EMC TEST REPORT for SHENZHEN MUST ENERGY TECHNOLOGY … · 2020. 5. 18. · Registration 752021,...

54
Shenzhen Anbotek Compliance Laboratory Limited Page 1 of 54 Report No. R0117020505I1 Shenzhen Anbotek Compliance Laboratory Limited Tel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com EMC TEST REPORT for SHENZHEN MUST ENERGY TECHNOLOGY CO., LTD SOLAR INVERTER Model No.: PV11-1200 Plus, PV11-1400 Plus, PV11-1800 Plus, PV11-2400 Plus Report Number : R0117020505I1 Date of Test : Feb. 20~Mar. 10, 2017 Date of Report : Mar. 10, 2017 Prepared for : SHENZHEN MUST ENERGY TECHNOLOGY CO., LTD Address : 4-5F, Building A11, Yusheng Industrial Park, NO.467, Section XiXiang, National Highway 107, XiXiang,Baoan District, Shenzhen, China Prepared By : Shenzhen Anbotek Compliance Laboratory Limited Address : 1/F., Building 1, SEC Industrial Park, No.0409 Qianhai Road, Nanshan District, Shenzhen, Guangdong, China Tel: (86) 755-26066544 Fax: (86) 755-26014772

Transcript of EMC TEST REPORT for SHENZHEN MUST ENERGY TECHNOLOGY … · 2020. 5. 18. · Registration 752021,...

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 1 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    EMC TEST REPORTfor

    SHENZHEN MUST ENERGY TECHNOLOGY CO., LTD

    SOLAR INVERTERModel No.: PV11-1200 Plus, PV11-1400 Plus, PV11-1800 Plus, PV11-2400 Plus

    Report Number : R0117020505I1Date of Test : Feb. 20~Mar. 10, 2017Date of Report : Mar. 10, 2017

    Prepared for : SHENZHEN MUST ENERGY TECHNOLOGY CO., LTD

    Address : 4-5F, Building A11, Yusheng Industrial Park, NO.467,Section XiXiang, National Highway 107, XiXiang,BaoanDistrict, Shenzhen, China

    Prepared By : Shenzhen Anbotek Compliance Laboratory LimitedAddress : 1/F., Building 1, SEC Industrial Park, No.0409 Qianhai Road,

    Nanshan District, Shenzhen, Guangdong, ChinaTel: (86) 755-26066544Fax: (86) 755-26014772

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 2 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    TABLE OF CONTENT

    Description

    Test Report VerificationPage

    1. GENERAL INFORMATION....................................................................................................... 61.1. Description of Device (EUT)................................................................................................................. 61.2. Auxiliary Equipment Used during Test................................................................................................. 71.3. Description of Test Facility....................................................................................................................71.4. Measurement Uncertainty...................................................................................................................... 71.5. Description of Test Modes..................................................................................................................... 81.6. Test Summary........................................................................................................................................ 81.7. EMS Performance Criteria..................................................................................................................... 9

    2. POWER LINE CONDUCTED EMISSION TEST...................................................................102.1. Block Diagram of Test Setup............................................................................................................... 102.2. Measuring Standard..............................................................................................................................102.3. EUT Configuration on Test..................................................................................................................102.4. Operating Condition of EUT................................................................................................................102.5. Test Procedure......................................................................................................................................102.6. Test Equipment.................................................................................................................................... 112.7. Measuring Results................................................................................................................................ 11

    3. RADIATED EMISSION TEST..................................................................................................143.1. Block Diagram of Test......................................................................................................................... 143.2. Measuring Standard..............................................................................................................................143.3. Radiated Emission Limits.................................................................................................................... 143.4. EUT Configuration on Test..................................................................................................................143.5. Operating Condition of EUT................................................................................................................153.6. Test Procedure......................................................................................................................................153.7. Test Equipment.................................................................................................................................... 153.8. Measuring Results................................................................................................................................ 15

    4. HARMONIC CURRENT EMISSION TEST........................................................................... 184.1. Block Diagram of Test Setup............................................................................................................... 184.2. Measuring Standard..............................................................................................................................184.3. Operating Condition of EUT................................................................................................................184.4. Test Equipment.................................................................................................................................... 184.5. Measuring Results................................................................................................................................ 18

    5. VOLTAGE FLUCTUATIONS & FLICKER TEST................................................................205.1. Block Diagram of Test Setup............................................................................................................... 205.2. Measuring Standard..............................................................................................................................205.3. Operating Condition of EUT................................................................................................................205.4. Test Equipment.................................................................................................................................... 205.5. Measuring Results................................................................................................................................ 20

    6. ELECTROSTATIC DISCHARGE IMMUNITY TEST..........................................................226.1. Block Diagram of Test Setup............................................................................................................... 226.2. Measuring Standard..............................................................................................................................226.3. Severity Levels and Performance Criterion......................................................................................... 226.4. EUT Configuration...............................................................................................................................22

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 3 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    6.5. Operating Condition of EUT................................................................................................................226.6. Test Procedure......................................................................................................................................236.7. Test Equipment.................................................................................................................................... 236.8. Measuring Results................................................................................................................................ 23

    7. RF FIELD STRENGTH SUSCEPTIBILITY TEST................................................................257.1. Block Diagram of Test......................................................................................................................... 257.2. Measuring Standard..............................................................................................................................257.3. Severity Levels and Performance Criterion......................................................................................... 257.4. EUT Configuration on Test..................................................................................................................257.5. Operating Condition of EUT................................................................................................................267.6. Test Procedure......................................................................................................................................267.7. Test Equipment.................................................................................................................................... 267.8. Measuring Results................................................................................................................................ 26

    8. ELECTRICAL FAST TRANSIENT/BURST IMMUNITY TEST.........................................288.1. Block Diagram of Test Setup............................................................................................................... 288.2. Measuring Standard..............................................................................................................................288.3. Severity Levels and Performance Criterion......................................................................................... 288.4. EUT Configuration...............................................................................................................................288.5. Operating Condition of EUT................................................................................................................288.6. Test Procedure......................................................................................................................................298.7. Test Equipment.................................................................................................................................... 298.8. Measuring Results................................................................................................................................ 29

