EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited Environmental Impact Assessment For CRZ Clearance Of Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane Prepared by Enviro Analysts & Engineers Pvt. Ltd. QCI NABET LIST for the Construction Project/ Area Development Project/Township: S.No. 45 of list of consultant with provisional accreditation. (Rev.15/ December 5, 2013) 1 Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Transcript of EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline...

Page 1: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

Environmental Impact Assessment For

CRZ Clearance Of

Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane

Prepared by

Enviro Analysts & Engineers Pvt. Ltd.

QCI NABET LIST for the Construction Project/ Area Development Project/Township:

S.No. 45 of list of consultant with provisional accreditation. (Rev.15/ December 5, 2013)

1

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 2: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

Table of Contents 1 EXECUTIVE SUMMARY ..................................................................................................................5

1.1 PROJECT BACKGROUND: ........................................................................................................5

1.2 INFRASTRUCTURE PROPOSED: .............................................................................................5

2 INTRODUCTION/ BACKGROUND:.................................................................................................6

2.1 IDENTIFICATION OF PROJECT & PROJECT PROPONENT: ...............................................6

2.2 BRIEF DESCRIPTION OF NATURE OF PROJECT: ................................................................6

2.3 INFRASTRUCTURE PROPOSED: .............................................................................................7

2.4 NEED FOR THE PROJECT: ........................................................................................................7

3 PROJECT DESCRIPTION: .................................................................................................................8

3.1 TYPE OF PROJECT (INCLUDING INTERLINKED & INTERDEPENDENT PROJECTS): ..8

3.2 Location:........................................................................................................................................8

3.3 DETAILS OF ALTERNATE SITES CONSIDERED AND SELECTION CRITERIA:.............9

3.4 PROJECT DESCRIPTION WITH PROCESS DETAILS: ..........................................................9

3.5 RAW MATERIALS REQUIRED AND QUANTUM: ..............................................................10

3.6 RESOURCE OPTIMIZATION/ RECYCLING: ........................................................................10

3.6.1 (A) AVAILABILITY OF WATER & SOURCE: ...............................................................10

3.6.2 ENERGY/ POWER REQUIREMENT & SOURCE:..........................................................10

3.7 QUANTITY OF WASTES: ........................................................................................................10

4 SITE ANALYSIS: ..............................................................................................................................11

4.1 CONNECTIVITY: ......................................................................................................................11

4.2 LAND FORM/ LAND USE/ LAND OWNERSHIP: .................................................................11

4.3 TOPOGRAPHY: .........................................................................................................................11

4.4 EXISTING LAND USE PATTERN: ..........................................................................................11

4.5 EXISTING INFRASTRUCTURE: .............................................................................................11

4.6 SOIL CLASSIFICATION: .........................................................................................................11

4.7 TEMPERATURE & RELATIVE HUMIDITY: .........................................................................11

4.8 RAINFALL: ................................................................................................................................12

4.9 WINDS& TIDES: .......................................................................................................................12 2

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 3: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited 4.10 VISIBILITY: ...............................................................................................................................12

5 PLANNING BRIEF: ..........................................................................................................................13

5.1 PLANNING CONCEPT: ............................................................................................................13

5.2 Minimizing Ecological Risk .......................................................................................................13

5.3 Understanding Site Conditions....................................................................................................13

5.4 Detailed Design Requirements ....................................................................................................14

6 PROPOSED INFRASTRUCTURE: ..................................................................................................15

6.1 INDUSTRIAL AREA (PROCESSING AREA): ........................................................................15

6.2 RESIDENTIAL AREA: ..............................................................................................................15

6.3 GREEN BELT: ...........................................................................................................................15

6.4 CONNECTIVITY: ......................................................................................................................15

6.5 SOLID WASTE MANAGEMENT: ...........................................................................................15

7 REHABILITATION & RESETTLEMENT (R & R) PLAN: ............................................................16

7.1 POLICY TO BE ADOPTED (CENTRAL/ STATE): ................................................................16

8 ENVIRONMENTAL IMPACT ASSESSMENT STUDY.................................................................17

8.1 BASELINE FACTORS FOR EIA ..............................................................................................17

8.1.1 HYDROMETEOROLOGY .................................................................................................17

8.1.2 PHYSIOGRAPHY:..............................................................................................................17

8.1.3 SOIL STRATA: ...................................................................................................................18

8.2 Study area & period: ...................................................................................................................18

8.3 Surface water quality ...................................................................................................................18

8.4 BED SEDIMENT ........................................................................................................................20

8.5 PHYSICO CHEMICAL CHARACTERISTICS OF SEDIMENT SAMPLES ..........................20

8.6 ACQUATIC ECOSYSTEM .......................................................................................................22

8.6.1 Phytoplankton and Zooplankton Analysis Methodology ....................................................22

8.6.2 Meiobenthic fauna Analysis Methodology ..........................................................................22

8.6.3 Macrobenthos Analysis Methodology .................................................................................22

8.7 Results .........................................................................................................................................23

8.8 Distribution, percentage and species composition of Zooplankton ............................................25

8.9 Distribution of Meiobenthos and Macrobenthos .........................................................................28

3

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 4: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited 8.10 Fisheries ......................................................................................................................................30

8.11 Flora and fauna in the Proposed Project area ..............................................................................33

8.11.1 Fauna profile ........................................................................................................................33

8.12 Mangrove Vegetation ..................................................................................................................34

9 ENVIRONMENT MANAGEMENT PLAN......................................................................................35

9.1 Construction Phase: .....................................................................................................................35

10 Environmental Monitoring .................................................................................................................46

4

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 5: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

1 EXECUTIVE SUMMARY

1.1 PROJECT BACKGROUND:

Mahanagar Gas Limited (MGL) is one of India’s leading natural gas distribution companies. Established in 1995, MGL is a joint venture between GAIL (India) Ltd and the BG Group, (U.K.). MGL has to its credit the distinction of pioneering the natural gas distribution network in Mumbai and its neighboring areas. MGL today is an ISO 9001:2008, ISO-14001 and OHSAS 18001 certified organization. Today, MGL has already connected above 7 lakh households and over 2300 small commercial and industrial establishments. MGL also supplies CNG to more than 3.7 lakh vehicles which include above 1.7 lakh rickshaws and over 57,000 taxis & about 1.3 lakh cars in Mumbai, Thane, Mira-Bhayander, Navi Mumbai and beyond. Besides, about 3400 BEST/TMT/MSRTC/NMMT buses, above 5000 LCVs/Tempos/Trucks/Private buses are plying on CNG supplied through its wide distribution network of about 390 kms of steel and over 3850 kms of MDPE pipeline system and over 170 CNG filling stations having more than 920 dispensing points. Safe and uninterrupted supply of gas to the customers is the priority of the company. To ensure safety, MGL has put in place robust systems and processes which match with the best in the world. MGL has adopted a Health, Safety, Security & Environment (HSS&E) Management system which provides a framework for continual improvement in its performance. An Emergency control room with a toll free number 1800 22 99 44 is available 24 hrs a day, 365 days a year. Besides this 'Dial-before-Dig' and continuous pipeline surveillance also contribute to the safety of the system. MGL has all the resources and competencies required from concept to commissioning of gas distribution networks available in-house. The entire business in MGL has been integrated through ERP-SAP system. MGL has got a track record of almost 100% reliability in its gas supply. During the devastating floods of Mumbai in July 2005, when most other utilities failed, MGL’s gas supply continued uninterrupted. In the interest of Customer’s convenience, the company has taken several customer-friendly initiatives such as multiple bill payment options and multiple customer contact channels.

1.2 INFRASTRUCTURE PROPOSED:

Energy Demand is increasing rapidly in India & use of Natural Gas is increasing gradually. As an Endeavour to ensure Security & Continuity in supply of Gas it is proposed to interconnect all the existing City Gate Stations, i.e. Ambernath, Wadala, Mahape & Taloja. As a part of this project gas connectivity will be established between Thane to Bhiwandi.

