABILITATION NOTES
ABBREVIATIONS:
19ECS-TI-12BE
267-S491-4 S101
OR MATCHED.
ALL GRADES WITHIN THE REGULATORY FLOOD PLAIN SHALL BE MAINTAINED 10.
OF 30 METRES FROM THE WATER.
VEHICULAR REFUELING AND MAINTENANCE SHALL BE CONDUCTED A MINIMUM
RUBBLE, CONCRETE OR OTHER DELETERIOUS SUBSTANCES INTO THE WATER.
CONTROLLED TO PREVENT THE ENTRY OF PETROLEUM PRODUCTS, DEBRIS,
ALL ACTIVITIES, INCLUDING MAINTENANCE PROCEDURES, SHALL BE 9.
TRCA ENFORCEMENT OFFICER AS WELL AS THE CONTRACT ADMINISTRATOR.
CONCERNS ARISE ON SITE THE ENVIRONMENTAL MONITOR WILL CONTACT THE
UNWATERING, RESTORATION AND IN- OR NEAR- WATER WORKS. SHOULD
WORKS RELATED TO EROSION AND SEDIMENT CONTROLS, DEWATERING OR
RAIN/SNOWMELT EVENT, TO MONITOR ALL WORKS, AND IN PARTICULAR
CONTROLS, AS WELL AS ON A REGULAR BASIS, OR FOLLOWING
AN ENVIRONMENTAL MONITOR WILL ATTEND THE SITE TO INSPECT ALL NEW 8.
ADDITIONAL ESC MEASURES TO BE KEPT ON SITE AND USED AS NECESSARY.
TRCA ENFORCEMENT OFFICER SHALL BE IMMEDIATELY CONTACTED.
IMPLEMENTED IMMEDIATELY TO MINIMIZE POTENTIAL ECOLOGICAL IMPACTS.
INCLUDING SEDIMENT, THEN ALTERNATIVE MEASURES SHALL BE
EFFECTIVE IN PREVENTING THE RELEASE OF A DELETERIOUS SUBSTANCE,
THE WORK AREAS. IF THE PRESCRIBED MEASURES ON THE PLANS ARE NOT
CONDITIONS CHANGE TO MINIMIZE SEDIMENT LADEN RUNOFF FROM LEAVING
ARE NOT STATIC AND MAY NEED TO BE UPGRADED/AMENDED AS SITE
THE EROSION AND SEDIMENT CONTROL STRATEGIES OUTLINED ON THE PLANS 7.
WITH APPROPRIATE EROSION AND SEDIMENT CONTROLS.
ALL IN-WATER AND NEAR WATER WORKS SHALL BE CONDUCTED IN THE DRY 6.
PROGRESSES.
TEMPORARILY OR PERMANENTLY STABILIZED OR RESTORED AS THE WORK
DISTURBED AREAS SHALL BE MINIMIZED TO THE EXTENT POSSIBLE, AND 5.
WITHIN 48 HOURS OF THE INSPECTION.
SEDIMENT CONTROL MEASURES SHALL BE REPAIRED AND/OR REPLACED
PREVENT ENTRY OF SEDIMENT INTO THE WATER. ALL DAMAGED EROSION AND
PRIOR TO, AND MAINTAINED DURING THE CONSTRUCTION PHASES, TO
EROSION AND SEDIMENT CONTROL (ESC) MEASURES SHALL BE IMPLEMENTED 4.
DISTURBANCE TO THE WATERCOURSES.
LOCATION OF COFFERDAMS SHALL BE SET BY THE CONTRACTOR TO MINIMIZE 3.
REQUIREMENTS RELATED TO THE PROTECTION OF THE ENVIRONMENT.
CONTRACTOR SHALL ADHERE TO ALL PROVINCIAL AND FEDERAL 2.
THE REGULATED AREA.
(TRCA) APPROVAL IS REQUIRED FOR ANY MODIFICATION TO THE PLANS WITHIN
AGENCIES FOR REVIEW. TORONTO REGION CONSERVATION AUTHORITY
CHANGES TO THE APPROVED PLANS SHALL BE RESUBMITTED TO APPROVAL 1.
AND HAVE BEEN GIVEN WRITTEN AND ORAL INSTRUCTIONS.
THE OHSA, HAVE BEEN TRAINED IN THE APPLICATION OF BOOK 7
COMPETENT WORKERS, ARE AWARE OF THE REQUIREMENTS OF
DEVICES OR MEASURES, AND TRAFFIC CONTROL PERSONS ARE
RESPONSIBLE FOR INSTALLING OR REMOVING TRAFFIC CONTROL
THE CONTRACTOR SHALL ENSURE THAT ALL WORKERS 6.
WALL AS REQUIRED.
THE SIGNS ON THE TEMPORARY PRECAST CONCRETE BARRIER
ALL MOUNTING BRACKETS NECESSARY TO INSTALL AND RELOCATE
THE CONTRACTOR SHALL SUPPLY, FABRICATE, INSTALL, MAINTAIN, 5.
PROPER POSITION) FOR ALL STAGES OF THE WORK.
BASES (EQUIPPED WITH SUFFICIENT BALLAST TO KEEP THEM IN
AND RELOCATE ALL CONSTRUCTION SIGN MOUNTING FRAMES AND
THE CONTRACTOR SHALL SUPPLY, FABRICATE, INSTALL, MAINTAIN, 4.
REFLECTIVITY LEVELS AS SPECIFIED BY THE OTM BOOK 7.
IN GOOD, LEGIBLE AND CLEAN CONDITION WITH THE MINIMUM
ALL CONSTRUCTION SIGNS, BARRICADES AND MARKERS SHALL BE 3.
WORK.
CONTRACT DOCUMENTS AND OTM BOOK 7, FOR ALL STAGES OF THE
SUPPLEMENTARY CONSTRUCTION SIGNS) AS REQUIRED IN THE
AND RELOCATE ALL CONSTRUCTION SIGNS (INCLUDING ANY
THE CONTRACTOR SHALL SUPPLY, FABRICATE, INSTALL, MAINTAIN, 2.
CONSTRUCTION STAGING DRAWING.
TRAFFIC STAGING DRAWINGS TO BE READ IN CONJUNCTION WITH 1.
CONCLUSION OF THE WORK.
CONSTRUCTION STAGING, THESE SHALL BE UNCOVERED AT THE
THAT CONFLICT WITH ANY TEMPORARY SIGNS REQUIRED FOR
THE CONTRACTOR SHALL COVER ALL EXISTING TRAFFIC SIGNS 17.
ALL LANE DIRECTIONAL CHANGES SHALL BE SMOOTH CURVES.16.
WIDE SOLID YELLOW LINES AT 400mm CENTRE.
CONSTRUCTION ENTRANCES SHALL BE DEMARCATED WITH 3-200mm 15.
INSTALLED BY THE CONTRACTOR.
PERMANENT PAVEMENT MARKINGS SHALL BE SUPPLIED AND 14.
DEFACED. TC-54'S TO BE CLEANED OF ROADSPRAY AS NEEDED.
OTHER TRAFFIC CONTROL DEVICES THAT HAVE BEEN DAMAGED OR
THE CONTRACTOR SHALL IMMEDIATELY REPLACE ALL SIGNS AND 13.
300mm BEHIND THE EDGE LINE.
ALL TC-54 FLEXIBLE DRUM TYPE DELINEATORS ARE TO BE PLACED 12.
CONFORM TO OPSD 911.140, OPSD 911.232 AND OPSD 911.233.
ALL TEMPORARY PRECAST CONCRETE BARRIER WALL SHALL 11.
CHAIN LINK FENCE.
TEMPORARY CONCRETE BARRIERS SHALL BE SUPPLIED WITH A 10.
AS SHOWN ON THESE DRAWINGS.
MAINTAINED, RELOCATED AND/OR REMOVED BY THE CONTRACTOR
SADDLE TYPE DELINEATORS SHALL BE SUPPLIED, INSTALLED,
TEMPORARY CONCRETE BARRIERS, DRUM TYPE DELINEATORS AND 9.
CONTRACT ADMINISTRATOR IN THE FIELD.
INDICATED ON THESE DRAWINGS OR AS DIRECTED BY THE
BE SUBSEQUENTLY REMOVED OR RESURFACED SHALL BE TAPE AS
TEMPORARY PAVEMENT MARKINGS ON PAVEMENT THAT WILL NOT 8.
INSTALLED, MAINTAINED, AND REMOVED BY THE CONTRACTOR.
ALL TEMPORARY PAVEMENT MARKINGS SHALL BE SUPPLIED, 7.
DENOTES WORKING POINTWP
DENOTES WATER LEVELWL
DENOTES STROM SEWERSTM
DENOTES TOP OF WALLT/WALL
DENOTES TYPICALTYP
DENOTES TOP UPPER LEVELTUL
DENOTES TOP LOWER LEVELTLL
DENOTES TOP OF PAVEMENTT/P
DENOTES TOP OF FOOTINGT/FTG
DENOTES INVERTINV
DENOTES OUTER FACEOF
DENOTES INNER FACEIF
DENOTES INTERNAL DIAMETERID
DENOTES FRONT FACEFF
DENOTES ELEVATIONEL
DENOTES EACH FACEEF
DENOTES CENTRE LINECL
DENOTES CONSTRUCTION JOINTCJ
DENOTES BOTTOM UPPER LEVELBUL
DENOTES BOTTOM LOWER LEVELBLL
DENOTES BOTTOM OF FOOTINGB/FTG
DENOTES BACK FACEBF
DENOTES BOTTOMBOT.
DENOTES BOREHOLEBH
SURROUNDING LANDS.
MATERIAL BE PERMITTED TO ENTER THE WATERCOURSE, RIGHT-OF-WAY, OR
WASHING OF CONCRETE TRUCKS. AT NO TIME SHALL EFFLUENT OR SURPLUS
EFFLUENT AND SURPLUS MATERIALS RESULTING FROM CLEANING OR
THE CONTRACTOR SHALL PROVIDE MEASURES TO COLLECT AND CONTAIN ALL 20.
ENFORCEMENT OFFICER AND PROJECT MANAGER IF AN ISSUE ARISES.
PROCEEDS. THE ENVIRONMENTAL MONITOR SHALL NOTIFY THE TRCA
NATURAL ENVIRONMENT ARE EFFECTIVELY MITIGATED AS CONSTRUCTION
ENSURE THAT ACTIVITIES THAT COULD HAVE A NEGATIVE IMPACT TO THE
AN ENVIRONMENTAL MONITOR WILL BE ON SITE, AND PROVIDE ADVICE, TO 19.
416-661-6600 x 5925) 48 HOURS PRIOR TO COMMENCING CONSTRUCTION.
AT 416-661-6600 x 5626) AND TRCA PROJECT MANAGER (LEILA SOTOUDEH AT
THE CONTRACTOR SHALL NOTIFY TRCA ENFORCEMENT OFFICER (PAUL NOWAK 18.
AND MATERIALS FROM THE WATERCOURSE PRIOR TO LEAVING THE SITE.
AT THE END OF EACH DAY, THE CONTRACTOR SHALL REMOVE ALL EQUIPMENT 17.
EVENTS.
OPERATIONS SUCH THAT NO IN-WATER WORK OCCURS DURING RAINFALL
THE CONTRACTOR SHALL MONITOR WEATHER FORECASTS AND SCHEDULE 16.
267, 274 AND 661, AND JULY 1 TO SEPTEMBER 15 FOR CULVERT 668.
OCCUR DURING THE FOLLOWING PERIOD: JULY 1 TO MARCH 31 FOR CULVERTS
AND MIGRATORY PERIODS, IN-WATER/NEAR WATER ACTIVITIES SHALL ONLY
TO PROTECT LOCAL FISH POPULATIONS DURING THEIR SPAWNING, NURSERY 15.
REMOVALS SHALL BE COMPLETED BETWEEN AUGUST 1 AND APRIL 1.
IN ORDER TO COMPLY WITH THE MIGRATORY BIRDS CONVECTION ACT, TREE 14.
THROUGH THE WATERCOURSE UNLESS APPROVED BY TRCA.
WATERCOURSE. NO EQUIPMENT OR VEHICLES ARE PERMITTED TO CROSS
ALL ACCESS TO THE WORK SITE SHALL BE FROM EITHER SIDE OF THE 13.
RELEASE OF SEDIMENT LADEN WATER.
AND MAINTAINED OR REVISED TO MEET THE OBJECTIVE OF PREVENTING THE
MEASURES SHALL BE MONITORED BY THE CONTRACTOR FOR EFFECTIVENESS
DRAIN ONTO DISTURBED SOILS WITHIN THE WORK AREA. THESE CONTROL
DIRECTLY TO ANY WATERCOURSE, WETLAND OR FOREST, OR ALLOWED TO
WELL-VEGETATED AREA. NO DEWATERING EFFLUENT SHALL BE SENT
WATERCOURSE OR WETLAND AND ALLOWED TO DRAIN THROUGH A
RELEASED TO THE ENVIRONMENT AT LEAST 30 METRES FROM A
ALL DEWATERING/UNWATERING SHALL BE DISCHARGED VIA A FILTER BAG AND 12.
MATERIALS, ETC.
TANKS, PORTA- POTTIES, MACHINERY, EQUIPMENT, CONSTRUCTION
POTENTIAL TO CAUSE A SPILL OR AN OBSTRUCTION TO FLOW, E.G., FUEL
ITEMS FROM THE REGIONAL STORM FLOOD PLAIN THAT WOULD HAVE THE
UNEXPECTED STORM ARISE, THE CONTRACTOR SHALL REMOVE ALL UNFIXED
CONDUCTED DURING FAVOURABLE WEATHER CONDITIONS. SHOULD AN
OF THE ONSET OF THE PROJECT TO ENSURE THAT THE WORKS WILL BE
THE CONTRACTOR SHALL MONITOR THE WEATHER SEVERAL DAYS IN ADVANCE 11.
THE CONTRACTOR SHALL PROVIDE WEEKEND MONITORING.6.
WATERCOURSE AND FLOOD PLAIN.
