Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | i
Table of Contents
EXECUTIVE SUMMARY ....................................................................................................................................... iii
1. INTRODUCTION & BACKGROUND ............................................................................................................. 1
1.1 PORTFOLIO OF INVESTMENTS UNDER NGRBA .............................................................................. 2
1.2 Patna River Front Development ................................................................................................................ 2
1.2.1 Proposed Developments in Patna RFD ................................................................................................... 3
1.3 PURPOSE AND SCOPE OF EIA .............................................................................................................. 3
1.4 PROPOJECT PROPONENT ..................................................................................................................... 4
1.5 TECHNICAL CONSULTANT AND ARCHITECT .................................................................................... 4
1.6 EIA CONSULTANT ..................................................................................................................................... 4
1.7 STRUCTURE OF EIA ................................................................................................................................. 4
2. PROJECT DESCRIPTION ............................................................................................................................. 6
2.1 EXISTING GHAT CONDITIONS ............................................................................................................... 7
2.2 NEED FOR PATNA RFD ......................................................................................................................... 12
2.3 PROPOSED DEVELOPMENTS ............................................................................................................. 13
2.3.1 Development of Ghats .............................................................................................................................. 13
2.3.2 Promenades including kiosks (connecting some of the ghats together) ........................................... 14
2.3.3 Community cum cultural centres ............................................................................................................. 17
2.3.4 Landscape work at Precinct Zones: ........................................................................................................ 18
2.3.5 City level parks: ......................................................................................................................................... 19
2.3.6 Improvement of approach roads to the precincts ................................................................................. 19
2.3.7 Development of Electric Crematoria at Gulbi Ghat ............................................................................... 20
2.3.8 Development of Toilet Complex .............................................................................................................. 20
2.3.9 Development of Interceptor Drain ........................................................................................................... 20
2.3.10 Environmental Awareness ....................................................................................................................... 20
2.4 PROJECT LOCATION .............................................................................................................................. 21
2.5 ADDITIONAL BENEFIT ............................................................................................................................ 24
2.6 PROJECT COST ....................................................................................................................................... 24
3. ENVIRONMENTAL POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK......................................... 25
3.1 POLICIES AND REGULATORY FRAMEWORK OF GOVERNMENT OF INDIA (GOI) ................. 25
3.2 Environment and Social Management Framework (ESMF) of NGRBA ............................................ 30
4. DESCRIPTION OF ENVIRONMENT ........................................................................................................... 34
4.1 PROJECT INFLUENCE AREA ................................................................................................................ 34
4.2 ENVIRONMENT AND SOCIAL SCREENING: ..................................................................................... 36
4.3 Project Area ................................................................................................................................................ 41
4.4 Baseline Environmental Profile ................................................................................................................ 41
4.4.1 Meteorological environment ..................................................................................................................... 41
4.4.2 Physical environment ................................................................................................................................ 43
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | ii
4.4.3 ECOLOGY AND BIODIVERSITY ............................................................................................................ 56
4.4.4 CULTURAL RESOURCES ...................................................................................................................... 75
4.4.5 SOCIO-ECONOMIC STATUS ................................................................................................................. 80
4.5 Conclusion .................................................................................................................................................. 81
5. ANALYSIS OF ALTERNATIVES ................................................................................................................. 82
5.1 With or Without Project Alternatives ....................................................................................................... 83
5.2 Good design aspects ................................................................................................................................ 86
5.3 Technology Benefits.................................................................................................................................. 91
6. PUBLIC CONSULTATION & STAKEHOLDER PARTICIPATION .............................................................. 92
6.1 Introduction ................................................................................................................................................. 92
6.2 Methods of Public Consultation ............................................................................................................... 92
6.3 Focus Group Discussion with local communities .................................................................................. 93
6.4 Public Consultation with Stakeholders ................................................................................................. 105
7. ANTICIPATED ENVIRONMENT AND SOCIAL IMPACT AND MITIGATION MEASURES ...................... 109
7.1 INTRODUCTION ..................................................................................................................................... 109
7.2 ENVIRONMENTAL and SOCIAL FACTORS: ..................................................................................... 109
7.2.1 Environmental Factors: ........................................................................................................................... 109
7.2.2 Social Factors: ......................................................................................................................................... 109
7.3 ENVIRONMENTAL IMPACT AND MITIGATION MEASURES-CONSTRUCTION STAGE ......... 109
7.3.1 Quarries and Crushers ........................................................................................................................... 109
7.3.2 Cultural and Heritage Resources: ......................................................................................................... 110
7.3.3 Loss of Structures.................................................................................................................................... 112
7.3.4 Generation of Dust: ................................................................................................................................. 113
7.3.5 Noise and Vibration: ................................................................................................................................ 113
7.3.6 Sanitation and Waste Generation: ........................................................................................................ 114
7.3.7 Impact on Utilities: ................................................................................................................................... 115
7.3.8 Integration of Drainage with Patna RFD: ............................................................................................. 115
7.3.9 Loss of vegetation and tree cutting: ...................................................................................................... 116
7.3.10 Impacts on Dolphin: ................................................................................................................................ 116
7.3.11 Clearing of Existing Solid Waste humps: ............................................................................................. 118
7.4 ENVIRONMENTAL IMPACT AND MITIGATION MEASURES-OPERATION STAGE ................. 120
7.4.1 Physiography and Drainage: ................................................................................................................. 120
7.4.2 River Water Quality: ................................................................................................................................ 120
7.4.3 Solid Waste Generation : ....................................................................................................................... 124
7.4.4 RISK ASSESSMENT AND SAFETY MEASURES: ............................................................................ 127
8. ENVIRONMENT MANAGEMENT PLAN ................................................................................................... 131
8.1 Specific activities by BUIDCo ................................................................................................................ 131
8.2 Specific activities by Contractor ............................................................................................................ 131
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | iii
8.3 Implementation of EMP .......................................................................................................................... 132
8.4 Environmental Monitoring Program ...................................................................................................... 144
8.4.1 Monitoring of Concessionaire / Contractor's Facilities, Plant and Equipment ............................... 144
8.5 Integration of Other NGRBA Programs with Patna RFD ................................................................... 144
8.6 Environmental Budget ............................................................................................................................ 145
8.7 Reporting System .................................................................................................................................... 151
9. CONCLUSION AND RECOMMENDATION .............................................................................................. 158
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | i
List of Tables
Table 2-1 : Proposed Ghats for development ....................................................................................................... 14
Table 2-2 : Proposed Project Cost ........................................................................................................................ 24
Table 3-1 : Environmental Regulations and Legislations ...................................................................................... 26
Table 3-2 : Environmental Regulations and Legislations ...................................................................................... 27
Table 4-1 : Environment and Social Screening for River Front Development ....................................................... 36