5

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 6: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

2 INTRODUCTION/ BACKGROUND:

2.1 IDENTIFICATION OF PROJECT & PROJECT PROPONENT:

Mahanagar Gas Limited (MGL) is one of India’s leading natural gas distribution companies. Established in 1995, MGL is a joint venture between GAIL (India) Ltd and the BG Group, (U.K.). MGL has to its credit the distinction of pioneering the natural gas distribution network in Mumbai and its neighboring areas. MGL today is an ISO 9001:2008, ISO-14001 and OHSAS 18001 certified organization. Today, MGL has already connected above 7 lakh households and over 2300 small commercial and industrial establishments. MGL also supplies CNG to more than 3.7 lakh vehicles which include above 1.7 lakh rickshaws and over 57,000 taxis & about 1.3 lakh cars in Mumbai, Thane, Mira-Bhayander, Navi Mumbai and beyond. Besides, about 3400 BEST/TMT/MSRTC/NMMT buses, above 5000 LCVs/Tempos/Trucks/Private buses are plying on CNG supplied through its wide distribution network of about 390 kms of steel and over 3850 kms of MDPE pipeline system and over 170 CNG filling stations having more than 920 dispensing points. Safe and uninterrupted supply of gas to the customers is the priority of the company. To ensure safety, MGL has put in place robust systems and processes which match with the best in the world. MGL has adopted a Health, Safety, Security & Environment (HSS&E) Management system which provides a framework for continual improvement in its performance. An Emergency control room with a toll free number 1800 22 99 44 is available 24 hrs a day, 365 days a year. Besides this 'Dial-before-Dig' and continuous pipeline surveillance also contribute to the safety of the system. MGL has all the resources and competencies required from concept to commissioning of gas distribution networks available in-house. The entire business in MGL has been integrated through ERP-SAP system. MGL has got a track record of almost 100% reliability in its gas supply. During the devastating floods of Mumbai in July 2005, when most other utilities failed, MGL’s gas supply continued uninterrupted. In the interest of Customer’s convenience, the company has taken several customer-friendly initiatives such as multiple bill payment options and multiple customer contact channels.

2.2 BRIEF DESCRIPTION OF NATURE OF PROJECT:

The proposal is for laying of Natural Gas Pipeline (Thane-Bhiwandi Looping) near Balkum Fire Station in Thane to Kalyan Naka in Bhiwandi along old Agra Road Crossing Ulhas

6

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 7: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

River adjacent to Kasheli North bridge by HDD Methodology.

2.3 INFRASTRUCTURE PROPOSED:

The proposal is for laying of Natural Gas Pipeline. A Portion of pipeline (2000 Mts) shall pass through the CRZ area.

2.4 NEED FOR THE PROJECT: Energy Demand is increasing rapidly in India & use of Natural Gas is increasing gradually. To fulfill the demand of Industrial, Commercial and Domestic Customers in Bhiwandi area MGL is proposing to Lay a Pipeline by Crossing Ulhas River adjacent to Kasheli North Bridge. As an Endeavour to ensure Security & Continuity in supply of Gas it is proposed to interconnect all the existing City Gate Stations, i.e. Ambernath, Wadala, Mahape & Taloja. As a part of this project gas connectivity will be established between Thane and Bhiwandi.

7

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 8: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

3 PROJECT DESCRIPTION:

3.1 TYPE OF PROJECT (INCLUDING INTERLINKED & INTERDEPENDENT PROJECTS):

The proposal is for laying of Gas pipeline through a narrow portion in CRZ area of Ulhas River/ Vasai Creek. The project is to strengthen the existing Network of pipelines and serve the newly developing Residential and Commercial areas at Bhiwandi. The project is expected to cater to energy demands in the region for Domestic as well as Commercial purpose.

3.2 Location: The site for the proposed pipeline is along the Agra Road near Kasheli Bridge. The Site is in thane district of Coastal division of Maharashtra on latitude 19°30’14.74” N and longitude 72°59 59.’40” E.

Figure 1: Google Map of the Site

8

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 9: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

Figure 2Project site showing clear path for laying of pipelines.

3.3 DETAILS OF ALTERNATE SITES CONSIDERED AND SELECTION CRITERIA:

The project requires a typical alignment route and the proposed route is the most suitable route for laying the pipeline with minimum environmental impacts.

3.4 PROJECT DESCRIPTION WITH PROCESS DETAILS:

The project is for laying of a Gas pipeline with open trenching. However, for the Portion passing through the CRZ will be done by HDD Methodology to reduce the environmental impacts to minimum.

The usual approach to pipeline installation is to dig an open trench, place the pipeline and then bury it.

Proposed pipeline passing through CRZ area shall be laid by:

1. Horizontal Directional Drilling (HDD) method for pipeline passing through Ulhas River.

2. Open cut method for remaining portion of pipeline.

• Horizontal Directional Drilling (HDD) is a Trench-less methodology that provides an installation alternative that can offer a number of benefits over traditional open-cut method.

• In a sensitive wetland environment such as a river/creek crossing, wildlife habitats would be

9

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 10: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

destroyed and extensive mitigation efforts would be required while pipe laying by open cut method. As a result, trenchless or "No-Dig" technology has been used extensively worldwide.

• HDD can be implemented with very little disruption to surface activities, requires less working space, and may be performed more quickly than open-cut methods.

• 12” NB, 9.5 mm thick & 4” NB with 6.4 mm thick ERW Carbon Steel Pipelines Crossing River & laid together by HDD methodology across river and 12” NB & 125 mm MDPE across remaining length of Pipeline Project by Open Cut Method.

Open Cut Method

• The usual approach to pipeline installation is to dig an open trench, place the pipeline and then bury it.

• MGL is using 9.5mm thick, Hydro testing test pressure shall be 76.5 Bar-g, 3 layer PE coated steel pipes of diameter 12” NB for the transportation of its natural gas to its pressure regulating stations

3.5 RAW MATERIALS REQUIRED AND QUANTUM:

The proposed project being a non-construction activity involving only laying of a pipeline, there is no requirement of raw material. Specification of the pipeline has been described above.

3.6 RESOURCE OPTIMIZATION/ RECYCLING:

There are no resources required for the project. The resource optimization shall primarily be achieved by reducing the operation timings and using the construction automated machinery judiciously.

3.6.1 (A) AVAILABILITY OF WATER & SOURCE:

The water requirement for the construction purpose shall be fulfilled through water tankers as it is not a regular requirement.

3.6.2 ENERGY/ POWER REQUIREMENT & SOURCE: Power shall be made available for HDD through 25 KVA DG sets.

3.7 QUANTITY OF WASTES:

The only waste that will be coming out of the process is Bentonite slurry due to HDD (35 MT/week). About 70% slurry is expected to be reutilized and remaining 30% will be sent to TSDF at Taloja through authorized transporters.

10

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 11: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

4 SITE ANALYSIS:

4.1 CONNECTIVITY:

The site is easily accessible by a four lane road connecting Thane and Bhiwandi (old Agra Road). The nearest railway station on Central Railway is Kalwa at 4.00 kms.

4.2 LAND FORM/ LAND USE/ LAND OWNERSHIP:

The land required for the project is a vacant land along the road and bridge with approximately 880 mts of creek crossing.

4.3 TOPOGRAPHY The land is at an elevation of about 2.30m above chart datum and is fairly leveled land on land side and sloping towards water end.

4.4 EXISTING LAND USE PATTERN:

The existing land is barren without any cultivation or other use.

4.5 EXISTING INFRASTRUCTURE:

The land is abutting the Thane-Bhiwandi Road and the region is fairly developed with basic & advanced infrastructure.

4.6 SOIL CLASSIFICATION: The creek bed is having coastal alluvial soil which is mainly clayee. The creek bank has mainly reclaimed soil up to 3 mts.