EQUIPMENT AND/OR MATERIALS NOT BEING USED SHALL BE STORED AT LEAST 30m FROM THE 5.
SOON AS CONDITIONS ALLOW.
MAINTAINED THROUGHOUT THE STORM EVENT, ANY NEEDED REPAIRS SHALL BE MADE AS
THE CONTRACTOR SHALL MONITOR EROSION PROTECTION MEASURES AND ENSURE THEY ARE 4.
EQUIPMENT AND/OR MATERIAL IS WITHIN THE FLOOD PLAIN LIMITS DURING A STORM EVENT.
CONTINGENCY PLAN THAT IDENTIFIES THE SPECIFIC REMOVAL/PROTECTION MEASURES IF
PROTECTION MEASURES SHALL BE IMPLEMENTED. THE CONTRACTOR SHALL PREPARE A
AWAY FROM THE FLOOD PLAIN AS POSSIBLE TO ALLOW FOR STORM FLOWS AND APPROPRIATE
MATERIAL REMOVAL IS NOT POSSIBLE THEN THEY SHALL BE MOVED AND STABILIZED AS FAR
ANY EQUIPMENT OR MATERIALS WITHIN THE FLOOD PLAIN SHALL BE REMOVED. IF EQUIPMENT/ 3.
THE CONTRACTOR SHALL SET UP A WEATHER MONITORING PROGRAM.2.
STORED OUTSIDE OF TRCA REGULATION AREA.
USE DURING AND AFTER AN UNANTICIPATED STORM EVENT. STOCKPILED MATERIALS SHALL BE
ROCK MATERIAL, SILT FENCE, PUMPS, ABSORBENTS ETC.) SHALL BE STOCKPILED ON SITE FOR
ADDITIONAL SEDIMENT AND EROSION CONTROL MATERIALS (SUCH AS CONCRETE BARRIER, 1.
SHALL BE INCLUDED IN THE CONTRACTORS CONTINGENCY PLAN.
EVENTS. IN PREPARATION OF AN UNANTICIPATED STORM EVENT THE FOLLOWING MEASURES
THE WATERCOURSES ARE SUBJECT TO SUDDEN INCREASES IN WATER LEVELS DURING STORM
APRIL, 2019
DESIGN
SCALE
DRAWN
NUMBERDRAWING
CHECKED
SHEET
CONTRACT No.
DATEEngineering & Construction Services
EXECUTIVE DIRECTOR
CHIEF ENGINEER AND
M.E.SC., P.ENG.
MICHAEL D'ANDREA,
Project, Engineering & Construction ServicesMunicipal Infrastructure & Gardiner Rehabilitation
Director, Design & ConstructionFRANK CLARIZIO, P.ENG.
Bridges, Structures & Expressways
Transportation Infrastructure
Acting Manager,Design & Construction
JODIE ATKINS, P.ENG. (A)
DOCUMENTS.
ABRASIVE BLAST CLEANED IN ACCORDANCE WITH THE CONTRACT
REMOVALS AND WHICH IS DESIGNATED TO REMAIN SHALL BE
EXISTING REINFORCING STEEL WHICH IS EXPOSED DURING CONCRETE 3.
LESS.
DEEP, OR TO THE DEPTH OF REINFORCING STEEL, WHICHEVER IS
THE LIMITS OF REMOVAL SHALL BE DELINEATED BY SAWCUT 25 mm 2.
ADMINISTRATOR.
INJECTION SHALL BE IDENTIFIED IN THE FIELD BY THE CONTRACT
SCHEMATICALLY. LIMITS OF CONCRETE REMOVAL AND CRACK
AREAS OF REPAIR ARE INDICATED ON THE DRAWINGS 1.
ROCK PROTECTION SHALL COMPRISE CLEAN WASHED STONES.11.
UNLESS NOTED OTHERWISE.
ALL EXPOSED CONCRETE EDGES TO RECEIVE 20x20mm CHAMFER, 10.
LIGHTS. METHOD OF SUPPORT TO BE DETERMINED BY CONTRACTOR.
TEMPORARILY SUPPORTED TO MAINTAIN OPERATION OF STREET
ELECTRICAL CONDUITS, CABLES/WIRING AND BOXES SHALL BE 9.
CONTRACTOR.
LEVEL 3. LIMITS OF PROTECTION SYSTEMS TO BE DETERMINED BY
QUADRANT FOR CULVERT NO. 267 TO BE DESIGNED TO PERFORMANCE
PERFORMANCE LEVEL 2. PROTECTION SYSTEM IN SOUTHWEST
ROADWAY PROTECTION SYSTEM SHALL BE DESIGNED TO 8.
ROUGHENED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
DESIGNATED TO BE PLACED SHALL BE ABRASIVE BLAST CLEANED AND
ALL CONCRETE SURFACES AGAINST WHICH NEW CONCRETE IS 7.
PROTECTED.
CONSTRUCTION. ALL UTILITIES TO BE MAINTAINED, SUPPORTED AND
CONFIRM LOCATION OF ALL UTILITIES PRIOR TO START OF
LOCATION OF UTILITIES SHOWN ARE APPROXIMATE. CONTRACTOR TO 6.
MAINTAINED AT ALL TIMES.
ACCESS TO NEARBY RESIDENCES AND BUSINESSES TO BE 5.
DESIGN CODE CHBDC CSA S6-14, LOADING CL-625-ONT.4.
DRAWINGS ARE NOT TO BE SCALED.3.
STRUCTURE SHALL BE SUBMITTED FOR APPROVAL.
ADJUSTMENT OF THE WORK REQUIRED TO MATCH THE EXISTING
REPORTED TO THE CONTRACT ADMINISTRATOR AND THE PROPOSED
COMMENCEMENT OF THE WORK. ANY DISCREPANCIES SHALL BE
ARE RELEVANT TO THE WORK SHOWN ON THE DRAWINGS PRIOR TO
ELEVATIONS OF THE EXISTING STRUCTURES AND ROADWAYS THAT
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, DETAILS, AND 2.
DRAWING.
ALL CONTRACT DRAWINGS TO BE READ IN CONJUNCTION WITH THIS 1.
ASTM A123.
REINFORCEMENT, WWR 102x102mm (MW25.8xMW25.8), GALVANIZED TO
REINFORCED WITH GALVANIZED WELDED STEEL WIRE MESH
ALL CONCRETE PATCH AND REFACING REPAIRS SHALL BE 4.
INDICATED OTHERWISE.
WITH THE STRUCTURAL STANDARD DRAWING SS12-1, UNLESS
MINIMUM HOOK DIMENSIONS. ALL HOOKS SHALL BE IN ACCORDANCE
MINIMUM BEND DIAMETERS, WHILE STIRRUPS AND TIES SHALL HAVE
BAR HOOKS SHALL HAVE STANDARD HOOK DIMENSIONS USING 3.
REINFORCING STEEL BARS SHALL BE CLASS B.
UNLESS SHOWN OTHERWISE, TENSION LAP SPLICES FOR 2.
REINFORCING STEEL SHALL BE GRADE 400W.1.
±2070UNLESS NOTED OTHERWISE
REMAINDER
±2070FRAME LEGS
±1060SOFFIT OF TOP SLAB
±2070TOP SURFACE OF TOP SLAB
CAST-IN-PLACE FRAME
±1055FRAME LEGS
±1050SOFFIT OF TOP SLAB
±1050TOP SURFACE OF TOP SLAB
PRECAST FRAME
±25100BOTTOMS & SIDES OF FOOTING
35 MPa, CLASS C-1(UNLESS NOTED OTHERWISE)
ALL OTHER CONCRETE
35 MPa, CLASS C-1CONCRETE PATCHES AND REFACING
25 MPa, CLASS C-1MASS CONCRETE
35 MPa, CLASS C-1PRECAST FRAME
WEATHER (AFTER THE SPRING RUNOFF IS COMPLETE).
THE CONTRACT ADMINISTRATOR AND SHALL CORRESPOND TO THE OBSERVED WATER LEVEL DURING DRY
SHALL BE AT LEAST THE BASE FLOW ELEVATION PLUS 300mm. BASE FLOW ELEVATION SHALL BE DETERMINED BY
DETERMINE THE SIZE OF THE TEMPORARY FLUME BASED ON LOW FLOW CONDITIONS. THE COFFERDAM HEIGHT
IN-WATER WORKS SHALL BE UNDERTAKEN UNDER LOW FLOW CONDITIONS. THE CONTRACTOR SHALL 5.
COARSE GRANULAR MATERIAL.
SHALL BE PROTECTED FROM EROSION OF CHANNEL SEDIMENTS THROUGH INSTALLATION OF A BED OF CLEAN,
OF THE CONSTRUCTION WORK AREA SHALL MAKE USE OF DEWATERING TRAPS.THE PUMP DISCHARGE ZONE
DOWNSTREAM OF THE PUMP INTAKE ZONE AND UPSTREAM OF THE PUMP DISCHARGE ZONE. ANY DEWATERING
BACK UP PUMP.BARRIERS TO ISOLATE THE CONSTRUCTION WORK AREA SHALL BE CONSTRUCTED
OR MORE PUMPS AS REQUIRED FOR THE WATERCOURSE DIVERSION FLOW PLUS AT LEAST ONE ADDITIONAL
FLOW DIVERSION HOSES TO PREVENT ANY ACCIDENTAL INTAKE OF FISH.THE CONTRACTOR SHALL INSTALL ONE
RESULTING FROM CONSTRUCTION ACTIVITIES. APPROPRIATE SCREENING SHALL BE USED ON THE ENDS OF THE
PUMPED WATERCOURSE DIVERSION FLOWS ARE TO REMAIN CLEAN AT ALL TIMES AND FREE OF ANY SEDIMENTS
GRANULAR MATERIAL TO ENSURE THAT CHANNEL SEDIMENTS ARE NOT RELEASED INTO THE PUMP INTAKE.
REQUIRED TO BE PLACED WITHIN THE WATERCOURSE, SHALL BE PLACED ON A BED OF CLEAN, COARSE
OUTSIDE THE WATERCOURSE BANKS WHERE POSSIBLE. PUMP INTAKE HOSES AND THE PUMP ITSELF, WHERE
THE EXISTING CULVERT AND PLACEMENT OF ROCK PROTECTION. FLOW DIVERSION PUMPS ARE TO BE LOCATED
COFFERDAMS WITH FLOW DIVERSION PUMPS ARE REQUIRED AT CULVERT NO. 267 DURING THE REMOVAL OF 4.
INSTALLATION AREA.
INSTALLING THE PUMP IN THE DRY THROUGH INSTALLATION OF A TEMPORARY COFFERDAM TO ISOLATE THE
TO ENSURE THAT NO SEDIMENT IS RELEASED TO THE WATERCOURSE. THIS MAY BE ACCOMPLISHED BY
PUMPS THAT REQUIRE INSTALLATION WITHIN THE WATERCOURSE SHALL BE INSTALLED IN SUCH A MANNER AS 3.
A PERMIT FROM THE ONTARIO MINISTRY OF NATURAL RESOURCES WILL BE REQUIRED.
FISH SHALL BE CARRIED OUT BY A QUALIFIED BIOLOGIST APPROVED BY THE MINISTRY OF NATURAL RESOURCES.
LICENSED PERSONNEL AND RELEASED DOWNSTREAM WITHOUT HARM. CAPTURE AND RELEASE OF STRANDED
ANY FISH STRANDED IN THE CONSTRUCTION ZONES SHALL BE CAPTURED USING APPROPRIATE TECHNIQUES BY 2.
SUPPORT IS REQUIRED.
ARE PERMITTED. ARMOUR STONE MAY BE PLACED BEHIND GRAVEL BAG BARRIERS WHERE ADDITIONAL
RESULTING IN HARMFUL IMPACTS TO AQUATIC HABITAT. BARRIERS MADE OF BAGS FILLED WITH 'PEA GRAVEL'
SANDBAG BARRIERS ARE NOT TO BE USED WITHIN ANY WATERCOURSES DUE TO THE RISK OF BREAKAGE 1.
LI
CE
NS
ED
PR
OFESSIONA
L
EN
G
IN
EE
R
R
OVIN
CE OFN
TA
RIO
O
P
J.F.BARICH
MARCH 18, 2019
DATE INITIALREVISIONSNo. SIGNEDDIGITAL INFORMATION
STREETLINE
MAPPING
UTILITY
DESIGN
Engineering & Construction Services
18-02143_MAP_267.dgn
18-02143_MAP_267.dgn
18-02143_MAP_267.dgn
18-02143_MAP_267.dgn
SURVEY(2018)
18-02143-267pd.dgn, 18-02143-267sh.dgn, 18-02143-267 det.dgn
03-18-19 ISSUED FOR TENDER J.B.
DESIGN DRAWN CHECKED
NUMBER
DRAWINGSCALE SHEET
DATE
B.P.Q. A.K.S. J.B.
HORIZONTAL 1:200
Project, Engineering & Construction ServicesMunicipal Infrastructure & Gardiner Rehabilitation
Director, Design & ConstructionFRANK CLARIZIO, P.ENG.
Engineering & Construction Services
EXECUTIVE DIRECTOR
CHIEF ENGINEER AND
M.E.SC., P.ENG.
MICHAEL D’ANDREA,
CONTRACT No. 19ECS-TI-12BE
S102
MARCH, 2019
GENERAL NOTES
Legislation, Regulation and Codes
and shall be liable for all or any damage.
themselves as to the actual location and depth of any utility
are for reference purposes only. The contractor shall satisfy
5 All existing utilities shown on drawings (plan and profile)
Construction Notes
Contact Information
4 Ultra-rib pipe is not permitted within the municipal right-of-way.
of the contract administrator.
of construction and appropriate action taken to the satisfaction
drawings must be reported to the City prior to commencement
6 Any discrepancies between site conditions and construction
Road Reconstruction
and gutter grades are calculated along the gutter line.
3 Chainage is established from the centreline of construction
on profile, or to be confirmed in the field.
