    • Mechanical Static / Process Equipment• Pressure Vessels, Heat Exchangers, Tanks

    • Skids & Modules• Engineering,Fabrication, erection/installation & integration• Pipe Racks Module

    • Plant Fabrication and Erection• Steel Structures Building, Warehouse• Site mechanical erection and installation works

    • Mechanical Fabrication• Out fittings for Jack-up Rigs• Water Intake Screens/ Stoplog/ Stop Gate • Offshore Marine Post, Transit Tower, Helideck Structure,

    Platforms & Ladders

    • Galvanized Steel Grating (Serrated & non-Serrated)• Manpower Supply – Technical and Skilled Workers

  • Testimonial

  • 7

    Condensate Recovery Unit

    Petronas FPSO Mampu-1

    Client: NGLTECH / MISC

    13.5mL x 5mW x 8mH, 75MT Wt

    Process Skids

    Condensate Recovery Unit

    Petronas Sabah Operations

    Client: NGLTECH

    Weight: 103 MT

    6.2mL x 7.7mW x12.2mH

  • Fuel Gas Treatment Unit

    Petronas Bokor C

    Client: ISS / PETRONAS

    Weight: 30MT

    Process Skids

  • Pressure Vessels

    9

    Seawater Filters

    Super Duplex Vessel

    ASME U and U2 Stamp

    Pressure Vessels

    Production Separators, Drums, Scrubber,

    Reactors, Columns, Towers

    Carbon Steel / Stainless Steel/ Duplex/

    Cladded Material

  • Offshore Piling Structure

    Grating

    Greasing Unit

    Offshore Platforms

  • FABRICATION WORKSHOP

    12,000m2 Fabrication Workshop at Pasir Gudang, Johor

    3 Fabrication Bays 18m x 60m, dedicated bays for Stainless steel and carbon steel material

    7,000m2 Open assembly and laydown yard

    Fully equipped with overhead cranes, rolling and bending machines, CNC plasma cutting

    machine, punch/shear hydraulic ironworker machines

  • 12,000m2 Fabrication Workshop at Pasir Gudang, Johor

    3 Fabrication Bays 18m x 60m, dedicated bays for Stainless steel and carbon steel material

    7,000m2 Open assembly and laydown yard

    Fully equipped with overhead cranes, rolling and bending machines, CNC plasma cutting

    machine, punch/shear hydraulic ironworker machines

    FABRICATION WORKSHOP

  • FR

    New Fabrication Shop

    Land Size: 107.4m x 72m

    7,736m2

    Covered Shop: 3,960m2

    Bay 1: 18m x 72m

    Bay 2: 22m x 72m

    Bay 3: 18m x 60m

    Height under-hook:

    Bay 2 : 15.7m

    Bay 1&3 : 9.8m

  • EXPERIENCE LIST / PROJECT REFERENCES 2018

    NO. SCOPE DESCRIPTION EQUIPMENT & MATERIAL PROJECT OWNER EPCC CLIENT CLIENTDATE OF

    AWARDS

    DATE OF

    COMPLETION

    1

    Supply and Fabrication of

    Piping and Steel Structures,

    installation of equipment,

    E&I Works, skid integration,

    and FAT for the offshore

    Condensate Recovery

    Unit Skid Package

    Condensate Recovery Skid Total Wt: 103.2MT

    6.2mL x 7.7mW x12.2mH

    LD Cold Seperator: SA 240 316L, Wt: 1991 kg

    ID 900mm x T/T 3445, Thickness 8t,

    Suction Scrubber: SA 516GR70N, Wt 4074kg

    ID 1100mm, T/T 4670mm, Thickness 12.7t,

    HP Cold Seperator: SA240 316L, Wt: 2657kg

    ID900mm, T/T 3205mm, Thickness 12t,

    MEG Recovery Vessel: SA516Gr70N, Wt 7159kg

    ID 1200mm, T/T6405mm, Thickness 12.7t

    Erb West Development Low

    Pressure Condensate Recovery

    System for Petronas Sabah

    Operations

    PETRONASNGL Tech Services Sdn

    Bhd

    NGL Tech Services Sdn

    BhdSept 2018 Dec 2019

    2

    Supply and

    Fabrication of

    Piping and

    Steel Structures,

    installation of

    equipment,

    E&I Works,

    skid integration

    and FAT

    Fuel Gas Skid Total Weight 32MT

    6.5mL x 4.2mW x 6mH

    Fuel Gas Scrubber SS516+316L clad

    1.6mID x 3.7mT/T, 32+4mm Thk; Wt:7,539kg

    Fuel Gas Filters SA312 TP 316L Wt: 760kg

    ID 336.5mm x T/T 3045mm, Thickness 9.53t,

    Fuel Gas Superheaters SA312TP 316L

    Wt: 441kg

    ID 304.84mm x T/T 3540mm, Thickness 9.53t

    Bokor Phase 3 Redevelopment -

    Central Processing Platform (CPP) PETRONAS

    Malaysia Marine and

    Heavy Engineering Sdn

    Bhd (MMHE)

    Innovative Synergy

    Solutions Sdn Bhd (ISS)Oct 2018 April 2019

    3

    Supply and Fabrication of

    Piping and Steel Structures,

    installation of equipment,

    E&I Works,integration

    and FAT for

    Vapour Recovery Skid

    Packages

    Vapour Recovery Skid 3.4mL x 2.1mW x 1.8mH

    Total Weight: 5MT

    Piping (ASTM A312 TP316) and Skid Structural

    Bokor Phase 3 Redevelopment -

    Central Processing Platform (CPP) PETRONAS

    Malaysia Marine and

    Heavy Engineering Sdn

    Bhd (MMHE)

    Innovative Synergy

    Solutions Sdn Bhd (ISS)Oct 2018 April 2019

    4Fabricate and Supply of Hot Dip Falvanized

    Gratings, Chequered Plates Cover, Grating

    Rapid Refinery Package 14 Utilities,

    Interconnecting, Offsite (UIO) PETRONAS

    OUI JV

    (Technip & Fluor JV)

    Gadang Engineering Sdn

    BhdDec 2018 Dec 2018

    5Fabricate and Supply of Hot Dip Falvanized

    Gratings, Chequered Plates Cover, Grating

    Rapid Refinery Package 14 Utilities,

    Interconnecting, Offsite (UIO) PETRONAS

    OUI JV

    (Technip & Fluor JV) Sino TCC (M) Sdn Bhd April 2018 Dec 2018

    6Fabricate and Supply Hot Dip Galvanized Heavy and

    Light Duty Gratings Grating Rapid Refinery Package P2 Refinery PETRONAS Sinopec

    Sinohydro Corporation

    (M) Sdn BhdMay 2018 Nov 2018

    7Fabricate and Supply Hot Dip Galvanized Heavy and

    Light Duty Gratings Grating

    Rapid Refinery Package 4 Sulphur

    Recovery UnitPETRONAS Petrofac Petrofac E & C Sdn Bhd April 2018 May 2018

    8Fabricate and Supply Hot Dip Galvanized Heavy and

    Light Duty Gratings, Light Towers, Steel StructuresGrating

    Rapid Refinery Package 12B Solid

    Product Jetty and associated

    Handling Facilities (SPJ) at Tanjung

    Setapa

    PETRONASSYS-McConnell Dowell

    (SPJ) Joint Venture

    SYS-McConnell Dowell

    (SPJ) Joint VentureJan 2018 Dec 2018

  • EXPERIENCE LIST / PROJECT REFERENCES 2018

    NO. SCOPE DESCRIPTION EQUIPMENT & MATERIAL PROJECT OWNER EPCC CLIENT CLIENTDATE OF

    AWARDS

    DATE OF

    COMPLETION

    9Fabricate and Supply of HDG Heavy Duty Gratings,

    Stainless steel trash screensScreens

    Rapid Refinery Package 14 Utilities,

    Interconnecting, Offsite (UIO) PETRONAS

    OUI JV

    (Technip & Fluor JV)

