DEE (Shri Anurag Agarwal)
Sr. DEE ( Shri Ramendra Kumar Tewari)
SMM/ETD Shri Ram Kirpal Meena
Officers :
1. Store2. Works3. Traction motor4. M-65. Lab6. Office including Time
1. Material Planning a) Stock Item b) Non Stock item c) Liaison with COS/ NDLS office
ADEE/I Shri Upendra Kumar
ADEE/II Shri K.K. Rastogi
6. Office including Time office
COS/ NDLS office
1. Investigation2. Technical & Computer3. Drawing Office4. E-1 to E-7 except TM
Sec.
1. PPIO & Shunting Sec.2. Machinery & Plant3. M-1 to M5 Sec.
-
ELECTRIC LOCO SHED, GHAZIABAD
Electric Loco Shed, Ghaziabad was set up at an initial Capital cost of Rs. 1.5 Cr. in Feb 1976 by Railway Electrification Organisation as a part of TUNDLA-DELHI electrification scheme basically to cater electric locomotive requirements for hauling important Mail/Express trains on DELHI-HOWRAH section. Initially shed was designed to home 50 locomotives. Subsequently loco holding capacity enhanced to home 120 locos.ELS/GZB is spread over 18105 m2 of with 8910 m2 ELS/GZB is spread over 18105 m2 of with 8910 m2 covered area and now maintaining 176 electric locomotives.
Distinguishing Features
Shed established & inaugurated in 1976 by the then honble MR Shri Kamlapati Tripathi.
Initial capital cost rs.1.5 cr. Initial loco holding 34 Maximum coaching loco holding for any shed
161.
-
First to home 3 phase coaching locomotives.Only loco shed in INDIA homing WAP-5 locomotives.Fastest train BHOPAL SHATABDI EXPRESS running at 150 kmph is hauled by WAP-5 locomotives.
Electric Locomotives maintained 184 electric locomotives comprising of 87
conventional and 97 based on State-of-the-Artthree phase technology are presently beingmaintained at Electric loco shed, Ghaziabad.maintained at Electric loco shed, Ghaziabad.Type wise holding of locomotives as on26/07/2011 is as under:
CONVENTIONAL THREE PHASE Total
WAP-1 WAP-4 WAG-5 WAP-5 WAP-7
33 40 14 40 57 184
-
The loco holding has consistently increased from 34 in 1976 to 184 in 2011 and year wise details are as under:
Year Loco Holding
1976-77 34
1980-81 80
1985-86 111
1990-91 1171990-91 117
1995-96 124
2000-01 141
2005-06 138
2007-08 140
2008-09 146
2009-10 162
2010-11 177
2011-12(upto July) 184
-
Important Rajdhani/Shatabadi/Duronto/Garib Rath trains running at 130 KMPH speed by Ghaziabad shed locomotives
Train No. Train Name From To2001/02 Bhopal Shatabadi
Express (150 KMPH)NDLS BPL
2003/04 Lucknow Shatabadi Express
NDLS LKO
2259/60 Duronto Express SDAH NDLS2425/26 Rajdhani Express NDLS JAT2029/30 Amritsar Shatabadi
ExpressNDLS ASR
2013/14 Amritsar Shatabadi Express
NDLS ASR
2011/12 Kalka Shatabadi Express
NDLS KLK
2951/52 Rajdhani Express NDLS MCT2953/54 August Kranti Rajdhani
ExpressHNZM MCT
2281/82 Duronto Express NDLS BBS2909/10 Garib Rath Express HNZM BDTS2005/06 Kalka Shatabadi
ExpressNDLS KLK
2313/14 Rajdhani Express NDLS SDAH2611/12 Garib Rath Express HNZM CEI
-
2283/84 Duronto Express HNZM Ernakulum
2441/42 Rajdhani Express NDLS BSP2423/24 Rajdhani Express NDLS GHY2353/54 Garib Rath Express BGP NZM-
RNGR2439/40 Rajdhani Express NDLS RNC2877/78 Garib Rath Express NDLS RNC2421/22 Rajdhani Express NDLS BBS2443/44 Rajdhani Express NDLS BBS2431/32 Rajdhani Express HNZM TVC2431/32 Rajdhani Express HNZM TVC2453/54 Rajdhani Express NDLS RNC2033/34 Shatabadi Express NDLS CNB2275/76 Duronto Express NDLS ALD
