Engineering Fabricator · 2019. 7. 17. · Plant Project GSPC LNG Limited(GLL) Toyo Engineering...
Transcript of Engineering Fabricator · 2019. 7. 17. · Plant Project GSPC LNG Limited(GLL) Toyo Engineering...
-
Engineering Fabricator
-
PRODUCT & SERVICES
-
Product & Services
• Mechanical Static / Process Equipment• Pressure Vessels, Heat Exchangers, Tanks
• Skids & Modules• Engineering,Fabrication, erection/installation & integration• Pipe Racks Module
• Plant Fabrication and Erection• Steel Structures Building, Warehouse• Site mechanical erection and installation works
• Mechanical Fabrication• Out fittings for Jack-up Rigs• Water Intake Screens/ Stoplog/ Stop Gate • Offshore Marine Post, Transit Tower, Helideck Structure,
Platforms & Ladders
• Galvanized Steel Grating (Serrated & non-Serrated)• Manpower Supply – Technical and Skilled Workers
-
Testimonial
-
7
Condensate Recovery Unit
Petronas FPSO Mampu-1
Client: NGLTECH / MISC
13.5mL x 5mW x 8mH, 75MT Wt
Process Skids
Condensate Recovery Unit
Petronas Sabah Operations
Client: NGLTECH
Weight: 103 MT
6.2mL x 7.7mW x12.2mH
-
Fuel Gas Treatment Unit
Petronas Bokor C
Client: ISS / PETRONAS
Weight: 30MT
Process Skids
-
Pressure Vessels
9
Seawater Filters
Super Duplex Vessel
ASME U and U2 Stamp
Pressure Vessels
Production Separators, Drums, Scrubber,
Reactors, Columns, Towers
Carbon Steel / Stainless Steel/ Duplex/
Cladded Material
-
Offshore Piling Structure
Grating
Greasing Unit
Offshore Platforms
-
FABRICATION WORKSHOP
12,000m2 Fabrication Workshop at Pasir Gudang, Johor
3 Fabrication Bays 18m x 60m, dedicated bays for Stainless steel and carbon steel material
7,000m2 Open assembly and laydown yard
Fully equipped with overhead cranes, rolling and bending machines, CNC plasma cutting
machine, punch/shear hydraulic ironworker machines
-
12,000m2 Fabrication Workshop at Pasir Gudang, Johor
3 Fabrication Bays 18m x 60m, dedicated bays for Stainless steel and carbon steel material
7,000m2 Open assembly and laydown yard
Fully equipped with overhead cranes, rolling and bending machines, CNC plasma cutting
machine, punch/shear hydraulic ironworker machines
FABRICATION WORKSHOP
-
FR
New Fabrication Shop
Land Size: 107.4m x 72m
7,736m2
Covered Shop: 3,960m2
Bay 1: 18m x 72m
Bay 2: 22m x 72m
Bay 3: 18m x 60m
Height under-hook:
Bay 2 : 15.7m
Bay 1&3 : 9.8m
-
EXPERIENCE LIST / PROJECT REFERENCES 2018
NO. SCOPE DESCRIPTION EQUIPMENT & MATERIAL PROJECT OWNER EPCC CLIENT CLIENTDATE OF
AWARDS
DATE OF
COMPLETION
1
Supply and Fabrication of
Piping and Steel Structures,
installation of equipment,
E&I Works, skid integration,
and FAT for the offshore
Condensate Recovery
Unit Skid Package
Condensate Recovery Skid Total Wt: 103.2MT
6.2mL x 7.7mW x12.2mH
LD Cold Seperator: SA 240 316L, Wt: 1991 kg
ID 900mm x T/T 3445, Thickness 8t,
Suction Scrubber: SA 516GR70N, Wt 4074kg
ID 1100mm, T/T 4670mm, Thickness 12.7t,
HP Cold Seperator: SA240 316L, Wt: 2657kg
ID900mm, T/T 3205mm, Thickness 12t,
MEG Recovery Vessel: SA516Gr70N, Wt 7159kg
ID 1200mm, T/T6405mm, Thickness 12.7t
Erb West Development Low
Pressure Condensate Recovery
System for Petronas Sabah
Operations
PETRONASNGL Tech Services Sdn
Bhd
NGL Tech Services Sdn
BhdSept 2018 Dec 2019
2
Supply and
Fabrication of