Table 4-2: Proposed Ghats for Developments along river Ganga in Ganga Ghats ............................................... 41
Table 4-3 :Rainfall and Temperature at Patna in Ganga Basin ............................................................................. 42
Table 4-4: Soil Quality Analysis of Proposed Project Site ..................................................................................... 50
Table 4-5: Ambient Air Quality within study area................................................................................................... 52
Table 4-6: Ambient Noise Level within study area ................................................................................................ 53
Table 4-7:Water Quality Sample Analysis and Results ......................................................................................... 54
Table 4-8: List of trees reported in the project affected area ................................................................................. 61
Table 4-9: List of Avifauna reported in inner buffer zone ....................................................................................... 64
Table 4-10:Fish Species reported in the study area .............................................................................................. 73
Table 4-11List of Heritage Buildings within DPIA and IPIA ................................................................................... 76
Table 4-12: List of Indigenous Building along Ghats ............................................................................................. 75
Table 4-13: Component wise Project Affected Famililies ...................................................................................... 80
Table 4-14: Details of Possession of Material in PAFs .......................................................................................... 81
Table 5-1: With and Without Project Scenario ...................................................................................................... 84
Table 6-1: Level of Consultations .......................................................................................................................... 92
Table 6-2: Outcome of Stakeholder Participation Meeting as Held on 30th August 2013. ................................... 106
Table 7-1: RAP Budget ....................................................................................................................................... 112
Table 7-2: Budget for Solid Waste Management................................................................................................. 125
Table 7-3: Carrying Capacity Calculation for each of project ghats ..................................................................... 127
Table 8-1: Environment Management Plan ......................................................................................................... 133
Table 8-2: Environmental Monitoring Plan .......................................................................................................... 146
Table 8-3: Environmental Budget ........................................................................................................................ 148
Table 8-4: Summary Details of Reporting ........................................................................................................... 151
Table 8-5: Clearance Requirements from Government of Bihar ......................................................................... 152
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | i
List of Figures
Figure 2.1: Artists view of Golaghar Patna .............................................................................................................. 6
Figure 2.2: Sanitation issues along the ghats ......................................................................................................... 8
Figure 2.3: Slums at edge of river Ganga ............................................................................................................... 9
Figure 2.4:Gandhi Ghat (the only developed ghat at moment) ............................................................................... 9
Figure 2.5:Adalat Ghat Edge Condition Analysis (Boulder pitching at the edges) ................................................. 10
Figure 2.6:Edge condition Analysis in Krishna Ghat ............................................................................................. 11
Figure 2.7 Potential of ghat as a public Space ...................................................................................................... 14
Figure 2.8: Urban Precincts proposed ................................................................................................................... 15
Figure 2.9: Design of Urban Precinct (3D-View) ................................................................................................... 16
Figure 2.10:View of ghats after the proposed development of urban precinct ...................................................... 16
Figure 2.11:Proposed Community cum Eco-centre at Gai ghat ............................................................................ 17
Figure 2.12:Restoring the riparian edge and landscaping ..................................................................................... 19
Figure 2.13:Proposed approach road development of Gai ghat ............................................................................ 20
Figure 2.14:Project Location ................................................................................................................................. 22
Figure 2.15: Landuse along project ghats ............................................................................................................. 23
Figure 4.1:Direct Project Influence Area (DPIA) .................................................................................................... 34
Figure 4.2: Colour coded aspect map for direction of the terrain along the RFD, Patna ....................................... 44
Figure 4.3: DEM Map along the project section in Ganga ghat section in Patna .................................................. 45
Figure 4.4: Land Use along the stretch of river bank to be developed under RFD project in Patna ...................... 46
Figure 4.5: Physiographic map of Bihar along the river Ganga ............................................................................. 47
Figure 4.6: Seismic Hazard Map showing the Project Area (Ganga Ghats) .......................................................... 48
Figure 4.7:Seismic Zonation Map of India ............................................................................................................. 48
Figure 4.8:Sub-Basin maps of Ganga Basin ......................................................................................................... 49
Figure 4.9:Discharge of Raw Sewage in Ganga river from Anta Ghat (left) and Krishna Ghat (Right) .................. 56
Figure 4.10: Forest cover map of Bihar ................................................................................................................. 57
Figure 4.11: Photograph of Flora reported in Riparian Habitat .............................................................................. 60
Figure 4.12: Photographs of Trees Reported at Ghat Area ................................................................................... 63
Figure 4.13: Photograph of Animal Reported in study area .................................................................................. 66
Figure 4.14: Dolphins Movement in Project Study Area ........................................................................................ 69
Figure 4.15: Location were Dolphins are reported ................................................................................................ 71
Figure 4.16: Location of Vikramshila Gangetic Dolphins Sanctuary with respect to project site ........................... 72
Figure 4.17: Photographs of Species of Fishes reported during primary survey ................................................... 74
Figure 4.18: Locations of Heritage/Important Buildings within DPIA and IPIA ...................................................... 78
Figure 4.19: Locations of Indigenous Buildings within Project Ghats .................................................................... 79
Figure 7.1: Dolphins Movement .......................................................................................................................... 116
Figure 7.2: Open disposal of Solid Waste near to Ganga Ghats ......................................................................... 119
file:///C:/Users/it/Desktop/WB%2004.10.2013/Final_EIA_RFD%2003102013.docx%23_Toc368868281
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | ii
Figure 7.4 : Toilet Block as Proposed in the Project............................................................................................ 122
Figure 7.5 : Proposed toilet Blocks (WC) ............................................................................................................ 123
Figure 7.6: Open disposal of Solid Waste near to Ganga Ghats ......................................................................... 126
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | i
List of Annexure
Annexure 1.1: Guidelines for Existing Quarry Management
Annexure 1.2: Guidelines for Siting and Layout of Construction Camp
Annexure 1.3: Specific R&R Measures
Annexure 1.4: Drawings for Safety Measures
Annexure 1.5: Professor Sinha’s Report on Gangetic Dolphin in Context of Patna RFD
Annexure 1.6: INTACH’s Report on Cultural Heritage
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | ii
ACRONYMS
B.C. Before Christ
BUIDCo Bihar Urban Infrastructure Development Corporation
CPCB Central Pollution Control Board
EP Environment Protection
ESIA Environment and Social Impact Assessment
ESMF Environment and Social Management Framework
ESMP Environment and Social Management Plan
FGD Focus Group Discussion
GAP Ganga Action Plan
GoI Government of India
GoB Government of Bihar
INTACH Indian National Trust for Art and Cultural Heritage
MoEF Ministry of Environment and Forests
NGRBA National Ganga River Basin Authority
NGO Non- Government Organization
NMCG National Mission for Clean Ganga
NPRR National Policy on Resettlement and Rehabilitation
NP National Park
OP Operational Policy
PAFs Project Affected Families
PAPs Project Affected Person
PMG Program Management Group
R&R Resettlement and Rehabilitation Framework
RAP Resettlement Action Plan
RFD River Front Development
SC Supervision Consultant
SPMG Special Program Management Group
SPV Special Purpose Vehicles
ULB Urban Local Body
VSPL Voyants Solutions Pvt. Ltd.
WB World Bank
WLPA Wild Life Protection Act
WLS Wild Life Sanctuary
ZSI Zoological Survey of India
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | iii
EXECUTIVE SUMMARY
INTRODUCTION & BACKGROUND
River Ganga has a significant economic, environmental and cultural value in India. Rising in the
Himalayas and flowing into the Bay of Bengal, the river traverses through a course of more than
2500km in the plains of north and eastern India. Increasing population in the basin and haphazard
urbanization and industrial growth has significantly impacted the water quality of river Ganga,
particularly during the dry season. The primary sources of pollution are untreated sewage and
industrial wastewater, also non-point pollution sources from agriculture and livestock, religious
activities and poor solid waste management also contribute significantly to the pollution.
The previous attempts to clean the river, such as Ganga Action Plan (GAP) launched in 1985 have
provided some gains in arresting rate of water quality degradation, but lot more needs to be done.
As a major first step in this direction, Government of India (GoI) has established the National Ganga
River Basin Authority (NGRBA) for comprehensive management of the river.
PORTFOLIO OF INVESTMENTS UNDER NGRBA
The NGRBA program will adopt a river basin approach and has been given multi-sectoral mandate to
address both water quantity and quality aspects. To achieve this objective, NGRBA is implementing a
project with financial assistance from The World Bank. The portfolio of investments supported by
NGRBA under this project includes the following:
Sewerage and sanitation systems/sewage treatment plants (new/up gradation)
Solid Waste Management
Industrial Pollution Control Initiatives
River front Management initiatives
These investments in the first phase of the program are spread across several cities / towns within
Ganga main stem states of Uttarakhand, Uttar Pradesh, Bihar, Jharkhand and West Bengal.