    Tan Bock Kwee & Sons

    Sdn BhdApril 2018 Dec 2018

    10 Fabrication and supply of Piping Works PipingRapid Refinery Package 16A

    Effluent Treatment PlantPETRONAS

    Wabag Muhibah JV Sdn

    Bhd

    Wabag Muhibah JV Sdn

    BhdJune 2018 August 2018

    11Fabrication and Supply Hot Dipped Galvanised

    GratingGrating

    Rapid Refinery Package 14 Utilities,

    Interconnecting, Offsite (UIO) PETRONAS

    OUI JV

    (Technip & Fluor JV)

    WCT Construction Sdn

    BhdJune 2018 Dec 2018

    12Fabrication and Supply Hot Dipped Galvanised

    GratingGrating

    Rapid Refinery and Petrochemical

    Plant Package 2, 3, 7, 12, 14, 27PETRONAS

    Sinopec

    Technical Reunidas

    Tecnimont-HQC JV

    Technip-Fluor JV

    Zhong Huaxing

    Development (M) Sdn

    Bhd

    May 2018 Dec 2018

    13

    Fabricate and supply of Guides, Jigs, Band Screen,

    Bar Screens, BeaTrash Rake, Washing Pipes, Flush

    Pipies, Trash Baskets, Beams for Renaissance

    Project

    Screens, Rakes Steel Structures and PipingJamaica Renaissance 190 MW

    power plant U847718

    South Jamaica Power

    Company (SJPC) TSK Spain Beaudrey Asia Sdn Bhd March 2018 August 2018

    14

    Fabricate and Supply Main Shaft (A29 Filter),

    Travelling Bandscreen, Structure, Piping, Supports,

    Lifting Lugs

    Screen, Steel Structure and Piping

    Malaysia Kota Tinggi

    WaterTreatment Plant C112317

    Munseh Johor River

    PUB, Singapore's

    National Water Agency

    Munseh Engineering Sdn

    Bhd Beaudrey Asia Sdn Bhd January 2018 June 2018

    15

    Fabrication and supply of StopLogs Gates, Trash

    Rake, Travelling Band Screen and ByPass for

    Carem Project

    Screens, Rakes, Steel Structures and Piping

    Argentina U847117 Carem - Project

    Balance of Plant of the Reactor

    Carem 25 Nuclear power plant

    Argentina’s Comision Nacional de Energia

    Atómica (CNEA)

    Tecna /

    Grupo Isolux Corsan Beaudrey Asia Sdn Bhd January 2018 August 2018

    16Fabricate and Supply of Travelling Bandscreen and

    AccesorriesScreen, Steel Structure and Piping

    Malaysia Bukit Shah Project

    C112517 Johor water solution

    project

    BEWG (M) Sdn Bhd BEWG (M) Sdn Bhd E. Beaudrey & C IE April 2018 Nov 2018

    17 Fabricate and Supply of Structures Steel StructuresSingapore Tengeh Retrofit Water

    Treamtnet Plant Project M846116

    PUB, Singapore's

    National Water Agency

    PUB, Singapore's

    National Water Agency Beaudrey Asia Sdn Bhd August 2018 August 2018

    18 Supply and Fabricate of Jacking Timber Gage Supply and Fabricate of Jacking Timber Gage YC Logistics Sdn Bhd November 2018 December 2018

    19Fabricate and supply of Lifting Bin complete with

    Load Test for RAPIDPETRONAS

    McConnell Dowell (M)