4.7 TEMPERATURE & RELATIVE HUMIDITY:

The region experiences moderate temperature variations, the mean day bulb temperature in the hottest (May) and in coldest (Jan) months being 30.30OC and 23.600C. The mean annual daily maximum and minimum temperatures are 31OC and 23.600C. In recent years this region has experienced high temperature up to 36 degrees centigrade and low up to 22 degrees centigrade. The relative humidity is moderate to high and varies between 62% and 85%.

11

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 12: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

4.8 RAINFALL: Rainfalls mainly occur in this area during the South-West Monsoon in the months June-September. The mean annual rainfall in whole rainy season is around 2,800 mm. In view of the area prone to heavy rains and floods during the monsoon, the construction activities will have to be planned giving due considerations to these factors. Similarly, during operation stage, the monsoon activities and targets have to specially planned taking into account possible disruptions.

4.9 WINDS & TIDES: Wind speeds of 45 km/hour are known to accompany the monsoon waves offshore, but inshore winds are thought to be lower than this. Wind conditions recorded by the offshore anemometer, during a field measurement exercise carried out in 1994 by NIO, were up to 40 Km/hour in September, which suggests that this speed can be taken as an approximate upper limit during non-monsoon operations. CWPRS had conducted some study earlier for wind speed in Konkan area and reported wind speed up to 60 km/hour. The typical wind rose diagram based on the observations of the Indian Meteorological Department and Marine climatologically department give following information. The predominant wind direction is N and NE during fair weather season and W and SW during monsoon season.

4.10 VISIBILITY: From November to March smog hangs over the land around Mumbai. This happens only for short periods, most often shortly after sunrise but occasionally in the evening. Visibility is generally good for most part of the year as the number of days on which visibility is poor being negligible.

12

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 13: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

5 PLANNING BRIEF:

5.1 PLANNING CONCEPT: Horizontal Directional Drilling (HDD) is intended to be a less intrusive construction method than the traditional open cut for crossing a watercourse or wetland with a pipe, cable or other underground service. However, there is a possibility of surface (water, riparian, wetland) disturbance if a ‘frac-out’ (inadvertent release of drilling fluid or a release of sediment laden groundwater into the wetland or watercourse. There is also the potential for sediment laden water or other deleterious substances to enter surface water feature as the result of grading, drilling excavations, equipment washing, or other construction related activities during directional boring. Frac-out releases are typically caused by the pressurization of the drill hole beyond the containment capability of the near surface geologic materials (soil and/or rock). Therefore the type and depth of these materials, as well as the drilling pressure, are key factors in preventing and managing frac-outs. MGL aims to minimize ecological risk, which is accomplished by effective siting of the project, collection of detailed information to understand environmental constraints/sensitivities, proactive mitigation of potential ecological impacts, environmental monitoring during HDD construction, and detailed contingency measures.

5.2 Minimizing Ecological Risk The preferred order for dealing with potential releases of drilling fluid is first to prevent them from occurring, second to contain them if such an incident occurs, and third is site restoration/remediation. Sediment entering a surface water feature may result in a temporary increase in turbidity or siltation that can negatively impact aquatic life, by covering spawning/feeding areas and clogging fish gills.

5.3 Understanding Site Conditions The poposed portion of the pipeline route is passing through the CRZ area for a distance of about 2000 mts. Of this, 880 mts is passing through the creek bed and the remaining area is along the old Agra Road joining Thane to Bhiwandi. The site is mostly vacant without any other infrastructure that may counter with the proposed pipeline route. The soil is firm. The Kasheli Bridge is connecting the road from Thane to Bhiwandi. There is no significant vegetation along the proposed route of the pipeline.

13

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 14: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited The MGL should identify any hydro-geological or surface water constraints and the contractor should be made aware of it during the drilling process, such as artesian groundwater pressure, ground conditions that may limit construction, etc. Test pits and boreholes should not be located directly on, or extend through, the proposed alignment, as these weak points may serve as conduits where inadvertent fluid returns or frac outs occur. It is recommended that at least a 3 m offset be provided between the boreholes and pipe alignment.

5.4 Detailed Design Requirements Once the route has been determined, the following information will be required on the detailed site plans: The proposed HDD alignment in both plan and profile views; Borehole data including the stratigraphy in relation to the proposed bore path, and the elevation of groundwater resources; The exact location of all watercourses, including accurate surveys of Creeks, clearly identifying the location of banks, and bed invert elevations; The exact location of all wetlands, including accurate surveys of wetland boundaries as determined by the IRS in the CZMP; An accurate cross-section of the watercourse/wetland at the crossing location in relation to the HDD trajectory; All tree/vegetation removals, access points, entry and exit points, erosion and sediment controls, dewatering/depressurization requirements, details for working in the dry, and site restoration; Contingency methods of treating sediment laden water and details on monitoring the effluent should be provided, in the event that treatment is ineffective at removing suspended clays and silts from the water column. The filter bags are not effective at removing silts and clays.

14

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 15: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

6 PROPOSED INFRASTRUCTURE:

6.1 INDUSTRIAL AREA (PROCESSING AREA): The proposed project is for laying of Gas pipeline and shall occupied a narrow strip of about 5 mts across a length of 2000 mts during the construction phase.

6.2 RESIDENTIAL AREA: This point is not applicable for the project.

6.3 GREEN BELT: This is not applicable for the project. The project does not involve clearing of any vegetation, hence compensatory afforestation is also not applicable to this project.

6.4 CONNECTIVITY: The proposed site is well connected by a four lane road from Thane to Bhiwandi. The site connectivity is well established as the site is adjacent to a major transport artery for Mumbai.

6.5 SOLID WASTE MANAGEMENT: There are no solid wastes generated in operations phase of this project. During construction, bentonite slurry of approximately 35 MT/Week shall be generated. 70% of it shall be reutilized in the project and about 30% shall be sent to TSDF. The consent for the same has been taken by the MGL.

15

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 16: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

7 REHABILITATION & RESETTLEMENT (R & R) PLAN:

7.1 POLICY TO BE ADOPTED (CENTRAL/ STATE): As there is no rehabilitation or settlement of people, there is no need for any plan for rehabilitation & resettlement under central or state policy.

16

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 17: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

8 ENVIRONMENTAL IMPACT ASSESSMENT STUDY

8.1 BASELINE FACTORS FOR EIA

8.1.1 HYDROMETEOROLOGY The climate of the region is tropical with high relative humidity throughout the year. The general climatic condition is fair since seasonal fluctuations of temperature are not very high. The moderating effects of the adjoining sea and the fairly high amount of relative humidity in the atmosphere have restricted the unevenness. January is the coldest month and May the warmest. With the onset of monsoon in early June the temperature decreases and remains more or less steady. Again the temperature rises in October and falls gradually till January. The maximum day temperature ranges in between 28˚C to 37˚C while the minimum temperature ranges in between 17˚C to 27˚ C. The average relative humidity varies from lowest in the month of December to the highest of 85% during July. The relative humidity remains 44% to 76% throughout the year. The monsoon generally sets in around the second week of June and continues till late September. July and August are the wettest months all over the region. Maximum rainfall is recorded mostly in the month of July. The study area falls in the High Rainfall Zone of Northern Konkan.

8.1.2 PHYSIOGRAPHY: The Maharashtra coast is characterized by pocket beaches flanked by rocky cliffs of Deccan basalt as we go from North to south, estuaries and the patches of the mangroves along the estuaries. Beaches of the Maharashtra coast are small, crescent shaped and flanked by promontories. They are termed as pocket beaches as they are pocketed between headlands. Mudflats are found mainly along the estuaries and bay. They are broad at the mouth and gradually taper down. They are observed near Thane creek, Vasai creek, and Vasai creek. Mangroves are mainly observed along the intertidal region of estuaries and creeks. Large patches of mangroves are observed along the Vasai creek, Vasai creek, Thane creek and Dharamtar creek. For Vasai creek, the Ulhas river is a major stream, there are a few others which are short and very much seasonal in their flow.

