Electrical, Plumbing and Gas Permit Timeline Begin Process 1 2 3 4 5 Completed Application Submitted to the Town Review Based on Quality Managment Plan Requirements (If outstanding items exist return to step 1) 1-2 weeks Issue Permit Applicant Requests Inspections (Plumbing ,Electrical ,Gas) at Strathmore.ca (quicklinks) 2 weeks - 12 months depending on type of application V4.18.04.2019 6 Re-inspection Performed (if required) Internal Circulation and Review * At this stage each stakeholder must have adequate response time for a meaningful review. VOC = Verification of compliance to confirm completion of items noted on the inspection report. 2-5 days Inspection Performed Final Inspection (if required)
Transcript of Electrical Plumbing Gas Permit Timeline V4.18.04 · Electrical, Plumbing and Gas Permit Timeline...
-
Electrical, Plumbing and Gas Permit Timeline
Begin Process 1 2 3 4
5
Completed Application Submitted to the Town
Review Based on Quality Managment Plan Requirements
(If outstanding items exist return to step 1)
1-2 weeks
Issue Permit
Applicant Requests Inspections
(Plumbing ,Electrical ,Gas) at Strathmore.ca
(quicklinks)
2 weeks - 12 months depending on type of application
V4.18.04.2019
6Re-inspection
Performed (if required)
Internal Circulation and Review *At this stage each stakeholder must have adequate response time for a meaningful review. VOC = Verification of compliance to confirm completion of items noted on the inspection report.
2-5 days
Inspection Performed
Final Inspection (if required)