Piping and
Steel Structures,
installation of
equipment,
E&I Works,
skid integration
and FAT
Fuel Gas Skid Total Weight 32MT
6.5mL x 4.2mW x 6mH
Fuel Gas Scrubber SS516+316L clad
1.6mID x 3.7mT/T, 32+4mm Thk; Wt:7,539kg
Fuel Gas Filters SA312 TP 316L Wt: 760kg
ID 336.5mm x T/T 3045mm, Thickness 9.53t,
Fuel Gas Superheaters SA312TP 316L
Wt: 441kg
ID 304.84mm x T/T 3540mm, Thickness 9.53t
Bokor Phase 3 Redevelopment -
Central Processing Platform (CPP) PETRONAS
Malaysia Marine and
Heavy Engineering Sdn
Bhd (MMHE)
Innovative Synergy
Solutions Sdn Bhd (ISS)Oct 2018 April 2019
3
Supply and Fabrication of
Piping and Steel Structures,
installation of equipment,
E&I Works,integration
and FAT for
Vapour Recovery Skid
Packages
Vapour Recovery Skid 3.4mL x 2.1mW x 1.8mH
Total Weight: 5MT
Piping (ASTM A312 TP316) and Skid Structural
Bokor Phase 3 Redevelopment -
Central Processing Platform (CPP) PETRONAS
Malaysia Marine and
Heavy Engineering Sdn
Bhd (MMHE)
Innovative Synergy
Solutions Sdn Bhd (ISS)Oct 2018 April 2019
4Fabricate and Supply of Hot Dip Falvanized
Gratings, Chequered Plates Cover, Grating
Rapid Refinery Package 14 Utilities,
Interconnecting, Offsite (UIO) PETRONAS
OUI JV
(Technip & Fluor JV)
Gadang Engineering Sdn
BhdDec 2018 Dec 2018
5Fabricate and Supply of Hot Dip Falvanized
Gratings, Chequered Plates Cover, Grating
Rapid Refinery Package 14 Utilities,
Interconnecting, Offsite (UIO) PETRONAS
OUI JV
(Technip & Fluor JV) Sino TCC (M) Sdn Bhd April 2018 Dec 2018
6Fabricate and Supply Hot Dip Galvanized Heavy and
Light Duty Gratings Grating Rapid Refinery Package P2 Refinery PETRONAS Sinopec
Sinohydro Corporation
(M) Sdn BhdMay 2018 Nov 2018
7Fabricate and Supply Hot Dip Galvanized Heavy and
Light Duty Gratings Grating
Rapid Refinery Package 4 Sulphur
Recovery UnitPETRONAS Petrofac Petrofac E & C Sdn Bhd April 2018 May 2018
8Fabricate and Supply Hot Dip Galvanized Heavy and
Light Duty Gratings, Light Towers, Steel StructuresGrating
Rapid Refinery Package 12B Solid
Product Jetty and associated
Handling Facilities (SPJ) at Tanjung
Setapa
PETRONASSYS-McConnell Dowell
(SPJ) Joint Venture
SYS-McConnell Dowell
(SPJ) Joint VentureJan 2018 Dec 2018
-
EXPERIENCE LIST / PROJECT REFERENCES 2018
NO. SCOPE DESCRIPTION EQUIPMENT & MATERIAL PROJECT OWNER EPCC CLIENT CLIENTDATE OF
AWARDS
DATE OF
COMPLETION
9Fabricate and Supply of HDG Heavy Duty Gratings,
Stainless steel trash screensScreens
Rapid Refinery Package 14 Utilities,
Interconnecting, Offsite (UIO) PETRONAS
OUI JV
(Technip & Fluor JV)
Tan Bock Kwee & Sons
Sdn BhdApril 2018 Dec 2018
10 Fabrication and supply of Piping Works PipingRapid Refinery Package 16A
Effluent Treatment PlantPETRONAS
Wabag Muhibah JV Sdn
Bhd
Wabag Muhibah JV Sdn
BhdJune 2018 August 2018
11Fabrication and Supply Hot Dipped Galvanised
GratingGrating
Rapid Refinery Package 14 Utilities,
Interconnecting, Offsite (UIO) PETRONAS
OUI JV
(Technip & Fluor JV)
WCT Construction Sdn
BhdJune 2018 Dec 2018
12Fabrication and Supply Hot Dipped Galvanised
GratingGrating
Rapid Refinery and Petrochemical
Plant Package 2, 3, 7, 12, 14, 27PETRONAS
Sinopec
Technical Reunidas
Tecnimont-HQC JV
Technip-Fluor JV
Zhong Huaxing
Development (M) Sdn
Bhd
May 2018 Dec 2018
13
Fabricate and supply of Guides, Jigs, Band Screen,