PATNA RIVER FRONT DEVELOPMENT (RFD)
Government of Bihar through Bihar Urban Infrastructure Development Corporation (BUIDCo) intends
to implement improvements to the Ganga River Front in Patna through NGRBA Program.
The River Ganga in Patna is an intrinsic part of life of Patna. Some of the most important Hindu
festivals and religious congregations are celebrated on the banks of the river Ganga such as the
Kumbh Mela and the Chhathh puja and large numbers of devotees gather during these festivals.
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | iv
At present the existing facilities at the Ghats for these activities are poor. The Ghats are neither big
enough to accommodate thousands of devotees during Chhath festival nor there is any facility like
changing rooms.
River water fronts have potential to become the recreational and cultural hubs of city and have
emerged as lively urban face. River water front development also has potential to create
Environmental Awareness for cleanliness of river and generating Ecological Awareness and
tourism for the river edge and thus prevent disposal of untreated sewage into the river,
Considering these aspects, the proposed Patna RFD project, proposes the following improvements.
Development of 20 ghats (from Anta ghat to Naujarghat);
Promenades including kiosks (connecting some of the ghats together); Promenade will have
long walkways along the river ganga
Community cum cultural centres including places for cafeteria, reading room, Dolphin
Information centre.
Landscape work in the precinct zones;
City level parks; and,
Improvement of approach roads to the precincts
Development of Crematoria in Gulbi Ghat to an electric crematoria
Development of interceptor drains (total 8 nos.)
Toilet Complex
The total cost of the project is INR 24327.00 Lakhs. The cost break up is shown in table1.
Table 1: Proposed Project Cost
S.No Description of Item Cost (INR Lakh)
1 Development of 20 ghats (from Anta ghat to Naujar ghat including
change room)
8,929.37
2 Promenades including kiosks (connecting ghats together) 8751.07
3 Community cum cultural centres 1,660.04
4 Landscape work in the precinct zones 425.60
5 City level parks 833.14
6 Improvement of approach roads to the precincts 262.11
7 Development of Gulbi ghat 750.77
8 Interceptor Drain 326.97
9 Toilet Complex 36.96
10 Information Education and communication campaign 75.00
11 ESMP Cost (including R&R Cost) 511.89
12 Add contingency (8%) 1764.08
Total 24327.00
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | v
POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK
The following laws and regulations are applicable to the proposed activities of Patna RFD:
Policy and regulatory framework of Govt. of India;
Environmental Policy of the respective State Governments;
Legislations applicable to the construction activities;
Environment and Social Management Framework of NGRBA
The Project is seeking financing from World Bank and hence their environmental and social
safeguards are also applicable to this Project.
Since, the total built up area of the project is about 2700sq.m which is less than 20,000 sq.m and the
total construction area is about 69,500 which is less than 1,50,000 sq.m, the project does not attract
requirement of Environmental Clearance requirements of EIA Notification, 2006 of GoI.
Similarly, the Wildlife Protection Act 1972 is not applicable to the project, despite the presence of
Gangetic Dolphin in the river, as the project area is not located within 10 km radius of a wildlife
sanctuary area.
Other Applicable important regulations are:
The The Air (Prevention and Control of Pollution) Act, 1981 and Water Prevention and Control
of (Pollution) act, 1974 will be applicable;
The Noise Pollution (Regulation and Control) Rules, 2000 will be applicable;
The Ancient Monuments and Archaeological Sites and Remains Act, 1958, as the project
area is located however some old building are there along the ghats which will be protected;
Environmental and Social Management Framework (ESMF) of NGRBA:
In addition to the above regulations, NGRBA has developed an ESMF to address various
environmental and social issues related to investments. According to this framework, any project
supported by NGRBA shall carry out an Environment and Social Screening to understand magnitude
of impacts. In general, based on screening exercise, projects are categorized either as High Impact or
Low Impact category in which high impact projects require detailed ESIA study along with preparation
of an EMP. The Patna RFD has been categorized as High impact category due to presence of
schedule-I animal, i.e. Dolphin and resettlement requirement of 229 Project Affected Families (PAFs).
Therefore a detailed EIA and EMP study has been carried out.
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | vi
BASELINE ENVIRONMENTAL PROFILE
In general 200m lateral distance from the right bank side has been considered as Direct Project
Influence Area (DPIA) and 500 m lateral distance from the right bank side has been considered as
Indirect Project Influence Area (IPIA) to access the baseline environmental conditions around the
project area.
The area within this DPIA and IPIA mostly consists of built up area which also includes some old and
important buildings. Very few open spaces are present within the IPIA, the prominent one being
Gandhi maidan. No sensitive areas like wildlife sanctuary, national park, etc. are observed within the
DPIA or IPIA. However institutions such as Patna Medical College, Patna College, B.N. College,
Patna Law College, temples along the ghats, some old buildings and few schools are located in the
IPIA.
Meteorology: The climate in Patna is characterized by quite hot summers to moderately cold winters.
In the Ganga basin the mean maximum and mean minimum temperature as recorded in Patna is
respectively 31.9°C and 20.8°C. The relative humidity ranges between 80-93%. The mean annual
rainfall is 1003.4mm. The maximum Wind speed is 177 km/h while the average wind speed during the
year is 5 km/h. The wind direction near the river area varies from NE during the summer season to
SW during the winter season.
Topography: .The topography near the Ganga Ghats in Patna City is like a saucer and city has
drainage issues during monsoon season. This core area of Ganga Ghats in Patna faces problems of
ofver crowding (e.g. Collectorate ghat, Anta ghat, B.N College ghat, Gulbi ghat etc.) which has lead to
enormous pressure on the physical infrastructure and traffic congestion.
Geology: Ganga ghats are part of the Indo-Gangetic alluvium, one of the three main physiographic
divisions of India, which separates Extra-Peninsular regions on the north from the peninsular region
on the south. The quaternary sediments are deposited unconformable on the Achaean basement.
Physiography and Soil: The project area of Patna RFD falls under active alluvial plain and the soil of
the Patna river basin area is characterized by Calcareous alluvial (UstochreptsHaplaquepts) i.e. it is
slightly alkaline. This shows that the alluvium deposit in this region is old alluvium deposit.
Seismicity: The DPIA and IPIA fall under Seismic Zone-IV i.e. in low hazard zone.
Drainage: The project area falls under the river basin of Ganga and sub basins of Punpun, Gandhak
and Burhi-Gandak-Bagmati river basins. As per the local observation, Ganga river near the project
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | vii
Ghats are meandering to the left and during the summer season, lean flow is observed between
Collectorate Ghat to Adalat Ghat at the right bank of river Ganga.
Air Quality: Baseline Ambient air quality was monitored during September 2012 at 3 locations to
understand the air quality of the DPIA for 24 hours in each location as per CPCB standards for the
parameters like PM10, PM2.5, SOx, NOx, HC and CO. The air quality data are given in table 2.
Table 2 : Ambient Air Quality within study area
Location
PM 10
(µg/m3)
PM 2.5
(µg/m3)
SO2
(µg/m3)
NO2
(µg/m3)
CO
(µg/m3)
Collector ghat 88 47 5.4 26.7 363
Dr. T.N.Banerjeeghat 54 29 4.3 21.4 275
Gulbighat 69 36 4.0 19.0 175
CPCB Standards 100 60 80 80 2000
Source: Baseline Environmental Monitoring done at project site during September 2012
Noise Quality: Noise quality monitoring has been undertaken for the duration of 24 hrs at 3 selected
locations. The monitoring data is given in table 3.
