The development of gridinfrastructure on bothEuropean & Belgian level
Federal NetworkDevelopment Plan
F. Dunon, Elia
AGENDA
1. Network development: the context
2. Infrastructure projects
3. Consultation & approval process
1. NETWORKDEVELOPMENTThe context
ELIAGROUP PRESENTATION TEMPLATE / CITY, 19.11.2013 /FIRSTNAME LASTNAME5
TSOs play a key role in the energy revolution
3 CHALLENGES3 ACTIVITIES
Infrastructuremanagement
System operation +strategic reserves
Market facilitation
Belgian electricity network: history and futuredevelopments
Industrial developmentElectricity Companies
Economic Expansion Nuclear development Gas power plantsintegration
EU ElectricityDirectives & packages
20’s – 40’s20’s – 40’s 50’s – 70’s50’s – 70’s 70’s70’s late 80’s –eraly 90’slate 80’s –eraly 90’s
late 90’s -2013
late 90’s -2013
EU leaders agreed on 23 October 2014 thedomestic 2030 greenhouse gas reduction targetof at least 40% compared to 1990
COMMISIONER GÜNTHER OETTINGER
Increasing uncertainties
today 2020 2030
Uncertainties
Essentially, the following uncertainties
Nuclear power plants EU 2020 targets New thermal plants Additional decommissioning Load growth
Key drivers shaping the future energy landscape
No nuclear power plants after 2025 Pace of RES integration Security of supply : autonomy or dependency CO2 market reforms Additional decommissioning Load growth and Energy efficiency Storage developments Off-grid solutions
From today to 2020 From 2020 to 2030
Scenarios for framing uncertainty: 2030Construction of 4 scenarios 2030:• Legal obligation: in line with the
prospective study on generationresources (federal authorities)
• Legal obligation: being compatiblewith TYNDP scenarios
• Elia does not assume that onescenario is more likely or moredesirable than another
• The actual situation should tally inthese extreme scenarios
Reality 2030
?
60
70
80
90
100
110
2005 2010 2015 2020 2025 2030
Total electricity demand (TWh)
+23%
V0
+3%
Year
V4
EU 2020V3
4 ENTSO-E based scenarios used by Elia toevaluate federal development plan
4 scenarios defined to test robustness of development plan All visions assume a demand increase vs. 2013 (3-23%)
Low (imports) High (autonomy)National autonomy
Low
High
RESgrowth
Vision 4: "GreenRevolution"
Vision 3: "GreenTransition"
Vision 0: "Noprogress"
Vision 1: "Slowprogress"
Historical consumptionScenarios
V1
% RES
CO2 reduction(% - compared to 1990)
2
40% 50% 60%
-78%
-62% 3
14%
-7%2005
-39%
-20%
35%
1-42%
4
RES Targets EU = total scope energy% RES graph = part within electricity generation mix
On track energyroadmap 2050
2020
Definition of scenarios : test for the resiliance ofinfrastructure projects
Scheme
Description
Application of the 4 visions (V0,V1, V3 and V4)Moderate transition of the powermarket
• Moderate to strong demandincrease
• Further RES penetration• Different national autonomy
levels
Strong decentral production (30%of power demand), no longerpassing through grids
• High adoption of intermittentRES
• Breakthrough of 'prosumption',combining local generation &storage
• Adequacy and balancing onunit or microgrid level
Pan-European mgmt of demand andgeneration fluctuations in context ofhigh intermittent production
• High adoption of intermittentRES
• High capacity interconnections• Adequacy on pan-European
level: pooling variability &capacity
• Likely by European ISO
4 ENTSO-Etrajectories Supergrid0 2
DecentralIslands1
“380kV backbone andinterconnection projects areeffective and robust againstuncertainties”
ENTSO-E SYSTEM DEVELOPMENTCOMMITTEE
