Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

download Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

of 28

Transcript of Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    1/28

    The best solution often lies in the unapparent.

    John Olaf Nelson

    [email protected]

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    2/28

    Eliminate Water Supply

    Impact

    of New Residential

    Development

    withZero FootprintLeague of California Cities

    ConferenceSept. 26, 2008

    John Olaf Nelson Water Resources Mgt

    [email protected]

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    3/28

    What is Zero Footprint?

    A. Onsite Reduction of Potable Demand:

    Conservation Measures

    Recycled Water Use

    B. Off-site Offsets of Potable Demand:

    Utility Conservation Programs

    Utility Recycled Water Projects

    A + B = Zero Net Potable Demand

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    4/28

    How Paid For?

    Onsite Reductions are cost to

    Developer at time of construction.

    Off-site Offsets are payments made to

    Utility (lump sum or an added

    connection fee.

    Both reduce profit margin to Developer.

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    5/28

    How are Savings Assured?Onsite

    Use of approved devices

    Inspection by Utility

    Conditions, Covenants & Restrictions

    (CC&Rs)

    Off-site Factor of Safety in estimating savings

    Utility sets/approves Offset Fee

    Utility administers off-site cons. programs

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    6/28

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    7/28

    EPAct Standards

    ULFTs 1.6 gpf

    Shower heads 2.5 gpm

    Faucets/aerators 2.2 gpm

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    8/28

    New Standards - Inside

    HE Toilets 1.28 gpf*

    HE Shower heads 2.0 gpm

    HE Faucets/aerators 1.5gpm**

    HE Clothes washers 5.5

    gcd HE Dishwashers 0.6 gcd

    Submeter MF 21.8 gpd

    Structured Plumb./HWD 8.5 gpd

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    9/28

    HE Toilets and Appliances

    Dual Flush

    Clothes Washer & Dryer

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    10/28

    Structured Plumbing

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    11/28

    in Plan View

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    12/28

    HWD RetrofitHot Cold

    Receiver

    < Recycle Pump and

    Temperature Sensor

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    13/28

    New Standards - Outside

    Limit Turf for SF to < 800 sf

    No narrow strips of turf (< 8 ft)

    Xeriscape plant materials

    Smart (ET) Controller

    Meet States MAWA requirement *

    * 70% ET Adjustment Factor

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    14/28

    XeriscapeTraditional

    Xeriscape

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    15/28

    ET Controller

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    16/28

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    17/28

    B/C of Some Onsite Measures

    HE Clothes Washer

    4.4

    Submetering MF 2.3 HE Dishwasher 1.3

    Structured Plumbing 1.2

    ET Controllers for SF 0.7

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    18/28

    Added Unit Cost

    HE Clothes Washer $238

    Submetering MF $273

    HE Dishwasher $111 Structured Plumbing $573

    ET Controllers for SF $312

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    19/28

    Select Off-site Programs & B/C

    Utility Cust.

    ET Contr. - Irr. (100%) 2.6 5.1

    Submetering MF (100%) 1.9 2.3

    ET Contr. - UQ SF (75%) 1.2

    1.5

    HWD Retrofit (40%) 1.0 1.8

    ET Contr. - Typ. SF (50%) 0.6 0.5

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    20/28

    Estd Program Unit Cost to Utility

    ET Contr. - Irr. (100%) $1,180

    Submetering MF (100%) $473

    ET Contr. - UQ SF (75%)

    $590

    HWD Retrofit (40%) $270

    ET Contr. - Typ. SF (50%) $324

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    21/28

    Case Example

    Location:

    Inland Coastal Valley of North CA

    33 inches of annual rainfall (nil in summer)

    Description:

    300 acres (29% open space)

    1,736 DUs (SF = 68%) 250,000 sf of commercial

    Total Project Demand = 580 afa (0.518 mgd)

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    22/28

    EDU Relationships

    EDU Ratio

    SF Detached 1.00

    SF Attached 0.70 MF 0.53

    Second Units 0.24

    Note: 1,736 DUs = 1,330 EDUs

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    23/28

    Onsite Reductions and

    Remaining Offset NeedOnsite Reductions:

    Conservation 23%

    Recycled Water Use 24%

    Total 47%

    Remainder to offset viaOff-site Programs: 53%

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    24/28

    Measures and Distribution

    of Onsite Reductions

    `

    Recycle 51% EPAct 25%

    HE Clothes Washers 9%

    Submetering 4%

    Commercial and HE Dishwasher 1% eachStructured Plumbing w. HWD 4%

    ET Controllers 5%

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    25/28

    Expand Existing 28%

    ET - Upper Quart. SF 16%

    Increase Clothes

    Washer Rebates 6%

    HWD Retrofit 8%

    Submetering MF

    15%

    ET - Irr. Only 18%

    ET - Typical SF 9%

    Note: ET Controller Programs total 43%

    Off-site Program Savings and

    Distribution

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    26/28

    Case Example Recap

    M$ $/DU $/EDU

    Onsite Conservation 1.2 684 892

    Onsite Recycled 3.2 1,857 2,424Off-site Conservation 2.9* 1,650 2,154**

    Total $7.3 $4,191 $5,470

    * Includes 22% Safety Factor for est. errors.

    ** Offset Fee to pay for Off-site Programs

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    27/28

    Build-it-Green Points

    Points

    Build-It-Green points for SF: 294

    Portion in Water category*: 66

    Application of New Standards

    can capture: 46

    * Excluding consideration of Recycled Water Use

  • 8/14/2019 Eliminate Water Supply Impact of New Residential Development with Zero Footprint Design

    28/28

    John Olaf Nelson Water Resources Mgt

    [email protected]