ENERGETIKA CJSC BUGOJNO Utilization of Electric Power Plants Distribution of Technological Water Plastics Processing Armije BiH 171 70230 Bugojno BOSNIA AND HERZEGOVINA

Transcript of Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

Page 1: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNOUtilization of Electric Power Plants Distribution of Technological Water Plastics Processing

Armije BiH 17170230 Bugojno

BOSNIA AND HERZEGOVINA

Page 2: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

Basic information

Page 3: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO Property: Joint-stock company 10

shareholders The majority owners (>94%) : Emin Tiro,

Sead Burnić and Ensar Bukarić Number of employees: 3 Director: Emin Tiro Supervisory Board Chairman: Ensar

Bukarić

Page 4: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNOAddress of company:

Armije BiH 17170230 BugojnoBOSNIA AND HERZEGOVINA

Page 5: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNOBank account:

ID number: 4236012900005VAT number: 236012900005

Bank:Privredna banka Sarajevo, Filijala BugojnoBank account: 1011300000084460

Page 6: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNOProfit per year:

2009

2010

2011

2012

2013

2014

2015

2016

-160,000-140,000-120,000-100,000-80,000-60,000-40,000-20,000

020,000

Profit / Loss (KM)

1,95583 KM (Convertible mark) = 1 € (Euro)

Page 7: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

Opportunities

Page 8: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

Business scope of ‘’Energetika’’ CJSC Bugojno includes distribution of power supply through ''Elektroprivreda'' Sarajevo, technological water and sewage, and we have two plastics processing machines as well.

Page 9: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

We possess excess square meters and we would like to rent them for the purpose of production, storage or office utilization.

It is possible to establish a mini water power plant on our water flow.

Page 10: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

In the case that interested parties find a market for our business operations, there is a possibility for joint investment in machines and equipment in our premises.

Page 11: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

Since our Staff premises are positioned next to the highway, they can be used for various purposes such as construction of a motel, gas station, wholesale with an exhibition hall or offices.

It is also possible to put an advertising billboard on this facility.

Page 12: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

We are entitled to 6,5 MW of engaged power and we own complete power supply equipment, power supply lines and lightning in the industrial zone, as well as technological water supply pipeline and sewage.

Page 13: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

We also own the unused land having almost 10 quarter-acres of surface in the industrial zone which can be used for different purposes.

Page 14: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

Location

Page 15: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

Energetika CJSC Bugojno has the unused production premises being located in the industrial zone of former factory ''Slavko Rodić“ Bugojno next to Banja Luka – Split highway.

Page 16: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

Slavko Rodić

VIA KUPRES - SPLIT VIA JAJCE – BANJA LUKA

Energetika CJSC Bugojno has the unused production premises being located in the industrial zone of former factory ''Slavko Rodić“ Bugojno next to Banja Luka – Split highway.

Page 17: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

Slavko Rodić

VIA KUPRES - SPLIT VIA JAJCE – BANJA LUKA

Compressor station

Staff premises

Workshop

Boiler-room

Water pumps

Page 18: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

Objects

Page 19: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO The company has the following facilities:

Page 20: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

1. Compressor station with 150 m2 surface including 1.500 m2 of land. It is available for renting or selling.

Page 21: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

Compressor station

Page 22: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO 2. Staff premises with 370 m2 surface and

two floors, being suitable for a branch office, exhibition room, point-of-sale or offices. It is positioned at the entrance into the industrial zone and has a big parking place next to the highway.

Page 23: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

Staff premises

Page 24: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO 3. Workshop with 600 m2 surface including

2.000 m2 of land. Here we perform plastics processing by means of spraying technology and it is possible to extend this production and to introduce new technologies in cooperation with interested parties.

Page 25: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

Workshop

Page 26: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO 4. Boiler-room with 300 m2 surface

including 1.800 m2 of land. This facility is suitable for production, renting or joint production startup.

Page 27: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

Boiler-room

Page 28: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO In addition to plastics processing by means of

spraying technology, the company also provides distribution of technological water as well as utilization of our power supply plants in the industrial zone.

Page 29: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

Water pumps at the entrance of ''Slavko Rodić'' factory

Page 30: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

Drinking water in Alibegovići

Page 31: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

Technological water in Poriče (Bugojno)

Page 32: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

Water flow on Poričnica river (Bugojno)

Page 33: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

Our facilities within ''Slavko Rodić'' factory(Boiler-room, Compressor station and Workshop and their surroundings)

Page 34: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

Our facilities within ''Slavko Rodić'' factory(Staff premises and their surroundings)

Page 35: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

Our facilities within ''Slavko Rodić'' factory(Water flow, filtering facility and their surroundings)

Page 36: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO

Contacts

Page 37: Energetika z.d.d. Bugojno (10 12 2016) (05) (LD) (EN)

ENERGETIKA CJSC BUGOJNO Contact persons:

Emin TiroManagerMob: 061 / 816 - 777, Tel / fax: 030 / 251 - 503e-mails: [email protected];

[email protected]

Ensar Bukarić, B.Sc.Mech. Supervisory Board Chairman Mob: 061 / 434 - 476, Tel / fax: 030 / 251 - 503e-mail: [email protected]