4 Height of curb faces may vary along length of gutter, as shown
portion of top of structures to allow for minimum 150 mm adjustments.
new design elevations including breaking down and removal of
5 Adjust all structures (maintenance holes, catch basins, etc.) to suit
to facilitate future sidewalk construction.
6 All curb shall be constructed with a ledge at the back of the curb
curb, sidewalk and pavement unless otherwise shown.
7 Full depth saw-cuts are required at construction limits of existing
from the City’s right-of-way management unit district office.
-way, the contractor shall apply for a road occupancy permit
1 Prior to commencing any work within the municipal right-of
limits are to be confirmed in the field by the contract administrator.
2 Limits of sidewalk / curb reconstruction are approximate, actual
for the proposed work.
walkways, etc. at construction limits to provide a clean joint
8 Saw cut existing pavement, sidewalk, curb, gutter, driveways,
Limits are to be determined in the field by the contract administrator.
11 Adjustment of approaches, walkways, and steps may be required.
or approved equivalent.
sodded. Filter fabric for silt control to be Terra Fix 270R
and the boulevards are sodded or backyards graded and
not to be removed until such time as the curbs are constructed
trap sediment. Silt traps are to be cleaned regularly and are
13 Filter fabric to be placed under grates on all catchbasins to
are expressed in millimetres (mm) unless otherwise noted.
12 All dimensions are expressed in metres (m) and pipe sizes
TS 4.60.
shall be backfilled with unshrinkable fill according to
3 Service connections and utility cuts made in road pavements
and shall be sodded according to TS 5.00 and TS 5.10.
Grass areas shall be treated with 100 mm of topsoil
and to the satisfaction of the contract administrator.
right-of-way shall be restored to original or better condition
4 All areas disturbed during construction within the City’s
to be compacted to minimum 98% of maximum dry density.
is to extend from the lower pipe to the top of the upper pipe. Granular A
above the existing sewers, or utilities, Granular A bedding material
9 At all locations where the proposed watermain crosses under or
construction limits (minimum 2.0 m).
12 Existing asphalt thickness may vary, taper to match existing at
diameter shall be supported according to drawing T-1007.01-4.
11 All existing watermains and sewer pipes larger than 300 mm
specification is available.
City of Toronto, be used where no City standard or
and specifications may, subject to the approval of the
and specifications. Ontario Provincial Standard drawings
according to the latest City of Toronto standard drawings
1 All work within the City right-of-way shall be constructed
deemed to be the constructor as defined in the act.
. The general contractor shall be Construction Projects
Regulations for and Occupational Health and Safety Act
2 All work shall be completed according to the current
. Book 7: Temporary Conditions Field Edition
Ontario Traffic Manual shall be according to the current
3 All temporary traffic control and signage during construction
manual. and Watermains
for Sewers Design Criteria fromMaterial Specifications 6,
material/manufacturer specifications as required by Chapter
appurtenances, shall be according to City of Toronto
1 All material for sewer, forcemain, watermain, hydrants and
no extra cost to the City.
and protecting these systems shall be completed at
which are not shown on the plans. Locating, working around
sprinklers and lighting systems within the right-of-way,
8 Attention is directed to the possibility of existing private
T-310.050-8.
1 Reconstruction of driveway entrances shall be according to
Vehicular sidewalk ramp shall be according to T-310.050-1.
10 Existing entrance ramps to be re-instated.
1 Main line PVC pipe shall be DR 35.
300 mm diameter.
clearance between new watermain and gas mains larger than
watermain and existing gas mains. Minimum 600 mm vertical
a minimum of 300 mm vertical clearance between new
10 Contractor to provide adequate support during construction and
of Toronto Design Criteria for Sewers and Watermains Manual.
2 Utility separation shall be according to Appendix ’D’ of the City
reported to the City.
between the drawings and the layout shall be immediately
by the contractor prior to construction. Any discrepancies
7 All survey stake layout points shall be verified in the field
T-310.030-10 and T-310.030-11.
indicators according to T-310.030-7, T-310.030-8, T-310.030-9,
9 Construct pedestrian sidewalk ramps with tactile walking surface
416-393-3302 at least 48 hours prior to commencing construction.
co-ordinate all disruptionsin service, contractor to contact the TTC
2 All TTC traffic is to be maintained during construction. In order to
Water at 416-397-0187 at least 48 hours prior to construction.
close to an existing transmission watermain, contractor to notify Toronto
4 During the construction of watermain / services or sewer / laterals
inspector may be present.
to excavation near transmission watermain so that a Toronto Water
or send an e-mail message to [email protected] two weeks prior
3 Notify Toronto Water, Water Treatment and Supply at 416-397-0187
to minimum 98 % of maximum dry density.
bedding material according to TS 1010 and compacted
according to OPSD 802.031 and using Granular ’A ’
3 Bedding for rigid pipe shall be Class B bedding material
and compacted to minimum 98% of maximum dry density.
OPSD 802.010 and using Granular ’A’ according to TS 1010
2 Embedment material for flexible pipe shall be according to
CULVERT SITE NO. 267, 274, 661, 668
TOLEDO RD OVER ELMCREST CREEK, REDWATER DR OVER HUMBER RIVER TRIBUTARY
ROAD RECONSTRUCTION GENERAL NOTES AND DETAILS
807.010 and 807.030.
Height of fill to be verified using OPSD tables
5 Reinforced concrete pipe shall be minimum 65-D.
Frame and cover shall be according to OPSD 400.070.
T-705.010-1 complete with goss trap, where specified.
6 Single catchbasins shall be according to T-705.010 or
complete with goss trap, where specified.
7 Double catchbasins shall be according to T-705.020
catchbasins.
catchbasins and 300 mm PVC DR 35 for double
8 Catchbasin leads to be 250 mm PVC DR 35 for single
maintenance holes shall be according to T-708.020.
9 Connection detail for sewer pipe at catchbasins and
Storm Sewers
NOTES: EXISTING ASPHALT THICKNESS MAY VARY.
1250 mm
SURFACE COURSE ASPHALT AS DIRECTEDEXTEND SURFACE COURSE ASPHALT
EXISTING PAVEMENT
NOT TO SCALE
STEP JOINT DETAIL
BASE COURSE ASPHALT AS DIRECTED
ROAD BASE AS DIRECTED
EXISTING ROAD BASE
Bridges, Structures & Expressways
Transportation Infrastructure
Acting Manager,Design & Construction
JODIE ATKINS, P.ENG. (A)
267-S491-5
WITH GEOTEXTILE
GRATE TO BE DOUBLE WRAPED
GRATE AS PER OPSD 400.070
CATCH BASIN FRAME &
NOTES
CONTRACT ADMINISTRATOR.SEDIMENTS INTERFERES WITH DRAINAGE, OR AS DIRECTED BY THEGEOTEXTILE TO BE REPLACED PERIODICALLY WHEN ACCUMULATED3.
NON-WOVEN 270 R GEOTEXTILE FABRIC, OR EQUIVALENT SHALL BE USED.2.
TO BE USED UNDER APPROPRIATE DRAINAGE CIRCUMSTANCES.1.
CATCHBASIN SEDIMENT CONTROL TRAPN.T.S.
ALBION ROAD OVER ALBION CREEK, ISLINGTON AVE OVER HUMBER RIVER TRIBUTARY,
CC
SM
H
SM
H
C.L.
C.L.
HE
LS
IN
V.
= 143.6
87
OB
V
OB
V
WL
Nail
HE
WL
Dirt
675 UNK
SL2306589
MH4404098953
IO4404598966
IO4405698963
IO4402998952
MH4406098949
CB4402998942
SL2306875
SL2306868
600
CO
NC
450
CO
NC
T
T
145
148
148
150
CONSULTANTS
S:\2017\1
7M-0
2182-0
0\C
ON
TR
AC
T 1\f\projects\S
TR
UC
TU
RE
S_E
XP
RE
SS
WA
YS\C
UL
VE
RTS\2
67_
AL
BIO
N_
RD
_O
VE
R_
AL
BIO
N_
CR
EE
K\M
AS
TE
R\2
67-S
491-5.d
gn
JSSISSUED FOR TENDER03-21-20192
JSSISSUED FOR TRCA APPROVAL03-04-20191
CEN
VI
O
TA
NF O
NE
SD
EC
R
O
P
IL
R
ISAN
SR
PO
EF
EE
R
IO
N
E
L
N
I
G
100202018J. G. STONER
CEN
VI
O
TA
NF O
NE
SD
EC
R
O
P
IL
R
ISAN
SR
PO
EF
EE
R
IO
N
E
L
N
I
G
100127939J. SMITH
EL. 142.400 (SOUTH)EL. 143.278 (NORTH)INVERT
CHANNELLOW-FLOW
EL. 142.732 (SOUTH)EL. 143.385 (NORTH)
W.L. (FEB, 2018)
FOOTING (TYP)CONCRETE CAST-IN-PLACE
BEDROCK (EL. VARIES)APPROXIMATE TOP OF SHALE
CONCRETE (TYP)100mm MASS
ROCK PROTECTION
CULVERTPLATE ARCH CORRUGATED STEEL REMOVE EXISTING
NATIVE MATERIAL
RIGID FRAME CULVERTPRECAST CONCRETE
FOOTINGS)AND OVER CULVERT POLYSTYRENE (BETWEEN 50mm THICK EXTRUDED
DATE INITIALREVISIONSNo. SIGNEDDIGITAL INFORMATION
Engineering & Construction Services
WEST
1:50
EAST
PLAN1:125
NORTH
SOUTH
1:125
CROSS SECTION B
-
-
B
-
A
LONGITUDINAL SECTION A
-
3500
3000 3000 400 400
430
(TY
P)
430
(TYP)
430
1
1
CLEXISTING/NEW
CULVERT
(TYP)
1000
(TY
P)
300
C ALBION RD.L
C ALBION RD.L
PERPENDICULAR TO
C ALBION RD.L LANE LANE LANE LANE
143
144
145
146
147
148
149
142
ELEV (m)
MEDIAN
20000
24000
2°27'15"
LANE
3250
LANE
3250
LANE
3250
MEDIAN
3000
LANE
3250
FLOWALBIO
N CREEK
TO BE REMOVEDSTEEL PLATE ARCH CULVERT EXISTING CORRUGATED
AV
E.
TO KIP
LIN
G
SIDEWALK
2100
SIDEWALK
2100
SIDEWALK
2100
SIDEWALK
2100
EL. 142.400INV.
FLOW
AV
E.
TO IS
LIN
GT
ON
150
T/P EL. 149.346WP#1
EL. 143.278INV.
BH 18-AB-2
PLATE ARCH CULVERT CORRUGATED STEEL REMOVE EXISTING
(TYP)CURB AND GUTTER REMOVE AND REPLACE
CONDUITS (ROGERS)TELECOMMUNICATIONS EXISTING
CONDUITS (BELL)TELECOMMUNICATIONS EXISTING
(TYP INLET AND OUTLET)
= 200mm50D
300mm THICK
PLACE ROCK PROTECTION
PROTECTION SYSTEMTEMPORARY ROADWAY
(ENBRIDGE)200mm GAS MAIN PROTECT EXISTING
AS REQUIREDSOUTHWEST EMBANKMENT PROTECTION SYSTEM AT
RIGID FRAME CULVERTPRECAST CONCRETE INSTALL NEW
(TYP)STEEL BEAM GUIDE RAIL REMOVE AND REPLACE
(TORONTO HYDRO)BURIED CONDUIT STREET LIGHT PROTECT EXISTING
CONCRETE FOOTINGSCULVERT WITH CAST-IN-PLACE CONCRETE RIGID FRAME INSTALL NEW PRECAST
(IN CULVERT BARREL) = 400mm50D
600mm THICKPLACE ROCK PROTECTION
(FULL LEGNTH OF BARREL)= 400mm50 D
PROTECTION INSIDE THE CULVERTPLACE 600mm THICK ROCK
100mm MASS CONCRETE
CONCRETE FOOTINGSCAST-IN-PLACE
DETAILSSEE ROAD WORKS DRAWING FOR NEW ROAD BASE AND ASPHALT
BEDSTREAM EXISTING
300mm WATERMAINPROTECT EXISTING
(TYP)CONCRETE SIDEWALK REMOVE AND REPLACE
CLEXISTING/NEW
CULVERT
24000 20000
SEE NOTE 2.SEWER MANHOLE. EXISTING SANITARY
RAIL (TYP)STEEL BEAM GUIDE CONSTRUCT NEW
AND GUTTER (TYP)CONCRETE CURB CONSTRUCT NEW
SAN.675mm CONCRETE PROTECT EXISTING
SIDEWALK (TYP)CONSTRUCT NEW CONCRETE
TOP OF UTILITY EL. 147.840EXISTING 200mm GAS MAIN
OUTLET)(TYP INLET AND
= 200mm 50DROCK PROTECTION PLACE 300mm THICK
BEDROCK (EL. VARIES)APPROXIMATE TOP OF SHALE
SKEW
(TYP ALL 4 QUADRANTS)SEE SHEET S206 FOR DETAILS NEW ARMOUR STONE WALLS. BASKET WALLS AND INSTALL REMOVE EXISTING GABION
ACCORDANCE WITH OPSS 407INTO NEW CULVERT IN FOR LENGTH OF 3m AND TIE EXISTING STORMWATER PIPE STM. REMOVE AND REPLACE EXISTING 600mm CONCRETE
ACCORDANCE WITH OPSS 407INTO NEW CULVERT IN FOR LENGTH OF 3m AND TIE EXISTING STORMWATER PIPE STM. REMOVE AND REPLACE EXISTING 450mm CONCRETE
ELECTRICAL DRAWINGSEXCAVATION. SEE POLE WITHIN LIMITS OF REINSTATE STREET LIGHT REMOVE SALVAGE AND
ACCORDANCE WITH OPSS 407INTO NEW CULVERT IN FOR LENGTH OF 3m AND TIE EXISTING STORMWATER PIPE STM. REMOVE AND REPLACE EXISTING 300mm CONCRETE
(TYP)WATER EDGE OF
2:1
2:1
(TYP. INLET AND OUTLET)CONTRACT DOCUMENTS ACCORDANCE WITH CONCRETE IN WATERPROOF EXPOSED
2.5:1
OF CULVERT)PROTECTION (FULL LENGTH POLYSTYRENE UNDER ROCK 50mm THICK EXTRUDED
N
CONSTRUCTION
NORTH
G. LI
CULVERT SITE NO. 267
GENERAL ARRANGEMENT
ALBION ROAD OVER ALBION CREEK
CULVERT REPLACEMENT
WORKING POINT DATA
WP
1
NORTHING EASTING
4844050.863 298964.876
AS NOTED
NOTES:
S201
19ECS-TI-12BE
267-S491-6
M. KHAN
APRIL, 2019Bridges, Structures & Expressways
Transportation Infrastructure
Acting Manager,Design & Construction
JODIE ATKINS, P.ENG. (A)
DESIGN
SCALE
DRAWN
NUMBERDRAWING
CHECKED
SHEET
CONTRACT No.
