EMAIL-Completion of CWDS-2012.08.15

2
1 Poole, Mark From: David Kent Sent: Wednesday, 15 August 2012 3:56 AM To: Garry Seaborne; Mark Poole Cc: Gavin Hanlon; George Warne; Mark Paganini; Michelle Poole Subject: RE: Campaspe West D&S Operational Ditto Mark. Well done – excellent outcome Dave From: Garry Seaborne Sent: Tuesday, 14 August 2012 4:25 PM To: Mark Poole Cc: Gavin Hanlon; George Warne; David Kent; Mark Paganini; Michelle Poole Subject: RE: Campaspe West D&S Operational Mark, Congratulations are in order to the contractors – they are also very much in order for you noting that you stepped up & into the project at short notice & with a number of issues to contend with on this high profile project – you have worked hard & performed extremely well in terms of doing what project managers best getting the job done, ie. successfully managing cost, schedule & performance outcomes – thank you. Garry From: Mark Poole Sent: Tuesday, 14 August 2012 4:14 PM To: Mark Paganini Cc: Garry Seaborne; George Warne; David Kent; Simon Woodhouse Subject: Campaspe West D&S Operational Mark, I am pleased to report that the last section of pipeline passed its hydrotest today which means that the system is now operational. This includes the extension to include a landowner who is a late addition to the scheme. There is still 23 weeks of cleanup and property reinstatement work to go but the landowners can commence extracting water from their new system as of tomorrow. All credit is due the excellent work of Mitchells (and their subcontractors), coordinated by their project manager, Simon Woodhouse, for achievement of this task within our deadline of 15 Aug in difficult circumstances facing weather delays and other significant obstacles. Regards, Mark GOULBURN-MURRAY WATER Mark Poole PROJECT MANAGER, CONSTRUCTION G-MW Connections Project 55 Welsford St Phone (03) 5814 4631

Transcript of EMAIL-Completion of CWDS-2012.08.15

Page 1: EMAIL-Completion of CWDS-2012.08.15

1

Poole, Mark

From: David KentSent: Wednesday, 15 August 2012 3:56 AMTo: Garry Seaborne; Mark PooleCc: Gavin Hanlon; George Warne; Mark Paganini; Michelle PooleSubject: RE: Campaspe West D&S Operational

Ditto Mark. Well done – excellent outcome  Dave  

From: Garry Seaborne Sent: Tuesday, 14 August 2012 4:25 PM To: Mark Poole Cc: Gavin Hanlon; George Warne; David Kent; Mark Paganini; Michelle Poole Subject: RE: Campaspe West D&S Operational  Mark,  Congratulations are in order to the contractors – they are also very much in order for you noting that you stepped up & into the project at short notice & with a number of issues to contend with on this high profile project – you have worked hard & performed extremely well in terms of doing what project managers best getting the job done, ie. successfully managing cost, schedule & performance outcomes – thank you.  Garry  

From: Mark Poole Sent: Tuesday, 14 August 2012 4:14 PM To: Mark Paganini Cc: Garry Seaborne; George Warne; David Kent; Simon Woodhouse Subject: Campaspe West D&S Operational  Mark,  I am pleased to report that the last section of pipeline passed its hydrotest today which means that the system is now operational.  This includes the extension to include a landowner who is a late addition to the scheme.  There is still 2‐3 weeks of cleanup and property reinstatement work to go but the landowners can commence extracting water from their new system as of tomorrow.  All credit is due the excellent work of Mitchells (and their subcontractors), coordinated by their project manager, Simon Woodhouse, for achievement of this task within our deadline of 15 Aug in difficult circumstances facing weather delays and other significant obstacles.  Regards,  Mark  

GOULBURN-MURRAY WATER Mark Poole PROJECT MANAGER, CONSTRUCTION G-MW Connections Project 55 Welsford St Phone (03) 5814 4631

MarkPool
Highlight
Page 2: EMAIL-Completion of CWDS-2012.08.15

2

PO Box 1665 Shepparton Victoria 3632 Australia www.g-mwater.com.au

Mobile 0409 152 206 Fax (03) 5814 4666 Email [email protected]

The Northern Victoria Irrigation Renewal Project (NVIRP) is now integrated into Goulburn-Murray Water to deliver the G-MW Connections Project Please consider the environment before printing this email.

NOTICE: If you are not an authorised recipient of this email, please contact Goulburn-Murray Water immediately by return email or by telephone on +61 3 5826 3500. In this case, you should not read, print, re-transmit, store or act in reliance on this email or any attachments, and should destroy all copies of them. This email and any attachments are confidential and may contain legally privileged information and/or copyright material of Goulburn-Murray Water or third parties. You should only transmit, distribute or commercialise the material if you are authorised to do so. This notice should not be removed. Goulburn-Murray Water protects the privacy of its customers by providing customer information in accordance with the Victorian Information Privacy Act 2000 For further information regarding Goulburn-Murray Water's privacy statement please refer to our website at http://www.g-mwater.com.au/