    9. SURGE IMMUNITY TEST........................................................................................................319.1. Block Diagram of Test Setup............................................................................................................... 319.2. Measuring Standard..............................................................................................................................319.3. Severity Levels and Performance Criterion......................................................................................... 319.4. EUT Configuration...............................................................................................................................319.5. Operating Condition of EUT................................................................................................................319.6. Test Procedure......................................................................................................................................329.7. Test Equipment.................................................................................................................................... 329.8. Measuring Results................................................................................................................................ 32

    10. INJECTED CURRENTS SUSCEPTIBILITY TEST............................................................ 3410.1. Block Diagram of Test Setup............................................................................................................. 3410.2. Measuring Standard............................................................................................................................3410.3. Severity Levels and Performance Criterion....................................................................................... 3410.4. EUT Configuration.............................................................................................................................3410.5. Operating Condition of EUT..............................................................................................................3410.6. Test Procedure....................................................................................................................................3510.7. Test Equipment.................................................................................................................................. 3510.8. Measuring Results.............................................................................................................................. 35

    11. VOLTAGE DIPS AND INTERRUPTIONS TEST................................................................ 3711.1. Block Diagram of Test Setup............................................................................................................. 3711.2. Measuring Standard............................................................................................................................3711.3. Severity Levels and Performance Criterion....................................................................................... 3711.4. EUT Configuration.............................................................................................................................3711.5. Operating Condition of EUT..............................................................................................................3711.6. Test Procedure....................................................................................................................................3811.7. Test Equipment.................................................................................................................................. 3811.8. Measuring Results.............................................................................................................................. 38

    12. MAGNETIC FIELD SUSCEPTIBILITY TEST.................................................................... 4012.1. Block Diagram of Test....................................................................................................................... 4012.2. Measuring Standard............................................................................................................................40

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 4 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    12.3. Severity Levels and Performance Criterion....................................................................................... 4012.4. EUT Configuration on Test................................................................................................................4012.5. Operating Condition of EUT..............................................................................................................4112.6. Test Procedure....................................................................................................................................4112.7. Test Equipment.................................................................................................................................. 4112.8. Measuring Results.............................................................................................................................. 41

    13. PHOTOGRAPHS...................................................................................................................... 4313.1. Photo of Power Line Conducted Emission Test.................................................................................4313.2. Photo of Radiated Emission Test....................................................................................................... 4313.3. Photo of Flicker/ Harmonic Test........................................................................................................4413.4. Photo of Electrostatic Discharge Immunity Test............................................................................... 4413.5. Photo of RF Field Strength susceptibility Test.................................................................................. 4513.6. Photo of Electrical Fast Transient/Burst Immunity Test....................................................................4513.7. Photo of Surge Immunity Test........................................................................................................... 4613.8. Photo of Injected currents susceptibility Test.................................................................................... 4613.9. Photo of Voltage Dips and Interruptions Test....................................................................................4713.10. Photo of Magnetic Field Susceptibility test..................................................................................... 47

    APPENDIX I (Photos of EUT) (4 Pages)

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 6 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    1. GENERAL INFORMATION

    1.1. Description of Device (EUT)EUT : SOLAR INVERTER

    Model Number : PV11-1200 Plus, PV11-1400 Plus, PV11-1800 Plus,PV11-2400 Plus(Note: All samples are the same except the model number &appearance, so we prepare “PV11-1200 Plus” for EMC testonly.)

    Test Power Supply : AC 230V, 50Hz/ DC 24V

    Applicant : SHENZHEN MUST ENERGY TECHNOLOGY CO., LTDAddress : 4-5F, Building A11, Yusheng Industrial Park, NO.467,

    Section XiXiang, National Highway 107, XiXiang,BaoanDistrict, Shenzhen, China

    Manufacturer : SHENZHEN MUST ENERGY TECHNOLOGY CO., LTDAddress : 4-5F, Building A11, Yusheng Industrial Park, NO.467,

    Section XiXiang, National Highway 107, XiXiang,BaoanDistrict, Shenzhen, China

    Factory : SHENZHEN MUST ENERGY TECHNOLOGY CO., LTDAddress : 4-5F, Building A11, Yusheng Industrial Park, NO.467,

    Section XiXiang, National Highway 107, XiXiang,BaoanDistrict, Shenzhen, China

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 7 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    1.2. Auxiliary Equipment Used during TestN/A

    1.3. Description of Test FacilityThe test facility is recognized, certified, or accredited by the following organizations:

    FCC-Registration No.: 752021Shenzhen Anbotek Compliance Laboratory Limited, EMC Laboratory has beenregistered and fully described in a report filed with the (FCC) FederalCommunications Commission. The acceptance letter from the FCC is maintainedin our files. Registration 752021, July 06, 2016.

    IC-Registration No.: 8058A-1Shenzhen Anbotek Compliance Laboratory Limited, EMC Laboratory has beenregistered and fully described in a report filed with the (IC) Industry Canada. Theacceptance letter from the IC is maintained in our files. Registration 8058A-1,June 13, 2016.

    CNAS - LAB Code: L3503Shenzhen Anbotek Compliance Laboratory Limited., Laboratory has beenassessed and in compliance with CNAS/CL01: 2006 accreditation criteria fortesting laboratories (identical to ISO/IEC 17025:2005 General Requirements) forthe Competence of Testing Laboratories.

    Test LocationAll Emissions tests were performedShenzhen Anbotek Compliance Laboratory Limited. at 1/F., Building 1, SECIndustrial Park, No.0409 Qianhai Road, Nanshan District, Shenzhen, Guangdong,China

    1.4. Measurement UncertaintyRadiation Uncertainty : Ur = 4.1dB (Horizontal)

    Ur = 4.3dB (Vertical)

    Conduction Uncertainty : Uc =3.4 dB

    Disturbance Uncertainty : Ud = 2.6 dB

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 8 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    1.5. Description of Test Modes

    Pretest Mode Description

    Mode 1 Charging+Full Load

    Mode 2 Full Load

    For Mode 1 and Mode 2 Block Diagram of Test Setup

    1.6. Test Summary

    P)Indicates that the through the testN)Don’t test.