    Sdn Bhd24/2/2018

    20 Fabricate and Supply of Silencor Core Silencor CoreRapid Refinery Package 5 Steam

    Creacker ComplexPETRONAS Toyo Engineering Toyo Engineering Dec 2018 January 2019

    21 Dummy Spool PETRONAS Sanggul Emas Sdn Bhd 6/12/2018

  • EXPERIENCE LIST / PROJECT REFERENCES 2012-2017

    NO. SCOPE DESCRIPTION EQUIPMENT, MATERIAL & SERVICES PROJECT OWNER EPCC CLIENT CLIENTDATE OF

    AWARDS

    DATE OF

    COMPLETION

    1 Fabricate and supply of Travelling Band Screen Screen, Steel Structure and Piping Singapore Tengeh Project

    PUB, Singapore's

    National Water

    Agency

    PUB, Singapore's

    National Water Agency Beaudrey Asia Sdn Bhd 2017 2017

    2Fabrication and Supply Hot Dipped Galvanised Grating

    and CrMoly SA387 Grade II Class II Plate MaterialsGrating Rapid Refinery P3 PETRONAS Tecnicas Reunidas PetroVietnam 2017 2017

    3Fabrication and Supply Hot Dipped Galvanised Grating

    and CrMoly SA387 Grade II Class II Plate MaterialsGrating Rapid Refinery P3 PETRONAS Tecnicas Reunidas

    Zhonghe Huaxing

    Development (M) Sdn

    Bhd (China Nuclear)

    2017 2017

    4 Fabrication and Supply Hot Dipped Galvanised Grating Grating Rapid Refinery P2 PETRONAS Sinopec EngineeringSinohydro Corporation

    (M) Sdn Bhd2017 2017

    5

    Fabrication and Supply of Offshore Pile Clamp Platform,

    Offshore Walkway Structure, Embedded SUS316L

    Plates,

    GratingRapid Refinery P12B Marine

    FacilityPETRONAS

    SYS-McConnell Dowell

    (SPJ) Joint Venture

    SYS-McConnell Dowell

    (SPJ) Joint Venture2017 2017

    6

    Supply and Fabrication of

    Piping and Steel Structures,

    installation of equipment,

    E&I Works, skid integration,

    and FAT

    for the Condensate

    Recovery Skid Package

    Condensate Recovery Skid

    13.5mL x 5mW x 8mH

    Total Weight: 75MT

    LD Cold Seperator: SA 240 316L, ID 900mm x T/T

    3445, Thickness 8t, Wt 1991kg

    Suction Scrubber: SA 516 GR 70N, ID 1100mm, T/T

    4670mm, Thickness 12.7t, Wt 4074kg

    HP Cold Seperator: SA 240 316L, ID900mm, T/T

    3205mm, Thickness 12t, Wt 2657kg

    MEG Recovery Vessel: SA516 Gr 70N, ID 1200mm,

    T/T6405mm, Thickness 12.7t, Wt 7159kg

    Petronas FPSO Mampu-1 Vestigo Petroleum

    Sdn Bhd. MISC Berhad

    NGL Tech Services Sdn

    Bhd2016 2016

    7

    Fabricate and Supply of

    Continuous Tube

    Cleanig Equipment

    Continuous Tube Cleaning Equipment

    Wt: 15000kg

    Material (components): Mixture of ASTM A570 Gr50

    / UNS S 31803 / ASTM Gr.65 SS400 /

    Mexico Centro Morelos

    Combined Cycle 724 MW Power

    Plant

    Mexico state utility

    CFE Comisioin Federal Beaudrey Asia Sdn Bhd 2016 2016

    8

    Civil, M&E, Steel Structures Fabrication, Erection and

    Construction of a Workshop and Warehouse Building at

    Rapid Refinery Project site at Pengerang

    Steel Structures Fabrication, Erection, Civil and

    M&E WorksRapid Refinery P2 PETRONAS Sinopec Engineering Sinopec Engineering 2016 2016