Table 3: Noise monitoring result in the study area
Location Leq day dB(A) Leq Night
dB(A)
L Max dB(A) L Min dB(A)
Collectorate ghat 46.60 33.70 51.30 30.20
Gulbi ghat 43.80 31.90 48.30 25.60
Dr. T.N.Banerjee ghat 35.60 33.20 49.80 29.50
CPCB Standards 55.00 45.00
Source: Baseline Environmental Monitoring done at project site during September 2012
Soil Quality: The soil quality has been carried out in 3 locations and it has been observed that the
soil quality is slightly alkaline which also support the presence of Calcareous Alluvium. The texture of
soil is mostly silty loam and loamy.
Water Quality: Water quality samples were collected from 7 locations including upstream and
downstream of Ganga at Anta Ghat where a major sewage outfall has been seen. In general the DO
content of water is quite good ranging more than 7mg/l. The BOD content at the downstream of Anta
ghat shows the impact of Sewage on Ganga as the noted BOD was observed as 12.9 mg/l. In other
locations the BOD content has been seen in the range of 2-3.3 mg/l. Overall the water quality of
Ganga at the project locations are still well within the bathing water quality.
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | viii
Flora and Fauna: The proposed project partly comprises of Riparian Habitat and partly terrestrial
Habitat. The floristic survey of the proposed site witnesses scattered growth of grasses (mainly
weeds), rooted hydrophytes, emerging hydrophytes and shrubs. Commonly reported weeds species
are Congress grass (Partheniumhysterophorus), Lantana (Lantana Camara), Eipatoriumtrilpineve,
Solanumxanthiocarpum and Datura (Dathurastromonium). The species of grasses reported along the
banks are Cyanodondactylon, Achyranthesaspera, Saccharumarundinaceum, Vetiveriazizanoides,
Ludwigiaparviflora, Rungiarepens, etc. Rooted hydrophytes are reported along the banks, where
water level is less than a foot or water has recedes after flooding. The commonly reported
hydrophytes are Ipomoea carnea, Argeratumconyzoides, Azollapinnata, Eichhorniacrassipes,
Lemnaperpusilla, Spirodelapolyrhiza, etc. Ipomoea aquatic,etc.
The fauna reported in the area are mainly avifauna (highest diversity) followed by mammals and
reptiles. The commonly reported avifauna in the study area are Common crow, Myna, Eagle,
Sparrow, Babbler, Pigeon, Cattle Egrets, Red Vented bulbul, Drongo, Sparrow, Indian Roller etc.
Aquatic mammals like Gangetic Dolphins (PlatanistaGangeticagangetica) have been reported in the
study area.
The fish species reported in the project area include Mrigal (Cirrhinamrigala), Catla (CatlaCatla), Rohu
(Labeorohita), Calbasu (Labeocalbasu), Bata (Labeobata), Kalabans (Labeodero), Tengara
(Mystustengara), Singhi (Heyeropneustusfossilis), Palwa (Mystuscavasius), Pothia (Puntiussophore),
Phasia (Setipinnabrevifilis).
Cultural and Heritage Resources: A detailed survey of cultural and heritage buildings in and around
the project area was carried out by INTACH as part of preparation of Cultual Impact Assessment
(CIA) Reort and has identified 26 structures in the DPIA. While none of them physically affected, care
shall be taken during construction to avoid damages to these structures. These structures are not
included either in the list of Archeological Survey of India or Government of Bihar.
ENVIRONMENTAL IMPACTS & MITIGATION MEASURES
The anticipated environmental impact both during the construction and operation sages are
summarized in table 4.
Table 4: Environmental Impacts and Mitigation Measures
S.No Potential Environmental Impacts Mitigation Measures
Design and Pre-Construction Stage
1 Vegetation Clearance and Tree Cutting Trees are required to be saved as per the designs and
drawings of promenade and ghat development. Vegetaion are
to be removed before commencement of construction
2 Resettlement of PAP Nearly 229 PAFs are to be resettled as per the RAP report and
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | ix
S.No Potential Environmental Impacts Mitigation Measures
summary given in Annexure 1.3.
3 Prcument of plant and machinery Specifications to comply with the relevant national standard
norms of emission control.
4 Set up of construction camp (For 25-30
Peoples)
The construction camps will be located at least 200m away
from Ganga ghats and there must be basic living standard as
per the guidelines given in annexure 1.2.
Construction Stage
5 Procurement of construction materials from
existing quarry sites and thus consumption
of resources.
About 10,000-15,000m3 of quarry material to be procured from
existing and approved quarry sites. For new quarries if
Environmental Clearance is applicable to be obtained.
Adequate safety pre-cautions to be ensured during
transporation of quarry material from quarries to the
construction site. Vehicles transporting the material shall be
covered to prevent spillage.
6 Generation of Debris Debris generated due to the dismantling of the existing ghats,
structures shall be stored at a place sufficiently away from the
main channel of Ganga.
The debris generated from the structures shall be reused as far
as possible and the left over material shall be disposed at a
suitable location with following local rules and regulations along
with approval from the ‘Engineer’ and the ‘Environmental
Specialist’ on the project. In no case, no debris shall be
disposed into the river Ganga.
7 Noise and vibration impact to cultural and
old buildings and safety to devotees
coming to temples along ghat during
construction.
For any kind of piling work during construction vibro hammer to
be used instead of sheet piling to minimize vibration. Noise
barriers shall be put at locations like Patna Medical College,
B.N College, Patna Law College and schools to avoid noise.
8 Discharge from existing sewer drains at
Anta Ghat and Krishna Ghat
Route of these discharge point to be diverted before the start of
ghat construction at these 2 locations;
Route to be diverted through the existing trunk sewer line to the
existing STP at Saidpur.
This needs to be taken up by BUIDCO as a separate project.
9 Waste Water from construction camp Adequate sanitation and waste management facility to be provided in construction camp as per Annexure 1.2 of EIA
report and it is to be ensured that no liquid or solid waste get
disposed into river Ganga during the construction period.
Monitoring of water quality during construction period as per the monitoring plan
10 Impact on structures during construction As part of the project no heritage building/indigenous buildings/temples/mosques shall be demolished;
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | x
S.No Potential Environmental Impacts Mitigation Measures
For heritage buildings within 25 m from ghat adequate care shall be taken to minimize vibration impact. Overall piling
work to be used with Vibro Piling rather than normal sheet
piling.
Chance find of any heritage structure / remnants during construction shall be immediately reported to the
authorities and shall comply with Ancient Monuments and
Archeological Sites and Remains Act 1958
11 Noise from Vehicles, Plants and Equipment Construction activities shall be avoided during evening and
night time hours (7 p.m. to 6 a.m.)
All jackhammers and pavement breakers used on the
construction site shall be fitted with manufacturer’s approved
exhaust muffler.
Use of pneumatic impact equipment shall be restricted 100m
from noise sensitive locations,. Instead of pneumatic
hammers electric, hydraulic hammers could be used.
Temporary Noise Barrier at important locations of Schools
and Health centres.
12 Dust Generation and Equipment Selection,
Maintenance and Operation
Vehicles carrying construction materials shall be covered;
Regular water sprinkling at areas of dust generation;
Regular pollution under check for construction vehicles shall
be made;
13 Loss of flora and Fauna Fuel provision shall be made available in camp like LPG so
that no tree cutting is involved for fuel wood.
Construction workers must protect natural resources and
wild animals especially Dolphin
Fishing is strictly prohibited.
14 Risk and Safety Adequate precautions will be taken to prevent danger from
electrical equipment.