    Test Items Test Modes Status

    Power Line Conducted Emission Test (150KHz To 30MHz) Mode 1 P

    Radiated Emission Test (30MHz To 1000MHz) Mode 1 P

    Harmonic Current Test Mode 1 P

    Voltage Fluctuations and Flicker Test Mode 1 P

    Electrostatic Discharge immunity Test Mode 1 P

    RF Field Strength susceptibility Test Mode 1 P

    Electrical Fast Transient/Burst Immunity Test Mode 1 P

    Surge Immunity Test Mode 1 P

    Injected Currents Susceptibility Test Mode 1 P

    Magnetic Field Susceptibility Test Mode 1 P

    Voltage Dips and Interruptions Test Mode 1 P

    AC mainsEUT

    Light Battery

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 9 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    1.7. EMS Performance Criteria

    A: Normal performance within the specification limits

    B: Temporary degradation or loss of function or performance which is

    self-recoverable

    C: Temporary degradation or loss of function or performance which requires

    operator intervention or system reset

    D: Degradation or loss of function which is not recoverable due to damage of

    equipment (components) or software, or loss of data

    Note: The manufacturer’s specification may define effects on the EUT which may be

    considered insignificant, and therefore acceptable.

    This classification may be used as a guide in formulating performance criteria,

    by committees responsible for generic, product and product-family standards, or as a

    framework for the agreement on performance criteria between the manufacturer and

    the purchaser, for example where no suitable generic, product or product-family

    standard exists.

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 10 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    2. POWER LINE CONDUCTED EMISSION TEST

    2.1. Block Diagram of Test Setup

    2.2. Measuring StandardEN 61000-6-4Power Line Conducted Emission Limits

    Frequency(MHz)

    Limit (dBV)Quasi-peak Level Average Level

    0.15 ~ 0.50 79 660.50 ~ 30.00 73 60

    NOTE1-The lower limit shall apply at the transition frequencies.NOTE2-The limit decreases linearly with the logarithm of thefrequency in the range 0.15MHz to 0.50MHz.

    2.3. EUT Configuration on TestThe following equipments are installed on conducted emission measurement tomeet EN 61000-6-4 requirements and operating in a manner which tends tomaximize its emission characteristics in a normal application.

    2.4. Operating Condition of EUT2.4.1. Setup the EUT as shown on Section 2.1.

    2.4.2. Turn on the power of all equipments.

    2.4.3. Let the EUT work in measuring mode measure it.

    2.5. Test ProcedureThe EUT is put on the plane 0.1m high above the ground by insulating supportand connected to the AC mains through Line Impedance Stability Network(L.I.S.N). This provided a 50ohm coupling impedance for the tested equipments.Both sides of AC line are investigated to find out the maximum conductedemission according to the EN 61000-6-4 regulations during conducted emissionmeasurement.

    L.I.S.N EUT System

    Test Receiver

    AC mains

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 11 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    The bandwidth of the field strength meter (R&S Test Receiver ESCI) is set at9kHz in 150kHz~30MHz.

    The frequency range from 150kHz to 30MHz is investigated for AC mains.

    The test results are listed in Section 2.7.

    2.6. Test EquipmentThe following test equipments are used during the power line conductedmeasurement:

    Item Equipment Manufacturer Model No. Serial No. Last Cal. Cal. Interval

    1. Two-LineV-network Rohde & Schwarz ENV216 100055 Jul. 19, 2016 1 Year

    2. EMI Test Receiver Rohde & Schwarz ESCI 100627 Jun. 17, 2016 1 Year

    3. RF Switching Unit ComplianceDirection RSU-M2 38303 Jun. 17, 2016 1 Year

    2.7. Measuring Results

    PASS

    The frequency range 150kHz to 30MHz is investigated.

    Test data see the following pages.

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 12 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    CONDUCTED EMISSION TEST DATA

    Test Site: 1# Shielded RoomTest Specification: AC 230V, 50HzComment: L1

    Temp: 22.2 Hum: 60%

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 13 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    CONDUCTED EMISSION TEST DATA

    Test Site: 1# Shielded RoomTest Specification: AC 230V, 50HzComment: N

    Temp: 22.2 Hum: 60%

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 14 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    3. RADIATED EMISSION TEST

    3.1. Block Diagram of Test3.1.1. Block diagram of test setup (In chamber)

    ANTENNA ELEVATION VARIES FROM 1 TO 4 METERS

    3 METERSEUT and Simulators System

    0.1 METER

    GROUND PLANE

    3.2. Measuring StandardEN 61000-6-4

    3.3. Radiated Emission LimitsAll emanations from a device or system, including any network of conductors andapparatus connected thereto, shall not exceed the level of field strengths specifiedbelow:

    FREQUENCY DISTANCE FIELD STRENGTHS LIMIT(MHz) (Meters) (dBV/m)

    30 ~ 230 3 50230 ~ 1000 3 57

    Note: (1) The smaller limit shall apply at the combination point between twofrequency bands.

    (2) Distance refers to the distance in meters between the measuringinstrument antenna and the closed point of any part of the EUT.

    3.4. EUT Configuration on TestThe EN 61000-6-4 regulations test method must be used to find the maximumemission during radiated emission measurement.

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 15 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    3.5. Operating Condition of EUT3.5.1. Setup the EUT as shown on Section 3.1.

    3.5.2. Turn on the power of all equipments.

    3.5.3. After that, let the EUT work in test mode measure it.

    3.6. Test ProcedureThe EUT is placed on a turn table which is 0.1 meter high above the ground. Theturn table can rotate 360 degrees to determine the position of the maximumemission level. The EUT is set 3 meters away from the receiving antenna whichis mounted on a antenna tower. The antenna can be moved up and down from 1to 4 meters to find out the maximum emission level. Bilog antenna (calibrated byDipole Antenna) is used as a receiving antenna. Both horizontal and verticalpolarization of the antenna are set on test.The bandwidth of the Receiver (ESCI) is set at 120kHz.The EUT is tested in 9*6*6 Chamber.The test results are listed in Section 3.8.