  • EXPERIENCE LIST / PROJECT REFERENCES 2012-2017

    NO. SCOPE DESCRIPTION EQUIPMENT, MATERIAL & SERVICES PROJECT OWNER EPCC CLIENT CLIENTDATE OF

    AWARDS

    DATE OF

    COMPLETION

    9 Fabrication and Supply of Steel Structures Steel Structures Rapid Refinery P3 PETRONAS Tecnicas Reunidas PetroVietnam 2016 2016

    10Fabrication and Supply of Heavy Lift and Transportation

    BeamsBeams ` PETRONAS Siemens ALE 2016 2016

    11 Fabrication of Out Fitting for Jack Up Rig B378 Outfitting Jack up Rig B378 Japan’s BOTL Frigstad Offshore Keppel FEL 2015 2015

    12Supply and Fabrication of Steel Structures for Heavy

    LiftSteel Structures - ALE - ALE 2015 2015

    13Supply, Fabricate and supply of Raw Water Intake

    EquipmentScreen, Steel Structure and Piping

    Thailand Khanom 977MW Gas

    turbine combined cycle (GTCC)

    power generation plant

    Khanom Electricity

    Generating Co., Ltd.

    (KEGCO)

    Mitsubishi Heavy

    Industries, Ltd. (MHI) Beaudrey 2014 2015

    14Civil, M&E, Steel Structures Fabrication, Erection and

    Construction of a Warehouse Building

    Steel Structures Fabrication, Erection, Civil and

    M&E WorksMalaysia Senai Idaman Park SKS Southern Sdn Bhd. SKS Southern Sdn Bhd. SKS Southern Sdn Bhd. 2015 2015

    15Supply, Fabricate and supply of Raw Water Intake

    EquipmentScreen, Steel Structure and Piping

    Philippines Pagbilao 735MW coal-

    fired power station

    Team Energy,

    JVTokyo Electric

    Power Company and

    Marubeni Corporation

    Mitsubishi Hitachi

    Power Systems and

    Korea's Daelim

    Industrial

    Beaudrey 2015 2015

    16Supply, Fabricate and supply of Raw Water Intake

    EquipmentScreen, Steel Structure and Piping

    Mexico Iberdrola Dulces

    Nombres II, 300-MW combined

    cycle power plant (CCGT)

    Iberdrola Iberdrola ingeniería y

    construcción. Beaudrey 2015 2015

    17Supply, Fabricate and supply of Raw Water Intake

    EquipmentScreen, Steel Structure and Piping

    India Mundra LNG Regasification

    Plant Project

    GSPC LNG

    Limited(GLL) Toyo Engineering Beaudrey 2015 2015

    18Supply, Fabricate and supply of Raw Water Intake

    EquipmentScreen, Steel Structure and Piping

    Indonesia Banggai Ammonia

    Plant

    PT Surya Esa Perkasa

    (SEP), PT Panca

    Amara Utama (PAU).

    Toyo Engineering - PT

    Inti Karya Persada

    Tehnik (IKPT)

    Beaudrey 2015 2015

    19Fabrication of Out Fitting for Jack Up Rig B360, 363, 369,

    370, 371, 372, 373, Semi Submesible M1235, M1222Outfitting Jack up Rigs Project Keppel FEL Keppel FEL 2014 2014

    20Civil, M&E, Steel Structures Fabrication, Erection and

    Construction of a Warehouse Building

    Steel Structures Fabrication, Erection, Civil and

    M&E WorksMalaysia Seelong, Senai

    Excel Metal Industries

    (Malaysia)

    Excel Metal Industries

    (Malaysia)

    Excel Metal Industries

    (Malaysia)2014 2014

    21Supply, Fabricate and supply of Raw Water Intake

    EquipmentScreen, Steel Structure and Piping

    Saudi Arabia 2,640MW Jeddah

    South power plant

    Saudi Electricity Co

    (SEC)

