Energy Saving Measures and Payback Period Calculation for DCCPP,Dholpur,RRVUNL
SL No.
1 2500000 Kwh of Electricity 7500000
2810000
2430000KWH of Electricity
31386000
4158000KWH of Electricity
41680000
5040000KWH of Electricity
516800000
50400000KWH of Electricity
6221760 KWH
665280of Electricity
Major Energy Conservation Option & Major Saving Potential
AreasEstimated Annual Energy
SavingEstimated Annual
Financial Saving in Rs.Installation of VFD in BFP &
CWP MotorsTemperature Controller (ATC) For Switching
On/Off Cooling Tower FanApplication of Glass Filled Polymer Coating in CW
Pumps
Installation of Hybrid Wind VentilatorCondenser Cleaning of
Condenser Tubes Using Bullet ShotsInstallation of Demand side
Controller in Compressed Air System
Energy Saving Measures and Payback Period Calculation for DCCPP,Dholpur,RRVUNL
Simple Pay Back Period
25000000 30-40 Months
3000000 15 Months
9000000 26 Months
2500000 6 Months
40000000 9.5 Months
500000 9 Months
Estimated Expenditure in Rs.
Sr No.
1 6000000 14500000
240000
120000 150000kWh of Electricity
3806400
2419200 3500000kWh of Electricity
460480 kWh
181440 300000of Electricity
Energy Saving Measures and Payback Period Calculation for RGTPP,Ramgarh,RRVUNL of Stage-I & II
Major Energy Conservation Option & Major Saving Potential Areas
Estimated Annual Energy Saving
Estimated Annual Financial Saving in
Rs.Estimated
Expenditure in Rs.
Installation of VFD in BFP & CWP Motors
2000000 kWh of ElectricityController (ATC) For
Switching On/Off Cooling Tower FanApplication of Glass Filled Polymer Coating in CW PumpsController in Compressed Air System
25-30 Months
12-18 Months
15-18 Months
15-20 Months
Energy Saving Measures and Payback Period Calculation for RGTPP,Ramgarh,RRVUNL of
Simple Pay Back Period