Engineering Change Order
Transcript of Engineering Change Order
![Page 1: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/1.jpg)
Engineering Change Order
Microchip Technology Incorporated
2355 W. Chandler Blvd.Chandler, AZ 85224-6199�
Distribution Location: T10
ECO Number:4940
Originator:Sharon Baker
Phone:7343
Date:12/5/2008
Supplier Notification:No
Description: Old Rev: New Rev:
Affected Documents
Product Document Number:PRODUCT TREE, MPLAB ICD 3 IN-CIRCUIT DEBUGGER 1 2DV164035 14-00888
FINAL ASSY, MPLAB ICD 3 IN-CIRCUIT DEBUGGER 1 212-00888
LABEL, SERIAL NUMBER BAR CODE 1 208-00225
LABEL, PART NUMBER BAR CODE 1 208-00224
Reason for Change:Changing clamshell for one that is made for the ICD 3.Updating Serial and Product Labels to Rev 2
Description of Change:[12-00888]Changing 09-00176 to 09-0022908-00225 and 08-00224 updating to Rev 2.
Material Disposition:CM: Implement as soon as new clamshells available.
Tempe: Consign new clamshells to CM as soon as they arrive.
12/5/200812/5/2008
HW Engineering SW Engineering RMA/TESTMarketing Documentation Quality Production OriginatorBaaN
Revs were updatedDescription of change was implemented
Packlist is correctAll necessary drawings are in PDF file
PPPPaaaaggggeeee 1111 ooooffff 1111
![Page 2: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/2.jpg)
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Q.C. Inspection
Date:
�Product Tree
ASSEMBLY NUMBER: 14-00888ASSEMBLY NAME: PRODUCT TREE, MPLAB ICD 3 IN-CIRCUIT DEBUGGER
REV: 2 LAST ECO: 4940 Part No: DV164035MPCode:
Part Number Rev Type Description
12-00888 FINAL ASSY, MPLAB ICD 3 IN-CIRCUIT DEBUGGER2 BQ 11-00261 ASSY, MPLAB ICD 3 MODULE W/ CABLE & SELF-TEST MODULEC BQ 10-00421 ASSY, MPLAB ICD 3 MODULEC B 10-00421-D ASSY DWG, MPLAB ICD 3 MODULEA D 02-02009 PCB ASSY, MPLAB ICD 3D B 02-02009-D PCB ASSY DWG, MPLAB ICD 3C1 D 03-02009 SCHEMATIC, MPLAB ICD 3C1 D 04-02009 PCB FABRICATION, MPLAB ICD 3C2 D 05-02009 PCB ARTWORK, MPLAB ICD 3C DISK 08-00323 LABEL, SERIAL NUMBER BOARD LABEL BARCODE1 LBL 08-00126 LABEL, NEED HELP WITH ASSY/SERIAL6 LBL 08-00236 LABEL, USB WARNING LABEL (DS51756)4 LBL 07-00024 CABLE ASSY, 6 CONDUCTOR MODULAR CABLE, 6"2 B 07-00024-D CABLE ASSY DWG, 6 CONDUCTOR MODULAR CABLE, 6"2 D 02-02026 PCB ASSY, ICD 3, SELF-TEST MODULE3 B 02-02026-D PCB ASSY DWG, ICD 3, SELF-TEST MODULE3 D 03-02026 SCHEMATIC, ICD 3, SELF-TEST MODULE3 D 04-02026 PCB FABRICATION, ICD 3, SELF-TEST MODULE3 D 05-02026 PCB ARTWORK, ICD 3, SELF-TEST MODULE3 DISK 08-00411 LABEL, ICD 3 SELF TEST MODULE FIRMWARE1 LBL 10-00420 ASSY, MPLAB ICD 3 LITERATURE/SOFTWARE PACKAGE1 B 08-00225 LABEL, SERIAL NUMBER BAR CODE2 LBL 08-00224 LABEL, PART NUMBER BAR CODE2 LBL 13-00888 TEST PROCEDURE, MPLAB ICD 3 IN-CIRCUIT DEBUGGER* TEST
Page 1 of 1* Revision of the Test Procedures are controlled in the Specification Index
![Page 3: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/3.jpg)
12-00888FINAL ASSY, MPLAB ICD 3 IN-CIRCUIT DEBUGGER
REV: 2�
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
11-00261 ASSY, MPLAB ICD 3 MODULE W/ CABLE & SELF-TEST MODULEC BQ1 1
09-00229 PACKAGING, CLAMSHELL FOR ICD 3 (PUCK SHAPE FRONT) PART2 1
10-00420 ASSY, MPLAB ICD 3 LITERATURE/SOFTWARE PACKAGE1 B3 1
CAB0008 CABLE, USB A-B M-M 6' PARTY4 1
RoHS CompliantEDAC 628-000-943 NEWARK 07J7119 Avail:
RoHS CompliantWESTERN ELEC UB0102100001439 Avail:
RoHS CompliantCOMPUTER GAT CUSAB06 Avail:
08-00225 LABEL, SERIAL NUMBER & COUNTRY W/ BAR CODE2 LBLplace on 09-00229
5 1
08-00224 LABEL, PRODUCT NAME & PART NUMBER W/ BAR CODE2 LBLplace on 09-00229
6 1
Page 1 of 21* In Rev Field: Part Rev is controlled in the Specification Index
![Page 4: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/4.jpg)
11-00261ASSY, MPLAB ICD 3 MODULE W/ CABLE & SELF-TEST MODULE
REV: C�
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
10-00421 ASSY, MPLAB ICD 3 MODULEC BY1 1
07-00024 CABLE ASSY, 6 CONDUCTOR MODULAR CABLE, 6"2 BY2 1
02-02026 PCB ASSY, ICD 3, SELF-TEST MODULE3 Bplace in separate baggie
Y3 1
Page 2 of 21* In Rev Field: Part Rev is controlled in the Specification Index
![Page 5: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/5.jpg)
10-00421ASSY, MPLAB ICD 3 MODULE
REV: C�
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
10-00421-D ASSY DWG, MPLAB ICD 3 MODULEA D1 1
02-02009 PCB ASSY, MPLAB ICD 3D B2 1
09-00225 MECH PART, MPLAB ICD 3 ENCLOSURE TOPA PART3 1