Precautions shall be made to provide proper access route to
the devotees;
The safety of workers shall be taken care as per the
prevailing norms;
No material or any of the sites will be so stacked or placed
as to cause danger.
All necessary fencing and lights will be provided.
Protective footwear and protective goggles to all workers.
Protective eye-shields to workers engaged in welding works
Earplugs to workers exposed to loud noise (above 75dB
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | xi
S.No Potential Environmental Impacts Mitigation Measures
(A)),
The Contractor shall comply with all regulations regarding
safe scaffolding, ladders, working platforms, etc.
The Contractor shall ensure that no paint containing lead or
lead products is used.
Operation Stage
15 Sewage generation from Project and Water
Quality
Toilet complexes along with 24 other toilets will be provided in the project;
Approximately 30 KLD of sewage expected;
Septic Tank and soak pit shall be provided for the sewage; Water quality to be monitored as per monitoring plan
16
Surface Run-off
Interceptor drain has been proposed to cater surface run-off
from promenade and pathways and will be ultimately be linked
with the drains along access roads
17 Increase of speed of water at Ghat section
and chances of Soil Erosion
As part of the project necessary green areas along the
banks will be protected as well as new green areas in terms
of city parks shall be created. This will provide necessary
bank stability.
Further, riparian edge restoration program will be
undertaken to maintain natural habitat.
At the bottom of the ghat boulder pitching shall be made so
that uniform speed is maintained.
18 Solid Waste Management Bins along Ganga ghats @4 bins in each ghat for 20kg
capacity;
254 litterbins along promenade and pathways of 1kg
capacity;
Masonry bins at 6 locations to facilitate communities to
dispose their waste at these bins;
Providing 2 no. of 4.5m3 bins at Anta Ghat Vegetable
market;
1 dumper placer, 2 auto tripper and 1 JCB hooper type
vehicle shall be provided to collect the dispose the waste
generated from the proposed project.
19
Dolphin Conservation
The mess size of the iron wire to be used to fix the boulders
below the steps at ghats close to the water line or river edge
should be four inches instead of eight inches.
No indigenous grasses should be planted in the landscape
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | xii
S.No Potential Environmental Impacts Mitigation Measures
terraces between two ghats as in the spaces natural
amphibious/aquatic grasses of riparian zone of the river grow
There should be minimum or no noise under the water during
implementation of the project. If any mechanized boat is used
during implementation of the project, the same may be propeller
guard.
20
Safety Measures
The load bearing capacity of each ghat has been calculated to
indicate the safe number of people to accomdae the ghat and
promenade with a carrying capacity approach. The other health
and safety measures being proposed in the project are:
Belts all along the ghats;
PPE use;
Inaccessibility to children; (Construction Netting);
4 ambulances (for 2 years of project construction
period) shall be provided for any type of medical
emergency;
Chaat festival will be restricted to these ghats during
construction period;
Side Access for pedestrian movements at
Mahendrughat;
Refuge access;
Increase of access to the promenade through
pedestrian streets;
One way traffic to ghat where accessibility is less than
6m.
Crowd management during festivals
PUBLIC CONSULTATION
Local people were extensively consulted while carrying out the EA study. A total of 8 FGDs were
conducted in the project area in the project influence area. Further, municipal ward councilors, MLAs
were consulted on 3rd
August 2013. In addition to the above, a city level public consultation was
carried out on 30th August 2013 to obtain the views of local people. While most of the people
welcomed the project and views and suggestion are incorporated in the project and EMP, wherever
applicable.
EMP BUDGET
In order to implement the proposed Environmental Mitigation measures a detailed Environmental
Management Plan has been prepared. To implement the plan there will be a Supervision Consultant
who will oversee the work of contractor. The Supervision consultant will further report the progress of
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | xiii
work to BUIDCo. The final implementation monitoring for the same shall be carried out by NMCG. The
total EMP budget has been considered is about INR 84.5 Lakhs. The detail about environmental
budget is presented below in Table-5
Table-5 Environmental Budget
S. No Description of Item Cost (INR Lakhs) Primary
Responsibilty
Secondary
Responsibility
1 Environmental Awareness program towards minimizing the pollution problem for solid waste management, water pollution prevention and minimizing impact on Dolphin etc. through preparing of IEC materials, media advertisement, clippings in cinema hall etc.
13.00 BUIDCo BUIDCo
2 Environmental Awareness during the construction stage
7.00 Contractors BUIDCo
3 Soil Erosion restoration work like retaining wall, edge restoration work, turfing and vegetative cover,
Covered in
Engineering Cost
(BOQ item 2.1.3)
Contractor BUIDCo
4 Establishing of Construction Camp including facilities for drinking water, waste water treatment and solid waste disposal facilities
Covered in
Engineering Cost
(Incidental Items)
Contractor BUIDCo
5 Facilities towards solid waste management for the project (Civil Cost from Table 7.3 of EIA report)
Covered in
Engineering Cost
(Incidental Items)
Contractor BUIDCo
6 Procurement of Vehicles for solid waste management and 2 dumper bins (O&M Cost from Table 7.3)
32.64 BUIDCo BUIDCo
7 Small mesh barrier to screen the pious refuse preferably iron mesh with 1’’x1’’seize
8.10 Contractor BUIDCo
8 Construction of interceptor drains (3000 m) to collect storm water from project area and raw sewage from the building lines along the ghats, connect to a suitable manhole for ultimate treatment in a STP
Covered in
Engineering Cost
(BOQ item 2.5)
Contractor BUIDCo
9 Construction of toilets along the promenade
Covered in
engineering cost
(Items 2.2.3,
2.2.4, 2.3 of BOQ)
Contractor BUIDCo
10 Provision of boulder pitching with 4incher iron wire;
No indigenous grass
Covered in
engineering cost
(Items 2.1.3,of
Contractor BUIDCo
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | xiv
S. No Description of Item Cost (INR Lakhs) Primary
Responsibilty
Secondary
Responsibility
species to be introduced BOQ)
Total Environmental Enhancement Cost
60.74
Environmental Monitoring-Construction Stage
11 Air Quality Moniutoring 0.96 Contractor BUIDCo
12 Water Quality Monitoring 3.84 Contractor BUIDCo
13 Noise Quality Monitoring 0.54 Contractor BUIDCo
14 Soil Quality Monitoring 0.72 Contractor BUIDCo
15 Travel and Transportation of
Laboratory Personnel
2.0 Contractor BUIDCo
Total Environmental Monitoring Cost
(Construction Stage)
8.06 Contractor BUIDCo
Environmental Monitoring-Operation Stage
16 Air Quality Moniutoring 1.2 BUIDCo BUIDCo
17 Water Quality Monitoring 6.4 BUIDCo BUIDCo
18 Noise Quality Monitoring 0.75 BUIDCo BUIDCo
19 Soil Quality Monitoring 9.75 BUIDCo BUIDCo
20 Travel and Transportation of
Laboratory Personnel for 5
years
5.00 BUIDCo BUIDCo
Total Monitoring Cost-Operation Stage 14.10
Total EMP-Cost 82.86
Contingency (2%) 1.66
Total EMP with contingency 84.52
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | 1
1. INTRODUCTION & BACKGROUND River Ganga has a significant economic, environmental and cultural value in India. Rising from the
Himalayas and flowing into the Bay of Bengal, the river traverses through a course of more than 2500
km in the plains of north and eastern India. Increasing population in the basin and haphazard
urbanization and industrial growth has significantly impacted the water quality of river Ganga,
particularly during the dry season. The primary sources of pollution are untreated sewage and
industrial wastewater, also non-point pollution sources from agriculture and livestock, religious
activities and poor solid waste management also contribute significantly to the pollution.