    3.7. Test EquipmentThe following test equipments are used during radiated emission measurement:

    Item Equipment Manufacturer Model No. Serial No. Last Cal. Cal. Interval1. EMI Test Receiver Rohde & Schwarz ESPI 101604 Jun. 17, 2016 1 Year

    2. Bilog BroadbandAntenna Schwarzbeck VULB9163VULB

    9163-289 May 06, 2016 1 Year

    3. Pre-amplifier SONOMA 310N 186860 Jun. 17, 2016 1 Year

    3.8. Measuring ResultsPASSThe frequency range from 30MHz to 1000MHz is investigated.

    Test data see the following pages.

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 16 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    Test item: Radiation Test Polarization: Vertical

    Standard: (RE)EN61000-6-4 Power Source: AC 230V, 50Hz

    Distance: 3m Temp.(℃)/Hum.(%RH): 24.3( ℃)/55%RH

    Note:

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 17 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    Test item: Radiation Test Polarization: Horizontal

    Standard: (RE)EN61000-6-4 Power Source: AC 230V, 50Hz

    Distance: 3m Temp.(℃)/Hum.(%RH): 24.3( ℃)/55%RH

    Note:

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 18 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    4. HARMONIC CURRENT EMISSION TEST

    4.1. Block Diagram of Test Setup

    4.2. Measuring StandardEN 61000-3-2

    4.3. Operating Condition of EUTSame as Section 2.4 except the test setup replaced by Section 4.1.

    4.4. Test EquipmentThe following test equipments are used during harmonic current emissionmeasurement:

    Item Equipment Manufacturer Model No. Serial No. Last Cal. Cal. Interval1. Programmable AC

    Power source SOPH POWER PAG-1050 630250 Jun. 17, 2016 1 Year

    2. Harmonic andFlicker Analyzer LAPLACE AC-2000A 272629 Apr. 16, 2016 1 Year

    4.5. Measuring ResultsPASS

    The test curves are shown in the following pages.

    AC PowerSource

    AC MainsEUT System

    PC

    Harmonic/FlickerAnalyzer

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 19 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    Harmonic Current Test Result Summary (Run time)Tested On : Feb. 20, 2017 15:16 for 150 Seconds.

    Supply Voltage : 229.7 to 229.8 Vrms 328.1 Vpk Frequency : 50.00 HzSupply Pass : Harmonic Requirements Crest Limits.

    Load Power : 893.00 to 893.80 W 894.4 VA Power Factor 0.999Load Current : 3.9 mArms 5.6 Apk Crest Factor: 1.437Limits Applied : EN61000-3-2: 2014 Class A Limits Apply.

    Harmonic Limit Average % max. Value % AssessmentNumber Current (filtered) Limit (Filtered) Limit

    mA mA mA

    Fundamental : 3890.92 : 1080.0 7.9 0.7 8.6 0.8 Pass3 : 2300.0 50.6 2.2 53.5 2.3 Pass4 : 430.0 5.1 1.2 5.3 1.2 Pass5 : 1140.0 22.2 1.9 23.7 2.1 Pass6 : 300.0 5.3 1.8 5.3 1.8 Pass7 : 770.0 16.0 2.1 16.9 2.2 Pass8 : 230.0 4.6 2.0 4.6 2.0 Pass9 : 400.0 8.3 2.1 8.6 2.2 Pass10 : 184.0 4.2 2.3 4.3 2.3 Pass11 : 330.0 5.8 1.8 6.1 1.8 Pass12 : 153.3 4.1 2.7 4.3 2.8 Pass13 : 210.0 4.5 2.1 4.6 2.2 Pass14 : 131.4 3.1 2.4 3.2 2.4 Pass15 : 150.0 2.2 1.5 2.1 1.4 Pass16 : 115.0 3.1 2.7 3.2 2.8 Pass17 : 132.3 2.3 1.7 2.5 1.9 Pass18 : 102.2 2.2 2.2 2.1 2.1 Pass19 : 118.4 1.9 1.6 1.7 1.4 Pass20 : 92.0 2.2 2.4 2.1 2.3 Pass21 : 107.1 1.9 1.8 2.1 2.0 Pass22 : 83.6 1.6 1.9 1.7 2.0 Pass23 : 97.8 1.4 1.4 1.4 1.4 Pass24 : 76.7 1.8 2.3 1.7 2.2 Pass25 : 90.0 1.3 1.4 1.4 1.6 Pass26 : 70.8 0.9 1.3 1.0 1.4 Pass27 : 83.3 1.4 1.7 1.7 2.0 Pass28 : 65.7 0.7 1.1 0.7 1.1 Pass29 : 77.6 1.0 1.3 1.0 1.3 Pass30 : 61.3 0.8 1.3 1.0 1.6 Pass31 : 72.6 0.2 0.3 0.3 0.4 Pass32 : 57.5 0.2 0.3 0.3 0.5 Pass33 : 68.2 0.9 1.3 1.0 1.5 Pass34 : 54.1 0.4 0.7 0.7 1.3 Pass35 : 64.3 0.8 1.2 0.7 1.1 Pass36 : 51.1 0.4 0.8 0.3 0.6 Pass37 : 60.8 1.6 2.6 1.7 2.8 Pass38 : 48.4 0.5 1.0 0.7 1.4 Pass39 : 57.7 1.1 1.9 1.0 1.7 Pass40 : 46.0 0.0 - 0.0 - Pass

    21 - 39 : 251.4 3.9 1.6 4.3 1.7 -

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 20 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    5. VOLTAGE FLUCTUATIONS & FLICKER TEST

    5.1. Block Diagram of Test Setup

    5.2. Measuring StandardEN 61000-3-3: 2013

    5.3. Operating Condition of EUTSame as Section 2.4 except the test setup replaced by Section 5.1.

    5.4. Test EquipmentThe following test equipments are used during the voltage fluctuations and flickermeasurement:

    Item Equipment Manufacturer Model No. Serial No. Last Cal. Cal. Interval1. Programmable AC

    Power source SOPH POWER PAG-1050 630250 Jun. 17, 2016 1 Year

    2. Harmonic andFlicker Analyzer LAPLACE AC-2000A 272629 Apr. 16, 2016 1 Year

    5.5. Measuring Results

    PASS

    The test curves are shown in the following pages.