09-00226 MECH PART, MPLAB ICD 3 ENCLOSURE BOTTOMA PART4 1
08-00126 LABEL, NEED HELP WITH ASSY/SERIAL6 LBL5 1
MISC0053 LED, LIGHT PIPE, 1x1 POS, ST PART6 3
RoHS CompliantBIVAR VLPR-24-650-2 Avail:
HW0008 HW, SCREW, #4-40 x 5/8", SELF-TAP, ROLLING THRD FOR PLASTIC, PH PHIL, SS Y PART7 1
RoHS CompliantALBANY STEEL PPP4-58Z Avail:
08-00236 LABEL, USB WARNING LABEL (DS51756)4 Y LBLTo be placed by C.M to the left of USB port
8 1
Page 3 of 21* In Rev Field: Part Rev is controlled in the Specification Index
![Page 6: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/6.jpg)
10-00420ASSY, MPLAB ICD 3 LITERATURE/SOFTWARE PACKAGE
REV: 1�
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
DS51754 DOC, MPLAB ICD 3 PACKAGING INSERT* DOC1 1
DS51123 SOFTWARE, MPLAB CDROM* DOCY2 1
DS30030 DOC, WARRANTY/REGISTRATION CARD* DOCY3 1
DS30210 DOC, "IMPORTANT INFORMATION" MICROCHIP INFORMATION* DOCY4 1
DS51765 DOC, MPLAB ICD 3 POSTER* DOCY5 1
DS51764 DOC, MPLAB ICD 3 DESIGN ADVISORY* DOCY6 1
DS51769 DOC, MPLAB ICD 3 NOTEPAD* DOCY7 1
Page 4 of 21* In Rev Field: Part Rev is controlled in the Specification Index
![Page 7: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/7.jpg)
09-00225MECH PART, MPLAB ICD 3 ENCLOSURE TOP
REV: A�
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
DS51752 MECH PART ART, MPLAB ICD 3 TOP ENCLOSURE DESIGN* DOC1 1
Page 5 of 21* In Rev Field: Part Rev is controlled in the Specification Index
![Page 8: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/8.jpg)
07-00024CABLE ASSY, 6 CONDUCTOR MODULAR CABLE, 6"
REV: 2�
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
07-00024-D CABLE ASSY DWG, 6 CONDUCTOR MODULAR CABLE, 6"2 D1 1
CON0147 PLUG, 6-6 STRAND ROUND MODULAR PLUG PART2 2
RoHS CompliantTYCO/AMP 5-554710-3 DIGIKEY A9117-ND Avail:
WIRE0012 WIRE, 26/6 CONDUCTOR SILVER SATIN LINE CORD PART6" long
3 1
RoHS CompliantINTERSTATE WI WICTSS-2606 Avail:
RoHS CompliantADIRONDACK W AWC10152-W-1000 Avail:
Page 6 of 21* In Rev Field: Part Rev is controlled in the Specification Index
![Page 9: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/9.jpg)
02-02026PCB ASSY, ICD 3, SELF-TEST MODULE
REV: 3�
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
02-02026-D PCB ASSY DWG, ICD 3, SELF-TEST MODULE3 D1 1
03-02026 SCHEMATIC, ICD 3, SELF-TEST MODULE3 D2 1
04-02026 PCB FABRICATION, ICD 3, SELF-TEST MODULE3 D3 1
MIC0516 IC, PIC10F202 8 BIT FLASH MICROCONTROLLER 8P-DIP Y PARTU1
4 1
RoHS CompliantMICROCHIP PIC10F202-I/P Avail:
CON0052 CONN, MOD JACK 6-6 SIDE ENTRY LOW PROFILE (RJ11) PARTJ1
5 1
RoHS CompliantTYCO/AMP 5555165-1 DIGIKEY A31422-ND Avail:
RoHS CompliantTYCO/AMP 5555165-1 NEWARK 42K8762 Avail:
08-00411 LABEL, ICD 3 SELF TEST MODULE FIRMWARE1 LBLLabel @top of the J2 connector
6 1
-SPARE- -SPARE- LOCATION DO NOT INSTALL PARTJ2
7 1
Page 7 of 21* In Rev Field: Part Rev is controlled in the Specification Index
![Page 10: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/10.jpg)
02-02009PCB ASSY, MPLAB ICD 3
REV: D�
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
02-02009-D PCB ASSY DWG, MPLAB ICD 3C1 D1 1
03-02009 SCHEMATIC, MPLAB ICD 3C1 D2 1
04-02009 PCB FABRICATION, MPLAB ICD 3C2 D3 1
MIC0246 IC SMT, 24LC024, SERIAL EEPROM 8L SOIC Y PARTU20
4 1
RoHS CompliantMICROCHIP 24LC024/SN 74AA21CAXA03 Avail:
RoHS CompliantMICROCHIP 24LC024-I/SN 74AA27CAXA04 Avail:
RoHS CompliantMICROCHIP 24LC024-I/SN B5AT27C2XA00 Avail:
RoHS CompliantMICROCHIP 24LC024/SN B5AT21C2XA00 Avail:
MIC0495 IC SMT, 25LC1024, 1024K-BIT SPI SERIAL EEPROM 8L SOIC Y PARTU9
5 1
RoHS CompliantMICROCHIP 25LC1024-I/SM DECR27C3XA00 Avail:
MIC0494 IC SMT, dsPIC33FJ256GP510 100P TQFP (12 X 12) Y PARTU2
6 1
RoHS CompliantMICROCHIP dsPIC33FJ256GP510-I/PT YGAG17V7XBFD Avail:
MIC0430 IC SMT, ANALOG OP-AMP, SNGL SUPPLY R-R, MCP601 SOT-23-5 Y PARTU28
7 1
RoHS CompliantMICROCHIP MCP601T-I/OT AB009TC7XA00 Avail:
MIC0272 IC SMT, MCP1525T-I/TT, 3L SOT-23 Y PARTU36
8 1
RoHS CompliantMICROCHIP MCP1525T-I/TT A7BQ1TC6XA00 Avail:
RoHS CompliantMICROCHIP MCP1525T-I/TT A7BQ1TCQXA00 Avail:
MIC0402 IC SMT, MCP1630T-E/MS HIGH-SPEED PWM 8-MSOP Y PARTU31, U32
9 2
RoHS CompliantMICROCHIP MCP1630T-E/MS GBAU1YA3XA00 Avail:
MIC0403 IC SMT, MCP1652ST-E/MS 750kHZ BOOST CONTROLLER 8-MSOP Y PARTU26
10 1
RoHS CompliantMICROCHIP MCP1652ST-E/MS ABBC1YA3XC25 Avail:
Page 8 of 21* In Rev Field: Part Rev is controlled in the Specification Index
