ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij...

48
ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert

Transcript of ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij...

Page 1: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS

Daniel Molnar, Arjan Verweij and Erwin Bielert

Page 2: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

2

Contents

Daniel Molnar

Introduction Interconnections and their repair Physical description

Materials Modeling with Comsol 4.1 Comparisons to other codes, validations Shunted lines Design optimizations for the shunts

Shunt concepts Other investigations Conclusions Acknowledgements

Page 3: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

3

The LHC interconnections

Daniel Molnar

In case of a quench they should ensure the safe operation i.e. carrying the current

In the main ring there are some 10.000(!) connection btw. the dipole and quadrupole magnets

If the protection systems detect a quench ,the circuit is opened and the current is decaying with a time constant Tau , 100 sec for dipoles and 30 sec for quadrupole

Page 4: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

4

Motivation

Daniel Molnar

The motivation is to insure the safe operation of the LHC machine at the nominal beam energy of 7TeV

The 2008 incident has shown that present splices mean a significant danger, and not capable to secure the long term operation at higher current levels Thus they need to be repaired and protected

A shunt will be added to all of them, which has to carry the current even in worst case (adiabatic) conditions

Page 5: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

5

The ideal\designed interconnects

Daniel Molnar

Different Cu stabilizer

pieces

Cross section of a well soldered

cable

Side view of a perfectly soldered joint

Page 6: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

6

And the reality…..

Daniel Molnar

A vast number of defects and lack of soldering

X-ray Schematics

Page 7: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

7

Physical description

The first and main physical phenomena which describes such a runaway is the Joule

heating , later other physical problems coupled with it (magneto-resistivity)

Daniel Molnar

Page 8: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

8

Boundary conditions and initial values

Daniel Molnar

Most of the following results with the assumption of adiabatic thermal boundaries(worst case)

Electrical boundary conditions: On one side J current density constraint, the other is V=0

Initial conditions: V(t=0)=0 and in most cases T(t=0)=10K, so we have already quenched the cable

Pessimism is the most important factor !

bus= 𝐼0𝐴∗exp൬−𝑡𝜏൰ −𝑛ሬԦ⋅ 𝐽Ԧ= 𝐽0 ∗exp൬−𝑡𝜏൰ V= 0

Page 9: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

9

Material properties

Daniel Molnar

-Magneto resistivity is included in the models, simply adding a constant to

the Copper’s electrical resistivity (Self Field Factor)

-The superconducting cable consists Nb-Ti and Copper,

with the ratio of1:1.95

-0 resistivity could not be implemented in numerical calculations (in Comsol), so instead 10^-14 Ohm*m is

used

Page 10: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

10

Modeling

Daniel Molnar

3D model of the problem Linear shape function for the finite elements, significant save

of time Mesh elements number: for shunted 12236, non shunted

11950 Mesh size: 0.3-0.5mm in the defects(and shunt), 10 mm for

the BUS Linear interpolation for the material properties i.e. between

two known points it uses constant value, not significant simplification

The non linear solver uses a Newtonian algorithm, relative tolerance is 0.02

CPU time is typically 2000 sec, but for instance the He cooling case and quench etc. took 12000 sec

Page 11: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

11

Modeling II.

Instead of the actual shape rectangular was used with same cross section , to be able to use rectangular mesh

Symmetries introduced when it’s possible to speed up calculations Time step: 1msec

Daniel Molnar

Page 12: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

12

Comparisons, validations

The simulations carried out with Comsol, have been compared to another code QP3

Good agreement between the two results (and between measurements), within a 4-5 % difference

The difference is intrinsic to the fact that QP3 is a 1D model, while in Comsol 3D was implemented

Again we have to point out , both measurements and codes (QP3 and Comsol) show that the runaway is very fast, and in some cases non-protectable !

Daniel Molnar

Page 13: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

13

Non shunted studies

Daniel Molnar

Page 14: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

14

RQ/RB non shunted

Daniel Molnar

Page 15: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

15

Non shunted run-away(cause of 2008 incident)

Daniel Molnar

A runaway of a joint, notice the sharp and very fast change in the temperature

Page 16: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

16

The shunted bus bars

The main shunt itself is the same for both quadrupole and dipole circuits

Dipole lines can have 4 shunts/ joints, for the quads just below ones

The solder is SnPb, avg. thickness 100 mm In the calculations the RRR is 200 (pessimistic)

Daniel Molnar

Main shunt dimensions, top/bottom and side

view

The main shunt soldered to the BUS

Page 17: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

17

Description of symmetric shunt defects

50 mm

15 mm

Holes Up shunt

Below shunt

BUSwedgeU-profile

BUS

Daniel Molnar

Non stabilized

cable

Page 18: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

18

Safe operating currents for Dipole lines

Daniel Molnar

Page 19: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

19

Safe operating currents for the Quadrupole lines

Daniel Molnar

Page 20: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

20

Shunt designs

Naturally questions come up: do we have bigger margin for longer shunt? Or could a smaller reservoir hole for solder mean higher safety?