17

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 18: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

8.1.3 SOIL STRATA: The subsurface profile consists of fill material overlying marine clay for a depth of 11.00m below ground level.

Stations Parameters S 1 S 2 (Near Kashe S 3 (North Bank

( Near project Site) Villge)- 800 m of Vasai Creek)-

1.38 km

pH 7.9 6.7 6.8

Electrical Conductivity 1.25 1.67 1.07 mS/cm

Texture Sandy Clay Loamy Sandy Loam Sandy Loam

Sodium (mg/g) 104 92 98

Calcium (mg/g) 174 101 168

Magnesium (mg/g) 70 74 69

Potassium (mg/g) 80 96 109

Sodium Adsorption Ratio 8.4 6.7 9.3

Water Holding Capacity 64.4 45.2 47.1

Porosity % 26 32 33

8.2 Study area & period: The study was carried out between April 2014 to December 2014. The study areacovered the Project site as Core area and a buffer area of 2 kms around the site. The scope was determined based on location of the project and magnitude of operations that would be incremental in the already developed area.

8.3 Surface water quality Water quality samples were collected at five different stations during March 2014 (Pre-monsoon

18

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 19: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited data) and was analysed in the laboratory for the various parameters. The water samples were collected in plastic containers and were taken to the laboratory for analysis of the water samples for all the designated water quality parameters like, heavy metals, total suspended solids and nutrients.

These stations were chosen to have a good representation of the entire study area. From the analysis it was found that temperature of the marine water was ranging from 24º C to 25º C and salinity was 21 to 23 ppt. Values of pH ranged from 7.82 to 7.95. The dissolved oxygen content ranged between <1 mg/l and 2.8 mg/l. Values of Do from all the stations were found to be below the prescribed standards of harbour water quality of 3 mg/l. Subsequently the BOD was found to be quite high. The BOD values ranged from 12 mg/l to 20 mg/l in the sampling stations. The heavy metal concentrations were compared with SW-1 water criteria as no values are available in SW-IV water. The heavy metal concentration was also found to be within the prescribed limits set for SW-1 water by EPA 1986. The values of Cadmium was found to be < 0.002 mg/l; lead <0.005 mg/l and Mercury <0.0005 mg/l in all stations in comparison to the SW-1 water of 0.01 mg/l, 0.001 mg/l and 0.001 mg/l respectively. Faecal coliform were present from all the stations (14 to 32 /100 ml). No standard is prescribed for faecal coliform in SW-IV waters. The limit of faecal coliform in Class SW-II waters (For bathing, contact water sports and Commercial Fishing) is 100/100 ml (MPN); and if compared to SW-II waters the results found from Vasai creek (SW-IV waters) is found to be well within the limit.

Table 1: RESULTS OF WATER QUALITY ANALYSIS OF VASAI CREEK DURING PRE-MONSOON SEASON

Slno Parameters Units Stn-1 Stn-2 Stn-3 Stn-4 Stn-5 Water Quality

Criteria for

Harbour water-

EPA 1986 1 Temperature °C 24.5 24 24 25 25 --

2 pH 0% 7.95 7.93 7.91 7.82 7.82 6.5-9.0

3 Salinity ppt 21 21 22 23 23 --

4 DO mg/l <1 1.4 1.4 1.6 2.8 3 mg/l

5 BOD mg/l 20 15 12 13 20 5 mg/l

6 Oil & grease mg/l <0.5 <0.5 <0.5 <0.5 <0.5 10 mg/l

7 Petroleum mg/l < 0.1 < 0.1 < 0.1 < 0.1 < 0.1 ---

Hydrocarbon 19

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 20: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited 8 Nitrates mg/l < 0.1 < 0.1 0.95 < 0.1 < 0.1 --

9 Nitrites mg/l 0.019 0.02 0.037 0.023 0.018 ---

10 Lead mg/l <0.005 <0.005 <0.005 <0.005 <0.005 ---

11 Cadmium mg/l <0.002 <0.002 <0.002 <0.002 <0.002 --

12 Mercury mg/l <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 ---

13 Turbidity NTU 48 152 210 145 289 ---

14 Faecal Per 18 32 23 20 14 ----

Coliforms 100ml

8.4 BED SEDIMENT Baseline data on bottom sediments and the associated bottom biota and other physical habitat, at the proposed project area has been collected during the course of marine water sampling and analyzed. The results are presented in the Table 2.

8.5 PHYSICO CHEMICAL CHARACTERISTICS OF SEDIMENT SAMPLES Table 2: PHYSICO CHEMICAL CHARACTERISTICS OF SEDIMENT SAMPLES

Sl Parameters Stn-1 Stn-2 Stn-3 Stn-4 Stn-5 Sediment Quality

no Standards (USEPA) -

WAC 173-204-320 (a).

Source: www.ecy.wa.gov

01 pH of 10% suspension 7.5 7.44 7.51 7.57 6.51 --

Physical

Parameters

02 Texture Loamy Loamy Sandy Loamy Sandy

20

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 21: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

Metal & Heavy

Metal

03 Cadmium(mg/kg) 0.77 0.84 <0.50 0.71 <0.50 5.1 to 6.7 mg/kg

04 Lead(mg/kg) 17.89 27.51 13.18 23.72 8.35 450 to 530 mg/kg

05 Mercury (mg/kg) <0.10 <0.10 <0.10 <0.10 <0.10 0.41 to 0.59 mg/kg

Specific

Parameters

06 Organic Carbon (%) 1.09 0.79 0.10 0.51 0.07 1%

07 Nitrate (mg/kg) <0.50 <0.50 11.56 <0.50 1.26 --

08 Nitrite (mg/kg) 1.66 <0.50 0.67 0.92 0.75 -- Sieve Analysis --

09 Particles more than 0.3 0.0 15.0 16.2 47.9 1680 microns (%)

-

10 Particles between

1680 1.3 0.1 6.9 3.2 17.1 -- – 1003 microns (%)

11 Particles between

1003 0.2 0.0 8.5 2.0 8.7 -- – 710 microns (%)

12 Particles between 710

– 0.8 0.6 25.0 5.9 5.7 - 250 microns (%)

13 Particles between 250

– 10.9 4.5 10.2 7.4 0.8 -- 150 microns (%)

14 Particles between 150

– 7.4 6.2 1.6 1.5 3.2 - 45 microns (%)

15 Particles less than 45 21.8 46.8 4.4 25.4 0.0 - microns (%)

21

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 22: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited The texture of the bed sediments from stations 3 and 5 were found to be sandy and stations 1, 2 and 4 were found to be loamy. Organic matter and Heavy metal content of the sediment did not show any unusual values in comparison to the standards set by USEPA.

8.6 ACQUATIC ECOSYSTEM Acquatic Ecosystem is represented by the Vasai Creek. In order to assess the water quality based

on the phytoplankton, zooplankton and benthos samples were collected from the above

mentioned water bodies within the study area.

8.6.1 Phytoplankton and Zooplankton Analysis Methodology Phytoplankton and zooplankton samples were also collected from the same stations where the

samples for water and bed sediments were collected by towing a plankton net (mouth diameter

0.35m) made of bolting silk (No. 30, mesh size 48μm) for 15 minutes. The samples were

preserved in 5% neutralized formalin and used for qualitative analysis. For the quantitative

analysis of phytoplankton, the settling method described by Sukhonova (1978) was adopted.

8.6.2 Meiobenthic fauna Analysis Methodology Sediment sub-samples were collected by using inserting corers (4.5cm) and samples were

sectioned into thin layers down to 5cm depth. Samples were placed into MgCl2 solution for 15

minutes for tissue relaxation and then fixed with a neutralized formaldehyde solution until a

final concentration of 4% samples were stained with rose Bengal solution (0.5g/l) and were

sieved through 500 and 32 um mesh. All sieved metazoan and hard shells foraminifera were

counted and identified by using microscope.

