A Seminar Presentation
on“Energy Audit For CITM ,Jaipur ”
SUBMITTED To: SUBMITTED BY: Mr kuldeep Saini Pawan KumarHead of Department (12ECIEE008) Ram Ratan Nagar (12ECIEE011)
![Page 2: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/2.jpg)
CONTENT1. What is Energy?2. Types of Energy.3. Definition of Energy Management.4. The Energy Management System.5. The Energy Management System.6. The Objectives of Energy Management.7. Definition of Energy Audit.8. Why the Need for Energy Audit.9. Types of Energy Audits.10. Energy Audit Instruments.
![Page 3: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/3.jpg)
11. Technical and Economic feasibility- Factors.12. Understanding energy costs.13. Citm Load Calculation
![Page 4: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/4.jpg)
WHAT IS ENERGY?Energy is the capacity of a physical system to
perform work. Energy exists in several forms such as heat,
kinetic or mechanical energy, light, potential energy, electrical or other forms.
According to the law of conservation of energy, the total energy of a system remains constant, though energy may transform into another form.
![Page 5: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/5.jpg)
TYPES OF ENERGY• Mechanical energy
Mechanical energy is energy that results from movement or the location of an object. Mechanical energy is the sum of Kinetic and Potential Energy.
• Thermal energyThermal energy or heat energy reflects the temperature difference between two systems.
• Nuclear energyNuclear energy is energy resulting from changes in the atomic nuclei or from nuclear
• Chemical energyChemical energy results from chemical reactions between atoms or molecules. There are different types of chemical energy, such as electrochemical energy etc.
• Electromagnetic energyElectromagnetic energy is energy from light or electromagnetic waves.
![Page 6: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/6.jpg)
Definition of Energy Management
Energy Management is defined as “The strategy of adjusting and optimizing energy, using systems and procedures so as to reduce energy requirements per unit of output while holding constant or reducing total costs of producing the output from these systems”
![Page 7: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/7.jpg)
The Energy Management System
![Page 8: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/8.jpg)
The Objectives of Energy Management
1. To achieve and maintain optimum energy procurement and utilisation, throughout the organization.
2. To minimise energy costs / waste without affecting production & quality.
3. To minimise environmental effects.
![Page 9: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/9.jpg)
Definition of Energy Audit• As per Indian Energy Conservation Act 2001,
Energy Audit is defined as:
“The verification, monitoring and analysis of use of energy including submission of technical report containing recommendations for improving energy efficiency with cost benefit analysis and an action plan to reduce energy consumption “
![Page 10: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/10.jpg)
Why the Need for Energy Audit
• The three top operating expenses are energy (both electrical and thermal), labour and materials.
• Primary objective of Energy Audit is to determine ways to reduce energy consumption per unit of product output or to lower operating costs.
• Energy Audit provides a “ bench-mark” (Reference point) for managing energy in the organization.
![Page 11: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/11.jpg)
Types of Energy Audits
1. Preliminary Energy Audit2. Targeted Energy Audit3. Detailed Energy Audit
![Page 12: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/12.jpg)
Energy Audit Instruments
1. Electrical System Parameters
![Page 13: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/13.jpg)
2. Combustion AnalyzerThis instrument has in-built chemical cells which measure various gases such as O2, CO, NOx and SOx.
![Page 14: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/14.jpg)
3.Temperature measurements(a) Contact thermo meter These are thermocouples which measures for example flue gas, hot air, hot water temperatures by insertion of probe into the stream
![Page 15: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/15.jpg)
(b) Infrared thermometerThis is a non-contact type measurement which when directed at a heat source directly gives the temperature read out. This instrument is useful for measuring hot spots in furnaces, surface temperatures etc.
![Page 16: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/16.jpg)
5. Leak detectorsUltrasonic instruments are available which can be used to detect leaks of compressed air. Other gases which are normally not possible to detect with human abilities. Compressed Air Leaks.Steam Leak.
![Page 17: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/17.jpg)
6. Measurement of lightLux meters Illumination levels are measured with a lux meter. It consists of a photo cell which senses the light output, converts to electrical impulses which are calibrated as lux.
![Page 18: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/18.jpg)
Technical and Economic feasibility- Factors
Sample Worksheet for Economic Feasibility Name of Energy Efficiency Measure
i. Investment a. Equipments b. Civil works c. Instrumentati
on d. Auxiliaries
2. Annual operating costs Cost of capital Maintenance Manpower Energy Depreciation
3. Annual savings Thermal Energy Electrical Energy Raw material Waste disposal
Net Savings /Year (Rs./year) = (Annual savings-annual operating costs)
Payback period in months = (Investment/net savings/year) x 12
Technology availability, space, skilled man power, reliability, service, Impact of measure on safety, quality, production or process. Maintenance requirements and spares availability
![Page 19: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/19.jpg)
CITM LOAD CALCULATION
COMPUTER LAB
Connected Load Running Load
Total Load 7.81 kwh 2.25 kwh
![Page 20: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/20.jpg)
LIBRARY
Connected load Running Load
Total Load 2.63 kwh 0.74 kwh
![Page 21: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/21.jpg)
CANTEEN
Connected Load Running Load
Total Load 0.66 kwh 0.53 kwh
![Page 22: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/22.jpg)
BCA and MBA Block
Connected Load Running Load
Total Load 3.97 kwh 1.26 kwh
![Page 23: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/23.jpg)
B.TECH BLOCK
Connected Load Running Load
Total Load 7.75 kwh 1.79 kwh
![Page 24: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/24.jpg)
ADMINISTRATION BLOCK
Connected Load Running Load
Total Load 3.90 kwh 2.32 kwh
![Page 25: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/25.jpg)
BOY’S HOSTEL
Connected Load Running Load
Total Load 34.36 kwh 11.16 kwh
![Page 26: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/26.jpg)
GIRL’S HOSTEL
Connected Load Running Load
Total Load 6.58 kwh 2.45 kwh
![Page 27: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/27.jpg)
AUDITORIUM AND TEMPLE
Connected Load Running Load
Total Load 6.67 kwh 0.83 kwh
![Page 28: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/28.jpg)
JAN TV
Connected Load Running Load
Total Load 10.18 kwh 8.32 kwh
![Page 29: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/29.jpg)
ALL LABS
Connected Load Running Load
Total Load 4.29 kwh 1.00 kwh
![Page 30: Energy audit for citm college](https://reader036.fdocuments.net/reader036/viewer/2022070514/587c6d8e1a28abd04e8b4f07/html5/thumbnails/30.jpg)