Eliminate Routine Well Site Checking

Page 2: Eliminate  Routine Well Site Checking

Backgrounder

• Advanced Flow Technology– Calgary, Alberta– 7 Years in gas well monitoring– 1 year oil well monitoring– Patented technologies using temperature and

acoustics • Len Johnson– 30 years’ CEO technology companies– Last company: Advanced Measurements Inc.

Page 3: Eliminate  Routine Well Site Checking

Goals

• Validation of potential in US market– We know the Great White North, but..

• Beta Test Partner– Fall time frame

Page 4: Eliminate  Routine Well Site Checking

Well Site Visits

• Over 700,000 oil wells in North America– Majority low production, manually monitored– 50% of operator time spent checking!

• Is the well producing as expected?– Pump Working?– Fluid being produced?– At the expected levels

• Is there a leak at the well head?

Page 5: Eliminate  Routine Well Site Checking

Well Monitoring Choices:SCADA Controller : $10k-$25k Bert: Have Truck Will Travel: $800 per

well/month

Page 6: Eliminate  Routine Well Site Checking

Filling the Gap

• Field based system– Low Cost ($3,000 range)– Self Powered– Easy to Install: Any well, anywhere– Cellular Network for communication– Class 1 Div 1– All weather conditions

Page 7: Eliminate  Routine Well Site Checking

Information

• Easy to access and understand– Simple– Available from Smart Phone, Computer…

• Provides answers to basic questions:– Pump working, – well producing • at expected levels,

– not leaking• Manage by exception

Page 8: Eliminate  Routine Well Site Checking

Manage by Exception

Green = all systems go

Yellow = maybe a problem

Red= go to the well

Click on an icon to drill down for well status

Page 9: Eliminate  Routine Well Site Checking

Is the Pump Working?

Page 10: Eliminate  Routine Well Site Checking

Is the pump working?

Page 11: Eliminate  Routine Well Site Checking

Is Fluid Being Produced?

Page 12: Eliminate  Routine Well Site Checking

Is Fluid being produced?

ΔT = VariableΔT = 0

FlowingNot Flowing

Page 13: Eliminate  Routine Well Site Checking

Normal : Well Producing

Page 14: Eliminate  Routine Well Site Checking

Reduced Flow

Page 15: Eliminate  Routine Well Site Checking

Well Down

Page 16: Eliminate  Routine Well Site Checking

Delta T: Simple but powerful

• Any flow change– Flow trends easily spotted

• Sub-surface problems spotted in near real time

• Big reduction in requirement to trouble shoot– Fluid shots, putting wells on test

Page 17: Eliminate  Routine Well Site Checking

Is It Leaking?

Page 18: Eliminate  Routine Well Site Checking

Considerations for Leak Detection

• Accurate detection of leaks– 0 false negatives– Very limited tolerance for false positives

• Timely– Within hours

Page 19: Eliminate  Routine Well Site Checking

Not a Problem

Page 20: Eliminate  Routine Well Site Checking

Problem?

Page 21: Eliminate  Routine Well Site Checking

Problem

Page 22: Eliminate  Routine Well Site Checking

Leak Notification

• Green well, all good• Sliding scale for notification–Notify when somewhat oily?–Notify only when visit is required?–Different levels of notification for field vs.

office?

Page 23: Eliminate  Routine Well Site Checking

Benefits of Reduced Visits

• Lower Costs– 50% of operator time spent on routine checking– Leak remediation costs reduced

• Fewer Safety Incidents• Higher Production

– Problems spotted immediately– Operator time shifted from problem finding to problem

solving

Page 24: Eliminate  Routine Well Site Checking

Summary

• The pump is working• Fluid is being produced–At the expected level

• There is no leak• Do we need to send a guy to the well?

Page 25: Eliminate  Routine Well Site Checking

The Ask