DATEEngineering & Construction Services
EXECUTIVE DIRECTOR
CHIEF ENGINEER AND
M.E.SC., P.ENG.
MICHAEL D'ANDREA,
Project, Engineering & Construction ServicesMunicipal Infrastructure & Gardiner Rehabilitation
Director, Design & ConstructionFRANK CLARIZIO, P.ENG.
APPLICABLE STANDARD DRAWINGS:
THE DIFFERENCE IN ELEVATION BE GREATER THAN 500mm.
BACKFILL APPROXIMATELY THE SAME. AT NO TIME SHALL
BOTH SIDES OF CULVERT KEEPING THE HEIGHT OF
BACKFILL SHALL BE PLACED SIMULTANEOUSLY BEHIND 3.
UTILITY CONFLICTS WITH THE WORK.
TO THE CONTRACT ADMINISTRATOR TO DETERMINE IF THIS
THE CONTRACTOR SHALL REPORT THESE MEASUREMENTS
AND MEASURE THE INVERT ELEVATIONS OF THIS UTILITY.
MANHOLES LOCATED ON THE SOUTH SIDE OF ALBION ROAD
CONTRACTOR SHALL ACCESS THE SANITARY SEWER
IMMEDIATELY FOLLOWING CONTRACT AWARD, THE 2.
S101 - GENERAL NOTES.
THIS DRAWING TO BE READ IN CONJUNCTION WITH SHEET 1.
ON STRUCTURE
JOINTS, CONCRETE EXPANSION AND CONSTRUCTION OPSD 3950.100
REQUIREMENT
WALLS, RETAINING, BACKFILL MINIMUM GRANULAR OPSD 3121.150
DESIGN y2018det.dgn y2018pd.dgn
J. SMITH
CONSULTANTS
S:\2017\1
7M-0
2182-0
0\C
ON
TR
AC
T 1\f\projects\S
TR
UC
TU
RE
S_E
XP
RE
SS
WA
YS\C
UL
VE
RTS\2
67_
AL
BIO
N_
RD
_O
VE
R_
AL
BIO
N_
CR
EE
K\M
AS
TE
R\2
67-S
491-5.d
gn
JSSISSUED FOR TENDER03-21-20192
JSSISSUED FOR TRCA APPROVAL03-04-20191
CEN
VI
O
TA
NF O
NE
SD
EC
R
O
P
IL
R
ISAN
SR
PO
EF
EE
R
IO
N
E
L
N
I
G
100202018J. G. STONER
CEN
VI
O
TA
NF O
NE
SD
EC
R
O
P
IL
R
ISAN
SR
PO
EF
EE
R
IO
N
E
L
N
I
G
100127939J. SMITH
DATE INITIALREVISIONSNo. SIGNEDDIGITAL INFORMATION
Engineering & Construction Services
NORTH
SOUTH
NORTH
SOUTH
NORTH
SOUTH
NORTH
SOUTH
NORTH
SOUTH
PEDESTRIAN HOARDING / COVERED WALKWAY
-
1DETAIL1 : 40
1:125
STAGE 1
1:125
STAGE 2
1:125
FINAL
1:125
EXISTING
1:125
PRE - STAGE 1
C ALBION RD.L
FLOW
PERPENDICULAR TO
C ALBION RD.L LANE LANE LANE LANE SIDEWALK
SIDEWALK
C ALBION RD.L
FLOW
C ALBION RD.L
MEDIAN
TO REMAIN OPENSOUTH SIDEWALK
570
PROTECTIONROADWAY
570
FLOW
PROTECTIONROADWAY
PERPENDICULAR TO
C ALBION RD.L
SIDEWALK
2100
LANE
3250
LANE
3250
MEDIAN
3000
LANE
3250
LANE
3250
SIDEWALK
2100
C ALBION RD.L
FLOW
DURING STAGE 1EXISTING CULVERT MAINTAIN FLOWS IN
EXISTING CULVERTCONSTRUCTED, REMOVE ONCE NEW CULVERT IS CULVERT DURING STAGE 2. MAINTAIN FLOWS IN EXISTING
WORK ZONE
WORK ZONE
CULVERT AS REQUIREDREMOVE TOP OF EXISTING EXISTING CUVERT. OF NEW CULVERT OVER CONSTRUCT SOUTH HALF
CULVERTPLATE ARCH EXISTING STEEL
TO REMAIN OPENNORTH SIDEWALK
EXISTING CUVERTCULVERT OVER HALF OF NEW CONSTRUCT NORTH
PERPENDICULAR TO
C ALBION RD.L
PERPENDICULAR TO
C ALBION RD.L
CONCRETE FOOTINGSNEW CAST-IN-PLACE
CONCRETE SIDEWALKCONSTRUCT NEW
STEEL BEAM GUIDERAILCONSTRUCT NEW
STEEL BEAM GUIDERAILCONSTRUCT NEW
CONCRETE SIDEWALKCONSTRUCT NEW
CONCRETE FOOTINGSNEW CAST-IN-PLACE
AND GUTTERCONSTRUCT NEW CURB
AND GUTTERCONSTRUCT NEW CURB
C ALBION RD.L
FLOW
PERPENDICULAR TO
C ALBION RD.L LANE LANE LANE LANE
SIDEWALK
SIDEWALK
MEDIAN
CULVERTPLATE ARCH EXISTING STEEL
TEMP.
2000
570
WIDEN SIDEWALKPLACE ASPHALT TO LANE
EXISTING SIDEWALKTYPE 'M' TCB PINNED TO
SEE DETAIL 1AND HOARDING 1800 TEMP. WALKWAY
SIDEWALK
570
LANE
3100
LANE
3100
SEE DETAIL 1AND HOARDING 1800 TEMP. WALKWAY
(TYP)TYPE 'M' TCB
LANE
3100
LANE
3100
COURSE ASPHALTBASE AND BASE PLACE NEW ROAD
COURSE ASPHALTBASE AND BASE PLACE NEW ROAD
COURSE ASPHALTNEW SURFACE
TEMPORARY LANECONSTRUCT GUTTER AND SBGR AND REMOVE CURB AND
PATHWAYEXISTINGTOP OF
1500 (MIN.)
MIN.
VE
RTIC
AL C
LE
AR
AN
CE
2500
SUPPORT BEAMSALUMINUM OR OTHER
CLIMBING (BOTH SIDES)HOARDING TO PREVENTFENCE ON BOTH SIDES OFCOVERED BY CHAIN LINKTEMPORARY SUPPORTS
BOARDSOF 38mm THICK
TWO LAYERS
AS NOTED
CULVERT SITE NO. 267ALBION ROAD OVER ALBION CREEK
STAGE 2:
STAGE 1:
CULVERT REPLACEMENT
CONSTRUCTION STAGING
S202
19ECS-TI-12BE
267-S491-7
SUGGESTED CONSTRUCTION SEQUENCE:
FINAL:
TEMPORARY 1INSTALLATION - GUIDE RAIL SYSTEM, CONCRETE BARRIER TYPE M CONNECTION OPSD 911.160
APPLICABLE STANDARD DRAWINGS:
PRE-STAGE:
1500mm
PLACE ASPHALT TO WIDEN EXISTING SOUTH SIDEWALK TO PROVIDE WIDTH OF 4.
WITH OTM BOOK 7.
CONSTRUCT TEMPORARY LANE AND TCB. CONTROL TRAFFIC IN ACCORDANCE 3.
REMOVE SOUTH CURB AND GUTTER AND STEEL BEAM GUIDE RAIL2.
LOCATE UTILITIES.1.
Bridges, Structures & Expressways
Transportation Infrastructure
Acting Manager,Design & Construction
JODIE ATKINS, P.ENG. (A)
DESIGN
SCALE
DRAWN
NUMBERDRAWING
CHECKED
SHEET
CONTRACT No.
DATEEngineering & Construction Services
EXECUTIVE DIRECTOR
CHIEF ENGINEER AND
M.E.SC., P.ENG.
MICHAEL D'ANDREA,
Project, Engineering & Construction ServicesMunicipal Infrastructure & Gardiner Rehabilitation
Director, Design & ConstructionFRANK CLARIZIO, P.ENG.
APRIL, 2019
PLACE FINAL LANE MARKINGS.4.
PLACE NEW SURFACE COURSE ASPHALT.3.
REMOVE TRAFFIC CONTROL.2.
REMOVE ROADWAY PROTECTION.1.
PLACE NEW BASE COURSE ASPHALT.16.
REMOVE SEDIMENT AND EROSION CONTROL MEASURES.15.
BEAM GUIDE RAIL.
CONSTRUCT ROAD BASE, CURB AND GUTTER, CONCRETE SIDEWALK, AND STEEL 14.
ISOLATE WORK FROM CHANNEL FLOW.
AND LOW-FLOW CHANNEL WITHIN CULVERT USING COFFERDAMS AS REQUIRED TO
CONSTRUCT ROCK PROTECTION UPSTREAM AND DOWNSTREAM OF NEW CULVERT 13.
PLACE BACKFILL IN STAGES TO PERMIT REMOVAL OF UTILITY SUPPORTS.12.
NEW ARMOUR STONE WALLS.
REMOVE EXISTING GABION BASKET WALLS AT CULVERT OUTLET AND CONSTRUCT 11.
CULVERT.
REMOVE EXISTING STEEL PLATE ARCH CULVERT, AND INTRODUCE FLOWS TO NEW 10.
INTO NEW CULVERT.
WITHIN STAGE 2 LIMITS) OVER LENGTH OF 3.0m FROM EXISTING CULVERT AND TIE
REPLACE EXISTING STORMWATER PIPES THAT OUTLET INTO EXISTING CULVERT (2
ERECT NEW PRECAST CULVERT UNITS OVER EXISTING CULVERT. REMOVE AND 9.
CONSTRUCT CAST-IN-PLACE CONCRETE FOOTINGS FOR NEW CULVERT.8.
EXCAVATE AND SUPPORT/PROTECT UTILITIES.7.
INSTALL COFFERDAMS.6.
SIDEWALK, AND STEEL BEAM GUIDE RAIL WITHIN STAGE 2 WORK LIMITS.
REMOVE EXISTING ASPHALT PAVEMENT, CURB AND GUTTER, ASPHALT/CONCRETE 5.
CONSTRUCT ROADWAY PROTECTION ALONG CENTRELINE OF ALBION ROAD.4.
INSTALL EROSION AND SEDIMENT CONTROL MEASURES.3.
STRUCTURE.
HOARDING, AND TRAFFIC CONTROL. DIVERT TRAFFIC TO NORTH HALF OF
ERECT TEMPORARY CONCRETE BARRIERS, TEMPORARY PEDESTRIAN WALKWAY AND 2.
LOCATE UTILITIES.1.
PLACE NEW BASE COURSE ASPHALT.13.
BEAM GUIDE RAIL.
CONSTRUCT ROAD BASE, CURB AND GUTTER, CONCRETE SIDEWALK, AND STEEL 12.
PLACE BACKFILL IN STAGES TO PERMIT REMOVAL OF UTILITY SUPPORTS.11.
ARMOUR STONE WALLS.
REMOVE EXISTING GABION BASKET WALLS AT CULVERT INLET AND CONSTRUCT NEW 10.
INTO NEW CULVERT.
WITHIN STAGE 1 LIMITS) OVER LENGTH OF 3.0m FROM EXISTING CULVERT AND TIE
REPLACE EXISTING STORMWATER PIPE THAT OUTLETS INTO EXISTING CULVERT (1
ERECT NEW PRECAST CULVERT UNITS OVER EXISTING CULVERT. REMOVE AND 9.
CONSTRUCT CAST-IN-PLACE CONCRETE FOOTINGS FOR NEW CULVERT.8.
EXCAVATE AND SUPPORT/PROTECT UTILITIES.7.
INSTALL COFFERDAMS.6.
SIDEWALK, AND STEEL BEAM GUIDE RAIL WITHIN STAGE 1 WORK LIMITS.
REMOVE EXISTING ASPHALT PAVEMENT, CURB AND GUTTER, ASPHALT/CONCRETE 5.
CONSTRUCT ROADWAY PROTECTION ALONG CENTRELINE OF ALBION ROAD.4.
INSTALL EROSION AND SEDIMENT CONTROL MEASURES.3.
AND REDUCE TO ONE LANE IN EACH DIRECTION.
HOARDING, AND TRAFFIC CONTROL. DIVERT TRAFFIC TO SOUTH HALF OF STRUCTURE
ERECT TEMPORARY CONCRETE BARRIERS, TEMPORARY PEDESTRIAN WALKWAY AND 2.
LOCATE UTILITIES.1.
G. LIJ. STONER J. SMITH
DESIGN y2018det1.dgn
CC
SM
H
C.L.
LS
IN
V.
= 143.6
87
OB
V
OB
V
WL
Nail
WL
Dirt
C.L.
CC
SM
H
SM
H
C.L.
C.L.
RS
HE
HE
LS
LS
HE
IN
V.
= 143.6
87
OB
V
OB
V
WL
Nail
HE
Dirt
WL
Dirt
C.L.
CC
C.L.
SM
H
SM
H
C.L.
C.L.
RS
HE
HE
LS
LS
HE
IN
V.