“ Regarding lower voltage levels, it is wiseto maintain a careful approach towards gridextensions, based on techno-economicoptimizations, flexible operationalmeasures, projects phasing and strivingfor a rationalization of the portfolio”
ELIA GRID DEVELOPMENT
2. INFRASTRUCTUREPROJECTS
ELIAGROUP PRESENTATION TEMPLATE / CITY, 19.11.2013 /FIRSTNAME LASTNAME16
Developing or reinforcing interconnections oneach border
1
23
4
5
1 NEMO [2019]: GB-BE subseaHVDC interconnection
2 ALEGrO [2019]: DE-BEunderground HVDCinterconnection
3 Avelin-Avelgem-Horta [2021-23]: new HTLS conductors
4 Brabo I [ 2016 ]: PST 4Zandvliet
5 PST Schiffelange [CREOS-2015]2 220 kV Aubange-Bascharage
(*)HTLS : High Temperature Low Sag – High performance conductors
Reinforcing the 380 KV backbone
12 3
4
6
56
1 STEVIN [2018]: CorridorZomergem-Zeebrugge 380 kV
2 Mercator-Horta [2019-2021]: newHTLS conductors
3Brabo II [2019]: Zandvliet-Lillo-Liefkenshoek 380 kVBrabo III [2023]: Liefkenshoek-Mercator 380 kV
(*)HTLS : High Temperature Low Sag – High performance conductors
Reinforcing the 380 KV backbone
12 3
4
6
56
4 Gramme-Van Eyck[2015] : 2nd
circuit 380 kV and substationVan Eyck
5 Lixhe-Herderen [2017] : 2nd
circuit 380 kV and substationLixhe
6 Longer run - indicative: 2nd circuit Van Eyck-
Massenhoven New HTLS conductors on
Gramme-Van Eyck corridor 380kV
2nd corridor 380 kV Lixhe-Herderen
(*)HTLS : High Temperature Low Sag – High performance conductors
Local grids: 220 – 150 – 110 KV
(*)HTLS : High Temperature Low Sag – High performance conductors
Refurbish
Reinforce
Mixed
RES
3. CONSULTATION &APPROVAL PROCESS
ELIAGROUP PRESENTATION TEMPLATE / CITY, 19.11.2013 /FIRSTNAME LASTNAME21
Plan de Développement fédéral 2015 - 2025
Drafting PDF 2015-2025Drafting PDF 2015-2025
Juin 2014 Mai 2015 Nov. 2015Sept. 2015Juil. 2015Août 2014 Oct. 2014 Nov. 2014 Jan. 2015 Mars 2015
PDFapprouvé
Draft PDPPublié
PDF 2015-2025: approbation par le Ministre de l’Energie pour novembre 2015 (date cible)SEA = Strategic Environmental AssessmentPDF = Plan de Développement FédéralTYNDP = Ten-Year Network Development Plan d’ENTSO-EBFP = Bureau Fédéral du PlanSPF = Service Public Fédéral (Direction énergie)
FinalisationFinalisation
Consult,CREG +
comité SEA
Consult,CREG +
comité SEA
EtudeSEA
EtudeSEA
ConsultationPublique
ConsultationPublique
TYNDP finalpublié
ProcessusapprobationProcessus
approbationUpdate
PDFUpdate
MeetingsSPF-BFP (4x)
MeetingsSPF-BFP (4x)
5 Jan, 2015
Many thanks for your attention!
FRÉDÉRIC DUNON
EU EnergyInfrastructure package
Implications for BelgiumL. Meeus, Vlerick Energy Centre
“200 billion needs to be invested in energyinfrastructure projects in the EU by 2020”
“Risk that almost half of this investment willarrive too late or not at all”
EUROPEAN COMMISSION, 2011
ALREADY MAKING APOSITIVE DIFFERENCE
EU Energy Infrastructure Package
Common CBA method:new instrument to select EU priorities
Cost Benefit Analysis now enables right project selection
Projects of common interest: several belgianprojects made the selection
Infrastructure Projects Nemo and Alegro have PCI label
Permits: FIRST one stop shops AREcoming online
EU Funding for projects rather than paper
IF National Regulation AuthoritiesCANNOT AGREE ON COST SHARING….
..THEN ACER WILL TAKE AN IMPORTANT ROLE
INVESTMENT INCENTIVES?EU Energy Infrastructure Package
Incentives to invest: TSO rate of return
Cos
t effi
cien
cy in
cent
ives
:
Risk versus Return…TS
O R
isk
… divergingpractices
across Europe
Incentives to invest: TSO rate of return
Cos
t effi
cien
cy in
cent
ives
:Towards a harmonization of nationalregulatory frameworks?