![Page 11: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/11.jpg)
02-02009PCB ASSY, MPLAB ICD 3
REV: D�
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
MIC0404 IC SMT, MCP4922T-E/ST 12 BIT DAC W/SPI INTERFACE 14-TSSOP Y PARTU21
11 1
RoHS CompliantMICROCHIP MCP4922T-E/ST DEBB2YD4XB00 Avail:
MIC0405 IC SMT, MCP6546T-I/OT OPEN-DRAIN OUTPUT COMPARATOR SOT-23 Y PARTU29, U30
12 2
RoHS CompliantMICROCHIP MCP6546T-I/OT A7BX2TC7XA00 Avail:
MIC0568 IC SMT, MCP1726-1202E/SN, 1.0A, LOW VOLTAGE, 1.2V LDO REG 8P SOIC PARTU35
13 1
RoHS CompliantMICROCHIP MCP1726-1202E/SN GBAM14C2XA12 Avail:
MIC0569 IC SMT, MCP1726-2502E/SN, 1.0A, LOW VOLTAGE, 2.5V LDO REG 8P SOIC PARTU34
14 1
RoHS CompliantMICROCHIP MCP1726-2502E/SN GBAM14C2XA25 Avail:
MIC0570 IC SMT, MCP1726-3302E/SN, 1.0A, LOW VOLTAGE, 3.3V LDO REG 8P SOIC PARTU33
15 1
RoHS CompliantMICROCHIP MCP1726-3302E/SN GBAM14C2XA33 Avail:
MIC0406 IC SMT, TC4428A 1.5A DUAL HIGH SPEED MOSFET 8-MSOP Y PARTU24, U25
16 2
RoHS CompliantMICROCHIP TC4428AEUA Y2AF3BA3XA00 Avail:
CAP0005 CAP SMT, 0.01uF 0603 CER 50V 20% X7R PARTC108, C109, C110
17 3
RoHS CompliantKEMET C0603C103M5RAC Avail:
RoHS CompliantPANASONIC ECJ-1VF1H103Z DIGIKEY PCC1801CT-ND Avail:
RoHS CompliantNIC COMPONEN NMC0603X7R103K50TRPF Avail:
RoHS CompliantCAL-CHIP GMC10X7R103K5NTLF Avail:
CAP0012 CAP SMT, 0.1uF 0603 CER 25V +80/-20% Y5V Y PARTC1, C6-10, C13-C17, C19, C20, C22, C24, C27, C31-C34, C52-C106, C111, C112
18 77
RoHS CompliantROHM MCH182FN104ZK Avail:
RoHS CompliantPANASONIC ECJ-1VF1E104Z DIGIKEY PCC1794TR-ND Avail:
RoHS CompliantNIC COMPONEN NMC0603Y5V104Z25TRPF Avail:
RoHS CompliantCAL-CHIP GMC10Y5V104Z25NTLF Avail:
Page 9 of 21* In Rev Field: Part Rev is controlled in the Specification Index
![Page 12: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/12.jpg)
02-02009PCB ASSY, MPLAB ICD 3
REV: D�
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
CAP0218 CAP SMT, 9.0pF 0603 CER 50V NP0 Y PARTC39, C40
19 2
RoHS CompliantPANASONIC ECJ-1VC1H090D DIGIKEY PCC090CVTR-ND Avail:
CAP0142 CAP SMT, 10pF 0603 CER 50V 5% Y PARTC3, C4
20 2
RoHS CompliantKEMET C0603C100J5GAC Avail:
RoHS CompliantKEMET C0603C100J5GACTU DIGIKEY 399-1049-2-ND Avail:
CAP0220 CAP SMT, 150pF 0603 CER 50V 5% NP0 Y PARTC42, C43
21 2
RoHS CompliantYAGEO 0603CG151J9B200 DIGIKEY 311-1071-2-ND Avail:
RoHS CompliantPANASONIC ECJ-1VC1H151J DIGIKEY PCC151ACVTR-ND Avail:
CAP0031 CAP SMT, 1000pF (1.0nF) 0603 CER 50V 10% X7R Y PARTC11
22 1
RoHS CompliantPANASONIC ECU-V1H102KBV DIGIKEY PCC102BVTR-ND Avail:
RoHS CompliantPANASONIC ECJ-1VB1H102K DIGIKEY PCC1772TR-ND Avail:
RoHS CompliantNIC COMPONEN NMC0603X7R102K50TRPF Avail:
RoHS CompliantCAL-CHIP GMC10X7R102K50NTL_F Avail:
RoHS CompliantAVX CORP 06035C102KAT2A DIGIKEY 478-1215-1-ND Avail:
CAP0056 CAP SMT, 1500pF 0603 CER 50V 10% X7R Y PARTC21, C23, C25, C26
23 4
RoHS CompliantROHM MCH185CN152KK DIGIKEY 511-1165-1-ND Avail:
RoHS CompliantMURATA ELECT GRM188R71H152KA01D DIGIKEY 490-1498-1-ND Avail:
RoHS CompliantPANASONIC ECU-V1H152KBV DIGIKEY PCC152BVTR-ND Avail:
CAP0116 CAP SMT, 0.1uF 0805 CER 25V 10% X7R Y PARTC51
24 1
RoHS CompliantVISHAY/BC COM VJ0805Y104KXXCW1BC DIGIKEY BC1299TR-ND Avail:
RoHS CompliantPANASONIC ECJ-2VB1E104K DIGIKEY PCC1828TR-ND Avail:
RoHS CompliantYAGEO 08052R104K8B20D DIGIKEY 311-1141-2-ND Avail:
RoHS CompliantNIC NMC0805X7R104K50TRPF Avail:
RoHS CompliantCAL-CHIP GMC21X7R104K50NTLF Avail:
Page 10 of 21* In Rev Field: Part Rev is controlled in the Specification Index
![Page 13: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/13.jpg)
02-02009PCB ASSY, MPLAB ICD 3
REV: D�
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
CAP0261 CAP SMT, 1.0uF 0805 CER 50V +80/-20% Y5V Y PARTC35, C36, C45, C47, C49, C50, C107
25 7
RoHS CompliantTDK CORP C2012Y5V1H105Z DIGIKEY 445-1364-1-ND Avail:
CAP0379 CAP SMT, 10uF 0805 CER 6.3V10% , X5R PARTC5
26 1
RoHS CompliantMURATA ELECT GRM219R60J106KE19D DIGIKEY 490-3340-1-ND Avail:
RoHS CompliantKEMET C0805C106K9PACTU DIGIKEY 399-3138-1-ND Avail:
CAP0021 CAP SMT, 1.0uF 1206 16V 10% X7R PARTC12, C28, C29, C30
27 4
RoHS CompliantCAL-CHIP GMC31X7R105K16NTLF Avail:
RoHS CompliantNIC COMPONEN NMC1206X7R105K16TRPF Avail:
RoHS CompliantKEMET C1206C105K4RAC Avail:
RoHS CompliantSAMSUNG CL31F105KANC Avail:
RoHS CompliantKEMET C1206C105K4RACTU DIGIKEY 399-1254-2-ND Avail:
CAP0321 CAP SMT, 10uF 1206 25V X5R Y PARTC18, C37, C38
28 3