Figure 1. 1The Ganga and its spirituality
The previous attempts to clean the river, such as Ganga Action Plan (GAP) launched in 1985 have
provided some gains in arresting rate of water quality degradation, but lot more needs to be done.
As a major first step in this direction, the Government of India (GoI) has established the National
Ganga River Basin Authority (NGRBA) for comprehensive management of the river. The NGRBA
program will adopt a river basin approach and has been given multi-sectoral mandate to address both
water quantity and quality aspects.
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | 2
1.1 PORTFOLIO OF INVESTMENTS UNDER NGRBA
The NGRBA program will adopt a river basin approach and has been given multi-sectoral mandate to
address both water quantity and quality aspects. To achieve this objective, NGRBA is implementing a
project with financial assistance from The World Bank. The portfolio of investments supported by
NGRBA under this project includes the following:
Sewerage and sanitation systems/sewage treatment plants (new/up gradation);
Solid Waste Management;
Industrial Pollution Control Initiatives; and,
River front Management initiatives
These investments in the first phase of the program is spread across several cities and/or towns
within Ganga main stem states of Uttarakhand, Uttar Pradesh, Bihar, Jharkhand and West Bengal.
1.2 Patna River Front Development
The River Ganga in Patna is an intrinsic part of life of Patna. Being a historical city1, the settlements
started right along river’s bank edge and consequently the river’s edge remained unattended. Some of
the most important Hindu festivals and religious congregations are celebrated on the banks of the
river Ganga such as the Kumbh Mela and the Chhath puja and large numbers of devotees gather
during these festivals.
At present the existing facilities at the Ghats are quite poor. There is no change room or toilet facility
on the Ghats. The Ghats are neither big enough to accommodate thousands of Devotees during
Chhath festival nor there is any facility like changing rooms. There is hardly any Ghat where Visitors
of Patna can go for an enjoyable glimpse of river Ganges. The entire river bank is hard surface, they
are either Ghats or stone pitched and there is virtually very little landscaping or soft surface along the
river edge. There are also no city level parks.
River water fronts have potential to become the recreational and cultural hubs of city and have
emerged as lively urban face. This can transform the water front areas from marginal use and connect
to the main stream; public activity etc. The great potential of river front development eluded the people
of Patna.
River water front development also has potential to create Environmental Awareness for cleanliness
of river and generating Ecological Awareness and tourism for the river edge and thus prevent
disposal of untreated sewage into the river, and also prevent solid waste dumping on the river banks.
1 The history of Patna spans three millennia and has the distinction of being associated with two most ancient
religions of the world, namely Buddhism and Jainism. Patna was originally known as Patliputra in the Mauryan
empire. The mighty river Ganges is an intrinsic part of life of Patna.
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | 3
Now with this decision of Govt. of Bihar to develop the Ganga river front, a great opportunity for urban
transformation of city has emerged. The proposed Patna RFD will be developed under the portfolio of
investment under NGRBA.
1.2.1 Proposed Developments in Patna RFD
The proposed Patna river front development project is spread over 6.6 km from Collectorate Ghat to
Naujar Ghat and would involve the following activities:
Development of 20 ghats (from Collectorate ghat to Naujar ghat including change room);
Promenades including kiosks (connecting some of the ghats together);
Community cum cultural centers;
Landscape work in the precinct zones;
City level parks;
Improvement of approach roads to the precincts
Development of Crematoria in Gulbi ghat with provision of electric crematoria
Development of interceptor drain;
Toilet Complex
Details of the developments are presented in Chapter-2. The total project cost proposed for Patna
RFD is INR 24327.00 Lakhs.
1.3 PURPOSE AND SCOPE OF EIA
The present Patna RFD project will be implemented under NGRBA program being implemented with
the financial assistance from the World Bank. As per the Environmental and Social Management
Framework of NGRBA, the project has been screened (given in details in chapter-4) for its impacts
and has been identified as high impact category and hence an EIA study has been carried along with
specific EMP.
The scope of the EIA study has been finalized based upon the project screening and categorization
and is given below:
Project screening and scoping;
Project categorization considering as per the NGRBA ESMF ;
Detailed assessment of natural habitats in the river and its riparian areas;
Assessment of water quality along the river stretch both through secondary and primary data
generation;
Preparation of study area maps for an immediate vicinity of 200m-500m from either side of
the river through satellite imagery to understand the details of vegetation and potential of
siltation.
Aquatic Ecological assessment of the river stretch of ghat development program;
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | 4
Assessment of existing sewage disposal and proposed improvement mechanism for
restricting sewage and other trade effluent disposal (if any) in to the ghat development
section;
Assessment of proposed Solid Waste Management System as part of the proposed
development;
Assessment of possible impact on river bed due to the proposed engineering measures for
ghat development and possible management measures (if any);
Assessment of physical and cultural Resources along the project stretch and assessment of
potential beneficial and adverse impact on such resources from the project;
Assessment of possible Environmental Quality measures and monitoring mechanism;
Assessment of possible Environment Management measures and cost;
1.4 PROPOJECT PROPONENT
Bihar Urban Infrastructure Development Corporation, Government of Bihar.
1.5 TECHNICAL CONSULTANT AND ARCHITECT
M/s Sen and Lall Consultants Pvt. Ltd. is the technical consultant for this project and M/s NilaA
Architecture and Urban Design is the architect consultant for this project for the proposed river front
development in Patna including development of 20 ghats, promenade including kiosks, community
cum cultural centre, landscape work in the precinct zones, city level parks and development of
approach road to the ghats.
1.6 EIA CONSULTANT
M/s Voyants Solutions Pvt. Ltd. is the EIA consultant for the project.
1.7 STRUCTURE OF EIA
The present EIA report is organised in following chapters.
Chapter- 1 Introduction
This chapter describes briefly describes the project, NGRBA
Portfolios of Investments, the ESMF and need of EIA study.
Chapter- 2 Project Description
In this, chapter the existing conditions of the project area and
proposed developments taken under the projects are described along
with the cost summary of total investment under Patna RFD
Chapter- 3 Policy, Legal and Administrative Framework
This Chapter captures the policy and legal framework of government
of India as well the safeguard policies of World Bank that are
applicable to the project.
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | 5
Chapter-4 Description of Environment
Description of the baseline environmental condition including the
baseline conditions of river water quality, terrestrial and aquatic
ecology, air, noise and soil quality are described in this chapter.
Chapter-5 Analysis of Alternatives
This chapter describes the alternatives considered in the project
towards improving the project.
Chapter-6 Public Consultation
This chapter briefly describes the consultation measures carried out
with the various sections of common public in and around the project
area and the suggestions provided under the consultation are
documented.
Chapter-7 Environmental Impacts and Mitigation Measures
This chapter provides details of the potential impacts from the project
on various environmental factors and mitigation measures proposed
for the construction and operation stage
Chapter-8 Environmental Management Plan
This chapter envisages the requirement of Environmental
Management Plan including the monitoring and supervision
framework for the implementation of EMP along with the budget for
implementing EMP.
Chapter-9 Conclusion and Recommendation
This chapter provides the conclusion about the implementation of the
project and provides necessary recommendations.
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | 6
2. PROJECT DESCRIPTION A detailed project report on riverfront revitalization has been prepared to enhance the potential of
Patna’s river edge infrastructure and future decade. This is an unprecedented opportunity to create
new public realm facing towards the river that is strongly connected to the city’s urban fabric. The
report outlines a set of urban strategies that form the larger civic vision to the water front in the city
and illustrates the detail proposal in ghat precincts.
The main aim of the project is to attempt with a proposal that works collaboratively with Architecture
and Engineering, Urban design and Ecology and Landscape Design. The project area is spread over
a length of 6.6 km of the water front starting at Collectorate ghat and down the river till Ganga Setu
and beyond upto Naujar ghat.