There are other view points than electro-thermal, such as quality control, accessibility, mechanical studies and solder quality

Daniel Molnar

Length of Shunt[mm]

Curr

en

t densi

ty y

co

mponent[

A/m

^2]

Page 21: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

21

RB shunt with smaller holes

Daniel Molnar

Page 22: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

22

RQ shunt with smaller holes

Daniel Molnar

Page 23: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

23

Additional shunts for quadrupole bus bars(side shunts)

The quad buses have no possibilities for a top shunt(at least idem as below shunt )

There are two designs for side shunts

Again there are other view points than electro-thermal

Daniel Molnar

Type_a, “bridge”

Type_b

Page 24: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

24

RQ Side-shunt type_a, dimensions and results

15

zl zm

zr

x

8mm

-Summary of different designs for the “bridge” side shunt-The original design is not safe

The depth is not varied

Daniel Molnar

Page 25: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

Electrically redesigned versions

Courtesy of P. Fessia

Daniel Molnar

25

Page 26: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

26

RQ sideshunt type_b dimensions and results

xz=zb+zj

y

zb

15

zj

x

-Summary of different designs for the “simple” side shunt-The original design is not safe

Daniel Molnar

Page 27: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

27

Time constant of the circuit

Daniel Molnar

Page 28: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

28

Magneto-resistivity

In all calculations shown before the magnetic effect is included, a constant is added to the resistivity of the Copper –Self Field Factor

One can ask what about the shunt? The current density is higher so is the magnetic field

Nice modeling problem, but practically not so significant

Daniel Molnar

Page 29: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

29

Conclusions

The present shunt design could guarantee the safe long term operation of the LHC at 7TeV (13kA or more) for dipole and quadrupole lines as well

The side shunts for the quadrupoles do not mean full redundancy, although with major changes they could be safe

The safe current also strongly depends on the defect of the BUS

Also other calculations are ongoing, such as cooling to He, to investigate the margins in this case

Daniel Molnar

Page 30: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

30

Acknowledgements

Many thanks to Arjan Verweij and to Erwin Bielert

Daniel Molnar

Page 31: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

31

Thanks

Daniel Molnar

Page 32: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

32

Backups

Daniel Molnar

Page 33: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

33

Modeling in 1D and 3D

Qp3:1D

The green arrows are the current density vectors

Comsol 4.1:3D

In this case there’s a real redistribution

Daniel Molnar

defect defect

Page 34: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

34RQ shunts summary

Page 35: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

35

RB up shunt

-Note that the two reservoir holes are always considered to be AIR, with rectangular shape-The defect of SnPb solder is indicated by green lines, different lengths of it-also non perfect contact betweenwedge and U-profile

Top view for up-shunt 15

WedgeU-profile

Page 36: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

36

RQ/RB below shunt

15

Bottom view below shunt

-The shunt is the same as for the up one-The defect of SnPb solder is indicated by green lines, different lengths of it-Also the defect is symmetric with respect to the connection of Bus and U profile

Page 37: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

37

QP3 Comsol difference; shunt RRR 150

For RQ shunted calculations(0=0.5)

For RB shunted calculations (0=0.5)

QP3 the shunt’s RRR=150

Page 38: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

38

QP3 and Comsol 4.1 example

Daniel Molnar

Page 39: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

39

Modeling considerations: geometry

RB (half)

RQ(full)

RQ(half)

Page 40: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

40

Extreme case: full length non stabilized cable

Page 41: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

41

Extreme case II) full length NSC,non symmetric SnPb defect

Page 42: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

42

And a more Extreme:No Cu in the defect for RQ below shunt

Page 43: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

43

The effect of the SnPb thickness

The “standard” is 100 mm but , also the effect of a thicker SnPb layer under (or above) the shunt has been investigated

For an RB below shunt with 8mm of GAP in the SnPb -100 mm thickness:16200 A

-300 mm thickness:15900 A

Page 44: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

44

Defect look-a-like

Page 45: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

45

Magnetic models, mesh quality

Page 46: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

46

Different Time constants-same current

The safe current for Tau 30 sec:16kA(also a bd case)

Page 47: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

47Modeled RQ side shunts

Page 48: ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.

48

An example of usage beyond Comsol Resistance as a function of time; It could

carry14kA without reaching 300 K, shunted version, no void in SnPb