8.6.3 Macrobenthos Analysis Methodology Sediment samples were collected by employing Peterson’s grab. Samples were sieved and

washed through 0.5mm mesh sieve and retained samples were stained and treated with rose

Bengal solution and preserved in 10% seawater formaldehyde. Stained animals were picked up

from picking process in laboratory and used to study the distribution.

22

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 23: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited Chlorophyll a and Phaeo Pigments Analysis Methodology Chlorophyll a was extracted in an acetone solution. Chlorophyll and phaeo pigments were then

measured fluorometrically using an acidification technique.

8.7 Results Distribution, percentage and species composition of Phytoplankton There were 5 stations selected for the observation of present study. Phytoplankton recorded

from all the stations composed of Bacillariophyceae and Dinophyceae (Table.3). Sixteen

species of phytoplankton were identified in which 13 species belonged to Bacillariophyceae

and 3 species belonged to Dinophyceae. The percentage composition of phytoplankton for 5

stations revealed that the Bacillariophyceae (98.4%) were found to be the dominant group

followed by Dinophyceae (1.6%). The overall population of phytoplankton varies from 18,420

(Station 5) to 23,810 cells/l (Station 1) at different stations of the study area an overall diversity

for the 5 stations and diversity index of every stations of phytoplankton are given in the Table 4 Table 3: Distribution of Phytoplankton

No. Phytoplankton (Cells/100ml) Sampling stations

1 2 3 4 5 1 Biddulphia sp. 3,000 4,200 3,600 2,000 3,000

2 Biddulphiaheteroceros 18,500 17,500 15,000 16,800 14,200

3 Coscinodiscus centralis 600 200 30 300 150

4 Planktonella sp. 50 100 - 50 80

5 Thalassiosira sp. 800 500 400 700 100

23

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 24: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited 6 Chaetocerosdebilis - - 40 - 100

7 Pitylumbrightwelli - 50 - - -

8 Bacillariaparadaxa - - 100 - -

9 Rhizosolenia sp. 80 - 140 100 300

10 Thallassionemaritzshiodes - 200 - 80 -

11 Pleurosigma sp. - 50 - 30 20

12 Skeletsnema sp. 100 - 220 80 -

13 Nitzschiaclosterium 300 100 400 - 150

II Dinophyceae

14 Protscentrummicans 60 100 - 120 40

15 Ceratiumfurca 220 150 300 200 80

16 Noctiluca sp. 100 - 60 80 200

Population Density 23810 23150 20290 20540 18420 Table 4: Diversity Indices of Overall Study area

Diversity Indices Overall Indices in Study area

No. Phyto- Zoo- Meio- Macro-

plankton plankton benthos benthos 1 Species Richness 16 21 4 3

24

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 25: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited 2 Shannon Wiener 2.229 2.928 1.255 1.067

3 Evenness 0.5806 0.8899 0.694 0.647

4 Simpson’s 0.8516 0.9412 0.877 0.969

Table 5: Diversity Indices for different stations of Study area

No. Diversity Indices 1 2 3 4 5

Phytoplankton 1 Species richness 11 11 11 12 12

2 Shannon Wiener 1.812 1.989 1.951 1.906 2.154

3 Evenness 0.5568 0.6646 0.6398 0.5607 0.7183

4 Simpson’s 0.7845 0.8209 0.8307 0.7843 0.8628

Zooplankton

1 Species richness 17 17 13 16 20

2 Shannon Wiener 2.681 2.616 2.345 2.446 2.795

3 Evenness 0.8587 0.8045 0.8025 0.7216 0.8182

4 Simpson’s 0.925 0.9126 0.8851 0.8780 0.9298

8.8 Distribution, percentage and species composition of Zooplankton There were 9 groups of zooplankton recorded in 5 stations of the present study area viz.

Foraminifera, Spirotricha, Rotataria, Calanoida, Cyclopoida, Chaetognatha, Appendicularia,

Larval forms and Eggs. The percentage composition for zooplankton of 5 stations revealed that

25

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 26: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited the Calonoida (29.8%) were found to be dominant group followed by larval forms (22.5%),

Spirotricha (15.9%), Rotataria (10.14%), Cyclopoida (8.86%), Fish eggs (6.01%),

Appendicularia (3.3%), Foraminifera (2.03%) and Chaetognatha (1.43%). The overall

population of zooplankton varies from 1990 (Station 3) to 3470 organisms/100litre (Station 5)

at different stations of the study area, an overall diversity for the 5 stations and diversity index

of every stations of zooplankton are given in the Table 6. The hierarchical representation of Zooplankton is as follows: Calonoida> Larval forms

>Spirotricha>Rotataria>Cyclopoida> Fish eggs Appendicularia> Foraminifera >Chaetognatha

Table 6: Distribution of Zooplankton

Sr. No. Zooplankton

(Organisms/m2) STATIONS

1 2 3 4 5

I Foraminifera 1 Radiolaria sp. 30 80 - 100 60

II Sirotricha

2 Tinlinnopsis sp. 200 400 100 120 300

3 Flavella brevis 100 300 100 200 300

III Rotataria

4 Brachionus - 200 50 700 400

IV Calonoida

5 Calalus sp. 150 - 100 40 200

6 Eucalanus marina 100 80 120 300 400

26

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 27: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited 7 Paracalanus sp. 200 60 100 80 120

8 Acrocalanus giber 300 100 - 80 160

9 Temorastylifera 80 - 200 100 150

10 Condasia sp. 200 - 80 100 120

11 Acartiaspinicauda - 50 - - 200

V Cyclopoida

12 Oithona sp. 300 40 - - 140

13 Microsetella sp. 200 150 300 - 50

VI Chaetognatha

14 Sagitta sp. 50 - 40 - 100

15 Appendicularia

16 Oileopleura sp. 200 100 - 40 100

VIII Larval forms

17 Bivalve veliger 200 100 300 - 100

18 Gastropod veliger - 300 100 200 50

19 Nauplius larvae 100 100 400 100 300

20 Zoea larvae - 300 - 100 -

21 Mysis larvae 50 100 - 80 20

IX Fish eggs 300 100 - 200 200

27

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 28: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited Population density 2760 2560 1990 2540 3470

8.9 Distribution of Meiobenthos and Macrobenthos Sampling Station 1 The first station selected for the study of meiobenthos furnished the data as follows; 79

meiofaunal organisms were recorded in 10cm2. The Foraminifera (53/10cm2) were found to be

the dominant group and followed by Nematodes (16), and Ostracods (10). Whereas the study of

macro benthos in this area furnished the data as follows: 119 number benthic organisms were

recorded in one meter square area. The gastropods was found to be the dominant group (56/m2)

and followed by Polychaetes (42) and Bivalves (21).

Sampling Station 2 In this second station there was 49/10cm2 individual of meiobenthic organisms recorded in this

station. Among these Ostracods (24 /cm2) was found to be most dominant group and followed

by Nematodes (17) and Foraminifera (8). There were 64 individuals/m2 of Macrobenthos

recorded in this station. Among these bivalves was found to be the dominant group (32/m2) and

followed by Gastropods (21) and Polychaetes (15). Sampling Station 3 In this station 16 numbers of meiobenthic organisms were recorded in 10cm2 area. Among them

the Ostracods (12/10cm2) was found to be dominant group and followed by Foraminifera (4).

Whereas 32 numbers of macro benthic organisms were recorded in one meter square area.

