    BSC6810 System

    Commissioning

    BSC6810V200R010

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    2/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 2

    The commissioning of the

    RNC is performed after the

    hardware and software are

    installed. The commissioning

    ensures that the RNC works

    properly as designed.

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    3/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 3

    Upon completion of this course, you

    will be able to:

    Describe the procedure of BSC6810

    system commissioning

    Discuss loading commissioning, local

    office commissioning, interface and

    service commissioning

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    4/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 4

    References

    RNC System Description RNC Architecture and Principle RNC Commissioning Guide

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    5/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 5

    Chapter 1 System Commissioning Overview

    Chapter 2 System Commissioning

    Chapter 3 Checking RNC Commissioning

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    6/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 6

    RNC Commissioning Preparations

    This task describes how to obtain the installation software

    License

    MML command scripts

    System Commissioning Overview

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    7/33HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 7

    Main contents of system commissioning

    1. Commissioning RNC Equipment

    2. Verifying Interface : Iub,Iur,Iu-cs,Iu-ps Interface

    3. Handling Alarms During RNC Commissioning

    4. Verifying RNC Services

    5. Integrating the RNC into the M2000

    6. Creating RNC Scheduled Tasks

    7. Checking RNC Commissioning Results

    System Commissioning Overview

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    8/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 8

    Chapter 1 System Commissioning Overview

    Chapter 2 System Commissioning

    Chapter 3 Checking RNC Commissioning

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    9/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 9

    2.1 Commissioning RNC Equipment

    2.2 Verifying Interface : Iub,Iur,Iu-cs,Iu-ps Interface

    2.3 Handling Alarms During RNC Commissioning

    2.4 Verifying RNC Services

    2.5 Integrating the RNC into the M2000

    2.6 Creating RNC Scheduled Tasks

    Maincontentsof system commissioning

    Chapter 2 System Commissioning

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    10/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 10

    Commissioning BAMs

    Obtain the Installation Information of the BAM Software

    Administrator password of Windows Server 2003 .

    Password for the user sa to log in to SQL Server 2000 .

    Fixed IP addresses of the internal and external networks .

    Remotely Logging In to the BAM

    Choose Start > Run . The Run dialog box is displayed.Enter mstsc /console and click OK. The Remote Desktop

    Connection dialog box is displayed.

    When entering the mstsc /console, leave a space between mstsc and

    /console!

    Enter the external virtual IP address of the BAM for remote login, and

    then click Connect.

    Enter the name and password of an administrator-level user of the

    BAM, and then click OK. You are remotely logged in to the BAM.

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    11/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 11

    Checklist for BAM Software Settings Performed Before Delivery

    Installing Windows Server 2003The default password of the administrator of the active and standby BAMs is11111111.

    Starting the Routing and Remote Access serviceThe Routing and Remote Access service is started and Startup Type is setto Automatic.

    Starting the Terminal Services serviceThe Terminal Services service is started and Startup Type is set toAutomatic.

    Creating the internal network team

    The preset IP addresses of the internal Ethernet adapters are:

    Active BAM: 80.168.3.50 (255.0.0.0)

    Standby BAM: 80.168.3.60 (255.0.0.0)

    Creating the external network team

    The preset IP addresses of the external Ethernet adapters are:

    Active BAM: 172.121.139.201 (255.255.255.0)

    Standby BAM: 172.121.139.202 (255.255.255.0)

    Configuring backup channel IP addresses of the active andstandby BAMs

    The preset backup channel IP addresses are:

    Active BAM: 192.168.3.50 (255.255.255.0)

    Standby BAM: 192.168.3.60 (255.255.255.0)

    Configuring commissioning IP addresses of the active andstandby BAMs

    The preset commissioning IP addresses are:

    Active BAM: 192.168.6.50 (255.255.255.0)

    Standby BAM: 192.168.6.60 (255.255.255.0)

    Installing SQL Server 2000 The default password of the sa account is 11111111.

    Installing SQL Server 2000 Service Pack 4 The version number is 8.00.2039.

    Commissioning BAMs

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    12/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 12

    Checking BAM Software

    Check the version of Windows Server 2003 on the BAM.

    Check active services on the BAM.

    Check the version of SQL Server on the BAM.

    Check the operation of the SQL Server database.

    Check the login mode of the SQL Server database on the BAM.

    Check the data sequence of the SQL Server database on the BAM.

    Check the name consistency between the BAM and SQL Server.

    Check and ensure that no BAM has the same name as that of the current BAM

    in the same subnet.

    Check the teaming of the Ethernet adapters on the BAM.

    Check the teaming modes of the Ethernet adapters on the BAM.

    Check the system time and time zone of the BAM and ensure that it is

    consistent with the local time.