Bar Screens, BeaTrash Rake, Washing Pipes, Flush
Pipies, Trash Baskets, Beams for Renaissance
Project
Screens, Rakes Steel Structures and PipingJamaica Renaissance 190 MW
power plant U847718
South Jamaica Power
Company (SJPC) TSK Spain Beaudrey Asia Sdn Bhd March 2018 August 2018
14
Fabricate and Supply Main Shaft (A29 Filter),
Travelling Bandscreen, Structure, Piping, Supports,
Lifting Lugs
Screen, Steel Structure and Piping
Malaysia Kota Tinggi
WaterTreatment Plant C112317
Munseh Johor River
PUB, Singapore's
National Water Agency
Munseh Engineering Sdn
Bhd Beaudrey Asia Sdn Bhd January 2018 June 2018
15
Fabrication and supply of StopLogs Gates, Trash
Rake, Travelling Band Screen and ByPass for
Carem Project
Screens, Rakes, Steel Structures and Piping
Argentina U847117 Carem - Project
Balance of Plant of the Reactor
Carem 25 Nuclear power plant
Argentina’s Comision Nacional de Energia
Atómica (CNEA)
Tecna /
Grupo Isolux Corsan Beaudrey Asia Sdn Bhd January 2018 August 2018
16Fabricate and Supply of Travelling Bandscreen and
AccesorriesScreen, Steel Structure and Piping
Malaysia Bukit Shah Project
C112517 Johor water solution
project
BEWG (M) Sdn Bhd BEWG (M) Sdn Bhd E. Beaudrey & C IE April 2018 Nov 2018
17 Fabricate and Supply of Structures Steel StructuresSingapore Tengeh Retrofit Water
Treamtnet Plant Project M846116
PUB, Singapore's
National Water Agency
PUB, Singapore's
National Water Agency Beaudrey Asia Sdn Bhd August 2018 August 2018
18 Supply and Fabricate of Jacking Timber Gage Supply and Fabricate of Jacking Timber Gage YC Logistics Sdn Bhd November 2018 December 2018
19Fabricate and supply of Lifting Bin complete with
Load Test for RAPIDPETRONAS
McConnell Dowell (M)
Sdn Bhd24/2/2018
20 Fabricate and Supply of Silencor Core Silencor CoreRapid Refinery Package 5 Steam
Creacker ComplexPETRONAS Toyo Engineering Toyo Engineering Dec 2018 January 2019
21 Dummy Spool PETRONAS Sanggul Emas Sdn Bhd 6/12/2018
-
EXPERIENCE LIST / PROJECT REFERENCES 2012-2017
NO. SCOPE DESCRIPTION EQUIPMENT, MATERIAL & SERVICES PROJECT OWNER EPCC CLIENT CLIENTDATE OF
AWARDS
DATE OF
COMPLETION
1 Fabricate and supply of Travelling Band Screen Screen, Steel Structure and Piping Singapore Tengeh Project
PUB, Singapore's
National Water
Agency
PUB, Singapore's
National Water Agency Beaudrey Asia Sdn Bhd 2017 2017
2Fabrication and Supply Hot Dipped Galvanised Grating
and CrMoly SA387 Grade II Class II Plate MaterialsGrating Rapid Refinery P3 PETRONAS Tecnicas Reunidas PetroVietnam 2017 2017
3Fabrication and Supply Hot Dipped Galvanised Grating
and CrMoly SA387 Grade II Class II Plate MaterialsGrating Rapid Refinery P3 PETRONAS Tecnicas Reunidas
Zhonghe Huaxing
Development (M) Sdn
Bhd (China Nuclear)
2017 2017
4 Fabrication and Supply Hot Dipped Galvanised Grating Grating Rapid Refinery P2 PETRONAS Sinopec EngineeringSinohydro Corporation
(M) Sdn Bhd2017 2017
5
Fabrication and Supply of Offshore Pile Clamp Platform,
Offshore Walkway Structure, Embedded SUS316L
Plates,
GratingRapid Refinery P12B Marine
FacilityPETRONAS
SYS-McConnell Dowell
(SPJ) Joint Venture
SYS-McConnell Dowell
(SPJ) Joint Venture2017 2017
6
Supply and Fabrication of
Piping and Steel Structures,
installation of equipment,