= 143.6
87
OB
V
OB
V
WL
Nail
HE
Dirt
HE
Dirt
WL
Dirt
PARKING
P
CONSULTANTS
S:\2017\1
7M-0
2182- 0
0\C
ON
TR
AC
T 1\f\projects\S
TR
UC
TU
RE
S_E
XP
RE
SS
WA
YS\C
UL
VE
RTS\2
67_
AL
BIO
N_
RD
_O
VE
R_
AL
BIO
N_
CR
EE
K\ M
AS
TE
R\2
67-S
491-5.d
gn
JSSISSUED FOR TENDER03-21-20192
JSSISSUED FOR TRCA APPROVAL03-04-20191
CEN
VI
O
TA
NF O
NE
SD
EC
R
O
P
IL
R
ISAN
SR
PO
EF
EE
R
IO
N
E
L
N
I
G
100202018J. G. STONER
CEN
VI
O
TA
NF O
NE
SD
EC
R
O
P
IL
R
ISAN
SR
PO
EF
EE
R
IO
N
E
L
N
I
G
100127939J. SMITH
DATE INITIALREVISIONSNo. SIGNEDDIGITAL INFORMATION
Engineering & Construction Services
PLAN - TEMPORARY FLOW PASSAGE SYSTEM1:125
PLAN - REMOVALS1:150
PLAN - REGIONAL FLOOD PLAINNTS
C ALBION RD.L
2°27'15"
FLOWALBIO
N CREEK
AV
E.
TO IS
LIN
GT
ON
AV
E.
TO KIP
LIN
G
TO NEW CULVERT.CULVERT AND INTRODUCE FLOWS CONSTRUCTED, REMOVE EXISTING WORK. ONCE NEW CULVERT IS EXISTING CULVERT DURING THE MAINTAIN FLOWS THROUGH
CLEXISTING
CULVERT
S604 FOR DETAILS (TYP)WORK AREA SEE SHEET COFFERDAM TO ISOLATE TEMPORARY NON-EARTH
SKEW
STEEL ARCH CULVERTEXISTING CORRUGATED
FLOWALBIO
N CREEK
GUIDE RAIL (TYP)REMOVE STEELBEAM
LIMITS SHOWN (TYP)CURB AND GUTTER TO REMOVE CONCRETE
SHOWN (TYP)SIDEWALK TO LIMITS REMOVE CONCRETE
LIMITS OF REMOVAL
18200
18200
SHOWN(TYP)RAIL TO LIMITS AND STEEL BEAM GUIDE REMOVE PAVED SIDEWALK
CLALBION RD.
AV
E.
TO IS
LIN
GT
ON
AV
E.
TO KIP
LIN
G
CULVERTOUTLINE OF NEW
ARCH CULVERTCORRUGATED STEEL REMOVE EXISTING
2°27'15"
WP#1
INTO NEW CULVERT FOR LENGTH OF 3m AND TIE EXISTING STORMWATER PIPE STM. REMOVE AND REPLACE EXISTING 300mm CONCRETE
AND TIE INTO NEW CULVERT PIPE FOR LENGTH OF 3m EXISTING STORMWATER STM. REMOVE AND REPLACE EXISTING 600mm CONCRETE
INTO NEW CULVERT LENGTH OF 3m AND TIE STORMWATER PIPE FOR AND REPLACE EXISTING CONCRETE STM. REMOVE EXISTING 450mm
(TORONTO HYDRO)BURIED CONDUIT STREET LIGHT
CLEXISTING/NEW
CULVERT
(TYP ALL 4 QUADRANTS) CULVERT INLET/OUTLET WITHIN 10m OF EXISTING BASKET RETAINING WALL REMOVE EXISTING GABION
AS NOTED
CULVERT SITE NO. 267
X. ZHAO J. SMITH
ALBION ROAD OVER ALBION CREEK
CULVERT REPLACEMENT
S203
19ECS-TI-12BE
N
CONSTRUCTION
NORTH
TEMPORARY FLOW PASSAGE SYSTEM AND REMOVALS
267-S491-8
M. KHANDESIGN
SCALE
DRAWN
NUMBERDRAWING
CHECKED
SHEET
CONTRACT No.
DATEEngineering & Construction Services
EXECUTIVE DIRECTOR
CHIEF ENGINEER AND
M.E.SC., P.ENG.
MICHAEL D'ANDREA,
Project, Engineering & Construction ServicesMunicipal Infrastructure & Gardiner Rehabilitation
Director, Design & ConstructionFRANK CLARIZIO, P.ENG.
Bridges, Structures & Expressways
Transportation Infrastructure
Acting Manager,Design & Construction
JODIE ATKINS, P.ENG. (A)
APRIL, 2019
REGIONAL FLOOD PLAINN
DESIGN 18-02143-267pd2.dgn, 18-02143-267pd3.dgn
18-02143_MAP_267.dgnMAP
CONSULTANTS
S:\2017\1
7M-0
2182-0
0\C
ON
TR
AC
T 1\f\projects\S
TR
UC
TU
RE
S_E
XP
RE
SS
WA
YS\C
UL
VE
RTS\2
67_
AL
BIO
N_
RD
_O
VE
R_
AL
BIO
N_
CR
EE
K\M
AS
TE
R\2
67-S
491-5.d
gn
JSSISSUED FOR TENDER03-21-20192
JSSISSUED FOR TRCA APPROVAL03-04-20191
CEN
VI
O
TA
NF O
NE
SD
EC
R
O
P
IL
R
ISAN
SR
PO
EF
EE
R
IO
N
E
L
N
I
G
100202018J. G. STONER
CEN
VI
O
TA
NF O
NE
SD
EC
R
O
P
IL
R
ISAN
SR
PO
EF
EE
R
IO
N
E
L
N
I
G
100127939J. SMITH
2400020000
2400020000 2400020000 2400020000 2400020000
2400020000
24000200002400020000
DATE INITIALREVISIONSNo. SIGNEDDIGITAL INFORMATION
Engineering & Construction Services
1:15
PLAN - DIMENSIONS
1:15
PLAN - REINFORCING
-
B
-
A
-
C
SECTION1:15
A
-
DIMENSIONS
REINFORCING
SECTION1:20
B
-
DIMENSIONS
SECTION1:20
C
-
50
150
150
50
1-15M
4-1
5M T
OP
4-1
5M B
OT.
CLCULVERT
29000
15M @ 200 TOP
1-15M EF
WP #1
20M @ 200 BOT
4-1
5M E
Q. S
P.
CLLEG
CLLEG
200
200
3200
3200
44000
C ALBION RDL
STAGES
CJ BETWEEN
CONNECTOR (TYP)
MECHANICAL
LAP (TYP)
750 MIN
(TYP)
OPTIONAL CJ
(TYP)
OPTIONAL CJ
STAGES
CJ BETWEEN
400
950
100
CONCRETEMASS
4-15M EQ. SP.
20M @200
15M @200
1-15M EF
1-15M
4-15M EQ. SP.
EQ. SP.4-15M
LAP (TYP)
750 MIN
EL. 142.550T/FTG
EL. 143.428T/FTG
EL. 142.150B/FTG
EL. 142.478B/FTG
(TYP)
100
STAGES
CJ BETWEEN
CONNECTOR (TYP)
MECHANICAL
OPTIONAL CJ (TYP)
100 100
VA
RIE
S150
FRAME LEG
PRECAST
CONCRETE
MASS
4-15M EQ. SP.
4-15M EQ. SP.
15M @200
20M @200
100
400 400
(TYP)
150
(TYP)
50
CLLEG
(TYP)
CULVERT SUPPLIER
GROUT AS PER
35 MPa NON-SHRINK
CLLEG
1-15M EF
4-15M EQ. SP.
20M @200
CLLEG
AS NOTED
CULVERT SITE NO. 267ALBION ROAD OVER ALBION CREEK
CULVERT REPLACEMENT
FOOTING DETAILS
NOTES:
N
CONSTRUCTION
NORTH
S204
19ECS-TI-12BE
267-S491-9
300mm OF JOINT BETWEEN PRECAST CULVERT UNITS.
CONSTRUCTION JOINTS IN FOOTINGS SHALL NOT BE PLACED WITHIN 4.
1500 kPaULS
1000 kPaSLS
BEARING CAPACITY:
MASS CONCRETE SHALL BE PLACED ON SHALE BEDROCK.3.
ADMINISTRATOR.
INSPECTION OF THE FOUNDING SOIL/ROCK BY THE CONTRACT
MASS CONCRETE SHALL BE PLACED IMMEDIATELY AFTER 2.
ELEVATION.
CONTRACT ADMINISTRATOR HAS APPROVED THE FOUNDING
REINFORCING STEEL OR CONCRETE IS TO BE PLACED UNTIL THE
SHALL BE INSPECTED BY THE CONTRACT ADMINISTRATOR. NO
AFTER COMPLETION OF EXCAVATION THE FOUNDING SOIL/ROCK 1.
DESIGN
SCALE
DRAWN
NUMBERDRAWING
CHECKED
SHEET
CONTRACT No.
DATEEngineering & Construction Services
EXECUTIVE DIRECTOR
CHIEF ENGINEER AND
M.E.SC., P.ENG.
MICHAEL D'ANDREA,
Project, Engineering & Construction ServicesMunicipal Infrastructure & Gardiner Rehabilitation
Director, Design & ConstructionFRANK CLARIZIO, P.ENG.
Bridges, Structures & Expressways
Transportation Infrastructure
Acting Manager,Design & Construction
JODIE ATKINS, P.ENG. (A)
APRIL, 2019
J. SMITHX. ZHAO
DESIGN y2018det2.dgn
M. KHAN
150
BEDROCKEXISTING SHALE
200 200
CONSULTANTS
S:\2017\1
7M-0
2182-0
0\C
ON
TR
AC
T 1\f\projects\S
TR
UC
TU
RE
S_E
XP
RE
SS
WA
YS\C
UL
VE
RTS\2
67_
AL
BIO
N_
RD
_O
VE
R_
AL
BIO
N_
CR
EE
K\M
AS
TE
R\2
67-S
491-5.d
gn
JSSISSUED FOR TENDER03-21-20192
JSSISSUED FOR TRCA APPROVAL03-04-20191
CEN
VI
O
TA
NF O
NE
SD
EC
R
O
P
IL
R
ISAN
SR
PO
EF
EE
R
IO
N
E
L
N
I
G
100202018J. G. STONER
CEN
VI
O
TA
NF O
NE
SD
EC
R
O
P
IL
R
ISAN
SR
PO
EF
EE
R
IO
N
E
L
N
I
G
100127939J. SMITH
DATE INITIALREVISIONSNo. SIGNEDDIGITAL INFORMATION
Engineering & Construction Services
WEST
EAST
WEST
EAST
WEST
EAST
EAST
WEST
(TYP)
DIMENSIONS
REINFORCING
PRECAST RIGID FRAME1:30
A
-
DIMENSIONS
REINFORCING
1:30
PRECAST UNIT PLAN
1:125
PRECAST UNIT LAYOUT
-
A
1DETAIL-
ADDITIONAL REINFORCEMENT
1:20
FOR STORM SEWER OPENING OVER 300mm
1 : 20
1DETAIL-
C CULVERTL
3500
430
CLEAR SPAN
6000
3930
15M @250
25M @150
(TYP)
15M @300
(TYP)
15M @225
400 400
15M @300 TOP
15M @250 BOT.
(TYP)
1200 LAP
1800 (TYP)
25M @175 (TYP)
2-15M (TYP)
(TYP)
430
(TY
P)
430
(TY
P)
15
M @
300 E
F
3190.100 (TYP)
C/C PER OPSD
DRAIN @ 3000
75mm DIA. WALL
(TY
P)
15
M @
225
2000
TO
P
15
M @
250
BO
TT
OM
25
M @
150
CLLEG
2570 430 200 200 2570 430 200 200
3200 3200
CLLEG
CLCULVERT
2-15M (TYP)
15M @300 TOP
15M @250 BOTTOM
(TYP)
15M @300 EF
(TY
P)
25
M @
175
(TY
P)
15
M @
300
C CULVERTL
C ALBION RD.L
2º27'15"
WP #1
450mm STMOPENING FOR
600mm STMOPENING FOR
300mm STMOPENING FOR
(SEE NOTE 8)
22 UNITS @ 2000 = 44000
(TY
P)
450
MIN. C
OVER
50m
m SR
AB LL
A P
YT
BARS EF4-20M DIAGONAL
EF (TYP)2-25M BARS
EF (TYP)1-25M BAR
PIPE ID+450mm
WITH PROTECTION BOARDWATERPROOFING MEMBRANE 450mm WIDE ADHESIVE
SIDE
BACKFILL
UNITS
PRECAST CONCRETE
SEALING COMPOUNDCOLD APPLIED JOINT
AS NOTED
CULVERT SITE NO. 267ALBION ROAD OVER ALBION CREEK
CULVERT REPLACEMENT
NOTES:
PRECAST UNIT DETAILS
S205
19ECS-TI-12BE
N
CONSTRUCTION
NORTH
APPLICABLE STANDARD DRAWINGS:
DESIGN
SCALE
DRAWN
NUMBERDRAWING
CHECKED
SHEET
CONTRACT No.
DATEEngineering & Construction Services
EXECUTIVE DIRECTOR
CHIEF ENGINEER AND
M.E.SC., P.ENG.
MICHAEL D'ANDREA,
Project, Engineering & Construction ServicesMunicipal Infrastructure & Gardiner Rehabilitation
Director, Design & ConstructionFRANK CLARIZIO, P.ENG.
Bridges, Structures & Expressways
Transportation Infrastructure
Acting Manager,Design & Construction
JODIE ATKINS, P.ENG. (A)
APRIL, 2019
OPENINGS IN ACCORDANCE WITH OPSD 804.050.
INSTALL HOT DIP GALVANIZED GRATE ON 450mm AND 650mm STORM SEWER 9.
BETWEEN UNITS.
ACHIEVE SPECIFIED CULVERT LENGTH ACCOUNTING FOR GAP DIMENSION
CONTRACTOR TO ADJUST PRECAST UNIT LENGTH AND NUMBER OF UNITS TO 8.