Figure 2.1: Artists view of Golaghar Patna
The history of Patna spans three millennia and has the distinction of being associated with two most
ancient religions of the world, namely, Buddhism and Jainism. The state has seen the rise and fall of
mighty empires of the Mauryas and the Guptas. The Patna was originally known as Patliputra in the
Mauryan empire. From this city the famed emperor Chandragupta ruled a vast empire from Bay of
Bengal to Afghanistan.
This state has also produced several eminent world class scholars namely:
Aryabhatt-Famous mathematician and astronomers
Chanakya-Master of State Craft and Guru of Chandragupta Maurya
It is believed that Patliputra was among the largest cities of the world between 300 and 195B.C.
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | 7
2.1 EXISTING GHAT CONDITIONS
During the visit of the project team of the environmental consultants to assess the existing conditions of
the ghats the following point emerges:
Sanitation: At present the existing facilities at the ghats are quite poor. Practically there is no
infrastructure in the ghats. Disposal of raw sewage from settlement and slums is very common
including open defecation along the edge. Further there are dairy units along the ghat the
waste is directly disposed to river Ganga (Refer Figure 2.2).
The mighty river Ganges is an intrinsic part of life of Patna. This being an historical city, the
settlements started right after river’s bank edge and consequently the river’s edge remained unattended.
The great potential of riverfront development eluded the people of Patna.
The famous Chhathh Puja of Eastern India is celebrated in Patna with great gaiety on river Ganga’s
banks. More than five lakhs devotees offer Puja to Sun God on the occasion of Chhathh Puja in the
month of October. On this occasion lakhs of people trek to Ganges and after holy dip in the Ganges
worship Sun God.
Recently Ganga Aarti has started at 2 nos. ghats, namely Gandhi ghat and Bhadra ghat. The Tourism
Department conducts these activities on weekly basis and this already has emerged an attractive
weekly event of city. Such programs can create enormous awareness for cleanliness of river Ganges.
Now with the decision of Bihar Govt. to develop the Ganga river front, a great opportunity for Urban
transformation of city has emerged.
The spread of Patna along river Ganga The spread of Patna city in and around Gandhi
Maidan
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | 8
Disposal of sewage from building lines along
ghat to river ganga
Domesticated animal and dairy units along ghat,
disposal of animal waste to river Ganga
Open Defecation along edges of river Ganga Direct disposal of solid waste from the
slum/colonies along the river bank into river Ganga
Figure 2.2: Sanitation issues along the ghats
Festivals and Safety: The ghats are neither big enough to accommodate thousands of
Devotees during Chhath festival. There are high chances of accident if any mishap happens
with the devotees.
Encroachments: Illegal colonies, slums and encroachment are observed along the ghat
especially at Bhadra ghat high density of slum observed. The colonies are developed so close
to the bank that during monsoon, there are chances of drowning and unsafe conditions. (Refer
figure 2.3).
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | 9
Figure 2.3: Slums at edge of river Ganga
Safety issues during Night time: There is no lighting along the ghats making it really
unsafe to women and general public as well. On the contrary at Gandhi Ghat has been
developed well for recreational purposes.
Figure 2.4:Gandhi Ghat (the only developed ghat at moment)
Edge Restoration:. Stone pitching has been observed along the river bank. This is a practice
being done to protect the banks from erosion but this does not sustain for more than 2-3
years and every time such types of edge restoration work is done without any kind of
landscaping or green area, reduces the ecological activities in the river edges and impacts the
food chain (Figure 2.5).
Unsafe Ghats-No clear entry exit route: At present the ghats are very narrow and the steps
are very steep especially at Mishri ghat. Almost all the ghats have some temple and devotees
go for puja and making it difficult for children, women and aged persons.
Further, there is no demarked entry or exit route to the ghats from the banks which also
creates unsafe conditions during mass gatherings like Chatth festival etc.
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at Patna
EIA-Ver2.1
P a g e | 10
Figure 2.5:Adalat Ghat Edge Condition Analysis (Boulder pitching at the edges)
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at Patna
EIA-Ver2.1
P a g e | 11
Figure 2.6:Edge condition Analysis in Krishna Ghat
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | 12
2.2 NEED FOR PATNA RFD
Patna being an historical city2, the settlements started right along river’s bank edge and consequently
the river’s edge remained unattended. Some of the most important Hindu festivals and religious
congregations are celebrated on the banks of the river Ganga such as the Kumbh Mela and the
Chhath puja and large numbers of devotees gather during these festivals.
At present the existing facilities at the Ghats are quite poor. There is no change room or toilet facility
on the Ghats. The Ghats are neither big enough to accommodate thousands of Devotees during
Chhath festival nor there is any facility like changing rooms. There is hardly any Ghat where Visitors
of Patna can go for an enjoyable glimpse of river Ganges. The entire river bank is hard surface, there
are either Ghats or stone pitched or there is virtually very little landscaping or soft surface along the
river edge. There are also no city level parks.
River water fronts have potential to become the recreational and cultural hubs of city and have
emerged as lively urban face. This can transform the water front areas from marginal use and connect
to the main stream, public activity etc. The great potential of river front development eluded the people
of Patna.
River water front development also has potential to create Environmental Awareness for cleanliness
of river and generating Ecological Awareness and tourism for the river edge and thus prevent disposal
of untreated sewage into the river, and also prevent solid waste dumping on the river banks.
Now with this decision of Bihar Govt. to develop the Ganga river front, a great opportunity for urban
transformation of city has emerged. The proposed Patna RFD will be developed under the portfolio of
investment under NGRBA.
After several discussions with the government agencies and NGRBA the need for the river front
development in Patna along river Ganga was taken in to consideration mainly for the following
reasons:
Upgradation of Ghats:
At present the existing facilities at the ghats are quite poor. Practically there is no change room or
toilet facility in the ghats. The ghats are also not big enough to accommodate thousands of Devotees
during Chhath festival. There is hardly any ghat where Visitors to Patna can go for an enjoyable
glimpse of river Ganges.
2 The history of Patna spans three millennia and has the distinction of being associated with two most ancient
religions of the world, namely Buddhism and Jainism. Patna was originally known as Patliputra in the Mauryan
Empire. The mighty river Ganges is an intrinsic part of life of Patna.
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | 13
Environmental Awareness:
The proposed river front development has potential to become one of the recreational and cultural
hubs of the city and can emerge as lively urban face. This can transform the water front areas from
marginal use and connect to main stream, public activity etc. Once such public place is being
developed then the necessary environmental awareness and citizen’s responsibility towards the
cleanliness of river Ganga is expected to be developed along with increase of tourism. It is expected
that the proposed river front development in Patna would enhance the environmental awareness
specifically addressing (i) sanitation issues, (ii) prevent disposal of untreated sewage from the houses
adjoin the ghats, (iii) prevent uncontrolled disposal of solid waste in the river, (iv) ecological
awareness among people and among the fishermen specifically regarding Ganga Dolphin and (v)
Open Defecation. The Project also expected to generate awareness among the pilgrims as well as
with the line department regarding the health, safety and environmental issues during mass gathering
of people during famous chatt festival and ?Ganga A arti? along Ganga ghats.
Ghat Landscaping:
At present only stone pitching work has been observed along the banks which are generally need to
be repeated for every 2-3 years of time. This generally reduces the ecological activities along the
banks.
The proposed project is proposed with ecological edge restoration work along the banks.
