2006 – ELI on ESFRI Roadmap

ELI-PP 2007-2010 (FP7) ELI-Beamlines (Czech Republic) ELI-Attoseconds (Hungary) ELI-Nuclear Physics (Romania)

ELI-DC (Delivery Consortium): 2010, Legal entity: April 2013 Czech Republic, Hungary, Romania, Italy, Germany

2

Extreme Light Infrastructure

Page 3: ELI-NP Team , March 5, 2013

ELI-NP

NUCLEARTandem accelerators

Cyclotronsγ – Irradiator

Advanced DetectorsBiophysics

Environmental PhysicsRadioisotopes

ring rail/road

BUCHAREST

Bucharest-MagureleNational Physics Institutes

LasersPlasma

OptoelectronicsMaterial Physics

Theoretical PhysicsParticle Physics

ELI-NP

Page 4: ELI-NP Team , March 5, 2013

Large equipments:• High power laser system, 2 x 10PW maximum power• Gamma beam, high intensity, tunable energy up to 20MeV, produced by Compton scattering of a laser beam on a 700 MeV electron beam produced by a warm LINAC

Buildings: 33000sqm total

Experiments: • 8 experimental areas, Interaction chambers, Beam transportation

• 8 auxiliary laboratories

4

ELI-Nuclear Physics

Page 5: ELI-NP Team , March 5, 2013

ELI-NPMain buildings Lasers

Gamma

Experiments

Laboratories

Page 6: ELI-NP Team , March 5, 2013

ELI-Nuclear PhysicsLarge equipments:

• High power laser system, 2 x 10PW maximum power

Thales Optronique SA and SC Thales System Romania

• Gamma beam, high intensity, up to 20MeV, produced by Compton scattering of a laser beam on a 700 MeV electron beam produced by a warm LINAC

EUROGAMMAS (Italy, France, UK, Danemark, Sweden)

Scientific program: • Nuclear Physics experiments to characterize laser – target int.• Photonuclear reactions• Exotic Nuclear Physics and astrophysics • Applied Research

6

Page 7: ELI-NP Team , March 5, 2013

Financial aspects

Implementation by EU Structural Funds:• Project Approval: 18.09.2012, Contract with MA: 12.12. 2012

Building 66 M€ Staff 34 M€ Large Equipment 120 M€ Scientific equipment 49 M€ Others 24 M€ Total 293 M€

• EC contribution: 243 M€• National contribution: 50 + 63 + 5 + 4 = 122 M€• Duration/phasing: 2 phases (2012-2015/2014-2017)• 1st phase EC approval : 180 M€

Page 8: ELI-NP Team , March 5, 2013

8

White Book (Scientific Case)

Feasibility Study

Preparation of the Application

E.C. Evaluation & Approval

Building - Preparation

Building - Construction

Major Eqp. - Tender

Major Eqp.– Constr, Install

Experimental set-ups

Recruitment

2010 2011 2012 2013 2014 2015

Project implementation

2017

Page 9: ELI-NP Team , March 5, 2013

Human Resources

0

50

100

150

200

250

2011 2012 2013 2014 2015 2016 2017 2018

Technical Staff (18)

Eng. Staff (18)PhD students (50)

Jr. researchers (107)

Senior researchers (20)

Head of Res. Activities (5)2013 2014 2015 2016 2017 2018 2019

Page 10: ELI-NP Team , March 5, 2013

August 23, 2013

10

August 23, 2013June 14, 2013

September 25, 2013 February 2014

Page 11: ELI-NP Team , March 5, 2013

GOVERNMENT OF ROMANIA Structural Instruments2007-2013

EUROPEAN UNION

Infos: http://www.eli-np.ro

March 2014

Management Team

Dir.: N.V. Zamfir