    AC PowerSource

    AC MainsEUT System

    PC

    Harmonic/FlickerAnalyzer

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 21 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    Flicker Test Summary per EN/IEC61000-3-3 (Run time)

    Tested On : Feb. 20, 2017 15:15 for 600 Seconds.

    Supply Voltage : 230.0 Vrms 327.9 Vpk Frequency : 50.00 HzLoad Current : 4.3 mArms 6.7 Apk Crest Factor: 1.526

    Test Method: EN61000-3-3: 2013

    Voltage Variations :Highest Level: +0.22%Lowest Level: -0.13%

    d(max): 0.35% PASS

    Highest d(t) of 500ms: 0.00% PASSPresent d(t) over 3.33%: 0.00 SecondsLongest d(t) over 3.33%: 0.00 Seconds

    Highest Steady State: -0.00%Lowest Steady State: -0.00%

    Max d(c) Between Adjacent: 0.00% PASSMax d(c) Between Any: 0.00%

    Short Term Flicker Pst: 0.30 PASS

    Flicker Results :Pst Classifier Plt CalculationDuration Flicker Interval Pst

    0.1% 0.750.7% 0.621.0% 0.571.5% 0.502.2% 0.41

    3% 0.344% 0.246% 0.148% 0.08

    10% 0.0513% 0.0217% 0.0030% 0.0050% 0.0080% 0.00

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 22 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    6. ELECTROSTATIC DISCHARGE IMMUNITY TEST

    6.1. Block Diagram of Test Setup6.1.1. Block diagram of ESD test setup

    6.2. Measuring StandardEN 61000-6-2 (IEC 61000-4-2)Severity Level: 3 / Air Discharge: ±8kV; Level: 2 / Contact Discharge: ±4kV

    6.3. Severity Levels and Performance Criterion6.3.1. Severity level

    Level Test VoltageContact Discharge (kV)

    Test VoltageAir Discharge (kV)

    1. ±2 ±2

    2. ±4 ±4

    3. ±6 ±8

    4. ±8 ±15

    X Special Special

    6.3.2. Performance criterion: B

    6.4. EUT ConfigurationThe following equipments are installed on electrostatic discharge immunitymeasurement to meet EN 61000-6-2 requirements and operating in a manner whichtends to maximize its emission characteristics in a normal application.

    6.5. Operating Condition of EUTSame as conducted emission measurement, which is listed in Section2.4, exceptthe test set up replaced by Section 6.1.

    EUT System

    AC MainsAC Mains

    ESDTester

    0.8 m

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 23 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    6.6. Test Procedure

    6.6.1. Air Discharge:This test is done on a non-conductive surface. The round discharge tip of thedischarge electrode shall be approached as fast as possible to touch the EUT. Aftereach discharge, the discharge electrode shall be removed from the EUT. Thegenerator is then re-triggered for a new single discharge and repeated 100 times foreach pre-selected test point. This procedure shall be repeated until all the airdischarge completed

    6.6.2. Contact Discharge:All the procedure shall be same as Section 6.6.1. except that the tip of thedischarge electrode shall touch the EUT before the discharge switch is operated.

    6.6.3. Indirect discharge for horizontal coupling plane

    At least 50 single discharges shall be applied to the horizontal coupling plane, atpoints on each side of the EUT. The discharge electrode positions vertically at adistance of 0.1m from the EUT and with the discharge electrode touching thecoupling plane.

    6.6.4. Indirect discharge for vertical coupling plane

    At least 50 single discharge shall be applied to the center of one vertical edge ofthe coupling plane. The coupling plane, of dimensions 0.5m X 0.5m, is placedparallel to, and positioned at a distance of 0.1m from the EUT. Discharges shall beapplied to the coupling plane, with this plane in sufficient different positions thatthe four faces of the EUT are completely illuminated.

    6.7. Test EquipmentThe following test equipments are used during the Electrostatic Dischargemeasurement:

    Item Equipment Manufacturer Model No. Serial No. Last Cal. Cal. Interval1. ESD Simulators 3ctest ESD-30T ES0131505 Jun. 17, 2016 1 Year

    6.8. Measuring ResultsPASS

    Please refer to the following pages.

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 24 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    Electrostatic Discharge Test ResultsShenzhen Anbotek Compliance Laboratory Limited

    Air discharge : ±8.0kV Temperature : 19℃

    Contact discharge : ±4.0kV Humidity : 55%

    Power Supply : AC 230V, 50Hz Number of discharge : 25

    Criterion : B Test Result: Pass Fail

    Location KindA-Air DischargeC-Contact Discharge

    Result

    Slot of the EUT 12 points A A B C D

    Other 5 points A A B C D

    Screen 5 points A A B C D

    Function keys 6 points A A B C D

    Metal surface of the EUT 10 points C A B C D

    Screws 4 points C A B C D

    HCP 4 points C A B C D

    VCP of front 4 points C A B C D

    VCP of rear 4 points C A B C D

    VCP of left 4 points C A B C D

    VCP of right 4 points C A B C D

    Note: Discharge should be considered on Contact and Air and Horizontal Coupling Plane (HCP) andVertical Coupling Plane (VCP).

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 25 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    7. RF FIELD STRENGTH SUSCEPTIBILITY TEST

    7.1. Block Diagram of Test7.1.1. Block diagram of RS test setup

    7.2. Measuring StandardEN 61000-6-2 (IEC61000-4-3)Severity Level: 2, 3V / m

    7.3. Severity Levels and Performance Criterion7.3.1. Severity Levels

    Level Field Strength V/m

    1. 1

    2. 3

    3. 10

    X Special

    7.3.2. Performance Criterion: A

    7.4. EUT Configuration on TestThe following equipments are installed on RF Field Strength susceptibilityMeasurement to meet EN 61000-6-2 requirements and operating in a manner whichtends to maximize its emission characteristics in a normal application.

    3 Meters

    EUT system

    0.8Meter

    AnechoicChamber

    Power Amp Signal generator

    MeasurementRoom

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 26 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    7.5. Operating Condition of EUTSame as radiated emission measurement which is listed in Section 2.4, except thetest setup replaced as Section 7.1.