CENTERED AT MID -LENGTH OF CULVERT UNIT OR AT JOINT BETWEEN UNITS.
OPENINGS IN PRECAST CULVERT UNITS FOR STORM SEWER PIPES SHALL BE 7.
TOP OF THE PRECAST UNITS AND FULL WIDTH OF TOP SLAB.
JOINT TREATMENT TO BE APPLIED FOR FULL HEIGHT OF JOINT IN WALLS TO 6.
SHIPPING.
PLANT AND CONFIRM THAT THE SECTIONS FIT PROPERLY PRIOR TO
CONTRACTOR SHALL PREASSEMBLE THE PRECAST CONCRETE UNITS IN 5.
HAS BEEN PLACED ON TOP SLAB.
OF THE LEGS HAVE BEEN BACKFILLED AND MINIMUM OF 600mm OF BACKFILL
DECK UNTIL GROUT HAS REACHED A STRENGTH OF 35 MPa AND FULL HEIGHT
VEHICULAR LOADS SHALL NOT BE ALLOWED ON THE PRECAST CULVERT 4.
PRECAST UNITS. USE MIN. 35 MPa NON-SHRINK STRUCTURAL GROUT.
COMPLETE ALL GROUTING OPERATIONS PRIOR TO BACKFILLING THE 3.
UNITS AS WORK PROGRESSES.
BE FREE OF STEPS. CHECK THE PLACEMENT AND POSITION OF PRECAST
VERTICAL AND MAINTAIN SMOOTH INTERIOR LINES OF ADJACENT UNITS, TO
UNDER THE LEGS OF THE PRECAST UNITS. PRECAST UNITS ARE INSTALLED
MORTAR OF PLASTIC CONSISTENCY. STEEL SHIMS SHALL NOT BE ALLOWED
THE CONTRACTOR SHALL PLACE PRECAST UNITS ON A FRESH BED OF 2.
OVERSTRESSED.
ENSURE PRECAST ELEMENTS AND LIFTING INSERTS ARE NOT
THE CONTRACTOR SHALL EMPLOY RIGGING AND HANDLING METHODS TO 1.
THAN 300mm
REINFORCING STEEL FOR SLAB DEPTH GREATER
DECK, REINFORCEMENT, SUPPORTS FOR OPSD 3329.101
WALLS RETAINING, AND ABUTMENT WALL DRAINOPSD 3190.100
GRATING FOR CONCRETE ENDWALLOPSD 804.050
267-S491-10
J. SMITHX. ZHAO
DESIGN y2018pd1.dgn y2018det2.dgn 61001163-UGS.dgn
M. KHAN
CONSULTANTS
S:\2017\1
7M-0
2182-0
0\C
ON
TR
AC
T 1\f\projects\S
TR
UC
TU
RE
S_E
XP
RE
SS
WA
YS\C
UL
VE
RTS\2
67_
AL
BIO
N_
RD
_O
VE
R_
AL
BIO
N_
CR
EE
K\M
AS
TE
R\2
67-S
491-5.d
gn
JSSISSUED FOR TENDER03-21-20192
JSSISSUED FOR TRCA APPROVAL03-04-20191
CEN
VI
O
TA
NF O
NE
SD
EC
R
O
P
IL
R
ISAN
SR
PO
EF
EE
R
IO
N
E
L
N
I
G
100202018J. G. STONER
CEN
VI
O
TA
NF O
NE
SD
EC
R
O
P
IL
R
ISAN
SR
PO
EF
EE
R
IO
N
E
L
N
I
G
100127939J. SMITH
142.100 (S)143.000 (N)
142.100
143.000
DATE INITIALREVISIONSNo. SIGNEDDIGITAL INFORMATION
Engineering & Construction Services
WEST
EAST
WEST
EAST
ARMOUR STONE RETAINING WALL PLAN1 : 100
EXCAVATION PAYMENT LIMITS1 : 100
BACKFILL PAYMENT LIMITS1 : 100
1:50
NORTHWEST ELEVATION
1:50
SOUTHWEST ELEVATION
1:50
SOUTHEAST AND NORTHEAST ELEVATION
TYPICAL SECTION
1:30
ARMOUR STONE WALLS
NE
NW
SW
6000
10000
CLCULVERT
SE6000
5000 FLOW
ALBION CREEK
110
1
TO BE REMOVEDEXISTING CULVERT
EXCAVATIONLIMIT OF
110
1
TO BE REMOVEDEXISTING CULVERT
EXCAVATIONLIMIT OF
CLCULVERT
FINAL GRADE SUBGRADE
FINAL GRADE SUBGRADE
CLCULVERT
(TY
P)
1200
(TY
P)
1200
(TYP)
600
(TYP)1
(TYP)
600
(TYP)1
PROTECTIONBOTTOM OF ROCK (TYP)
SOME LOCATIONS ANTICIPATED IN EXCAVATION LOCALIZED ROCK
BACKFILLGRANULAR 'B' TYPE II
2400
3600
6000
200
4 R
OW
S @ 6
00
1200
3600
5000
200
4 R
OW
S @ 6
00
6000
7000
8000
200
5 R
OW
S @ 6
00
GRANULAR 'A' PAD
GRANULAR 'A' PAD
GRANULAR 'A' PAD
300
300
300
10000
200
300
(TYP)
1000
FABRICGEOTEXTILE
(TY
P)
600
(TYP)
75
300
FINAL GRADE
EXCAVATIONLIMIT OF
60°
NATIVE SOILCOMPACTED
OPSD 206.050OUTLET ACCORDING TO 150mm SUBDRAIN INCLUDING
2.5H:1V MAX.MATCH EXISTING SLOPE.
GROUNDPROPOSED
ROCK PROTECTION
BACKFILLTYPE II GRANULAR 'B'
AS NOTED
CULVERT SITE NO. 267ALBION ROAD OVER ALBION CREEK
CULVERT REPLACEMENT
NOTES:
ARMOUR STONE WALL DETAILS
S206
19ECS-TI-12BE
N
CONSTRUCTION
NORTH
267-S491-11
DESIGN
SCALE
DRAWN
NUMBERDRAWING
CHECKED
SHEET
CONTRACT No.
DATEEngineering & Construction Services
EXECUTIVE DIRECTOR
CHIEF ENGINEER AND
M.E.SC., P.ENG.
MICHAEL D'ANDREA,
Project, Engineering & Construction ServicesMunicipal Infrastructure & Gardiner Rehabilitation
Director, Design & ConstructionFRANK CLARIZIO, P.ENG.
APRIL, 2019Bridges, Structures & Expressways
Transportation Infrastructure
Acting Manager,Design & Construction
JODIE ATKINS, P.ENG. (A)
INLET AND OUTLET.
CHANNEL EMBANKMENTS WITHIN 10m OF NEW CULVERT
LAYOUT OF ARMOUR STONES REQUIRED TO SUPPORT THE
CONTRACTOR SHALL CONFIRM THE EXACT NUMBER AND
ARMOUR STONE LAYOUTS SHOWN ARE SCHEMATIC ONLY. 3.
ADMINISTRATOR.
OR ROCK SHALL BE INSPECTED BY THE CONTRACT
AFTER COMPLETION OF EXCAVATION THE FOUNDING SOIL 2.
STANDARD PROCTOR MODIFIED DRY DENSITY
ON GRANULAR 'A' PAD COMPACTED TO 100% OF ITS
THE ARMOUR STONE RETAINING WALLS SHALL BE PLACED 1.
APPLICABLE STANDARD DRAWINGS:
SUBDRAIN PIPE CONNECTION AND OUTLET - RURALOPSD 206.050
DESIGN y2018det.dgn y2018pd.dgn
J. SMITHX. ZHAOM. KHAN
C.L.
CC
C.L.
SM
H
SM
H
C.L.
C.L.
RS
HE
HE
LS
LS
HE
OB
V
OB
V
WL
Nail
HE
Dirt
HE
Dirt
WL
Nail
Dirt
PARKING
P
LI
CE
NS
ED
PR
OFESSIONA
L
EN
G
IN
EE
R
R
OVIN
CE OFN
TA
RIO
O
P
J.F.BARICH
MARCH 18, 2019
N
Street Light Conduit
Street Light Conduit
200 mm SC IP Gas Main (Endbridge)
200 mm SC IP Gas Main (Endbridge)
Telecommunication (Bell)
Telecommunication (Bell Aband’d)
Telecommunication (Bell Aband’d)Telecommunication (Bell)
30
300 mm Conc. Stm. Sewer
675 mm Conc. San. Sewer
675 mm Conc. San. Sewer
450 mm Conc. Stm. Sewer
450 mm Conc. Stm. Sewer
600 mm Conc. Stm. Sewer
300 mm D.I. Watermain
300 mm D.I. Watermain
ALBION RD
HA
RL
OW
CR
ES
WA
LT
HA
M
DR
MONTERREY DR
LAMELLA RD
BEAUMONDE HEIG
HTS DR
AMARON AVE
FINCH A
VE W
TAYSHAM CRES
SANAGAN RD
FELAN CRES
RADWINTER
DR
LIGHTWOOD DR
LAKELAND DR
GRO
VE
TREENO
TT
AW
AS
AG
A
WO
O
D
T
JO
HN
GR
UB
B
C
RT
NOR
WIC
H
PL
TO
DD
BROOKDR
CE
LA
NDIN
E
RDV
AL
OIS
CR
T
CA
FO
N
CR
T
BE
NST
RO
WA
VE
TAYSHAM CRES
KINGS-
MOOR
GT
HONBURYRD
KIP
LIN
G
AV
E
ISLIN
GT
ON
AV
E
DATE INITIALREVISIONSNo. SIGNEDDIGITAL INFORMATION
STREETLINE
MAPPING
UTILITY
DESIGN
Engineering & Construction Services
NOT TO SCALE
K
E
Y
P
L
A
N
RELATED DRAWINGS:
18-02143_MAP_267.dgn
18-02143_MAP_267.dgn
18-02143_MAP_267.dgn
18-02143_MAP_267.dgn
SURVEY(2018)
18-02143-267pd.dgn, 18-02143-267sh.dgn, 18-02143-267 det.dgn
267-S491-11
03-18-19 ISSUED FOR TENDER J.B.
36.62 m
16.03 m
36.59 m
15.87 m
DESIGN DRAWN CHECKED
NUMBER
DRAWINGSCALE SHEET
DATE
N
ALBION ROAD
ALBIO
N CREEK
ALBION ROAD OVER ALBION CREEK
B.P.Q. A.K.S. J.B.
HORIZONTAL 1:200
Project, Engineering & Construction ServicesMunicipal Infrastructure & Gardiner Rehabilitation
Director, Design & ConstructionFRANK CLARIZIO, P.ENG.
Engineering & Construction Services
EXECUTIVE DIRECTOR
CHIEF ENGINEER AND
M.E.SC., P.ENG.
MICHAEL D’ANDREA,
LIN
E
NO
RT
H S
TR
EE
T
LIN
E
SO
UT
H S
TR
EE
T
LIN
E
NO
RT
H S
TR
EE
T
LIN
E
SO
UT
H S
TR
EE
T
AND DEPTH OF ANY UTILITY AND SHALL BE LIABLE FOR ALL, OR ANY DAMAGES.PURPOSES ONLY. THE CONTRACTOR SHALL SATISFY THEMSELVES AS TO THE ACTUAL LOCATION ALL EXISTING UTILITIES SHOWN ON DRAWINGS (PLAN AND PROFILE) ARE FOR REFERENCE
CLEARANCES BETWEEN UTILITIES THE WALL THICKNESS MAY NOT BE INDICATEDPROFILES TYPICALLY SHOW THE INSIDE DIAMETER OF PIPES. FOR
SUB-SURFACE UNDERGROUND ENGINEERING INVESTIGATION (SUE) OR MODIFIED TO MEET SURVEY UPDATE.UNDERGROUND UTILITIES OBTAINED FROM CITY "PUCC" FILES, CITY PLANS,
TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR BEFORE CONSTRUCTION.INFORMATION REGARDING DEPTHS AND LOCATIONS OF EXISTING UTILITIES ARE APPROXIMATE.
BY EACH RESPECTIVE UTILITY STAKEHOLDER.PROPOSED IN PLACE GAS AND HYDRO LOCATIONS ARE TAKEN FROM AS-BUILT NOTES PROVIDED
PLANIMETRIC MAPPING DATA OBTAINED FROM AERIAL PHOTOGRAPHY DATED "APRIL, 2005"
PAVEMENT TO BE RECONSTRUCTED -------------------------------------------------------------------------------------------------
SIDEWALK TO BE RECONSTRUCTED --------------------------------------------------------------------------------------------------
LEGAL LIMIT OBTAINED FROM SURVEYS & MAPPING SSARA "MARCH 7, 2017"
SURVEY DATA UPDATED "APRIL 4, 2017"
LEGEND:
NORTH
CONSTRUCTION
ASPHALT BOULEVARD TO BE RECONSTRUCTED ---------------------------------------------------------------------------------
CONTRACT No. 19ECS-TI-12BE
CULVERT SITE NO. 267
E.L.L.
W.L.L.