Among them, the Bivalves (21/m2) was found to be dominant group and followed by

Gastropods (11). Sampling Station 4 The total macrofunal organisms were recorded in this station were 20/10cm2. Among these

Harpacticoid (12/10cm2) recorded as dominant group followed by Nematodes (8). There were

28

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 29: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited 74 individuals/m2 of Macro benthos recorded in this station. Among these bivalves was found to

be the dominant group (42/m2) and followed by Gastropods (21) and Polychaetes (11). Sampling Station 5 In this station totally 7 individuals of meiofaunal organisms were recorded in ten centimeter

square area. Among these Ostracods (4/10cm2) were found to be dominant group followed by

foraminiferans (3). In this station 11 individuals of bivalves were recorded as macrobenthos per

meter square. An overall result from the analysis summarizes the spatial variation of benthic population in the

study area. The meiofauna mainly composed of Foraminifera (39.8%), Ostracods (29.2%),

Nematodes (24%), and Harpacticoids (7%). The hierarchical representation of Meio fauna in the surveyed area from the analysis found is as

follows: Foraminifera >Ostracods> Nematodes >Harpacticoids The hierarchical representation of Macro-fauna from the surveyed area from the analysis is as

follows: Bivalves > Gastropods >Polychaetes Table 7: Distribution of Meiobenthos

No. Meiobenthos STATIONS Composition

% 1 2 3 4 5 1 Foraminiferans 53 8 4 - 3 39.80%

2 Nematodes 16 17 - 8 - 24%

3 Harpacticoids - - - 12 - 7%

4 Ostracods 10 24 12 - 4 29.20%

Total 79 49 16 20 7

No. Macrobenthos

STATIONS Composition % 1 2 3 4 5

29

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 30: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

1 Polychaetes 42 15 - 11 - 21.30%

Bivalves 21 32 21 42 11 42.30%

3 Gastropods 56 21 11 21 - 36.40%

Total 119 64 32 74 11

Chlorophyll a and Phaeophytin Chlorophyll a (Table 8 shows higher concentration at station 1 (2.6 mg/m3) and the higher concentration of phaeophytin was recorded in station 3 (2.1 mg/m3). Phaeophytin values are lower than chlorophyll a at all stations suggesting a delicate balance between the growth and mortality of algae. Table 8: Distribution of Chlorophyll a and Phaeophytin

No. Sampling Stations

Pigments(mg/m3) 1 2 3 4 5 1 Chlorophyll a 2.6 2.1 2.3 2.4 1.9

2 Phaeophytin 2.0 1.6 2.1 1.8 1.4

8.10 Fisheries Marine/Coastal fishery plays an important role in the socio-economic condition of the local

fisher folks due to the contribution towards the three vital aspects viz. Nutrition, Employment

and Earning. Maharashtra State is one of the major maritime states in India. It has 720 Km long coastal line

spread all over the five marine districts viz. Thane, Mumbai and Suburban, Raigad, Ratnagiri

and Sindhudurg. The continental shelf area up to 55,529 sq.kms (50% of the total continental

shelf) is being exploited. There are 25 Zone in the 5 districts and 162 landing centre.

30

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 31: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited The fish potential of state is estimated at 6.3 lakhs Tonnes. About 40 fish species are found in

the sea-water of the Maharashtra State. During the Financial Year 2009 -10, the Marine Fish

Production in the state was estimated 4.16 lakhs Tonnes. Thus, the percentage of the actual

production to the state potential is 66 %. There are five coastal districts of Maharashtra namely Thane, Greater Mumbai, Raigad,

Ratnagiri and Sindhudurg. Vasai coast falls within the jurisdiction of Thane district. There are

total 6 zones which have been created by the District Fisheries department in Thane district. The

zones include Dahanu, PophranDandi, Satpati, Kelwa, Vasai (Bassein) and Uttan Thane district

stands second to Greater Mumbai, in terms of total annual Fish yield. The lowest is Sindhudurg

district. The third and fourth positions are held by Ratnagiri and Raigad districts respectively. Table 9: Variety wise Marine Fish species of Zone- Vasai

Sl No Variety Sl No Variety Sl No Variety

1 Elasmobranch 13 Polynomids 25 Cragnids small

2 Eels 14 Sciaenids 26 Leognathus

3 Cat fishes 15 Otolithessp 27 Upeniades sp.

4 Chirocentrus 16 Ribbon Fish 28 Penaeids Prawn

5 Sardines 17 Caranx 29 Non Penaeids

Prawn 6 Hilsa 18 Pomfrets 30 Lobsters

7 Anchoviella 19 Black Pomfret 31 Lactarius

8 Thrissocles 20 Mackarel 32 Cephalopoda

9 Other Clupied 21 Seer Fish 33 Miscellaneous

10 Harpodon 22 Tunnies

31

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 32: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

Neherus 11 Perches 23 Bregamceros

macellendi 12 Red snapper 24 Soles

Landing centre wise fish catch data was not available and hence the zone wise data on types of

species of fishes is given in the table below. From the statistics of 20012-2013 Bombay duck

(Harpodonneherus) was considered to be a very common catch and also the highest yield from

the Vasai zone. The species has been maintaining the same trend as a highest catch since the

financial year 2005-2006. Pomfrets tables the second position followed by Non-penaeid

prawns. The other major catch includes Thrissocles, Seer Fish and Anchoviella. Bombay duck is native to the waters of Mumbai Coast and also found in Kutch in the Arabian

Sea. In comparison to other pelagic sea fishes, Bombay duck is considered to be a lower

category fish species. The fish is often dried and salted before it is consumed. After drying, the

odour of the fish is extremely powerful, and it is usually transported in air-tight containers. The second highest catch is non-penaeid prawn which has also very less economic value. Non-

penaeid prawns constitute one of the important fishery resources contributing to 5.8% of total

marine fish production. The resource is characteristic of the North West coast, which accounts

for almost 90% of the total is non-penaeid prawn production in the country. In Maharashtra and

Gujarat, the non-penaeids account for 10.8% and 12.6% of the total marine fish landings in these

states. The non-penaeid prawn resource is multi-species, mainly supported by tiny species of the genus

Acetes. There are five species of Acetes namely Acetesindicus, A. Johni, A. Sibogae, A.

Erythraeus and A. Japonicus. Among these the first two support the commercially important

fisheries from marine waters while the rest are exploited on a low key from estuarine and near

shore coastal seas. During the primary survey, the local fishermen were noticed to catch the non-

32

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 33: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited penaeid shrimps by the traditionally bag nets which is locally known as dol nets. They prefer

tony boats for the catch. On account of the increasingly prohibitive coast of the penaeid shrimps,

the non-penaeids have assumed greater importance in the diet of fish eating population of

Maharashtra. Due to the small size and delicate nature the non-penaeids get rapidly decomposed,

therefore they are sundried and generally consumed by the poor people

8.11 Flora and fauna in the Proposed Project area Mangroves represent taxonomically diverse, salt tolerant, woody vegetation of seed bearing

plants found in the intertidal regions of the tropical and subtropical coasts. A creek is defined as

an inlet of land where the seawater comes up regularly during the high tides and submerges vast

areas known as intertidal regions. Because of their unique physio- graphy, creeks act as

shelterbelts and provide prudent habitats for mangroves. Vasai creek is a tidal dominated creek and subjected to semi-diurnal tides with large amplitude

of more than 4 m. The tides are important as they periodically flush the creek and responsible for

dispersion of nutrients and other matter. Mangroves were recorded along both the banks as well

as in the downstream of the Vasai creek. The mangroves in the area were found to be stunted

and represented by mostly Avicennia marina and A. alba. The other mangroves species which

were recorded were Avicenniaofficinalis, Aegicerascorniculatum, Ceriopstagal and

Bruguieracylindrica. Acanthus ilicifolius was also found in between the Avicennia species.

Acanthus ilicifolius is not true mangrove species rather an associate of the mangrove vegetation.

The other associate but prominent mangrove species was identified as Excoecariaagallocha,

Salvadorapersica. Thespesiapopulnea was the most prominent landward associate species of

mangrove vegetation and was observed mostly along the north bank of the Vasai creek.