2.3 PROPOSED DEVELOPMENTS
The proposed Patna river front development project would involve the following projects:
Development of 20ghats (from Collectorate ghat to Naujar ghat including change room);
Promenades including kiosks (connecting some of the ghats together);
Community cum cultural centres;
Landscape work in the precinct zones;
City level parks; and,
Improvement of approach roads to the precincts
Development of Crematoria in Gulbi Ghat to an electric crematoria
Development of interceptor drains (total 8 nos.)
Toilet Complex
Details of the developments are given below:
2.3.1 Development of Ghats
The proposed 20 ghats considered to be developed under this project given in table 2.1 and shown in
figure 2.2 respectively.
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | 14
Table 2-1 : Proposed Ghats for development
Figure 2.7 Potential of ghat as a public Space
2.3.2 Promenades including kiosks (connecting some of the ghats together)
The proposed development of promenades are given below and shown in figure 2.8 and 2.9:
Name of
Precinct
Connected Ghats
Precinct-I Collectorate ghat Anta ghat B.N.College ghat Mahendru ghat
till Adalat ghat
Precinct-II Adalat ghat To Gandhi ghat
Precinct-III Gandhi ghat to Rani ghat
Ghat Names
Anta ghat B.N. College ghat
Adalat ghat Mishri ghat
T.N. Banerjee ghat Krishna ghat
Baharwa ghat Rani ghat
Ghagha ghat Raushan ghat
Choudharytola ghat Pathri ghat
Alamgaunj ghat Naurwa ghat
Hanuman ghat Raja ghat
Gai ghat Bhadra ghat
Mahavir ghat Naujar ghat
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | 15
Name of
Precinct
Connected Ghats
Precinct-IIIA Gulbi Ghat to Gai Ghat
Precinct-IV Bhadra ghat Mahavir ghat Naujar ghat
Figure 2.8: Urban Precincts proposed
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | 16
Name of
Precinct
Connected Ghats
Figure 2.9: Design of Urban Precinct (3D-View)
After the development of the urban precincts the view of a ghat is shown in figure 2.10.
Figure 2.10:View of ghats after the proposed development of urban precinct
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | 17
2.3.3 Community cum cultural centres
Three number of community cum culture centres are proposed as given below and shown in figure
2.11.
Community cum Eco Centre at Collectorate ghat: This centre is facilitated with community
landscape court with sit out, eco-centre cum meeting hall, café sitting in the second floor. The
total built up area would be 2014 sq.m.
Community cum cultural Centre at Bhadra ghat: This centre will be facilitated with food
court and community hall and children centre, multi purpose hall for dance and performance
and a promenade view café. The total built up area would be 1273 sq.m.
Dolphin Information Centre at Gai ghat: The total built up area would be 950 sq.m
Café at Patna College: This centre will be facilitated with café in the ground floor, Reading
room and kids reading area in the 1st floor and Amphitheatre and viewing deck in the 2
nd floor.
The proposed built up area is 381 sq.m
Audio-Visual theatre at Gandhi ghat: This centre is facilitated with café in the ground floor,
audio-visual hall in the 1st floor, amphitheater and viewing deck in the 2
nd floor. Total built up
area 381 sq.m.
Figure 2.11:Proposed Community cum Eco-centre at Gai ghat
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | 18
2.3.4 Landscape work at Precinct Zones:
The proposal has also put forward a framework to integrate landscape in to the existing river edge
design. The landscape design has listed criteria like edge restoration, bio-diversity for wildlife,
methods for carbon reduction , providing Larger open space for people for rituals, activity and
exercise, walks, workshops, seminars, shade areas for people, concepts of bio-degradable garbage,
flood control through landscape engineering and environmental education.
The development on the river edge has to be of a kind that doesn’t harm the river ecology. The design
solution is a sustainable process. Steps have been taken to put in place on the promenade network of
waste disposal. The textures and use of material be such that it would be green and environment
friendly.
Landscape work has been proposed in four (4) number of precinct zones as given below and shown
in figure 2.12:
Precinct Landscape Work Landscape Work Landscape Work
Precinct-I Collectorate ghat to Anta ghat Anta ghat to B.N
college ghat
B.N College ghat to
Mahendru ghat
Precinct-II Mishri ghat to T.N Banerjee ghat T.N Banerjee ghat to
Kali ghat
Precinct-III
and Precinct-
IIIA
Gandhi ghat to Bharva ghat Bharva ghat to Law
college ghat
Rani ghat to Gulbi ghat
Precinct-IV Gai ghat to Naujar ghat
The proposal under the landscape works at the precinct zones will include the following aspects:
Riparian edge restoration, planting long edge for biodiversity of wild life, carbon reduction,
nutrient exchange along edge
Large open space to facilitate people for rituals, activity and exercise, walks, workshops,
seminars, shade areas for people
Flood control through landscape engineering permanent and temporary
Environmental education
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | 19
Figure 2.12:Restoring the riparian edge and landscaping
2.3.5 City level parks:
Two (2) city level parks are proposed respectively at Patna College ghat and Gai ghat
2.3.6 Improvement of approach roads to the precincts
Following approach roads are proposed for improvement, which are connected through main road of
Gandhi Maidan- Patna City. These approach roads varies in length (100 to 500 m) and width (5 to 20
m) according to existing accessibility.
Approach road to precinct-I
Approach road to precinct-II
Approach road to precinct-III and IIIA
Approach road to precinct-IV
Approach road to Krishna ghat
Approach road to Choudurytola ghat
Approach road to Pathri ghat
Approach road to Gai ghat
Approach road to Raja ghat
A schematic view of proposed development of approach road is given in figure 2.13.
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | 20
Figure 2.13:Proposed approach road development of Gai ghat
2.3.7 Development of Electric Crematoria at Gulbi Ghat
At present the present crematoria uses wood as burning material. This electric crematorium will help
in reducing the wood consumption and next it would give more burning facilities. These electric
crematoria would help in burning 30 dead bodies in a day.
2.3.8 Development of Toilet Complex
Toilet complexes are proposed at 3 locations as part of the project namely at Collectorate Ghat, Anta
Ghat and Bhadra Ghat. Nearly 600 people are expected to use each of these toilets in a day.
2.3.9 Development of Interceptor Drain
The project also envisages towards improving interceptor drains to capture the sewage getting
directly disposed to Ganga from the building along the ghat and run-off and then finally disposing
them off at a main drain line. A total of 8 such interceptor drains are being proposed.
2.3.10 Environmental Awareness
The proposed river front development has potential to become one of the recreational and cultural
hubs of the city and can emerge as lively urban face. This can transform the water front areas from
marginal use and connect to main stream, public activity etc. Once such public place is being
developed then the necessary environmental awareness and citizen’s responsibility towards the
cleanliness of river Ganga is expected to be developed along with increase of tourism. It is expected
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at
Patna
EIA-Ver2.1
P a g e | 21
that the proposed river front development in Patna would enhance the environmental awareness
specifically addressing (i) sanitation issues, (ii) prevent disposal of untreated sewage from the houses
adjoining the ghats, (iii) prevent uncontrolled disposal of solid waste in the river, (iv) ecological
awareness among people and among the fishermen specifically regarding Ganga Dolphin and (v)
Open Defecation. The Project also expected to generate awareness among the pilgrims along with
various line department health, safety and environmental issues during festivals like “Chatth Puja?
and ?Ganga A arti?.
2.4 PROJECT LOCATION
The proposed project site is located along the river Ganga starting from Collectorate ghat and spread
beyond the Ganga setu. Few of the ghats are proposed to be connected through promenade and
would also involve landscape work.
The location map of the proposed project site is provided in Figure 2.14 and existing landuse along
the ghats is presented in Figure 2.15.
-
Project : Environmental Impact Assessment Study for Ganga River Front Development at Patna
EIA-Ver2.1
P a g e | 22
Figure 2.14:Project Location
-