LANE
SQUARE FRAME AND CIRCULAR GRATE (OPSD 400.070)
REMOVE AND REPLACE CATCH BASIN (T-705.010) WITH -----------------------------------------------------------------------
ROADWAY RECONSTRUCTION
CULVERT REPLACEMENT
267-S491-12 S207
GUTTER FLOW ARROWS --------------------------------------------------------------------------------------------------------------------
MARCH, 2019
EXISTING EDGE OF PAVEMENT ELEVATIONS --------------------------------------------------------------------------------------
EXISTING CROWN ELEVATIONS ---------------------------------------------------------------------------------------------------------
Bridges, Structures & Expressways
Transportation Infrastructure
Acting Manager,Design & Construction
JODIE ATKINS, P.ENG. (A)
(TYP.)RECONSTRUCTIONLIMIT OF SIDEWALK
(TYP.)EXISTING CONCRETE SIDEWALK
REMOVE AND REPLACE
TO MEET EXISTINGLIMIT OF CONSTRUCTION
OF SIDEWALK (TYP.)MATCH EXISTING BACK
TO MEET EXISTINGLIMIT OF CONSTRUCTION
8.0 m
8.0 m
PRIOR TO CONSTRUCTION (TYP.)CONFIRM IF SUBDRAIN EXISTSCONNECT TO EXISTING SUBDRAIN
TYPICAL CROSS SECTIONRECONSTUCTED SEE
EXISTING ROAD TO BE
(TYP.)AS PER DRAWING T-600.05-1
EXISTING CURB AND GUTTERREMOVE AND REPLACE
CENTRELINE OF CULVERT
CENTRELINE ALBION ROAD
18.2
0 m
FOR CULVERT REPLACEMENTSEE STRUCTURAL DRAWINGS
BOULEVARD (TYP.)EXISTING ASPHALT
REMOVE AND REPLACE
(TYP.)AS PER STD. T-216.02-8
CONSTRUCT NEW SUBDRAIN
2.1 m
1.1 m
2.1 m
0.6 m
18.2
0 m
AND COVER AS PER T-704.010-1 (TYP.)MAINTENANCE HOLE. ADJUST FRAME
SUPPORT AND MAINTAIN EXISTING
CATCH BASIN LEAD (TYP.)CONNECT TO EXISTING
250 mm PVC CATCH BASIN LEAD
POST GUIDE RAIL (OPSD 912.188)INSTALL STEEL BEAM, STEEL
BEAM GUIDE RAIL AND POSTS.REMOVE EXISTING STEEL
GUIDERAIL, OPSD 912.314 (TYP.)CONNECT TO EXISTING
RESTORATION (TYP.)LIMIT OF GRADING AND
1.8 m T
RA
NSITIO
N
(TYP.)
NOT TO SCALE
2.1 m 8.0 m 8.0 m 2.1 m
AS PER DRAWING T-600.05-1 (TYP.)CONCRETE CURB AND GUTTERREMOVE AND REPLACE EXISTING
2% - 4% CROSSFALL 2% - 4% CROSSFALL2-4%2-4%
1.1 m
0.6 m
150 mm SUBDRAIN (T-216.02-8)
19 mm CLEAR STONE
CROWN ELEVATIONMATCH EXISTING
ELEVATION (TYP.)EDGE OF PAVEMENTMATCH EXISTING
50 mm SP 9.5 ASPHALT (TYP.)EXISTING ASPHALT BOULEVARDREMOVE AND REPLACE
PER DRAWING T-310.010-2 (TYP.)CONCRETE SIDEWALK ASREMOVE AND REPLACE EXISTING
NORTH SOUTH
FOR CULVERT REPLACEMENTSEE STRUCTURAL DRAWINGS
TOP OF CULVERT
1.0 m1.0 m
2:1 M
AX.
2:1 MAX.GRANULAR ’A’150 mm (MIN.)
AND SOD (TYP.)WITH 100 mm TOPSOILREGRADE SLOPE
KEYWAY (TYP.)50 mm x 75 mm CHAMFERED
GUIDE RAIL AS PER OPSD 912.188 (TYP.)INSTALL STEEL BEAM, STEEL POSTBEAM GUIDE RAIL AND POSTS.REMOVE EXISTING STEEL
IF GREATER THAN 250 mmMATCH EXISTING DEPTH
250 mm (MIN.) CONCRETE
IF GREATER THAN 150 mmMATCH EXISTING DEPTH
150 mm (MIN.) GRANULAR ’A’
GREATER THAN 50 mmMATCH EXISTING DEPTH IF50 mm (MIN.) SP 19.0 ASPHALT40 mm SP 12.5 FC2 ASPHALT
[ ]
CBNEW
.
[ . ]
[148.965]
[149.118]
[149.071]
[149.310]
TYPICAL CROSS SECTION
C.L.
CC
C.L.
SMH
SMH
C.L.C.L.
RS
HE
HE
LS
HCP
LS
HE
INV. = 143.687
OBV
Nail
OBV
WL
Nail
Nail
HE
Dirt
HE
Nail
Dirt
WL
Nail
Dirt
PA
RKIN
G
P
40m 100m 40m
90m90m90m
100m 40m
YELLOW LINE100mm WIDE SOLID
WHITE LINE100mm WIDE SOLID
WHITE LINE100mm WIDE SOLID
50m
(TYP)
8m MIN.
TCB
TCB
HOARDINGSIDEWALK AND TEMPORARY
90m 90m 90m100m 50m
PARKING
PARKING
PARKING
PARKING
PARKING
CONSULTANTS
S:\2017\1
7M-0
2182- 0
0\C
ON
TR
AC
T 1\f\projects\S
TR
UC
TU
RE
S_E
XP
RE
SS
WA
YS\C
UL
VE
RTS\2
67_
AL
BIO
N_
RD
_O
VE
R_
AL
BIO
N_
CR
EE
K\M
AS
TE
R\2
67-S
491-5.d
gn
JSSISSUED FOR TENDER03-21-20192
JSSISSUED FOR TRCA APPROVAL03-04-20191
CEN
VI
O
TA
NF O
NE
SD
EC
R
O
P
IL
R
ISAN
SR
PO
EF
EE
R
IO
N
E
L
N
I
G
100202018J. G. STONER
CEN
VI
O
TA
NF O
NE
SD
EC
R
O
P
IL
R
ISAN
SR
PO
EF
EE
R
IO
N
E
L
N
I
G
100127939J. SMITH
CO
NSTR
UCTIO
N
TC-1
TC-2
B
ROAD
CLOSED
RB-92
TC-4
R
TC-3
L
TC-4
L
TC-4
0
TC-4
0
CO
NSTR
UCTIO
N
TC-1
TC-2
B
TC-9
L
TC-3
R
TC-4
L
DATE INITIALREVISIONSNo. SIGNEDDIGITAL INFORMATION
Engineering & Construction Services
1:750
STAGE 1
1:750
STAGE 1
RD
KO
OR
B D
DO
T
ALBION RD.
(LO
NG D
UR
ATIO
N)
WORK ZONE
TC-1
2
TC-1
2
ALBION RD.
TC-1
2
DU
RA
TIO
N)
(LO
NG
AS NOTED
N
CO
NS
TR
UC
TIO
N
NO
RT
H
CULVERT SITE NO. 267ALBION ROAD OVER ALBION CREEK
LEGEND:
TEMPORARY CONCRETE BARRIER
TC-54 BARRELS
CULVERT REPLACEMENT
S208
19ECS-TI-12BE
267-S491-13
MA
TC
H LIN
E A-A
MA
TC
H LIN
E A-A
TRAFFIC CONTROL I
DESIGN
SCALE
DRAWN
NUMBERDRAWING
CHECKED
SHEET
CONTRACT No.
DATEEngineering & Construction Services
EXECUTIVE DIRECTOR
CHIEF ENGINEER AND
M.E.SC., P.ENG.
MICHAEL D'ANDREA,
Project, Engineering & Construction ServicesMunicipal Infrastructure & Gardiner Rehabilitation
Director, Design & ConstructionFRANK CLARIZIO, P.ENG.
APRIL, 2019Bridges, Structures & Expressways
Transportation Infrastructure
Acting Manager,Design & Construction
JODIE ATKINS, P.ENG. (A)
J. STONER X. ZHAO
DESIGN 18-02143-267tsp1.dgn 18-02143-267tsp2.dgn
J. SMITH
18-02143_MAP_267.dgnMAPPING
C.L.
CC
C.L.
SMH
SMH
C.L.C.L.
RS
HE
HE
LS
HCP
LS
HE
INV. = 143.687
OBV
Nail
OBV
WL
Nail
Nail
HE
Dirt
HE
Nail
Dirt
WL
Nail
Dirt
PA
RKIN
G
P
40m 40m 100m
90m WHITE LINE100mm WIDE SOLID
(TYP)
8m MIN.
100m 100m 50m 90m 90m
YELLOW LINE100mm WIDE SOLID
TCB
HOARDINGSIDEWALK AND TEMPORARY
50m 90m 90m 90m
WHITE LINE100mm WIDE SOLID
PARKING
CONSULTANTS
S:\2017\1
7M-0
2182- 0
0\C
ON
TR
AC
T 1\f\projects\S
TR
UC
TU
RE
S_E
XP
RE
SS
WA
YS\C
UL
VE
RTS\2
67_
AL
BIO
N_
RD
_O
VE
R_
AL
BIO
N_
CR
EE
K\M
AS
TE
R\2
67-S
491-5.d
gn
JSSISSUED FOR TENDER03-21-20192
JSSISSUED FOR TRCA APPROVAL03-04-20191
CEN
VI
O
TA
NF O
NE
SD
EC
R
O
P
IL
R
ISAN
SR
PO
EF
EE
R
IO
N
E
L
N
I
G
100202018J. G. STONER
CEN
VI
O
TA
NF O
NE
SD
EC
R
O
P
IL
R
ISAN
SR
PO
EF
EE
R
IO
N
E
L
N
I
G
100127939J. SMITH
CO
NSTR
UCTIO
N
TC-1
TC-2
B
ROAD
CLOSED
RB-92
TC-4
L
TC-9
L
TC-4
L TC-4
0TC-3
L
TC-4
0
CO
NSTR
UCTIO
N
TC-1
TC-2
B
TC-3
L
TC-4
R
DATE INITIALREVISIONSNo. SIGNEDDIGITAL INFORMATION
Engineering & Construction Services
1:750
STAGE 2
1:750
STAGE 2
RD
KO
OR
B D
DO
T
ALBION RD.
(LO
NG D
UR
ATIO
N)
WORK ZONE
TC-1
2 (L
EFT)
SA
NA
GA
N R
DB
EN
ST
RO
W A
VE
TC-1
2 (L
EFT)
ALBION RD.
TC-1
2
DU
RA
TIO
N)
(LO
NG
AS NOTED
N
CO
NS
TR
UC
TIO
N
NO
RT
H
CULVERT SITE NO. 267ALBION ROAD OVER ALBION CREEK
LEGEND:
TEMPORARY CONCRETE BARRIER
TC-54 BARRELS
CULVERT REPLACEMENT
S209
19ECS-TI-12BE
267-S491-14
MA
TC
H LIN
E A-A
MA
TC
H LIN
E A-A
TRAFFIC CONTROL II
APRIL, 2019
DESIGN
SCALE
DRAWN
NUMBERDRAWING
CHECKED
SHEET
CONTRACT No.
DATEEngineering & Construction Services
EXECUTIVE DIRECTOR
CHIEF ENGINEER AND
M.E.SC., P.ENG.
MICHAEL D'ANDREA,
Project, Engineering & Construction ServicesMunicipal Infrastructure & Gardiner Rehabilitation
Director, Design & ConstructionFRANK CLARIZIO, P.ENG.
Bridges, Structures & Expressways
Transportation Infrastructure
Acting Manager,Design & Construction
JODIE ATKINS, P.ENG. (A)
J. STONER X. ZHAO
DESIGN 18-02143-267tsp1.dgn 18-02143-267tsp2.dgn
J. SMITH
18-02143_MAP_267.dgnMAPPING
2020C.L.
CC
C.L.
SMH
SMH
C.L.C.L.
RS
HE
HE
LS
HCP
LS
HE
INV. = 143.687
OBV
Nail
OBV
WL
Nail
Nail
HE
Dirt
HE
Nail
Dirt
WL
Nail
Dirt
PA
RKIN
G
P
CONSULTANTS
S:\2017\1
7M-0
2182- 0
0\C
ON
TR
AC
T 1\f\projects\S
TR
UC
TU
RE
S_E
XP
RE
SS
WA
YS\C
UL
VE
RTS\2
67_
AL
BIO
N_
RD
_O
VE
R_
AL
BIO
N_
CR
EE
K\M
AS
TE
R\2
67-S
491-5.d
gn
JSSISSUED FOR TENDER03-21-20192
JSSISSUED FOR TRCA APPROVAL03-04-20191
CEN
VI
O
TA
NF O
NE
SD
EC
R
O
P
IL
R
ISAN
SR
PO
EF
EE
R
IO
N
E
L
N
I
G
100202018J. G. STONER
CEN
VI
O
TA
NF O
NE
SD
EC
R
O
P
IL
R
ISAN
SR
PO
EF
EE
R
IO
N
E
L
N
I
G
100127939J. SMITH
LIMITS OF MARKINGS ] [
SYMBOLS20
SOLID WHITE, 60cm15
SOLID WHITE, 45cm14
SOLID WHITE, 30cm13
333 BROKEN WHITE, 30cm12
333 BROKEN WHITE, 20cm11
111 BROKEN WHITE, 20cm10
SOLID WHITE, 20cm9
393 BROKEN WHITE, 10cm8
363 BROKEN WHITE, 10cm7
333 BROKEN WHITE, 10cm6
SOLID WHITE, 10cm5
SOLID YELLOW, 20cm4
363 BROKEN YELLOW, 10cm3
SOLID DOUBLE YELLOW, 10cm2
SOLID YELLOW, 10cm1
DATE INITIALREVISIONSNo. SIGNEDDIGITAL INFORMATION
Engineering & Construction Services
RD
KO
OR
B D
DO
T
ALBION RD.1
1
1
556611
1
7
7
PMKEXISTING MATCH
BE
NS
TR
OW A
VE
ALBION RD.
7
1
1
7
PMKEXISTING MATCH
AS NOTED
N
CO
NS
TR
UC
TIO
N
NO
RT
H
CULVERT SITE NO. 267ALBION ROAD OVER ALBION CREEK
CULVERT REPLACEMENT
S210
19ECS-TI-12BE
FINAL LANE MARKING
NOTES:
USE 1 TO DENOTES PAVEMENT MARKING, DURABLE.2.
(ie, 3m LINE, 3m GAP, 3m LINE)
333, 363, 393, DENOTES PAVEMENT MARKING SPACING 1.
267-S491-15
DESIGN
SCALE
DRAWN
NUMBERDRAWING
CHECKED
SHEET
CONTRACT No.
