U.E.A SOLITARIADISTRIBUCION DE ENERGIA hp=746 watss
746 COSTO KW-HORA $ 0.0220
VENTILADORES DIAS LABORABLE 30
ITEM NIVEL NOMBRE CFM AN HP KW Hr KW/DIA1 NV-245 VENTILADOR 40,000.00 70 60 45 21 939.962
NV-285
VENTILADOR 25,000.00 34 25 19 21 391.653 VENTILADOR 50,000.00 87 75 56 24 1342.84 VENTILADOR 30,000.00 71.5 60 45 24 1074.245 TALLER VENTILADOR 50,000.00 148 125 93 0 06 STAND BY VENTILADOR 30,000.00 62 50 37 0 07 STAND BY NV-390 VENTILADOR 20,000.00 27.5 20 15 0 08 NV-265 VENTILADOR 15,000.00 48.8 40 30 20 596.89 NV-235 VENTILADOR 5,000.00 17.5 12.5 9 20 186.5
10 NV-410 S VENTILADOR 15,000.00 48.8 40 30 24 716.16TOTAL KW DIA 5248.11TOTAL KW MES 157,443.30
COSTO KW MES $ 3,463.75
![Page 2: Energia Kw Hora[1]](https://reader035.fdocuments.net/reader035/viewer/2022081805/55cf8ab755034654898d2726/html5/thumbnails/2.jpg)
BONBAS DE AGUA hp= 746 COSTO KW-HORA $ 0.020
DIAS LABORABLE 30
NIVEL NOMBRE HP KW Hrs KW/DIA
NV-245BONBA MAYO 8.00 6 10 59.68BOMBA MATADOR 32.00 24 12 286.46
NV-285 BONBA MAYO 8.00 6 16 95.49NV-290 BOMBA MATADOR 32.00 24 16 381.95NV-320 BOMBA MATADOR 32.00 24 18 429.70NV-350 BOMBA MATADOR 32.00 24 18 429.70NV-315 BONBA MAYO 8.00 6 18 107.42NV-370 BOMBA MATADOR 32.00 24 12 286.46
NV-390BOMBA MATADOR 32.00 24 12 286.46BONBA MAYO 8.00 6 12 71.62
NV-410 N BOMBA MATADOR 32.00 24 12 286.46NV-440 BOMBA MATADOR 32.00 24 9 214.85NV-460 BOMBA MATADOR 32.00 24 18 429.70N-235 BONBA MAYO 8.00 12 9 108.00
TOTAL KW DIA 3,473.95
TOTAL KW MES 104,218.56
COSTO KW MES $ 2,084.37
![Page 3: Energia Kw Hora[1]](https://reader035.fdocuments.net/reader035/viewer/2022081805/55cf8ab755034654898d2726/html5/thumbnails/3.jpg)
CIA MINERA SAN VALENTIN U.E.A :SOLITARIA
SUPERINTENDENCIA MINA COSTO KW/HORACONSUMO DE ENERGIA ELECTRICA AGOSTO 2009 $ 0.022
DESCRIPCION HP
ENERGIA(Kw-Dia)
VENTILADORES 60,75,25,125,12.5 5248 157443 3463.75BOMBAS SUMERGIBLES 8,32 3474 104219 2292.81COMPRENSORA 125,176 5248 157443 3463.75JUMBO BOOMER 281 52 KW 364 10920 240.24WINCHE ELEC /EQUIPO DIAM/Y MOTOR AFILAR BROCA 30,25,7.5 502 7532 165.69ALUMBRADO PUBLICO 50 KW 1200 36000 792.00TOTAL CONSUMO ENERGIA ELECTRICA 16036 473557 10,418.25
TOTAL KWS MES
COSTO ENERGIA MENSUAL $$
![Page 4: Energia Kw Hora[1]](https://reader035.fdocuments.net/reader035/viewer/2022081805/55cf8ab755034654898d2726/html5/thumbnails/4.jpg)
COSTO KW-HORA $ 0.022
DIAS LABORABLE 30
EQUIPO AM HP KW Hrs Kw/DíaWnche electrico 36 30 27.5 6 165Winche electrico 36 30 27.5 0 0Afilodora broca 10 7.5 3.5 1 3.5Motor agua 2.58 1.5 1 8 8Motor de lodo 10.00 6 3.7 8 29.6Sonda Drill 71.5 37 8 296
TOTAL KW DIA 502.10
TOTAL KW MES 15,063.00
COSTO KW MES $ 331.39
COMPRENSEORAS RMP AM HP KW Hrs Kw/DíaKELLOY1 1740 147 125 93 8 744KELLOY2 1740 147 125 93 0 0KELLOY3 1740 147 0 93 0 0ATLAS COPCO 250 165 22 3630
TOTAL KW DIA 4,374.00
TOTAL KW MES 131,220.00
COSTO KW MES $ 2,886.84
ALUMBRADO PUBLICO CANTIDAD KW Hrs Kw/diaFLORENCENTES 54 50 24 1200 $ 792.00JUMB BOOMER 281 1 52 7 364 $ 240.24
TOTAL KW DIA 1,564.00 $ 1,032.24TOTAL KW MES 46,920.00
COSTO KW MES $ 1,032.24