    7.6. Test ProcedureThe EUT are placed on a table which is 0.8 meter high above the ground. The EUTis set 3 meters away from the transmitting antenna which is mounted on an antennatower. Both horizontal and vertical polarization of the antenna are set on test. Eachof the four sides of the EUT must be faced this transmitting antenna and measuredindividually.In order to judge the EUT performance, a CCD camera is used to monitor its screen .All the scanning conditions are as following:

    Condition of Test Remark---------------------------------------------- ---------------------------------------1. Fielded Strength2. Radiated Signal3. Scanning Frequency4. Sweep time of radiated5. Dwell Time

    3V/m (Severity Level 2)Unmodulated80-1000MHz0.0015 Decade/s1 Sec.

    7.7. Test EquipmentThe following test equipments are used during the R/S (Shenzhen EMTEK) measurement:

    Item

    Equipment Manufacturer Model No. Serial No. Last Cal. Cal.Interval

    1. RF Power Meter. Dual Channel BOONTON 4232A 10539 May 29, 2016 1 year2. 50ohm Diode Power Sensor BOONTON 51011EMC 34236/34238 May 29, 2016 1 year3. Broad-Band Horn Antenna SCHWARZBECK BBHA9120 L3F 332 May 29, 2016 1 year4. Power Amplifier PRANA AP32MT215 N/A May 29, 2016 1 year5. Power Amplifier MILMEGA AS0102-55 N/A May 29, 2016 1 year6. Signal generator AEROFLEX 2023B N/A May 29, 2016 1 year7. Field Strength Meter HOLADAY HI-6005 N/A May 29, 2016 1 year8. RS232 Fiber Optic Modem HOLADAY HI-4413P N/A May 29, 2016 1 year9. Log.-Per. Antenna SCHWARZBECK VULP 9118E N/A May 29, 2016 1 year

    7.8. Measuring ResultsPASS

    Please refer to the following page.

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 27 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    RF Field Strength Susceptibility Test ResultsShenzhen Anbotek Compliance Laboratory Limited

    Field Strength.: 3 V/m Temperature : 19℃

    Power Supply.: AC 230V, 50Hz Humidity : 55%

    Criterion required : A Frequency Range: 80 MHz to 1000 MHz

    Test Result : Pass Fail

    Modulation: None Pulse AM 1kHz 80%

    Steps # / % Result

    Horizontal Vertical

    Front 3 V/m 3 V/m A B C D

    Right 3 V/m 3 V/m A B C D

    Rear 3 V/m 3 V/m A B C D

    Left 3 V/m 3 V/m A B C DNote: The Project was tested in Shenzhen EMTEK Co., Ltd.

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 28 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    8. ELECTRICAL FAST TRANSIENT/BURST IMMUNITY TEST

    8.1. Block Diagram of Test Setup8.1.1. EFT Test Setup

    8.2. Measuring StandardEN 61000-6-2 (IEC 61000-4-4)Severity Level, Level 2: 1kV

    8.3. Severity Levels and Performance Criterion8.3.1. Severity level

    Open Circuit Output Test Voltage ±10%Level On Power Supply

    LinesOn I/O (Input/Output)

    Signal data and control lines1. 0.5 kV 0.25 kV2. 1 kV 0.5 kV3. 2 kV 1 kV4. 4 kV 2 kV

    X Special Special

    8.3.2. Performance criterion: B

    8.4. EUT ConfigurationThe following equipments are installed on electrical fast transient/burst immunitymeasurement to meet EN 61000-6-2 requirements and operating in a manner whichtends to maximize its emission characteristics in a normal application.

    8.5. Operating Condition of EUTSame as conducted emission measurement, which is listed in Section 2.4, exceptthe test set up replaced by Section 8.1.

    0.1 m

    EUT EFT/B Tester

    AC Mains

    AC Mains

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 29 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    8.6. Test ProcedureThe EUT is put on the table which is 0.1 meter high above the ground. Thisreference ground plane shall project beyond the EUT by at least 0.1m on all sidesand the minimum distance between EUT and all other conductive structure, exceptthe ground plane beneath the EUT, shall be more than 0.5m.

    8.6.1. For input and output AC power ports:The EUT is connected to the power mains by using a coupling device whichcouples the EFT interference signal to AC power lines. Both polarities of thetest voltage should be applied during compliance test and the duration of thetest is 2 mins.

    8.6.2. For signal lines and control lines ports:No I/O ports. It’s unnecessary to test.

    8.6.3. For DC output line ports:It’s unnecessary to test.

    8.7. Test EquipmentThe following test equipments are used during the Electrical Fast Transient /BurstImmunity measurement:

    Item Equipment Manufacturer Model No. Serial No. Last Cal. Cal. Interval1. EFT Burst Simulator PRIMA EFT61004B PR10114282 Jul. 12, 2016 1 Year2. EFT-Clamp PRIMA EFT-Clamp / Jul. 12, 2016 1 Year

    8.8. Measuring ResultsPASS

    Please refer to the following page.

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 30 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    Electrical Fast Transient/Burst Test ResultsShenzhen Anbotek Compliance Laboratory Limited

    Ambient Condition : 24℃ 55% RH Criterion required : B

    Power Supply : AC 230V, 50Hz Test Result : Pass Fail

    Inject Line : AC Mains Inject Method: Direct Inject Time(s): 120

    Line Polarity Test Voltage Result

    L ± 1kV A B C D

    N ± 1kV A B C D

    PE ± 1kV A B C D

    L、N ± 1kV A B C D

    L、PE ± 1kV A B C D

    N、PE ± 1kV A B C D

    L、N、PE ± 1kV A B C D

    Signal Line

    DC Line

    Note :

    Remark:

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 31 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    9. SURGE IMMUNITY TEST

    9.1. Block Diagram of Test Setup9.1.1. Surge Test Setup

    AC Mains

    9.2. Measuring StandardEN 61000-6-2 (IEC 61000-4-5)Severity Level 2, Line to Line: 1.0kV; Level 3, Line to Earth: 2.0kV

    9.3. Severity Levels and Performance Criterion9.3.1. Severity level

    Severity Level Open-Circuit Test VoltagekV

    1234*

    0.51.02.04.0

    Special

    9.3.2. Performance criterion: B

    9.4. EUT ConfigurationThe following equipments are installed on surge immunity measurement to meet EN61000-6-2 requirements and operating in a manner which tends to maximize itsemission characteristics in a normal application.