TSO
Ris
k
Or towards exceptional regulatory frames forpriority projects?
Context
Solution
Experience
• Lack of stragicalligy improtant investment, 2003 blackout
• Eligible projects: interconnection andcongestion reducing domestic lines
• Incentives: 12 years (risk) and +2%WACC premium (return)
• 8 billion invested since 2008• 28 ongoing strategic projects
THIS IS ONLY THE FIRST PACKAGEFOR INFRASTRUCTURE
EU Energy Infrastructure Package
Key messages for Belgium
• Advanced regulatory treatment that has to be put inplace anyway for PCIs, could also be applied toimportant national investments
• Look at the state of the art one stop shops that arebeing implemented for permit granting
• Revisit the regulatory framework for electricitynetworks
Market functioning, strategicreserve & planned outagesE. Spire, EliaD. Zenner, EliaD. Aelbrecht, Elia
Q1 à Emeline Spire
ELIA STAKEHOLDERS’ DAY | FRIDAY, NOVEMBER 21, 201440
Le jugement de Leonardo Meeus sur le fonctionnementdu marché interne est du moins « mitigé ».
Quelle est ton opinion a ce sujet ?
Comment vois-tu évoluer les choses ?....
Q2 à Emeline Spire
ELIA STAKEHOLDERS’ DAY | FRIDAY, NOVEMBER 21, 201441
Quels ont été les principaux développements en 2014concernant le marché de l’énergie ?
Q3 à Emeline Spire
ELIA STAKEHOLDERS’ DAY | FRIDAY, NOVEMBER 21, 201442
Mais le fonctionnement du marché à plus long terme,pour les signaux d’investissements laisse quand-mêmebeaucoup à désirer ?
Q4 à Emeline Spire
ELIA STAKEHOLDERS’ DAY | FRIDAY, NOVEMBER 21, 201443
On entend beaucoup parler de l’incitant de 4500Euro/MWh, on parle même de temps en temps d’uneamende.
Peux-tu nous expliquer de quoi il s’agit exactement etcomment cet incitant a été déterminé.
44
Q5 aan David Zenner
ELIA STAKEHOLDERS’ DAY | FRIDAY, NOVEMBER 21, 201445
Heeft een dergelijke incentive toch voor enige reactiesgezorgd heeft bij de marktpartijen ?
Q6 aan David Zenner
ELIA STAKEHOLDERS’ DAY | FRIDAY, NOVEMBER 21, 201446
Hoe staan we ervoor? Wat is de laatste stand van zakenivm het risico op stroomschaarste voor deze winter?
SITUATIE WINTER 2014-2015
Context
Q7 aan David Zenner
ELIA STAKEHOLDERS’ DAY | FRIDAY, NOVEMBER 21, 201448
Quels moyens de communication Elia met en place pourses stakeholders afin de les avertir au mieux de lasituation?
•Towards the energy market professionals
Which channel, content and targeted audience?
•Towards the Community
49
… Strategic Reserve activation … load-shedding
Communicate on the risk evolution of …
www.readyforwinter.bewww.elia.be/en/grid-data
An app will also be availablewith notification push!
Also for subscription to RSSfeed
COMMUNICATION
Q8 à David Zenner
ELIA STAKEHOLDERS’ DAY | FRIDAY, NOVEMBER 21, 201450
Le plan de délestage connaît un grand impact.
Pour être clair, les utilisateurs du réseau d’Elia ne seront pas affectés ?
Q9 aan Dirk Aelbrecht
ELIA STAKEHOLDERS’ DAY | FRIDAY, NOVEMBER 21, 201451
Gezien de situatie, welke operationele acties en middelen heeft het National ControlCenter genomen om de situatie meester te blijven?
Q10 aan Dirk Aelbrecht
ELIA STAKEHOLDERS’ DAY | FRIDAY, NOVEMBER 21, 201452
Om het hoofd te bieden aan de situatie wordt rekening gehouden met eenbeschikbare interconnectiecapaciteit.
Hoe zit dit exact in elkaar en hoe wordt deze capaciteit berekend?