-
S. No
PARAMETER WAP1 WAP4 WAP5 WAP 7
1 HORSEPOWER
3800 5000 5400 6300
2 WEIGHT(TONNES)
108.3 112.8 78 123
3 TRACTIVEEFFORT(TONNES)
22.4 32.4 26.3 32.88
4 REGENERATIVE EFFORT
- - 160 182
5 NO.OFAXLES
6 6 4 6
Ratings of different locomotives
AXLES
6 MAX.SPEED(KMPH)
130 140 160 130
7 GEAR RATIO 21:58 23:59 67:35:17 20:72
8 Axle load 18.8t 18.8t 19.5t 20.5t
9 Suspension Axle-hung,nose-suspended
Axle-hung,nose-suspended
fullysuspended
axle-hung,nose-suspended
10 Bogie Co-CoFlexi coil
Co-Co Flexicoil
Bo-BoHenschelFlexi float
Co-Co
-
WORK FORCE
SHED OFFICERS
Sr.DEE - 1DEE - 1ADEE - 2
SHED STORES DEPOT
SMM - 1
SUPERVISORS, ANCILLARY AND OTHER STAFF
Electric loco shed, Ghaziabad is responsible for the maintenance of electric locomotives and also caters the requirement of supervisors and associated staff for day to day maintenance of locomotives to Divisional (Delhi) RSO organization. The availability of staff is as under:
-
SN CategoryELS/GZB RSO Total
SS OR SS OR SS OR
1 Supervisor 91 59 21 19 118 87
2 Skilled 612 549 98 90 711 639
3 Ancillary 76 71 2 3 78 74
4 Unskilled D 143 127 42 57 185 185
Unskilled 5 Unskilled Ancillary 19 17 2 2 21 19
6 Ministerial 33 30 - - 2 30
7 LAB 6 4 - - 6 4
8 Drawing 7 8 - - 7 8
9 Canteen 5 4 - - 5 4
Total 992 871 166 172 1166 1053
-
PERFORMANCE STATISTICS OF THREE PHASE LOCOs
YEAR PARAMETER 07-08 08-09 09-10 10-11 11-12
HOLDING 42 47 65.41 82.58 94
STATISTICAL FAILURE 6 5 09 08 04
NON-STATISTICAL FAILURE 2 8 23 23 07
UORs 570 662 927 970 250
TOTAL INCIDENCES 576 667 936 977 254
PUNCTUALITY CASES 9 17 50 40 19
UNSCHEDULED LIFTING PER 100 LOCO PER MONTH
22.5 24.4 16.56 11.81 12.76
UNSCHEDULED VISIT PER 100 LOCO PER MONTH
115.8 121.2 106.6 90.21 78.36
-
MAINTENANCE ACTIVITIES
For the reliable functioning of locomotives on line following periodical Schedules of electric locomotives based upon the norms laid down by Railway Board are undertaken in the shed.
MINOR SCHEDULES
Type of Conventional Locos Three Phase Type of Schedule Conventional Locos(Periodicity in days) Phase Locos
Coaching Freight
Coaching
IA 40 45 90
IB 80 90 180
IC 120 135 270
-
Type of Schedule
(periodicity in Months)
Conventional LocosThree Phase Locos
Coaching Freight Coaching
AOH/MOH* 12 18 18
IOH 36 54 54
MAJOR SCHEDULES
IOH 36 54 54
* MOH for three phase locomotives
Besides undertaking scheduled maintenanceof locomotives, unscheduled attention toGZB based as well as other Railway ownedlocomotives is also being under taken as perthe guidelines of Railway Board to avoid deadmovement of locomotives to their homesheds.
-
Achievements of
Current Finance Year
-
Termination of terminated OHE onshed structure.
Commissioning of dry compressed airplant for pneumatic testing in MR & LRbays.
-
Provision of Jib crane for filterchange.
JIB CRANE
SIDE BODY FILTER
Provision of Shunting wintches inMR & LR bays for pulling IN andOUT of locomotives.
-
Commissioning of 100 KVA AT
Improved illumination in HR & MRbays.
Energy saving of 6 KW, by using MH lamps
-
Vertical storage stand
Renovation of conference hall
MEETING HALL LAUNGE
-
Major repairing work of oldest Loco No. 30000
BEFORE AFTER