ENERGETIKA CJSC BUGOJNOUtilization of Electric Power Plants Distribution of Technological Water Plastics Processing
Armije BiH 17170230 Bugojno
BOSNIA AND HERZEGOVINA
ENERGETIKA CJSC BUGOJNO
Basic information
ENERGETIKA CJSC BUGOJNO Property: Joint-stock company 10
shareholders The majority owners (>94%) : Emin Tiro,
Sead Burnić and Ensar Bukarić Number of employees: 3 Director: Emin Tiro Supervisory Board Chairman: Ensar
Bukarić
ENERGETIKA CJSC BUGOJNOAddress of company:
Armije BiH 17170230 BugojnoBOSNIA AND HERZEGOVINA
ENERGETIKA CJSC BUGOJNOBank account:
ID number: 4236012900005VAT number: 236012900005
Bank:Privredna banka Sarajevo, Filijala BugojnoBank account: 1011300000084460
ENERGETIKA CJSC BUGOJNOProfit per year:
2009
2010
2011
2012
2013
2014
2015
2016
-160,000-140,000-120,000-100,000-80,000-60,000-40,000-20,000
020,000
Profit / Loss (KM)
1,95583 KM (Convertible mark) = 1 € (Euro)
ENERGETIKA CJSC BUGOJNO
Opportunities
ENERGETIKA CJSC BUGOJNO
Business scope of ‘’Energetika’’ CJSC Bugojno includes distribution of power supply through ''Elektroprivreda'' Sarajevo, technological water and sewage, and we have two plastics processing machines as well.
ENERGETIKA CJSC BUGOJNO
We possess excess square meters and we would like to rent them for the purpose of production, storage or office utilization.
It is possible to establish a mini water power plant on our water flow.
ENERGETIKA CJSC BUGOJNO
In the case that interested parties find a market for our business operations, there is a possibility for joint investment in machines and equipment in our premises.
ENERGETIKA CJSC BUGOJNO
Since our Staff premises are positioned next to the highway, they can be used for various purposes such as construction of a motel, gas station, wholesale with an exhibition hall or offices.
It is also possible to put an advertising billboard on this facility.
ENERGETIKA CJSC BUGOJNO
We are entitled to 6,5 MW of engaged power and we own complete power supply equipment, power supply lines and lightning in the industrial zone, as well as technological water supply pipeline and sewage.
ENERGETIKA CJSC BUGOJNO
We also own the unused land having almost 10 quarter-acres of surface in the industrial zone which can be used for different purposes.
ENERGETIKA CJSC BUGOJNO
Location
ENERGETIKA CJSC BUGOJNO
Energetika CJSC Bugojno has the unused production premises being located in the industrial zone of former factory ''Slavko Rodić“ Bugojno next to Banja Luka – Split highway.
ENERGETIKA CJSC BUGOJNO
Slavko Rodić
VIA KUPRES - SPLIT VIA JAJCE – BANJA LUKA
Energetika CJSC Bugojno has the unused production premises being located in the industrial zone of former factory ''Slavko Rodić“ Bugojno next to Banja Luka – Split highway.
ENERGETIKA CJSC BUGOJNO
Slavko Rodić
VIA KUPRES - SPLIT VIA JAJCE – BANJA LUKA
Compressor station
Staff premises
Workshop
Boiler-room
Water pumps
ENERGETIKA CJSC BUGOJNO
Objects
ENERGETIKA CJSC BUGOJNO The company has the following facilities:
ENERGETIKA CJSC BUGOJNO
1. Compressor station with 150 m2 surface including 1.500 m2 of land. It is available for renting or selling.
ENERGETIKA CJSC BUGOJNO
Compressor station
ENERGETIKA CJSC BUGOJNO 2. Staff premises with 370 m2 surface and
two floors, being suitable for a branch office, exhibition room, point-of-sale or offices. It is positioned at the entrance into the industrial zone and has a big parking place next to the highway.
ENERGETIKA CJSC BUGOJNO
Staff premises
ENERGETIKA CJSC BUGOJNO 3. Workshop with 600 m2 surface including
2.000 m2 of land. Here we perform plastics processing by means of spraying technology and it is possible to extend this production and to introduce new technologies in cooperation with interested parties.
ENERGETIKA CJSC BUGOJNO
Workshop
ENERGETIKA CJSC BUGOJNO 4. Boiler-room with 300 m2 surface
including 1.800 m2 of land. This facility is suitable for production, renting or joint production startup.
ENERGETIKA CJSC BUGOJNO
Boiler-room
ENERGETIKA CJSC BUGOJNO In addition to plastics processing by means of
spraying technology, the company also provides distribution of technological water as well as utilization of our power supply plants in the industrial zone.
ENERGETIKA CJSC BUGOJNO
Water pumps at the entrance of ''Slavko Rodić'' factory
ENERGETIKA CJSC BUGOJNO
Drinking water in Alibegovići
ENERGETIKA CJSC BUGOJNO
Technological water in Poriče (Bugojno)
ENERGETIKA CJSC BUGOJNO
Water flow on Poričnica river (Bugojno)
ENERGETIKA CJSC BUGOJNO
Our facilities within ''Slavko Rodić'' factory(Boiler-room, Compressor station and Workshop and their surroundings)
ENERGETIKA CJSC BUGOJNO
Our facilities within ''Slavko Rodić'' factory(Staff premises and their surroundings)
ENERGETIKA CJSC BUGOJNO
Our facilities within ''Slavko Rodić'' factory(Water flow, filtering facility and their surroundings)
ENERGETIKA CJSC BUGOJNO
Contacts
ENERGETIKA CJSC BUGOJNO Contact persons:
Emin TiroManagerMob: 061 / 816 - 777, Tel / fax: 030 / 251 - 503e-mails: [email protected];