53
Voorbeeld van een invoer van 3500 MWvanuit Noord-Europa
Import – inter-TSO coördinatie
Acties
Q11 aan Dirk Aelbrecht
ELIA STAKEHOLDERS’ DAY | FRIDAY, NOVEMBER 21, 201454
De regulator CREG, alsook de markt, challenged Elia of we wel voldoendeinspanningen leveren om een maximale capaciteit ter beschikking te stellen.
Hoe staan wij hier tegenover en wat is ons antwoord?
Risk for Electricity ShortfallWinter 2014-2015
What is the role of thegovernment?
N. Mahieu, FOD/SPF Economie
Procedure shortfall of electricity (iterative process)
ELIA STAKEHOLDERS’ DAY | FRIDAY, NOVEMBER 21, 201457
Notification PreparationCrisis consultation
Crisis consultation Decision ExecutionDetection
Elia Elia/Ministers/FPSEconomy/FPS of
the Interior
Minister(s)/ELIA/DGEnergy and DG NCC
Ministers ofEconomy
and Energy
Involved actors*ARP/ Elia
When situationconfirmed,Elia sends outa notification
Weatherfactors of theRMI,productionforecasts, etc
D-7 D-7
Technicalbriefing
D-7 D-7/D-6
Departmentalcrisis cell.ConsultationRegions
Discussion of themeasures and therelated impact (basedon the analysis of theevaluation cell)
D-6 D-6
Information partners/Communicationpopulation / TechnicalimplementationControl and monitoring
D-6/D-5 J
Package of measures(Awareness andProhibition)Activation loadshedding plan
* Involved actors: Ministers/ Administrations of FPS Economy and of the Interior/Elia/ distribution network provider/other involved actors
MEASURES TO REDUCE ELECTRICITYCONSUMPTION• Two types of measures :
• Awareness measures• Prohibition measures
• Prohibition of the use of electrical devices and consumption sources (i.e. via decrees)• Decision taken by Energy and Economy Ministers
• 4 main clusters :
ELIA STAKEHOLDERS’ DAY | FRIDAY, NOVEMBER 21, 201458
1. Residential clients• Awareness via OFF/ON campaign• Prohibition measures
2. Buildings (Private buildings and government buildings)
• Awareness via OFF/ON campaign• Reducing consumption procedure for all buildings
(written by Energy DG)
3. Lighting• Awareness via OFF/ON campaign• Prohibition measures for public (streets,
highways, etc.) and private non-functional lighting
4. Public transport• Awareness of all actors (trains, metro, etc)• Consumption reduction measures on electrical
railways
Capacity remuneration schemes
ELIA STAKEHOLDERS’ DAY | FRIDAY, NOVEMBER 21, 201459
Two planned mechanismsPart of an overarching generation adequacyplan.
• Strategic reserve: 850 MW, including100 MW of DSM, for winter 2014-2015can be called upon in case of ageneration adequacy crisis;
• Public tender: Mechanism to triggerinvestments in gas-fired powerplants. Three offers being analyzed.
Vision of the new governmentAim to radically improve the investmentclimate, including an evaluation of theplanned nuclear phase-out.
• Strategic reserve: Will be maintainedfor winter 2014-2015, but necessity forfollowing years analyzed in light of thenew context;
• Public tender: Opportunity of currenttender will be re-evaluated, in closecollaboration with neighboring countries.
Thank youfor your attention!