    Check and ensure that the system patron is not installed on BAMs.

    Commissioning BAMs

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    13/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 13

    Installing the BAM Application inthe Active Workspace

    For details, refer to Software Installation Slide.

    Checking the Operation of the BAM Application

    Working Modes ofBAM

    Description

    Single-BAM modeWhen the BAM application is installed, State of each service is

    Started, and Startup Type of each service is Automatic.

    Dual-BAM mode

    When the BAM application is installed successfully,

    For the active BAM, State of each service is Started, andStartup Type of each service is Automatic.

    For the standby BAM, the State parameter values of SNTPClient, FTP Server, DynMonitor, and FTP Client are Started

    and the Startup Type parameter values of these services areAutomatic. The State parameter values of other services areStopped and the Startup Type of them are Disabled.

    If the heartbeat test between the active and standby BAMssucceeds, the status bar displays DSS OK.

    Commissioning BAMs

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    14/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 14

    Checking the RNC LMT

    Installing the RNC LMT Application

    Connecting the RNC LMT to the BAM

    Starting the Local Maintenance Terminal of the RNC

    Commissioning the RNC LMT

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    15/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 15

    Loading RNC Software and Data Files

    Generating RNC Data Files

    The generated subrack loading file is saved in BAM ActiveWorkspace Installation Directory\LoadData.

    On the MML client, run the SET OFFLINE command , Run the RSTDATA command.

    Running commands in batches.

    Run the FMT DATA command to set Format type toALL_SUBRACK(Format all subracks) for formatting all subracks.

    Run the SET ONLINE.

    Setting RNC Loading Modes (Commissioning)

    On the MML client, run the SET LODCTRL command to set Boardstart load control. to LFB (Load from BAM and write flash) .

    Starting the RNC Message Tracing (Commissioning).

    Starting the Loading Progress Window.

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    16/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 16

    Loading the RSS Subrack

    Switch on the power distribution boxes SW3 and SW6 to power onthe RSS subrack. The boards in the RSS subrack automatically load

    the host software and data file from the BAM.

    On the MML client, run the RST SUBRACK command to set

    Subrack No. to 0. A dialog is displayed, asking you whether to

    proceed. Click Yes. The boards in the RSS subrack automatically

    load the host software and data file from the BAM.

    Observe the loading progress of the associated RSS subrack in

    Progress Management.

    After the loading of the RSS subrack, click the Device Panel tab in

    the navigation tree and then double-click the shelf node to be

    queried.

    The RSS subrack loading lasts 3 to 5 minutes.

    Loading RNC Software and Data Files

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    17/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 17

    Loading the RBS Subrack

    Switch on the power distribution box to power on the RBS subrack.

    On the MML client, run the RST SUBRACK command to set

    Subrack No. to Number of the RBS to be loaded.

    Observe the loading progress of the associated RBS subrack in the

    Progress Management window.

    After the current RBS subrack is loaded, go to Step 2 to load other

    RBS subracks until all the RBS subracks of the RNC are loaded.

    After all the RBS subracks are loaded, click the Device Panel tab in

    the navigation tree and then double-click the shelf node to bequeried.

    Observe the signaling connection setup on the Iub interface and cell

    setup in the message tracing window.

    Loading RNC Software and Data Files

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    18/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 18

    Verifying the License

    The license of the local office is in BAM Active Workspace

    Installation Directory\FTP\Licenseand the file name is license.lic.

    Run the LST CFGMODE to query the data configuration of all the

    subracks. If the subrack is in offline mode, run the SET ONLINE

    command to set the subrack to the online mode.

    Run the ACT LICENSE command and set File Name to the name

    of the specified license to activate the license.

    Run the DSP LICENSE command and set Query type to SCU

    (SPU, BAM). The system displays the current configuration of each

    licensed service.

    Verifying the License

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    19/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 19

    The RNC supports switchover of boards such as the OMUaSCUa

    SPUaGCUaAOUaUOIaFG2aGOUaPEUaAEUa

    POUa

    After the switchover of boards, the existing standby board becomes

    the active one. The process lasts 2 to 5 seconds. The existing activeboard becomes the standby one and is reset. The process lasts 2 to

    5 minutes

    Verifying Switchover Between Active and Standby Boards

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    20/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 20

    2.1 Commissioning RNC Equipment

    2.2 Verifying Interface : Iub,Iur,Iu-cs,Iu-ps Interface

    2.3 Handling Alarms During RNC Commissioning

    2.4 Verifying RNC Services

    2.5 Integrating the RNC into the M2000

    2.6 Creating RNC Scheduled Tasks

    Maincontentsof system commissioning

    Chapter 2 System Commissioning

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    21/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 21

    Verifying the Iub Interface

    Checking physical link.