8.11.1 Fauna profile No direct sighting of wild animal occurred during the primary survey. Dialogue with local

people could also not confirm presence of any wild animal around the study area. Being on the coastal area a number of avifauna was recorded in and around the proposed project

area. Species such as Cattle egret, Little egret, Cormorant, Common King Fisher, Pied King

33

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 34: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited Fisher, Common wagtail, Red Wattled lapwing, Common babbler, Green bee eater, Indian

Roller, Common Myna, Brahminy Kite, Common crow, Black drongo, and Common Stilt. Reptilian species such as garden lizard, skinks were the common reptilian species which were

sighted during the field survey. No other reptilian species were directly sighted during the

survey.

8.12 Mangrove Vegetation There are no mangroves in the proposed route of the pipeline.

34

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 35: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

9 ENVIRONMENT MANAGEMENT PLAN

9.1 Construction Phase:

The Operations phase of the project will be dormant phase and besides the DMP prepared by MGL, no active environmental management is required.

For construction phase, Environmental Management is required

Solid waste such as empty bags, packing material, insulating plastic, metal pieces etc. will be properly segregated and sent to authorized recycler/ brick work and tiles, excavated material will be used as filling material at site.

Hazardous Materials General Use Further Information

Fuels (Diesel and Unleaded

Used to power site-based vehicles and

backup

Emergency Response Manual,

MSDS Register

Oils and lubricants Vehicle & plant maintenance &repairs

Emergency Response Manual,

MSDS Register

Bentonite Chips Directional boring of conduits MSDS Register

Drilling fluids compound

Geotechnical and environmental bore

construction MSDS Register

35

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 36: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

Activity posing hazard Risk/ Potential Impact Inherent Control

Measure Hazardous material

Storage,disposal including Use of fuels, gases and

concrete.

Pollution Of soils,receiving waters or potential harm / injury to personnel,

flora and fauna via discharge of hazardous substance

Moderate

#1-4, 7

Spill resulting from equipment or plant failure(i.e. accidental rupture of tank, etc)

Pollution of soils, receiving waters or potential harm / injury to personnel, flora and fauna via discharge of hazardous substance

High #12

Bund design is insufficient for the maximum volume of material stored

Pollution Of soils, receiving waters or potential harm / injury tpersonnel, flora and fauna via discharge of hazardous substance

High #12,

The following risks were not deemed as significant in the environmental risk assessment, but are

Included below for completeness:

~ Frac-out (escape of drilling mud into the environment as a result of a spill, tunnel collapse or the rupture of mud to the surface) during horizontal directional drilling of power supply cable beneath waterways and crossings resulting in pollution of receiving waters (dealt with in the Waterways and Wetlands Sub plan under section 9.3) ~ Spill of concrete or concrete residue waters during decommissioning of groundwater bores, piling for the booster pump station or cleaning of cement mixers and tools used in grouting of the internal joints of the transfer pipeline resulting in pollution of receiving waters or soils The Bentonite used as a drilling mud would fill up the fissures and crack of strata and works as a cementing agent. This would also prevent ingress of water inside the borehole. The Bentonite by virtue of Thixotropic characteristics forms a gel (semi-solid), when in stationary stage and this helps the Borewell to maintain its stability even when drilling is completed and Reaming operation is in progress.

36

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 37: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited SAFETY MEASURES TAKEN DURING DRILLING AND REAMING OPERATION TO ENSURE

SOIL STABILITY

1) The hole will be filled with Pressurized mud (Bentonite slurry) and will be maintained such

throughout the pull back operation. This would not only provide the borehole stability but

also provide lubricating effect on pipe during pull back operation.

2) The theoretical overburden pressure on top of pipe has been evaluated. This overburden has

considered the depth of water in water body (at deepest point) and height of soil/rock strata

in between bed level and pipe level. After comparing the minimum collapse pressure and

maximum overburden pressure (with factor of safety), it is observed that overburden

pressure on top of pipe is within allowable limit.

3) The design of HDD has also considered the critical safety factors (e.g. longitudinal stresses

developed in pipe due to tension and bending, Design pull force required on empty pipe to

counter buoyancy, curvature, variations in alignments, drag force etc.). This would prevent

sudden jolts / torsion on pipeline section and prevent caving of borehole.

1) SIGNIFICANCE OF BENTONITE/ DRILLING MUD IN HDD OPERATIONS

Bentonite is naturally occurring colloidal clay (aluminum silicate) composed essentially of

Montmorillonite, quartz and mica. Bentonite is commonly used as drilling mud, in oil wells

and horizontal direction Drilling jobs. When exposed to water, it swells considerably expand

to ten times its volume when completely hydrated, making it ideal for protecting subterranean

formations by providing a thixotrophic effect.

Drilling mud is a suspension of bentonite in fresh water.

Drilling Mud serves following main purposes in drilling operations

(i) Protects the wall of the drill hole by preventing caving-in

(ii) Acts as a lubricant and coolant for the cutting bits

(iii)Carries away spoils and cut rock fragments

(iv) Imparts rotary motion to the drill bit(cutter) by using hydraulic energy

(v) Provides lubrication to carrier pipe during pull back operation

37

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 38: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited 2) PRECAUTIONS TAKEN IN CASE OF EVENTUALITY OF WATER ENTERING INTO

CARRIER PIPE BORE

There are 3 possibilities of entering water inside the borehole,

• Rain / Storm water entry

• Rise of water level due to Tidal waves

• Ingress / seepage of ground water

a) Rain / Storm Water: As per the design requirement, the selection of Entry and Exit points

shall be made taking into account the HFL (Highest Flood Level). However, considering

uncertainty of rainfall in Mumbai region, MGL as a precautionary measure has proposed to

carryout the HDD activity only during non-monsoon period (from October. to May).

b) Tidal Water: The entry and exit points shall be located well above the maximum tide level.

Additionally, as a precautionary measures the entry and exit pits shall be provided with

earthen bunds to prevent sudden ingress of surface water

c) The most significant design aspect considered to prevent the entry of water is that the

borehole is filled up with pressurized mud (high density Bentonite slurry) all the times

during drilling, reaming and pull-back operation. Therefore, due to variation in density of

media, the chance of surface water entering inside the borehole is ruled out.

d) As explained at point no. 1.A (4), the pressurized Bentonite slurry present inside the borehole

acts as cementing agent and fill-up the fissures /cracks in permeable soil/rock formation.

This in turn would prevent the ingress / seepage of ground water inside the borehole.

Control, management and mitigation measures Table 10 describes a range of mitigation and control measures that will be used to minimize and manage potential hazardous material impacts. The measures in table 10 are designed to address potential impacts from the risks outlined earlier as well as deliver on the objectives, targets and in particular the PRs listed. They include requirements and responsibilities for design, construction, evaluating performance and reporting. The Occupational Health and Safety Regulations and Approved Code of Practice for the Control of Workplace Hazardous Substances specify the requirements for the identification and management of hazardous substances. Substances used during construction that may be classed as hazardous will

38

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 39: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited include all chemicals brought onto site and may come in the form of solids, liquids, gases, fumes and fibres. They include products such as strong acids and alkalis, solvents and reactive chemical agents. All environmental incidents will be responded to in accordance with the Utilities Environmental Incident Response Procedure (EIRP). The EIRP provides project specific details for the identification of and response to potential environmental related incidents along the utilities corridor work sites. It provides guidance on strategies to manage Potential and actual incidents, as well as follow-up and reporting requirements. The environmental risk assessment has identified the following circumstances that could occur outside normal operating conditions: ~ Unforeseen water and soil contamination due to a spill resulting from equipment (i.e. rupture of tank, etc) ~ Accidental spill ~ Unexpected ignition of flammable and combustible liquids during normal construction operations ~ Contamination of air, land and water, and human and ecological health, due to the incorrect

separation and segregation of hazardous and dangerous substances

~ Traffic incident involving the transportation of bulk hazardous materials and dangerous

substances. If these circumstances occur, the contingency measures outlined in Figure 1 will be

implemented

~ DISPOSAL CONSIDERATIONS:

~ Bentonite and waste from residue can be disposed as non-toxic, non-hazardous and inactive materials in approved landfill sites in accordance with local regulations.