NANCY MAHIEU, ACTING DIRECTOR GENERAL FOR ENERGY
Energy shortage & loadshedding
The role of the DSOs
B. Crabs, Synergrid
1. Wie is Synergrid?
• Synergrid verenigt de beheerders van de aardgas- en elektriciteitsnetten in België:– Elia: transmissie van elektriciteit (hoogspanningslijnen)– Fluxys: vervoer van aardgas (hogedrukleidingen)– Distributienetbeheerders: distributie van elektriciteit en aardgas (midden en lage druk/spanning)
• Missie:Bevorderen van de efficiëntie van de netinfrastructuur
Verhogen van de dienstverlening aan de netgebruikers
2. De elektriciteitsnetbeheerdersTransportnetbeheerder
Distributienetbeheerders
Vlaanderen
EandisInfrax
Brussel
Sibelga
Wallonië
OresResaREWAIEG
AIESH
3. Het elektriciteitsnet in enkele cijfers
• Lengte transportnet: 8.370 km
• Lengte distributienet: 210.072 km
• Aantal leveringsposten TNB/DNB: 567– Vlaanderen: 300– Brussel: 49– Wallonië: 218
• Aantal klantcabines: 73.810
• Aantal actieve leveringspunten: 5.714.503
4. Wie doet wat?
Beslissing afschakeling: Minister Economie + Energie
Crisisbeheer: Federale + provinciale + gemeentelijke crisiscellen
Uitvoering afschakeling: TNB Elia
Hervoeding ziekenhuizen en zorgcentra: DNB
Hervoeding alle klanten na herbevoorrading door Elia: DNB
5. Hoe verloopt een afschakeling?
6. Hervoeding van de netten
• De volgende leveringspunten zullen zo snel mogelijk hervoed worden:– Hulpdiensten van de netinfrastructuur– Ziekenhuizen en zorgcentra: volgens de lijst opgesteld door de FOD Volksgezondheid
7. Decentrale productie-eenheden
• Windmolens, fotovoltaïsche zonnepanelen en wkk’s zullen zich automatisch afkoppelenvan net conform de geldende reglementering
• Productie-eenheden aangesloten op hoogspanningspost: terug onder spanninggebracht om bij te dragen tot beperken schaarste
• Productie-eenheden op laag- en middenspanningsnet: niet terug onder spanninggebracht
=> Verbruik > productie => Schaarsteprobleem verergeren!
Bedankt!
BÉRÉNICE CRABS - SYNERGRID
Energy shortage planning
P. De Leener, CoresoF. Vandenberghe, Elia
Coreso
• Independent company (SA); 100% TSO owned
• Created in Dec 2008; in operation since Feb 2009
• Today over 20 operators in 24/7 shift role
• Centralized model; experts coming from the TSOs (“rotational model”)
ELIA STAKEHOLDERS’ DAY | FRIDAY, NOVEMBER 21, 201471
Coreso’s Mission
ELIA STAKEHOLDERS’ DAY | FRIDAY, NOVEMBER 21, 201472
• The mission of Coreso is to assist TSOs pro actively to ensure Security of Supply on aEuropean regional basis.
• Being a centralized RSCI, the highest added value and so the operational focus isfrom a few days before until close to real time.
• Coreso develops and performs operational coordination services in cooperation withTSOs and RSCIs; the operational responsibilities remain at TSO level.
• Based on its regional expertise, Coreso supports the TSO community in identifyingand undertaking actions and initiatives on medium and longer term to ensure Securityof Supply.
• By its centralized model with rotational staffing from TSOs, Coreso spreads the cultureand practice of international cooperation amongst the TSOs.
Coreso’s role in the Winter Action Plan
ELIA STAKEHOLDERS’ DAY | FRIDAY, NOVEMBER 21, 201473
In order to support the TSOs in case of scarcity situation during next winter ina coordinated way, an ad hoc action plan has been put forward:
1. ex ante operational winter study together with CWE partners
2. Set up of a coordinated process to enable adequate import capacitiesin a secure way on Day Ahead and Intraday Markets
3. Coordination support to interTSO actions (after the markets; close toreal time)
European energy policy andinternal markets
P. Bornard, RTE, Chairman of ENTSO-EP. Fonck, EliaO. Koch, European Commission
QUESTIONS FROM THEAUDIENCE?
ELIAGROUP PRESENTATION TEMPLATE / CITY, 19.11.2013 /FIRSTNAME LASTNAME75
LUNCH
ELIAGROUP PRESENTATION TEMPLATE / CITY, 19.11.2013 /FIRSTNAME LASTNAME76
Elia’s broadeninginternational scope
M. Maes, Chairwoman of the Board
The role of the regulator
MP Fauconnier, CREG
De CREG,een blik in de keuken
ELIA Stakeholders Day 2014
Marie-Pierre FauconnierVoorzitster van het directiecomité van de CREG
Brussel, 21 november 2014
Agenda
I. Regulatoir kader
II. Rol van de regulator bij de bevordering van een stabiel regulatoir kader
III. Rol van de regulator als marktfacilitator
IV. Rol van de regulator bij de bevordering van degelijke informatie
V. Rol van de regulator bij de bevordering van een open, eerlijke en constructievedialoog
80
I. Regulatoir kader
Veel wetswijzigingen de laatste jaren
Als gevolg van omzetting & uitvoering 3e Energiepakket: splitsing en certificering vanDNB’s, tariefmethodologie, Europese netwerkcodes, bescherming van de verbruikers ...