    9.5. Operating Condition of EUTSame as conducted emission measurement, which is listed in Section 2.4, exceptthe test set up replaced by Section 9.1.1.

    0.8 m AC Mains

    EUT Surge Tester

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 32 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    9.6. Test Procedure9.6.1. Set up the EUT and test generator as shown on Section 9.1.1.

    9.6.2. For line to line coupling mode, provide a 1.0 kV 1.2/50us voltage surge (atopen-circuit condition) and 8/20us current surge to EUT selected points.

    9.6.3. For line to earth coupling mode, provide a 2.0 kV 1.2/50us voltage surge (atopen-circuit condition) and 8/20us current surge to EUT selected points.

    9.6.4. At least 5 positive and 5 negative (polarity) tests with a maximum 1/minrepetition rate are conducted during test.

    9.6.5. Different phase angles are done individually.

    9.6.6. Record the EUT operating situation during compliance test and decide theEUT immunity criterion for above each test.

    9.7. Test EquipmentThe following test equipments are used during the Surge Immunity measurement:

    Item Equipment Manufacturer Model No. Serial No. Last Cal. Cal. Interval1. 6kV Surge

    Generator TESEQ NSG 3060-1 1480 Mar. 30, 2016 1 Year

    2. CDN TESEQ CDN 3061 1408 Apr. 05, 2016 1 Year

    9.8. Measuring ResultsPASS.

    Please refer to the following page.

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 33 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    Surge Immunity Test ResultsShenzhen Anbotek Compliance Laboratory Limited

    Temperature: 24℃ Criterion required: B

    Humidity: 55% Power Supply : AC 230V, 50Hz

    Test Result : Pass Fail

    Location Polarity Phase Angle Numberof PulsePulse Voltage

    (kV) Result

    L-N ± 0o 90o

    180o 270o 5 1.0 A B C D

    L-PE ± 0o 90o

    180o 270o 5 2.0 A B C D

    N-PE ± 0o 90o

    180o 270o 5 2.0 A B C D

    Remark:

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 34 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    10. INJECTED CURRENTS SUSCEPTIBILITY TEST

    10.1. Block Diagram of Test Setup10.1.1. Block Diagram of Test Setup

    10.2. Measuring StandardEN 61000-6-2 (IEC 61000-4-6)Severity Level 2: 3V (rms), (0.15MHz ~ 80MHz)

    10.3. Severity Levels and Performance Criterion10.3.1. Severity level

    10.3.2. Performance criterion: A

    10.4. EUT ConfigurationThe following equipments are installed on currents susceptibility measurement tomeet EN 61000-6-2 requirements and operating in a manner which tends tomaximize its emission characteristics in a normal application.

    10.5. Operating Condition of EUTSame as conducted emission measurement, which is listed in Section 2.4, exceptthe test set up replaced by Section 10.1.1.

    Level Field Strength V(rms)

    1. 12. 33. 10

    X Special

    Ground Reference Support

    EUTSyste CDN AC Mains

    Signalgenerator

    PowerAmplifier

    0.1 m

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 35 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    10.6. Test Procedure10.6.1. For AC Mains

    10.6.1.1. Set up the EUT, CDN and test generators as shown on Section 10.1.1.10.6.1.2. Let the EUT work in test mode and measure it.10.6.1.3. The EUT are placed on an insulating support 0.1m high above a

    ground reference plane. CDN (coupling and decoupling device) isplaced on the ground plane about 0.3m from EUT. Cables betweenCDN and EUT are as short as possible, and their height above theground reference plane shall be between 30 and 50 mm (wherepossible).

    10.6.1.4. The disturbance signal described below is injected to EUT throughCDN.

    10.6.1.5. The EUT operates within its operational mode(s) under intendedclimatic conditions after power on.

    10.6.1.6. The frequency range is swept from 150kHz to 80MHz using 10Vsignal level, and with the disturbance signal 80% amplitudemodulated with a 1kHz sine wave.

    10.6.1.7. The rate of sweep shall not exceed 1.5*10-3decades/s. Where thefrequency is swept incrementally, the step size shall not exceed 1% ofthe start and thereafter 1% of the preceding frequency value.

    10.6.1.8. Recording the EUT operating situation during compliance testing anddecide the EUT immunity criterion.

    10.6.2. For signal lines and control lines ports:No I/O ports. It’s unnecessary to test.

    10.6.3. For DC output line ports:It’s unnecessary to test.

    10.7. Test EquipmentThe following test equipments are used during the Injected Current Susceptibility measurement:

    Item Equipment Manufacturer Model No. Serial No. Last Cal. Cal.Interval

    1. C/S Conducted ImmunityTest System FRANKONIA CIT-10 126A1196/2012 Apr. 16, 2016 1 Year

    2. CDN FRANKONIA CDN - M2+ M3 A2210178/2012 Jun. 18, 2016 1 Year3. 6dB attenuator FRANKONIA DAM 26W 1172202 Jun. 17, 2016 1 Year

    10.8. Measuring ResultsPASS

    Please refer to the following page.

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 36 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    Injected Currents Susceptibility Test ResultsShenzhen Anbotek Compliance Laboratory Limited

    Temperature : 19℃ Humidity : 55%

    Power Supply : AC 230V, 50Hz Criterion required: A

    Test Result : Pass Fail

    Frequency Range(MHz)

    Injected Position Strength(Unmodulated) Result

    0.15 ~ 80 AC Mains 3V A B C D

    Test Mode :

    Frequency Range(MHz)

    Injected Position Strength(Unmodulated)

    Result

    Note :

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 37 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    11. VOLTAGE DIPS AND INTERRUPTIONS TEST

    11.1. Block Diagram of Test Setup11.1.1. Dips Test Setup

    11.2. Measuring StandardEN 61000-6-2 (IEC 61000-4-11)

    11.3. Severity Levels and Performance Criterion11.3.1. Severity level

    Test Level%UT

    Voltage dip andshort

    interruptions%UT

    Duration(in period)

    0 100 0.515102550*

    40 60

    70 30

    0 100

    11.3.2. Performance criterion: B&C

    11.4. EUT ConfigurationThe following equipments are installed on voltage dips and interruptionsmeasurement to meet EN 61000-6-2 requirements and operating in a manner whichtends to maximize its emission characteristics in a normal application.

