Energy labeling and Solar Thermal - June 2012 -

10
Energy labeling and Solar Thermal - June 2012 -

description

Energy labeling and Solar Thermal - June 2012 -. Product label - Typical -. Product label - Solar thermal -. Package label - Typical -. Package label - Solar thermal -. Package label - How it works -. Package label - How it works -. Package label - implementation -. - PowerPoint PPT Presentation

Transcript of Energy labeling and Solar Thermal - June 2012 -

Page 1: Energy labeling and Solar Thermal - June 2012 -

Energy labeling and Solar Thermal- June 2012 -

Page 2: Energy labeling and Solar Thermal - June 2012 -

Product label- Typical -

Page 3: Energy labeling and Solar Thermal - June 2012 -

Product label- Solar thermal -

Page 4: Energy labeling and Solar Thermal - June 2012 -

Package label- Typical -

Page 5: Energy labeling and Solar Thermal - June 2012 -

Package label- Solar thermal -

Page 6: Energy labeling and Solar Thermal - June 2012 -

Package label- How it works -

Page 7: Energy labeling and Solar Thermal - June 2012 -

Package label- How it works -

Page 8: Energy labeling and Solar Thermal - June 2012 -

Package label- implementation -

Page 9: Energy labeling and Solar Thermal - June 2012 -

Need for testing- Solar thermal -

Page 10: Energy labeling and Solar Thermal - June 2012 -

Need for testing- Solar thermal -

As to the current status:

• It seems that the label for boilers and combi systems will be the first to be implemented. This may be a problem since for combi systems you need Lot 2??

• In the latest version for boilers, there is a surprising change introduced: a supplier of both solar and a conventional boiler is now allowed to label the package. This was limited to the dealer / installer.

• Currently we are waiting for the commissioner to make the working documents a formal proposal. The last obstacle is a protest from EHI: Max. label class for gas boiler must be ‘A’ and the efficiency should be mentioned on the label. The commission seems to move in their direction, but it does not have much consequences for our business.

• There is no formal new date for the implementation. We are just waiting for Outinger.

Best regards,Gerard van AmerongenvAConsult