RoHS CompliantPANASONIC ECJ-3YB1E106M DIGIKEY PCC2326TR-ND Avail:
CAP0024 CAP SMT, 1.0uF 3216 (A) TANT 16V 20% Y PARTC44, C46, C48
29 3
RoHS CompliantKEMET T491A105K016AS Avail:
RoHS CompliantPANASONIC ECS-T1CP105R DIGIKEY PCS3105BTR-ND Avail:
RoHS CompliantPANASONIC ECS-H1CY105R DIGIKEY PCT3105TR-ND Avail:
RoHS CompliantKEMET T491A105K016AT Avail:
RoHS CompliantKEMET T491A105K016AG Avail:
CAP0322 CAP SMT, 22uF 3528 (B) TANT 10V 20% Y PARTC2
30 1
RoHS CompliantKEMET T491B226K010AT Avail:
RoHS CompliantKEMET T491B226K010AG Avail:
Page 11 of 21* In Rev Field: Part Rev is controlled in the Specification Index
![Page 14: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/14.jpg)
02-02009PCB ASSY, MPLAB ICD 3
REV: D�
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
CON0013 CONN, RECPT, USB TYPE-B R/A Y PARTJ1
31 1
RoHS CompliantAROMAT AXJ115301S Avail:
RoHS CompliantKYCON KUSB-BS-1-N-WHT Avail:
RoHS CompliantMILL-MAX 897-43-004-90-000000 DIGIKEY ED90064-ND Avail:
RoHS CompliantAROMAT AXJ115301S-F Avail:
CON0052 CONN, MOD JACK 6-6 SIDE ENTRY LOW PROFILE (RJ11) PARTJ4
32 1
RoHS CompliantTYCO/AMP 5555165-1 NEWARK 42K8762 Avail:
RoHS CompliantTYCO/AMP 5555165-1 DIGIKEY A31422-ND Avail:
DIODE0072 DIODE SMT, ULTRA FAST BAS16 85V 600mA SOT-23 PARTD4-D7
33 4
RoHS CompliantNXP BAS16 DIGIKEY 568-1596-1-ND Avail:
RoHS CompliantFAIRCHILD SEMI BAS16 DIGIKEY BAS16FSCT-ND Avail:
RoHS CompliantFAIRCHILD SEMI BAS16_NL Avail:
DIODE0102 DIODE SMT, SCHOTTKY 30V 1.5A (3-2A1A) PARTD8-D10
34 3
RoHS CompliantTOSHIBA CRS08(TE85L) DIGIKEY CRS08TR-ND Avail:
RoHS CompliantTOSHIBA CRS08(TE85L,Q) DIGIKEY CRS08QTR-ND Avail:
DIODE0113 DIODE SMT, SMAJ5.0A TVS 400W 5V UNI-DIR DO-214AC(SMA) PARTTR1
35 1
RoHS CompliantST MICRO SMAJ5.0A-TR DIGI-KEY 497-2999-2-ND Avail:
FUSE0019 FUSE SMT, POLYSWITCH 0.05A 30V RESETTABLE (0.135" x 0.110" x 0.025") PARTPTC1, PTC2, PTC3
36 3
RoHS CompliantTYCO/RAYCHEM MICROSMD005 Avail:
RoHS CompliantTYCO/RAYCHEM MICROSMD005F Avail:
IC00115 IC SMT, 74AHCT1G00, SINGLE 2-INPUT NAND GATE, 5L SOT-23 PARTU22, U23
37 2
RoHS CompliantTEXAS INSTRU SN74AHCT1G00DBVR DIGIKEY 296-1111-1-ND JUN-05Avail:
IC00364 IC SMT, 74LVC1G00, SINGLE 2-INPUT NAND GATE SOT-23-5 PARTU19
38 1
RoHS CompliantTEXAS INSTRU SN74LVC1G00DBVR DIGI-KEY 296-9845-2-ND Avail:
Page 12 of 21* In Rev Field: Part Rev is controlled in the Specification Index
![Page 15: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/15.jpg)
02-02009PCB ASSY, MPLAB ICD 3
REV: D�
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
IC00353 IC SMT, 74LVC1G04, SINGLE INVERTER GATE, 5L SOT-23 PARTU5
39 1
RoHS CompliantTEXAS INSTRU SN74LVC1G04DBVR DIGIKEY 296-11599-2-ND Avail:
IC00342 IC SMT, 74LVC1G08, SINGLE 2-INPUT AND GATE SOT-23-5 PARTU17, U18, U37
40 3
RoHS CompliantTEXAS INSTRU SN74LVC1G08DBVR DIGIKEY 296-11601-1-ND Avail:
IC00354 IC SMT, 74LVC1G32, SINGLE 2-INPUT OR GATE, 5L SOT-23 PARTU3, U11, U12
41 3
RoHS CompliantTEXAS INSTRU SN74LVC1G32DBVR DIGIKEY 296-9847-2-ND Avail:
IC00270 IC SMT, 74LVC1T45 1BIT DUAL BUS TXRX SOT23-6 PARTU13, U14, U38, U41
42 4
RoHS CompliantTEXAS INSTRU SN74LVC1T45DBVR DIGIKEY 296-16843-2-ND APR-05Avail:
IC00355 IC SMT, 74LVC74 D-TYPE FLIP-FLOPS WITH CLEAR AND PRESET, 14L TSSOP PARTU16
43 1
RoHS CompliantTEXAS INSTRU SN74LVC74APW DIGIKEY 296-1241-2-ND Avail:
IC00300 IC SMT, 74LVC245A OCTAL BUS TXCVR 20-TSSOP PARTU6, U7
44 2
RoHS CompliantTEXAS INSTRU SN74LVC245APWR DIGI-KEY 296-1233-2-ND Avail:
IC00301 IC SMT, ADG419 SW ANALOG SINGLE PREC 8MSOP PARTU27
45 1
RoHS CompliantANALOG DEVIC ADG419BRMZ-REEL DIGI-KEY ADG419BRMZ-REE Avail:
RoHS CompliantANALOG DEVIC ADG419BRM-REEL DIGI-KEY ADG419BRM-REEL Avail:
IC00289 IC SMT, CONTRLR OVERVOLT PROT SOT23-6 PARTU15
46 1
RoHS CompliantLINEAR TECHN LTC1696ES6#TR DIGIKEY LTC1696ES6TR-ND Avail:
RoHS CompliantLINEAR TECHN LTC1696ES6#TRPBF Avail:
IC00303 IC SMT, GS74108 512k X 8 SRAM 44P TSOP-II Y PARTU8, U10
47 2
RoHS CompliantGSI TECHNOLO GS74108AGP-15 Avail:
RoHS CompliantALLIANCE SEMI AS7C34096A-10TCN Avail:
RoHS CompliantGSI TECHNOLO GS74108AGP-12 Avail:
RoHS CompliantALLIANCE SEMI AS7C34096A-12TCN Avail:
Page 13 of 21* In Rev Field: Part Rev is controlled in the Specification Index
![Page 16: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/16.jpg)
02-02009PCB ASSY, MPLAB ICD 3
REV: D�
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
IC00304 IC SMT, NET2272 HIGH SPEED USB CONTROLLER 64P TQFP (10 x 10) PARTU1