DATEEngineering & Construction Services
EXECUTIVE DIRECTOR
CHIEF ENGINEER AND
M.E.SC., P.ENG.
MICHAEL D'ANDREA,
Project, Engineering & Construction ServicesMunicipal Infrastructure & Gardiner Rehabilitation
Director, Design & ConstructionFRANK CLARIZIO, P.ENG.
APRIL, 2019Bridges, Structures & Expressways
Transportation Infrastructure
Acting Manager,Design & Construction
JODIE ATKINS, P.ENG. (A)
MA
TC
H LIN
E A-A
MA
TC
H LIN
E A-A
J. STONER X. ZHAO J. SMITH
18-02143_MAP_267.dgnMAPPING
DESIGN 18-02143-267pvm1.dgn
A
L
B
IO
N
R
O
A
D
L
IG
H
T
W
O
O
D
D
R
IV
E
B
A
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
Z
X
W
Y
A1
B1C1
D1
E1
F1
G1
H1
I1
J1
K1 L1
M1
N1
P1
O1
Q1
R1
U1
S1
T1
V1
W1
X1
C2
D2
TG-2
E2
F2
TG-1
T
O
D
D
B
R
O
O
K
D
R
IV
E
Y1
Z1
A2
B2
G2
H2
BEAUMONDE
HEIGHTS
PARK
THISTLETOWN
PARK
LIMIT OF TREE INVENTORY
· ±30 FROM THE HEADWALL
· ±20M EITHER SIDE OF ALBION
CREEK
LIMIT OF TREE INVENTORY
· ±30 FROM THE HEADWALL
· ±20M EITHER SIDE OF
ALBION CREEK
ROCK PROTECTION.
REFER TO GENERAL
ARRANGEMENT PLAN:
18-02143-267_S1
ALB
IO
N C
RE
EK
FLO
W
ARMOURSTONE
RETAINING WALLS.
REFER TO GENERAL
ARRANGEMENT PLAN:
18-02143-267_S1
ARMOURSTONE RETAINING
WALLS. REFER TO GENERAL
ARRANGEMENT PLAN:
18-02143-267_S1
ROCK PROTECTION. REFER TO
GENERAL ARRANGEMENT
PLAN: 18-02143-267_S1
SIDEWALK TO BE
REPLACED
CULVERT TO BE
REPLACED
A
L
B
IO
N
C
R
E
E
K
F
L
O
W
NEW CONCRETE
CURBS AND GUIDERAIL
SIDEWALK TO BE
REPLACED
NEW CONCRETE
CURBS AND GUIDERAIL
LIMIT OF GRADING
X
X
X
X X
X
XX
X
XX
TREE PROTECTION
FENCING TO BE
PLACED ALONG THE
LIMIT OF GRADING
(SHOWN OFFSET FOR
GRAPHIC PURPOSES
ONLY)
HORIZONTAL ROOT
PROTECTION. REFER
TO NOTES ON THIS
SHEET.
TREE PROTECTION FENCING
TO BE PLACED ALONG THE
LIMIT OF GRADING (SHOWN
OFFSET FOR GRAPHIC
PURPOSES ONLY)
TREE PROTECTION FENCING
TO BE PLACED ALONG THE
LIMIT OF GRADING (SHOWN
OFFSET FOR GRAPHIC
PURPOSES ONLY)
TREE PROTECTION FENCING
TO BE PLACED ALONG THE
LIMIT OF GRADING (SHOWN
OFFSET FOR GRAPHIC
PURPOSES ONLY)
HORIZONTAL ROOT
PROTECTION. REFER
TO NOTES ON THIS
SHEET.
APPROXIMATE RNFP
LIMIT
1.8m TREE PROTECTION FENCING
BY FAST FENCE INC. OR APPROVED
EQUAL. INSTALL INSTALL PER
MANUFACTURERS
RECOMMENDATIONS AND OFFSET
FROM SILT FENCE. www.fastfence.ca
416-751-7877
LEGEND:
RAVINE AND NATURAL FEATURE
PROTECTION LIMIT (RNFP)
PROPERTY LINE
SURVEYED TREES
X
EXISTING INDIVIDUAL TREE
(NOT SURVEYED) LOCATIONS
ARE APPROXIMATE.
T-?
IDENTIFICATION NUMBER FOR
EXISTING TREE TO BE PRESERVED
EXISTING TREE GROUPING
T-?
T-?
IDENTIFICATION NUMBER FOR
TREE INJURY
IDENTIFICATION NUMBER FOR
EXISTING TREE TO BE REMOVED
EXISTING INDIVIDUAL TREE TO BE
REMOVED
TREES ON PRIVATE PROPERTY AND RNFP
LIMIT: SOLID BOARD TREE PROTECTION
HOARDING (TPZ). REFER TO CITY OF
TORONTO DETAIL TP-1 ON SHEET TP-9.
TREES ON CITY PROPERTY: ORANGE,
PLASTIC WEB TREE HOARDING (TPZ).
REFER TO CITY OF TORONTO DETAIL TP-1
ON SHEET TP-9.
MINIMUM TREE PROTECTION ZONE DISTANCE
EXISTING TREE GROUPING TO BE
REMOVED
TP-1
CITY OF TORONTO
CITY OF TORONTO
KEY MAP
J:\JOBS\LANDSCAPE\2017\17M-02182-00 - City of Toronto Culvert Replacements\Drawings\Culvert 267\TP1-2.dwg
Mar 13, 2019 - 3:32pm
FILENAME:
PLOTDATE:
NOTE:
· FOR A DETAILED DESCRIPTION OF TREE SPECIES,
SIZE, CONDITION AND RECOMMENDATIONS REFER TO
THE TREE INVENTORY AND PRESERVATION CHARTS
ON SHEET TP-9 AND TABLE 1: TREE INVENTORY AND
PRESERVATION CHARTS IN THE ARBORIST REPORT
PREPARED BY WSP CANADA GROUP LIMITED, DATED:
NOVEMBER 14, 2018.
· REFER TO THE ARBORIST REPORT FOR SPECIFIC
RECOMMENDATIONS, PROTECTIVE AND MITIGATION
MEASURES.
Fax (905) 882-0055
100 Commerce Valley Dr. West
Thornhill, Ont. L3T 0A1
Tel (905) 882-1100
www.mmm.ca
RAVINE & NATURAL FEATURE PROTECTION BY-LAW
THE RAVINE & NATURAL FEATURE PROTECTION BY-LAW, CHAPTER 658 OF THE CITY OF TORONTO
MUNICIPAL CODE REGULATES THE INJURY AND DESTRUCTION OF TREES, DUMPING OF REFUSE AND
CHANGES TO GRADE WITHIN PROTECTED AREAS.
UNDER THIS BY-LAW PROTECTED TREES MAY NOT BE REMOVED, INJURED OR DESTROYED, AND
PROTECTED GRADES MAY NOT BE ALTERED, WITHOUT WRITTEN AUTHORIZATION FROM URBAN
FORESTRY RAVINE & NATURAL FEATURE PROTECTION, ON BEHALF OF THE GENERAL MANAGER OF
PARKS, FORESTRY & RECREATION.
CONVICTIONS OF OFFENCES RESPECTING THE REGULATIONS IN THE RAVINE AND NATURAL FEATURE
PROTECTION BY-LAW ARE SUBJECT TO FINES, AND THE LANDOWNER MAY BE ORDERED BY THE
COURT TO RESTORE THE AREA TO THE SATISFACTION OF THE CITY. A PERSON CONVICTED OF AN
OFFENCE UNDER THIS BYLAW IS LIABLE TO A MINIMUM FINE OF $500 AND A MAXIMUM FINE OF
$100,000 FOR EACH TREE DESTROYED, A MAXIMUM FINE OF $100,000 FOR ANY OTHER OFFENCE
COMMITTED UNDER THIS CHAPTER, AND/OR A SPECIAL FINE OF $100,000. A PERSON CONVICTED OF A
CONTINUING OFFENCE, INCLUDING FAILURE TO COMPLY WITH RAVINE PERMIT CONDITIONS IS LIABLE
TO A MAXIMUM FINE OF NOT MORE THAN $10,000 FOR EACH DAY OR A PART OF A DAY THAT THE
OFFENCE CONTINUES
SITE
TREE PRESERVATION
PLAN
TO BE UTILIZED WHERE APPROPRIATE, WHERE ENCROACHMENTS WILL OCCUR
WITHIN THE PROTECTION ZONE (TPZ), IN PARTICULAR AT TREES: A AND E1:
· PRIOR TO GRADING AND CONSTRUCTION, STAKE OUT THE LIMIT OF GRADING
USING SPRAY PAINT OR STAKES;
· PLACE 100mm DEPTH MULCH BETWEEN THE LIMIT OF GRADING AND THE
LIMIT OF THE TREE PROTECTION ZONE;
· APPLICATION TO BE REVIEWED BY THE CONTRACT ADMINISTRATOR PRIOR
TO INSTALLATION;
· AFTER APPLICATION OF MULCH HAS BEEN COMPLETED, INSTALL TREE
PROTECTION HOARDING;
· UPON COMPLETION OF CONSTRUCTION, SPREAD MULCH THROUGHOUT THE
THE DRIPLINE.
HORIZONTAL ROOT PROTECTION
TREE PRESERVATION IS LIMITED TO TREES ON CITY PROPERTY, TREES WITHIN 6m OF
THE LIMIT OF WORK AND TREES 12m OF TRCA REGULATION / RAVINE AND NATURAL
FEATURE PROTECTION LIMITS (RNFP). TREE PROTECTION HOARDING IS TO CONSIST
OF THREE TYPES DEPENDING ON THE APPLICABLE CITY BY-LAW:
· 1.2m HIGH PAIGE WIRE SEDIMENT CONTROL FENCE, INSTALLED AT LOCATIONS
WITHIN THE TRCA / RNFP LIMITS. REFER TO DETAIL T-219-130.1 ON SHEET TP-9.
· CITY STANDARD 1.2m HIGH ORANGE PASTIC WEB SNOW FENCING ON A 38 x 89mm
(2" x 4") WOOD FRAME FOR ALL TREES ON CITY PROPERTY. REFER TO DETAIL TP-1
ON SHEET TP-9.
· CITY STANDARD 2.4m HIGH SOLID BOARD PLYWOOD HOARDING (
3
4
" THICK), FOR ALL
TREES >30cm DBH ON PRIVATE PROPERTY WITHIN 6m OF THE LIMIT OF WORK.
REFER TO DETAIL TP-1 ON SHEET TP-9.
· 1.8m HIGH CHAIN LINK FENCE, BY FENCE FENCE INC. INSTALLED OFFSET FROM
LIMIT OF WORK. REFER TO NOTES ON THIS SHEET.
MINIMUM TREE PROTECTION HOARDING DISTANCES
· 5 TREES WILL BE 'INJURED' DUE TO ENCROACHMENTS AND WORK WITHIN THE
TREE PROTECTION ZONE (TPZ), TREES: A, C, P, E1 AND P1
· 21 TREES WILL REQUIRE REMOVAL. TREES: B, Q, R, TG-1 (10 TREES), F1, H1, G1,
K1, L1, M1, N1 AND O1.
TREE REMOVALS / INJURY APPLICATIONS
TPZ REDUCTIONS (NO INJURY)
WHERE TREE PROTECTION ZONES WILL REQUIRE A REDUCTION DUE TO PROXIMITY
TO A EXISITNG HARD SURFACE SUCH AS DRIVEWAYS, EDGE OF PAVEMENT AND
SIDEWALKS, THERE WILL BE NO 'INJURY' AS IT IS ASSUMED THAT NO TREE ROOTS
HAVE ESTABLISHED UNDER CURBS, ROADS, DRIVEWAYS AND SIDEWALKS AND THAT
NO CONSTRUCTION WILL OCCUR IN THESE AREAS.
· IT IS LIKELY THAT SOME BRANCH PRUNING WILL BE NECESSARY WHERE
EXISTING PRESERVED TREES ARE CLOSE TO SERVICE CONNECTION
INSTALLATIONS. BRANCH PRUNING LOCATIONS ARE TO BE REVIEWED IN THE
FIELD BY THE CONTRACT ADMINISTRATOR. THIS WORK IS TO BE CONDUCTED
BY AN ISA CERTIFIED ARBORIST OR UNDER THE SUPERVISION OF ONE AND IN
ACCORDANCE WITH THE GUIDELINES ON SHEET TP-9.
· TREE ROOTS ARE LIKELY TO BE IMPACTED WHERE THERE WILL BE
ENCROACHMENT INTO THE MINIMUM TREE PROTECTION ZONE. ROOTS ARE TO
BE PRUNED BY A CERTIFIED ARBORIST OR UNDER THE SUPERVISION OF ONE
AND IN ACCORDANCE WITH THE 'ROOT PRUNING' GUIDELINES ON SHEET TP-9.
ROOT AND BRANCH PRUNING
TREE INJURY:
AS PER THE CITY OF TORONTO'S URBAN FORESTRY POLICY A TREE IS CONSIDERED
INJURED IF THE MINIMUM TREE PROTECTION ZONE IS NOT PROTECTED. THUS IF THE
MINIMUM TREE PROTECTION ZONE CANNOT BE ESTABLISHED THE POTENTIAL EXISTS FOR
INJURY TO TREE ROOTS AND BRANCHES. A 1:1 (FOR EVERY ONE TREE CONSIDERED
INJURED ONE TREE SHALL BE PLANTED) PLANTING RATIO IS REQUIRED FOR THE
RESTORATION OF PLANT MATERIAL CONSIDERED INJURED.
TREE INJURY / REMOVAL POLICIES
TREE PRESERVATION NOTES AND GUIDELINES
CULVERT SITE NO.267
ALBION ROAD OVER ALBION CREEK
CULVERT REPLACEMENT
PETER McNAMARA, BA
ISA Certified Arborist ON-1140A
HORIZONTAL ROOT PROTECTION
1.8m HIGH TREE PROTECTION HOARDING
BY FAST FENCE INC.
267-S491-16