    Checking control plane.

    Checking user plane.

    Checking management

    plane.

    Checking cell status.

    ApplicationProtocol

    DataStream(s)

    ALCAP(s)

    TransportNetwork

    Layer

    SignallingBearer(s)

    Transport NetworkUser Plane

    Control Plane User Plane

    Transport NetworkUser Plane

    Transport NetworkControl Plane

    RadioNetwork

    Layer

    SignallingBearer(s)

    DataBearer(s)

    Physical Layer

    Interface and Service Commissioning

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    22/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 22

    Verifying the Iu-CS

    Iu-PS,Iur Interface

    Checking physical links.

    Checking control plane.

    Checking user plane.

    ApplicationProtocol

    DataStream(s)

    ALCAP(s)

    TransportNetwork

    Layer

    SignallingBearer(s)

    Transport NetworkUser Plane

    Control Plane User Plane

    Transport NetworkUser Plane

    Transport NetworkControl Plane

    RadioNetwork

    Layer

    SignallingBearer(s)

    DataBearer(s)

    Physical Layer

    Interface and Service Commissioning

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    23/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 23

    2.1 Commissioning RNC Equipment

    2.2 Verifying Interface : Iub,Iur,Iu-cs,Iu-ps Interface

    2.3 Handling Alarms During RNC Commissioning

    2.4 Verifying RNC Services

    2.5 Integrating the RNC into the M2000

    2.6 Creating RNC Scheduled Tasks

    Maincontentsof system commissioning

    Chapter 2 System Commissioning

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    24/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 24

    On the main menu of Local Maintenance Terminal, choose

    Fault Management > Browse Alarm

    Check whether there are alarms in the alarm browse window

    Handle the alarm according to the suggestions in the Alarm

    Handling part

    If the alarm cannot be cleared, contact Huawei for technical

    support

    Handling Alarms During RNC Commissioning

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    25/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 25

    2.1 Commissioning RNC Equipment

    2.2 Verifying Interface : Iub,Iur,Iu-cs,Iu-ps Interface

    2.3 Handling Alarms During RNC Commissioning

    2.4 Verifying RNC Services

    2.5 Integrating the RNC into the M2000

    2.6 Creating RNC Scheduled Tasks

    Maincontentsof system commissioning

    Chapter 2 System Commissioning

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    26/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 26

    Start the following RNC message tracing tasks: message tracing

    over the Uu, Iu, Iub, Iur (Optional. Mandatory in inter-RNC handover),and CDT and REDIRECT serial-port print

    Verify the voice service

    Verify the CS streaming service

    Verify the PS service

    Verify mobility management

    Verify OM management

    Verify HSDPA

    Verify HSUPA

    Verify Other Services

    Verifying RNC Services

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    27/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 27

    2.1 Commissioning RNC Equipment

    2.2 Verifying Interface : Iub,Iur,Iu-cs,Iu-ps Interface

    2.3 Handling Alarms During RNC Commissioning

    2.4 Verifying RNC Services

    2.5 Integrating the RNC into the M2000

    2.6 Creating RNC Scheduled Tasks

    Maincontentsof system commissioning

    Chapter 2 System Commissioning

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    28/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 28

    Integrating the RNC into the M2000

    BSC6810 physical connecting

    with the operation and

    maintenance network

    Set the route from BSC6810 to

    M2000

    Add BSC6810 in M2000

    Collecting the information of

    location and IP address of

    BSC6810 Add a new network and

    BSC6810 in M2000

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    29/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 29

    2.1 Commissioning RNC Equipment

    2.2 Verifying Interface : Iub,Iur,Iu-cs,Iu-ps Interface

    2.3 Handling Alarms During RNC Commissioning

    2.4 Verifying RNC Services

    2.5 Integrating the RNC into the M2000

    2.6 Creating RNC Scheduled Tasks

    Maincontentsof system commissioning

    Chapter 2 System Commissioning

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    30/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 30

    Automatically back up the RNC configuration data, performance

    data, and alarm data

    Automatically back up RNC logs

    Creating RNC Scheduled Tasks

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    31/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 31

    Chapter 1 System Commissioning Overview

    Chapter 2 System Commissioning

    Chapter 3 Checking RNC Commissioning

  • 8/3/2019 ENE040607000004 BSC6810V200R010 System Commissioning Issue1.0

    32/33

    HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 32

    Check RNC commissioning results according to Checklists

    for RNC Commissioning

    Please refer to the manual about the detailed forms

    Action ExecutionData Record (End Time, Personnel,

    Data)/Reason for No Execution

    The RSS subrack isloaded.

    All the RBS subracksare loaded.

    Checking RNC Commissioning Results