48 1
RoHS CompliantPLX TECHNOLO NET2272REV1A-LF Avail:
IC00356 IC SMT, FPGA, XC3S100E HIGH PERFORMANCE, 144P TQFP PARTU4
49 1
RoHS CompliantXILINX XC3S100E-4TQG144C Avail:
IC00272 IC SMT, TRANS, HEX/MOS N-CH DUAL 30V 4.9A 8-SOIC PARTQ7, Q8
50 2
RoHS CompliantINTL RECTIFIER IRF7303TR DIGIKEY IRF7303TR-ND Avail:
RoHS CompliantINTL RECTIFIER IRF7303TRPBF DIGIKEY IRF7303PBFTR-ND Avail:
IC00273 IC SMT, TRANS, HEX/MOS N-CH 20V 6.5A TSOP-6 PARTQ6
51 1
RoHS CompliantINTL RECTIFIER IRLMS2002TR DIGIKEY IRLMS2002TR-ND Avail:
RoHS CompliantINTL RECTIFIER IRLMS2002TRPBF DIGIKEY IRLMS2002PBFTR- Avail:
IC00305 IC SMT, IRF5852 20V POWER MOSFET 6P TSSOP PARTQ9, Q10
52 2
RoHS CompliantINTL RECTIFIER IRF5852TRPBF Avail:
IC00275 IC SMT, SUPPRESSOR ESD 24VDC SOT-23 PARTTVS3
53 1
RoHS CompliantLITTELFUSE PGB102ST23WR DIGIKEY F2596CT-ND Avail:
RoHS CompliantLITTELFUSE PGB002ST23WR DIGIKEY F1321TR-ND Avail:
IC00068 IC SMT, RELAY, PHOTO MOS, 1CH, SOP-4 PARTK1, K2
54 2
RoHS CompliantOMRON G3VM-61GR1 Avail:
RoHS CompliantPANASONIC/AR AQY212GS AVNET Avail:
IC00290 IC SMT, SCR, 200V 0.25A SOT-23 PARTQ2, Q3
55 2
RoHS CompliantST MICRO P0102BL 5AA4 DIGIKEY 497-2527-2-ND Avail:
IC00306 IC SMT, TPS2014 .66A POWER DIST SWITCH 8-SOIC PARTU39
56 1
RoHS CompliantTEXAS INSTRU TPS2014DR DIGI-KEY 296-1354-2-ND Avail:
Page 14 of 21* In Rev Field: Part Rev is controlled in the Specification Index
![Page 17: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/17.jpg)
02-02009PCB ASSY, MPLAB ICD 3
REV: D�
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
IC00363 IC SMT, TPS2049 DIST SWITCH SNGL-CHAN 8-SOIC PARTU40
57 1
RoHS CompliantTEXAS INSTRU TPS2049DR DIGI-KEY TPS2049DR-ND Avail:
RoHS CompliantTEXAS INSTRU TPS2049D DIGI-KEY 296-21264-5-ND Avail:
IND0035 INDUCTOR SMT, 10uH POWER INDUCTOR 10% PARTL1
58 1
RoHS CompliantCOILCRAFT ME3220-103KLC COILCRAFT ME3220-103KL Avail:
IND0034 INDUCTOR SMT, 1.0UH 5% FIXED SMD 0805 PARTL2,L3
59 2
RoHS CompliantPANASONIC ELJ-ND1R0JF DIGIKEY PCD1184TR-ND Avail:
IND0036 INDUCTOR SMT, 15uH DUAL WINDING INDUCTOR (DRQ73) PARTT1-T2
60 2
RoHS CompliantCOOPER BUSS DRQ73-150-R DIGIKEY DRQ73-150-R-ND Avail:
LED0046 LED SMT, 3x2.5mm BI-COLOR RED/GREEN, LOW POWER PARTD1
61 1
RoHS CompliantKINGBRIGHT APB3025ESGC NEUMANN Avail:
RoHS CompliantKINGBRIGHT APB3025ESGC-F01 Avail:
LED0059 LED SMT, 0805 BLUE CLEAR 2x1.25mm PARTD2
62 1
RoHS CompliantLITE-ON LTST-C170TBKT DIGI-KEY 160-1579-2-ND Avail:
LED0034 LED SMT, 0805 GREEN CLEAR 2x1.25mm PARTD3
63 1
RoHS CompliantKINGBRIGHT APT2012QGC-F01 Avail:
RoHS CompliantLITE-ON LTST-C170GKT DIGIKEY 160-1179-2-ND Avail:
RoHS CompliantLITE-ON LTST-C170GKT DIGIKEY 160-1179-1-ND Avail:
RoHS CompliantCHICAGO MINAT 7012X5 DIGIKEY L61105TR-ND Avail:
RoHS CompliantKINGBRIGHT APT2012QGC Avail:
OSC0077 OSC SMT, 30.000MHz CRYSTAL 18PF SMD (ABM8) PARTY1
64 1
RoHS CompliantABRACON COR ABM8-30.000MHZ-B2-T DIGI-KEY 535-9145-2-ND Avail:
Page 15 of 21* In Rev Field: Part Rev is controlled in the Specification Index
![Page 18: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/18.jpg)
02-02009PCB ASSY, MPLAB ICD 3
REV: D�
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
RSMT0381 RES SMT, 0.10 OHM 1/10W 1% 0603 Y PARTR66
65 1
RoHS CompliantPANASONIC ERJ-3RSFR10V DIGIKEY P.10AJTR-ND Avail:
RSMT0138 RES SMT, 1.0K-OHM 1/10W 1% 0603 Y PARTR8, R11-R13, R39, R40, R52, R53, R61, R62, R83, R84, R87, R88
66 14
RoHS CompliantROHM MCR03EZPFX1001 DIGIKEY RHM1.00KHCT-ND Avail:
RoHS CompliantPANASONIC ERJ-3EKF1001V DIGIKEY P1.00KHTR-ND Avail:
RoHS CompliantVISHAY DALE CRCW06031K00FKEA NEWARK 52K8015 Avail:
RSMT0134 RES SMT, 1.5K-OHM 1/10W 1% 0603 Y PARTR2
67 1
RoHS CompliantPANASONIC ERJ-3EKF1501V DIGIKEY P1.50KHTR-ND Avail:
RSMT0274 RES SMT, 2.05K-OHM 1/10W 1% 0603 Y PARTR59, R60, R68, R69
68 4
RoHS CompliantYAGEO/PHYCO 9T06031A2051FBHFT DIGIKEY 9T06031A2051FBH Avail:
RoHS CompliantSEI RMC 1/16 2.05 1% TR Avail:
RoHS CompliantYAGEO/PHYCO 9T06031A2051FBPFT Avail:
RoHS CompliantSEI RMCF 1/16 2.05 1% TR NOWAvail:
RSMT0421 RES SMT, 2.43K OHM 1/10W 1% 0603 Y PARTR5, R7
69 2
RoHS CompliantROHM MCR03EZPFX2431 DIGI-KEY RHM2.43KHTR-ND Avail:
RSMT0393 RES SMT, 4.22K OHM 1/16W 1% 0603 Y PARTR64, R67, R82
70 3
RoHS CompliantPANASONIC ERJ-3EKF4221V DIGI-KEY P4.22KHTR-ND Avail:
RSMT0410 RES SMT, 4.75K-OHM 1/8W 1% 0603 Y PARTR15, R19, R37, R38, R95, R96, R99, R104, R105, R106
71 10
RoHS CompliantPANASONIC ERJ-3EKF4751V DIGIKEY P4.75KHCT-ND Avail:
RoHS CompliantROHM MCR03EZPFX4751 DIGIKEY RHM4.75KHCT-ND Avail:
RoHS CompliantPANASONIC ERJ-3EKF4751V DIGIKEY P4.75KHTR-ND Avail:
Page 16 of 21* In Rev Field: Part Rev is controlled in the Specification Index
![Page 19: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/19.jpg)
02-02009PCB ASSY, MPLAB ICD 3
REV: D�
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
RSMT0280 RES SMT, 7.87K-OHM 1/10W 1% 0603 Y PARTR91, R92
72 2
RoHS CompliantSEI RMCF 1/16 7.87K 1% TR NOWAvail:
RoHS CompliantYAGEO/PHYCO 9T06031A7871FBPFT Avail:
RoHS CompliantYAGEO/PHYCO 9T06031A7871FBHFT DIGIKEY 9T06031A7871FBH Avail:
RoHS CompliantSEI RMC 1/16 7.87K 1% TR Avail:
RSMT0456 RES SMT, 10-OHM 1/10W 1% 0603 PARTR85, R86
73 2
RoHS CompliantPANASONIC ERJ-3EKF10R0V DIGIKEY P10.0HTR-ND Avail:
RSMT0139 RES SMT, 10K-OHM 1/10W 1% 0603 Y PARTR9, R10, R14, R22, R23, R44-R47, R50, R51, R107
74 12
RoHS CompliantSEI RMCF 1/16 10K 1% R Avail:
RoHS CompliantNIC NRC06F1002TRF Avail:
RoHS CompliantXicon 302-10K-RC MOUSER 302-10k-RC Avail:
RoHS CompliantPANASONIC ERJ-3EKF1002V DIGIKEY P10.0KHCT-ND Avail:
RSMT0422 RES SMT, 11.3K OHM 1/10W 1% 0603 Y PARTR65
75 1
RoHS CompliantROHM MCR03EZPFX1132 DIGI-KEY RHM11.3KHTR-ND Avail:
RoHS CompliantVISHAY/DAL CRCW060311K3FKEA DIGIKEY 541-11.3KHCT-ND Avail:
RSMT0414 RES SMT, 12.1K-OHM 1/8W 1% 0603 Y PARTR75, R80
76 2
RoHS CompliantPANASONIC ERJ-3EKF1212V DIGIKEY P12.1KHCT-ND Avail:
RoHS CompliantROHM MCR03EZPFX1212 DIGIKEY RHM12.1KHCT-ND Avail:
RSMT0412 RES SMT, 15.0K-OHM 1/8W 1% 0603 Y PARTR93, R94
77 2
RoHS CompliantPANASONIC ERJ-3EKF1502V DIGIKEY P15.0KHCT-ND Avail:
RoHS CompliantROHM MCR03EZPFX1502 DIGIKEY RHM15.0KHCT-ND Avail:
Page 17 of 21* In Rev Field: Part Rev is controlled in the Specification Index
![Page 20: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/20.jpg)
02-02009PCB ASSY, MPLAB ICD 3
REV: D�
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
RSMT0309 RES SMT, 20.0K-OHM 1/10W 1% 0603 PARTR71
78 1
RoHS CompliantYAGEO/PHYCO 9C06031A2002FKPFT Avail:
RoHS CompliantYAGEO/PHYCO RC0603FR-0720KL Avail:
RoHS CompliantYAGEO/PHYCO 9C06031A2002FKHFT DIGIKEY 311-20.0KHTR-ND Avail:
RSMT0423 RES SMT, 22.1 OHM 1/10W 1% 0603 Y PARTR42, R43, R89, R90, R103
79 5
RoHS CompliantROHM MCR03EZPFX22R1 DIGI-KEY RHM22.1HTR-ND Avail:
RSMT0408 RES SMT, 22.1K-OHM 1/10W 1% 0603 Y PARTR76, R77, R81
80 3
RoHS CompliantYAGEO/PHYCO 9C06031A2212FKHFT DIGIKEY 311-22.1KHCT-ND Avail:
RoHS CompliantPANASONIC ERJ-3EKF2212V DIGIKEY P22.1KHCT-ND Avail:
RoHS CompliantROHM MCR03EZPFX2212 DIGIKEY �RHM22.1KHTR-N Avail:
RSMT0424 RES SMT, 39.2 OHM 1/10W 1% 0603 Y PARTR3, R4
81 2
RoHS CompliantROHM MCR03EZPFX39R2 DIGI-KEY RHM39.2HTR-ND Avail:
RSMT0399 RES SMT, 43.2K OHM 1/10W 1% 0603 PARTR34, R36
82 2
RoHS CompliantYAGEO RC0603FR-0743K2L DIGI-KEY 311-43.2KHRTR-ND Avail:
RSMT0104 RES SMT, 47K-OHM 1/16W 5% 0603 Y PARTR6
83 1
RoHS CompliantSEI RMCF 1/16 47K 5% R Avail:
RoHS CompliantKOA RK73B1JIT0473J Avail:
RoHS CompliantROHM MCR03FZHJ4702 Avail:
RoHS CompliantPANASONIC ERJ-3GEYJ473V Avail:
RoHS CompliantNIC COMPONEN NRC06J473TRF Avail:
RSMT0252 RES SMT, 56.2K-OHM 1/16W 1% 0603 Y PARTR63
84 1
RoHS CompliantPANASONIC ERJ-3EKF5622V DIGIKEY P56.2KHTR-ND Avail:
RoHS CompliantROHM MCR03EZPFX5622 Avail:
Page 18 of 21* In Rev Field: Part Rev is controlled in the Specification Index
![Page 21: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/21.jpg)
02-02009PCB ASSY, MPLAB ICD 3
REV: D�
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
RSMT0411 RES SMT, 61.9K-OHM 1/8W 1% 0603 Y PARTR72, R79
85 2
RoHS CompliantPANASONIC ERJ-3EKF6192V DIGIKEY P61.9KHCT-ND Avail:
RoHS CompliantROHM MCR03EZPFX6192 DIGIKEY RHM61.9KHCT-ND Avail:
RSMT0385 RES SMT, 90.9K OHM 1/16W 1% 0603 Y PARTR78
86 1
RoHS CompliantPANASONIC ERJ-3EKF9092V DIGIKEY P90.9KHTR-ND Avail:
RSMT0215 RES SMT, 100K-OHM 1/10W 1% 0603 Y PARTR41, R54, R55, R70, R73, R74
87 6
RoHS CompliantPANASONIC ERJ-3EKF1003V DIGIKEY P100KHTR-ND Avail:
RSMT0210 RES SMT, 220-OHM 1/10W 5% 0603 PARTR24, R25, R102
88 3
RoHS CompliantPANASONIC ERJ-3GEYJ221V DIGIKEY P220GTR-ND Avail:
RoHS CompliantNIC NRC06J221TRF Avail:
RoHS CompliantSEI RMCF1/162205%R Avail:
RSMT0400 RES SMT, 301K OHM 1/10W 1% 0603 PARTR33, R35
89 2
RoHS CompliantYAGEO RC0603FR-07301KL DIGI-KEY 311-301KHRTR-ND Avail:
RSMT0166 RES SMT, 330-OHM 1/10W 5% 0603 PARTR20, R26-R32, R48, R49, R101
90 11
