Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed...
Transcript of Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed...
![Page 1: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/1.jpg)
Energy Pipelines CRC
Outcomes and Update
APGA Convention 2018 Darwin
Robert Newton- CEO
![Page 2: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/2.jpg)
Energy Pipelines CRC
2017-2018
• 8 projects completed bringing the total number of completed
projects to 86.
• 24 research projects currently active.
• $1.8 million expended on Energy Pipelines CRC research
projects across four research programs this year.
• 54 researchers, including 8 PhD students.
• 39 active industry advisors (principally from APGA RSC
member companies).
![Page 3: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/3.jpg)
Research Program One:
Materials
• New Research has produced a new standardised
approach for assessing the relative remaining lifetime
of PE pipes that includes material grade, pipe location
and age.
• New research to further develop and improve
PIPESTRAIN has commenced and will be completed
before April 2019
• Research that aims to provide industry guidelines for
predicting and controlling WMHACC in X70 pipelines is
nearing completion
![Page 4: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/4.jpg)
Research Program Two
Life Extension
• A new corrosion integrity monitoring technique was
tested in the field. The technique provides real time
monitoring of the effectiveness of the CP system.
• Further Stress Corrosion Cracking (SCC) research
relates manufacturing processes to microstructures
with a lower SCC susceptibility in a quantifiable
manner.
• Research to improve engineering guidance for design
of cathodic protection (CP) systems at pipeline
shoreline crossings was completed in 2017-18.
![Page 5: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/5.jpg)
Research Program Three:
Design and Construction
• A new project to create a Fracture Control Code of
Practice for the Australian industry, has commenced.
• A full scale test rig to better understand drilling damage
to pipelines caused by Horizontal Directional Drilling
equipment has been commissioned.
• Research into future energy fluids has quantified the
issues and opportunities associated with a number of
fluids such as syngas and hydrogen.
![Page 6: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/6.jpg)
Research Program Four:
Public Safety and Security of Supply
• Research completed this year reviewed the range of
engineering and procedural controls used in AS2885 to
protect pipelines from external interference, and also
identified new controls which may be beneficial.
• AS2885 has issued a new part 6 for public comment.
This part includes more specific requirements for safety
management studies and draws heavily upon the RP4
research.
• Case study work examined land use planning practices
around pipelines in the UK and made comparisons with
similar practices in Victoria.
![Page 7: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/7.jpg)
A Legacy of Success
Through direct industry collaboration, the Energy Pipelines
CRC has delivered;
• World Leading Research in Fracture Control
• The establishment of the National Facility For Pipeline
coatings Assessment
• Input into many standards including AS2885
• Training the next generation of engineers through
scholarships and industry mentoring.
• Used as a role model by Commonwealth Govt for
industry led research and collaboration.
![Page 8: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/8.jpg)
Government recognition
• Energy Pipelines CRC considered as one the best
performing CRCs by C’wealth
• Exemplar CRC for Industry-Research Collaboration
• Strong track record for delivery:
– Delivering value to Industry
– Delivering value to Australia
• Strong international recognition
• Recipient of two CRCA Innovation Awards
![Page 9: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/9.jpg)
EPCRC Windup
Activities to June 2019
• Completion of all current CRC projects before
April 2019
• Completion of CCS RDD project by March 2019
• New projects approved by EPCRC Board on 11
July to be completed by June 2019
• Commonwealth reporting requirements
– During 2018-19
– At completion of CRC funded activities
• Wind back to asset holding organisation
![Page 10: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/10.jpg)
![Page 11: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/11.jpg)
• Established by the Hawke Government
• Maintained bipartisan support for 30 years
• Competitive, merit based grant programme
• Industry-led and outcome-focused
• Collaborative research partnerships b/w;
▪ Industry.
▪ Researchers.
▪ Community.
• Directly address Australia’s standing in OECD for
Industry-Academic interaction• Typical CRC’s are ~ 25% Commonwealth Cash, 15% Participant Cash: 60%
Participant In-Kind.
![Page 12: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/12.jpg)
• November 2016 – Strategic planning day
• March 2017 – New bid planning day
• July 2017 – Stage 1 Bid submitted
• October 2017 - Stage 2 Planning workshop
• December 2017 – Stage 2 Bid submitted
• February 2018 – Stage 2 interview
• April 2018 – Future Fuels CRC announcement
…and many stakeholder
interactions in between…
![Page 13: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/13.jpg)
• On 12 April 2018 Assistant Minister for Industry,
Innovation and Science Senator The Hon Zed Seselja
announced Government’s CRC program will be co-
funding Future Fuels CRC with $26.25m.