... maar ook andere nationale en Europese wetgevingsinitiatieven: strategischereserve, steunregeling voor offshore productie, verlenging van Tihange 1, de Europese REMIT-verordening, investeringsprojecten van gemeenschappelijk belang (PCI - infrastructure package) ...
=> Uitbreiding van de bevoegdheden van de regulator naar gebieden die,direct of indirect, verband houden met de netactiviteiten.
81
II. Rol van de regulator bij de bevordering van eenstabiel regulatoir kader (1)
Stabiliteit van het regulatoir kader = ook het streven van de regulator− gunstig investeringsklimaat (productie, netinfrastructuren ...)− bevoorradingszekerheid− harmonieuze ontwikkeling van de energiemarkten− ...
Maar er zijn 'exogene' beperkingen:− toenemende complexiteit van energiesector in transitie− veel en uiteenlopende besluitvormingscentra− Integratieproces van nationale markten in de EU: speelt zich voortaan af in het kader
van een Europees energiebeleid dat ook de klimaatproblematiek wil aanpakken
82
II. Rol van de regulator bij de bevordering van eenstabiel regulatoir kader (2)
Groeiend aantal beslissingen/initiatieven van invloed op de binnenlandse marktenworden op Europees niveau genomen/goedgekeurd
Europese Raad van 23 & 24 oktober 2014 40 – 27 – 27 interne energiemarkt (interconnecties - projecten van gemeenschappelijk belang) bevordering van de energiezekerheid van de EU ontwikkeling van een governancesysteem
“A Bridge to 2025” – ACER: prioriteitenpakket volledige uitvoering van de Europese energiewetgeving totstandbrenging van een interne energiemarkt flexibiliteit van het energiestelsel
83
II. Rol van de regulator bij de bevordering van eenstabiel regulatoir kader (3)
Conclusies Een interne energiemarkt: meer interconnecties maar wel tegen een achtergrond van transitie naar
een koolstofarme Europese economie én met voldoende concurrentiekracht;
Aangepaste, gemoderniseerde en/of sterkere netten met een groeiend percentage variabelehernieuwbare energie en een grotere flexibiliteit aan vraag- en aanbodzijde;
Noodzaak om vakgebieden aan te passen en de energietransitie zo goed mogelijk te begeleiden inhet algemeen belang van het land en van alle Belgische verbruikers;
De CREG zal ertoe bijdragen dat ELIA, zo efficiënt en zo goed mogelijk, een niet-discriminerend,veilig, betrouwbaar en performant net ontwikkelt ten voordele van alle verbruikers.