RoHS CompliantSEI RMCF 1/16 330 5% R Avail:
RoHS CompliantPANASONIC ERJ-3GEYJ331V DIGIKEY P330GTR-ND Avail:
RoHS CompliantKOA RK73B1JTTD331J Avail:
RSMT0098 RES SMT, 470-OHM 1/10W 5% 0603 Y PARTR98
91 1
RoHS CompliantPANASONIC ERJ-3GEYJ471V DIGIKEY P470GTR-ND Avail:
RoHS CompliantSEI RMCF1/164705%R Avail:
RoHS CompliantNIC NRC06J471TRF Avail:
RSMT0455 RES SMT, 560-OHM 1/10W 5% 0603 PARTR16, R17, R18, R21
92 4
RoHS CompliantPANASONIC ERJ-3GEYJ561V DIGIKEY P560GTR-ND Avail:
Page 19 of 21* In Rev Field: Part Rev is controlled in the Specification Index
![Page 22: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/22.jpg)
02-02009PCB ASSY, MPLAB ICD 3
REV: D�
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
RSMT0002 RES SMT, 0-OHM 0805 PARTR97
93 1
RoHS CompliantSEI RMCF 1/10 0 5% TR NEWMAN Avail:
RoHS CompliantYAGEO/PHYCO RC0805JR-070RL DIGIKEY 311-0.0ARTR-ND Avail:
RoHS CompliantYAGEO/PHYCO 9C08052A0R00JLPFT Avail:
RoHS CompliantNIC NRC10Z0TRF Avail:
RoHS CompliantROYAL OHM HMWAJ0000T50 FARNELL 772239 Avail:
RoHS CompliantSEI RMC 1/10 0 5% TR NEWMAN Avail:
RoHS CompliantYAGEO/PHYCO 9C08052A0R00JLHFT DIGIKEY 311-0.0ACT-ND Avail:
RoHS CompliantPANASONIC ERJ-6GEY0R00V DIGIKEY P0.0ATR-ND Avail:
RSMT0404 RES SMT, 0.05-OHM 1/10W 5% 0805 Y PARTR56
94 1
RoHS CompliantPANASONIC ERJ-L06KJ50MV DIGI-KEY P50NLTR-ND Avail:
RSMT0387 RES SMT, VARISTOR TVS MULTI 5.5V 30A 0603 PARTTVS1,TVS2
95 2
RoHS CompliantLITTELFUSE V5.5MLA0603H DIGIKEY F2214TR-ND Avail:
RSMT0518 RES SMT, 470-OHM 1/10W 1% 0603 PARTR57, R58
96 2
RoHS CompliantPANASONIC ERJ-3EKF4700V DIGIKEY P470HCT-ND Avail:
TRA0027 TRANS SMT, POWER MOSFET 750mA 30V SOT-23 PARTQ1, Q4
97 2
RoHS CompliantON SEMI MGSF1N03LT1G AVNET Avail:
RoHS CompliantON SEMI MGSF1N03LT3G DIGIKEY MGSF1N03LT3G-N Avail:
RoHS CompliantON SEMI MGSF1N03LT1G DIGIKEY MGSF1N03LT1GO Avail:
RoHS CompliantON SEMI MGSF1N03LT3G AVNET Avail:
RoHS CompliantON SEMI MGSF1N03LT1 AVNET Avail:
RoHS CompliantON SEMI MGSF1N03LT1G DIGIKEY MGSF1N03LT1GO Avail:
08-00323 LABEL, SERIAL NUMBER BOARD LABEL BARCODE1 LBLPlaced in the open top side of the 04-02009 board
98 1
MISC0063 MISC, TAPE, FOAM, 0.5SQ x 0.25 THICK (NON-CONDUCTIVE) PART@ Bottom side (see 02-02009-D)
99 2
Page 20 of 21* In Rev Field: Part Rev is controlled in the Specification Index
![Page 23: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/23.jpg)
02-02009PCB ASSY, MPLAB ICD 3
REV: D�
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199
Bill of MaterialsASSEMBLY NUMBER:ASSEMBLY NAME:
Part Number Rev TypeManufacturer Vendor / Part NoDescriptionPL
CS
CRQty
CR: Cross CS: Consign PL: Pack List
D: DrawingB: BOMLBL: LabelQ: Quality Check
KEY
-SPARE- -SPARE- LOCATION DO NOT INSTALL PARTDACK, DREQ, GND, NOE, NWR, PVDD, PVPP, J2, J3, J5, J6 TP1-TP6
100 17
Page 21 of 21* In Rev Field: Part Rev is controlled in the Specification Index
![Page 24: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/24.jpg)
Microchip Technology Incorporated2355 W. Chandler Blvd.
Chandler, AZ 85224-6199�Pack List
ASSEMBLY NUMBER: 14-00888ASSEMBLY NAME: PRODUCT TREE, MPLAB ICD 3 IN-CIRCUIT DEBUGGER
REV: 2 Product No: DV164035
10-00420 ASSY, MPLAB ICD 3 LITERATURE/SOFTWARE PACKAGEPart Number DescriptionQty
Rev: 1
DS51769 DOC, MPLAB ICD 3 NOTEPAD1DS51764 DOC, MPLAB ICD 3 DESIGN ADVISORY1DS51765 DOC, MPLAB ICD 3 POSTER1DS30210 DOC, "IMPORTANT INFORMATION" MICROCHIP INFORMATION1DS30030 DOC, WARRANTY/REGISTRATION CARD1DS51123 SOFTWARE, MPLAB CDROM1
11-00261 ASSY, MPLAB ICD 3 MODULE W/ CABLE & SELF-TEST MODULEPart Number DescriptionQty
Rev: C
02-02026 PCB ASSY, ICD 3, SELF-TEST MODULE107-00024 CABLE ASSY, 6 CONDUCTOR MODULAR CABLE, 6"110-00421 ASSY, MPLAB ICD 3 MODULE1
12-00888 FINAL ASSY, MPLAB ICD 3 IN-CIRCUIT DEBUGGERPart Number DescriptionQty
Rev: 2
CAB0008 CABLE, USB A-B M-M 6'1
Page 1 of 1
![Page 25: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/25.jpg)
![Page 26: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/26.jpg)
![Page 27: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/27.jpg)
![Page 28: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/28.jpg)
1 1R Griffith
07-00024
6CONDUCTORMODULARCABLE
212/22/200507-00024R2.cdr
A
Notes:
6”
Overallcablelength:6.00”Cableisreverseconnect(P1-P6)
Typ:2places
P i n 1 P i n 6
2
3
Title
Size
Date
Filename
Number Rev
DrawnBy
Sheet of
A A
B B
C C
D D
1
1
2
2
3
3
4
4
UNLESSOTHERWISESPECIFIEDDIMENSIONSAREININCHES.