E&I Works, skid integration,
and FAT
for the Condensate
Recovery Skid Package
Condensate Recovery Skid
13.5mL x 5mW x 8mH
Total Weight: 75MT
LD Cold Seperator: SA 240 316L, ID 900mm x T/T
3445, Thickness 8t, Wt 1991kg
Suction Scrubber: SA 516 GR 70N, ID 1100mm, T/T
4670mm, Thickness 12.7t, Wt 4074kg
HP Cold Seperator: SA 240 316L, ID900mm, T/T
3205mm, Thickness 12t, Wt 2657kg
MEG Recovery Vessel: SA516 Gr 70N, ID 1200mm,
T/T6405mm, Thickness 12.7t, Wt 7159kg
Petronas FPSO Mampu-1 Vestigo Petroleum
Sdn Bhd. MISC Berhad
NGL Tech Services Sdn
Bhd2016 2016
7
Fabricate and Supply of
Continuous Tube
Cleanig Equipment
Continuous Tube Cleaning Equipment
Wt: 15000kg
Material (components): Mixture of ASTM A570 Gr50
/ UNS S 31803 / ASTM Gr.65 SS400 /
Mexico Centro Morelos
Combined Cycle 724 MW Power
Plant
Mexico state utility
CFE Comisioin Federal Beaudrey Asia Sdn Bhd 2016 2016
8
Civil, M&E, Steel Structures Fabrication, Erection and
Construction of a Workshop and Warehouse Building at
Rapid Refinery Project site at Pengerang
Steel Structures Fabrication, Erection, Civil and
M&E WorksRapid Refinery P2 PETRONAS Sinopec Engineering Sinopec Engineering 2016 2016
-
EXPERIENCE LIST / PROJECT REFERENCES 2012-2017
NO. SCOPE DESCRIPTION EQUIPMENT, MATERIAL & SERVICES PROJECT OWNER EPCC CLIENT CLIENTDATE OF
AWARDS
DATE OF
COMPLETION
9 Fabrication and Supply of Steel Structures Steel Structures Rapid Refinery P3 PETRONAS Tecnicas Reunidas PetroVietnam 2016 2016
10Fabrication and Supply of Heavy Lift and Transportation
BeamsBeams ` PETRONAS Siemens ALE 2016 2016
11 Fabrication of Out Fitting for Jack Up Rig B378 Outfitting Jack up Rig B378 Japan’s BOTL Frigstad Offshore Keppel FEL 2015 2015
12Supply and Fabrication of Steel Structures for Heavy
LiftSteel Structures - ALE - ALE 2015 2015
13Supply, Fabricate and supply of Raw Water Intake
EquipmentScreen, Steel Structure and Piping
Thailand Khanom 977MW Gas
turbine combined cycle (GTCC)
power generation plant
Khanom Electricity
Generating Co., Ltd.
(KEGCO)
Mitsubishi Heavy
Industries, Ltd. (MHI) Beaudrey 2014 2015
14Civil, M&E, Steel Structures Fabrication, Erection and
Construction of a Warehouse Building
Steel Structures Fabrication, Erection, Civil and
M&E WorksMalaysia Senai Idaman Park SKS Southern Sdn Bhd. SKS Southern Sdn Bhd. SKS Southern Sdn Bhd. 2015 2015
15Supply, Fabricate and supply of Raw Water Intake
EquipmentScreen, Steel Structure and Piping
Philippines Pagbilao 735MW coal-
fired power station
Team Energy,
JVTokyo Electric
Power Company and
Marubeni Corporation
Mitsubishi Hitachi
Power Systems and
Korea's Daelim
Industrial
Beaudrey 2015 2015
16Supply, Fabricate and supply of Raw Water Intake
EquipmentScreen, Steel Structure and Piping
Mexico Iberdrola Dulces
Nombres II, 300-MW combined
cycle power plant (CCGT)
Iberdrola Iberdrola ingeniería y
construcción. Beaudrey 2015 2015
17Supply, Fabricate and supply of Raw Water Intake
EquipmentScreen, Steel Structure and Piping
India Mundra LNG Regasification
Plant Project
GSPC LNG
Limited(GLL) Toyo Engineering Beaudrey 2015 2015
18Supply, Fabricate and supply of Raw Water Intake
EquipmentScreen, Steel Structure and Piping
Indonesia Banggai Ammonia
Plant
PT Surya Esa Perkasa
(SEP), PT Panca
Amara Utama (PAU).