84
III. Rol van de regulator als marktfacilitator (1)
Doel: zorgen voor een goede marktwerking, van alle activiteitensegmenten,en de transparantie ervan ten behoeve van de verbruikers en in overleg metde marktspelers
Voorbeelden
1. Tariefmethodologie2. Strategische reserves3. Capaciteit op de grenzen
85
III. Rol van de regulator als marktfacilitator (2)Tariefmethologie - chronologie
Ontwerp van tariefmethodologie in overleg met ELIA (06/2014)
Openbare raadpleging (09/2014 en NEMO 11/2014)
12 reacties (geen op NEMO) 60 verschillende vragen => 60 antwoorden
Verslag van de raadpleging (27/11)
Verzending van de documenten naar de Kamer van Volksvertegenwoordigers(30/11)
Publicatie tekst tariefmethodologie : vóór 31/12/201486
III. Rol van de regulator als marktfacilitator (3)Tariefmethologie – grote consultatiethema’s
Allocatie van de kosten aan de gebruikers
− CREG: legt het kader voor de allocatie van de kosten vast− ELIA: stelt de allocatie van de kosten voor
Beslissing CREG
Peak Load Pricing
− Efficiëntie, Eenvoud, Transparantie, Harmonisatie, Kostenreflectiviteit, Evoluties van demarkt en het netwerk
Tariefperiodes
− Tarief voor de jaarlijkse piek berekend op basis van tarifaire piekperiode
87
III. Rol van de regulator als marktfacilitator (4)Tariefmethologie – stimulansen
Kostenefficiëntie Beheersbare kosten en beïnvloedbare kosten
Marktintegratie Financiële participaties Interconnecties en welfare
Investeringen Efficiëntie Respect van de termijnen
R&D Bevoorradingszekerheid Strategische reserve
Rendabiliteit en Kwaliteit88
III. Rol van de regulator als marktfacilitator (5)Strategische reserve
Behoud van een bepaald veiligheidsniveau voor levering in de winter
Overlegprocedure betreffende modaliteiten voor samenstelling van de reserve
Procedure, op voorstel van Elia en na overleg, voor goedkeuring door de CREG vanwerkingsregels voor de strategische reserve - definitieve beslissing CREG: 5 juni 2014
Standpunt van de CREG betreffende de redelijkheid van de prijsoffertes die bij Eliabinnengekomen zijn
Wil om in samenwerking met Elia, toezicht te houden op het mechanisme van de strategischereserve
Open vraag: andere CRM-types nodig? Te bepalen in een regionaal / Europees kader.89
III. Rol van de regulator als marktfacilitator (6)Capaciteit op de grenzen
Realiseren van studies om beter zicht te krijgen op de commerciële capaciteit diebeschikbaar is op de bestaande interconnecties
Tot op vandaag heeft de CREG geen enkele investering verworpen
Initiatieven om de realisatie van bepaalde projecten te faciliteren NEMO (BE-UK): ontwikkeling van een specifiek regulatoir kader (genaamd “cap & floor”)
met de Britse regulator OFGEM, in samenwerking met Elia en National Grid, en
ondersteund door verschillende publieke consultaties
90
IV. Rol van de regulator in het verspreidenvan kwaliteitsvolle informatie
Ter bevordering van de transparantie van de markt en voor een beter inzicht in demechanismen van de marktwerking, voor alle activiteitensegmenten
Informatie 'op maat' of aangepast aan de doelgroepen (industrie, huishoudens, kmo's ...)
Informatie over evoluties op Europees niveau en in de Belgische gewesten
Publicatie door de CREG van goedgekeurde ‘akten’ gelinkt met de uitvoering van haaropdrachten, met respect voor vertrouwelijkheid van gegevens: www.creg.be
Verbeterde communicatie-instrumenten91
V. Rol van de regulator in het bevorderen van eenopen, eerlijke en constructieve dialoog
In een energiewereld die voortdurend in beweging is, zal de CREG, in een geest vanopenheid en constructief overleg, zich blijven inspannen om:
de contacten tussen de marktspelers te bevorderen
aandacht te hebben voor de bekommernissen van de verschillende stakeholders en hen regelmatig te raadplegen
hen antwoorden te geven inspelend op hun behoeften, met respect voor haar onafhankelijkheid en met nalevingvan haar bevoegdheden
haar verantwoordelijkheid te nemen op regionaal niveau (FORBEG), nationaal en Europees niveau (CEER,ACER, Europese Commissie…) en de bestaande samenwerkingsverbanden te versterken
haar van de overheden en hen regelmatig te informeren expertise ter beschikking te stellen
92
Traditionele rol van « waakhond » van de markt
Maar deze « métier » dient mee te evolueren met een steeds complexereenergiewereld
Alleen zo kunnen we blijven beantwoorden aan de behoeften van demarktspelers, steeds rekening houdend met de verbruikers
Met als noodzakelijke sleutel tot succes: een cultuur van open enconstructieve dialoog, op permanente basis
93
Besluit
Dank voor uw aandacht
94
Federal Minister of Energy
M-C Marghem
J. Vandermeiren
F. Vandenberghe
Main highlights of the day
I. Tant, Elia
Thank you for your attention!