TOLERANCESARE:
.XX
.XXX0.020.005
Fractions Decimals Angles1DEG
![Page 29: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/29.jpg)
![Page 30: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/30.jpg)
![Page 31: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/31.jpg)
![Page 32: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/32.jpg)
M
![Page 33: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/33.jpg)
![Page 34: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/34.jpg)
![Page 35: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/35.jpg)
![Page 36: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/36.jpg)
![Page 37: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/37.jpg)
![Page 38: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/38.jpg)
![Page 39: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/39.jpg)
![Page 40: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/40.jpg)
1 1
08-00236
USB Warning Label
4A
Before attaching this device to a USB port, follow instructions for installing
the MPLAB® IDE USB driver.
0.500"
1.750"
100%
200%
Microchip Technology Inc.2355 W. Chandler B lvd.Chandler, AZ 85224
Title
Size
Da te
Filename
Number Rev
Drawn By
Sheet of
A A
B B
C C
D D
1
1
2
2
3
3
4
4
UNLESS OTHERWISE SPECIFIEDDIMENSIONS ARE IN INCHES.
TOLERANCES ARE :
.XX
.XXX0.020.005
Fractions Decimals Angles1 DEG
Before attaching this device to a USB port, follow instructions for installing
the MPLAB® IDE USB driver.
08/08/08
08-00236R4_USBWarn.ai
R. Dufseth
Notes:
Font: Arial
Label MaterialMaterial: White VinylFinish: Clear OverlaminateAdhesive: PermanentOverall Dimensions 1.75" x 0.5" w/0.075" R corners
Color Specification:Black
Packaging:Supplied on Rolls
![Page 41: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/41.jpg)
Label Definition Need Help Label with Serial Number 08-00126 Rev 6
Label Information Label Size: 0.5” x 2.0” Text Size Need Help? (8pt, Bold) Assembly Number, Serial Number, Revision: (7pt) Graphics Microchip Logo provided as a true type font. (~24pt) Label Data Need Help? (10pt, Bold, Centered) http://support.microchip.com (7.5pt, centered) Assy# (7-9pt, Left) Serial# (7-9pt, Right) Part Number Part Number of the assembly that calls out the label Revision R1 - Revision of the assembly that calls out the label Serial Number: JIT- Manufacturer ID 95 - Year (95....) 28 - Work week product shipped (01-52) 1 – Lot number (0-9) 0001 - Sequence Piece Number (0001 - 9999) Starts over with each new lot number. Location The 08-00126 label is to be located on the assembly that calls out the label.
M Need Help?
http://support.microchip.com
Assy# 10-00157-R2 Serial # JIT971217076
![Page 42: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/42.jpg)
Label Definition ICD 3 SELF-TEST MODULE FIRMWARE VERSION 08-00411 Rev 1
Label Information Label Size: 15mm x 12mm Label Color: White Label Text Font: any Font Size: any (~ 6 point) Label Data v1.0 Graphics Not required Barcode Not required Serialization Not required Location Label to be located on topside of the J2 connector.
v1.0
![Page 43: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/43.jpg)
Board Level Barcode08-00323 Rev 1
Label InformationApprox. Label Size: 1.5" x 0.37"
Text (Times New Roman)Serial Number Data: ~ 10 Point
Barcode InformationBarcode is Code 39 format (3 of 9)Barcode Height is approx. 0.15”Ratio is 2.5:1 (Deviations need to be approved by Microchip)Density is 5.29 cpi (Deviations need to be approved by Microchip)Text is Times New Roman (Deviations need to be approved by Microchip)
Serial Number:JIT- Manufacturer ID06 - Year (06....)28 - Work week product shipped (01-52)1 – RoHS Compliance/Lot number, if unit is RoHS compliant 9, if not indicates lot #(1-8).0001 - Sequence Piece Number (0001 - 9999) Starts over with each new lot number.
LocationThis label is attached to the open area found on the topside of the 02-xxxxx assembly. It will beattached either before or, at electrical testing and be used by the test personnel to program theinternal serial EEPROM found on the assembly.
Vendor to insure that the serial number data corresponds to the serial number label placed on theplastic assembly and on the outer packaging.
J IT984810001 JIT062510001
![Page 44: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/44.jpg)
Product Label, Product Name, Part Number, w/ barcode 08-00224 Rev 2
Drawing not to scale. Label Information Label Size: 2" x 0.5" (Customize to fit packaging) Text (Arial or other Sans Serif Font) Product Name: ~7 pt (Customize to fit label) Part Number Identifier: (1P) ~2 Points smaller than Part Number Font (Not included in Bar Code) Part Number Bar Code: ~7pt (Customize to fit label) Part Number: ~7 pt (Customize to fit label) Product Name and Part Number are provided in the header area of the 14-xxxxx final assembly BOM for the product that this label will be attached to. Barcode Information Barcode is Code 39 format (3 of 9) Barcode Height is 0.150” Ratio is 2.5:1 Density is 5.29 cpi Font: Arial (or other Sans Serif Font) Serial Number: None Graphics No Graphics Location This label is attached to the outside of the product case. Vendor to insure that the serial number corresponds to the serial number assigned to the main electro-mechanical assembly contained in this product case.
MPLAB ICD 3 IN-CIRCUIT DEBUGGER |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
(1P) DV164035
![Page 45: Engineering Change Order](https://reader031.fdocuments.net/reader031/viewer/2022020621/61e69b28d45b4556e3114766/html5/thumbnails/45.jpg)
Serial Label, Country of Origin, w/ barcode 08-00225 Rev 2
Drawing not to scale. Label Information Label Size: 2" x 0.5" (Customize to fit packaging) Text (Arial or other Sans Serif Font) Date Code Identifier: (1T) ~2 Points smaller than Part Number Font (Not included in Bar Code) Serial Number & Country of Origin Bar Code: ~7pt (Customize to fit label) Serial Number & Country of Origin: ~7 pt (Customize to fit label) Barcode Information Barcode is Code 39 format (3 of 9) Barcode Height is 0.150” Ratio is 2.5:1 Density is 5.29 cpi Font: Arial (or other Sans Serif Font) Serial Number: JIT- Manufacturer ID 0828 - Date Code: Last two digits of year and two digits of work week shipped (01-52) (underlined) 1 - Lot number (1-9) 0001 - Sequence Piece Number (0001 - 9999) Starts over with each new lot number. Graphics Country Code: No Graphics US United States CN China TH Thailand Location This label is attached to the outside of the cardboard product case. Vendor to insure that the serial number corresponds to the serial number assigned to the main electro-mechanical assembly contained in this product case.
||||||||||||||||||||||||||||||||||||||||||||||||||||||| |||||||| (1T) JIT082810008 US