Toyo Engineering - PT
Inti Karya Persada
Tehnik (IKPT)
Beaudrey 2015 2015
19Fabrication of Out Fitting for Jack Up Rig B360, 363, 369,
370, 371, 372, 373, Semi Submesible M1235, M1222Outfitting Jack up Rigs Project Keppel FEL Keppel FEL 2014 2014
20Civil, M&E, Steel Structures Fabrication, Erection and
Construction of a Warehouse Building
Steel Structures Fabrication, Erection, Civil and
M&E WorksMalaysia Seelong, Senai
Excel Metal Industries
(Malaysia)
Excel Metal Industries
(Malaysia)
Excel Metal Industries
(Malaysia)2014 2014
21Supply, Fabricate and supply of Raw Water Intake
EquipmentScreen, Steel Structure and Piping
Saudi Arabia 2,640MW Jeddah
South power plant
Saudi Electricity Co
(SEC)
Hyundai Heavy
Industries (HHI) Beaudrey 2014 2014
22Supply and Fabricate and supply of Raw Water Intake
EquipmentScreen, Steel Structure and Piping
Saudi Arabia Shuqaiq 2.64GW oil-
fired power plant
Saudi Electricity Co
(SEC)
Hyundai Heavy
Industries (HHI) Beaudrey 2014 2014
-
EXPERIENCE LIST / PROJECT REFERENCES 2012-2017
NO. SCOPE DESCRIPTION EQUIPMENT, MATERIAL & SERVICES PROJECT OWNER EPCC CLIENT CLIENTDATE OF
AWARDS
DATE OF
COMPLETION
23Supply, Fabrication and Erection of Steel Structure
Building and Installation and Erection of Plant Equipment
Steel Structure Fabrication and Erection,
Installation of Plant Equipment
Malaysia Tanjung Langsat
Biomass Steam PlantTPM Technopark Sdn Bhd
TPM Technopark Sdn
BhdAKK Engineering 2013 2013
24Supply and Fabricate and supply of Raw Water Intake
EquipmentScreen, Steel Structure and Piping
Malaysia Tanjung BinPower Plant
Phase 2 1,000 MW supercritical
coal-fired power plant
Tanjung Bin Energy
Issuer Bhd / Malakoff
Corporation
Alstom Power Beaudrey 2013 2013
25Supply and Fabricate and supply of Raw Water Intake
EquipmentScreen, Steel Structure and Piping
Mexico Centro Morelos Combined
Cycle 724 MW Power Plant
Mexico state utility
CFE Comisioin Federal Beaudrey 2013 2013
26Supply and Fabricate and supply of Raw Water Intake
EquipmentFilter Vessels - Super Duplex Material
Chile Guacolda 54 MW coal-fired
power generation plant
Empresa Eléctrica
Guacolda
Mitsubishi Heavy
Industries, Ltd. (MHI) Beaudrey 2013 2013
27Fabrication of Out Fitting for Jack Up Rig B342, 345, 346,
349, 350, 351, 352, 353, 354, 355, 356, 357, 358Outfitting Jack up Rigs Project Keppel FEL Keppel FEL 2013 2013
28
Design Supply Fabrication
and Installation of 4 units
Duplex Filter Vessels and
Oil Water Separator
Oil Seperator:
Material: Mixture of SS304 / Carbon Steel ,
Fabrication Weight: 12,269.8kg
4400mm x 1435mm x 3450mm
Filter Vessel
Material Duplex UNS S31803, ID 2000mm, TL/TL
3718mm, Thickness 8mm, Weight 10000kg
Singapore LNG Terminal Singapore LNG
Corporation (SLNG)
Samsung C&T
Corporation Ovivo Water 2012 2012
29Fabrication of Out Fitting for Jack Up Rig B322, B323,
b326, 327, 329, 330, 333, 335, 336, 341Outfitting Jack up Rigs Project Keppel FEL Keppel FEL 2013 2013
30
Fabrication Erection Paining
Overturning and Seafasterning
of 600 ton Helideck Structures
600 ton Helideck Structures Jack up Rig Helideck Mencase Offshore Mencase Offshore Keppel FEL 2012 2012
-
THANK YOU
Integer Engineering Sdn Bhd (979727-P)Sales Office: Head Office & Fabrication
2A-2 Jalan Puteri 4/2 PLO 685 Jalan Platinum Utama
Bandar Puteri, 47100 Puchong Pasir Gudang Industrial Estate Zone 12B
Selangor, Malaysia 81700 Pasir Gudang, Johor, Malaysia
Phone: +6010 661 2380
E: [email protected]; www.integergroup.com.my
mailto:[email protected]://www.integergroup.com.my/