    11.5. Operating Condition of EUT

    0.8 m AC Mains

    EUT Dips Tester

    AC Mains

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 38 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    Same as conducted emission measurement, which is listed in Section 2.4, exceptthe test set up replaced by Section 11.1.1.

    11.6. Test Procedure1) Set up the EUT and test generator as shown on Section 11.1.1.2) The interruptions is introduced at selected phase angles with specified duration.3) Record any degradation of performance.

    11.7. Test EquipmentThe following test equipments are used during the Dips Immunity measurement:

    Item Equipment Manufacturer Model No. Serial No. Last Cal. Cal. Interval1. CYCLE SAG Simulator PRIMA DRP61011AG PR12046234 Jun. 17, 2016 1 Year

    11.8. Measuring Results

    PASS

    Please refer to the following page.

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 39 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    Voltage Dips and Interruptions Test ResultsShenzhen Anbotek Compliance Laboratory Limited

    Temperature : 24℃ Humidity : 55%

    Power Supply : AC 230V, 50Hz Criterion required : B&C

    Test Result : Pass Fail

    Test Level

    % UT

    Voltage Dips & ShortInterruptions

    % UT

    Duration (in periods)Result

    70 30 0.5P A B

    C D

    60 40 5P A B C D

    60 40 50P A B

    C D

    0 100 250P A B

    C D

    Test Level

    % UT

    Voltage Dips & ShortInterruptions

    % UT

    Duration (in periods) Result

    Remark:

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 40 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    12. MAGNETIC FIELD SUSCEPTIBILITY TEST

    12.1. Block Diagram of Test12.1.1. Magnetic field test setup

    12.2. Measuring StandardEN 61000-6-2 (IEC 61000-4-8)Severity Level 4, 30A / m

    12.3. Severity Levels and Performance Criterion12.3.1. Severity Levels

    Level Field Strength A/m

    1 1

    2 3

    3 10

    4 30

    5 100

    X Special

    12.3.2. Performance Criterion : A

    12.4. EUT Configuration on TestThe following equipments are installed on magnetic field susceptibilitymeasurement to meet EN 61000-6-2 requirements and operating in a manner whichtends to maximize its emission characteristics in a normal application.

    Ground Reference Support

    EUT

    0.8 m

    Magnetic FieldTester

    ACTransformer

    wood

    Induction Coil

    AC Mains

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 41 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    12.5. Operating Condition of EUTSame as conducted emission measurement, which is listed in Section2.4, except thetest set up replaced by Section 12.1.

    12.6. Test ProcedureThe EUT is placed in the middle of a induction coil (1*1m), under which is a1*1*0.1m (high)table, this small table is also placed on a larger table,0.8 m abovethe ground. Both horizontal and vertical polarization of the induction coil are set ontest, so that each side of the EUT is affected by the magnetic field. Also can reachthe same aim by change the position of the EUT.

    12.7. Test EquipmentThe following test equipments are used during the Magnetic Field ImmunityMeasurement:

    Item Equipment Manufacturer Model No. Serial No. Last Cal. Cal. Interval1. Power Frequency

    Magnetic FieldGenerator

    EVERFINE EMS61000-8K 906002 Apr. 16, 2016 1 Year

    12.8. Measuring ResultsPASS

    Please refer to the following page.

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 42 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    Magnetic Field Immunity Test ResultsShenzhen Anbotek Compliance Laboratory Limited

    Ambient Condition : Temp : 20℃ Humid: 45%

    Power Supply : AC 230V, 50Hz Criterion required : A

    Test Result : Pass Fail

    Test Level(A/M)

    TestingDuration

    Coil Orientation Result

    30 5 mins X A B C D

    30 5 mins Y A B C D

    30 5 mins Z A B C D

    Test Level(A/M)

    TestingDuration

    Coil Orientation Result

    Note:

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 43 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    13. PHOTOGRAPHS

    13.1. Photo of Power Line Conducted Emission Test

    13.2. Photo of Radiated Emission Test

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 44 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    13.3. Photo of Flicker/ Harmonic Test

    13.4. Photo of Electrostatic Discharge Immunity Test

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 45 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    13.5. Photo of RF Field Strength susceptibility Test

    13.6. Photo of Electrical Fast Transient/Burst Immunity Test

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 46 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    13.7. Photo of Surge Immunity Test

    13.8. Photo of Injected currents susceptibility Test

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 47 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    13.9. Photo of Voltage Dips and Interruptions Test

    13.10. Photo of Magnetic Field Susceptibility test

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 48 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 49 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    APPENDIX I(Photos of EUT)

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 50 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    Figure 1The EUT- Overall View

    Figure 2The EUT- Top View

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 51 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    Figure 3The EUT- Side View

    Figure 4The EUT- Inside View

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 52 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    Figure 5The EUT- Inside View

    Figure 6The EUT- Inside View

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 53 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    Figure 7The EUT- Inside View

  • Shenzhen Anbotek Compliance Laboratory LimitedPage 54 of 54 Report No. R0117020505I1

    Shenzhen Anbotek Compliance Laboratory LimitedTel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com

    CE Label1. The CE conformity marking must consist of the initials ‘CE’ taking the following form:

    If the CE marking is reduced or enlarged, the proportions given in the above graduated drawing must

    be respected.

    2. The CE marking must have a height of at least 5 mm except where this is not possible on account of

    the nature of the apparatus.

    3. The CE marking must be affixed to the product or to its data plate. Additionally it must be affixed to

    the packaging, if any, and to the accompanying documents.

    4. The CE marking must be affixed visibly, legibly and indelibly.

    It must have the same height as the initials ‘CE’.