~ Contaminated packaging can be disposed in approved landfill sites in accordance with local regulations.

~ TRANSPORT INFORMATION:

~ Bentonite is not classified as dangerous for transportation. Bentonite may be transported in accordance with the standard local authority regulations.

39

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 40: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

~ HANDLING AND STORAGE:

~ Handling: Bentonite is safe to handle. Material is very slippery when wet. Use appropriate controls and ventilation to avoid creating accumulation dust. Avoid inhalation and repeated contacts with eyes or skin.

~ Storage: Store in a dry covered area.

~ ACCIDENTAL RELEASE MEASURES:

~ Collect spillage by vacuum cleaning or other means whereby dust creation is minimised. If dust levels should exceed the occupational exposure standard, then personal protective equipment is required.

~ Personal precautions: Wear dust mask, safety gloves and goggles.

~ Environmental precautions: Do not allow the entering into drains, rivers, or lakes.

~ Method of cleaning: Use a vacuum or any other means minimising dust creation (flushing with water must be avoided by all means).

40

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 41: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited Table 10: HAZARDOUS MATERIALS – CONTROL MEASURES TABLE

No Issue Control Measure Responsibility

Evidence

1 Avoidance of

Limit the on-site storage and/or use of hazardous Construction Procurement

Hazardous

substances and dangerous Goods Manager records, Site

inspection records

Materials

2 Chemical Ensure MSDS are readily available for all hazardous Site

Manager, MSDS

Register,

Awareness and

substances used or stored at the site. Safety Manager

Workpacks

Procedures

3 Chemical All work involving the use of chemical substances shall be

Safety Officers MGL Records

Awareness and

subject to the Job

Procedures

Safety and Environment Analysis (MGL) process.

4 Training All employees and sub-contractors will receive induction

Project Manager, General Area

training which will All employees

Induction

include the safe use of hazardous substances being used

Content,

at the workplace.

The training provided shall be commensurate with the

Induction

associated risks and will include (but not be limited to)

records

the following (as outlined in the Approved

Code of Practice for Workplace Hazardous Substances):

- The labeling of containers of hazardous substances, the

41

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 42: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

information that each part of the label provides and why

the information is being provided

- The availability of MSDS for hazardous substances, how

to access

the MSDS and the information that each part of the

MSDS provides

- Information about hazardous substances to which

employees are or may be exposed in the course of their

work (information should include the nature of the

hazards and risks to the environment)

- The assessment process and how the employee can

Contribute

- The work practices and procedures to be followed in the

use, handling, processing, storage, transportation,

cleaning up and disposal of hazardous substances

- The procedures to be followed in case of an emergency

involving hazardous substances, including any special

decontamination procedures to be followed.

- Requirement to limit the on-site and on-vessel storage

and/or use of hazardous substances and dangerous

goods. Enforcement that only the substances or goods required to do the task are to be brought on to site.

Material Identify and record the type, volume and concentration

Safety Manager

Current HAZMAT

identification

of chemicals that are used and stored Materials records

5

6 Storage Each chemical substance will be stored and disposed of in Workplace Waste disposal

accordance with the requirements specified by the MSDS Managers Records

42

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 43: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

Storage Bulk storage chemicals will not occur within 30-50m of a Site

Manager SEPs and Site

7 waterway and will not occur within a floodplain or land subject to inundation

Design Inspecti

on

records

Storage Appropriate segregation and separation of dangerous

Safety Officers Site

inspection

goods during storage records

will be established as required by the regulations

8 Storage Dangerous goods storage areas will be isolated from all

Safety Officers

Site plans and site

sources of ignition and appropriate fire extinguisher

inspection records

coverage provided

9 Storage Dangerous goods storage areas will be posted with the

Safety Officers Site inspection

relevant HAZCHEM signage and emergency response

Records

information at the entry to site

Storage Bulk fuel storage areas (drums or bulk storage tanks) will

Safety Officers Site

10 be bunded in accordance with available Bunding

Environmental

Guidelines

Plans

11 Storage The ground around the storage area will be kept clear of

Safety Officers MGL and Site

combustible vegetation or refuses for a distance of not Environmental

Plans

less than 3 m.

Labeling All original containers are to be labeled to accurately

Safety Officers MGL and Site

12 and

identify the hazardous contents (product name and

Environmental

chemical name) and include appropriate risk 43

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 44: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

and safety

Signposting

phrases,

first aid

and emergency procedures and the

Plans

manufacturers or importers details

Incident Emergency response training will be provided through Construction

Induction

13 Management

incident simulations and general inductions. Incident

Managers/ records

management (including spill control and clean-up

measures) will be undertaken in accordance with the

Health

relevant

MSDS(s)

and the Project Environmental

and Safety

Emergency Plan

Manager

Routine Undertake routine maintenance of construction Site Manager

Equipment

maintenance

equipment for prevention of fuel leaks, visible exhaust

maintenance

14 emissions or other maintenance issues.

Maintenance will be in designated and controlled areas only. records

15 Spill risk Install bunds where appropriate to reduce the risk of Environment SEP

reduction

spills entering the storm water drainage system.

Manager

Spill clean Clean up all spills immediately. Contain and absorb spill Site Manager Daily logs

16

up

with sand, earth, inert material or vermiculite. Wipe up.

Place in a suitable, labeled container for waste disposal.

procedures Clean area and DO NOT discharge into sewer or

waterways.

Return to supplier for reuse/ recycling if 44

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 45: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

possible

45

Prepared by Enviro Analysts & Engineers Pvt. Ltd.

Page 46: EIA For Natural Gas Transmission Pipeline Crossing …...EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

EIA For Natural Gas Transmission Pipeline Crossing Ulhas river adjacent to Kasheli North Bridge, Thane, By Mahanagar Gas Limited

10 Environmental Monitoring An environmental monitor will be required on site during the HDD construction. Notes regarding environmental monitoring need to be provided on the plans. Please note that the environmental monitor should be experienced with an understanding of the ecological objectives and sensitivities of the site, and in identifying/anticipating potential ecological concerns/risks in a proactive manner in an attempt to avoid impacts before they occur. It is our preference that environmental monitors be qualified, in that they have a college or university degree in environmental science or equivalent, and have experience in managing and mitigating environmental issues on construction sites.

The environmental monitoring and contingency plan should clearly outline the steps that the contractor is to take in the event of a sediment release or other type of spill. The plan should clearly outline the steps involved to mitigate an inadvertent return or frac out after it occurs, and should not rely solely on the contractor to take all necessary steps to minimize the impacts. Ultimately, the responsibility lies with the proponent.

As contingency plan, may include the provision of a vacuum truck, or alternative means of containing or cleaning up a sediment release, at the time of construction in sensitive areas. If vacuum trucks are to be utilized, they should be on-site during construction, and be ready to contain any spill, as it occurs, before it enters a surface water feature. If a sediment spill occurs within the watercourse, adequate isolation of the release should be provided to contain the sediment, and the vacuum truck be ready to remove the drilling fluid and any other frac out soil.

Additional measures may include having a supply of products that can be used to stop a frac-out, such as ‘Poly Swell’, or equivalent. All products used on site are to be environmentally safe. Frac mitigation wells may also be considered to relieve drilling pressures.

The Contingency Plan should indicate if, and when, HDD activities are to resume. For example, when mitigation measures have been implemented are deemed to be effective at mitigating potential ecological impacts.

46

Prepared by Enviro Analysts & Engineers Pvt. Ltd.