![Page 14: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/14.jpg)
![Page 15: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/15.jpg)
![Page 16: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/16.jpg)
![Page 17: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/17.jpg)
RP1 – Future Fuels Technologies,
Systems & Markets
RP3 – Network Lifecycle
Management
RP 2 – Social Acceptance, Security of
Supply & Public Safety
• Education
• Training• Utilisation
• Commercialisation
![Page 18: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/18.jpg)
• CSIRO National Hydrogen Roadmap
• Chief Scientist COAG paper ‘Hydrogen for Australia’s future’
• ARENA funding of $22 million for exporting renewable hydrogen
• AGIG Hydrogen Injection Project
• ATCO Hydrogen Micro-grid
• Jemena Power to Gas
• AGIG Biogas Injection
• 2 Proposed SA PtG Projects
![Page 19: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/19.jpg)
• Establishment phase: May 2018 – September 2018
• Constitution
• Key agreements – Gov’t and Participants
• Governance
• Start-up phase: October 2018 – June 2019
• Program and project development
• Operations
• Management
• Steady–state phase: July 2019 to 2025
![Page 20: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/20.jpg)
• Timely Delivery of Establishment Phase◦ Signed agreements
• Move to ‘Start-Up Phase’ – & Get Into It◦ In parallel with last 12 months of Energy Pipelines CRC
◦ Identify projects across its programs – start by year end
◦ Leads to middle ‘steady-state research years’
◦ Run-state for these ~5 years – substantial - capability of nearly $1m
cash and in-kind per month
• Key message – over next 12 months two org’s◦ Transition and Wind-Up Plan for Energy Pipelines CRC
◦ Formal segregations for some issues, but continue to sensibly
operate our secretariat resources across two org’s.
![Page 21: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/21.jpg)
![Page 22: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/22.jpg)
The decarbonisation challenge is huge
Gas and electricity networks are both part of the solution
0
500
1,000
1,500
2,000
2,500
Jan-14 Apr-14 Jul-14 Oct-14 Jan-15 Apr-15 Jul-15 Oct-15 Jan-16 Apr-16 Jul-16 Oct-16 Jan-17 Apr-17 Jul-17
Direct Gas Consumption Electricity Consumption Transport Consumption
Total Energy Consumption Renewable Generation
![Page 23: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/23.jpg)
![Page 24: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/24.jpg)
Focus on understanding the technical, commercial and market barriers to, and opportunities for, the use of future fuels
◦ Integrated planning of fuel systems production, delivery and use;
◦ Techno-economic modelling of fuel production processes and supply chains;
◦ Accelerated development of early stage, breakthrough technologies;
◦ Compatibility of end user equipment with future fuels;
◦ Applied research support to support future fuels demonstration projects.
![Page 25: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/25.jpg)
Studies the social and policy context, including
public acceptance and safety, for future fuels
technology and infrastructure
◦ Appropriate community engagement;
◦ Policy solutions for new technology governance;
◦ Organisational accident prevention;
◦ Urban encroachment and third party interference.
![Page 26: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/26.jpg)
Advances in design, construction, and
operations-related factors relevant to energy
infrastructure, extending the life of existing
infrastructure and enabling safe and efficient
delivery of existing and future fuels.
◦ Material properties and performance;
◦ Safe and efficient design, construction and operation of an
integrated fuels infrastructure;
◦ Smart monitoring, data management and asset condition
prediction;
◦ Advanced infrastructure repair and protection systems.
![Page 27: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/27.jpg)
PhD program
Undergraduate program
Development of education modules (for industry)
Training of industry personnel / competencies
Exchange and secondments
2 research-industry dissemination seminars per year
Researcher Conference
In-house company presentations
Presentations at industry conferences / seminars
Etc.
![Page 28: Energy Pipelines CRC Outcomes and Update · Energy Pipelines CRC 2017-2018 • 8 projects completed bringing the total number of completed projects to 86. • 24 research projects](https://reader034.fdocuments.net/reader034/viewer/2022042313/5edce70fad6a402d6667c87c/html5/thumbnails/28.jpg)