    Hyundai Heavy

    Industries (HHI) Beaudrey 2014 2014

    22Supply and Fabricate and supply of Raw Water Intake

    EquipmentScreen, Steel Structure and Piping

    Saudi Arabia Shuqaiq 2.64GW oil-

    fired power plant

    Saudi Electricity Co

    (SEC)

    Hyundai Heavy

    Industries (HHI) Beaudrey 2014 2014

  • EXPERIENCE LIST / PROJECT REFERENCES 2012-2017

    NO. SCOPE DESCRIPTION EQUIPMENT, MATERIAL & SERVICES PROJECT OWNER EPCC CLIENT CLIENTDATE OF

    AWARDS

    DATE OF

    COMPLETION

    23Supply, Fabrication and Erection of Steel Structure

    Building and Installation and Erection of Plant Equipment

    Steel Structure Fabrication and Erection,

    Installation of Plant Equipment

    Malaysia Tanjung Langsat

    Biomass Steam PlantTPM Technopark Sdn Bhd

    TPM Technopark Sdn

    BhdAKK Engineering 2013 2013

    24Supply and Fabricate and supply of Raw Water Intake

    EquipmentScreen, Steel Structure and Piping

    Malaysia Tanjung BinPower Plant

    Phase 2 1,000 MW supercritical

    coal-fired power plant

    Tanjung Bin Energy

    Issuer Bhd / Malakoff

    Corporation

    Alstom Power Beaudrey 2013 2013

    25Supply and Fabricate and supply of Raw Water Intake

    EquipmentScreen, Steel Structure and Piping

    Mexico Centro Morelos Combined

    Cycle 724 MW Power Plant

    Mexico state utility

    CFE Comisioin Federal Beaudrey 2013 2013

    26Supply and Fabricate and supply of Raw Water Intake

    EquipmentFilter Vessels - Super Duplex Material

    Chile Guacolda 54 MW coal-fired

    power generation plant

    Empresa Eléctrica

    Guacolda

    Mitsubishi Heavy

    Industries, Ltd. (MHI) Beaudrey 2013 2013

    27Fabrication of Out Fitting for Jack Up Rig B342, 345, 346,

    349, 350, 351, 352, 353, 354, 355, 356, 357, 358Outfitting Jack up Rigs Project Keppel FEL Keppel FEL 2013 2013

    28

    Design Supply Fabrication

    and Installation of 4 units

    Duplex Filter Vessels and

    Oil Water Separator

    Oil Seperator:

    Material: Mixture of SS304 / Carbon Steel ,

    Fabrication Weight: 12,269.8kg

    4400mm x 1435mm x 3450mm

    Filter Vessel

    Material Duplex UNS S31803, ID 2000mm, TL/TL

    3718mm, Thickness 8mm, Weight 10000kg

    Singapore LNG Terminal Singapore LNG

    Corporation (SLNG)

    Samsung C&T

    Corporation Ovivo Water 2012 2012

    29Fabrication of Out Fitting for Jack Up Rig B322, B323,

    b326, 327, 329, 330, 333, 335, 336, 341Outfitting Jack up Rigs Project Keppel FEL Keppel FEL 2013 2013

    30

    Fabrication Erection Paining

    Overturning and Seafasterning

    of 600 ton Helideck Structures

    600 ton Helideck Structures Jack up Rig Helideck Mencase Offshore Mencase Offshore Keppel FEL 2012 2012

  • THANK YOU

    Integer Engineering Sdn Bhd (979727-P)Sales Office: Head Office & Fabrication

    2A-2 Jalan Puteri 4/2 PLO 685 Jalan Platinum Utama

    Bandar Puteri, 47100 Puchong Pasir Gudang Industrial Estate Zone 12B

    Selangor, Malaysia 81700 Pasir Gudang, Johor, Malaysia

    Phone: +6010 661 2380

    E: [email protected]; www.integergroup.com.my

    mailto:[email protected]://www.integergroup.com.my/