ELECTRICAL SUPPLY & LIGHTING (Compulsory for Space...

2
08 FORM DEADLINE SUBMISSION PLEASE RETURN TO: CIRCLE QATAR LTD Tel : +974 4441 8510 Fax : +974 4442 6084 Email : [email protected] 08 FORM DEADLINE SUBMISSION FEB 17, 2020 PLEASE RETURN TO: CIRCLE QATAR LTD Tel : +974 4441 8510 Fax : +974 4442 6084 Email : [email protected] Company Name Contact Person Stand No. Telephone Address ELECTRICAL SUPPLY & LIGHTING (Compulsory for Space Only Stand) Shell scheme may complete this form only if they require additional electricity and lighting IT IS COMPULSORY FOR SPACE ONLY EXHIBITORS TO COMPLETE THIS FORM # Power Mains, Audio Visual, Electrical Appliances and Fittings Qty Total / QR Price / QR 1 2 3 4 5 6 7 8 9 10 11 12 13 14 2,300.00 5,750.00 5,750.00 1,100.00 1,500.00 130.00 110.00 145.00 165.00 10.00 55.00 1,150.00 1,375.00 660.00 20 Amp single phase power main 32 Amp three phase power main – Ground Supply Only 32 Amp three phase power main – Ceiling Or Truss Supply Only Single phase distribution Box Three phase distribution box Additional power socket max. 500 Watt (fitted shell stand only) Spotlight on track light system (fitted shell stand only) Spotlight with arm (fitted shell stand only) LED floodlight (fitted shell stand only) Multi-pin plug (fitted shell stand only) Extension cord with multi-plug (fitted shell stand only) 32-inch LCD screen with USB Port and Stand (picture for illustration purposes only) 42-inch LCD screen with USB Port and Stand (picture for illustration purposes only) Laptop 15 inches continued on next page Email Date Fax No. We will start energizing stands two (2) days before the opening of the exhibition i.e. March 14, 2020. Ensure that all electrical work is up to code to avoid delays. Electrical testing will be done before stand energizing. Should you require 24-hour power or for the stand to be energized earlier, kindly contact Circle Qatar Ltd. for an additional quotation to support your requirements.

Transcript of ELECTRICAL SUPPLY & LIGHTING (Compulsory for Space...

Page 1: ELECTRICAL SUPPLY & LIGHTING (Compulsory for Space …exhibitor.dimdex.com/sites/default/files/2019-12/8- Electrical Supply and...electrical work is up to code to avoid delays. Electrical

08FORM D E A D L I N E

SUBMISSION FEB 17, 2020PLEASE RETURN TO: CIRCLE QATAR LTDTel : +974 4441 8510Fax : +974 4442 6084Email : [email protected] 08

FORM D E A D L I N ESUBMISSION FEB 17, 2020PLEASE RETURN TO: CIRCLE QATAR LTDTel : +974 4441 8510Fax : +974 4442 6084Email : [email protected]

Company NameContact Person

Stand No.Telephone

Address

ELECTRICAL SUPPLY & LIGHTING (Compulsory for Space Only Stand)

Shell scheme may complete this form only if they require additional electricity and lighting

IT IS COMPULSORY FOR SPACE ONLY EXHIBITORS TO COMPLETE THIS FORM

# Power Mains, Audio Visual, Electrical Appliances and Fittings Qty Total / QRPrice / QR1

2

3

4

5

6

7

8

9

10

11

12

13

14

2,300.00

5,750.00

5,750.00

1,100.00

1,500.00

130.00

110.00

145.00

165.00

10.00

55.00

1,150.00

1,375.00

660.00

20 Amp single phase power main

32 Amp three phase power main – Ground Supply Only

32 Amp three phase power main – Ceiling Or Truss Supply Only

Single phase distribution Box

Three phase distribution box

Additional power socket max. 500 Watt (fitted shell stand only)

Spotlight on track light system (fitted shell stand only)

Spotlight with arm (fitted shell stand only)

LED floodlight (fitted shell stand only)

Multi-pin plug (fitted shell stand only)

Extension cord with multi-plug (fitted shell stand only)

32-inch LCD screen with USB Port and Stand (picture for illustration purposes only)

42-inch LCD screen with USB Port and Stand (picture for illustration purposes only)

Laptop 15 inches

continued on next page

Email

DateFax No.

We will start energizing stands two (2) days before the opening of the exhibition i.e. March 14, 2020. Ensure that all

electrical work is up to code to avoid delays. Electrical testing will be done before stand energizing. Should you

require 24-hour power or for the stand to be energized earlier, kindly contact Circle Qatar Ltd. for an additional

quotation to support your requirements.

Page 2: ELECTRICAL SUPPLY & LIGHTING (Compulsory for Space …exhibitor.dimdex.com/sites/default/files/2019-12/8- Electrical Supply and...electrical work is up to code to avoid delays. Electrical

08FORM D E A D L I N E

SUBMISSION FEB 17, 2020PLEASE RETURN TO: CIRCLE QATAR LTDTel : +974 4441 8510Fax : +974 4442 6084Email : [email protected] 08

FORM D E A D L I N ESUBMISSION FEB 17, 2020PLEASE RETURN TO: CIRCLE QATAR LTDTel : +974 4441 8510Fax : +974 4442 6084Email : [email protected]

Payment for all services can be made by cheque or bank transfer to:Account Name

Bank

IBAN QAR Account

IBAN USD Account

Swift Code

CIRCLE QATAR LTD

HSBC BANK MIDDLE EAST LIMITED

QA25BBME000000000001579093001 (QATARI RIYALS)

QA97BBME000000000001579093063 (US DOLLARS)

BBMEQAQX

Payment in full must accompany this order

A 20% surcharge will be added to all orders received after the submission deadline and before March 2, 2020 (inclusive). From March 3, 2020 orders will only be accepted on site during the build-up phase and will be subject to 50% additional charge and availability.

ELECTRICITY AND LIGHTING

6 7 8Additional power sockets socket max. 500 Watt (shell scheme booths only)

Spotlight on track light system(shell scheme booths only)

Spotlight with arm(shell scheme booths only)

9 Halogen floodlight: (shell scheme booths only) Multi-pin plug10 11 Extension cord with multi plug

Laptop 15 inches141332-inch LCD screen

with USB Port and Stand (picture for illustration purposes only)

42-inch LCD screen with USB Port and Stand

(picture for illustration purposes only)12